Decks - Application Forms
Transcription
Decks - Application Forms
115670 Build_Deck Temp_v3_Layout 2 2014-06-05 10:21 AM Page 1 If your development application is refused: When applying for a Development and Building Permit for a deck, please provide: • Municipal address and legal description (lot, block, plan number) of the property. • Five (5) copies of a site plan or Survey including a drawing showing the proposed location of the deck and the distance from the deck to property lines and other structures. • Dimensions of deck including length, width, height and location of proposed steps. Distance from side and rear property lines, existing structures, easements and utility right of ways must also be included in the drawing. You may have the right to appeal the decision within fourteen (14) days of the date of notice of decision to: Secretary, Subdivision and Development Appeal Board City Hall 3rd Floor, 10005 - 102 Street Fort Saskatchewan, AB T8L 2C5 Phone: 780.992.6584 Fax: 780.998.4774 Remember call before you dig! Contact Alberta 1st Call at 1.800.242.3447 concerning utility and service locations. • All required application fees. Processing your application • We receive your Building and Development permit application and ensure it is complete. • A Development Officer reviews the Development Permit Application and site plan to determine conformance with the appropriate Land Use Bylaw Regulations in place, and a decision will be rendered on your application. • The plans/drawings of the deck are reviewed by a Building Inspector to determine conformance with the Alberta Building Code Regulations and process the Building Permit application. • Incomplete applications will not be accepted. • Construction cannot commence until permits have been issued. Note: When you apply, personal information is collected under the authority of the City of Fort Saskatchewan Land Use Bylaw and will be used to process the application and may be used to provide statistical data. This information is subject to the provisions of the Freedom of Information and Protection of Privacy Act (FOIP). If you have any questions about the collection of Information please contact the City of Fort Saskatchewan FOIP Coordinator at (780) 992.6236 The information shown is for reference only. The City of Fort Saskatchewan disclaims all responsibility for the accuracy, completeness, timeliness and merchant ability of information shown. Building a Deck? WHAT YOU NEED TO KNOW 115670 Build_Deck Temp_v3_Layout 2 2014-06-05 10:21 AM Page 2 Where to apply for Permits: Planning and Development Services City Hall 2nd Floor, 10005 - 102 Street Fort Saskatchewan, Alberta T8L 2C5 Phone: 780.992.6198 Fax: 780.992.6180 fortsask.ca Office Hours: Monday-Friday 8:00 am - 4:30 pm Decks must be constructed within your property and within the required setbacks (distance to property lines). Development Permit (form available on fortsask.ca) If any portion of the deck will be greater than 0.6m (2 feet) from grade level to the top of deck surface, or if it will be covered, it must comply with the City of Fort Saskatchewan’s Land Use Bylaw setback requirements and will require Development and Building permits. Building Permit (form available on fortsask.ca) Your proposed deck is subject to Alberta Building Code Regulations, and your building permit includes an inspection by a Safety Codes Officer. The following form is a example of the information required to submit with your building permit (both available for printing on our web site): Deck "Guardrail requirements" Guardrails: The requirements for guardrails on uncovered decks depend on the height of the deck: • On decks 0.6m to 1.8m (2ft to 6ft) above grade, guardrails must be at least 900mm (36 inches) tall. • On decks more than 1.8m (6 ft) above grade, guardrails must be at least 1070mm (3 ft 6 inches) tall. All guardrails must be: Decks cannot be located over an easement, utility right of way, gas meter and/or gas shut off. • Built with a space between vertical spindles of less than 4 inches (100mm) • Designed with no horizontal rails, fixed benches or other items that would provide a foothold • Handrail must be smooth and easily graspable You DO NOT need a Building or Development Permit if the uncovered deck you are planning is less than 0.6m (2 feet) from ground elevation. UNCOVERED DECK – Permit Application Information When applying for an Uncovered Deck over 0.6m high, please ensure that you submit the following to avoid processing delays: □ Building and Development Permit Application Forms complete with required fees Please include Signature and indicate whether you are/represent the owner of the property □ Uncovered Deck Details of Construction form – with complete information and signature □ Three copies of Site Plan The easiest and most reliable site plan would be to use a copy of your most recent Real Property Report Survey, sketching on the proposed location of the deck. • Site Plan must show the dimensions of the proposed deck and the distances from the deck to the property lines and any other structure on the property (such as a shed) □ Decks may not obstruct Gas shut-off valves and meters so they can be accessed for regular maintenance and emergency crews. □ Decks cannot be constructed in Utility Right of Ways or Easements. □ Decks over 0.6m high may project a maximum of 2.4m into the rear yard setback but may not project into the side yard setback. If you are uncertain of the setback requirements in your residential district, a copy of the Land Use Bylaw regulations for your district can be found on the City website at www.fortsask.ca, or can be picked up at the Planning and Strategic Initiatives Department. Please ensure that you call Alberta One-Call at 1-800-242-3447 to locate any buried utilities on your property. If there are overhead power lines located on or adjacent to this property please also contact Fortis Alberta regarding your proposed development before submitting this application. If you have any questions regarding the development permit or completing the application forms for your deck please contact Planning and Development at 780-992-6198. If you have questions regarding the building permit portion of the application or Alberta Building Code regulations please contact the Building Inspector at 780-992-6233. □ **Incomplete submissions cannot be processed** ___________________________ Signature Date APPLICATION # D– RESIDENTIAL (MINOR) DEVELOPMENT PERMITAPPLICATION MUNICIPAL ADDRESS: LEGAL DESCRIPTION: LOT(S) BLOCK PLAN OTHER APPLICANT NAME: ADDRESS: CITY / PROVINCE: POSTAL CODE: PHONE: CELL: FAX: APPLICANT INTEREST (IF NOT THE OWNER) CONTRACTOR AGENT OTHER OWNER NAME: (A letter of authorization is required in absence of the owner(s) signature on this application form) ADDRESS: CITY / PROVINCE: POSTAL CODE: PHONE: CELL: FAX: PROPOSED DEVELOPMENT: (Check All Applicable Boxes) SINGLE DETACHED DWELLING CONSTRUCTION VALUE: $ SEMI-DETACHED DWELLING ADDITION: SIZE = RAISED DECK: SIZE = MULTI-ATTACHED DWELLING (UP TO 4 UNITS) ATTACHED GARAGE: SECONDARY SUITE CARPORT: SIZE = DETACHED GARAGE: SIZE = _______ x ________ WALL HEIGHT (grade to eave) = OVERALL HEIGHT _____________ ACCESSORY BUILDING: SIZE = _______ x_______ WALL HEIGHT (grade to eave) = _____________ OVERALL HEIGHT _____________ VARIANCE: OTHER: _____________________________________________________________________________________________________________ x x x SIZE = x HEIGHT (grade to top of deck) = __ ________________________________________________________________________________________________________ I/We hereby declare that I am / we are I / we represent the owner(s) of the property in which the development identified in this Application will be conducted in accordance with the plans submitted and upon approval, will adhere to the conditions and provisions of the Land Use Bylaw. I / We further declare that I / we WILL NOTIFY the Development Authority of any proposed changes to the plans submitted with this Application. Date Received: Signature of Applicant Date of Application Signature of Owner (if not the applicant) Date Date Application Deemed Complete: Land Use District: Tax Roll Number: IMPORTANT NOTICE: This Application does not permit you to commence any development until such time as the Development Authority has issued a Development Permit. If a decision has not been issued within 40 days of the date of this Application being deemed complete, the applicant may file an appeal to the Subdivision and Development Appeal Board (SDAB). Please contact the Secretary of the SDAB at (780) 992-6236 for appeal information. NOTE: This personal information is being collected under the authority of Section 33(c) of the Freedom of Information and Protection of Privacy Act (FOIPP) and will be used in relation to this Development Permit and the City of Fort Saskatchewan Land Use Bylaw to process the Application and may be used to provide statistical data. It will be treated in accordance with the privacy protection provisions of Part 2 of the FOIPP Act. If you have any questions about the collection, please contact the City of Fort Saskatchewan FOIPP Coordinator at 780-992-6236. Base Fee: $ Variance Fee: $ Construction Water $ Lot Grading Program $ ____________ Security Deposit $____________ Planning & Development 10005 – 102 Street, Fort Saskatchewan, AB, T8L 2C5 – Ph: 780.992.6198IRUWSODQQLQJ#IRUWVDVNFD www.fortsask.ca City of Fort Saskatchewan 10005 – 102 Street Fort Saskatchewan, Alberta T8L 2C5 Ph: 780.992.6198 IRUWSODQQLQJ#IRUWVDVNFD Fdn Fram Insul Final _______________________ _______________________ _______________________ _______________________ INSPECTIONS REQUIRED: Please contact The Inspections Group Inc. at Ph: 780.992. Application # ____________________________ BUILDING PERMIT PERMIT # B-________________ Date of Application (M/D/Y) ______/______/_____ Please Print All Information Clearly Contractor: _______________________________________________________________ Phone:________________Fax:_____________________ Address: _______________________________________________________________ Postal Code____________________________________ Contact Name: __________________________________ Cell Ph: ________________ Email: ________________________________________ Building Owner: __________________________________________________________ Phone:________________Fax:_____________________ Address: _______________________________________________________________ Postal Code____________________________________ Contact Name: _________________________________ Email: ________________________________________ Cell Ph: ________________ Designer/Professional Engineer: ____________________________________________ Phone:________________Fax:_____________________ Address: _______________________________________________________________ Postal Code____________________________________ Other: ___________________________________________________________________ Phone:________________Fax:_____________________ Address: _______________________________________________________________ Postal Code____________________________________ Permit Type: New Construction Alteration Addition Demolition Other ________________________________ Project Description _____________________________________________ Intended Use/Occupancy _______________________________________ Project Address ________________________________________________________________________________ in the City of Fort Saskatchewan Legal Survey: Lot _____________ Block ______________ Development Permit ____________________________ Plan ___________________________ Tax Roll ________________________________ I (am) (represent) * the owner of the land and (will be) (represent) * the owner of the building for which I am submitting this permit application. I have read and understand the statements printed on the reverse side of this form. I agree to conform to all applicable laws in this jurisdiction. Signature_____________________________________ Company____________________________________________ Address______________________________________ City ___________________________________________ APPLICANT – PLEASE COMPLETE: CONSTRUCTION VALUE: $__________________ FINISHED AREA: MAIN 2ND FLR BSMT _______________SF Permit Fee $_____________ + Garage (if app) $_____________ + SUB-TOTAL $ _____________ _______________SF _______________SF TOTAL SQUARE FEET: ________________ GARAGE SQUARE FEET: ________________ Safety Codes $_____________ = ($4.50 or 4.0% whichever is greater, maximum $560.00) TOTAL FEES: $ ______________ PROOF OF WARRANTY COVERAGE? ________ Plot Plan: Required: YES___ NO_____ Enclosed: YES___ NO_____ PAYMENT INFORMATION: Cash Phone_______________ Postal Code________________ This Section for Office Use Only Plans Reviewed: ___________________________ Resubmit_________________ by date__________ Permit # Issued____________________________ Issued By_________________________________ Designation No.____________________________ Date_____________________________________ Comments________________________________ Cheque THREE SETS OF PLANS, SPECS & TRUSS/ FLOOR SYSTEM LAYOUTS ARE REQUIRED AT TIME OF APPLICATION. PAYMENT MUST BE ATTACHED TO THIS PERMIT. INCOMPLETE APPLICATIONS WILL NOT BE PROCESSED. Visa M/C Construction work related to this application shall not commence until permit approval has been issued. Debit Permit Conditions attached if applicable. This personal information is being collected under the authority of Section 33 (c) of the Freedom of Information and Protection of Privacy Act and will be used for this building permit and applicable safety codes to process the application It will be treated in accordance with the privacy protection provisions of Part 2 of the Freedom of Information and Protection of Privacy Act. If you have any questions about the collection, contact the FOIP Coordinator for the City of Fort Saskatchewan at 780-992-6236. City of Fort Saskatchewan 10005 – 102 Streeet Fort Saskatchewan, Alberta T8L 2C5 Ph: (780) 992-6198 fortplanning@fortsask.ca BUILDING PERMIT INSPECTIONS WILL BE PERFORMED AT THE FOLLOWING STAGES OF CONSTRUCTION. THREE INSPECTIONS ARE REQURIED. FOOTING & FOUNDATION (WILL BE MARKED WITH A GREEN CHECK MARK ONCE INSPECTED AND APPROVED) FRAMING INSULATION & VAPOUR BARRIER – PRIOR TO DRYWALL (MAY BE COMBINED WITH FRAMING INSPECTION) FINAL – BEFORE OCCUPANCY SEE STICKER ON ELECTRICAL PANEL FOR ALL OTHER INSPECTIONS. 1) ISSUANCE OF A PERMIT AND THE EXAMINATION OF PLANS AND SPECIFICATION SHALL NOT BE CONSTRUED TO BE AUTHORITY TO VIOLATE ANY OF THE PROVISIONS OF THE SAFETY CODES ACT OR PURSUANT REGULATIONS. 2) A BUILDING SAFETY OFFICER IS PROHIBITED FROM ISSUING A PERMIT TO AN APPLICANT IF THE APPROPRIATE ARCHITECTS AND/OR PROFESSIONAL ENGINEER’S SEALS OR STAMPS ARE NOT ON THE PLANS AND SPECIFICATIONS IF REQUIRED. 3) THE OWNER OF THE BUILDING IS FULLY RESPONSIBLE FOR CARRYING OUT THE WORK OR HAVING THE WORK CARRIED OUT IN ACCORDANCE WITH THE REQUIREMENTS OF THE SAFETY CODES ACT AND PURSUANT REGULATIONS. 4) THIS PERMIT APPLICATION IS NOT FOR ZONING/DEVELOPMENT, GAS, PLUMBING OR ELECTRICAL WORK. PERMITS FOR SUCH WORK MUST BE OBTAINED SEPARATELY. 5) BEFORE ANY EXCAVATION OR CONSTRUCTION IS STARTED, THE FOLLOWING SHOULD BE CHECKED: A) UTILITIES LOCATION, HEIGHT, OR DEPTH, AND PROTECTION FROM DAMAGE OR ALL UTILITIES. I.E. SEWERS, WATER, POWER, GAS, TELEPHONE, ETC. B) LEVELS RESPECTING PROPOSED ELEVATIONS OF FINISHED LANES, STREETS OR AVENUE, SANITARY OR STORM SEWER CONNECTIONS. 6) REVIEWED DRAWINGS AND SPECIFICATIONS SHALL BE KEPT ON THE BUILDING SITE AT ALL TIMES DURING WHICH THE WORK AUTHORIZED BY THE PERMIT IS IN PROGRESS, AND SHALL BE AVAILABLE FOR INSPECTION BY A BUILDING SAFETY OFFICER. 7) A BUILDING SAFETY OFFICER MAY SUSPEND OR REVOKE A PERMIT ISSUED IN ERROR OR ISSUED ON THE BASIS OF INCORRECT INFORMATION OR IF THERE IS A CONTRAVENTION OF ANY CONDITIONS UNDER WHICH THE PERMIT WAS ISSUED OR THE PERMIT FEES HAVE NOT BEEN PAID. 8) ISSUANCE OF A PERMIT BASED UPON PLANS AND SPECIFICATIONS SHALL NOT PREVENT A BUILDING SAFETY CODES OFFICER FROM ISSUING ORDERS UNDER THE SAFETY CODES ACT. 9) ISSUANCE OF A PERMIT SHALL NOT PREVENT A BUILDING SAFETY CODES OFFICER FROM STOPPING CONSTRUCTION OPERATIONS THAT ARE IN VIOLATION OF THE SAFETY CODES ACT OR PURSUANT REGULATIONS. 10) EVERY PERMIT SHALL AUTOMATICALLY EXPIRE BY LIMITATION AND BECOME NULL AND VOID IF THE WORK AUTHORIZED BY THE PERMIT IS NOT COMMENCED WITHIN 90 DAYS FROM THE DATE OF ISSUE, OR IF THE BUILDING AUTHORIZED BY THE PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 120 DAYS AT ANY TIME AFTER THE WORK IS COMMENCED. BEFORE WORK CAN BE STARTED AGAIN, A NEW PERMIT SHALL BE OBTAINED OR ON RECEIPT OF A WRITTEN APPLICATION, A SAFETY CODES OFFICER FROM THE AGENCY, MAY IN WRITING, EXTEND A PERIOD OF TIME ONLY ONCE FOR UP TO AN ADDITIONAL 90 DAYS, IF THE PERMIT HAS “NOT EXPIRED” (ONE YEAR FROM DATE OF ISSUANCE) WHEN THE APPLICATION FOR EXTENSION IS MADE. 11) EXCEPTIONS MAY BE MADE, AT THE DISCRETION OF A BUILDING SAFETY OFFICER IN CASES OF SUMMER OR RECREATIONAL HOMES OR UNDER UNAVOIDABLE CIRCUMSTANCES. 12) THE APPLICANT GRANTS PERMISSION FOR NECESSARY INSPECTIONS TO BE CONDUCTED WITH THE SIGNING OF THIS APPLICATION. 13) AN ORDER OF A BUILDING SAFETY OFFICER MAY BE APPEALED TO THE SAFETY CODES COUNCIL. FOR FURTHER INFORMATION, CONTACT ANY BUILDING SAFETY CODES OFFICER AT THE CITY OF FORT SASKATCHEWAN AT 780.992.6248. 14) SHOULD A PERMIT BE CANCELLED, THE HOLDER OF THE PERMIT MUST SUBMIT A WRITTEN REQUEST TO THE CITY OF FORT SASKATCHEWAN. THE CITY OF FORT SASKATCHEWAN WILL REFUND AS FOLLOWS: i) TO THE PERMIT HOLDER, IF THERE HAS NOT BEEN A CONSTRUCTION DOCUMENT REVIEW – HOLDBACK OF 25% OR $25.00 – WHICHEVER IS GREATER. SAFETY CODES FEE IS ONLY REFUNDED IF THE PERMIT IS CANCELLED IN THE SAME MONTH IT WAS REVIEWED. ii) TO THE PERMIT HOLDER, IF THERE HAS BEEN A CONSTRUCTION DOCUMENT REVIEW – NO REFUND. This personal information is being collected under the authority of Section 33 (c) of the Freedom of Information and Protection of Privacy Act and will be used for this building permit and applicable safety codes to process the application It will be treated in accordance with the privacy protection provisions of Part 2 of the Freedom of Information and Protection of Privacy Act. If you have any questions about the collection, contact the FOIP Coordinator for the City of Fort Saskatchewan at 780-992-6236. Uncovered Deck Details of Construction X DECK SIZE: JOIST SIZE & SPACING: SF FOUNDATION TYPE: PILES CONCCRETE PAD MAXILlMLlM JOIST SPAN: DIAMFTER & DEPTH OF PILES: JOIST CANTILEVER: BEAM SIZE: HEIGHT FROM GROUND: POST SPACING: STAIR DETAIL: GUARDRAIL HEIGHT: RISE: (MAX. RISE-8"/200mm) HANDRAIL HEIGHT: ADDITIONAL INFO: TREAD: (MIN. 9,25"/235mm) Framing Details -k Example Only Asile plan wilh the deck location is 4- Joist span Guardrail Design rnax. space Min. step Itread = 9'12' Handrail height 32" lo 38' horizontal rails. Nxed benches or offieriterns that would provide a foolhold. H cantilever max. 16" 2x6"12x8 Joist cantilever max. 24" 2x1012~12 Foundation Options NOTE: Maximum cantilevers apply when joists carry uniform distributed roof loads. Other point loads to transfer directly to the foundation. I Joist l Span I Span Beam I Post I C I T Y O F FORT SASKATCHEWAN .. '' ..:.; NAME: ADDRESS: CITY/POSTAL CODE: PHONE NUMBER: SIGNATURE: DATE: Permanent foundations Required when decks exceed 6' above grade and if a roof structure or olher enclosure v,ll be constructed, permanent loundalions such as 12" x 12' piles or suppofi on footings 4' below grade are required. Addillanal detail drawings must be subrnined for review. ADDITIONAL COMMENTS : A deck cannot cover the gas meter or gas shut off valve.