UMCC Satellite Sites
Transcription
UMCC Satellite Sites
Brief for Senior AF Leadership - April 2010 - Rationalization of Construction Engineering Support to - Air Force Satellite Sites - Background Budget constraints and limitations on the numbers of indeterminate DND/CF civilians has been the catalyst for the AF and A4CE to better utilize existing positions; hence the push to develop options for the optimization of pan-AF infrastructure support. 2 Feb 2010 2 Satellite Sites 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 3 Ere Armoury (Sept Isles) 3 Ere Armoury (Jonquiere) 3 Ere HMCS Chicoutimi 3 Ere Rankin Inlet FOL 4 Wg Inuvik FOL 4 Wg Iqualuit FOL 8 Wg Armoury (Bellville) 8 Wg Armoury (Peterborough) 8 Wg CFS Alert 9 Wg Armoury (Corner Brook) 9 Wg Armoury (Stephenville) 9 Wg Armoury (Grand Falls) 14 Wg Armoury (Middleton) 14 Wg Armoury (Yarmouth) 14 Wg Trg Area (Aldershot) 14 Wg Debert Cadet Camp 19 Wg Trg Area (Jarvis Lake AB) 19 Wg Trg Area (Resolute Bay) 19 Wg CFS Holberg 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 17 Wg Armoury (MacGregor,Wpg) 17 Wg Armoury (Minto, Wpg) 17 Wg HMCS (Chippewa, Wpg) 17 Wg HMCS Griffon (Thunder Bay) 17 Wg Armoury (Kenora) 17 Wg Armoury (Thunder Bay) 17 Wg Armoury (Portage La Prairie) 17 Wg Armoury (Moose Jaw) 17 Wg Armoury (Regina) 17 Wg HMSC (Saskatoon) 17 Wg Armoury (Saskatoon) 17 Wg HMCS Queens (Regina) 17 Wg Armoury (Yorkton, SK) 17 Wg Det Dundurn (SK) 17 Wg Yellowknife FOL 34 Satellite Sites, $10,000,000 O&M, SWE, Overhead/yr (Does not include Dundurn SWE $2.5 Million) Existing Support 4 Wing 19 Wing 9 Wing AOR 3 Wing Supporting Wing Satellite Site 17 Wing 14 Wing 8 Wing 3 March 2010 Existing Support 4 HR - Approx 25 positions directly support satellite sites plus a significant overhead costs (Engineering, Properties, Shops) – Total $2 Million. 4 In addition , 50 CE Civ positions at Det Dundurn (approx $2.5 Million in SWE) plus15 Military positions. 4 Costly - Sites are generally located away from the Wings resulting in personnel being away for extended periods (not available for Wg support) and increased travel costs. 4 Operational Impact - Increased Op Tempo has resulted in greater demands being placed on limited CE staff as Military pers deploy. Minimal support is applied to programs such as preventive maintenance (PM) as resources just aren’t available. 3 March 2010 Objectives 4 To advance options to remove or minimize direct CE personnel support to non-AF infrastructure; allowing those resources to focus on higher AF priority issues/sites. 4 Selected sites to be managed via an alternative means, likely through PWGSC or DCC tendered SOA contracts. 4 Initial focus on armouries and similar satellite sites with the intent to gradually move the responsibility from Wings to a more central (AF / CF / DND) management authority. 4 Existing on-site CE staff will remain until mutually acceptable alternative employment is secured or positions become vacant through attrition. Where possible gains in SWE due to vacancies will go back to supporting Wings if in line with AF priorities. Support Concept 4 To provide support to selected satellite sites through a DND/AF led, centrally located Facility Management Office (FMO) in conjunction with DCCs Real Property Management Services (RPMS). 4 DCCs RPMS will provide capabilities such as engineering, environment, properties and contracting as required. 4 The DCC site office at each Wing will be responsible to manage day to day activities at each satellite site using PWGSC, DCC contracts. 3 March 2010 Support Concept 4 Wing 3 Wing 19 Wing 9 Wing 17 Wing Primary Support Wing & AOR Assisting Support Wing & AOR Satellite Site 3 March 2010 14 Wing 8 Wing Management Model 3 March 2010 AF Responsibility 4 Manage ongoing requirements and direct DCC to provide all support services such as Engineering, Properties, Environmental, Contracting and Fire inspection. 4 Funding (Wing baseline funding will be reduced by the amount currently allocated to support the site) 4 There is no impact to existing CE positions; employee Admin (leave, pay, training) will continue as per Status Quo. 4 DND will be final authority on all operations. AF Responsibility 4 Headed by senior Military/Civilian pers, working in conjunction with RPMS Service Line personnel 4 Responsible to manage program 4 Business Planning 4 Roll up of program to HHQ (HCMS, environmental program, funding requests) 4 Project review/approval 4 Provide assistance/review for DCC site office program 4 Keeping Responsible Wings (RW) up to date on matters of concern (environment) 4 Ensure A4CE policies and procedures remain core to the program DCC Responsibility 4 Manage the day-to-day operations of the satellite sites using PWGSC, DCC SOA contracts. 4 Provide all support services such as Engineering, Properties, Environmental, Contracting and Fire inspection. DCC Site Office 4 Manage day-to-day satellite site operations 4 Action work requests 4 Manage budget 4 Manage environmental program 4 Site inspections 4 Manage PM program 4 Prepare project synopsis 4 Roll up of program (reporting, budget, projects) 4 Monthly billing to DND 4 Pay utilities DCC Services 4 To provide comprehensive Real Property services to the facility management office. 4 Engineering services (designs, scopes of work, specifications, building condition reports) 4 Properties services (leasing, MOU’s, SLA’s, NMU’s, PILT, RAIS) 4 Environmental services (compliance, HCMS, program authority, reporting to HHQ) 4 Fire services (compliance, inspections, reporting) 4 Contract services (contract review, tendering) FMO Summary Facility Management Office Staffing Requirements Eff: 30 Sept 2009 Ser Title / Task Position SWE Civ Duties $80,000 1 Management of all AF Satellite site operations on behalf of Air Div/WLEO 0 1 Coordinate contracting requirements on behalf of regional offices, manage armouries properties issues, provide oversight on satellite site enviromental issues and provide engineering support capability. $59,000 1 Finiancial tracking, reporting, HR, General office support. Management Office 1 Leader 2 DCC RPMS 3 Admin - Pers Grand Totals: Notes: 3 March 2010 AS 06 AS 3 $139,000 1. Size of DCC staff will be dependant on work requirements. Total Staff: 3 Implementation 4 4 4 4 4 4 4 4 Initiate discussions with WCEO and review potential sites. Discuss program with WCE civilian/military staff. Determine requirements/develop SOW. Request funding. Tender SOA contracts. Develop DCC site management plan. Discuss transition plan at joint CE/DCC staff meeting. Transfer period (approx 2 months) - transfer site documentation from CE to DCC, get DCC FM acquainted with program. 4 DCC assumes site management. Timelines Conclusion 4 New programs and policies continue to place greater demands on AF civilian/military staff. This initiative is intended to alleviate some of those demands and allow folks to focus on tasks that are core to the AF mission.