Tassajara Hills ES
Transcription
Tassajara Hills ES
ATTACHMENT FOR AGENDA ITEM 4A Page 3 of 64 MEASURE J TRAFFIC CONGESTION RELIEF AGENCY BOARD OF DIRECTORS DRAFT SUMMARY OF ACTIONS Tuesday, March 17, 2009 The regular meeting of the Measure J Traffic Congestion Relief Agency (TRAFFIX) Board of Directors convened at Danville Town Offices, 510 La Gonda Way, Danville, County of Contra Costa on March 17, 2009. 1. CALL TO ORDER Karen Stepper called the meeting to order at 4:00 p.m. 2. ROLL CALL Directors Present: Karen Stepper, Dave Hudson, Greg Marvel, Newell Arnerich (arrived at 4:05 p.m.), Bill Clarkson (arrived at 4:20 p.m.), Carol Rowley (arrived at 4:47 p.m.), Others Present: Gary Black, San Ramon Valley Unified School District; Lisa Bobadilla, City of San Ramon; Aram Boyd, TRAFFIX; Joe Calabrigo, Town of Danville; Michael Conneran, Hanson Bridgett LLP; John Cunningham, County of Contra Costa; PJ Dhoot, City of San Ramon; Gina Ferretti, Contra Costa County Supervisor Piepho’s Office; Sheri Glaser, San Ramon Valley Unified School District; Thomas Jamison, San Ramon Valley Unified School District; Nat Rojanasathira, Town of Danville; Christine West, GoWest Communications. 3. PUBLIC COMMENT: None 4. CONSENT CALENDAR A. Consider approval of Meeting Summary of January 20, 2008 Regular Meeting. MOTION by Director Hudson to approve the Meeting Summary. SECOND by Director Marvel. MOTION CARRIED 3-0-0 5. REPORTS AND PRESENTATIONS A. Introduction of Contract Program Manager – Aram Boyd TRAFFIX Contract Manager Aram Boyd was introduced and reported on his extensive activities and meetings with the TAC, CAC and First Student staff to date. Page 4 of 64 MEASURE J TRAFFIC CONGESTION RELIEF AGENCY BOARD OF DIRECTORS – DRAFT SUMMARY OF ACTIONS MARCH 17, 2009 B. Status update of Citizens Advisory Committee (CAC) Lisa Bobadilla reported that the CAC was formed from previous members and PTA representatives for the six priority schools. It was noted that Tassajara Hills does not yet have a PTA representative on the CAC. 6. PUBLIC HEARINGS: None 7. UNFINISHED BUSINESS: None 8. NEW BUSINESS A. Review and adopt Updated TRAFFIX 5-Year Financial Plan. Lisa Bobadilla presented an updated Financial Plan, reflecting a prolonged recession through fiscal 2013. The Financial Plan also reflects a discounted annual pass of $200 per year, with an increase to $250 per year subsequent years of the plan. The Financial Plan also reflects a software licensing fee for VersaTrans, routing software recommended by the contract operator, First Student. MOTION by Director Hudson to adopt the Updated TRAFFIX 5-Year Financial Plan. SECOND by Director Arnerich. MOTION CARRIED 6-0-0 B. Consider Special Liability Insurance (SLIP) policy quotations, select policy coverage level, and authorize Board Chair to execute a Special Liability Insurance Program (SLIP) policy on behalf of the TRAFFIX Board. The Board was presented with two options for coverage; the first option at $1,000,000 and the second at $2,000,000. Mike Conneran clarified that although First Student has insurance and the obligation to indemnify and protect the agency, the SLIP policy will be the only insurance covering the Agency, not just added protection for the Directors. MOTION by Director Marvel to select the second option of $2,000,000 in coverage. SECOND by Director Arnerich. MOTION CARRIED 6-0-0 C. Consider other potential funding sources and contingency options. Lisa Bobadilla noted that an assessment district was created to fund public transit to the Alamo Creek subdivision as a possible source of funding for TRAFFIX. John Cunningham reported that he had investigated the possibility of accessing these funds. John stated there is no language that addresses congestion, and that by design, the assessment district was not intended to provide congestion relief but rather to provide 2 Page 5 of 64 MEASURE J TRAFFIC CONGESTION RELIEF AGENCY BOARD OF DIRECTORS – DRAFT SUMMARY OF ACTIONS MARCH 17, 2009 commute related trips for residents. Therefore, it appears that TRAFFIX would not be eligible for these funds. Lisa described the Transportation Demand Management (TDM) funding available through the Bay Area Air Quality Management District (BAAQMD), which has been incorporated into the Financial Plan. Additional grant funding could be available through BAAQMD if we can demonstrate success in traffic congestion relief. D. Receive status update on contract services agreement, and start-up efforts, with First Student. Lisa Bobadilla reported on First Student’s start-up efforts and progress, which is currently on schedule. E. Discuss ZONAR Student Tracking Option. With the 5-Year financial plan now showing an ending fund balance of $7400 in Year 1, Lisa Bobadilla reported that the TAC has discussed deferring deployment of the Zonar ZPass Student Tracking system until Year 2. This would save about $23,000 in the first year. Further, she noted that the Lamorinda program does not currently use a student tracking system and does not appear to suffer safety perception concerns. Director Marvel noted the availability of comparable systems at a lower cost. Director Arnerich felt it would be a problem for school site administrators to not have this technology and would have to field many more queries from parents. Aram Boyd reported on the CAC discussion of ZPass. While some parents liked the idea, others felt it would feed paranoia and generate concerns. Director Arnerich spoke strongly in favor of acquiring the system. MOTION by Director Marvel to purchase the ZPass option in the first year. SECOND Director Arnerich. MOTION FAILED 3-3 MOTION by Director Marvel to accept the TAC recommendation to defer the ZPass purchase option in the first year. SECOND Director Crowly. MOTION AMENDED by Director Marvel to table the decision until the next meeting and direct staff to negotiate a better offer from Zonar, investigate competitive options to Zonar return a proposal at the next Board meeting. SECOND by Director Arnerich. MOTION CARRIED 6-0-0 F. Receive status update on follow-up meetings with schools targeted to receive student transportation service. 3 Page 6 of 64 MEASURE J TRAFFIC CONGESTION RELIEF AGENCY BOARD OF DIRECTORS – DRAFT SUMMARY OF ACTIONS MARCH 17, 2009 Lisa Bobadilla reported that TAC representatives had met with all Principals to reaffirm their commitment and inform them of the program’s progress. Lisa summarized the visits to the San Ramon schools, stating that all three principals are on board. However the Pine Valley principal expressed concern over changing bell times to accommodate bus tiering. Lisa reminded the Board that adjustment of bell times would be necessary in order to serve all elementary and middle schools with. Director Marvel stated that the District should have discussions with all principals and unions and make this a District directive. John Cunningham reported on several meetings at Tassajara Hills, including an operational meeting with Fehr & Peers and the District’s Facilities Department. A narrow two-lane driveway in conjunction with parent pick-up/drop-off queuing presents an overwhelming challenge to providing access to buses into the parking lot. The District relayed concern over the planned number of buses accessing the school site. Director Marvel expressed that it is unacceptable, as a TRAFFIX Board member and a School Board member, to hear that the District may not be indicating full commitment to the service at this late date. While he acknowledged the physical constraints of the driveway, he articulated that the District can facilitate a solution at Tassajara Hills Elementary School to provide service. Greg Black stated that both the School and District definitely support the program. He has reviewed the site although there are constraints at the site, but there’s no reason we cannot make the service work. Nat Rojanasathira reported on meetings at Los Cerros Middle School and Green Valley Elementary School. Principals at both schools are very cooperative and supportive of the program. Aram on behalf of Tai Williams, requested a Special Board meeting in April to discuss refined bus routing, bell times and consider any facilities constraints that may prevent the implementation of the original preliminary plan. The Board scheduled a meeting for April 21, 2009. G. Authorize Board Chair to execute a Memorandum of Understanding (MOU) with San Ramon Valley Unified School District (SRVUSD) regarding expectations and responsibilities of each school site associated with the implementation of the TRAFFIX student transportation service. Lisa Bobadilla will bring this issue back to the Board at its April meeting. H. Receive progress report on marketing efforts. Christine West, from Go West Communication, provided an overview of the updated web site and rack cards. Directors provided a number of comments. Overall, the Directors were quite pleased with the materials presented. 4 Page 7 of 64 MEASURE J TRAFFIC CONGESTION RELIEF AGENCY BOARD OF DIRECTORS – DRAFT SUMMARY OF ACTIONS MARCH 17, 2009 9. BOARD REPORTS: None 10. CLOSED SESSION: None 11. ADJOURNMENT Chair Stepper adjourned the meeting at 5:55 p.m. to April 21, 2009. ___________________________________ Karen G. Stepper, Chair ___________________________________ Aram Boyd, Board Secretary 5 Page 8 of 64 ATTACHMENT FOR AGENDA ITEM 7A Page 9 of 64 DATE: April 21, 2009 TO: TRAFFIX Board of Directors FROM: Technical Advisory Committee SUBJECT: Consideration of Student Tracking System Options BACKGROUND At the direction of the Board, the Technical Advisory Committee (TAC) investigated the possibility of incorporating an electronic student tracking system as one of the “value added” safety features of the TRAFFIX Program. At its regularly scheduled meeting of March 17, 2009, the TRAFFIX Board of Directors, as a component of its 2009-10 Financial Plan, considered an electronic student tracking system (“ZPass”) as an add-on service from First Student, using Radio Frequency Identification (RFID) technology. The system’s costs, benefits, and possible concerns were discussed at length. At the conclusion of this discussion, the Board requested that the TAC explore competitive student tracking options. OVERVIEW - STUDENT TRACKING While manual student tracking systems have served the school bus industry nationwide over many years, the availability of new and emerging technology presents an opportunity to consider whether an electronic system – designed to offer real time data – would be an appropriate fit for the TRAFFIX Program. In consideration of electronic student tracking systems, it is important to evaluate each system based on the following key factors: 1. 2. 3. 4. Infrastructure & Service Costs Administration Costs Reliability Security and Privacy This staff report will provide an overview of the competing electronic tracking systems in the context of the key factors outlined above. Page 1 Page 10 of 64 Infrastructure & Service Costs The infrastructure costs are inclusive of the installation of hardware necessary to “read” the electronic card, transmit the data to a central location, and retain the information. The service costs correlate somewhat to an on-going need to retain and provide access to the information collected. Nearly all electronic student tracking systems utilize RFID technology. Given that First Student buses are already equipped with electronic hardware (manufactured by Zonar) used to transmit the real-time location of each bus using RFID technology, the incremental cost to utilize the pre-existing infrastructure to transmit student data is $6.67 per bus per day (or approximately $23,000 per year for a 19-bus fleet). This reflects both the infrastructure costs (absorbed mostly by First Student with the purchase of the fleet) and on-going service costs. Consistent with Board direction, the TAC explored a number of competing electronic student tracking systems. The disadvantage of utilizing a competing system is that a separate, and duplicate, infrastructure system must be installed on each bus. Therefore, the costs outlined below reflect the true cost of an electronic student tracking system if TRAFFIX were unable to be served by a fleet of buses already equipped with RFID technology. The competitors to Zonar’s ZPass system are: 1. Synovia: The nation’s leading provider of school bus tracking and Zonars primary competitor. They offer an RFID student tracking option but admit that the technology is not entirely reliable. The implementation of a Synovia system on the TRAFFIX buses would require the installation of a separate GPS unit and systems, which would cost between $75,000 and $100,000 to implement in the first year. 2. National Scientific Corporation: A provider of RFID and barcode reader-based student tracking systems. The data from the RFID card reader on the bus would be transmitted to a database via a Wi-Fi connection at each school site. The system would require the installation of a Wi-Fi node at school sites in order to enable the transmission of data during pick-up/drop-off times. Installation of the system (Wi-Fi technology at school sites not included) is estimated at $49,610. 3. AT&T: A relatively new area for AT&T, who has worked with one school district in Texas to implement RFID-based student tracking for student transportation. The transmittal of data from the RFID card reader to the database would be in real-time through AT&T’s 3G wireless network. Implementation of the system is estimated to cost between $50,000 and $100,000. 4. Track What Matters: This Texas-based company utilizes barcode-based technology to track students. The initial estimate provided by the company is Page 1 Page 11 of 64 $12,202. However, it should be noted that barcode scanning requires a level of manual dexterity that is not typical of the abilities of most elementary school students. This is the reason that most student tracking systems utilize RFID, a technology that relies only on a student’s proximity to the scanner, rather than an accurate swipe. It is also important to note that very few student transportation systems in the United States, including the Lamorinda School Bus Program, use electronic-based student tracking systems. Administrative Costs The implementation of an electronic student tracking system has significant administration implications. Aside from the special treatment necessary to print each RFID card, the administrative oversight necessary to track and replace lost or stolen cards could be cumulatively extensive. Reliability Given the emerging nature of this technology, it is important to consider the ability of the technology to perform as marketed. In response to the TAC’s inquiry, Tim Ammon of Management Partnership Services (MPS), reported that the school districts he has worked with which have attempted to implement RFID student tracking have encountered a number of difficulties. Specifically, Mr. Ammon reported that some RFID readers have had trouble transmitting data from the student’s RFID tag embedded in their student pass. As a result, the system may indicate that a student has not boarded the bus when they have; or it may record a student boarding twice. Other RFID student tracking vendors have admitted that their products are not entirely reliable given the fact that this technology is new and has yet to benefit from field-tested modifications. Security and Privacy Given the nature and potential capabilities of electronic tracking systems, it is important to consider an emerging public sentiment that resists electronic tracking of children. This sentiment first surfaced in 2005, when a school district in Sutter, California began tracking students’ school bus and classroom attendance using RFID technology embedded in student identification cards. National media attention grew surrounding this case after parents objected to having their children tracked using the new technology, citing privacy and security concerns. Parents in Sutter and other communities have expressed concern that they do not want their children’s activities to be tracked. As recently as 2007, California State Senator Joe Simitian (D-Palo Alto) introduced the “Identity Information Protection Act” which seeks to prohibit public agencies Page 1 Page 12 of 64 (including school districts, municipalities and JPAs) from using RFID technology for employees, students, for driver’s licenses and more. While this proposed legislation has not been adopted, RFID technology appears to remain a sensitive issue in the public sphere. Members of the TRAFFIX Citizens Advisory Committee echoed public sentiment, stating that the security risks and privacy concerns among parents outweigh the potential benefit for electronic-based student tracking. RECOMMENDATION The TAC recommends that the Board defer the implementation of an electronic student tracking system to a future year. Page 1 Page 13 of 64 This page is intentionally left blank. Page 14 of 64 ATTACHMENT FOR AGENDA ITEM 7B Page 15 of 64 MEMORANDUM DATE: April 21, 2009 TO: TRAFFIX Board of Directors FROM: Technical Advisory Committee SUBJECT: Revised Five-Year Financial Plan At the March 17, 2009 regularly scheduled meeting, the TRAFFIX Board of Directors adopted a Five-Year Financial Plan. Subsequent to this action, the Contra Costa Transportation Authority – with the most recent figures from the State Board of Equalization in hand – further reduced the funding allocations for all programs. Attached are two revised Five-Year Financial Plan options for the Board’s consideration: Scenario “E1”: Reflects the reduced Measure J funding allocation and continues to show a contribution toward ZPass, the electronic student tracking system. Scenario “E2”: Reflects the reduced Measure J funding allocation but eliminates ZPass line item cost for the first year of the program. RECOMMENDATION Given the continued reduction in funding, in conjunction with the potential reliability and security issues raised regarding Radio Frequency Identification (RFID) technology, the TAC recommends that the Board adopt Scenario E2. Attachment: TRAFFIX 5-Year Financial Plan - Scenarios E1 and E2 P.O. Box 1130, Danville, CA 94526 Page 16 of 64 Scenario E1 REV Revenues (March 2009) 19 Buses; $200 intro offer; Z-Pass TRAFFIX Five Year Financial Plan Year 3 FY 2011/12 April 16, 2009 Year 1 FY 2009/10 Year 2 FY 2010/11 Year 4 FY 2012/13 Year 5 FY 2013/14 $ 90,000 $ 1,256,405 $ 22,811 $ 3,000 $ 60,000 $ 5,000 $ 7,500 $ 10,000 $ 10,000 $ 1,000 $ 92,700 $ 1,294,094 $ 22,811 $ 3,090 $ 2,500 $ 5,150 $ 5,000 $ 10,350 $ 10,000 $ 1,000 $ 95,481 $ 98,345 $ 101,296 $ 1,332,911 $ 1,372,898 $ 1,414,085 $ 22,811 $ 22,811 $ 22,811 $ 3,183 $ 3,278 $ 3,377 $ 2,500 $ 2,500 $ 2,500 $ 5,305 $ 5,464 $ 5,628 $ 5,175 $ 5,356 $ 5,544 $ 10,661 $ 10,980 $ 11,310 $ 10,000 $ 10,000 $ 10,000 $ 1,000 $ 1,000 $ 1,000 $ $ - $ $ - $ $ - $ $ - $ $ - $ $ $ 10,000 10,000 10,000 $ $ $ 7,500 10,000 5,000 $ $ $ 7,500 10,000 5,000 $ $ $ 7,500 10,000 5,000 $ $ $ 7,500 10,000 5,000 $ $ 2,000 2,000 $ $ 1,000 1,000 $ $ 1,000 1,000 $ $ 1,000 1,000 $ $ 2,500 2,500 * Reflects 3% annual inflationary increase Expenditures Contract Services Program Administration* Service Operator* (1) - ZPass ($6.67/bus/day) Audit* (2) Consulting Services (3) Insurance* (3) Legal Counsel (4) Treasurer/Accounting* VISA S/C (3) Equipment Leases (5) Office/Meeting Space Other Marketing & Promotions (6) Advertising Printing Promotional Materials Public Notification (7) Advertising Postage Software (8) License Fees (annual) Support Fees (annual) Supplies Utilities Telephone Web Site Maintenance Misc. Expenses under $500 Monitoring Program (9) General Contingency Reserve Account (10) $ $ $ 6,200 2,700 2,500 $ $ $ 6,200 2,700 2,500 $ $ $ 6,200 2,700 2,500 $ $ $ 6,200 2,700 2,500 $ $ $ 6,200 2,700 2,500 $ $ $ $ $ $ 1,000 1,000 500 2,500 100,000 $ $ $ $ $ $ 1,000 1,000 500 5,000 2,500 100,000 $ $ $ $ $ $ 1,000 1,000 500 2,500 100,000 $ $ $ $ $ $ 1,000 1,000 500 5,000 2,500 100,000 $ $ $ $ $ $ 1,000 1,000 500 2,500 100,000 Total Expenditures $ 1,616,117 $ 1,592,595 Starting Fund Balance New Revenue Measure J Sales Tax (11) Parent Contributions (12) Other Funds TDM Funds (13) Marketing Supplement (14) Interest (15) Misc Revenues (16) $ $ $ 1,157,381 $ 320,000 $ 1,195,109 $ 400,000 $ 1,344,298 $ 1,371,198 $ 1,412,597 $ 420,000 $ 441,000 $ 463,050 $ $ $ $ $ $ $ $ $ $ $ $ Total New Revenue Total Funds Available Ending Fund Balance $ 1,597,381 $ 1,600,109 $ 1,769,298 $ 1,818,480 $ 1,883,328 $ 1,597,381 $ 1,581,373 $ 1,758,076 $ 1,946,630 $ 2,151,425 $ (18,736) $ (11,222) $ 128,150 $ 268,097 $ 429,975 - 70,000 50,000 $ 1,629,926 (18,736) $ 5,000 - $ 1,678,533 (11,222) $ 5,000 - $ $ $ $ 128,150 5,000 1,282 - $ 1,721,450 $ $ $ $ $ 268,097 5,000 2,681 - NOTES & ASSUMPTIONS: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) $367.37/bus/day x 19 buses x 180 days; incl. 3% annual increase from proprosal; does not reflect potential adjustment after Year 3 Based on Lamorinda expenditures (plus 3% annual inflation) FY 09/10: Pays City for Adv Planning reimb. $50K from CCTA for Prog. Mgmt Contract; + $10K web site eCommerce; thereafter $2.5K placeholder Higher first year estimates for set-up work; thereafter based on Lamorinda expenditures Placeholder expenses Reflects higher level of community outreach in first 3 years Reflects higher # of community notifications during first year; Higher # in Year 5, assumes hearings for new routes Based on First Student's recommendation to use VersaTrans, prices reflects significant discount through First Student Biennial monitoring program $5K; Every 6 years - New Baseline Assessment $15K (Year 6) Reflects an absolute reserve amount, rather than a percentage of Measure J revenues Reflects revenue adjustments from CCTA - March 2009; Also reflects 10% reduction first 2 years to acct for Adv Plan Reimbursements $200/first year x 1600 students "very likely" and "likely" to walk and ride fr/ survey; $250/year thereafter; assumes 5% ridership increase starting Year 3 FY 09-10: One-time TDM funds (TFCA & Measure J) for trip reduction; FY 10-11 onward: assumes conservative $5K from SWAT TDM Budget No marketing supplement with First Student Interest = 1% of Starting Fund Balance (no interest in Scenario A) FY 09-10: Reflects CCTA payment of $50K for Prog. Mgmt Contract Adv Planning costs (October 1st) Page 17 of 64 Scenario E2 REV Revenues (March 2009) 19 Buses; $200 intro offer; No Z-Pass TRAFFIX Five Year Financial Plan Year 3 FY 2011/12 April 16, 2009 Year 1 FY 2009/10 Year 2 FY 2010/11 Year 4 FY 2012/13 Year 5 FY 2013/14 $ 90,000 $ 1,256,405 $ $ 3,000 $ 60,000 $ 5,000 $ 7,500 $ 10,000 $ 10,000 $ 1,000 $ 92,700 $ 1,294,094 $ 22,811 $ 3,090 $ 2,500 $ 5,150 $ 5,000 $ 10,350 $ 10,000 $ 1,000 $ 95,481 $ 98,345 $ 101,296 $ 1,332,911 $ 1,372,898 $ 1,414,085 $ 22,811 $ 22,811 $ 22,811 $ 3,183 $ 3,278 $ 3,377 $ 2,500 $ 2,500 $ 2,500 $ 5,305 $ 5,464 $ 5,628 $ 5,175 $ 5,356 $ 5,544 $ 10,661 $ 10,980 $ 11,310 $ 10,000 $ 10,000 $ 10,000 $ 1,000 $ 1,000 $ 1,000 $ $ - $ $ - $ $ - $ $ - $ $ - $ $ $ 10,000 10,000 10,000 $ $ $ 7,500 10,000 5,000 $ $ $ 7,500 10,000 5,000 $ $ $ 7,500 10,000 5,000 $ $ $ 7,500 10,000 5,000 $ $ 2,000 2,000 $ $ 1,000 1,000 $ $ 1,000 1,000 $ $ 1,000 1,000 $ $ 2,500 2,500 * Reflects 3% annual inflationary increase Expenditures Contract Services Program Administration* Service Operator* (1) - ZPass ($6.67/bus/day) Audit* (2) Consulting Services (3) Insurance* (3) Legal Counsel (4) Treasurer/Accounting* VISA S/C (3) Equipment Leases (5) Office/Meeting Space Other Marketing & Promotions (6) Advertising Printing Promotional Materials Public Notification (7) Advertising Postage Software (8) License Fees (annual) Support Fees (annual) Supplies Utilities Telephone Web Site Maintenance Misc. Expenses under $500 Monitoring Program (9) General Contingency Reserve Account (10) $ $ $ 6,200 2,700 2,500 $ $ $ 6,200 2,700 2,500 $ $ $ 6,200 2,700 2,500 $ $ $ 6,200 2,700 2,500 $ $ $ 6,200 2,700 2,500 $ $ $ $ $ $ 1,000 1,000 500 2,500 100,000 $ $ $ $ $ $ 1,000 1,000 500 5,000 2,500 100,000 $ $ $ $ $ $ 1,000 1,000 500 2,500 100,000 $ $ $ $ $ $ 1,000 1,000 500 5,000 2,500 100,000 $ $ $ $ $ $ 1,000 1,000 500 2,500 100,000 Total Expenditures $ 1,593,305 $ 1,592,595 $ 1,629,926 $ 1,678,533 $ 1,721,450 Starting Fund Balance New Revenue Measure J Sales Tax (11) Parent Contributions (12) Other Funds TDM Funds (13) Marketing Supplement (14) Interest (15) Misc Revenues (16) $ $ $ $ $ $ 1,157,381 $ 320,000 $ 1,195,109 $ 400,000 $ 1,344,298 $ 1,371,198 $ 1,412,597 $ 420,000 $ 441,000 $ 463,050 $ $ $ $ $ $ $ $ $ $ $ $ Total New Revenue Total Funds Available Ending Fund Balance $ 1,597,381 $ 1,600,150 $ 1,769,414 $ 1,818,709 $ 1,883,560 $ 1,597,381 $ 1,604,226 $ 1,781,045 $ 1,969,828 $ 2,174,855 $ 4,076 $ 11,630 $ 151,119 $ 291,295 $ 453,405 - 70,000 50,000 4,076 5,000 41 - 11,630 5,000 116 - $ $ $ $ 151,119 5,000 1,511 - $ $ $ $ 291,295 5,000 2,913 - NOTES & ASSUMPTIONS: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) $367.37/bus/day x 19 buses x 180 days; incl. 3% annual increase from proprosal; does not reflect potential adjustment after Year 3 Based on Lamorinda expenditures (plus 3% annual inflation) FY 09/10: Pays City for Adv Planning reimb. $50K from CCTA for Prog. Mgmt Contract; + $10K web site eCommerce; thereafter $2.5K placeholder Higher first year estimates for set-up work; thereafter based on Lamorinda expenditures Placeholder expenses Reflects higher level of community outreach in first 3 years Reflects higher # of community notifications during first year; Higher # in Year 5, assumes hearings for new routes Based on First Student's recommendation to use VersaTrans, prices reflects significant discount through First Student Biennial monitoring program $5K; Every 6 years - New Baseline Assessment $15K (Year 6) Reflects an absolute reserve amount, rather than a percentage of Measure J revenues Reflects revenue adjustments from CCTA - March 2009; Also reflects 10% reduction first 2 years to acct for Adv Plan Reimbursements $200/first year x 1600 students "very likely" and "likely" to walk and ride fr/ survey; $250/year thereafter; assumes 5% ridership increase starting Year 3 FY 09-10: One-time TDM funds (TFCA & Measure J) for trip reduction; FY 10-11 onward: assumes conservative $5K from SWAT TDM Budget No marketing supplement with First Student Interest = 1% of Starting Fund Balance (no interest in Scenario A) FY 09-10: Reflects CCTA payment of $50K for Prog. Mgmt Contract Adv Planning costs (October 1st) Page 18 of 64 ATTACHMENT FOR AGENDA ITEM 8A Page 19 of 64 DATE: April 21, 2009 TO: TRAFFIX Board of Directors FROM: Technical Advisory Committee SUBJECT: Adopt a Modification to the Routing Strategy and a Service Delivery Plan for the 2009-10 School Year BACKGROUND In 2007, the Measure J Traffic Congestion Relief Policy Advisory Committee (PAC), reconstituted as the current Board of Directors, adopted a Program Routing Strategy (“Routing Strategy”) to provide service within the San Ramon Valley. The Routing Strategy was designed, regardless of the fluid nature of student population shifts, to serve the following overarching principles (consolidated): Principle #1 Focus on Core Congested Areas: Consistent with the purpose of Measure J, the program would provide transportation service in the most congested areas of the San Ramon Valley, as determined by a valley-wide traffic study. Principle #2 Route Tiering Strategy: To leverage the maximum utilization of limited resources, buses serving the middle schools would be reused to serve the elementary schools, with adjustments in bell times if necessary. Principle #3 “Outside In” Approach: This approach serves the population residing at the periphery of the school attendance boundary, outside of the key congested intersection(s), eliminating the need for inbound trips to the congestion area. Principle #4 Accommodation of Survey Constraints: This seeks to accommodate where feasible the desire, as expressed through parent surveys, for short bus ride times (less than 30 minutes) and short walk distances to the bus stop. Principle #5 Accommodation of Physical Constraints: Some school attendance boundaries consist of isolated neighborhoods that require a greater length of time to access. In order to maintain the desired short ride times, a greater number of resources (buses) would be allocated to serve far reaching neighborhoods. Page 1 Page 20 of 64 Based on these core principals, and using proximity to traffic congestion as the metric for receipt of service, the PAC adopted a list of priority schools: Priority 1 Priority 2 High Schools California HS Monte Vista HS San Ramon Valley HS Middle Schools Los Cerros MS Pine Valley MS Diablo Vista MS Stone Valley MS Charlotte Wood MS Elementary Schools Country Club ES Alamo ES Montevideo ES Rancho Romero ES Walt Disney ES Sycamore Valley ES Green Valley ES Neil Armstrong ES Tassajara Hills ES Priority 3 Vista Grande ES Note: Given the emerging nature of the neighborhoods in the Dougherty Valley during this assessment, schools within the Dougherty Valley were not accounted for in this analysis. Within the context of projected Measure J sales tax and limited fare box revenues, these principles served as the foundation for the development of a preliminary set of routes utilizing 19 buses to serve two middle schools and re-using 17 of these same buses to serve four elementary schools, which are: 1. 2. 3. 4. 5. 6. Los Cerros Middle School (Danville) Pine Valley Middle School (San Ramon) Country Club Elementary School (San Ramon) Green Valley Elementary School (Danville) Tassajara Hills Elementary School (Contra Costa County) Walt Disney Elementary School (San Ramon) Based on student population data provided by the San Ramon Valley Unified School District (“District”), in combination with the results from two parent surveys, it was estimated that these 19 routes would represent a ridership of about 2,000 students from approximately 1,700 unique addresses (an indicator of traffic trips removed). It was acknowledged that these routes were preliminary in nature and detailed final routes would need to be established with the selected service operator. IMPLEMENTATION CONSIDERATIONS With the selection of First Student as the service operator and execution of the service contract in March 2009, the TRAFFIX Technical Advisory Committee (TAC) has been working with the First Student route planners and local operations personnel to refine the final service routes for the Priority 1 schools. This lengthy route refinement Page 2 Page 21 of 64 exercise has identified the following considerations associated with the program’s implementation: 1. Bell Time Shifts: The following “spread” in bell times, between the middle school and the surrounding elementary schools that would receive tiered service, are necessary to implement a route tiering strategy: a. San Ramon Schools: Buses used to provide service to Pine Valley Middle School (”Pine Valley MS”) would be re-used to provide service to Walt Disney Elementary School (“Walt Disney ES”) and Country Club Elementary School (“Country Club ES”). To tier these routes, a bell time spread of at least 35 minutes between Pine Valley MS and its tiered elementary schools would be necessary. Given the current bell time spreads, an additional 10 – 15 minute spread allocated between the two tiers, would be sufficient as illustrated: Current Bell Times School Example of Revised Schedule* MTHF Wed MTHF Wed Pine Valley MS 8:15 – 2:45 8:15 – 1:45 8:00 – 2:30 8:00 – 1:30 Walt Disney ES** 8:30 – 3:00 8:30 – 2:00 8:35 – 3:05 8:35 – 2:05 Country Club ES** 8:25 – 3:00 8:20 – 2:00 8:35 – 3:10 8:35 – 2:15 * The proposed schedule represents only an illustrative example of necessary bell time spread to implement route tiering. Actual bell time adjustments would be implemented by the School District in consideration of many factors that is not within the purview of this discussion. ** Indicates bell times for 3rd – 5th grades only. Kindergarteners, as well as 1st and 2nd graders, have a different schedule (Attachment A). For purposes of this discussion, only the 3rd – 5th grade bell schedule is referenced. b. Danville/Contra Costa County Schools: In the northern part of the San Ramon Valley, a route tiering strategy faces two significant challenges. The first challenge is that the geographic distance between Los Cerros Middle School (“Los Cerros MS”) and Tassajara Hills Elementary School (“Tassajara Hills ES”), compounded by the physical site access constraints at Tassajara Hills ES, means that the route tiering would require a minimum bell time spread of 110 minutes (inclusive of 20 minutes of travel, 45-minute run time, and at least 5 minutes queuing in the eastbound left-turn lane along Camino Tassajara) would be necessary. Given that a 110-minute bell time spread would significantly exceed reasonable expectations for bell time adjustments, the provision of service to Tassajara Hills ES would necessitate dedicated, non-tiered, service. From a financial perspective, dedicated service (to Tassajara Hills ES or any school) is relatively more expensive - on a per student basis - than a tiered service strategy. Therefore, the consequence of providing dedicated service would be Page 3 Page 22 of 64 a deviation from the Board’s adopted route tiering strategy, one of its core operating principles. This issue will be discussed later. The second challenge is that the Los Cerros MS and Green Valley ES attendance boundaries comprise primarily of isolated neighborhoods that are only accessible via major congested arterial roadways. Furthermore, many of these neighborhoods contain long dead-end streets that do not provide sufficient turn-around areas for a 40-foot long bus. These physical constraints represent a greater need for bus route time to access, and to turn around in, these neighborhoods. Therefore, in order to maintain a relatively short bus ride, a greater number of buses must be deployed to serve these neighborhoods. Therefore, the consequence of maintaining a short ride time means that (a) the routes serving these neighborhoods will carry a relatively lighter load; and (b) the bell time spread between Los Cerros MS and Green Valley ES must be greater. If dedicated bus service is not approved at Tassajara Hills ES, those busses could be deployed at Los Cerros MS and Green Valley ES. To tier routes from Los Cerros MS to Green Valley ES, a bell time spread of a 40 to 45 minutes would be necessary. Given the current bell time spreads, an additional 15 minute spread in the AM, with a greater spread in the PM, would be sufficient to achieve this goal: Current Bell Times School Example of Revised Schedule* MTHF Wed MTHF Wed Los Cerros MS 8:00 – 2:30 9:04 – 2:30 8:00 – 2:30 8:00 – 1:30 Green Valley ES** 8:30 – 3:00 8:30 – 2:05 8:45 – 3:15 8:45 – 2:15 * The proposed schedule represents only an illustrative example of necessary bell time spread to implement route tiering. Actual bell time adjustments would be implemented by the School District in consideration of many factors that is not within the purview of this discussion. ** Indicates bell times for 1st – 5th grades only. Kindergarteners have a different schedule (Attachment A). For purposes of this discussion, only the 1st – 5th grade bell schedule is referenced. 2. Operational Changes – School Sites: In order to accommodate bus ingress/egress as well as student pick-up/drop-off locations, a number of operational changes would need to be implemented at each school site. These operational changes, consisting primarily of signage and striping, are shown on illustrations in Attachment B. 3. Operational Changes – Local Roadways: In order to ensure safe turn-around bus maneuvers within neighborhoods, parking prohibitions through signage and striping must be implemented along certain roadways within specific neighborhoods, as listed in Attachment C. Page 4 Page 23 of 64 4. Modification of Core Principle: As described above, providing dedicated service to necessitates the reduction of service from other tiered service areas, and represents a significant deviation from the core operating principle of utilizing route tiering as an asset maximization strategy. Therefore, the TAC recommends that the Board consider the provision of dedicated service to a “Priority 1” school only if the dedicated service routes meet performance standards established above and beyond those expected of the tiered routes, including: a. b. c. d. Fully subscribed routes Longer bus rides Longer walk distances Operational changes to facilitate bus ingress/egress through the route 5. Parent & Community Education: Given that a culture of bus ridership does not currently exist in the San Ramon Valley, a parent and community education effort would need to be undertaken to prepare the community to accept – and hopefully embrace - the presence of large student transportation vehicles on their streets and at their schools. SERVICE DELIVERY OPTIONS In light of the considerations outlined above, the TAC is forwarding two service delivery options for the Board’s consideration. Option A is a scenario that provides only tiered bus service (Attachment D), and therefore would not include service to Tassajara Hills ES. Option B is a scenario that diverts resources from the Los Cerros MS to provide dedicated bus service to Tassajara Hills ES (Attachment E). Tier School Option A Option B Tier 1 Pine Valley Middle School 10 (same) Tier 2 Î Walt Disney Elementary School 5 (same) Tier 2 Î Country Club Elementary School 3 (same) Los Cerros Middle School 9 7 Î Green Valley Elementary School 6 6 Tassajara Hills Elementary School 0 2 Tier 1 Tier 2 Tier 1 RECOMMENDATION In light of the commitments made to provide service at Tassajara Hills ES, the TAC recommends that the Board take the following actions: Page 5 Page 24 of 64 1. Adopt a Modification to Principle #2 of the Routing Strategy to allow for the potential provision of dedicated service to a “Priority 1” school, only if the dedicated service routes meet performance standards established above and beyond those expected of the tiered routes, including: a. Fully subscribed routes, representing a commitment equal to 100% of the student capacity on each bus (e.g., capacity for elementary school students on an 80-passenger bus is 70 students to account for variation in student sizes. Therefore, an 100% student capacity equates to a route subscription of a minimum of 70 students); b. Longer ride times, extending up to 45 minutes; c. Longer walk distances with consolidated stop locations; d. Operational changes to facilitate bus ingress/egress throughout the route and at the school site; and e. Demonstrated support of the service by the parent community of the school site receiving the service. 2. Adopt “Option B” as the 2009-10 Service Delivery Plan, with the conditions of service outlined above for dedicated routes. Attachment A: Attachment B: Attachment C: Attachment D: Attachment E: Current Bell Time Schedules Proposed Operational Changes at School Sites Proposed Operational Changes along Local Roadways “Option A” Service Routes “Option B” Service Routes Page 6 Page 25 of 64 This page is intentionally left blank. Page 26 of 64 ATTACHMENT FOR AGENDA ITEM 8A ATTACHMENT A Current Bell Time Schedules Page 27 of 64 Est. Pop. Current Bell Schedule M, T, TH, F Wednesday School Grade Level Los Cerros MS All Grades 639 Green Valley ES (no more early/late) 1st - 5th K - Early Birds K - Late Birds 570 49 40 8:30 AM - 3:00 PM 8:25 AM - 11:46 AM 11:50 AM - 3:11 PM 8:30 AM - 2:05 PM 8:25 AM - 11:46 AM 8:25 AM - 11:46 AM Tassajara Hills ES 3rd - 5th 1-2 Early Birds 1-2 Late Birds K - Early Birds K - Late Birds 361 119 118 56 55 8:30 AM 9:20 AM 8:30 AM 8:45 AM 11:40 AM - 3:00 PM - 4:00 PM - 2:10 PM - 11:35 PM - 3:00 PM 8:30 AM 8:30 AM 8:30 AM 8:15 AM 8:15 AM - 2:00 PM - 2:00 PM - 2:00 PM - 11:40 AM - 11:40 AM Vista Grande ES 3rd - 5th 1-2 Early Birds 1-2 Late Birds K - Early Birds K - Late Birds 346 100 100 50 50 8:30 AM 8:30 AM 9:15 AM 8:30 AM 11:50 AM - 3:00 PM - 2:15 PM - 3:00 PM - 12:00 PM - 3:10 PM 8:30 AM 8:30 AM 8:30 AM 8:30 AM 8:30 AM - 2:00 PM - 2:00 PM - 2:00 PM - 12:00 PM - 12:00 PM Pine Valley MS All Grades 932 Walt Disney ES 3rd - 5th 1-2 Early Birds 1-2 Late Birds K - Early Birds K - Late Birds 252 71 70 40 40 8:30 AM 8:30 AM 9:35 AM 8:20 AM 11:50 AM - 3:00 PM - 2:05 PM - 3:00 PM - 11:45 PM - 3:15 PM 8:30 AM 8:30 AM 8:30 AM 8:20 AM 10:30 AM Country Club ES 3rd - 5th 1-2 Early Birds 1-2 Late Birds K - Early Birds K - Late Birds 288 87 86 60 40 8:25 AM 8:25 AM 9:15 AM 8:20 AM 11:45 AM - 3:00 PM - 2:00 PM - 3:00 PM - 11:40 PM - 3:05 PM 8:20 AM 8:20 AM 8:20 AM 8:20 AM 8:20 AM - 2:00 PM - 2:00 PM - 2:00 PM - 11:45 AM - 11:45 AM Neil Armstrong ES 3rd - 5th 1-2 Early Birds 1-2 Late Birds K - Early Birds K - Late Birds 348 8:30 AM 8:30 AM 9:20 AM 8:15 AM 9:15 AM - 3:00 PM - 2:00 PM - 3:00 PM - 12:00 PM - 12:45 PM 8:30 AM 8:30 AM 8:30 AM 8:20 AM 8:20 AM - 2:00 PM - 2:00 PM - 2:00 PM - 11:45 AM - 11:45 AM 55 100 8:00 AM - 8:15 AM - 2:30 PM 2:45 PM 9:04 AM - 8:15 AM - 2:30 PM 1:45 PM 2:00 PM 2:00 PM 2:00 PM 2:05 PM 1:55 PM Page 28 of 64 ATTACHMENT FOR AGENDA ITEM 8A ATTACHMENT B Proposed Operational Changes at School Sites Pine Valley Middle School Walt Disney Elementary School Country Club Elementary School Los Cerros Middle School Green Valley Elementary School Tassajara Hills Elem. School Page 29 of 64 Pine Valley MS PARENT DROP-OFF/ PICK UP AREA LEGEND TRAFFIX Bus Zone Spans length of blue line BR O A DM OO RD RI V E Parent Drop-Off/Pick Up Bus Loading Zone Signs TRAFFIX BUS LOADING & UNLOADING ONLY Spans length of yellow line Bus Loading Only Signs PINE VALLEY ROAD LA GU NA PL AC E Existing County Connection Bus Stop Bus Loading Only Signs Page 30 of 64 Walt Disney ES LEGEND TRAFFIX Bus Zone Parent Drop-Off/Pick Up Bus Loading Zone Signs PARENT DROP-OFF/ PICK UP AREA Spans length of blue line TRAFFIX BUS LOADING & UNLOADING ONLY Spans length of yellow line PINEHURST CT PINE VALLEY ROAD Page 31 of 64 Country Club ES LEGEND TRAFFIX Bus Zone Parent Drop-Off/Pick Up Bus Loading Zone Signs PARENT DROP-OFF/ PICK UP AREA Spans length of blue line TRAFFIX BUS LOADING & UNLOADING ONLY Spans length of yellow line BLUE FOX WAY Page 32 of 64 Los Cerros MS PARENT DROP-OFF/ PICK UP AREA LEGEND TRAFFIX Bus Zone Parent Drop-Off/Pick Up SCHOOL BUS LOADING/UNLOADING ONLY AFTER THIS POINT SIGN Spans length of blue line Sign Installations TRAFFIX BUS LOADING & UNLOADING ONLY Spans length of yellow line ADJUST GATE TO OPEN WIDER BLEMER ROAD Page 33 of 64 Green Valley ES LEGEND EL CA JO ND RIV E TRAFFIX Bus Zone Parent Drop-Off/Pick Up Sign Installations PARENT DROP-OFF/ PICK UP AREA Mc CA UL EY RO AD Spans length of blue line TRAFFIX BUS LOADING & UNLOADING ONLY Spans length of yellow line School Bus Loading/Unloading Signs and Pavement Markings Right Turn Restriction During Specific Hours on Pole Remove Tubular Markers SRVFPD STATION 33 Left Turn Restriction (R33B) During Specific Hours on Masthead Sign SUNRISE ASSISTED LIVING DIABLO ROAD Page 34 of 64 Tassajara Hills ES LEGEND TRAFFIX Bus Zone Parent Drop-Off/Pick Up Sign Installations CAMINO TASSAJARA TRAFFIX BUS LOADING & UNLOADING ONLY Spans length of yellow line PARENT DROP-OFF/ PICK UP AREA Spans length of blue line Bus Loading Only Signs Enforcement of bus loading only, no parking in fire lane and double parking needed “KEEP CLEAR” Pavement Markings Remove bulb-outs and parking to accommodate extended passenger and school bus loading/unloading 3 queuing lanes Flagger Turnaround Area for Buses Page 35 of 64 This page is intentionally left blank. Page 36 of 64 ATTACHMENT FOR AGENDA ITEM 8A ATTACHMENT C Proposed Operational Changes along Local Roadways Page 37 of 64 PROPOSED OPERATIONAL CHANGES ALONG LOCAL ROADWAYS 1. Stone Valley Oaks Drive (Alamo area, Unincorporated Contra Costa County) Parking restriction likely needed at the end of cul-de-sac adjacent to open space ___________________________________________________________________ 2. Mountain Canyon Place (Alamo area, Unincorporated Contra Costa County) Parking restriction needed in parts of the loop Page 1 Page 38 of 64 3. Piedras Circle (White Gate, Alamo area, Unincorporated Contra Costa County) Parking restriction needed at the end of the loop ___________________________________________________________________ 4. Carleton Way (Bryan Ranch, Alamo area, Unincorporated Contra Costa County) Parking restriction needed at the end of the cul-de-sac adjacent to open space Page 2 Page 39 of 64 5. Merano Street (McCauley neighborhood, Town of Danville) Parking restriction needed at the end of the cul-de-sac adjacent to open space __________________________________________________________ 5. Old Ranch Estates Drive at Hawthorn Court (Old Ranch, City of San Ramon) Red curb to reinforce no parking along intersection corners Page 3 Page 40 of 64 6. Portillo Valley Drive (Old Ranch Estates Neighborhood, City of San Ramon) Parking restriction likely needed at the end of cul-de-sac Page 4 Page 41 of 64 This page is intentionally left blank. Page 42 of 64 ATTACHMENT FOR AGENDA ITEM 8A ATTACHMENT D “Option A” Service Routes - Pine Valley MS Routes - Walt Disney ES Routes - Country Club ES Routes - Los Cerros MS Routes - Green Valley ES Routes Page 43 of 64 OPTION “A” and “B” SERVICE ROUTES: PINE VALLEY MIDDLE SCHOOL Page 44 of 64 OPTION “A” and “B” SERVICE ROUTES: WALT DISNEY ELEMENTARY SCHOOL Page 45 of 64 OPTION “A” and “B” SERVICE ROUTES: COUNTRY CLUB ELEMENTARY SCHOOL Page 46 of 64 OPTION “A” SERVICE ROUTES: LOS CERROS MIDDLE SCHOOL Page 47 of 64 OPTION “A” and “B” SERVICE ROUTES: GREEN VALLEY ELEMENTARY SCHOOL Page 48 of 64 ATTACHMENT FOR AGENDA ITEM 8A ATTACHMENT E “Option B” Service Routes (Please note: Pine Valley MS, Walt Disney ES, Country Club ES and Green Valley ES are the same as in Option A) - Los Cerros MS Routes - Tassajara Hills ES Routes Page 49 of 64 OPTION “B” SERVICE ROUTES: LOS CERROS MIDDLE SCHOOL Page 50 of 64 OPTION “B” SERVICE ROUTES: TASSAJARA HILLS ELEMENTARY SCHOOL Page 51 of 64 This page is intentionally left blank. Page 52 of 64 ATTACHMENT FOR AGENDA ITEM 8B Page 53 of 64 MEMORANDUM OF UNDERSTANDING BETWEEN THE MEASURE J TRAFFIC CONGESTION RELIEF AGENCY (DBA “TRAFFIX”) AND SAN RAMON VALLEY UNIFIED SCHOOL DISTRICT REGARDING THE EXPECTATIONS & RESPONSIBILITIES ASSOCIATED WITH THE IMPLEMENTATION OF THE TRAFFIX STUDENT TRANSPORTATION SERVICE This Memorandum of Understanding is entered into this ____ day of __________ 2009, by and between the Measure J Traffic Congestion Relief Agency hereinafter referred to as the "Agency" and the San Ramon Valley Unified School District, hereinafter referred to as the “District.” RECITALS WHEREAS, in November 2004, the taxpayers of Contra Costa County approved Measure J, a 25-year extension of a countywide ½-cent sales tax measure for the purposes of providing congestion relief through capital projects and programs; and WHEREAS, one category of Measure J provides funding for a program entitled, “Safe Transportation for Children” and provides an estimated $40 million over a period of 25 years for “the inauguration of a San Ramon Valley School Bus Program or other projects in the San Ramon Valley that reduce school related congestion, or improve the safety of children traveling to and from schools”; and WHEREAS, the funding and the operation of this program would begin in FY 2009-10 and its development and program elements are subject to the review and approval of the Contra Costa Transportation Authority (the “Authority”) and of the Southwest Area Transportation (“SWAT”) Committee, a regional transportation planning committee of the Authority; and WHEREAS, the public agencies of the San Ramon Valley (“Partnering Agencies”) consisting of the Town of Danville, City of San Ramon, Contra Costa County, and the San Ramon Valley Unified School District - have formed a three-tiered multi-agency advisory committee structure beginning in 2005 to develop a student transportation program with the specific purpose of reducing traffic congestion in the San Ramon Valley; and WHEREAS, the Partnering Agencies acknowledge that funding from the Measure J sales tax for this program would not be sufficient to serve all 35 schools and approximately 26,000 public school students located within the San Ramon Valley; and Page 54 of 64 WHEREAS, the Partnering Agencies adopted a program service priority approach based on the level of traffic congestion near school sites, adopted a list of “Priority 1,” “Priority 2,” and “Priority 3,” schools to be served as described in the “Findings of the Measure J School Bus Program Study – Report on Phase 2” document adopted by the Policy Advisory Committee and summarized, in alphabetical order, below: High Schools Middle Schools Elementary Schools Priority 1 California HS Monte Vista HS Pine Valley MS Los Cerros MS Country Club ES Green Valley ES Neil Armstrong ES Tassajara Hills ES Vista Grande ES Priority 2 SRVHS Diablo Vista MS Stone Valley MS Alamo ES Montevideo ES Rancho Romero ES Walt Disney ES Priority 3 Charlotte Wood MS Sycamore Valley ES Note: Given the changing nature of the neighborhoods in the Dougherty Valley during this assessment, schools within the Dougherty Valley were not accounted for in this analysis. WHEREAS, the program service priority approach identified the following schools as the six (6) schools on the “Priority 1” list to receive service in the 2009-10 school year: 1. 2. 3. 4. 5. 6. Los Cerros Middle School (Danville); Pine Valley Middle School (San Ramon); Green Valley Elementary School (Danville); Tassajara Hills Elementary School (Contra Costa County); Walt Disney Elementary School (San Ramon); Country Club Elementary School (San Ramon); and WHEREAS, the service to all six (6) “Priority 1” schools necessitate the commitment of significant staff resources and substantial financial commitment represented by an annual contract with a private service operator; and WHEREAS, the service to all six (6) “Priority 1” schools is dependent upon the ability to “tier routes” to the greatest extent feasible and re-use buses to serve multiple schools during the morning and afternoon school bell times; and WHEREAS, the ability to tier routes is dependent upon a commitment from San Ramon Valley Unified School District to proactively facilitate the efficient access onto, and off of, the school site; and Page 55 of 64 WHEREAS, the ability to tier routes may be dependent upon a commitment to consider adjusting School bell times if it should be deemed necessary; and WHEREAS, the inability to facilitate the efficient access to/from the School site and/or adjust bell schedules to ensure the ability to tier routes may necessitate consideration of diverting service from a “Priority 1” school to a “Priority 2” school; and WHEREAS, the Partnering Agencies have formed the Measure J Traffic Congestion Relief Agency, dba TRAFFIX (“Agency”), an independent Joint Powers Agency, to oversee the operation of the TRAFFIX Program; now therefore be it RESOLVED that in consideration of the foregoing, the Agency and District, do hereby agree as follows that the parties agree to commit in taking the following actions: 1. The Agency shall: a. Fund, operate and manage the student transportation service; b. Serve as lead, through its Technical Advisory Committee members, for identification of necessary actions to implement the TRAFFIX service at the School, including school bus loading locations, traffic circulation, and any signing and/or striping necessary to implement the student transportation service at the school site plan; and c. Provide the public outreach efforts necessary to market the TRAFFIX Program at the School. 2. The District shall: a. Work with the Agency to implement a circulation plan to facilitate the efficient access onto, and off of, school sites including the provision of resources available to facilitate the safe movement of school buses within school parking lots as identified in the attached Exhibits; b. Work with the Agency to identify an appropriate loading and unloading location for school buses as identified in the attached Exhibits; c. Work to adjust bell times to the greatest extent feasible to enable the ability for the TRAFFIX Program to tier routes; d. Work with the Agency to facilitate the promotion of the TRAFFIX Program, including hosting informational booths and events; dissemination of Page 56 of 64 informational materials and promotional items; and facilitate correspondence with parents and the student body through classrooms and newsletter announcements or through Lyris e-mail announcements. Page 57 of 64 IN WITNESS WHEREOF, the parties hereto have executed this Memorandum of Understanding on the dates stated. “AGENCY” “DISTRICT” MEASURE J TRAFFIC CONGESTION RELIEF AGENCY SAN RAMON VALLEY UNIFIED SCHOOL DISTRICT X Tai J. Williams, Chair Technical Advisory Committee X Gary Black Assistant Superintendent Date: __________________________ Date: ____________________________ Attachments: Exhibit 1 – Exhibit 2 Exhibit 3 Exhibit 4 Exhibit 5 Exhibit 6 - Operational Agreements at Los Cerros Middle School Operational Agreements at Pine Valley Middle School Operational Agreements at Green Valley Elementary School Operational Agreements at Tassajara Hills Elementary School Operational Agreements at Walt Disney Elementary School Operational Agreements at Country Club Elementary School U:\Transportation\TRAFFIX Program\Administration\Agreements - Agencies\MOU with SRVUSD - FINAL (tw 031309).doc Page 58 of 64 Los Cerros MS PARENT DROP-OFF/ PICK UP AREA LEGEND TRAFFIX Bus Zone Parent Drop-Off/Pick Up SCHOOL BUS LOADING/UNLOADING ONLY AFTER THIS POINT SIGN Spans length of blue line Sign Installations TRAFFIX BUS LOADING & UNLOADING ONLY Spans length of yellow line ADJUST GATE TO OPEN WIDER BLEMER ROAD Page 59 of 64 Tassajara Hills ES LEGEND TRAFFIX Bus Zone Parent Drop-Off/Pick Up Sign Installations CAMINO TASSAJARA TRAFFIX BUS LOADING & UNLOADING ONLY Spans length of yellow line PARENT DROP-OFF/ PICK UP AREA Spans length of blue line Bus Loading Only Signs Enforcement of bus loading only, no parking in fire lane and double parking needed “KEEP CLEAR” Pavement Markings Remove bulb-outs and parking to accommodate extended passenger and school bus loading/unloading 3 queuing lanes Flagger Turnaround Area for Buses Page 60 of 64 Pine Valley MS PARENT DROP-OFF/ PICK UP AREA LEGEND TRAFFIX Bus Zone Spans length of blue line BR O A DM OO RD RI V E Parent Drop-Off/Pick Up Bus Loading Zone Signs TRAFFIX BUS LOADING & UNLOADING ONLY Spans length of yellow line Bus Loading Only Signs PINE VALLEY ROAD LA GU NA PL AC E Existing County Connection Bus Stop Bus Loading Only Signs Page 61 of 64 Green Valley ES LEGEND EL CA JO ND RIV E TRAFFIX Bus Zone Parent Drop-Off/Pick Up Sign Installations PARENT DROP-OFF/ PICK UP AREA Mc CA UL EY RO AD Spans length of blue line TRAFFIX BUS LOADING & UNLOADING ONLY Spans length of yellow line School Bus Loading/Unloading Signs and Pavement Markings Right Turn Restriction During Specific Hours on Pole Remove Tubular Markers SRVFPD STATION 33 Left Turn Restriction (R33B) During Specific Hours on Masthead Sign SUNRISE ASSISTED LIVING DIABLO ROAD Page 62 of 64 Walt Disney ES LEGEND TRAFFIX Bus Zone Parent Drop-Off/Pick Up Bus Loading Zone Signs PARENT DROP-OFF/ PICK UP AREA Spans length of blue line TRAFFIX BUS LOADING & UNLOADING ONLY Spans length of yellow line PINEHURST CT PINE VALLEY ROAD Page 63 of 64 Country Club ES LEGEND TRAFFIX Bus Zone Parent Drop-Off/Pick Up Bus Loading Zone Signs PARENT DROP-OFF/ PICK UP AREA Spans length of blue line TRAFFIX BUS LOADING & UNLOADING ONLY Spans length of yellow line BLUE FOX WAY Page 64 of 64