Brochure Green Future per web1
Transcription
Brochure Green Future per web1
About The Green Future Srl was born from the experience gained from years in the field of environmental sustainability and of the studies on the impacts generated by human acvies. The growing awareness of environmental and sustainable development policies, pursued by the industrialized countries, require soluons that combine the needs of funconality with those of the natural environment in which they are inserted. We offer our experience in favor of territorial projects with specific acons and environmentally friendly, inpu#ng technical soluons with low environmental impact. Our Mission We operate since 2003 in the field of environmental consulting through conducting activities in the public interest, in the fields of nature conservation, biodiversity, ecology and sustainable development. Since 2011, we have implemented our services while also offering the sale of technologies for environment. The a)enon to environmental needs, through sustainable intervenons, makes us aware of the importance of our work. Our MISSION reflects this important role and is at the center of a process whose main objecves are the good of the community and the environment. We have worked with leading companies and public administraons, ge#ng results with extensive customer sasfacon. Our core values are: • • • • • Maximum a)enon for the customer Muldisciplinary approach Reliable performance and high quality content Timing rapid and guaranteed Quality of products Renewables Energies Green building Environmental Studies Parks and Gardens Environmental restoraon Cerficaon of Management Systems Applied Ecology Research and Development Environmental Communicaon Acvies Renewables Energies − − − − − − − − − Search suitable sites and feasibility studies Design, Construcon Supervision and Safety Projects development and managment administrave Service advisor Technical and environmental due diligence Plans industrial chain Control of plant efficiency Construcon of plants Turnkey Management, Monitoring and Maintenance of plants Foeniculum (40x50) - Green building − − − − − − − − − Homes and ecological structures Materials and bio-ecological products Systems with high energy efficiency Systems for water reuse and natural purificaon Insulaon systems Roofs and green walls Energy cerficaon of buildings Energy Consulng Analysis with infrared camera Ganzirri (60x80) - Cerficaon of Management Systems − ISO 9001, ISO 14001 − OHSAS 18001 − HCCP Environmental Studies − Checks subjecon to Environmental Impact Assessments − Environmental implicaons assessment − Environmental Impact Assessments − Landscape relaons − Integrated Environmental Authorisaons − Botanical and Studies and Consultaonsns − Agronomic Studies and Consultaons − Studies and Consultaons on marine bioc communies − Acousc Impact Assessments Il Gruccione (40x50) Environmental restoraon − Reforestaon with nave species − Renaturaon with bioengineering techniques − Reconstuon of coastal marine − Constructed wetlands and lagoons − Environmental restoraon of quarries and landfills − Environmental restoraon a?er construcon Eryngium (60x60) Parks and Gardens − Design and construcon − Maintenance of green Technical Services Topographic services Cadastre services Changes of the crop in soils Surveys, inspecons, current and historical maps and a)ribuon of cadastral income − Appraisals environmental and agronomic − − − − Il bruco (30x40) Applied Ecology − − − − − − − Polluon level expressed by Macrodescriptors (LIM) Extended Bioc Index (EBI) Ecological Status of Rivers (SECA) State Environmental of Rivers (SACA) Ecological Status of Lakes (SEL) Analysis of microenvironmental Characterizaons environmental Environmental Communicaon Il Salmpalo (30x40) − − − − Communicaon Plans Organizing and managing events Creaon of informaonal and educaonal material 3D rendering and photo simulaons Research and Development − − − − Il faro - Capo Granitola (40x50) Mare morto (50x35) Scienfic research Technological research Development of new products Methodological development Team and Partners Giuseppe Filiberto General Director mail: g.filiberto@greenfuture.it Tel.: +39 3398381172 Italia Alessio Furlo Technical Director mail: a.furloƫ@greenfuture.it Tel.: +39 3284192378 Italia Claudio Palillo Consultant Internaonal Business mail: c.palillo@greenfuture.it Tel.: +49 1715859338 Germania Valeria Palummeri Consultant Nature and Agriculture mail: v.palummeri@greenfuture.it Tel.: +39 3662599227 Italia Marco Pecorella Consultant Sales Manager mail: marcopecorella@greenfuture.it Tel.: +39 3280314972 Italia We treat well the earth on which we live: it not been given to us by our fathers, but there has been paid by our children. (Proverb Masai) References Renewables Energies Project development Solar Parks - Malta Project development Solar Parks in Malta: • Project “Nardu” 2,97 MWp • Project “Gozo 1” 2,90 MWp • Project “Kosis” 2,10 MWp Project financing Year: Ongoing Project development Small Wind Parks 1 MWp capillary - Sicily Project development of Small Wind Parks 1 MWp capillary in Sicily, consis)ng of 20 wind turbines of 50 kW. Project financing Year: Ongoing Realizaon Photovoltaic System 100 kWp - Menfi (AG), Sicily Construcon of Photovoltaic system on the ground of 100 kWp to the service of the municipal sewage treatment plant in Menfi (AG). Client: Private Year: 2013 Administrave management of Photovoltaic System 200 kWp - Palermo, Sicily Administrave management of Photovoltaic System 200 kWp installed on the roof of an industrial building - Palermo. • Network connecon manager • Authorizaon for the construcon • Code for Electricity Company • Convenon for Retreat Dedicated GSE • Convenon for feed-in tariff GSE Client: Private Year: 2013 Maintenance Solar Park 5 MWp - Villalba (CL), Sicily Ordinary maintenance Solar Park 5 MW Villaba: • Maintenance of green • Clean panels • Analysis with infrared camera • General monitoring Client: Private Year: since 2012 Support for the construcon Solar Park 5 MWp - Villalba (CL), Sicily Support for the construc'on Solar Park 5 MWp Villaba: • Selec'ng contractors • Site prepara'on • Managing Permissions • Stacking Client: Private Year: 2010-2012 Project development Solar Parks 1 MWp grid parity - Sicily Project development Solar Parks 1 MWp (tot. 20 MW) in Sicily for the grid parity: • Search suitable sites and feasibility studies • Preliminary and final project • Permission to connect to the Local Area Networ • Execuve project of the plant and cable duct • Permissions for the execuon of the works • Support for the sale of the project Client: Private Year: 2011-2013 Construcon of renewable energy plants Construcon of renewable energy plants, residenal and industrial, grid connected/stand alone: • Supply and installaon of photovoltaic systems, wind and solar thermal systems. • Supply and installaon of devices for energy saving • Operaons and Maintenance (O&M) Clients: Privates Year: since 2011 Environmental Studies Screening for the Environmental Implicaons Assessment Center for Biotechnology and Biomedical Research - Carini (PA) Screening for the Environmental Implicaons Assessment in accordance with Arcle 4 of the Decree of the regional department of the territory and environment of 30/03/07, for Project of the Center for Biotechnology and Biomedical Research - Carini Proposer: FONDAZIONE Ri.MED Year: 2012 Environmental Studies for renewable energy plants - Italy Environmental Impact Assessments, Landscape relaons and Environmental Implicaons Assessment for: • 148 MW Solar Parks • 12 MW Thermodynamic Solar Park • 22 MW Wind Farm • 55 MW Biomass plant Clients: Privates Year: since 2006 Environmental Studies for Marime Works - Sicily Environmental Impact Assessment (including Monitoring Plan and Waste Analysis) and Environmental Implicaons Assessment for “Final project of reconstrucon of the beach between the mouth of the river Achates-Dirillo and Punta Zafaglione in the territory of the municipalies of Victoria and Achates”. Proposer: Provincia Regionale di Ragusa Year: 2011 Environmental Implicaons Assessment for “Final project of reconstrucon of the beach between the p and Zafaglione and Scogli0, in the Municipality of Victoria (RG). Proposer: Provincia Regionale di Ragusa Year: 2009 Ex Centro R.I.N.G. Environmental Implicaons Assessment for tender for “execuve planning and execuon of upgrade works of a secon of the quay of the commercial port of Augusta for the docking of mega-container ships and tooling with gantry crane”. Contract authority: Autorità Portuale Augusta (SR) Year: 2011 Methodological report for the study of phyto-zoobenthic communies for tender for “execuve planning and execuon of the work of marime compleon of the exisng works relang to the extension of the breakwater, of the construcon of the pier and of the wharf”. Contract authority: Comune di Sant’Agata di Militello (ME) Year: 2010 Environmental Studies for producve acvies - Italy Environmental Impact Assessment and Autorizzazione Integrated Environmental Authorisaons for a breeding of 100,000 laying hens and on egg producon in the municipality of Misilmeri (PA). Client: Private Year: 2010 Checks subjecon to Environmental Impact Assessments for a "Storage facility for hazardous waste and non-hazardous" in the town of Nicolosi (CT). Client: Private Year: 2009 Consulng and support to the opinion and assessment for “procedure of environmental impact assessment for the project of the mining district – Cava San Giuseppe, in the municipality of Arluno (MI). Proposer: INERTI ECOTER SGA – Milano (Procedura R.743)” on behalf of the Regional Nature Reserve “BOSCO WWF DI VANZAGO” WWF Italia. Client: Centro RING Ricerche e Proge# Year: 2009 Scienfic advice on environmental degradaon and on the plan of invesgaons under the project of "Securing the MSW landfill of Contrada Maimone - City of Castellana Sicula (PA)" Client: LAAP Year: 2009 Environmental Implicaons Assessment and Environmental Impact Assessments for tender for “execuve planning and execuon of the work of di integrated intervenon for the cricalies of the towns of Lipari and Vulcano. Lipari Island: desalinaon plant, photovoltaic system and priority acons on water distribuon”. Contract authority: Commissario Delegato Year: 2009 Landscape Impact Study SS 121 PA-AG - Sicily Landscape relaon and study of visibility of the works for the final project of the "Modernizaon works of the tract Palermo - Lerch Friddi, funconal lot from km 14.4 (km 0.0 of Lot 2) including the connecng poron of the roundabout BologneEa at km 48.0 (km 33.6 Lot 2 - interchange Manganaro included) including connecons with the current SS 189 and SS 121” Proposer: ANAS Spa Year: 2010 Environmental Studies for se6lements tourist-hotel - Sicily Environmental Implicaons Assessment and Strategic Environmental Assessment for “Development plan in Z.T.O. "AL" (seElements tourist-hotel) for the construcon of houses for holidays in the Municipality of Terrasini (PA)”, falling within the Natura 2000 site ITA 020009 (Cala Rossa and Capo Rama). Client: Private Year: 2008 Environmental Implicaons Assessment for the creaon of a "Tourist center for water sports" in Municipality of Campobello di Mazara (TP), falling within the Natura 2000 site ITA 010011 “SISTEMA DUNALE CAPO GRANITOLA, PORTO PALO E FOCE DEL BELICE", included in the program PRUSST “Sicilia: Terre d’Occidente”. Client: Private Year: 2008 Environmental Studies for projects planning - Sicily Ecological analysis, design of green and Impact Assessment as part of the final project "Works for the construcon of a mulcultural center-playful-recreaon in Passo l'Abate: Parco Maimone" in the Municipality of Castellana Sicula (PA). Client: LAAP Year: 2008 Environmental Implicaons Assessment (Natura 2000 Site ITA 030008 “CAPO PELORO, LAGHI DI GANZIRRI; ZPS ITA 030042 “MONTI PELORITANI, DORSALE CURCURACI, ANTENNAMARE E AREA MARINA DELLO STRETTO DI MESSINA”) as part of the final project “Detailed Plan Execuve of Capo Peloro” – Messina Proposer: Comune di Messina Year: 2008 Environmental Studies for residenal se6lements - Italy Environmental Implicaons Assessment in Natura 2000 Site ITA090020 as part of the final project for the construcon of a building to be used in civil dwelling in the territory of Sorno (SR) Client: Private Year: 2010 Environmental Implicaons Assessment for the project “Residence and warehouse in the service of a farm located in the Municipality of Carini” Client: Private Year: 2010 Environmental Implicaons Assessment for the project “CONSTRUCTION OF HOUSES CATEGORY C2/16 Via Tiziano, Locality MANTEGAZZA – VANZAGO (MI)” in relaon to Natura 2000 Site IT2050006 “BOSCO DI VANZAGO” Client: Centro RING Ricerche e Proge# Year: 2009 Environmental Implicaons Assessment in Natura 2000 Site ITA090020 as part of the final project for the construcon of a building to be used in civil dwelling in the territory of Sorno (SR) Client: Private Year: 2009 Environmental Studies for the safeguard of the Natura 2000 Sites - Italy Environmental Implicaons Assessment for the project “Extraordinary maintenance for the renaturaon of the wetlands of the oasis and wildlife management intervenons for birds” in Natura 2000 Site IT2050006 “BOSCO DI VANZAGO” Proposer: WWF Italia Anno: 2009 Ex Centro R.I.N.G. Research project entled "The protecon of the environmental system" implemented through the City of Palermo - Sector Environment and Territory - Service Environment and Ecology. Processing of maps relang to the following themes: natural cavies; Regional reserves; City parks; Tradional fishing villages in the town of Palermo, analysis and graphical depicon of priority habitats and relave presence of animal and plant species of Community interest, within Natura 2000 Sites: ITA020006 Capo Gallo, ITA020012 Valle del Fiume Oreto, ITA020014 Monte Pellegrino, ITA020023 Raffo Rosso, M. Cuccio e Vallone Sagana, ITA020044 M. Grifone, ITA020047 Fondali Isola delle Femmine-Capo Gallo. Creang a map of the territory of the marine coast of Palermo. Proposer: Comune di Palermo Year: 2008 Ex Centro R.I.N.G. Management Plans of Natura 2000 Sites - Sicily Physical descripon of the site (geography, geology, climate, etc.), biological descripon of the site (flora, vegetaon, fauna, habitats, ecosystems, etc.); agro-forestry descripon of the site (land use, etc.), idenficaon of the cricality environmental and inventory of contaminated sites for the dra?ing of the Management Plan of the Natura 2000 Sites ITA 010005 “Laghe0 di Preola e Gorghi Tondi e Sciare di Mazara”; ITA 010014 “Sciare di Marsala”; ITA 010012 “Marausa: Macchia a Quercus Calliprinos” and ITA 010031 “Laghe0 di Preola e Gorghi Tondi e Sciare di Mazara e Pantano Leone”. Proposer: WWF Italia Anno: 2008 Environmental restoraon, Design, implementaon and maintenance of parks and gardens Environmental restoraon for the construcon site areas SS 121 PA-AG - Sicily Execuve project of the restoraon environmental works of the site areas for “Modernizaon works of the tract Palermo - Lerch Friddi, funconal lot from km 14.4 (km 0.0 of Lot 2) including the connecng poron of the roundabout BologneEa at km 48.0 (km 33.6 Lot 2 - interchange Manganaro included) including connecons with the current SS 189 and SS 121”. Proposer: ANAS Spa Year: 2012 Design of the green and of the wildlife crossings SS 121 PA-AG - Siciliy Design of the green and of the wildlife crossings for “Modernizaon works of the tract Palermo - Lerch Friddi, funconal lot from km 14.4 (km 0.0 of Lot 2) including the connecng poron of the roundabout BologneEa at km 48.0 (km 33.6 Lot 2 - interchange Manganaro included) including connecons with the current SS 189 and SS 121” Proposer: ANAS Spa Year: 2010 Environmental Recovery for a aggregates quarry - Isnello (PA) Design of "Intervenons Environmental Recovery of the former aggregates quarry located in Contrada Aculeia in the City of Isnello (PA)" Client: Private Year: 2009 Environmental restoraon of the shoreline of Campofelice di Roccella (PA) Ecological Consultancy and Engineering Naturalisc Intervenons for final project "Environmental restoraon and urban design of the shoreline between the former steelworks AFEM and the medieval village of Torre Roccella". Proposer: Comune di Campofelice di Roccella (PA) Year: 2008 Design of the green for planning of the City of Adwa - Ethiopia Study and design of green according to the principles of the agroforestry for the planning acvies of the town of Adwa (Ethiopia) given by FUPCoB Federal Urban Planning Coordinang Bureau of the Ministry of Public Works - Urban Development in Addis Ababa, and of the Municipality of Adwa. Proposer: FUPCoB Federal Urban Planning Coordinang Bureau Addis Abeba Research instuon: A+O ARCHIOPERAIO Year: 2008 Realizaon of the Green of the Municipal waste collecon center - Cefalù (PA) Design and Realizaon of the Green of the Center Municipal Separate collecon of MSW of the Municipality of Cefalù (PA) Proposer: Comune di Cefalù (PA) Year: 2008 Realizaon of the band of trees for Solar Park 5 MWp - Villalba (CL), Sicily Design and Realizaon of the band of trees for protecon and separaon for Solar Park 5MW “Villalba di Gesù” – Villaba (CL). Client: Private Year: 2011 Design of the green for Thermodinamic Solar Park 12 MW - Gela (CL), Sicily Design of the green for Thermodinamic Solar Park from 12 MW in the Municipality of Gela (CL). Client: Private Year: 2011 Consultancy for the works of recovery and conservaon of the Roman Villa Piazza Armerina (EN), Sicily Botanical surveys for the detecon of species suitable for the construcon of historical palisades for the works of recovery and conservaon of the Imperial Villa of Casale in Piazza Armerina (EN). Proposer: Assessorato Regionale Beni Culturali Ambientali - Regione Siciliana Client: Centro RING Ricerche e Proge# Year: 2008 Design of the Migaon Measures for a Pit Poll Hydrocarbons - Ragusa, Sicily Census of trees and design of the works of compensaon through Naturalisc Engineering techniques for migaon of impacts related to the construcon of a Pit Poll Hydrocarbons - Ragusa. Client: EniMed - Eni Mediterranea Idrocarburi S.p.A. Year: 2007 Ex Centro R.I.N.G. Intervenons for the promoon, protecon and enjoyment of the Natura 2000 site ITA020027 - Piana degli Albanesi (PA), Sicily Botanical study, Monitoring the works of Bioengineering, Reports maintenance of vegetaon, analysis of areas of stagnaon and chemical-physical and biological dynamics of the lake areas affected by the construcon of ecological corridors. Implementaon and networking of a database on damp environment. Proposer: Comune di Piana degli Albanesi Year: 2007-2008 Ex Centro R.I.N.G. Infrastructural environmental works of the valley of the River Morello and tributaries including the reservoir created by the dam Ferrara - Villarosa (EN), Sicily Scienfic advice for the project “Infrastructural environmental works of the valley of the River Morello and tributaries including the reservoir created by the dam Ferrara” - Villarosa (EN), Sicily Proposer: Comune di Villarosa (EN) Year: 2007 Ecological Corridor in the Madonie Park - Geraci Siculo (PA), Sicily Scienfic advice for the final project “Creaon of an Ecological Corridor between upstream and downstream of the River Giardinello, in the countryside of Geraci Siculo, to promote acvies of monitoring and scienfic research devoted to tesng of repopulaon of iEofauna and creaon of scienfic laboratories through the use of tradional heritage ” - Geraci Siculo (PA), Sicilia Proposer: Ente Parco Regionale delle Madonie Client: LAAP Year: 2004 Bathtub for poultry manure with a'ached constructed wetland plant - Belmonte Mezzagno (PA), Sicily Project for realization a bathtub for poultry manure with attached constructed wetland plant. Client: Private Year: 2011 Redevelopment naturalis"c for archaeological and naturalis"c circuits - Blufi (PA), Sicily Environmental feasibility study for the preliminary project: naturalistic redevelopment of the area between the away Nocilla and the river Cat and connection, through the recovery of the old paths, with the ecological corridor that along the southern Himera River is located between the Roman bridge of Blufi and the mills Avanelle and Oliva. Proposer: CANI, Circuito Archeo Naturalistico Interprovinciale Year: 2008 Design, implementation and maintenance of parks and gardens - Sicily Design, implementation and maintenance of parks and gardens Public green Private homes Gardens of condominiums Solar parks Industrial green areas Services of: Phytosanitary treatments Treatment for palms against red weevil Pruning and grafting Bush clearing of fallow land Preparing of the ground Analysis of soil Agronomic analysis Supply and installation of: Trees, shrubs and lawns Irrigation systems Natural pools Green Roofs Vertical walls Composters Furnishing gardens Gabion walls Construction of: Mediterranean gardens Exotic gardens Gardens for educational purposes Gardens in sharing Winter Gardens and Greenhouses Clients: Privates Year: since 2008 Environmental Communicaon and Educaon Course "Expert on Renewable Energy" Training course on Renewable Energy in the company, for 15 students, funded by the European Community. Client: Accademia Britannica Srl, Campobasso Year: 2012 Other courses designed Project training and upda"ng in the field of Environmental Impact Assessment (EIA) and Environmental Implica"ons Assessment in the light of the new "Environmental Energy Plan of the Sicilian Region" for staff of municipal engineering departments. Year: 2012 Technician for the management and control of the environment Year: 2006 Technician for the installa"on, opera"on and maintenance of facili"es for the produc"on of energy from renewable sources Year: 20006 Refresher course in the field of Environmental Implica"ons Assessment Year: 20006 Naturalis"c operator for the Mediterranean marine environment Year: 2004 Environmental Educa"on Projects funded by the European Community Project "A walk in nature (Ac"on F-1-FSE-2009-1698)" as part of the Opera8onal Programme Na8onal 2007/2013 Objec8ve "Convergence" (Calabria, Campania, Puglia, Sicily) ESF-European Social Fund "Skills for Development "Annuality 2009-2010. Client: Is8tuto Comprensivo “Renato GuAtuso”, Villagrazia di Carini (PA). Year: 2010 Project “We follow a track Recyclable (Ac"on F1-FSE-2008-645)" as part of the Opera8onal Programme Na8onal 2007/2013 Objec8ve "Convergence" (Calabria, Campania, Puglia, Sicily) ESF-European Social Fund "Skills for Development "Annuality 2008-2009. Client: Circolo DidaCco “E. SALGARI”, Palermo Year: 2009 Maps of the routes of fauna - Sicily Consul8ng and development of n.5 maps of the routes of fauna within the pilot project made out by the Italian Alpine Club - Sicily co-financed by the European Union under the Programme Leader + 2000-2006. Interven8on 1.2.4. "Integrated Management Exemplary of Natura 2000 sites: Gro'a di Entella" Measure 1.2.. "Increased of the compe88veness, environmental and cultural" - Sec8on I "territorial strategies of rural development" of the PSL Terre del GaAopardo. Client: Club Alpino Italiano – Sicilia Year: 2008 Communica"on Plan of the fluvial oasis Valle del Morello - Sicily Implementa8on of the Communica"on Plan and draIing of the Management Plan of the fluvial oasis Valle del Morello for the project "Infrastructural environmental works of the valley of the River Morello and tributaries including the reservoir created by the dam Ferrara” - Villarosa (EN), Sicily Ac8vi8es: • educa8onal signage • website • video documentary • cd Rom • informa8on material Proposer: Comune di Villarosa (EN) Year: 2007 Educaonal signage for WWF OASIS Lake of the Piana degli Albanesi - Sicily Realizaon of the educaonal signage for the paths of the WWF Oasis "Lago di Piana degli Albanesi" within the project “Intervenons for the promoon, protecon and enjoyment of the Natura 2000 site ITA020027 - Lago Piana degli Albanesi ” Proposer: Comune di Piana degli Albanesi Year: 2007-2008 Video documentary about the Atlan"c Forest - Porto Seguro, Brazil Produc8on of a video documentary about the Atlan"c Forest in the Porto Seguro, Brazil for tourism promo8on of the Residence Don Corleone. Client: Private Year: 2006 Territorial marke"ng projects Consultancy for the territorial marke8ng project “iMad Le Madonie in un'APP” Proposer: Private Year: 2013 Component of the project group "X counts as Y in C" par8cipa8on in the Compe""on of ideas launched by the Ente Parco Regionale delle Madonie "Feasibility study on the management, redevelopment, use and sustainable development of the mountain area of Piano Baaglia in rela on with mountain areas of Mandria del Conte, Piano Zucchi, with the system of the viability and a necessary osmosis with the countries of the park". Contract authority: Ente Parco Regionale delle Madonie Group Leader: LAAP Year: 2007 Consultancy for the territorial marke8ng project EQUAL-SICILIA “ValoreNatura: New local economy for areas of high environmental value” Proposer: WWF Italia Year: 2005-2006 Other realiza"ons Realiza8on dvd-rom "Guided prac"ce ac"vi"es - Course in renatura"on and Bioengineering and Environmental Faculty of Science MM.FF.NN and Faculty of Engineering - University of Palermo" A.I.P.I.N. Sec8on Sicily Client: A.I.P.I.N. Sec8on Sicily Year: 2007 Realiza8on cd-rom “Landscape and Flora of the Sicilian coasts”, AIPIN Sezione Sicilia. Client: A.I.P.I.N. Sec8on Sicily Year: 2005 Layout of the book: "Renatura"on of Wetlands: Case Studies. Edited by A.Petralia and G.Pirrera. WWF Sicily, December 2005. " Client: WWF Italia Year: 2005 Realiza8on cd-rom for the project LIFE NATURA (EOLIFE99 “Protec"on of priority plant species of the Aeolian Islands ” Client: ECOGESTIONI S.c.a.r.l. , Palermo Year: 2005 Applied Ecology, Research and Development Ecological surveys of waterways - Sicily Advice and assistance to the Technical Consultant in Case: "Regional Department of Land and Environment Vs Dis8llery Bertolino". Purpose of the consul8ng: Applica"on of the IFF (Fluvial Func"oning Index) on the first stretch of the River Nocella and River Raccuglia in the Municipality of Par"nico (PA). Proposer: Ordinary Court of Palermo Year: 2008 Applica"on of the Index SECA (Ecological Status of Rivers and of the index SEL (Ecological Status of Lakes) for the determina"on of the general ecological status of the rivers Vanelle and Mastrosilvestro and of the Lake Villarosa within the project "Infrastructural environmental works of the valley of the River Morello and tributaries including the reservoir created by the dam Ferrara” Proposer: Comune di Villarosa (EN) Year: 2007 Applica"on of the IFF (Fluvial Func"oning Index) and of the IBE (Extended Biotic Index) on the first stretch of the River Morello and on the rivers Vanelle and Mastrosilvestro within the project "Infrastructural environmental works of the valley of the River Morello and tributaries including the reservoir created by the dam Ferrara” Proposer: Comune di Villarosa (EN) Year: 2007 Effects of coexistence of photovoltaic systems with the agro-ecosystem - Paternò (CT), Sicily Predic"ve analysis, ecological and economic of the effects of coexistence of photovoltaic systems with the agro-ecosystem with applica"on of the Emergy analysis for the construc8on of a photovoltaic system power of 996 kWp. Proposer: Private Year: 2009 Product analysis on waste on the beach between the mouth of the river AcateDirillo and Punta Zafaglione - Acate, Vi'oria (RG), Sicily Product analysis on waste present in the dunes on the beach between the mouth of the river Acate-Dirillo and Punta Zafaglione - Acate, ViAoria (RG), Sicily Proposer: Provincia Regionale di Ragusa Year: 2011 Monitoring on the interac"ons of the fauna and flora in the photovoltaic plants - Sicily Monitoring on the interac8ons of the flora and fauna conducted on several photovoltaic plants built in Sicily. The monitoring results have been published as: G. Filiberto, G. Pirrera "Monitoring on the interac"ons of the flora and fauna in the photovoltaic plants". Acts of Congress SIEP-Iale (Società Italiana per l’Ecologia del Paesaggio – Interna"onal Associa"on for Landscape Ecology) 2008. Year: 2008 PHYTOS: produc"on and exploita"on of medicinal plants through micropropaga"on techniques and nursery techniques - Sicily Research on the produc"on of medicinal plants (medicinal and aroma"c), by micropropaga"on techniques and nursery techniques, used in the fields of pharmaceu8cal, cosme8c and herbal, with the aim of enhancing the environmental and cultural resources, but above all to safeguard biodiversity. Yaer: 2005 Species subject of research : Sarcopoterium spinosum Thymus vulgaris Malva sylvestris Calendula arvensis Hypericum perforatum Silybum marianum Research on invasive alien species in the Mediterranean - Sicily Research on invasive alien species in the Mediterranean. The research results have been published as: : G. Filiberto “Invasive alien species: a trap for the ecology of the Mediterranean ” in Cornelini P., Federico C., Pirrera G. “Mediterranean na ve shrubs” Azienda Regionale Foreste Demaniali Sicilia, 2009. Yaer: 2009 Green Future House GREEN FUTURE HOUSE is an ecological house, modular and transportable, capable of providing a complete energy independence, water and sanita8on. Year: 2013 Green Future Energy Box ENERGY BOX, is a system of self-generation of electricity, based on hybrid technology Year: 2013 Cerficaon of Management Systems The Green Future Srl is authorized CERTIND agency, independent cer"fica"on body, with private capital, founded in 2003 with headquarters in Bucharest, Romania. Our mission is to increase the level of compe88veness and performance of our customers by helping them to beAer manage the risks associated with the ac8vi8es carried out, trying to follow, at the same 8me, the principle of con8nuous improvement. We provide to any type of organiza8on of the impar8al evalua8ons, credible and professional, for management systems, produc8on flows and intermediate or finished products, while maintaining full confiden8ality of all informa8on obtained. We carry out our cer8fica8on ac8vi8es across Europe ensuring interna8onal recogni8on, with the following advantages: • Increase the pres8ge and image • Improved rela8ons with the authori8es • Opportuni8es to gain new markets Quality Management Systems ISO 9001 - Quality Management ISO 13485 - Medical Devices ISO/TS 29001 - Industries of the Petroleum and Gas ISO 29990 - Educa8onal services and educa8on EN 15838 - Customer Contact Centers ISO/TS 16949 – Automo8ve Environmental Management Systems ISO 14001 ed EMAS Management Systems for health and safety at work OHSAS 18001 Management Systems for Food Safety HACCP / ISO 22000 FSSC 22000 Energy Management Systems ISO 50001 / EN16001 Management systems for informa"on security ISO / IEC 27001 Management systems of services IT Service Management ISO / IEC 20000 Safety Management Systems of distribu"on channels ISO 28000 Management systems of social responsibility RS-8000 Management systems for business con"nuity BS 25999 Cer"fying compliance of food products D.O.P. (Denomina8on of Controlled Origin) I.G.P. (Geographical Indica8on of Product) Cer"fica"on of conformity of the products with applica"on of the trademark GREEN FUTURE Srl VAT number: 06004500820 Headquarters : via U.Maddalena, 92 - 90131 Palermo - Italy Phone +39 091 8776799 Fax1 +39 091 6686166 Fax2 +39 06233207237 email: info@greenfuture.it General Director: DoA. G.Filiberto Mobile: +39 339 8381172 email: g.filiberto@greenfuture.it www.greenfuture.it