CURRICULUM VITAE (CV) ABDALLAH DROUBI

Transcription

CURRICULUM VITAE (CV) ABDALLAH DROUBI
CURRICULUM VITAE (CV)
ABDALLAH DROUBI
PERSONAL INFORMATION
Name:
Date of birth:
Place of birth:
Nationality:
E-mail:
Current address:
DROUBI ABDALLAH MOUSSA.
19/10/1979.
AL-KUWAIT.
LEBANESE.
amd_electrical@hotmail.com
Beirut – Lebanon
Mobile: 0096171393561/0096171484678
Ghana
Mobile: 00233504014901/0023344288866
EDUCATION
1999-2004
Graduated from Lebanese university-Faculty of
Engineering (III)
 Electrical and Power Engineering(EPE)
Informatic Industrial.
2000-2004
Graduated from Lebanese university-Faculty of
Science (III)
 physics.
1996-1999 High School
 A “general mathematics” graduate student
2002-2003

Projects in the final year of engineering:
1-Electrical network reliability analysis using FUZZY
LOGIC (theory, analysis and simulation) Crane
control.
2001-2002
Attended a 120-hour training course in:
 MCSA Microsoft Certified System Administrator
including (2274-2275-2276-2277-2285-2824)
 Achieved a passing score on MCP Microsoft
Certification Program
WORK EXPERIENCE IN Ghana
February-2015-December-2015:
Projects Manager in DOUMMAR MEP contracting
under main contractor ENERGOPROJECT.
Start project:
Job Responsibilities:
ECOBANK Towers:
 Two basement
 Ground floor
 13 floors
 2 roofs
1234567891011121314-
Lighting
Power
Earthing
Lightning
Security system
CCTV system
Fire alarm and sound evacuation system
Cable trays and routing for cables in the basement of substation.
Telecommunication and Data center
Audio Visual system.
Drainage system.
Sewage system.
Water reticulation
Make the coordination with the all subcontractors fire fitting, HVAC, Architecture, Plumbing
and Civil work.
15- Electrical and plumbing shop drawing.
16- Calculate all the BOQ of project.
17- Coordination with HVAC, CONCRETE and ARCHITECTURE.
Finalize and solved the problem in old project:
BLATINUM Building:
 one basement
 Ground floor
 10 floors
 1 roofs
Henrietta Building:
 one basement
 Ground floor
 3 floors, 64 flat.
A&C Mall:
 one basement
 Ground floor
 2 floors, 1000m2 area.
WORK EXPERIENCE IN Algeria
February-2013-December-2014:
Project Manager in ICC- Groupement of MATELLIC
the main contractor of SONATRAGH-AGIP in Algeria














Substation 60/5.5 kv M7.
Switchyard 60 kv BRN.
60KV OHL 20Km from BRN to M7.
MCC and VFD for 2 PUMP 5.5KV.
Two POWER TRANSFORMER TR1 and TR2 60/5.5KV
11MVA
Two auxiliary transformer TA1 and TA2 5.5/0.4KV
630KVA
Switchgear 5.5kv 18 BLOCKS
Switch-yard for HV equipments
Generator 400v 630KVA
Protection system …
BT panels (lighting sockets phone….)
HVAC System
Fire alarm and security
Co2 and FM200
WORK EXPERIENCE IN Lebanon
March-2012-Febuary-2013:
Work as Project Manager in ICC-Groupement the
main contractor of SONATRAGH-AGIP in Algeria




Preparation for the projects.
Designing projects 33kv, 66kv, 132kv and 220kv
substation and overheadline.
Study
Planning using MS project
WORK EXPERIENCE IN Qatar
October-2010-march-2012:
MEP Coordinator Engineer in CFE-A&C .JV
CONSTRUCTION the main contractor of ABB.
EZDAN PROJECT:
 Substation 132/11kv GGM.

Substation 66/11kv Ezdan Substations.
October-2010-march-2012:
MEP Coordinator Engineer in A&C .JV
CONSTRUCTION the main contractor of MZ&
Partners.
ACT Towers:
 Two basement
 Ground floor
 26 floors

2 roofs
June-2010-October 2010:
Head Electrical Engineer in BOOM Contracting the
main contractor of AL GAZEERAH CONSULTING
ENGINEERING OFFICE under Public Works Authority
ALKHOR PROJECT:
 Shop drawing of Al khor park refurbishment and
beautification project.
March-2008-June 2010:
Head Electrical Engineer in ALSAC.JV
CONSTRUCTION the main contractor of SNCLAVALIN under HYDRO.
QATALUM PROJECT:

One Substation 220kv. 305-31

Four Substation 33kv. 305-11, 51,52.

Six Substation 11kv. 305-12,14,41,53,54,55,61.
 16 electrical room, control rooms of pot line
area.30611,12,13,14,21,22,23,24,31,32,33,34,41,42,43,44.
 Cathode Roding 511-21.
 Main store 702.
 Workshop 703.
 Admine building 704
 Service center 706
 Canteen and kitchen 712
 Guard house
 Mosque
Job Responsibilities:
1819202122232425262728-
Lighting
Power
Earthing
Lightning
HVAC controller
Fire damper controller
Fire alarm system coordination
Cable trays and routing for cables in the basement of substation.
Telecommunication
Crane installation in cathode rodding 511-21, main store 702 and workshop 703.
Make the coordination with the subcontractors for the all voltage duct bank in the Qatalum
project.
29- Industrial maintenance.
30- Electrical shop drawing.
31- HVAC shop drawing.
Job Description:
1- To perform detailed inspection of the activities executed by the
subcontractors in the area assigned with the objective of obtaining the quality
of work which conforms to: Contractual Documents; Construction Drawings
and Specification (include variation); Referenced codes and Standards.
2- To witness tests and file test reports with accepted Requested for
inspection(RFI)
3- When a subcontractors workmanship is not as per the contractual documents,
specification, drawings or the referenced codes and standards, the inspector
shall write jobsite surveillance reports and address these immediately to the
superintendent of his discipline to take necessary action, will provide daily
reports listing all QCI(instructions) and NCRs (nonconformities) issued and
will address it the area QC Superintendent for further action
4- To ensure that electrical materials and equipments supplied by
Subcontractors conform to the technical specifications.
5- To ensure that Subcontractors are working with the latest drawing
revision/approve.
6- To obtain approval from Site Engineering before accepting deviation from the
drawings and/or specification and to report to the area QC Superintendent
any deviations.
7- To be on site the full duration of Subcontractors activities each day.
8- To ensure and maintain a climate of trust, confidence and team spirit amongst
the site team.
9- To become thoroughly familiar with Site Health and Safety Program.
10- To execute special duties as may be assigned from timed to time, ensuring
that regular functions are not jeopardized.
11- In charge for Planning, Design; Estimate and Implementation for all electrical
requirements including control and protection in power plant, hospital facilities
and auxiliary building for renovation and new constructed facilities.
WORK EXPERIENCE IN Kuwait
2005-2007:
Electrical engineer in ALKAMEL FOR CONSTRUCTION
Substations 33KV, 11KV in Hawali Al-Kuwait.
Aljabeer Hospital in Alahmmady city
WORK EXPERIENCE IN Lebanon
2004-2005:
Electrical Engineer with UN FORCES in south Lebanon.
Supervise maintained and perform troubleshooting
activities with duty Electrician/Technician of defective
electrical equipment and vehicles trucks tanks..etc
2002-2004:
Teaching in Lebanese bintjbil high school.






Electrical.
Machine I.
Analysis I & II.
Algebra I & II.
LOGIC.
Laboratory In charge.
SKILLS



Knowledge of computer architecture.
Strong communication (team spirit), strategic
thinking.
Self instructive ( open to learn more specially any
programmable language and any
telecommunication development)
RELEVANT skills





Programming using Q-basic ,C++ ,Assembly
Mp-lab, piece-piece.
MATLAB
Microwave office
Autocad



Arabic: Excellent reading and writing.
English: good reading and writing.
French: good reading and fair writing.
LANGUAGES
INTERESTS AND ACTIVITIES


Karate.
Football.