our references are based on a solid foundation

Transcription

our references are based on a solid foundation
HOCHTIEF POLSKA
OUR REFERENCES
ARE BASED ON A SOLID
FOUNDATION
POLSKA
HOCHTIEF POLSKA
INDIVIDUAL SOLUTIONS
ARE A SOURCE OF BENEFITS
TO OUR CLIENTS
The new passenger terminal at the Wrocław-Strachowice Airport
2
3
CONTENTS
Construction of office buildings
8
Construction of residential buildings
18
Construction of infrastructural objects
24
Construction of public facilities
30
Individual solutions
are a source of benefits
to our clients
Dear Business Partners,
Construction of shopping and entertainment centers
36
Since 1996 HOCHTIEF Polska has been successfully implementing projects
which blend with the landscape of polish cities permanently. Many examples
of such buildings can be found on the maps of Warsaw, Poznań and Kraków
Construction of industrial buildings
42
where the branches of our company are located. For many years now, private
investors and public institutions have been placing their trust in our hands,
contracting us to carry out major investments. Our best recommendation
are our clients who, after our having executed one project, trust us with the
realisation of the next. This is due to our comprehensive attitude to the market,
implementation of the projects to the highest standards and quality as well as
applying fair-play principle in contacts with our business partners - not only
investors but also designers, architects and subcontractors. Through this
brochure we would like to to acquaint you with the offer of our selected
reference projects in which we combine local experience and knowledge
of HOCHTIEF Polska with the international expertise of HOCHTIEF Group.
Henryk Liszka
CEO
HOCHTIEF Polska
4
5
HOCHTIEF POLSKA
EXCELLENT WORKING
CONDITIONS LEAD TO BETTER
EFFICIENCY AND HIGHER PROFITS
The Nowy Dom Jabłkowskich office building in Warsaw
6
7
The Brama Portowa I, II office complex in Szczecin
The Brama Portowa I, II office complex in Szczecin
Investor: SwedeCenter
General contractor: HOCHTIEF Polska Branch in Poznań
Time of construction: 12.2010 - 11.2012
Total area: 4,500 square meters (Brama Portowa I),
8,000 square meters (Brama Portowa II)
A modern office complex with two independent buildings in the center of Szczecin, at Brama Portowa square.
The project has been implemented complete with ecological solutions enabling application for LEED certification.
In accordance with the rules of sustainable construction, the project is unique with innovative water and energy saving
systems, optimal access for sunlight, waste degradation, and roofing providing protection against the “heat island
effect”, and bicycle parking spaces for the lessees.
The best solutions
in office segment
The Business Garden Warszawa office complex in Warsaw (1st stage)
Investor: SwedeCenter
General contractor: HOCHTIEF Polska Branch in Warsaw
Time of construction: 02.2011 – 12.2012
Total area: 58,000 square meters
Both buildings form 1st stage of the Business Garden complex. They house office space,
The Business
Garden
Warszawa
a business hotel as well as conference center and restaurants. The construction involved
the application of modern design and technical solutions compliant with the principles
of sustainable construction. A LEED certificate has been applied for in relation
to B2 office building.
The Nowy Dom Jabłkowskich office building in Warsaw
Investor: LHI and Dom Towarowy Bracia Jabłkowscy
The Francuska office center in Katowice
General contractor: HOCHTIEF Polska Branch in Warsaw
Investor: Cyril (Globe Trade Center subsidiary)
Time of construction: 01.2010 – 09.2011
General contractor: HOCHTIEF Polska Branch in Kraków
Total area: 4,500 square meters
Time of construction: 06.2008 – 07.2010
Usable area: 27,100 square meters
The prestigious investment was designed so that its shell would be reminiscent
of the pre-war buildings while the architectonic solutions could combine with the style
The Francuska office center consists of two seven-storey,
of the neighbouring buildings.
class A office buildings founded on two-storey car park.
The Francuska office center in Katowice
8
9
The Flanders Business Park in Warsaw
The Canal + office building in Warsaw
The Flanders Business Park in Warsaw
Investor: LHI Leasing Group
Investor: Ceresco Poland
General contractor: HOCHTIEF Polska Branch in Warsaw
General contractor: HOCHTIEF Polska Branch in Warsaw
Time of construction: 01.2007 – 03.2008
Time of construction: 04.2008 – 05.2009
Total area: 14,800 square meters
Office space: 12,915 square meters
The Canal + is a modern six-storey office building with
The A building consists of two parts: five- and
a three-storey underground car park for 137 park places.
­six-storey part and an underground storey serving
With facades finished predominantly in glass, steel and
as a car park. Additionally, there are technical storeys
concrete, it has a modern and simple form and a light
­constructed in both parts.
The Globis office building in Wrocław
structure.
The Globis office building in Wrocław
Investor: GLOBIS Wrocław (Globe Trade Center subsidiary)
General contractor: HOCHTIEF Polska Branch in Poznań
Time of construction: 12.2006 – 10.2008
Usable area: 19,600 square meters
The 13-storey structure not only accommodates office space but also a commercial
and restaurant. Three underground storeys are used for car parks.
The Adgar Plaza A and B office complex in Warsaw
Investor: Adgar Postępu
General contractor: HOCHTIEF Polska Branch in Warsaw
Time of construction: 01.2007 – 10.2008 (A building)
06.2008 – 11.2009 (B building)
Usable space: 40,900 square meters
A modern 10-storey class A office complex consists of two buildings with conference
center for 300 people and an underground car park.
The Poloneza office building in Warsaw
Investor: Poloneza Investment
General contractor: HOCHTIEF Polska Branch in Warsaw
Time of construction: 07.2009 – 08.2010
Total area: 7,200 square meters
The three-storey office building with an underground car park,
above-ground parking space and a warehouse part.
The Canal + office building in Warsaw
10
The Adgar Plaza A and B
office complex in Warsaw
11
The Tulipan House in Warsaw
The International Business Center
in Warsaw (1st and 2nd stage)
The Diamante Plaza in Kraków
Investor: Aldesa Polska
General contractor: HOCHTIEF Polska Branch in Kraków
Time of construction: 06.2008 – 08.2009
Usable space: 17,900 square meters
The Diamante Plaza is a four-storey class A building. The modern shape of the building
resembles an irregularly cut diamond. Complete glazing gives the maximum amount
of natural light inside the building.
The Tulipan House in Warsaw
Investor: Segro Poland
General contractor: HOCHTIEF Polska Branch in Warsaw
Time of construction: 02.2007 – 05.2008
Usable space: 17,894 square meters
The Tulipan House stands out as a unique architectural work - the building having been
designed on the plan of a flower and providing the optimal amount of natural light with
a 14 m glass atrium giving the building its thoroughly modern look.
The Andersia Tower in Poznań
Investor: Andersia Tower
General contractor: HOCHTIEF Polska Branch in Poznań, HOCHTIEF Polska Branch
in Warsaw
Time of construction: 09.2005 - 10.2007
Total area: 42,518 square meters
The Andersia Tower is a mixed-use development comprising office, hotel, and retail
space. The lower floors are used for a deluxe hotel with retail outlets, restaurants,
conference center and a large banquet & ball room. The upper floors of the “Andersia
Tower” are designated for class “A” office space.
The International Business Center in Warsaw (1st and 2nd stage)
Investor: INTERBUS I, INTERBUS II (Golub Europe LLC)
General contractor: HOCHTIEF Polska Branch in Warsaw
Time of construction: 03.2001 - 01.2003 (1st stage) 04.2006 -05.2007 (2nd stage)
Total area: 54,095 square meters
The International Business Center is situated close to the Warsaw metropolitan subway
line and is an “intelligent” office object of the highest class. The complex was designed to
­offer office space at the higher floors, space for commerce and services at the ground
floor and three storeys of an underground car park.
The Diamante Plaza in Kraków
12
The Andersia Tower in Poznań
13
The Metropolitan office building in Warsaw
The Metropolitan office building in Warsaw
The Stock Exchange Center
Investor: Hines Polska
Investor: Centrum Giełdowe
General contractor: HOCHTIEF Polska Branch in Warsaw
General contractor: Consortium of HOCHTIEF Polska
Time of construction: 09.2001 - 09.2003
Branch in Warsaw and Porr Polska
Total area: 66,800 square meters
Time of construction: 03.1998 - 04.2000
Total area: 33,657 square meters
The object consists of three independent seven-storey buildings located within
a pentagonal shape, hence the nickname of the building, which is often called
A modern nine-storey building of the new Stock Exchange
“the Warsaw Pentagon”. The Metropolitan was the first AAA-class object in Poland
Center in Warsaw. Its architectural assets allow the building
and the only one such object in Central Europe. It has been designed
to seamlessly integrate with the surrounding urban
by the world-famous architect, Lord Norman Foster.
landscape. Another assets of the project are state-of-the-art
interior design and location right in the middle of the city.
The Liberty Corner office building in Warsaw
Investor: Von der Heyden Group
General contractor: HOCHTIEF Polska Branch in Warsaw
Time of construction: 10.2001 - 12.2003
Total area: 13,016 square meters
Eight-storey office building has been designed as two separate parts A and B. Precious materials have been selected
for the exterior façade, where white and light-yellow sandstone is dominant. Statues preserved from ex-censorship building
and placed now in the main corridor on the ground floor are an interesting interior element.
The Rondo 1 office complex in Warsaw
Developer: HOCHTIEF Development Poland
General contractor: HOCHTIEF Polska Branch in Warsaw
Time of construction: 03.2003 – 12.2006
Total area: 103,000 square meters
The Rondo 1 is one of the most well-known building in Warsaw, distinctive because of its: modernistic architecture,
cutting-edge technology, top notch standards and a prestigious location. The building Rondo 1 is the first office
building in Europe which has been awarded the certificate LEED Gold in the category "existing building". The office
project Rondo 1 consists of two elements: 40-storey skyscraper with ca. 58,000 square meters office area and
10-storey building offering retail rooms and car park places. Both structures are connected by a 14 m high, glass
space called „winter garden” accessible to the wider public.
The Rondo 1 office complex in Warsaw
14
The Liberty Corner office building in Warsaw
15
HOCHTIEF POLSKA
SAFETY AND BETTER LIVING
CONDITIONS ARE AN INVESTMENT
IN THE FUTURE
The Kalinowe residential complex in Rokietnica
16
17
The Platinum Towers in Warsaw
Investor: Platinum Towers
General contractor: HOCHTIEF Polska Branch in Warsaw
Time of construction: 08.2007 – 07.2009
Total area: 58,450 square meters
The best solutions
in residential segment
The Platinum Towers is one of the technologically most
advanced and most prestigious residential investment in
the center of Warsaw. Built between Grzybowska and
Wronia streets, is a part of a luxury hotel, conference and
residential complex.
The Holland Park II residential complex
in Warsaw
The Olbrachta residential complex in Warsaw
Investor: Holland Park II
Investor: Dom Development
General contractor: HOCHTIEF Polska Branch in Warsaw
General contractor: HOCHTIEF Polska Branch in Warsaw
Time of construction: 08.1999 - 01.2001
Time of construction: 04.2007 – 12.2008
Total area: 14,150 square meters
Total area: 55,000 square meters
The housing project includes buildings of eight, seven
The scope of the project included construction of three residential buildings
and five storeys.
with 448 apartments.
The CityZen I, II residential complex in Warsaw
Investor: Espais
General contractor: HOCHTIEF Polska Branch in Warsaw
Time of construction: 07.2008 - 06.2010 (CityZen I)
07.2011 – 06.2012 (CityZen II)
Area: 24,500 square meters (CityZen I)
13,325 square meters (CityZen II)
The state-of-the-art architecture of the complex is a combination of glass, stainless steel and
natural stone panels used both in its facades and in the interiors. The internal garden in the Zen
style of an area of 5,000 square meters is available to residents only.
The CityZen I, II residential complex in Warsaw
18
The Holland Park II residential complex in Warsaw
19
The Villa Poema residential
The Opera Residence in Warsaw
building in Warsaw
The Villa Poema residential building in Warsaw
Investor: Hepolico Investments (the company of HOCHTIEF Polska)
General contractor: HOCHTIEF Polska Branch in Warsaw
Time of construction: Q2 2011 - 11.2012
Area: 2,690 square meters
The organisation of the entire development process of the Villa Poema project was carried out by HOCHTIEF Polska.
The scope of works included a construction of five-storey building with 42 apartments. The intimate nature of the object,
the greenery in the immediate area, proximity to the city center and the shopping center as well as the specific
­atmosphere of Zoliborz are the main features of the Villa Poema project. The building has a total usable area
of 2,690 square meters and has apartments with floor areas ranging from 39 to 92 square meters.
The Opera Residence in Warsaw
Investor: Dom Development
General contractor: HOCHTIEF Polska Branch in Warsaw
Time of construction: 07.2003 – 10.2005
Usable space: ca. 8,300 square meters
An apartment building located in the city center near the Saski Park. The façade of the building and
interior design refer to the style of the buildings from the late nineteenth and early twentieth century.
The Kalinowe Residential Estate in Rokietnica
Investor: Kalbud Deweloper
General contractor: HOCHTIEF Polska Branch in Poznań
Time of construction: 10.2007 – Q2 2008 (1st stage)
10.2008 – 07.2011 (2nd stage)
The Meridian
in Warsaw
Area: 13,760 square meters (1st stage)
19,607 square meters (2nd stage)
The Kalinowe Estate was built in close proximity to green landscapes, the project envisages
­solutions combined with the natural surrounding: wooden elevation panels, blinds made
of Siberian Larch, exterior window trims in harmony with the wooden elevation elements
and sunken waste containers.
The Meridian in Warsaw
The Gemini residential building in Warsaw
Investor: Ronson Development Investment
Investor: Ronson Development Buildings
General contractor: HOCHTIEF Polska Branch in Warsaw
General contractor: HOCHTIEF Polska Branch in Warsaw
Time of construction: 12.2005 – 09.2007
Time of construction: 09.2008 – 09.2010
Total area: 30,408 square meters
Total area: 19,000 square meters
With its high standard of finishing work and favorable
The building meets top architectural standards and best usability requirements (large wooden
location in the center of Warsaw in the proximity
windows, spacious terraces, loggias and balconies). It has a very attractive location in direct
of Chłodna Street's historical architecture, this project
neighbourhood of the Ursynów Borough Office Building, an underground station and the
is an example of the finest architecture.
proximity of the rich infrastructure of the district.
The Gemini residential building in Warsaw
20
21
HOCHTIEF POLSKA
WE LAY EMPHASIS
ON THE HIGHEST
COMPETENCIES
The passenger terminal at the Poznań-Ławica Airport
22
23
The Deep-sea Container Terminal Gdansk (DCT)
in the Northern Port in Gdansk
Expansion of the passenger terminal at the Chopin Airport in Warsaw
Investor: Przedsiębiorstwo Państwowe „Porty Lotnicze”
General contractor: HOCHTIEF Polska Branch in Warsaw and HOCHTIEF Solutions
Time of construction: 02.2010 – 08.2011
Area: 18,316 square meters
The scope of works included construction of the central pier and completing
the construction of the southern pier of terminal as well as five gates and five lifts.
The best solutions
in infrastructure
The Deep-sea Container Terminal Gdansk (DCT) in the Northern Port in Gdansk
Investor: DCT Gdańsk
General contractor: Consortium of HOCHTIEF Construction AG Infrastructure Polska,
HOCHTIEF Construction AG Civil Engineering and Marine Works and HOCHTIEF Polska
Time of construction: 10.2005 - 10.2007
The construction site had the area of 44 ha
The Deepwater container terminal in Gdańsk North Harbour is the first within the Baltic Sea
to have the capability to service most post-Panamax container vessels with regards to access,
depth of water, quay facilities and equipment. The terminal was built on an artificially formed
solid pier measuring 800 m where two container reloading stations were built:
– the first section of the quay is 385 m long and the water depth at it is 16,5 m
– the other section is 265 m long and has 13,5 m water depth. This section is additionally
ended with a ramp for Ro-Ro ship handling.
The project also included the construction of transport routes and a railway line, each 2 km
in length as well as an office building with ca. 3,000 square meters of usable area and Cargo
Freight Station with total area amounts to 7,500 square meters.
Expansion of the passenger terminal
at the Chopin Airport in Warsaw
24
25
Expansion of the Poznań-Ławica Airport (1st stage)
The passenger Terminal 3 of the Władysław Reymont International Airport
The passenger Terminal 3 of the Władysław Reymont International Airport
Investor: Port Lotniczy Łódź im. Władysława Reymonta
General contractor: Consortium of HOCHTIEF Polska Branch in Warsaw, HOCHTIEF Solutions and Warbud (leader)
Time of construction: 12.2009 - 06.2012
Total area: 28,000 square meters
The new terminal hall includes three usable above-ground storeys, as well as a technical storey, an entresol
and an underground storey. With above 9,000 square meters of the designed base area, the terminal has
a total area of 28,000 square meters.
Expansion of the Poznań-Ławica Airport (1st stage)
Investor: Port Lotniczy Poznań-Ławica
General contractor: HOCHTIEF Polska Branch in Poznań
Time of construction: 03.2011 – 03.2012
Total area: 17,800 square meters
The first stage of the works covered the construction of a new part for the terminal. The check-in hall and new arrivals
zone (on the ground floor) as well as technical facilities for the whole building on the underground storey are housed
in this building.
Extension of the passenger terminal at the Wrocław-Strachowice Airport
Investor: Port Lotniczy Wrocław
General contractor: HOCHTIEF Polska Branch in Poznań
Time of construction: 09.2009 – 02.2012
Usable area: 38,670 square meters
The scope of works included the construction of the new passenger terminal with the infrastructure and equipment of
the new location. Project was designed to comply with IATA's standard C, as a hall with three above-ground storeys
and one underground storey.
Extension of the passenger terminal at the Wrocław-Strachowice Airport
26
27
HOCHTIEF POLSKA
UNIQUE PROJECTS ARE
OFTEN A SCENE OF
GREAT EVENTS
The new lecture and workshop building of the Eugeniusz Geppert Academy of Fine Arts in Wrocław
28
29
The Dialog Arena football stadium
Investor: Zagłębie Lubin SSA (KGHM Polska Miedź SA Group)
General contractor: Consortium with HOCHTIEF Polska and PeBeKa
Time of construction: 09.2007 – 06.2010
Capability: 16 000 football fans
The facility meets the highest security standards and UEFA requirements for class 3 stadiums. All the stands of the new football stadium are covered. Within the contract frame new
technical and sanitary facilities, changing rooms and a VIP zone were constructed.
To ­ensure continuity of football matches during most of the coming seasons
the ­construction of the new ­stadium was accomplished in stages. The new stadium
was introduced into the partly preserved and existing banks of the current stands.
The best solutions
in public facilities segment
The Kraków Opera
Investor: Opera Krakowska
General contractor: HOCHTIEF Polska Branch in Kraków
Time of construction: 09.2004 – 11.2008
Area: 11,914 square meters
The modern building for the Kraków Opera was created as reconstruction of the former manège, which was enhanced
by a new structure on its backyard. The entire complex consists of three integrated parts: administration & technical
building, main opera house with seats, stage and audience zones, and commercial building with box-office lobby,
space for lease and restaurants.
Expansion of the Eugeniusz Geppert Academy of Fine Arts in Wrocław
The Aula Nova - the Concert Hall of the I. J. Paderewski
Investor: Eugeniusz Geppert Academy of Fine Arts
Music Academy in Poznań
General contractor: HOCHTIEF Polska Branch in Poznań
Investor: I. J. Paderewski Music Academy in Poznań
Time of construction: 09.2010 – 12.2012
General contractor: HOCHTIEF Polska Branch in Poznań
Area: 13,000 square meters
Time of construction: 04.2005 - 06.2006
Area: 4,520 square meters
The new building located at the junction of Traugutta and Krasińskiego streets houses the Center of Practical Art and the
Innovation Center. With the attic level as high as 25 m above the ground, it has four storeys and one underground floor.
The Aula Nova is often called a musical landmark of Poznan. The building is also
It also includes a small-sized glass mill dedicated for the exclusive use of the Academy’s students.
a perfect venue for cultural and artistic events for the Music Academy as well as for the
entire region of Wielkopolska. The building meets the highest acoustic standards
and holds around 540 people.
Sala Ziemi (literally, the Earth Hall) – modernization of exhibition hall No.15 (C level)
within the MTP (Międzynarodowe Targi Poznańskie – Poznań International Fair)
30
31
The Pałac Sprawiedliwości (Palace of Justice) in Warsaw
Modernization of the C level of MTP exhibition hall No.15 in Poznań
Investor: Międzynarodowe Targi Poznańskie
General contractor: HOCHTIEF Polska Branch in Poznań
Time of construction: 03.2012 – 12.2012
Area: 6,500 square meters
As a result of disassembly of the central part of an existing roof and construction of the new one was developed
a multi-purpose amphitheatre conference room for around 2,000 people. Owing to mobile walls and telescopic
auditorium areas, the building became more functional.
The Andrzej Frycz Modrzewski Krakow University Collage
Investor: The Andrzej Frycz Modrzewski Krakow University Collage
General contractor: HOCHTIEF Polska Branch in Kraków
Time of construction:
1st stage: 03.2003 - 08.2004
2nd stage: 07.2004 - 07.2005
3rd stage: 08.2007 - 12.2008
Area:
1st stage: 10,784 square meters
2nd stage: 5,500 square meters
3rd stage: 8,985 square meters
Three stages of the Andrzej Frycz Modrzewski Krakow University College form
a coherent architectural complex:
– two buildings constructed in the 1st and 2nd stages with three storeys
and underground parts,
– the building constructed in the 3rd stage with four-storey and underground car park.
Its lenght amounts to 120 meters.
The Qubus Hotel Cracow
The Pałac Sprawiedliwości (Palace of Justice) in Warsaw
Investor: The Ministry of Justice, The Supreme Court, Warsaw Centrum Borough
General contractor: Consortium with HOCHTIEF Polska
Time of construction: 06.1996 - 11.1999
Area: 44,744 square meters
The four-storey object is the seat of the Supreme Court as well as the Appellation Court. With its characteristic design
and symbolic form, the building has become one of the new architectural landmarks of the capital of Poland.
Investor: Echo Investment
General contractor: HOCHTIEF Polska Branch in Kraków
Time of construction: 11.2004 - 05.2006
Area: 12,000 square meters
Building of a modern hotel in monumental surroundings of the old city required a skilful
adjustment of the architecture of the building to the existing building frontage of 19th
century Podgórze. Thanks to the architectonic solutions applied, the structure has been
perfectly adjusted to the existing urban arrangement of the surroundings, maintaining
the historical character of the city.
32
33
HOCHTIEF POLSKA
BECAUSE UNIQUE
ARCHITECTURE COMPLIES
WITH THE UNIQUE STYLE
The Malta Gallery in Poznań
34
35
The Marine Commercial Park in Gdańsk
The Malta Gallery in Poznań
The Malta Gallery in Poznań
The Baltic Gallery in Gdańsk - Wrzeszcz
Investor: Neinver Polska
Investor: ECE Projektmanagement
General contractor: HOCHTIEF Polska Branch in Poznań
General contractor: HOCHTIEF Polska Branch in Warsaw
Time of construction: 02.2007 – 03.2009
Time of construction: 03.2006 – 09.2007
Total area: 162,000 square meters
Area: 110,000 square meters
The modern, three-storey steel-and-glass Malta Gallery
The project consists of five-storey shopping center located by the crossing of
building is the largest commercial and entertainment cent-
Grunwaldzka and Kościuszki streets. Two last storeys are designed as a multilevel
er in the Wielkopolska Region.
parking with 1 100 park places.
The best solutions in shopping
and entertainment centers
The Marine Commercial Park in Gdańsk
The Castorama shopping center in Oświęcim
Investor: Librecht&Wood Polska
Investor: Castim
General contractor: HOCHTIEF Polska Branch in Warsaw
General contractor: HOCHTIEF Polska Branch in Kraków
Time of construction: 03.2010 – 03.2011
Time of construction: 03.2012 – 08.2012
Total area: 27,700 square meters
Area: 7,000 square meters
The project consists of buildings B and C of the complex,
The building with three zones of functionality:
including their technical infrastructure, access roads and car
– one-storey shopping hall,
parks. The single-storey Building C is dedicated
– two-storey social-office back-room facilities,
to independent tenants.
– one-storey technical-storage back-room facilities.
The Castorama shopping center in Oświęcim
36
The Baltic Gallery in Gdańsk - Wrzeszcz
37
The Futura Park complex in Modlniczka near Kraków
The Leroy Merlin retail hall in Modlniczka near Kraków
The Futura Park complex in Modlniczka near Kraków
Investor: Neinver Polska
General contractor: HOCHTIEF Polska Branch in Kraków
Time of construction: 06.2010 – 08.2011
Area: 49,000 square meters
The project consists of a two-storey building of an area exceeding 49,000 square meters and a 1,400-vehicle car
park. The Futura commercial park provides space for small and medium-sized shops and an outlet center. Futura is
the first project executed by HOCHTIEF Polska according to demands of BREEAM. The building got the certificate
BREEAM with rating of very good in 2012.
The Leroy Merlin retail hall in Modlniczka near Kraków
Investor: Leroy Merlin Inwestycje
General contractor: HOCHTIEF Polska Branch in Kraków
Time of construction: 04.2004 – 09.2004
Area: 12, 600 square meters
Simply and elegance commercial hall of the House and Garden Department of Leroy Merlin is one of the several projects
constructed by HOCHTIEF Polska for the distributor of building and finishing materials. Another projects were
implemented in Bielsko-Biała, Żory, Gliwice, Krasne near Rzeszów, Poczesna, Mikołów, Nowa Wieś near Częstochowa
and in Katowice.
The Old Brewery (Stary Browar) Commerce, Art and Business Center (1st stage and 2nd stage)
Investor: Fortis
General contractor: Consortium of HOCHTIEF Polska Branch in Poznań and Porr Polska
Time of construction: 06.2002 - 11.2003 (1st stage), 09.2005 - 03.2007 (2st stage)
Area: 68,942 square meters (1st stage), 65,477 square meters (2st stage)
The Old Brewery Commerce, Art and Business Center is an example of a modern building which is compliant to history.
Nineteenth-century buildings of Hugger’s Brewery in the center of Poznań was adapted as a commercial center and an office
park. The second construction stage included an expansion of the complex by adding a new office and commercial building.
The Old Brewery (Stary Browar) Commerce, Art and Business Center (1st stage and 2nd stage)
38
39
HOCHTIEF POLSKA
TECHNOLOGIES WHICH
TAKE A CARE OF
FUTURE GENERATIONS
The Bridgestone tyre production halls and warehouses in Poznań
40
41
The production facility for Polynt in Niepołomice
The Enginova manufacturing and storage
facility in Kutno
Investor: Enginova
General contractor: HOCHTIEF Polska Branch in Poznań
Time of construction: 11.2009 – 06.2010
Area: 11,000 square meters
Construction of production and warehouse hall with
office and infrastructure facilities (roads, green area).
The best solutions
in industrial buildings segment
The Kronospan production hall in Strzelce Opolskie
Investor: Kronospan Szczecinek
General contractor: HOCHTIEF Polska Branch in Poznań
Time of construction: 03.2008 – 09.2009
Area: 37,000 square meters
Five manufacturing halls were constructed in steel structure with firewalls
and technical buildings.
The production facility for Polynt in Niepołomice
Inwestor: Polynt
General contractor: HOCHTIEF Polska Branch in Kraków
Time of construction: 11.2006 – 02.2009
Usable area: 3,300 square meters
The Eaton production plant in Bielsko-Biała
The scope of the works included construction of five production facilities
as well as extension of office building.
Extension of Tyskie Browar Książęcy in Tychy
Investor: Kompania Piwowarska
The Bridgestone tyre production halls and warehouses in Poznań
General contractor: HOCHTIEF Polska Branch in Poznań
Investor: Bridgestone Poznań
Time of construction: 06.2006 – 03.2008
General contractor: HOCHTIEF Polska Branch in Poznań
Area: 3,100 square meters
Time of construction: 07.2010 – 04.2011
Usable area: 40,800 square meters
The scope of the works included extension of storage
facilities as well as fermentation unit and the construction
The scope of the project included a 12 m high warehouse hall and over 800 square meters
of a new brewhouse.
of gross office space.
Extension of Tyskie Browar Książęcy in Tychy
42
43
The Euroglas float glass works in Ujazd near Łódź
The BYŚ waste processing facility in Warsaw
Investor: BYŚ Wojciech Byśkiniewicz
General contractor: HOCHTIEF Polska Branch in Warsaw
Time of construction: 02.2010 – 12.2010
Area: ca. 5,000 square meters
In addition to the sorting hall and its auxiliary facilities,
the project also includes construction of roads, vehicle
manoeuvre areas and car parks. The plant has an annual
sorting capacity of about 150,000 tonnes.
The Euroglas float glass works in Ujazd near Łódź
Investor: Euroglas Polska
General contractor: HOCHTIEF Polska Branch in Kraków,
HOCHTIEF Polska Branch in Poznań
Construction period: 05.2008 - 09.2009
Area: 85,000 square meters
The float glass factory is one of the key projects in the Łódź Economic Zone. The factory has the world's largest glass
production furnace with an efficiency of 1,000 tonnes of glass per day and the longest glasswork production line
in Poland. To minimise its environmental footprint, the plant leverages the most advanced equipment and procedures.
The production facility for Kimball Electronics in Tarnowo Podgórne
Investor: KronoKimball Electronics Poland
General contractor: HOCHTIEF Polska Branch in Poznań
Time of construction: 11.2008 – 07.2009
Area: 10,000 square meters (production hall with a warehouse) 5,100 square meters (office and technical building)
The complex includes a production hall with a warehouse and a two-storey office and technical building. The project also
covered internal roads and an exit from National Route 92 too.
The Phoenix Contact production hall in Nowy Tomyśl
Investor: Phoenix Contact Wielkopolska
General contractor: HOCHTIEF Polska Branch in Poznań
Time of construction: 02.2009 – 02.2010
Area: 8,000 square meters
The scope of the works included construction of single-storey hall with two additional technical storeys above the roof
height. Besides offices the building also has training rooms and community rooms.
The production facility for Kimball Electronics
in Tarnowo Podgórne
44
45
HOCHTIEF POLSKA
INDIVIDUAL SOLUTIONS
ARE A SOURCE OF BENEFITS
TO OUR CLIENTS
The Canal + office building in Warsaw
46
47
Branch in Warsaw
Branch in Poznań
Branch in Kraków
8/12 Młynarska Street
6 Niepodległości Avenue
27 Lubicz Street
01-194 Warsaw
60-967 Poznań
31-503 Kraków
tel. +48 22 433 57 00
tel. +48 61 859 22 00
tel. +48 12 628 91 00
fax: +48 22 433 57 99
fax: +48 61 852 09 67
fax: +48 12 628 92 00
14 Elbląska Street
Representative Office
Office in Rzeszów
01-737 Warsaw
in Katowice
35A F. Chopina Street
tel.: +48 22 560 08 00
79 W. Korfantego Avenue
35-055 Rzeszów
fax: +48 22 633 97 86
40-166 Katowice
tel. +48 17 250 99 90
www.hochtief-polska.pl
tel. +48 32 259 28 23
info@hochtief.pl
fax: +48 32 259 28 24
HOCHTIEF Polska
POLSKA