5. - e-FiT Online System
Transcription
5. - e-FiT Online System
Briefing on e-FiT Online System & System Enhancements 26 February 2013 Update of Company’s Profile in e-FiT online system Update of Company Profile March 5 – 20, 2013 All companies registered in the e-FiT online system will be required to key in information of all their Ultimate Beneficiary Shareholders as per the date of submission of Feed-in Approval Companies are not allowed to make any changes to the Immediate Shareholders which was previously declared at the point of submission of Feed-in Approval. Any change in the previously declared Immediate Shareholders will result in the revocation of the Feed-in Approval granted. After keying the Ultimate Beneficiary Shareholders, companies are to update their profiles : a minimum paid-up capital of RM20,000 for Feedin Approval application of up to 72kW or RM50,000 for Feed-in Approval application of more than 72 kW; Latest Memorandum and Articles of Association under the Companies Regulations 1966 showing power generation from renewable energy as part of their line of business; Latest audited accounts under the Companies Regulations 1966 Copyright © SEDA Malaysia, 2012 3 Ultimate Beneficial Share-holders Key in each of the Ultimate Beneficial Share-holders’ Names, MyKad No/Passport No/Govt Linked Company/Public Limited Company Ownership/Shareholding percentages in the company and the date of filing with the Companies Commission of Malaysia Ownership/Share-holding Structure (in percentages) showing corporate information of the company; disclosing all their Ultimate Beneficial Shareholders • Certified true copies of their latest Forms 24, 49 or Form 29A for each company from the Applicant till the last level before the individual shareholder Copyright © SEDA Malaysia, 2012 4 Shareholding Structure Angela (Foreigner) Govt. Linked Co. Public Limited Co. Rosmary Hamid 50% Hamid 50% Jaya Sdn Bhd 30% 30% 5% 5% 30% RiverSide Pte (Foreign) Hamid Samsudin Maju Sdn Bhd 30% 60% 5% Solar Sdn Bhd Copyright © SEDA Malaysia, 2012 5% Shareholding Structure Angela (Foreigner) 60% x 5% = 3% 60% x 30% = 18% Govt. Linked Co. Hamid Rosmary Public Limited Co. Hamid 50% 50% 60% x 30% x 50% = 9% Jaya Sdn Bhd 30% 30% Category Individual RiverSide Pte (Foreign) 5% Shareholders 5% Percentages 30% + 9.00% 5.00% + 3.00% Hamid Samsudin 30% Company Copyright © SEDA Malaysia, 2012 Hamid5.00% Rosmary Maju Sdn Bhd 3.00% Angela (Foreigner) 60% Public Limited Co. 9.00% 5% 18.00% Govt. Linked Co. 18.00% Riverside Ptd (Foreign) Solar Sdn Bhd 30.00% Total 100.00% Samsudin 5% For 1.0MW Installed Capacity Category Individual Company Shareholders Shareholding Percentages Installed Capacity 5.00% + 3.00% + 9.00% 170.00kW Samsudin 5.00% 50.00kW Rosemary 3.00% 30.00kW Angela (Foreigner) 9.00% 90.00kW Public Limited Co. 18.00% 180.00kW Govt. Linked Co. 18.00% 180.00kW Riverside Ptd (Foreign) 30.00% 300.00kW 100.00% 1000.00kW Hamid Total Copyright © SEDA Malaysia, 2012 Immediate Shareholder Shareholding Percentages Category Individual Company Ultimate Beneficial Shareholders Category Individual Company Shareholders Hamid 5.00% Samsudin 5.00% Maju Sdn Bhd 60.00% Riverside Pte 30.00% Shareholders Percentages Hamid 5.00% + 3.00% + 9.00% Samsudin 5.00% Rosmary 3.00% Angela (foreigner) 9.00% Public Limited Co. 18.00% Govt. Linked Co. 18.00% Riverside Ptd (foreign) 30.00% Total Copyright © SEDA Malaysia, 2012 Percentages 100.00% Interpretation of “foreign person” (a) a non-Malaysian citizen; (b) a Malaysian permanent resident; (c) a foreign company as defined in the Companies Act 1965 [Act 125] or any other foreign entity; or (d) a Malaysian entity in which the individual, foreign company or other foreign entity specified in paragraph (a), (b) or (c), as the case may be, holds more than forty-nine per centum of the voting power or issued share capital (excluding preference shares); Copyright © SEDA Malaysia, 2012 9 Mandatory Update For all companies registered in the e-FiT online system Copyright © SEDA Malaysia, 2012 Shareholders Info Copyright © SEDA Malaysia, 2012 Ultimate Shareholders Copyright © SEDA Malaysia, 2012 Immediate Shareholders LOCAL FOREIGN • Individual (only MyKad No allowed) • a clear copy of his/her MyKad • Private Limited Company • a certified copy of Form 24 and 49 of the company by the company secretary + a confirmation letter by the company secretary confirming the list of shareholders • Public Listed Company • a certified copy of Form 29A (Substantial Shareholder) by the company secretary + a confirmation letter by the company secretary confirming the list of shareholders • Distribution Licensee • a certified copy of Form 24 and 49 of the company by the company secretary + a confirmation letter by the company secretary confirming the list of shareholders • Government Linked Company • a certified copy of Form 24 and 49 of the company by the company secretary + a confirmation letter by the company secretary confirming the list of shareholders • Foreigner/Permanent Resident Individual (Passport No/MyPR) • a clear copy of his/her MyPR/ Passport (the page with his/her particulars) • Foreign – Company • a certified copy of the certificate of its incorporation or registration in its place of incorporation or origin or a document of similar effect; and a certified copy of certificate issued by the Registrar of Companies in accordance with section 332(1A) of the Companies Act 1965 [Act 125], if the foreign company have a place of business in Malaysia. Copyright © SEDA Malaysia, 2012 13 Ultimate Shareholders LOCAL FOREIGN • Individual • a certified copy of Form 24 and 49 of the company(s) where <Name> <MyKad No> is a shareholder; direct or indirect • Public Listed Company • a certified copy of Form 29A (Substantial Shareholder) by the company secretary + a confirmation letter by the company secretary confirming the list of shareholders • Distribution Licensee • a certified copy of Form 24 and 49 of the company by the company secretary + confirmation letter by the company secretary confirming the list of shareholders • Government Linked Company • a certified copy of Form 24 and 49 of the company by the company secretary + confirmation letter by the company secretary confirming the list of shareholders • Foreigner/Permanent Resident Individual (Passport No/MyPR) • a confirmation letter by the authorised personnel of the Company confirming that the individual is a shareholder • Foreign – Company • a certified copy of the certificate of its incorporation or registration in its place of incorporation or origin or a document of similar effect; and a certified copy of certificate issued by the Registrar of Companies in accordance with section 332(1A) of the Companies Act 1965 [Act 125], if the foreign company have a place of business in Malaysia. Copyright © SEDA Malaysia, 2012 14 Paid-up Capital a minimum paid-up capital of : RM20,000 for Feed-in Approval application of up to and including 72 kWp or kW; or RM50,000 for Feed-in Approval application of more than 72 kWp or kW. Copyright © SEDA Malaysia, 2012 Demonstration on Update of Company’s Profile in e-FiT online system SEDA Malaysia’s Portal Copyright © SEDA Malaysia, 2012 17 Malaysia’s FiT Mechanism Commercial sector Residential sector Electricity bills Industrial sector Distribution Licensee {1% for RE Fund} {(FiT – displaced cost) + admin fee} RE Fund REPPA Fee License FiT fee {FiT payment } {FiT application } Solar BIPV buildings Copyright © SEDA Malaysia, 2012 Bank RE Act 2011, SS, REPPA {FiT payment} RE developers Bank 18 RE Resources eligible for FiT Biogas • including landfill gas & sewage Biomass • including solid waste REPPA for 16 years Copyright © SEDA Malaysia, 2012 Small hydropower Solar photovoltaic REPPA for 21 years 19 Features of e-FiT Online System 1st Come, 1st Served Any Time, Any Where Real Time e-FiT Online System Transpa rent Green (Online) Unbiased, Fair Copyright © SEDA Malaysia, 2012 20 Real time Quota Information Online Quota with Real-time Quota Availability Copyright © SEDA Malaysia, 2012 21 1st come 1st served No discriminati on based on color, creed, location or political affiliation Copyright © SEDA Malaysia, 2012 No preferential treatment based on family or political connections No allocation based on the amount a person or State contributes to the RE Fund Feed-in Tariff quota allocation is on a firstcome-firstserved basis. 22 FiT Application Detail Paid-up Capital =>RM20,000? Installed Capacity => 72kW? Supporting Documents Financial Information Workplan Digital Statutory Declaration Copyright © SEDA Malaysia, 2012 Paid-up Capital => RM50,000? RE Project Information Technical Detail Contractor / Service Provider 23 Submit FiT Application Generate Invoice If No Quota Available, Stop If Quota Available, Submit FiT Application Compute RE Fund System PreAllocates Quota Copyright © SEDA Malaysia, 2012 24 FiT – if No Quota available Copyright © SEDA Malaysia, 2012 25 FiT Verification Process Pay Application Fee within 7 days, if any Deliver Statutory Declaration to SEDA office within 7 days Verify Application & Query Applicant Refuse or Grant Feedin Approval Generate FiA Certificate Sign & Upload Statutory Declarati on within 3 days Copyright © SEDA Malaysia, 2012 26 FiT Realization Processes User Registration Feed-in Tariff Application Feed-in Approval REPPA signing with DL Construction / Installation Financing & Procurement ST Provisional License Register REPPA with SEDA ST Permanent Generating License Testing & Commissioning FiTCD – SEDA’s verify Actual CAPEX & OPEX Monitor Energy Production Distribution Licensee Pay FiT Commence FiTCD – SEDA’s confirmation Copyright © SEDA Malaysia, 2012 27 Project Milestones Registration of REPPA with SEDA Malaysia Softcopy of REPPA signed with Distribution Licensee to be uploaded into system within 4-6 weeks Scanned soft copy of the duly executed and stamped REPPA Agreement Hard copy of the above certified as a true copy by an Advocate & Solicitor of the High Court of Malaya or a Commissioner of Oaths Copyright © SEDA Malaysia, 2012 28 Project Milestones Public License (Provisional) from Suruhanjaya Tenaga To be applied within 30 days after issuance of FIAH Certificate Scanned soft copy of the Public License (Provisional) from Suruhanjaya Tenaga Hard copy of the above certified as a true copy by an Advocate & Solicitor of the High Court of Malaya or a Commissioner of Oaths. Copyright © SEDA Malaysia, 2012 29 Project Milestones Financing Agreement(s) To be completed before appointment of EPC contractor Scanned soft copy of the bank account latest 3 months statements showing a minimum credit balance of 5% of the capital cost. (applicable to company only). Scanned soft copy of the financing agreement(s) and related documents entered into in respect of the financing or refinancing of the renewable energy installation Copyright © SEDA Malaysia, 2012 30 Project Milestones 1st Payment to EPC Contractor Scanned soft copy of a letter from the FIA Holder's financier confirming that funds have been released to the FIA Holder for the 1st drawdown under the Financing Agreement(s). Scanned soft copy of the official receipt from the Contractor Copyright © SEDA Malaysia, 2012 31 Project Milestones Initial Operation Date (IOD) Documents to be uploaded into system within 5 days after IOD occurred • Scanned soft copy of the report / confirmation by DL that the revenue meter has been installed • Scanned soft copy of the acceptance test certificate issued by a qualified person • Scanned soft copy of the ST Public License (Permanent). Hard copy of the ST Public License (Permanent) certified as a true copy by an Advocate & Solicitor of the High Court of Malaya or a Commissioner of Oaths • Required to apply 3 Months from ST before Initial Operation Date (IOD) • Scanned soft copy of the written confirmation from the FiA Holder that the initial operation date has occurred, accompanied by: • a) A certificate from a qualified person stating that the renewable energy installation and interconnection facilities have been designed and constructed in accordance with prudent utility practices; and • b) The distribution licensee's written acceptance of the initial operation date proposed by the FiA Holder Copyright © SEDA Malaysia, 2012 32 Project Milestones FiT Commencement Date Documents to be uploaded into system within 14 days after FitCD occurred • Scanned soft copy of the written confirmation from the FiA Holder that the FiT Commencement Date has occurred, accompanied by a certificate from a qualified person; stating that the renewable energy installation has successfully completed a reliability run in accordance with the requirements of the Renewable Energy (Technical and Operational Requirements) Rules 2011 • Reliability Run of all renewable energy installations connected to a connection point through a medium or high voltage direct connection are seven (7) continuous days as per “Guideline and Determination of the Sustainable Energy Development Authority Malaysia” requirement • Scanned soft copy of the testing and commissioning report confirming the applicable bonus FiT criteria.(installation in buildings or building structures) • Scanned soft copy of the written confirmation by a qualified person that such modules and/or inverters (as the case may be) were installed in the renewable energy installation. (solar photovoltaic modules) Copyright © SEDA Malaysia, 2012 33 Enhancement of e-FiT Online System Enhancements Registration of RE Developers/Applicants • Minimal Age for Registration of RE Developer/Applicant • Request for Change due to typo mistake in Applicant/Company Particulars (excluding MyKad No/Registration No) • Limit of 30MW Solar PV accumulative installed capacity per RE Developer/ non-Individual Applicant • Limit of 5MW Solar PV accumulative installed capacity for each shareholder; direct or indirect Copyright © SEDA Malaysia, 2012 35 Enhancements [cont’d] Feed-in Approval Application • Unique Parcel Identifier (UPI) of Project site • Latitude & Longitude (GPS) information of Project site • Proof of Project Site Ownership Information • Workplan for all proposed Project Milestones • References of supporting documents to be uploaded • Enhanced Email Reminders to FiA holders • Control of Distribution Licensee by State/Locality • Online Declaration and softcopy to be uploaded within 3 days • 1 Feed-in Approval per RE Developer/Applicant per day Copyright © SEDA Malaysia, 2012 36 Universal Parcel Index (UPI) Copyright © SEDA Malaysia, 2012 Universal Parcel Index (UPI) Copyright © SEDA Malaysia, 2012 Site Ownership Biomass / Biogas / Small Hydro Copyright © SEDA Malaysia, 2012 Site Ownership Solar PV by Individual Copyright © SEDA Malaysia, 2012 Site Ownership Solar PV by Company Copyright © SEDA Malaysia, 2012 Site Ownership Option-to-Rent Copyright © SEDA Malaysia, 2012 Site Ownership No. Possible Site Ownership Biogas Biomass Small Hydro 1. Fully Owned – name of the Applicant will be automatically recorded. * * * 2. Owned (Charge to the Bank) – Applicant will specify the bank’s name. * * * 3. Owned by Shareholder / Director – Applicant specify the name and relationship of Shareholder / Director. * * * 4. Leased - specify the name of Lessor * * * Copyright © SEDA Malaysia, 2012 Site Ownership No. Possible Site Ownership 1. Fully Owned – name of the Applicant will be automatically recorded. Owned (Charge to the Bank) – Applicant will specify the bank’s name. Owned by Spouse/Parent/Children/Sibling – Applicant specify name and relationship of Spouse/Parent/Child/Sibling. Owned by Shareholder/Director – Applicant specify the name and relationship of Shareholder/Director. Leased - specify the name of Lessor Option-to-Rent/Leased – additional information : 2. 3. 4. 5. 6. • • • • • • • <=12kW <= 500 kW > 500 kW * * * * * * * * * * * Name of Lessor. LHDN Stamping Duty No. (optional). LHDN Stamping Date. Option-to-Rent / Leasing Duration. Size of Roof/Land Space (m2). Option Period Validity. Leasing Rate (RM / m2 / year). Owned by My Company (I'm a Shareholder of the Company) – Applicant specify the name of the company Copyright © SEDA Malaysia, 2012 7. Solar * Enhancements [cont’d] Capacity of RE Developer/Applicant to raise equity up to 5% of Project Cost Request for Change due to typo mistake in Feed-in Approval details (excluding DAA, Installed Capacities & Workplan) Request for Correction in Applicant’s MyKad No/Company Registration No Introduction of Net Export Capacity of Energy Improved DAA computation mode based on Net Export Energy Copyright © SEDA Malaysia, 2012 45 Processing & Application Fees Processing Fees for all Feed-in Approval submissions • RMxx for Individual and RMyy for Non-Individual Application Fee of RMxx per kW for all Feed-in Approval submissions • minimal Application Fee of RMxx Processing Fees for Request for Changes • RMxx for Individual and RMyy for Non-Individual before Approval • RMxx for Individual and RMyy for Non-Individual after Approval Processing Fees for Request for Correction in MyKad/Registration No • RMxx for Individual and RMyy for Non-Individual Processing Fees for Request for Transfer of Feed-in Approval • RMxx for Individual and RMyy for Non-Individual Copyright © SEDA Malaysia, 2012 46 Installed & Export Capacity Copyright © SEDA Malaysia, 2012 Enhancements [cont’d] Processing of FiA Application • Online Enquiry on Feed-in Approval application and Project Status • Sending Notifications and Reminders • Reclassification of solar PV category • Individual up to 12kW • Non-Individual up to 500kW • Non-Individual more than 500 kW • Net Export Capacity & Type of REPPA on FiAH certificate • No Multiple Feed-in Approval applications on one project site Copyright © SEDA Malaysia, 2012 48 1st Reminder – 14 days before Subject : e-FiT URGENT : G2012110007 Your milestone date for FIRST PAYMENT TO EPC CONTRACTOR is approaching in 14 days. Message : FIRST REMINDER Dear <Applicant Name>, Please be informed that a milestone date under your work plan for <Project Milestone> is approaching in 14 days. Please provide a status update on your renewable energy installation and work plan by <date> via the e-FiT Online System. If no status update is received from you by the abovementioned date, the Sustainable Energy Development Authority (SEDA) Malaysia will initiate steps to revoke your Feed-in Approval. Please ignore this email if you have already updated your renewable energy installation and work plan via the e-FiT Online System. Thank You, Copyright © SEDA Malaysia, Sustainable Energy2012 Development Authority Malaysia, 2nd Reminder – 7 days before Subject : e-FiT URGENT : S2011120697 Your milestone date for FIRST PAYMENT TO CONTRACTOR is approaching in 7 days. Message : SECOND REMINDER Dear <Applicant Name>, Please be reminded that a milestone date under your work plan for <Project Milestone> is approaching in 7 days. Please provide a status update on your renewable energy installation and work plan by <Date> via the e-FiT Online System. If no status update is received from you by the abovementioned date, the Sustainable Energy Development Authority (SEDA) Malaysia will initiate steps to revoke your Feed-in Approval. Please ignore this email if you have already updated your renewable energy installation and work plan via the e-FiT Online System. Thank You, Sustainable Development Authority Malaysia, Copyright © SEDAEnergy Malaysia, 2012 3rd Reminder – 1 day before Subject : e-FiT URGENT : S2012020037 Your milestone date for FIT COMMENCEMENT DATE is approaching in 1 days. Message : THIRD REMINDER Dear <Applicant Name>, Please be informed that a milestone date under your work plan for <Project Milestone> is approaching in 1 days. Please provide a status update on your renewable energy installation and work plan by 19/02/2013 via the e-FiT Online System. If no status update is received from you by the abovementioned date, the Sustainable Energy Development Authority (SEDA) Malaysia will initiate steps to revoke your Feed-in Approval. Please ignore this email if you have already updated your renewable energy installation and work plan via the e-FiT Online System. Copyright © SEDA Malaysia, 2012 Thank You, Final Reminder – 3 days after Subject : e-FiT URGENT : M2012090004 Your milestone date for ST PUBLIC LICENSE (PROVISIONAL) has lapsed 3 days ago. Message : FINAL REMINDER Dear <Applicant Name>, This is the final reminder regarding the status update on your renewable energy installation and work plan via the e-FiT Online System. Despite of sending 3 reminders to you, you have failed to provide a status update on your renewable energy installation and work plan by <Date> via the e-FiT Online System. Please submit the status update on your renewable energy installation and work plan via the e-FiT Online System within 3 days from the date of this e-mail; failing which, the Sustainable Energy Development Authority (SEDA) Malaysia will initiate steps to revoke your Feed-in Approval. Please ignore this email if you have already updated your renewable energy installation and work plan via the e-FiT Online System. Copyright © SEDA Malaysia, 2012 Enhancements [cont’d] Management of Feed-in Approval • Registration of ISPQ Holders • Withdrawal of Feed-in Approval submission • Cancellation of Feed-in Approval • Refusal and Revocation of Feed-in Approval • Transfer of Feed-in Approval • Individual to Individual • Company to Company Copyright © SEDA Malaysia, 2012 53 Registration of ISPQ Holders Copyright © SEDA Malaysia, 2012 Enhancements [cont’d] Payment of Fees by Credit Card Payment of Fees via Bank FPX facility Request for Change in Project Milestones Request for Change in scheduled FiTCD (Earlier/Later) Cancelation of Tariff’s Bonus Criteria Approval of FiT Commencement Date Copyright © SEDA Malaysia, 2012 55 Enhancements [cont’d] Feed-in Tariff for Community Trend Analysis of RE Plants’ Actual Cost Feed-in Tariff of combined Biomass & Biogas resources Increase in Installed Capacity (MW) Inspection/Site visit Reports of RE Plants Actual CAPEX & OPEX of RE Projects Copyright © SEDA Malaysia, 2012 56 Actual Cost for Solar PV Copyright © SEDA Malaysia, 2012 Actual Cost for Biogas Copyright © SEDA Malaysia, 2012 Actual Cost for Biomass Copyright © SEDA Malaysia, 2012 Actual Cost for Small Hydro Copyright © SEDA Malaysia, 2012 Increase in Installed Capacity Copyright © SEDA Malaysia, 2012 Increase in Installed Capacity Copyright © SEDA Malaysia, 2012 Increase in Installed Capacity *Information for Land Title’s UPI Location, Project Site Postal Address, Coordinate and Site Ownership cannot be changed. *Those who didn’t update UPI and site of ownership have to update their FiA application first before submit this application Copyright © SEDA Malaysia, 2012 Combined RE Resources Copyright © SEDA Malaysia, 2012 Resources Biomass Biogas 1. New New 2. Existing Existing 3. New Existing 4. Existing New Combined RE Resources Scenario 1: New (Biomass) + New (Biogas) Menu Option - Click New Combine Application - Perceive the existing project application number Copyright © SEDA Malaysia, 2012 Project Information - Key-in your combine project information Copyright © SEDA Malaysia, 2012 Combined Fuel Requirements Copyright © SEDA Malaysia, 2012 Combined Cost Copyright © SEDA Malaysia, 2012 Review Project Listed - Click the Application/Project List menu option - Check the combined project status in the list Copyright © SEDA Malaysia, 2012 Combined RE Resources Scenario 2: Existing (Biomass) + New (Biogas) Data Input - Select the existing project application no. to be combined with - Key-in the new project information Copyright © SEDA Malaysia, 2012 Review Project Listed - Click the Application/Project List menu option - Check the combined project status in the list Copyright © SEDA Malaysia, 2012 Thank You SEDA Malaysia, Level 9, Lot 4C11, No. 29, Persiaran Perdana, Presint 4, 62570 Putrajaya, Malaysia. Phone : +603-8870 5800 Email: fit@seda.gov.my Web: www.seda.gov.my Copyright © SEDA Malaysia, 2012 74