BILFINGER UAS - UNDERDECK ACCESS SYSTEM
Transcription
BILFINGER UAS - UNDERDECK ACCESS SYSTEM
BILFINGER SALAMIS UK –––––– BILFINGER UAS UNDERDECK ACCESS SYSTEM Bilfinger Salamis UK recognised that the use of conventional scaffolding as a means of access/egress in underdeck and hard to reach locations is time consuming. Our bespoke underdeck system, Bilfinger UAS, offers lightweight components, flexiblity of use, and fast installation time, both offshore and onshore. Bilfinger UAS has been developed by Bilfinger and Layher to achieve an underdeck access platform with minimal contact points to underdeck existing steel beam framework. This new scaffold system uses 750dp aluminium lattice beams. These beams are fixed directly onto Layher suspended upright standards which have purpose designed spigot plates at the top to connect to hanger beam clamps. The use of these beams allows for increased spans between support points, which reduces the number of touch up repair points at the dismantle stage. Faster install, increased flexibility of use Bilfinger UAS offers speed of installation, has minimum contact points and minimal conventional tube/fitting components, yet offers loading capacity for various work activities. The system offers the flexibility to overcome various types of structural, plant and pipework obstructions normally encountered in congested offshore/onshore locations. Additionally, Bilfinger UAS can cantilever past the platform edge by 2m, which makes this product unique compared to other alternative access products currently available. Bilfinger UAS is fully compliant with industry legislation and BSEN12811-1. Due to its lightweight design and ease of installation, the system reduces potential exposure to manual handling and working at height activities. Training There is no need for for specialist vendors to install or carry out any modifications on Bilfinger UAS. Our existing core crew scaffolders can be trained up in its use. Benefits: • Less contact points • No requirement for third party vendors. • Speed of construction and dismantle • Less labour intensive • Ability to cantilever out and access perimeter workscopes • Reduced manual handling • Less restriction due route of cables • More flexibility around obstructions • Once erected certification/maintenance can be completed by onboard scaffold teams • Individually tried and tested components • Stable working platform • Less movement due to wind uplift • Better containment of expended abrasives Uses: • Painting • Coatings • Inspection • Potential pre-installation on structures • Small bore pipework installation/refurb Bilfinger UAS Savings Tonnage Component Savings ConventionalTube&FittingScaffolding No components 755 Tonnage Contact Points Bilfinger UAS System Savings No components 329 56.4% 5.36 Tonnage 2.75 48.7% 25 Contact Points 8 68.0% Man-Hour/ Man-Day Savings Conventional Tube & Fitting Scaffolding Erect Man-Hours 228 Erect Man-Days 7.1 Dismantle Man-Hours 98 Dismantle Man-Days 3.1 Total Man-Hours 333.1 Total Man-Days 10.4 Bilfinger UAS System Erect Man-Hours Savings 160 29.8% Erect Man-Days 5 29.8% Dismantle Man-Hours 69 29.6% Dismantle Man-Days 2.2 29.6% Total Man-Hours 234 29.8% Total Man-Days 7.3 29.8% Demonstration A demonstration unit of the Bilfinger UAS system is now available for review at the Bilfinger Salamis Skills Centre in Aberdeen‘s Bridge of Don. We are more than happy to discuss your access requirements in more detail with our in-house scaffolding technical authorities and scaffolding design engineers. Oil and Gas Bilfinger Salamis UK 4 Greenhole Place, Bridge of Don Aberdeen Phone +44 1224 246000 info.salamis@bilfinger.com www.salamis.bilfinger.com Bilfinger UAS