101 Tips and Tricks for wInsight
Transcription
101 Tips and Tricks for wInsight
Copyright Earned Value Associates LLC. All rights reserved. 101 ! ! w e N All Tips and Tricks for wInsight Part III Eleanor Haupt Earned Value Associates LLC ehaupt@earnedvalue.biz www.earnedvalue.biz 937-572-2586 Advance Reviews 101 Tips & Tricks III “Outshines ‘Revenge of the wInsight Nerds’ . Riveting and powerful.” Ed Knox “A stunning work of raw, poetic beauty!! Two Arrows Up!” Epert & Roeber “I can’t believe Eleanor has this much time on her hands!” her Business Partner Copyright Earned Value Associates LLC. All rights reserved. Outline Updating your Software Custom Narrative Input Screens Risk and Scorecard Workspaces Analysis Comparison to Funding Baseline Analysis Custom Reports wInsight Version 6.3 Tips Copyright Earned Value Associates LLC. All rights reserved. Updating your Software w Copyright Earned Value Associates LLC. All rights reserved. Upgrading to Version 6.3 Prior to Installation – Save your Files!! 1 Save your custom settings (custom registry file) Save any custom reports you’ve built Archive your data base(s) 2 (wInsight) Click File, Export Custom Items Archive in a separate location from software (Admin) Click Utilities, Backup…. Archive in a separate location from software Note: Should always be stored on network drive, not on C drive!! Copyright Earned Value Associates LLC. All rights reserved. Upgrading to Version 6.3 3 Installation Remove prior version 4 Settings, Control Panel, Add or Remove Programs Ensure that the following folders are removed or empty CSSI6/bin CSSI6/data CSSI6/winst CSSI6/wsmde (contains .dll and other files) (contains blank data bases) (wInsight, report templates) (Administrator, report templates) Install new software Tips courtesy of Dan Zosh Copyright Earned Value Associates LLC. All rights reserved. Upgrading to Version 6.3 Post Installation 5 Re-import your custom registry file 6 (wInsight) Click File, Import Custom Items Convert 6.2 data base to 6.3 data base Option: 7 Open wInsight Administrator version 6.3 Create a data source link to a blank 6.3 data base Restore archived data base in the blank data base Option: Run wsquery for Access, MSSQL, or Oracle Example: C:\cssi6\winst\data\access\updateaccess62to63 Click Database, Connect. Select database to convert. Click green triangle Copyright Earned Value Associates LLC. All rights reserved. easy A Note about Compatibility Don’t hesitate to upgrade!! 8 Databases are forward compatible 9 Can open version 6.2 database in version 6.3 Databases are not backwards compatible If trying to open 6.3 version of database in 6.2, will get following error Copyright Earned Value Associates LLC. All rights reserved. What File do I Send my Customer? 10 Type of file First submission only Subsequent submissions Archived database (.wsa) Outlook blocks databases – do not send .mdb by e-mail Transfer file for most recent month only Version? 11 If your customer has a higher version of wInsight If you have a higher version of wInsight Shame on you! Get the upgrade In the meantime, send the transfer file Send them a transfer file compatible with their version Transfer file formats X12 format (.trn) XML format (if wInsight 6.0 or higher) Copyright Earned Value Associates LLC. All rights reserved. (.xml) Exporting a Different Version 12 XML Utilities, Export File Click Options button Can save to older version 13 6.2 6.1 6.0 TRN Utilities, Export File Select X12 as export option Click Options button Select version (WSA 5.0, 4.0, 2.0, wInsight 3.x, 2.x, PA) Copyright Earned Value Associates LLC. All rights reserved. Contract Names and Importing Transfer Files 14 Administrator uses the ContrName field to match the transfer file to the correct contract If you get the message that a new contract is being created during import ContrName may have been changed Open the transfer file in NotePad 15 Click Edit, Find, enter “ContrName” Edit name to match ContrName in database Contractors: do not modify ContrName without informing your customer! Copyright Earned Value Associates LLC. All rights reserved. Can I have both versions (i.e. 6.2 and 6.3) on same machine? 16 17 Yes, but not recommended! Need to register DLLs in both versions 18 Double click on CSSI6/bin/DoRegAll Launch correct version of software Be careful of data base versions May need to designate data base version in title (e.g., MOH-2 Vers 63) Keep in separate directories Copyright Earned Value Associates LLC. All rights reserved. Upgrade your Software If you have a renewal agreement Visit www.cssi.com/footprints monthly Download software upgrades Upgrade may not include all support files & utilities 19 Do not uninstall software or remove support files If asked if you wish to install a support file (e.g., xxx.dll), click yes Should archive registry file in separate location prior to downloading Copyright Earned Value Associates LLC. All rights reserved. Drag and Drop Import 20 21 Drag and drop a transfer file directly from Windows Explorer into the Administrator window Drag and drop for several contracts at once Automatically recalculates Ensure you have correct options selected prior to drag & drop Import Recalculate You won’t have a chance during drag & drop Copyright Earned Value Associates LLC. All rights reserved. 22 Step by Step Data Base Maintenance* Restore an Archived Contract or Contracts Recalculate page 12 page 9 X option 2 X option 2 X X X Restore an archived contract or contracts in an existing data base X X X Send periodic data to a customer X X Send the entire Data Base or contract to a customer X X X Archive the database to back-up the data X X X '---------------------------Functions ----- Create a Data Base Shell Select the Data Base Import a Transfer File page 4 page 4 (see page 5 for entering data manually) Recalculate Backup the Roll Up the Export a Data Base or Data Transfer File Contract page 11 --Desired Outcome page 9 page 10 page 10 page 12 FOLLOW THESE STEPS IN ORDER FROM LEFT TO RIGHT Create a Contract in a new Data Base X X X Add a Contract to an Existing Data Base X X option 1 X option 1 Import a new month of data X X X Restore an archived contract or contracts in a new data base X X X X *Guide to Mastering wInsight, published by Earned Value Associates, LLC Copyright 2005 Custom Narrative Input Screens Copyright Earned Value Associates LLC. All rights reserved. Custom Custom fmt5_narrative.htm fmt5_narrative.htm 23 generated generated generated generated 24 Input Input section section 25 -Provide -Provideblocks blocksfor forCAMs CAMsto tofill fillinin “If “Ifyou youbuild buildit,it,they theywill willwrite writeit” it” Copyright Earned Value Associates LLC. All rights reserved. Resulting Resulting Format Format 55 narrative narrative Copyright Earned Value Associates LLC. All rights reserved. 26 WE: Sample Custom Narrative Input Templates 27 Can modify any of the following standard input templates fmt5_template.htm sow_template.htm usernarr_template.htm Select new template on the Input menu The data and the new template will be shown in the corresponding report rfmt5_template.htm rsow_template.htm rusernarr_template.htm Copyright Earned Value Associates LLC. All rights reserved. 28 Names Namesare aresimilar similar Be careful! Be careful! Only Onlyneed needto to modify modifythe theinput input template, template,not notthe the report report 6.3 Customizing Narrative Inputs Step by Step Copy and save the original template in another location 29 in case you want to restore it later! Customize Open the file using a HTML editor Add fields to show dynamic data Add tables and words to indicate input areas Save with the same name in the winst folder Example: C:\cssi6\winst\fmt5_template.htm Could save Fmt 5 template with contract name 30 31 Example: C:\cssi6\winst\MOH-2_fmt5_template.htm Have to close and re-open wInsight to establish automatic link Demonstrated live in my other presentation! Copyright Earned Value Associates LLC. All rights reserved. Customizing Narrative Inputs How to Use Select Active Element Click on Input, name of narrative input report Hint: if new narrative inputs do not show up, may need to clear old narrative. Click Edit, Select All, Edit, Clear All, Save. Close window, then reopen narrative input. Enter information Click Save button To view report, select report from report menu Copyright Earned Value Associates LLC. All rights reserved. 32 Customizing Narrative Inputs How to Use To clear entered information 33 Click Edit, Clear All. Edit, Save. Close and reopen input screen to refresh template To copy forward Format 5 Narrative, User Narrative 34 Administrator (Utilities, Copy Forward) Can select option to only copy Format 5 narratives for 35 elements that meet the new month’s VAR thresholds Click VAR Only Scope of Work narrative Automatically copies forward Copyright Earned Value Associates LLC. All rights reserved. Risk and Scorecard Copyright Earned Value Associates LLC. All rights reserved. 6.3 New Risk Fields in Version 6.3 New fields Warning! 40 Warning! ••Old Oldfield field(Risk) (Risk)still stillexists. exists. ••Populate Populateinin“CPR “CPRElements” Elements”table. table. ••To Toshow, show,select select“RiskColor”, “RiskColor”,not not“Risk” “Risk” Copyright Earned Value Associates LLC. All rights reserved. Risk Technical Funding Staffing Satisfaction UserKpi6 UserKpi7 UserKpi8 UserKpi9 UserKpi10 36 37 ••Colors: Colors: __RRYYGGBB ••Trend Trendarrows arrows 38 ••Can Canbe be renamed renamedininSort Sort window window 39 ••Use for other Use for other risks risks(schedule, (schedule, probability, probability, etc.) etc.) 6.3 New Risk Fields in Version 6.3 Data Entry Enter in Element Data table, Scorecard table Option 42 Faster Option Select each risk item Select color from drop down box Double click in cell Type in rating directly Copy to next month 43 Not automatic Copy and paste from prior month, edit as needed Copyright Earned Value Associates LLC. All rights reserved. 41 6.3 Custom Workspace – “Scorecard” 44 Copyright Earned Value Associates LLC. All rights reserved. Custom Workspace – “Scorecard” WE: Sample 6.3 Copyright Earned Value Associates LLC. All rights reserved. Custom CustomView: View: Scorecard Scorecard 45 Fields: Fields: Risk, Risk,UserKpi8, UserKpi8,UserKpi7, UserKpi7,Technical, Technical,Staffing, Staffing,UserKpi6, UserKpi6,SpiTrCum, SpiTrCum, TFloat, TFloat,Bac, Bac,Funding, Funding,CpiTrCum, CpiTrCum,VacTrCum, VacTrCum,UserEacMin, UserEacMin,UserEac, UserEac,UserEac UserEac Max Max 46 •• Changed Changedto toIPT IPTstructure. structure. •• Sized Sizedand andarranged arrangedwindows. windows. •• Save SaveWorkspace WorkspaceAs… As… 48 Custom Customchart chart Columns: Columns: BAC, BAC,EAC EAC Trend Trendlines: lines: SPI, SPI,CPI CPI Used UsedScope Scopeof ofWork Work report to input report to inputrisk risk items, 90 day look items, 90 day look ahead ahead 47 6.3 Other Potential Uses for new Risk 50 ••IfIfentering colors for KPI Fields entering colors for KPI 9 and 10 only, must enter Track CAM competencies CAMs No performance data Use two blank risk fields 49 Create an alternate data structure 9 and 10 only, must enter 88blank blankspaces spaces ••Blanks Blankswill willnot notcopy copy && paste pasteto tonext nextmonth month CAM Training (UserKpi9) VAR Quality (UserKpi10) Show to PM on regular basis Copyright Earned Value Associates LLC. All rights reserved. OffSym ProjOff LL CAM Training VAR Quality 1 IPT 1 Smart √ ↓ ↔ 2 IPT 1 Bond √ ↔ ↔ 3 IPT 1 Wayne √ ↓ ↔ 4 IPT 1 Brown √ ↔ ↔ 5 IPT 2 Simmons √ ↔ ↔ 6 IPT 2 Novak √ ↔ ↔ 7 IPT 2 Smith √ ↔ ↔ 8 IPT 2 Price √ ↑ ↔ 9 IPT 3 Hall √ ↔ ↔ 10 IPT 3 Zepka √ ↔ ↔ 11 IPT 3 Tideman √ ↑ ↔ 12 IPT 4 Hall √ ↔ ↔ 13 IPT 4 Blair √ ↔ ↔ 14 IPT 4 Troop √ ↔ ↔ 15 IPT 4 Pino √ ↔ ↔ Master wInsight, you can Master the software Read Guide to Mastering wInsight Explore and have fun! Fear not the dark side of custom reports Customize for your team 51 Views, Filters, Charts Multiple windows Quad charts Workspaces Reports Share custom registry file, you must Copyright Earned Value Associates LLC. All rights reserved. “Try not. not. “Try Do oror dodo not, not, Do there isis nono try.” try.” there Workspaces Copyright Earned Value Associates LLC. All rights reserved. Custom Workspaces Are only valid for a particular data source How to create Use during live project reviews in conference room Customize for project manager, IPT, etc. 54 Save basic Sort window as default Arrange wInsight components as desired Filter, sort, custom reports, etc. Click File, Save Workspace As… 53 Recommend saving to network drive to avoid loss Uses 52 Save Workspace Automatically opens when you open wInsight Can open custom workspaces without closing data Copyright Earned Value Associates LLC. All rights reserved. Demonstrated live in my other presentation! Data Validity Workspace EAC Realism Workspace Copyright Earned Value Associates LLC. All rights reserved. VAR Input Workspace MR Status Workspace 55 56 57 6.3 VAR Track custom workspace 58 Custom Custom workspaces workspaces can can now now contain contain more more than than one one Sort Sort window window Copyright Earned Value Associates LLC. All rights reserved. Analysis Tips Copyright Earned Value Associates LLC. All rights reserved. Contract Tree Current/Cum toggle 59 Right mouse click anywhere in Tree Click Options menu to see if Current toggle is on Toggle to OBS structure Analysis Drill down the WBS or OBS structure Can select the Active 60 Element on the tree All open charts and reports are changed Copyright Earned Value Associates LLC. All rights reserved. Contract Tree workspace 61 !%#$& Filter Name DO NOT begin the name of a custom filter with any of following characters !%#$& It will be at the top of the pre-filter list in the Open Data Set dialog box Becomes default unless you always remember to click on <All Elements> Copyright Earned Value Associates LLC. All rights reserved. 62 6.3 Interactive Filters Prompt you to enter value Example: name of CAM, WBS begins with, CPI, etc. 6.3 Enhancement 63 Click Apply to keep interactive window open Can enter new values Copyright Earned Value Associates LLC. All rights reserved. Comparison to Funding Copyright Earned Value Associates LLC. All rights reserved. Show total funding vs. expected Price at Completion (PAC) MEGA HERZ ELEC & VEN F04695-86-C-0050 FPI RDPR Funding vs PACs Element: 1000 Dollars in Millions 64 2003 APR MAY JUN JUL AUG SEP OCT NOV DEC Name: MOH-2 2004 JAN 28.0 27.0 ••Use 2, UseNumber1, Number1, 2,3, 3,44fields fieldsin inAdministrator Administrator ••Enter total funding, Price at Completion Enter total funding, Price at Completion 26.0 25.0 24.0 23.0 22.0 21.0 20.0 PO Funding 23.00 PAC Min 19.99 PAC ML 21.05 PAC Max 22.02 23.00 20.08 21.10 21.54 23.00 21.11 21.54 21.90 23.00 21.44 21.75 21.66 Copyright Earned Value Associates LLC. All rights reserved. 23.00 21.50 21.90 21.75 23.00 21.54 22.01 22.90 23.00 21.78 22.54 22.98 23.00 24.54 25.01 27.54 27.00 27.00 27.00 27.00 27.00 27.00 27.00 27.00 39 Funding chart Funding F04695-86-C-0050 FPI RDPR Contractor: MEGA HERZ ELEC & VEN Contract: MOH-2 Complete Time Now Start Dollars in Millions ••Shows Showsspreads spreadsof offunding funding 25.0••Requires RequiresCFSR CFSRdata data ••Customized Customizedon onnext nextchart chart Program: Mohawk Vehicle AS OF: JAN 93 20.0 15.0 10.0 5.0 0.0 65 ••Completion line is the later of: Completion line is the later of: ••ContrCompl ContrCompl (Administrator) (Administrator) ••CtrEstCompl CtrEstCompl (Administrator) (Administrator) ••POEstCompl (wInsight) POEstCompl (wInsight) 1992 BCWS BCWP ACWP 7.28 6.85 7.35 Copyright Earned Value Associates LLC. All rights reserved. 1993 Contractor Spread Automated Spread Custom Spread 23.36 24.00 25.10 66 Funding F04695-86-C-0050 FPI RDPR Contractor: MEGA HERZ ELEC & VEN Contract: MOH-2 22.5 Complete Time Now 25.0 Program: Mohawk Vehicle AS OF: JAN 04 Start Dollars in Millions *Guide to Mastering wInsight, published by Earned Value Associates, LLC Customized Funding chart* 20.0 17.5 15.0 Problem! Planned obligations less than Ctr Spread 12.5 10.0 7.5 Copyright 2005 ••Changed Changedfield fieldon onstandard standardFunding Fundingchart chart 5.0 ••Autospread field Budget field Autospread field Budget field(populated (populatedin inAdministrator) Administrator) • Legend: “Planned Obligations” • Legend: “Planned Obligations” 2.5 ••Changed Changedlegend legend 0.0 •“Custom •“CustomSpread” Spread”to to“PMO “PMOSpread Spreadof ofPAC” PAC” •“Contractor Spread” Spread •“Contractor Spread”to to“Contractor “Contractor Spreadof ofPAC” PAC” 2003 2004 2005 BCWS BCWP ACWP 7.33 7.31 7.35 Copyright Earned Value Associates LLC. All rights reserved. Contractor Spread of PAC Planned Obligations PMO Spread of PAC 23.36 24.10 24.10 Analyze Staffing Forecasts Open Manpower chart Available for all elements in OBS structure Available at Level 1 for WBS and other structures Shows actual data for past 3 months and incremental data for future periods Look for 67 Significant shifts from prior reports 68 Compare actual costs (past 3 months) to what had been forecasted 69 Compare end point (EAC data) with Prior months to see if period has been extended End point for BAC (if entered) End point for total program BAC on Format 3 Copyright Earned Value Associates LLC. All rights reserved. Element: QA EQP 2003 NOV MEGA HERZ ELEC & VEN F04695-86-C-0050 FPI RDPR Manpower 2004 FEB MAR APR MAY JUN JUL DEC JAN Name: QUALITY CONTROL AUG SEP OCT 25.0 20.0 ••Does Doesthis thiscurve curvesupport supportthe thephasing phasing of ofthe thework? work? Does Doesthe thework workend endinin October? October? ••What Whatdoes doesthe theFormat Format33show showfor for Forecasted ForecastedCompletion CompletionDate? Date? 15.0 10.0 5.0 0.0 71 ACTUAL LRE BAC 9.00 9.00 0.00 Could Couldenter enterBAC BAC 16.20 18.20 information for information for23.60 15.20 17.40 17.80 manpower inin 0.00 0.00 0.00 0.00 manpower Administrator Administrator Copyright Earned Value Associates LLC. All rights reserved. 26.00 0.00 26.40 0.00 25.40 0.00 23.60 0.00 16.60 0.00 4.40 0.00 0.00 0.00 70 Baseline Analysis Copyright Earned Value Associates LLC. All rights reserved. Review the Baseline Analysis Chart Baseline Analysis F04695-86-C-0050 FPI RDPR Contractor: MEGA HERZ ELEC & VEN Contract: MOH-2 80 60 40 74 5.0 ••Completion Completionline lineisisthe thelater laterof: of: ••ContrCompl (Administrator) ContrCompl (Administrator) ••CtrEstCompl CtrEstCompl (Administrator) (Administrator) ••POEstCompl (wInsight) POEstCompl (wInsight) 2.5 0.0 2003 BCWS BCWP ACWP 7.28 6.85 7.35 Copyright Earned Value Associates LLC. All rights reserved. 100 2004 JAN 04 Baseline DEC 03 Baseline NOV 03 Baseline 20 0 20.80 20.80 19.38 Percent of PMB •• Look Lookfor forshifts shiftsfrom fromone one 17.5 period periodto toanother. another. Should Should correlate with correlate15.0 withIMS IMSbaseline baseline changes. changes.12.5 •• Analyze Analyzespikes, spikes,flat flatspots, spots, 10.0 slopes. or ornegative negative slopes. •• MR UB are spread. MRand and 7.5 UB are spread. 73 Complete 72 Time Now Start Dollars in Millions 20.0 Program: Mohawk Vehicle AS OF: JAN 04 Baseline Analysis chart Program: Mohawk Vehicle AS OF: JAN 04 100 80 15.0 12.5 60 10.0 40 7.5 5.0 20 2.5 0.0 0 2003 BCWS BCWP ACWP 7.28 6.85 7.35 2004 JAN 04 Baseline DEC 03 Baseline Sep 03 Rolling Wave 20.80 20.80 19.16 Percent of PMB Complete Time Now Start Dollars in Millions 75 ••Shows ShowsBCWS BCWSbaseline baselinecurves curvesfor forlast last3Baseline 3months months Analysis F04695-86-C-0050 ••Can designate a “fixed period” for curves Can designate a ELEC “fixed period” for curvesFPI RDPR Contractor: MEGA HERZ & VEN ••Designate for Contract: MOH-2 Designate forOTB, OTB,rolling rollingwave, wave,etc. etc. ••Click Define Chart Click Define Chart ••Select one Select20.0 oneofof33future futurecurves. curves. ••Edit , click Absolute , select Edit, click Absolute, selectperiod period ••Requires future period BCWS data 17.5 Requires future period BCWS data Custom Custom Reports Reports for for Baseline Baseline Analysis Analysis Future Future Period Period BCWS BCWS –– Twelve Twelve Months Months 76 (banded (bandedreport reportfor forall allelements) elements) 77 Baseline Baseline Analysis Analysis for for WBS WBS Element Element Copyright Earned Value Associates LLC. All rights reserved. Custom Reports Copyright Earned Value Associates LLC. All rights reserved. Custom Reports Keep all custom reports in same folder Suggest: C:\CSSI6\winst If not in same folder, wInsight will automatically look for a report in last location that was mapped for any report Will get error message Have to continually re-map Copyright Earned Value Associates LLC. All rights reserved. 78 Hints for Custom Reports Banded Reports Show data fields for all elements showing in Sort window (could be filtered set) Example: PM Summary report How to create 79 80 (|Meta|BeginLoop|ce|SyncSortWnd|) Begins “loop” (|field name|$ce$|) Specifies field for all elements (|Meta|EndLoop|ce|) Ends “loop” through all elements Copyright Earned Value Associates LLC. All rights reserved. Hints for Custom Reports Begin by studying existing reports Copy and edit existing report 81 Copy scripts, formats, etc. Arrange HTML editor window and wInsight sort window together on screen Make changes to report Switch to wInsight, apply report Verify changes in new report Copyright Earned Value Associates LLC. All rights reserved. 82 Formatting Custom Reports (|Lre|(-0)|[c0]|) Current period No decimals 84 Must use Lre for field name instead of Eac (|Lre|(-1)|[n3]|) Prior period (relative to current period) Specify number of decimals (|Lre|(-0)|{+1}|Dollars|) 85 Future period (relative to current period) Copyright Earned Value Associates LLC. All rights reserved. Specify units If left off, can toggle units 83 EAC Realism - Work Breakdown Structure (Dollars) As of: JAN 04 Contract Name: MOH-2 Contract Number: F04695-86-C-0050 Contractor: MEGA HERZ ELEC & VEN Element Code: 1000 Element Name: MOH-2 86 Project Officer: Jones Office Symbol: JDHD Method 1 - Comparison of CV to VAC Cum Cost Variance -36.0 VAC 0.0 The cumulative cost variance to date is worse than the projected final cost overrun. The EAC appears to be optimistic or may be outdated. Cumulative cost performance is overrunning; but final costs are expected to come in at the budget value. Method 2 - Comparison of CPI to TCPI-EAC CPI 0.995 TCPI-EAC ••“EAC “EACRealism” Realism”custom customreport report ••Verifies Verifiesrealism realismby by44methods methods ••Also Alsocreated: created: •“EAC •“EACRealism Realismsince sinceOTB” OTB” custom customreport report 1.002 Comparison of CPI to TCPI-EAC -0.007 The EAC is relatively consistent with cost efficiency to date. Method 3 - Compare EAC to Statistical Forecasts Contractor's EAC 28,389.4 wInsight Independent Statistical Forecasts •Current Period CPI •CPI (3 period average) •CPI (6 period average) •Cumulative CPI •Weighted Cost Schedule •MICOM (CPI6*SPI) •CPI*SPI 30,874.7 27,167.8 28,414.7 •User EAC (most likely) •User EAC (max) 28,389.0 Compare the EAC to range of statistical EACs. If the EAC is below the range, it appears to be unrealistic based on past performance. If the EAC is within the range, it appears to be realistic based on past performance, but evaluate its position within the range. If the EAC is above the range, it may be too pessimistic, unless it is based on knowledge of future risks. Compare the EAC to the range of User EACs (if input). 28,512.7 28,525.8 Method 4 - Compare EAC to Regression Forecasts 28,600.9 28,696.0 User Input EACs •User EAC (min) SPO EAC 28,663.8 Contractor's EAC 28,389.4 Linear Regression 28,643.9 Evaluate the EAC against the linear regression formula. Note that this is not a curvilinear function, but a straight line projection. 29,580.8 30,169.8 Notes Weights for Cost + Schedule Forecast: Cost = 50.0% Forecasts are summed from lower levels. Copyright Earned Value Associates LLC. All rights reserved. Schedule = 50.0% 87 Twelve Twelve Period Period Summary Summary Copyright Earned Value Associates LLC. All rights reserved. Copying Reports to Word or 88 PowerPoint Two Two Step Step Process Process Open wInsight report Click Edit, Select All, Edit, Copy Open new Word or PowerPoint document Click Edit, Paste Special, HTML Format Click on report to select, Cut Click Edit, Paste Special, Picture (Enhanced Metafile) PowerPoint Select script tag (if any) and delete Copyright Earned Value Associates LLC. All rights reserved. Allows Allowsyou youto totreat treatthe the report reportas asaapicture picture (resize, (resize,etc.) etc.) wInsight 6.3 Copyright Earned Value Associates LLC. All rights reserved. 6.3 MEGA HERZ ELEC & VEN F04695-86-C-0050 FPI RDPR Chart 2 Element: 1000 Name: MOH-2 SPICUM Index of Dollars 0.95 0. 90 10 . 1 89 •• Select SelectGauge Gaugeas astype typeof ofUnits Units •• Can Canchart chartany any% %or orindex indexfield field •• Clicking OptionalData Datashows shows ClickingOptional previous previous22months months AUG 03 0.972 Copyright Earned Value Associates LLC. All rights reserved. SEP 03 0.993 OCT 03 1.089 6.3 MEGA HERZ ELEC & VEN F04695-86-C-0050 FPI RDPR Chart 2 Element: 1000 Name: MOH-2 SPICUM Index of Dollars 0.95 1 0. 0 .1 90 AUG 03 SEP 03 OCT 03 0.972 0.993 1.089 Copyright Earned Value Associates LLC. All rights reserved. 6.3 Custom Animation for Gauge Chart 90 Copy and paste to PowerPoint Cut and Paste Special (Windows Metafile) Ungroup picture elements Animate Change colors, font sizes Copyright Earned Value Associates LLC. All rights reserved. 6.3 New Fields •• Rolling Rolling averages averages •• Show Show in in Sort Sort window window •• Plot Plot on on trend trend charts charts ••Suggest Suggestbars barsfor forrolling rollingaverages averages ••Trend lines for cum indices Trend lines for cum indices MEGA HERZ ELEC & VEN F04695-86-C-0050 FPI RDPR CPI 3 Element: 1000 Index of Dollars CpiCum3 CpiCum6 SpiCum3 SpiCum6 1.200 2003 APR MAY JUN JUL AUG SEP OCT NOV DEC Name: MOH-2 2004 JAN 1.150 1.100 1.050 1.000 0.950 0.900 0.850 CPICUM3 1.150 1.051 0.996 0.967 0.903 1.016 0.869 0.872 0.905 0.950 CPICUM 1.150 1.051 0.996 0.987 0.927 1.011 0.906 0.891 0.947 0.932 Copyright Earned Value Associates LLC. All rights reserved. 91 6.3 New Fields in Administrator CprDid Contracts, Contract Set Up table 93 Report Set Up, CPR Header table Select “0” for Aug 99 DID Select “1” for Mar 00 DID EvmsAppr 92 Enter date of system validation ReprogSch Element, Earned Value table Enter SV adjustments by element Copyright Earned Value Associates LLC. All rights reserved. 94 6.3 New CPR Formats Can be selected by switching CprDid field to “1” Files are contained in C:\CSSI6\wsmde 95 Example: cpr_1m1.htm New formats available on FootPrints with correct title View new formats in Administrator Open Reports in navigation pane Select CPR format Can save as HTML file or print Tips courtesy of Wayne Erwin Copyright Earned Value Associates LLC. All rights reserved. Caution Caution not notyet yet supported supportedinin wInsight wInsight 6.3 Import File options Recalculate after import 96 Uses last settings for Recalculate and Import Import warnings are quickly displayed Generate import messages only Dry run option No data is imported Copyright Earned Value Associates LLC. All rights reserved. Leave Leave both both options options unchecked unchecked for for normal normal import import 6.3 Administrator Tree Manager Drag and drop element onto new parent element On same tree Only need to open second tree to save scrolling up and down Click Insert on your keyboard to insert new element Generates default number 97 parent#.1 Enter element number only Must enter name in CPR Elements table Click Delete on your keyboard to delete an element Copyright Earned Value Associates LLC. All rights reserved. Can Canonly onlymove move elements elementswithin within same samestructure structure 6.3 Administrator WBS Map Drag and drop from WBS (left pane) to target structure on right Click Options To show Lowest only Unmapped Mapped Linked WBS elements for selected target To filter WBS elements 98 Example: by CAM To remove link, click target WBS and drag to blank area in target area Click File, Validate/Repair to detect and repair broken links Click File, Save Copyright Earned Value Associates LLC. All rights reserved. Important ImportantNext NextSteps Steps ••Run RunUtilities, Utilities,Run RunScript, Script,Set Set Linked LinkedPeriod PeriodData Data ••Copies Copiesdata datato tonew newlinks links Script, Set Linked Future ••Run Run Script, Set Linked Future Data Data ••Copies Copiesfuture futureperiod perioddata data ••Recalculate Recalculate One Final Hint about Administrator If unsure about what you are about to do Step 1 Step 2 Step 3 No worries! Copyright Earned Value Associates LLC. All rights reserved. 99 Recalculate and archive the database in a safe place Try out new techniques If you blow it, delete the test database and restore the archived database Need Help? Send me an e-mail if you’d like any of the following 100 wscustom.xml Custom reports (my custom registry file) Visit our website for wInsight resources www.earnedvalue.biz Copyright Earned Value Associates LLC. All rights reserved. Copyright Earned Value Associates LLC. All rights reserved. Tip #101 16 There is only one copy of wInsight-opoly in the world! Register at our booth to win the only copy!