ENJJPT SC #70 T-6A Programs
Transcription
ENJJPT SC #70 T-6A Programs
ENJJPT SC #70 T-6A Programs Mr. Patrick Frye AFLCMC/WLZ (JPATS) Mr. Bryan Knoll HQ AETC/A3FP Overview • Funding summary • T-6 Current & Future Mod’s 2 SC70 Funding Timeline (FY) Summary • Distribution quantities and funding for ADS-B Out and CFIS show a new distribution for SC70 • A new cost estimate for ADS-B Out is included. The estimate includes both aircraft and ATD requirements • New cost estimate for CFIS is lower than originally planned. 3 Future T-6 Mod’s 1. Automatic Dependant Surveillance - Broadcast: (ADS-B) Out – Modify aircraft and ATDs to meet FAA mandated National Airspace requirements by 1 Jan 2020. – ENJJPT PO, Annex 10, “Mission Essential”, per HQ AFMC – Earliest anticipated Sheppard installation: FY19 – Estimated cost: $7M AETC FY16 POM strategy for ADS-B as a separate project versus combined as AVI suite approach. 4 Future T-6 Mod’s (cont.) 2. CFIS (Canopy Fracture Initiation System) Ballistic – Modify aircraft due to obsolescence of current laser/flash initiated system. Replace with military certified ballistic system – ENJJPT PO, Annex 10, “Logistics Essential”, per HQ AFMC – Earliest anticipated Sheppard installation: FY16 – FY19 • Retrofit at next scheduled R&R – Estimated cost: $40K 5 Future T-6 Mod’s (cont.) 3. Wing Rib one repair/correction – Cracking discovered on top portion of center wing rib (rib one) – Repair/correction is still TBD, but will be depot level effort – ENJJPT PO, Annex 10, “Safety of Flight”, per HQ AFMC – Earliest anticipated Sheppard work: TBD – Estimated cost: TBD Cost estimate expected by spring 2017 6 Future T-6 Mod’s (cont.) 4. ATD DAS II - Control loading/Flight Deck I/O Retrofit • Commercial Off-The-Shelf (COTS) elements of legacy platforms to the Electronic Control Loading System (ECLS) and Flight Deck I/O of the JPATS ATDs are obsolete and have limited supportability • Legacy IP‑GSNet cards, 429 Cards, and power supplies are out of production and cannot be supplied by any vendor • Projections based on current failure rates indicate that ATDs will start becoming irreparable in 2015. This will cause the number of ATDs for student training to decrease until insufficient numbers of ATDs are available to support Program Flying Training throughput mandated by AETC and CNATRA. – Estimated cost for Shepperd AFB: 1.2M 7 Future T-6 Mod’s (cont.) ATD DAS II - Control loading/Flight Deck I/O Retrofit (cont.) Legacy DRI system ??? Next Generation of COTS Control Loading Current Production DAS II System 8 Future T-6 Mod’s (cont.) 5. Rudder Binding Repair • Over two dozen events to date -- similar failure mode (jamming/binding rudder controls) • Problem self-corrects on landing • No mishaps attributed to this condition • Number of incidents occurring at an increasing rate • Fault tree aggressively investigated by USG and Contractor • Determine root cause ECD – Unknown (maximum effort underway) • Estimated cost of repair – Unknown as root cause and repair method TBD 9 Summary • Cost figures presented are subject to change due to program delays, aircraft beddown changes, DoD funding adjustments, efficiencies not determined, contract restructuring and re-pricing, or other unforeseen circumstances. • This info is provided for long range budget planning purposes and should not be interpreted as a final cost estimate. • Our goal is to ensure NATO’s future fighter pilot training needs are met and ENJJPT, with new advanced training systems, will continue to produce the world’s best pilots. 10 Recommendation Steering Committee approve funding plan 11