in this issue - Das Otomotiv
Transcription
in this issue - Das Otomotiv
ViZYON www.dasoto.com.tr info@dasoto.com.tr Corporate publication by DAS Otomotiv ve Jeneratör Tic. Ltd. Şti. May 2014 / Issue 7 Terex CC2400 Crawler Crane provided by Sarılar was used at the power station project by AKSA in Yalova. Within the scope of the project, 5 treatment units with a capacity ranging from 55 to 80 tons were mounted in this issue 03 Growth in port equipment 05 Bendini training performed 06 DAS supports mega projects in Azerbaijan 6 V SAYFA 11 V PAGE DAS Otomotiv established a permanent maintenance facility for Terex cranes operating at Tüpraş, number one in “Turkey’s 500 Biggest Industrial Facilities” list. DAS personnel is continually on-site to provide spare parts and maintenance services 4 V PAGE Izmit Bay Bridge Project Crane services for assembly of constructions to be used during the construction of the bridge piers will be provided by Çaba spare parts, service and maintenance works are performed by DAS Otomotiv Terex Port Equipment is the leading choice in many regions of Turkey. Major port operators are increasing the volume of business using Terex Port Equipment for container transportation and other purposes At the training given by Sergio Govoni from Terex Bendini plant, new Quadstar 75 model and its details were discussed Ali Spatar, DAS Azerbaijan Region Sales Manager, replied our questions on the contributions of DAS to development of Azerbaijan and the projects in progress www.dasoto.com.tr OUR WEB ADDRESS UPDATED facebook.com/dasvinc twitter.com/das_oto Das Otomotiv ve Jeneratör Tic. Ltd. Şti. instagram.com/dasotomotiv PAGE 10 V Uninterrupted services at TÜPRAŞ ISSN NO 96324 2 Cimolai MBH 560T at Aykın Shipyard Cimolai MBH 560T, the largest tonnage capacity lift in Turkey which was purchased by Aykırı Shipyard and installed in April 2013, was delivered free of any problems on March 3, 2014 after finger pier and dock concreting and with the static and dynamic tests successful C imolai MBH 560T, the largest tonnage capacity lift in Turkey which was purchased by Aykırı Shipyard with the sales agreement made in December 2012 and installed in April 2013, was delivered free of any problems on March 3, 2014 after finger pier and dock concreting and with the static and dynamic tests successful. The static test was performed at x1.25 capacity (560Tx1.25=700T ) and the float taken from the pier was disconnected from the water line, held over the slings for 15 minutes and the tests for the drum, pilot valves, ropes, slings, main engine and auxiliary engine were performed using visuals and data provided via plc computer and no error was detected. The dynamic test was performed with x1.1 capacity (560Tx1.1=620T ) and 620T waterfilled float taken from the pier was removed from the sea, rotated 360 degrees around its axis for 10 minutes in Slew-Drive mode, moved for 10-minute periods with crab walks and all hydraulic systems, main and auxiliary engines, ropes, slings, pivot pin tensions, hydro-valves and alarm systems were tested. Cimolai MBH 560T was proven as a lift exceeding 100% capacity and received full marks from the shipyard’s operations managers, Bilal and Muammer Aykın. Otomativ Customer Project Type Crane Type Project Location GEMONT Construction Rough Terrain Mobile Turkey GEMONT Construction Manlift Turkey SISTEM Rental Crawler Crane Turkey SISTEM Rental Crawler Crane Turkey HEAVY CRANE Rental All Terrain Mobile Crane Azerbaijan PSP-IRAQ Construction Rough Terrain Mobile Crane Iraq TEMEL KIMYA Trader Rough Terrain Mobile Crane Turkey SİMGETEK Construction Rough Terrain Mobile Crane Turkey ECETUR Construction Rough Terrain Mobile Crane Turkey Stock Machinery; List of immediate on-site delivered stock cranes from Istanbul customs: Rough Terrain Mobile Cranes 32t 45t 60t 75t 90t Terex RC30 Terex RC45 Terex A600 Terex RT75 Terex RT100 ViZYON 2014 ISSUE: 7 NEW! NEW! NEW! NEW! NEW! Please contact our sales team for your new and second-hand crane requirements. Das Otomotiv attended CNRAvrasya Boatshow at CNRExpo from February 15 to 23. Das Otomotiv promoted boat lifts and boatmover products by the Italian Cimolai brand at the show. The show was visited by 65 thousand visitors and very positive for Das Otomotiv. Cimolai products known for good references in Turkey were at the forefront for representatives of many marinas. The latest references of Das include Aykın Shipyard with a 560t boat lift and Bodrum Palmarina, a wellknown high-capacity marina, with a 260t boat lift and 100t boatmover. PublIsher On behalf of DAS Otomotiv ve Jeneratör Tic. Ltd. Şti. KERİM BAŞAKINCI General CoordInator ALİ BAŞAKINCI COPYRIGHT PAGE Recent Sales by Intensive attention to Das at Boatshow; ManagIng EdItor CEYHUN HAZNECİ Prepared By APA YAYINCILIK PRINTED BY Gezegen Basım San. Tic. Ltd. Yüzüncü Yıl Matbaacılar Sitesi 2.Cadde 202/A Bağcılar / İSTANBUL GEZEGEN BASIM CERTIFICATE NO: 12002 PRINT DATE: MAY 2014 DAS Otomotİv ve JENERATÖR Tİc. Ltd. Ştİ. Gardenya Plaza 5 Kat:2 34758 Ataşehir/İSTANBUL Tel: 0(216) 456 57 05/06 Type of Publication: Quarterly published local periodical. This complimentary copy of DAS VİZYON is for internal and external distribution. Growth in port equipment “Fully business-focused team” Terex Port Equipment sold by DAS Otomativ is the leading choice in many regions of Turkey. Major port operators are increasing the volume of business using Terex Port Equipment for container transportation and other purposes Korhan Yeşil joined DAS Otomotiv three months ago as Turkey Sales Manager. Yeşil tells that he started his career at Michelin in 1999 as Marmara Region Representative for construction machinery tires and worked for construction machinery and construction companies for 15 years and continues: “We are authorized distributors in Azerbaijan, Turkmenistan and Kazakhstan as well as Turkey. My colleagues are focused on these countries and therefore I am responsible for sales in Turkey”. Yeşil tells that crane group is a niche business and continues: “This business requires a high level of accumulated knowledge. This area of sales requires a lot of technical knowledge and you are expected to be directly in Korhan Yeşil contact with Turkey Sales Manager the customers. I have an advantage here, because I was in contact with customers from this segment at my previous employers. Yeşil reminded that DAS Otomotiv has a 45-year history and a well-established network and continued: “What made me decide to work here were specifically the vision, open-mindedness and approaches of top-level managers. Everyone here are extremely good professionals. It is a completely business-focused company and therefore I fit in easily. I can say that this is a really professional atmosphere. In crane business, achievement depends on close follow-up of projects. We are closely following power and construction projects in Turkey”. T erex Port Equipment Varying areas of use sold by DAS Port Aktan tells that some machinery Equipment unit is the was sold for STFA’s project preferred choice of in Morocco and the project port equipment in Turkey, as it includes a 3 km-long and 18 is in many other countries. Port km-deep breakwater at Safi, 250 operators are increasing the km south of Casablanca, with a pace of business using Terex total length of 390 m including Port Equipment for container the pier. STFA purchased Terex loading and unloading and TFC 45 type stackers for this other purposes. project. Aktan tells that STFA’s DAS Otomotiv recently made stackers are used for a quite some serious sales of port unique purpose, that they are equipment. Hakan Aktan, Das very happy with this and adds: Port Equipment Represantative, “Stacker type products we sold Hakan Aktan briefed us on the issue and are used to move and place DAS Port Equipment Represantative reminded that they sold port the concrete blocks called equipment to STFA, TCE, Marport and Asyaport. Aktan tetrapods used in construction of the breakwater. This reported that they sold a FDC 25K7 machine for is a new field of use but STFA is quite satisfied with the stacking empty containers to TCE, TCB’s terminal in product.” Turkey, and continued: “The machine was transported Aktan reminded that the most significant reason for and mounted, it is now operational at Aliağa terminal, choosing this product was that the product is capable FDC 25K7 can stack 7 tiers of empty containers. TCE of pick and carry the objects. Aktan also reminded purchased a FDC 25J7 model Terex earlier and these the recent RTG sale to ASYAPORT and continued: are manufactured at Terex’s plant in Italy. “Asyaport purchased 24 Terex RTG cranes to use at the Electric RTG type cranes which are recently on the port which is still under construction 5 km to the west rise in Turkey due to lower cost of electric power as of Tekirdağ. The cranes are being manufactured now compared to diesel are also sold by DAS Otomotiv and they will be commissioned at the port in October, and 6 of them have been sold to Marport as the last before the port starts its operations”. Aktan adds business. Aktan reminds that the products will be used that Steve Filipov, Terex Material Handling and Port for stacking containers at the port and continues: Solutions Director was recently in Turkey for customer “Marport at İstanbul Ambarlı is one of the best visits and continues: “We visited some customers on customers of Terex Port Equipment”. Aktan mentions March 17 and 18. We focused especially on Marport, that Marport has been using Terex products for a long Asyaport and Assan. These meetings were beneficiary, time and adds: “Arkas, which owns Marport, used to both for us andfor our customers”. prefer Fantuzzi since 1990s. In 2009, when Fantuzzi and Noell were purchased by Terex, the company continued to purchase Terex products”. Aktan reminds that manufacturing a RTG crane takes almost 1 year and they are widely preferred in Turkey in the last years. Aktan thinks that the reason of this is that it operates on electric power and adds: “Most of the RTG sales we make consists of electric products. Diesel costs in Turkey are quite high and therefore port operators prefer electric-powered RTGs. It is also faster and more economic as compared to other container stackers. The global trend is to switch to electric-power products and the number or users in Turkey is also on the rise”. YENİ BiR iSiM 3 TFC45 - STFA, Morocco Breakwater Project Visit of Mr. Steve Filipov, Terex Material Handling and Port Solutions Director ViZYON 2014 ISSUE: 7 4 Uninterrupted services at TÜPRAŞ DAS Otomotiv established a permanent maintenance facility for Terex cranes operating at Tüpraş, number one in “Turkey’s 500 Biggest Industrial Facilities” list. DAS personnel is continually on-site to provide spare parts and maintenance services W Hasan Konca DAS Otomotiv Marmara Region Representative e talked about TÜPRAŞ and maintenance services provided by DAS with Hasan Konca, Das Otomotiv Marmara Region Representative. Hasan Konca works for DAS since 2006 and informs us on the maintenance services provided by DAS: “Our company provides maintenance services exclusively with its personnel. We will build our maintenance workshop as soon as possible and train employees for crane maintenance. I have no doubt that this will ensure that we will be the authorized company providing the best maintenance services”.Konca informs us also on the works at TÜPRAŞ: “TÜPRAŞ uses its cranes with its own personnel. They also have a yearly agreement with Coşkun Vinç. Companies including Tekfen, Gemont, Gemsan, Havatek and Ahmet Nihat Özhan are involved in the investments within TÜPRAŞ and all these companies have cranes with varying capacities”. Training at Zweibrücken plant 2014 updated training for rubber tire telescopic mobile cranes under All Terrain crane group with a maximum capacity of 250 tons was performed at Terex’s Zweibrücken plant 2 014 updated training for rubber tire telescopic mobile cranes under All Terrain crane group with a maximum capacity of 250 tons was performed at Zweibrücken plant of Terex. The training was given by Cristoph Leininger and Ömür Topal, Cemil Çetin, İhsan Dalgıç and Oğuz Bozkurt from Das Otomotiv service team attended the training. the training was performed on March 25, 26 and 27 and focused on electrical, electronics, hydraulics, mechanics, general diagnostics, scheme reading and maintenance for the new generation 100 tons – 250 tons cranes. Das Otomativ service team mentioned that best maintenance is only possible with being informed on the crane as well as an operator and the training was extremely useful. ViZYON 2014 ISSUE: 7 Maintenance and spare part services Hasan Konca tells us why a permanent maintenance facility was established at TÜPRAŞ: “TÜPRAŞ has the largest industry facilities in Turkey. Terex cranes used at these facilities are provided by DAS. We provide maintenance and spare part services for 22 years. As a result of mutual satisfaction, we provide maintenance services with permanent staff. We also provide maintenance services for other machinery as requested by TÜPRAŞ. We have an annual maintenance contract with İzmit TÜPRAŞ refinery. As per the contract, we perform quarterly maintenance and failure maintenance. This contract can be extended for three years by mutual agreement. Furthermore, we provide additional out-of-scope services with specific contracts. We receive work orders from TÜPRAŞ’ Maintenance Scheduling Department for quarterly maintenance. Maintenance is performed on the specified date. Failures are detected during maintenance. A report is submitted to the related authorities. When necessary, maintenance scheduling department requests maintenance with a failure work order” SSH (after-sales services) team meets at dinner Das Otomotiv after-sales service team came together at dinner. DAS Otomotiv managers were also at the meeting and the focus was on assessments to increase the level of satisfaction for maintenance and spare-part services D as Otomotiv organized a dinner to allow the members of newly-developing after-sales department to socialize and improve their relations. The dinner was at Develi Restoran, with attendance of Das Otomotiv board members and managers. At the meeting, discussed issues included better synchronization and cooperation of the new IHI site team and updated TÜPRAŞ maintenance team with the headquarters, their problems and general maintenance support requirements. The meeting was extremely effective, allowing discussions on improvement of spare-part sales team and better coordinated operations with the technicians and it is now an objective to keep such organizations going to keep the motivation at the highest level possible. At the training given by Sergio Govoni from Terex Bendini plant, new Quadstar 75 model and its details were discussed. Newlydesigned operator’s cabin and new generation joystick which will be used in all new models were also presented in detail T he first training of 2014 was performed at Silence Convention Center on January 27 to 29. At the training given by Sergio Govoni from Terex Bendini plant, new Quadstar 75 model and its details were discussed. Newly-designed operator’s cabin and new generation joystick which will be used in all new models were also presented in detail. Furthermore, new LMI systems, their specifications and updates were explained in detail. Improvements in hydraulic and pneumatic systems, major possible failures, system reinforcements and important issues regarding diagnostics were explained. Improvements regarding all rough terrain crane models, system improvements, detailed analysis of electronic circuit diagrams and methods of fast diagnostics were detailed. Tower crane training in Italy Terex CTT-181 comedil tower crane training in Italy was attended by Sercan Kösterit from Das Otomotiv as well as Mehmet Coşkun, Duran Yaşar Akış and Serdar Güçlü from Ekinciler İnşaat T erex CTT-181 comedil tower crane training was performed from March 31 to April 4 in Italy. The training had theorical and practical aspects and exchange of views added to its efficiency. 4-day training in Italy was attended by Sercan Kösterit from Das Otomotiv as well as Mehmet Coşkun, Duran Yaşar Akış and Serdar Güçlü from Ekinciler İnşaat. The training given by Willam de Bona was 70 percent theorical and 30 percent practical. The theorical aspects of the training were supported by visuals and Q&A sessions and exchange of views assisted the practical aspects. Simulators were also used during the training and the participants were very satisfied with the training Sercan Kösterit which they considered Das Otomotiv extremely efficient. “I am fulfilling my obligations to my family” Ömer Dedeoğlu was graduated from Yıldız Technical University Surveying Engineering Department in 2007 and fulfilled his military obligation afterwards. After the military service, he had a 3-month business experience and joined Das Otomotiv, where he has been working since 2008. Dedeoğlu says that her was assigned to DAS Engineering in his first days at DAS and continues: “In my first days, we were making a research on wind energy. We were researching the process from building a wind power station to the day of commissioning”. Dedeoğlu explains that he continued to work for DAS Engineering and then assigned for Order Follow-up at DAS Otomotiv in May 2013 and adds: “My work now covers the process beginning with the placement of order and ending with delivery of the product. Dispatch of products from the plant, placement of orders, delivery times, transportation, follow-up of insurance processes, customs procedures, receipt of payments by the customers and similar processes are included”. Dedeoğlu reminded that they functioned as a bridge between sales and after-sales services and added: “The scope of our job is actually quite extensive. In some cases, we provide assistance regarding the delivery times at pre-order stage. After the sale is finalized, all processes related with delivery of the product to the customer are under our control. We keep the customer up-to-date on the delivery time. Our basic objective is to deliver the products to customers fast and securely. These processes are important not only for the customer but also for internal data flow”. DAS is a family Dedeoğlu said that DAS, being the first step in his career, is very important for him and continued: “I am very happy at DAS Otomotiv. This is my 6th year. Actually I do not feel like I am coming to a workplace. It feels like I am out of one home into another one. We are a family here. Under the corporate identity, we can feel the warmth of a family. This is not the case in many companies and it helps me a lot”. Dedeoğlu continued: “I do not feel uncomfortable here, waiting for the month to end. I just feel like I am fulfilling my obligations to my family and I work for that purpose. With this level of integrity and warmth, everyone is efficient and does the best.” Ömer Dedeoğlu – SOrder Follow Proccesing Bendini training performed One Of Us 5 ViZYON 2014 ISSUE: 7 6 supports mega projects in Azerbaijan Baku Olympic Stadium Project What can you tell us about the new organization in Azerbaijan? I can say that the Azerbaijan organization gained pace with the establishment of our local company, Das Kran AZ in April 2010. During this period, we made several visits to Azerbaijan and we were informed on the region. Oil and natural gas resources as well as the developing nature of the region makes it important for us. What is your organization to provide services for the projects in the region? The initial organization is the local service team, which is very important for us. The service team was trained as necessary and is now capable of immediate intervention to any failure. What will be the activities regarding the maintenance and spare part services in the region? With the purposes of fast responds to the needs of customers in the region, we placed DAS Otomotiv containers at the sites of major projects and try to make a difference. We provide maintenance and spare part services for Terex cranes in the region. We supply spare parts from our inventory as fast as ViZYON 2014 ISSUE: 7 7 Ali Spatar, DAS Azerbaijan Region Sales Manager, replied our questions on the contributions of DAS to development of Azerbaijan and the projects in progress Socar Headquarters Project Sport Center Project Airport, various residential are among the projects we sell equipment for. Ali Spatar DAS Azerbaijan Region Sales Manager possible and prevent interruption of equipment. Which projects in Baku are your machines used for? Can you give us basic information on the projects? Oil projects (construction of platforms and refineries), chemicals plants, Olympic Stadium, Socar Headquarters, Shooting Complex, Baku Haydar Aliyev International Can you detail which machines are used for which projects? We sold 44 pieces of equipment for the Olympic Stadium Project being constructed for the first European Olympics in 2015. This package includes tower cranes, mobile cranes, platforms and telescopic forklifts plus a 1250 ton capacity crawler crane. We sold 20 pieces of Terex cranes and Genie equipment for Socar Headquarters Project. We sold 34 pieces of Genie platforms for Baku Haydar Aliyev International Airport. 5 rough terrain mobile cranes are operating at Qazma and Azerikimya which are managed by Socar. 4 luffing type tower cranes with a capacity of 24 tons were sold for Ministry of Property Committee and Baku Tower project constructed by Azinko Holding companies. We also have a 32-ton capacity crane at the shooting complex built for the European Olympics project. What can you say about your rental services? Comparing the market demand for platforms and the equipment available, we can see a significant lack. In this sense, we started to rent hydraulic platforms with an operating height between 12 to 43 in 2013. We want to increase the number and be effective in this business. Anything to add? Although we can exist only if we make sales, we are also aware of the importance of after-sales services and we will use our best efforts to provide best services for the customers in a timely manner. ViZYON 2014 ISSUE: 7 8 Finishing touches at Akasya Acıbadem Hareket providing services at Akasya Acıbadem residential project at Istanbul’s Anatolian Side mounted steel constructions of up to 20 tons to the roof floor at a height of 100 meters. 600 ton-capacity Terex CC2800-1 crawler crane was used A kasya Acıbadem, one of the most prestigious residential projects of Istanbul’s Anatolian Side, was recently completed and mounting of steel constructions specially designed for the roof floor were among the finishing touches. Terex CC2800-1 crawler crane used for mounting the steel constructions at an height of 100 meters made a majestic site at the busiest district of the Anatolian side. Hareket at work Hareket was assigned to transport the steel constructions manufactured for Akasya Acıbadem project and weighed up to 20 tons and used a 600 ton-capacity Terex CC28001 crawler crane for the job. Terex CC2800-1 crawler crane was the preferred machine for this prestigious project and the constructions were transported to the site in pieces by Hareket, which also made a site research before the assembly of the crane. The engineers of the company had to take many factors into account including strong winds, narrow working space and the location of the crane and specified the best boom configuration Terex CC2800-1 crawler crane based on the date gathered ViZYON 2014 ISSUE: 7 from the research. Following the determination of the boom configuration and location of the crane, Hareket performed a site survey and the lifting operation started after the required conditions were met. Project-specific boom Following the ground reinforcement required for the lifting operations, Hareket assembled the Terex CC28001 crawler crane and a configuration of 84-meter main boom with a length of 144 meters and a 60 luffing fly boom as specified by the project team was installed. After the installation of the boom, 250 tons of rear counterweight was mounted to the Terex CC2800-1 and the configuration was suitable for lifting 32 tons of load to a height of 92 meters. Hareket engineers told that the most challenging aspects of the project were strong wind and narrow working space, complete installation of Terex CC2800-1 took 1 week and they lifted steel constructions ranging from 1 ton to 20 tons in weight to a height of 100 meters for assembly. It was reported that all safety measures were taken by Hareket for Akasya Acıbadem as usual, that they had to stop the operation a couple of times due to strong wind and all wind limits were strictly observed. Step-by-step operation 4 Hareket transported the components of Terex CC2800-1 to Akasya Acıbadem project site with 31 trips using 6 trailers and 3 low-bed vehicles. 4 Ground surveys were performed before the project. Certain tests were performed for ground reinforcement and the ground was reinforced by some materials to make it available for lifting. 4 After the survey, the location of the crane and the boom configuration was determined. ( 84-meter main boom - 60 luffing fly boom) 4 Terex CC2800-1 installed with a 250-ton rear counterweight and a specific boom configuration was suitable for lifting 30.3 tons of load to the assembly site which was at a distance of 94 meters. 4 Finally, steel constructions ranging from 1 ton to 20 tons in weight were lifted to a height of 100 meters and assembled by the assembly team. 9 New CTL1600 introduced in Italy A two-day event was organized in Italy for introduction of the new CTL1600. The event hosted many crane manufacturers and distributors from all around the world and the participants also had the opportunity to test the crane C TL1600 Fontanafredda, newest and strongest member of Terex’s luffing jib tower crane line was introduced at the event in Italy. The two-day event was attended by crane manufacturers and distributors from all around the world. The first day started with presentation of the crane and a Q&A session and continued with testing the first manufactured CTL1600 at the test field. Lifting, boom luffing and upper structure slewing capacity of the crane were tested under test load and the attendants examined the crane closely. In the second day, the visitors made a tour of the facilities where the crane was designed and manufactured, spare parts department and training facilities. establishes a service center in Kazakhstan DAS Otomotiv started the process to establish a service center for Kazakhstan region of Terex distribution network. The service center will be established in Atyrau and will be the first and the sole authorized service center for cranes and lifting equipment in Kazakhstan D as Otomotiv increases the quality of service year by year and is now ready to establish a service center at Kazakhstan region of Terex distribution network. The service center with an indoor space of 1200 square meters and a 10-ton roof crane will be capable of hosting 6 cranes for service simultaneously. The service center will be established in Atyrau and will be the first and the sole authorized service center for cranes and lifting equipment in Kazakhstan. The service team was established by an engineer and a technician from Kazakhstan and Das Otomotiv will make local trainings by its 6 employees from the service team in Turkey to transfer its accumulated knowledge to the country. As of the end of 2014, the figure is expected to be doubled. Das Otomotiv After-sales Services team will initially provide services for the companies at oil - natural gas fields. In the days to come, satellite offices reporting to the office in Atyrau are on schedule to provide the best services throughout Kazakhstan. Spare part warehouse in accordance with the types of machinery in Kazakhstan will also be in Atyrau along with the service center. Spare part and service containers will be placed at sites with many cranes and full-time service personnel will be assigned for such sites. ViZYON 2014 ISSUE: 7 10 Izmit Bay Bridge Project Underwater works for the Izmit Bay Bridge are almost finished and the works on shore are continuing fast. Crane services for assembly of constructions to be used during the construction of the bridge piers will be provided by Çaba, spare parts, service and maintenance works are performed by Das Otomotiv for building the piers. Çaba provides machinery assistance with 3 units of IHI CCH2500 crawler and 2 units of Terex A600 mobile cranes and the works regarding the piers are scheduled for completion as of the end of May. Çaba Project Manager Kemal Kunt expressed that no other machinery is used for this project and they are ready to purchase the machinery which may be required during the ongoing stages and he added that this project was extremely important for them. Kunt said that they were involved in the project with references from Das Otomotiv and that they made machinery investments of 5 million Euro for this project. Kunt mentioned that a 7-employee team was currently assigned for the project and this team is sufficient for the singleshift system and that they plan to increase the number of team members to 12 if the number of shifts also increases. The company’s requests were decisive Kunt said that they discussed the project with IHI at the preparation phase and the machinery purchases were decided based on the feedback from the company. Kunt continued: “The company requested use of IHI crawler cranes manufactured by itself at the project. We acted accordingly. We analyzed these machines in Japan. After the machines were purchased, CE processes in Turkey were handled by Das Otomotiv. The machines were transported here and Das Otomotiv supported us in certification and training of our personnel. After these preliminary works, we modified them as required by the project”. Kunt expressed that IHI requested experienced and certified employees for the project and that they organized a team of qualified workers in this business for zero mistakes. Kemal Kunt Çaba Project Manager T he Japanese IHI INFRASTRUCTURE SYSTEMS CO, LTD. assigned for Izmit Bay Bridge are continuing off shore and on shore works with a fast pace. The construction of bridge piers approximately 500 meters off shore are almost finished and the assembly works are ongoing for the constructions which will carry the cranes to be used ViZYON 2014 ISSUE: 7 Scheduling for uninterrupted Works Das Otomotiv will provide maintenance and repair works for 5 cranes and 80 other machines owned by Çaba at IHI site. Das Otomotiv Service Chief Sabri Kaya said that a team of 3 employees will handle the maintenance and repair of the machinery during the project. He expressed that a permanent service center was established at Yalova site for this important project for urgent intervention to the machinery and continued: “The works here cannot be interrupted. The project is late from the schedule and IHI wants a fast progress. Therefore, we decided to establish a permanent service center at the project site. We will store all spare parts including pumps and hydro-engines which may be required during the project. In case of a failure, we will replace the failed component. We will repair the demounted component to prevent any delay. The challenge is that there will be one crawler and one mobile crane on each pier. When these fail, we will be able to intervene without interrupting the works. There are no other options for off shore intervention”. Kaya expressed that the service will be operational throughout the project scheduled to late 2015. One crane will be maintained every month Kaya said that on shore project works are expected to be completed by the end of May and afterwards the cranes will be installed on piers. Kaya expressed that the total capacity of work for the bridge with 252-meter high piers will be 72 thousand tons and the 25-meter long and 36-meter wide bridge floors which will be 325 tons in weight will be manufactured in İzmit Gölcük site, loaded on barges and then mounted using cranes. Kaya said that they will do their best to prevent any interruption of works due to machinery failure during this high-paced project and that their schedule is to maintain one crane every month. Sabri Kaya DAS Otomotiv Service Chief 11 11 Mounting with CC2800-1 Terex CC2400 at Ağaoğlu Skytower at AKSA Project A window cleaning elevator was mounted to Ağaoğlu Skytower Ataşehir. Sarılar was assigned for lifting the elevator and a Terex CC2800- 1 crane was used. The specifications of the crane used for the mounting are: SWSL, 84m main boom, 90m fly jib, superlift counterweight 50t. The materials were lifted to a horizontal access distance of 62m. The heaviest lift was 7 tons. CC2800-1 equipped with a system length of 174m and a superlift attachment lifted the 7-ton load to a height of 160m with 30 percent capacity. The ground was reinforced by concrete to support a total weight of 486 tons and a soil pressure of 21.6t/square meter. Terex CC2400 Crawler Crane provided by Sarılar was used for the assembly of 5 purifying units which are weighted between 55 to 80ton at AKSA facilities in Yalova T erex CC2400 Crawler Crane provided by Sarılar was used for the assembly of 5 purifying units which are weighted between 55 to 80 ton at AKSA facilities in Yalova. Hüseyin Altun, Terex CC2400 Crawler Crane Operator said: “I operate a Terex CC2400 crawler crane in this project. We installed the Terex CC2400 with 1 160-ton mobile crane and use a 60-meter boom configuration”. Hüseyin Altun expressed that the purifying units were successfully mounted and continued: “The working space was narrow and this caused some delays. The units we lifted were ranging from 55 tons and 80 tons in weight. We set up the most suitable boom configuration based on the environmental conditions and load specifications”. Hüseyin Altun commented on the crane as follows: “Terex CC2400 was the first crane I operated from crawler Terex CC series. I think that the crane is quite practical and usable. It is very good in terms of view of sight, comfort and ease of use. I can say that it functions quite sufficiently.” Our web address updated “www.dasoto.com.tr” address is online with its new design. Our web site consisting of 7 main topics has Turkish, English and Russian language options, announcements, photo gallery, sale stories, second hand crane list and stock machinery data. The site also has links to DAS Otomotiv social media pages. You can be up-to-date on current news, events and photos by following our Facebook, Twitter and LinkedIn pages. www.dasoto.com.tr ViZYON 2014 ISSUE: 7 12 3rd bridge construction increases its pace Yavuz Sultan Selim Bridge construction works by IC İçtaş – Astaldi Consortium are continuing fast. The bridge, which is the first ‘ecosystem bridge’ to preserve natural life, is scheduled for 2015. A total of four 45t-capacity Terex CTL 650 F45 luffing tower cranes are used, with two cranes located on each side Y avuz Sultan Selim Bridge, the 3rd bridge on Bosporus, was started on 29 May 2013 after long discussions and the works are now ongoing with a fast pace. The piers of the bridge which will be 320 meters high are already at 200 meters. 3rd Bridge Construction Director Osman Sarı, involved in any successful projects earlier, expressed that the 3rd Bridge will be constructed much faster as compared to Fatih Sultan Mehmet Bridge. Sarı said that the progress is much faster. He expressed that the bridge is a majestic construction with its specifications and the pace of works does not cause any quality issues. The bridge towers are constructed with a 24-hour shift system. 65 workers are simultaneously on the towers and the number of workers involved within the days is 300. Cranes are rising The works on the towers are performed in 3 stages. The hydraulic system pushes the mould system up using 60 pistons. Tower cranes are connected to bridge towers and they also rise. Every 30 meters, these cranes also go up. The mould system on bridge towers which were at a height of 208 meters were than changed after 208 meters and a climbing mould system is now used. Dr. Michel Virlogeux, the French Building Engineer who designed the Bosporus Bridge, says that this bridge is the most significant ongoing bridge project in the world. Virlogeux, also known as a master of bridges, assured the people of Istanbul regarding earthquakes and added: “Earthquake is an important issue in Turkey. The Bosporus is seismically safer as compared to Izmit coast. It is at a level almost one third of Izmit coast. The bridge was designed with the flexibility to prevent any affect of an earthquake”. 3rd Bridge in Figures The foundations of Yavuz Sultan Selim Bridge were laid on May 29, 2013 and it is the first suspension bridge to be constructed by a Turkish company. Yavuz Sultan ViZYON 2014 ISSUE: 7 Selim Bridge is 59 meters wide, with 8 lanes of road. A 2-lane train line will also be on the bridge. It will be the first suspension bridge with a rail transport system on its main span of 1408 meters and the suspension bridge with highest towers exceeding 320 meters. Bridge piers will be 20-meter deep, with a diameter of 20 meters. The piers will be 12 meters below sea level. The projects consists of 1875-meter long suspension bridge, 60-meter long viaducts and 21-kilometer long tunnels. There are 45 intersections en-route, including the access roads. 65 viaducts and 7 tunnels will be built to minimize the environmental effect. In certain areas, the viaducts will be as high as 85 meters. Total length of the tunnels will be more than 5 kilometers. Cranes used Tower cranes have an important role in construction of bridge piers. A total of four 45t-capacity Terex CTL 650 F45 luffing tower cranes are used, with two cranes located on each side. CTL 650 F45 luffing jib tower crane was introduced in 2012 as the newest member of Terex’s new extra-high capacity tower crane family. The product was manufactured at the plant in Fontanfredda-Italy and the design was made based on the requirements of Terex tower crane users with high lifting capacity, ease of installation, operator comfort and site security kept in mind. The design of CTL 650 F45 is suitable for lifting operations at urban construction works and power stations with a maximum lifting capacity of 45t, 65m extra long jib size and Terex’s new generation EVO15 operator cabin. Other superb specifications are: Folding platform and A-frame press design allowing transportation with a single standard trailer reduce the costs. Automatic slewing unit lubrication system decreases maintenance time. In addition, a third lifting drum can be used as service crane during assembly. The new CTL650 F45 is designed for both heavy lifting and high winding capacity with single- and doubleequipment options. The word “F” in the name of the crane is a referral to Ferrucio Moritsch by Terex, who was considered as a leader in tower crane industry, especially for luffing tower cranes, and passed away in 2011.
Similar documents
in this issue - Das Otomotiv
continue delivering training courses in order to provide the highest quality of training to customers. During the training between May 26th - 28th, Claudio Cimini, Rough terrain mobile crane instru...
More information