Hwy. 61 Reconstruction brochure
Transcription
Hwy. 61 Reconstruction brochure
Access During Construction: Project Communications: Construction Communication: The City of Red Wing and its project partners are committed to minimizing the impacts of the US 61/Main Street project on businesses, residents, and visitors to Red Wing. We will work with the Contractor to ensure that business and residential accesses are maintained at all times and proper lines of communication are in place to inform all stakeholders of project updates and progress. •Weekly construction updates and newsletters •Public Meetings with Contractor and City of Red Wing staff •Project website – www.redwing.org/th61home.html •City of Red Wing “Main Event Committee” -- Local information and business support during construction -- Website: XXXXXX •Media The City of Red Wing staff with assistance from Bolton & Menk will be leading all outreach and communication efforts during construction. Staff will be available to answer questions during construction and will provide updates on upcoming work to affected property/ business owners. Construction staff will be on-site to resolve problems as they arise and available via cell phone or email at any time for additional assistance. Typical Access Strategies: •Installing temporary business and directional signing •Installing temporary driveway locations •Installing temporary ramps where sidewalk has been removed •Phasing sidewalk construction •Using alleys for access and deliveries •Installing temporary signals at key intersections •Maintaining access to parking ramps Outreach Coordination: AARON WARFORD – Bolton & Menk Project Manager Contact: aaronwa@boton-menk.com or 651.503.5700 JAY OWENS – Red Wing City Engineer Contact: jay.owens@ci.red-wing.mn.us or 651.385.3625 CORY BEINFANG – Bolton & Menk Project Engineer Contact: corybi@bolton-menk.com or 507.995.2936 JOSH HRABE – Bolton & Menk Construction Inspector Contact: joshhr@bolton-menk.com or 612.965.2473 HWY 61/MAIN STREET RECONSTRUCTION Construction Communication About the Project: The US Highway 61 (Main Street) Project includes the reconstruction of US Highway 61 between Old West Main Street and Potter Street in downtown Red Wing. The City has developed a project to replace utilities, reconstruct the roadway corridor, enhance multimodal travel, and incorporate key streetscaping elements. V LE P SH P 3R ST . . E AV E AV ST HWY 61/MAIN STREET RECONSTRUCTION ST . D EA WE T. 4TH ST. CITY HALL P PUBLIC PARKING POST OFFICE ER ST . P P P ST. T. 2016 Construction LIBRARY ST . ST . . ST S TA KO DA ST. LIN NK LS 2015 Construction HOTEL PL UM BU T. H o T E L P ST . H o T E L ES PARK AI N . ST M EE P D OA BR . RD N LTO ST. HIL ST. PIN “Establish downtown Red Wing as a premier riverfront destination by creating vibrant gathering places, attractive housing options, thriving commerce, and strong linkages that celebrate the experience and foster sustainability.” L M MAIN E E EV AIN OLD DEPOT P St. Main to Open Traffic CEDAR ST. Vision Statement M FRA The project will be constructed in 2015 and 2016. R IVE PPI R SI ISSIS RED WING BAY PO TT FU The primary improvements of the project include: •Full pavement reconstruction and utilities replacement •Narrowed overall roadway pavement section with the use of 11’ travel lanes •Improved street lighting - decorative and efficient pedestrian/roadway lighting •Improved Americans with Disabilities Act (ADA) pedestrian facilities •Mid-block pedestrian crossing between Hill Street and Franklin Street, including median refuge and HighIntensity Activated crossWalk (HAWK) signal system •Pedestrian bump-outs at key intersections downtown •Traffic Signal upgrades •Streetscape improvements including trees, planted boulevards and medians, pedestrian and bicycle amenities, and gateway and historic district identity features