specom engineering sdn bhd full version link
Transcription
specom engineering sdn bhd full version link
SPECOM ENGINEERING SDN. BHD. (Specialist in Information Technology, Telecommunication, Power and Railway Signalling) Company Profile ACTIVITIES Suppliers for Telecommunication Parts Design & Built Fiber Optic Network System Design & Built Infrastructure for IT and Telecommunications Network Design & Built Railway Signalling – CTC and SSI System Telecommunication Engineering Services For Fiber Optic & Copper Cables and Related Power Works SPECOM ENGINEERING SDN. BHD. INTRODUCTION ______________________________________________________________________________________ SPECOM ENGINEERING SDN. BHD. was incorporated on 1st Day of April 1993 for the purpose of providing Specialized Telecommunication Services, Local Area Network (LAN), Wide Area Network (WAN), Information Technology, Multimedia and Project Management. Since then, our company has provided services to a number of projects including namely the 88 story KLCC TWIN TOWERS (LAN & WAN ) – AL-JAZEERA INTERNATIONAL in Kuala Lumpur, NTT MSC SDN. BHD. in Kuala Lumpur, INSTITUT TEKNOLOGI MARA (UiTM) in Shah Alam, Design, Construction, Testing, Commisioning and Guarantee of KTMB Rail Link (Signalling) in Johor, KUALA LUMPUR AIRPORT BERHAD in Sepang, ELECTRIFIED DOUBLE TRACK PROJECT FROM Ipoh to Rawang (Utilities & Signalling), PERBADANAN PUTRAJAYA (ICT and Infra) and other projects throughout Peninsular Malaysia, Sabah and Sarawak. SPECOM plays an important role as one of the major Contractor to the Telecommunication and Information Technology industries with her Telecom Malaysia’s approved materials and equipment. From time to time, SPECOM conducts in-house seminars and training to update and cater her customers on the latest technology. SPECOM provides and undertake projects on turnkey basis in engineering designing, planning, networking, supplying, installing and commissioning. SPECOM is an certified ISO 9001 : 2000 company as this is one of the main criteria for its growth. In line with high technology demand and rapid changes in the industries, SPECOM is technically supported by appointed joint venture partners and also by well established and renowned local and overseas manufacturers in order to provide her customers with an up-to-date and proven technology. SPECOM ENGINEERING SDN. BHD. initially had five employees and currently employs over forty personnels including twelve local professionals, nineteen foreign expert engineers and a team of skilled staffs who are highly computer literate. SPECOM is fully equipped with an advance IT Department and with the latest sophisticated telecommunication gadgets, test gears and other heavy machinery. SPECOM ENGINEERING SDN. BHD. has been appointed by JALENAS (JALUR LEBAR NASIONAL SDN BHD) as the OUTSIDE PLANT TURNKEY CONTRACTOR for PROPOSED, PLANNING, DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING, POST-ACCEPTANCE, COMMISSIONING, OPTIONAL MAINTENANCE AND SUPPORT SERVICES IN RESPECT OF A HIGH SPEED BROADBAND NETWORK IN PENINSULAR MALAYSIA. The contract has been awarded to SPECOM ENGINEERING SDN. BHD. on 1st SEPTEMBER 2010. The company believes in not only providing professional services to their clients but also striving to excel in these services. THE COMPANY NAME OF COMPANY : SPECOM ENGINEERING SDN. BHD. ADDRESS : NO: 15, JALAN SEPADU A, 25/A, TAMAN PERINDUSTRIAN AXIS, SECTION 25, 40400 SHAH ALAM, SELANGOR DARUL EHSAN, MALAYSIA. REGISTERED OFFICE : 97-3, JALAN USJ 21/10, 47630 SUBANG JAYA, SELANGOR DARUL EHSAN. TELEPHONE NUMBER : 603-5122 0545, 603-5122 0546 & 603-5122 0548 FAX NUMBER : 603-5122 0549 E-MAIL : specom@specomsb.com STATUS : BUMIPUTRA, PRIVATE LIMITED COMPANY DATE OF INCORPORATION : 1st APRIL 1993 AUTHORISED CAPITAL : RM 5,000,000.00 PAID UP CAPITAL : RM 1,000,000.00 ACTIVITY : PROVISION OF PROJECT MANAGEMENT, DESIGN AND BUILT FOR TELECOMMUNICATION INFRASTRUCTURE, RAILWAYS SYSTEMS, RELATED POWER WORKS AND OFFICE INFORMATION TECHNOLOGY AUTOMATION. COMPANY BANKERS CIMB Bank Berhad Bangunan UMNO Selangor Persiaran Bandaraya 40000 Shah Alam, Malaysia Eon Bank Berhad No. 20 Jalan Jinjang 27/64 Section 27,Taman Alam Megah 40400 Shah Alam,Selangor,Malaysia MANAGEMENT ORGANISATION STRUCTURE CHAIRMAN : TUAN HAJI MALIKI BIN ALI SECRETARY : PN. ZALINA BT. MOHD EXECUTIVE DIRECTOR : MR. K. CHANDRAN CHIEF OPERATION DIRECTOR : DATO’ PADUKA MOHAMED B. HJ ABDUL HAMID PROJECT DIRECTOR : EN. MOHD ZAWAWI AWANG CHIEF TECHNICAL OFFICER : MR. DEVANDRAN SUNDRAM SENIOR PROJECT MANAGER : MR. SATYA NARAYANAN ENGINEERING & CONSULTATION SERVICES FOR FIBER OPTIC NETWORKING SYSTEM SPECOM ENGINEERING SDN. BHD. offers engineering and consultation services for fiber optics network projects. This include providing telecommunication and data communications engineers with fibre optic implementation capabilities for the initial stage - designing and development of project proposals and advanced engineering services for the later implementation stages. These services are flexible and versatile to meet each contractor’s or customer’s needs, project by project. SPECOM staffs are well trained, courteous, and most importantly, conscientious, offering only the highest quality service and solutions. SPECOM’s engineers and technicians will be at the project site and work with the project crew to explain, demonstrate and perform the proper and most cost effective means of splicing, terminating, and testing the fibre optic cable systems. Our staff will also provide the tools and test equipment needed to install the cable plant and use various test gears for testing. In project consulting, SPECOM provides a team of experience staffs with excellent customer relationship and technical skills to consult on a project. A project consultant cum advisor will advise on the installation aspects of fibre optic cables in accordance with system/drawing plans and industry approved procedures. The project consultant will also provide a work schedule and adheres to this schedule for the successful completion of a project. In The Design / Proposal Preparation - SPECOM will assist in identifying: • the right fibre optic cables • connecting hardware • connectors • physical cable routes • installation issues • termination needs • testing needs • network equipment (hub / switches) SERVICES PROVIDED: • • • • • • • • • • • • • • Network (LAN & WAN) Consultation & Design Network (LAN & WAN) Implementation Structured Cabling System (Design & Implementation) Electrical Cabling Works (Design & Implementation) - Indoor and Outdoor Fiber Optic Cabling System (Design & Implementation) - Indoor & Outdoor Data Communications Consultation & Implementation Services Signalling Railway Indoor & Outdoor Works Telecommunications Consultation, Engineering & Implementation Services Network Integration Systems Integration Internet & Intranet Access and Design Services Data And Voice Integration Services Maintenance Services Training & Professional Services SYSTEMS : • • • • • • Computer Networks Guest Room Control System Apartment & Fireman Intercom System CCTV & Security System and SCADA Public Address (PA) System Passenger Information System (PIS) Lighting System PRODUCTS SUPPLIED : • • • • • • • • • • • • • • Ericsson PABX, Keyphone and Telephone Systems Siemens PABX, Keyphone and Telephone Systems NEC PABX, Keyphone and Telephone Systems Cisco Routers, Hubs, 10/100Base-T Switches and ATM Switches 3COM Routers, Hubs, 10/100/1000Base-T Switches and ATM Switches Bay Network Routers, Hubs, 10/100Base-T Switches and ATM Switches Shiva Remote Access Dial-up Servers Eicon ISDN Modems USRobotics & Motorola Modems Railway System Products Compaq PCs, Servers & Notebooks Dell PCs, Servers & Notebooks Hewlett Packard Servers Microsoft Windows 98, 2000, XP and Server 2003/’08 MS Office, Scheduler, Exchange, SQL, Visual Basic & Proxy Server • • • • • • • • • • • • • • • • • • • • • • • Uninterruptible Power Supply System Signalling System Radio Frequency Identification System Audio Visual System Access Control System MATV & SMATV System Novell Netwar Corell Draw Graphics Epson Color & Dot Matrix Printers NEC Color & Dot Matrix Printers Hewlett Packard Laser, Color & Inkjet Printers AT&T Cabling Systems (UTP Cat 5 & 6 and Fiber Optics) MOD TAP Cabling Systems (UTP Cat 5 & 6 and Fiber Optics) Siemon Cabling Systems Bosch Cameras AMP Cabling Systems Polycom Telephony Systems - IP Based Bose Acoustic Sound System Nec Plasma & LCD Monitors SDH System Transmisson Towers 132kV to 275 kV Power Cabling Equipments up to 33kV Underground Acer PCs, Servers & Notebooks COMPANY TOOLS AND EQUIPMENT KYORITSU INSULLATION TESTER 2 UNITS CONCRETE CUTTER 2 UNITS HAMMER DRILL 5 UNITS CABLE WRENCH SET 2 UNITS NORMA TESTER 2 UNITS EARTH TESTER 2 UNITS SIEMEN UC/UCN TOOLS 6 UNITS CONCRETE MIXER 2 UNITS WATER PUMP 12 UNITS COMPACTOR PREMIX 2 UNITS CABLE DRUM JACK 3 UNITS VIBRATOR HOSE 2 UNITS ROAD SAFETY CONE 26” 100 UNITS 3M HOT MELT TERMINATION KIT 2 UNITS GENERATOR 4 SETS CLEAVER TOOLS FIBER OPTIC 2 UNITS TRIFOR WRENCH 2 UNITS IMPACT TOOL CAT 5 5 UNITS CABLE SHEATH CUTTER 2 UNIT OPTICAL FIBER TELEPHONE 4 SETS 3M SPLICING TIG TOOL 3 SETS UTP TESTER CAT 5 2 UNITS LPG GAS TORCH COMPLETE 5 UNITS OPTICAL POWER METER 2 UNITS VENTILATION FAN C/W DUCT 5 UNITS PENTER SCANNER CAT 5 2 UNITS TELEPHONE HANDSET 10 UNITS SPLICING EQUIP. SINGLE MODE 1UNITS JOINTER CANVAS TENT 10 UNITS SPLICING EQUIP. MULTI MODE 1 UNITS 3M CRIMPING TOOL E9C 12 SETS OTDR TESTER 2 UNITS AT&T CRIMPING TOOL 2 UNITS OTDR TESTER SINGLE MODE 2 UNITS RODDING STICK 3 SETS LIGHT SOURCE MULTI MODE 2 UNITS CONCRETE GRINDER 4 UNITS SINGLE MODE ISDN TESTER 2 UNITS COMPANY VEHICLES TADANO CRANE TRUCK (25 TON) 1 LORRY CARGO WITH CRANE (16 TON) 1 LORRY (1 TON) 6 PICKUP (1 TON) 1 LORRY (1 TON) TIPPER 1 DATSUN C/20 - PICKUP 2 DAIHATSU PICKUP 1 SUBARU PICKUP 1 MITSUBISHI PICKUP 2 SSANGYONG REXTON RX 270 XDI 2 FORD RANGER HURRICANE 2.5 1 PROJECT LIST PREVIOUS JOBS • 1996 ITS contract Telekom Malaysia - 1.4 Million • 1997 ITS contract Telekom Malaysia - 1.4 Million • 1998 Telecommunication Contract VADS - 1.0 Million • 1999 KLIA Telecommunication Contract - 0.75 Million • 1999 DIGI Telecomm. Contract - 1.5 Million • 2000 KUB Telecommunication & Power Contract - 1.5 Million • 2001 Design, Construction, Testing & Commissioning and guarantee of Signalling Solution for Rail Link from existing KTMB Main Link Between Kempas and Senai to PTP Port Johore - 3.0 Million • 2002 Design, Supply, Install, Testing of Optic of Hanjoong Cement Plant Perak - 3.0 Million • 2002 Design, Supply, Install and guarantee Duct Sealing System & Telephone Infrastructure for Menara Telekom Kuala Lumpur - 0.25 Million • 2002 Line Plant Maintenance for Telekom Malaysia Berhad (LO System CNO) - 2.5 Million • 2002 Supply, Delivery, Installation, Testing and Commissioning Structured Cabling System for Consultancy and Customer Solution Telekom Malaysia - 1.5 Million • 2002 Infrastructure and ICT at Putrajaya for Perbadanan Putrajaya (Authority) - RM 0.2 Million • 2002 Electrified Double Track Project Between Ipoh and Rawang for DRB Contract No: KP/KTM/10/2000 (Utilities for TNB and Telekom) - RM 20 Million • 2004 Relocation of Telekom Fibre at Putrajaya – RM 1,063.969.40 • 2004 Pilot Project for Broadband Line Carrier at University Putra Malaysia Powerline Communication - RM 0.1 Million • 2005 AL-Jazeera International - Supply, Delivery, Installation, Testing, and Commissioning Structured Cabling System, Private Branch Exchange, Close Circuit Television, Office LAN Configuration and Building & Environment Monitoring System. Full Office Automation System Solution for hardware and software - RM 5.5 Million • 2005 Media Digital Distribution Sdn Bhd - Supply, Delivery, Installation, Testing, and Commissioning Structured Fiber & Copper Cabling System and Office LAN Configuration. - RM 0.6 Million PROJECT LIST PREVIOUS JOBS • 2005 Contract for Signalling, Power, Optic Fiber Cable Installation, Termination, Testing & Commissioning Works at Ipoh ~ Rawang for 14 Stations. - RM 4.5 Million • 2006 Electrified Double Track Project Between Ipoh and Rawang for UEM Construction Infrastructure Works (Utilities for TNB and Telekom) - RM 2.8 Million • 2007 Relocation Work for Transmission Line (22KW) at Kg. Sg. Terap, Batu Gajah, PerakRelocation of TNB 22/ 33/ 66/ 132/ 275KW Transmission Line Crossing - RM 380,000.00 • 2008 Supply, Delivery and Installation of Cable Ducting and Manhole for Signalling and Communication Systems - RM 1.4 Million • 2008 Sub-Contract for Design, Supply, Delivery, Installation, Testing and Commissioning of Communication Works at Batu Gajah Depot and Workshops Project – RM 1.5 Milion • 2009 Sub-Contract for Design, Supply, Delivery, Installation, Testing and Commissioning of CCTV and PA Cabling System at Batu Gajah Depot and Workshops Project – RM 735,000.00 • 2009 Sub-Contract for Design, Supply, Delivery, Installation, Testing and Commissioning of Electrical Control and Monitoring System – RM 400,000.00 • The Design, Construction, Completion, Testing, Commissioning And Maintenance of Railways Development At Batu Gajah, Perak – Package 1: Workshop & Depots - TETRA Radio System – RM 1.5 Million ONGOING JOBS • Proposed, Planning, Design, Supply, Delivery, Installation, Testing, Post-Acceptance, Commissioning, Optional Maintenance and Support Services in Respect of a High Speed Broadband Network in Peninsular Malaysia for Jalur Lebar Nasional Sdn Bhd – RM 1.0 Billion • Project Management Consultant (PMC) for North – South Fiber Access for the Client Symphonet Sdn Bhd – Micro Trenching and Blowing of Air Blown Fiber The information contained herein is prepared on a confidential basis. Any delivery or disclosure of this document to any person or any reproduction of this document in whole or in parts, must be with prior written consent from SPECOM Engineering Sdn. Bhd. TECHNICAL ASSISTANT SAFETY & QUALITY ASSURANCE MANAGER HEAD OF TECHNICAL PROJECT ADVISER PROJECT MANAGER ADMIN HEAD PROJECT MANAGER PROJECT DIRECTOR EXECUTIVE DIRECTOR CHAIRMAN PROJECT MANAGER WAYLEAVE OFFICER DESIGN TEAM (5) DESIGN OFFICER CHIEF FINANCIAL OFFICER SECRETARY ORGANISATION CHART AUTOCAD OPERATOR PROJECT DATA SHEET Project Name : DESIGN, CONSTRUCTION, TESTING & COMMISSIONING AND GUARANTEE OF SIGNALLING SOLUTION FOR RAIL LINK FROM EXISTING KTMB MAIN LINK BETWEEN KEMPAS & SENAI TO PORT TANJUNG PELEPAS, JOHOR Location : Client : PORT TANJUNG KERETAPI TANAH MELAYU BHD (KTMB) PELEPAS, JOHOR Services Provided : SPECIALIST MAIN CONTRACTOR FOR SIGNALLING & COMMUNICATION WORKS Approximate Contract Value : RM 3.0 MILLION Owner : KERAJAAN MALAYSIA KEMENTERIAN PENGANGKUTAN Turnkey Contractor : IRCON INTERNATIONAL LIMITED Start Date : FEBRUARY1999 Completion Date : DECEMBER 2001 Project Description : The project involved construction of 31.5km of track from Simpang Senai to PTP, three operating stations at Skudai, Gelang Patah and Tanjung Pelepas, a Centralised Train Control System and installation of modern signalling and communication systems. The link, successfully completed according to schedule, was declared open by Prime Minister Datuk Seri Dr Mahathir Mohamad on January 21, 2002. The main scope of works are :• Supply and install foundations and related pipe works for the signal units, equipment boxes and track distribution boxes. • Supply and install of equipment box, track distribution box, signal units, point machine, power cubicle, main distribution frame, battery banks, generator, UPS & lightning surge arrestor • Termination, testing, commissioning of all copper and fiber optic cables with complete testing & commissioning documentation. Commissioning and guarantee of outdoor signaling works with partly supply of materials for the rail link project from existing KTMB main line between Senai and Kempas Baru to Pelabuhan Tanjung Pelepas, Malaysia. PROJECT DATA SHEET Project Name : DESIGN, SUPPLY, INSTALL AND GUARANTEE DUCT SEALING SYSTEM & TELEPHONE INFRASTRUCTURE FOR MENARA TELEKOM KUALA LUMPUR Client : Location : TELEKOM MALAYSIA MENARA TELEKOM, KUALA LUMPUR Services Provided : SPECIALIST SUB CONTRACTOR FOR TELEKOM WORKS Approximate Contract Value : RM 0.25 MILLION Owner : Turnkey Contractor : Start Date : JANUARY 2002 Completion Date : OCTOBER 2003 Project Description : The project involved in maintaining the whole Line Plant for Telekom Malaysia which consists of :• Supply & install main fiber optic cable. • Supply & install copper cable for the entire Telekom Building. • Testing & commissioning fiber optic and copper cables. • Mandrel test for the existing and new PVC ducts. • Telekom cabinet/server room maintenance. PROJECT DATA SHEET Project Name : Client : LINE PLANT MAINTENANCE FOR TELEKOM MALAYSIA BERHAD (LO SYSTEM CNO) Location : TELEKOM MALAYSIA TELEKOM, SELANGOR Services Provided : SPECIALIST SUB CONTRACTOR FOR TELEKOM MAINTENANCE WORKS Approximate Contract Value : RM 2.5 MILLION Owner : Turnkey Contractor : Start Date : SEPTEMBER 2002 Completion Date : JUNE 2003 Project Description : The project involved in maintaining the whole Line Plant for Telekom Malaysia which consists of :• Supply & install main fiber optic cable. • Supply & install copper cable for the entire Telekom Building. • Testing & commissioning fiber optic and copper cables. • Mandrel test for the existing and new PVC ducts. • Telekom cabinet/server room maintenance. PROJECT DATA SHEET Project Name : Client : SUPPLY, DELIVERY, INSTALLATION, TESTING AND COMMISSIONING STRUCTURED CABLING SYSTEM FOR CONSULTANCY AND CUSTOMER SOLUTION TELEKOM MALAYSIA Location : TELEKOM MALAYSIA TELEKOM, SELANGOR Services Provided : SPECIALIST SUB CONTRACTOR FOR STRUCTURED CABLING Approximate Contract Value : RM 1.5 MILLION Owner : Turnkey Contractor : Start Date : JULY 2002 Completion Date : APRIL 2003 Project Description : The main scope of works are :• Supply and install using UTP 5e or higher cables and connectors from the switches to workstations, which capable of handling Ethernet and Fast Ethernet equivalent to 10/100 Base-T Ethernet Network using structured cabling system. • Structured cabling installed have the following features :- Compliant to CAT 5e cabling (Branded and of U.S. or European Brands, UL listed) - Be able to address all the networking demands - Capable of high speed data block transfer - Open for future expansion and upgrade • Supply and install network switches and all network and cabling components pertaining to connectivity and cable management. • Supply of materials and manpower for installation of conduit components of all cabling installations. • Supply & install necessary connectors, PVC pipe and moulding, patch panel, patch cable, conduit, faceplate duplex, blank insert, modular wall jack for RJ 45 shutter and clutter boxes or splitters, etc. • 2ft wall mount closed rack cabinet with flexi-glass for every switch location with lock, exhaust fan, power strip and extension cord to the nearest outlet • Testing, tagging/labeling, documentation and commissioning of the structured cabling project. (Patch cords, patch panel and ports labeled and managed by the cable managers and all laid out circuits tested and affected areas retouched) • Supply and install fiber optic cable and fiber switches c/w fiber track/tray. PROJECT DATA SHEET Project Name : ELECTRIFIED DOUBLE TRACK PROJET BETWEEN RAWANG TO IPOH (PROJECT LANDASAN ELEKTRIK BERKEMBAR DARI RAWANG KE IPOH Client : Location : KERETAPI TANAH MELAYU BERHAD (KTMB) RAWANG TO IPOH Services Provided : SPECIALIST SUBCONTRACTOR FOR RELOCATION OF UTTILITIES WORKS Approximate Contract Value : RM 20 MILLION Owner : KERAJAAN MALAYSIA KEMENTERIAN PENGANGKUTAN Turnkey Contractor : DRB-HICOM Start Date : OCTOBER 2001 Completion Date : DECEMBER 2004 Project Description : This project involves the construction of a new track (179 km) and upgrading of the existing track to allow for a maximum design speed of 160 kph. The other components of the project involved the construction of new concrete railway bridges, culverts, 14 stations, 40 overhead road bridges to eliminate all level crossings, construction of a new EMU Depot at Batu Gajah, overhead 25kV 50Hz electrification system, modern signalling and communication, Automatic Fare Collection system, land acquisitions and relocation of squatters The main objectives are:• to extend the existing KTM Komuter service from Seremban - Rawang to Tg. Malim with an average number of 100 services per day. • introduction of a rapid intercity service, between Ipoh and Sentral KL Sentral, with 16 services per day in the beginning and ultimately 32 services per day. • to upgrade existing rail infrastructure for the increase in track capacity for KTM Komuter, Intercity and freight trains. PROJECT DATA SHEET Project Name : CADANGAN MEMBINA DAN MENYIAPKAN PENJAJARAN SEMULA JALAN B15 (LAMA) DARI SKVE KE TERMINAL SIMPANAN MINYAK LEMBAH KELANG (KDVT) DAN KERJA - KERJA TANAH BERKAITAN DI PRESINT 11, PUTRAJAYA Client : Location : KUALA LUMPUR CITY CENTER BHD PRESINT 11, PUTRAJAYA Services Provided : SPECIALIST SUB CONTRACTOR FOR RELOCATION OF TELEKOM FIBER MAINTRUNK TO PUTRAJAYA GOVERNMENT OFFICE Approximate Contract Value : RM 1,063.969.40 Owner : PERBADANAN PUTRAJAYA Turnkey Contractor : BUMIHIWAY(M) SDN BHD Start Date : MAY 2004 Completion Date : SEPTEMBER 2005 Project Description : The project is situated in Precinct 11, Putrajaya, located at the north western corner of the city of Putrajaya. It is bounded by the Express Rail Link (ERL) Reserve and the South Klang Valley Expressway (SKVE) on the north, the collector road called R3 on the south and the city of Cyberjaya on the west. The total area measures 1,056.92 acres, making it the largest precinct in the whole of Putrajaya. This project is mainly involve in laying fiber optic cable and relocation of existing Telekom fibers. The major works carried out by Specom Engineering are: • Installation of JC9C manholes • Laying of PVC ducts • Testing & commissioning fiber optic cables PROJECT DATA SHEET Project Name : CONTRACT FOR SIGNALLING, POWER, OPTIC FIBER CABLE INSTALLATION, TERMINATION AND TESTING WORKS Client : Location : KERETAPI TANAH MELAYU BHD (KTMB) IPOH ~ RAWANG Services Provided : SPECIALIST SUB CONTRACTOR FOR SIGNALLING & COMMUNICATION WORKS Approximate Contract Value : RM 4,500,000.00 Owner : KERAJAAN MALAYSIA KEMENTERIAN PENGANGKUTAN Turnkey Contractor : BOMBARDIERBALFOUR BEATTYSIEMENS CONSORTIUM Start Date : DECEMBER 2004 Completion Date : COMPLETED Project Description : The main scope of works are :• Installation of cables type:- single and 3 phase 415v power cables up to 35mmsq. - Multicore signalling cables of various sizes from – 2pr to 28pr - ATPcables – 2pr and 10pr - Multimode Optic Fiber Cable • Installation of local (tail) cables from LSC & EB to track side mounted signalling equipment (eg. Signals, route indicators, shunt signals, track disconnection box & point machine) • Casting of concrete foundations for the color light signals with supply of sand, aggregate, & cements as per technical specification for:o 2 aspect signals, 3 aspect signals, Route Indicator, Ground Type Shunt Signal, SRI, FOTRI • Bonding for traction return rail (RE area) • Installation of main & local cables in the cable trough or cable ducts between the Signalling Equipment Room in the Station Building and Line Side Cabinets. • Termination all cables in SER, LSC, EB, DB and track side mounted signalling equipment. • Testing & commissioning all cables (copper & optic fiber types and complete test documentation) PROJECT DATA SHEET Project Name : PILOT PROJECT TESTRUN FOR BROADBAND LINE CARRIER AT UNIVERSITY PUTRA MALAYSIA – POWERLINE COMMUNICATION Client : Location : MALAYSIAN COMMUNICATIONS AND MULTIMEDIA UNIVERSITY PUTRA COMMISSION (MCMC) MALAYSIA Services Provided : SPECIALIST CONTRACTOR FOR COMMUNICATION WORKS Approximate Contract Value : RM 100,000.00 Turnkey Contractor : REALM ENERGY Start Date : AUGUST 2004 Completion Date : SEPTEMBER 2004 Project Description : Provide a comprehensive solution that transforms the existing electric grid into a broadband telecommunication network. The main scope of works are :• Supply and install fiber optic cables. • Supply and install UTP & coaxial cables. • Testing and commissioning for all cables (provided with test reports and comparison graphs). • Supply and install Light Interface Units(LIU) for each building/substation. • System integration with Ascom unit and UPM main server. • Testing of high speed signal data with Spectrum Analyser (Aniritsu Call Master). • Substation/server room maintenance. • As-Built drawing & documentation. PROJECT DATA SHEET Project Name : AL – JAZEERA INTERNATIONAL Client : AL – JAZEERA INTERNATIONAL Location : 60th FLOOR, TOWER 2, KUALA LUMPUR CITY CENTRE Services Provided : SPECIALIST CONTRACTOR FOR SUPPLY, DELIVERY, COMMISSIONING STRUCTURED CABLING SYSTEM,PBX,CCTV, OFFICE LAN (IT SYSTEMS) CONFIGURATION & BUIDLING MONITORING SYSTEM Approximate Contract Value : RM 5.5 MILLION IT Consultant : SPECOM ENGINEERING SDN BHD Start Date : DECEMBER 2005 Completion Date : COMPLETED Project Description : Provide a comprehensive solution for the entire broadband and telecommunication network. The main scope of works are :• Supply and install fiber optic cables. • Supply and install AMP Cat6 & coaxial cables. • Supply and install Dell Personal Desktop / Workstation, 3COM Switches, HP Server, FlexWatch IP Dome Camera, IP-EWST Network Intercom c/w Audio substation, Sierra IP Card Access System and Building Monitoring System. • Testing and commissioning for all cables (provided with test reports and comparison graphs). • Design the entire VLAN cabling structure & interfacing with free space optic module. • As-Built drawing & documentation. • Project Management. PROJECT DATA SHEET Project Name : MEDIA DIGITAL DISTRIBUTION Client : MEDIA DIGITAL DISTRIBUTION Location : 30th FLOOR, EMPIRE TOWER Services Provided : SPECIALIST CONTRACTOR FOR SUPPLY, DELIVERY, COMMISSIONING STRUCTURED CABLING SYSTEM & OFFICE LAN CONFIGURATION Approximate Contract Value : RM 600,000.00 Turnkey Contractor : MEDIA DIGITAL DISTRIBUTION Start Date : FEBRUARY 2006 Completion Date : MARCH 2006 Project Description : Provide a comprehensive solution for the entire broadband and telecommunication network. The main scope of works are :• Supply and install fiber optic cables. • Supply and install AMP Cat6 & coaxial cables. • Supply and install 3COM Gigabit Switches. • Testing and commissioning for all cables (provided with test reports and comparison graphs). • Design the entire VLAN cabling structure & interfacing with free space optic module. • As-Built drawing & documentation. PROJECT DATA SHEET Project Name : ELECTRIFIED DOUBLE TRACK PROJET BETWEEN RAWANG AND IPOH INFRASTRUCTURE WORKS Client : Location : KERETAPI TANAH MELAYU BERHAD (KTMB) RAWANG TO IPOH Services Provided : SPECIALIST SUBCONTRACTOR FOR RELOCATION OF UTTILITIES WORKS Approximate Contract Value : RM 2.8 MILLION Owner : KERAJAAN MALAYSIA KEMENTERIAN PENGANGKUTAN Turnkey Contractor : UEM CONSTRUCTION Start Date : MARCH 2006 Completion Date : ON GOING Project Description : This project involves the construction of a new track (179 km) and upgrading of the existing track to allow for a maximum design speed of 160 kph. The other components of the project involved the construction of new concrete railway bridges, culverts, 14 stations, 40 overhead road bridges to eliminate all level crossings, construction of a new EMU Depot at Batu Gajah, overhead 25kV 50Hz electrification system, modern signalling and communication, Automatic Fare Collection system, land acquisitions and relocation of squatters The main objectives are:• to extend the existing KTM Komuter service from Seremban - Rawang to Tg. Malim with an average number of 100 services per day. • introduction of a rapid intercity service, between Ipoh and Sentral KL Sentral, with 16 services per day in the beginning and ultimately 32 services per day. • to upgrade existing rail infrastructure for the increase in track capacity for KTM Komuter, Intercity and freight trains. PROJECT DATA SHEET Project Name : RELOCATION WORK FOR TRANSMISSION LINE (22Kw) AT KG. SG. TERAP, BATU GAJAH Client : Location : KERETAPI TANAH MELAYU BHD (KTMB) KG. SG. TERAP, BATU GAJAH Services Provided : RELOCATION OF TNB 22/ 33/ 66/ 132/ 275Kw TRANSMISSION & DISTRIBUTION LINE CROSSING Approximate Contract Value : RM 380,000.00 Owner : KERAJAAN MALAYSIA KEMENTERIAN PENGANGKUTAN Turnkey Contractor : UEM CONSTRUCTION Start Date : JULY 2006 Completion Date : COMPLETED Project Description : The main scope of works are :• Setting out and pegging of tower. • Reinforced concrete foundation works for lattice tower including competent person to receive and cancel PTW. • Supply and construct hot-dip galvanized mild steel lattice tower ‘shackle off’ type including all tower fittings, stub, bolt and nuts with anti climbing devices. • System re-energising and testing & commissioning. PROJECT DATA SHEET Project Name : THE DESIGN, CONSTRUCTION, COMPLETION, TESTING, COMMISSIONING AND MAINTENANCE OF RAILWAY DEVELOPMENT AT BATU GAJAH, PERAK PACKAGE 1 : WORKSHOPS & DEPOTS Client : Location : KERETAPI TANAH MELAYU BHD (KTMB) BATU GAJAH, PERAK Services Provided : SUPPLY, DELIVERY AND INSTALLATION OF CABLE DUCTING AND MANHOLE FOR SIGNALLING & COMMUNICATION SYSTEMS Approximate Contract Value : RM 1,400,000.00 Owner : KERAJAAN MALAYSIA KEMENTERIAN PENGANGKUTAN Turnkey Contractor : ROAD BUILDER (M) SDN BHD Start Date : SEPTEMBER 2008 Completion Date : COMPLETED Project Description : The Federal Government has approved a plan to build a central workshop and railway training centre in Batu Gajah for KTM Bhd. The project is said to be a priority as KTM's present base in Sentul will be giving way for residential and commercial development activities. The project involves the construction of several buildings on a 160-hectare site as part of a new rail infrastructure development plan. The plan calls for a dedicated centre to undertake major maintenance and overhaul of KTM's rolling stock, as well as a centre to manufacture locally-assembled wagons and coaches, which are currently mostly imported from Europe. This project is mainly involved in laying fiber optic and copper cables. The major works carried out by Specom Engineering are: • Installation of manholes – JC9C and JRC7 • Laying of PVC ducts – 150 & 100m • Testing & commissioning fiber optic cables PROJECT DATA SHEET Project Name : THE DESIGN, CONSTRUCTION, COMPLETION, TESTING, COMMISSIONING AND MAINTENANCE OF RAILWAY DEVELOPMENT AT BATU GAJAH, PERAK PACKAGE 1 : WORKSHOPS & DEPOTS Client : Location : KERETAPI TANAH MELAYU BHD (KTMB) BATU GAJAH, PERAK Services Provided : CONTRACT FOR DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING AND COMMISSIONING OF COMMUNICATION WORKS AT BATU GAJAH DEPOT AND WORKSHOPS PROJECT Approximate Contract Value : RM 1,500,000.00 Owner : KERAJAAN MALAYSIA KEMENTERIAN PENGANGKUTAN Turnkey Contractor : ROAD BUILDER (M) SDN BHD Start Date : SEPTEMBER 2008 Completion Date : COMPLETED Project Description : Provide a comprehensive solution for the entire telecommunication network. The main scope of works are :• Supply and install fiber optic cables. • Supply and install AMP Cat6 & coaxial cables. • Testing and commissioning for all cables (provided with test reports and comparison graphs). • As-Built drawing & documentation. • Project Management. PROJECT DATA SHEET Project Name : THE DESIGN, CONSTRUCTION, COMPLETION, TESTING, COMMISSIONING AND MAINTENANCE OF RAILWAY DEVELOPMENT AT BATU GAJAH, PERAK PACKAGE 1 : WORKSHOPS & DEPOTS Client : Location : KERETAPI TANAH MELAYU BHD (KTMB) BATU GAJAH, PERAK Services Provided : SUB-CONTRACT FOR DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING AND COMMISSIONING OF CCTV AND PA CABLING SYSTEM AT BATU GAJAH DEPOT AND WORKSHOPS PROJECT Approximate Contract Value : RM 735,000.00 Owner : KERAJAAN MALAYSIA KEMENTERIAN PENGANGKUTAN Turnkey Contractor : ROAD BUILDER (M) SDN BHD Start Date : SEPTEMBER 2008 Completion Date : COMPLETED Project Description : Provide a comprehensive solution for the entire telecommunication network. The main scope of works are :• Supply and install fiber optic cables. • Supply and install 4C,2C 300/500v power cable & RG59 cables. • Testing and commissioning for all cables (provided with test reports and comparison graphs). • As-Built drawing & documentation. • Project Management. PROJECT DATA SHEET Project Name : THE DESIGN, CONSTRUCTION, COMPLETION, TESTING, COMMISSIONING AND MAINTENANCE OF RAILWAY DEVELOPMENT AT BATU GAJAH, PERAK PACKAGE 1 : WORKSHOPS & DEPOTS Client : Location : KERETAPI TANAH MELAYU BHD (KTMB) BATU GAJAH, PERAK Services Provided : SUPPLY, DELIVERY, INSTALLATION, TESTING AND COMMISSIONING OF ELECTRICAL CONTROL AND MONITORING SYSTEM Approximate Contract Value : RM 400,000.00 Owner : KERAJAAN MALAYSIA KEMENTERIAN PENGANGKUTAN Turnkey Contractor : ROAD BUILDER (M) SDN BHD Start Date : JULY 2009 Completion Date : COMPLETED The entire integrated Control and Building Automation System (BAS) comprised of a network interoperable, stand alone digital controllers that communicating on an industry standard protocol in a network of a host computer. The BAS can be communicated to third party system such as HT Substation Digital Power Meters System, LV Substation Digital Power Meters System. The system is been modulated in the simple nature, and ease for future expansion on both capacity and functionality through the addition of sensor, actuator, network controllers and operational devices. The BAS specified for KTM project is monitored the following items:1. 2. 3. 4. 5. 6. TNB Power Substations, HT & LV Digital Power Meters MSB & EMSB, Generators External Compound or Yard Lighting Control System AHU Control Panel Fire Protection Alarm Lift Car Control Panel Power PROJECT DATA SHEET Project Name : THE DESIGN, CONSTRUCTION, COMPLETION, TESTING, COMMISSIONING AND MAINTENANCE OF RAILWAY DEVELOPMENT AT BATU GAJAH, PERAK PACKAGE 1 : WORKSHOPS & DEPOTS Client : Location : KERETAPI TANAH MELAYU BHD (KTMB) BATU GAJAH, PERAK Services Provided : SUPPLY, DELIVERY, INSTALLATION, TESTING AND COMMISSIONING TETRA RADIO SYSTEM SYSTEM (TETRA) Approximate Contract Value : RM 1,500,000.00 Owner : KERAJAAN MALAYSIA KEMENTERIAN PENGANGKUTAN Turnkey Contractor : ROAD BUILDER (M) SDN BHD Start Date : AUGUST 2009 Completion Date : COMPLETED A professional mobile radio and two-way transceiver was specifically designed to suite KTMB for the their communication purposed. A fully digital system, TETRA employs the open system architecture, providing for internetworking with other communication network via standard interfaces. TETRA makes efficient use of available spectrum – packing four channels into a single RF carrier, occupying only 25 kHz of bandwidth. This leads to significant gains in traffic density and can reduce the complexity and expenses of base station combining equipment.