Nellie McClung Elementary School
Transcription
Nellie McClung Elementary School
RECAPP Facility Evaluation Report Calgary School District #19 Nellie McClung Elementary School B2729A Calgary Report run on: March 27, 2012 10:11 AM Calgary - Nellie McClung Elementary School (B2729A) Facility Details Building Name: Nellie McClung Elementary S Address: 2315 Palliser Drive S. W. Location: Calgary Building Id: Gross Area (sq. m): Replacement Cost: Construction Year: B2729A 3,800.30 $10,666,000 1969 Evaluation Details Evaluation Company: Arup Datta Architect Ltd. Evaluation Date: November 15 2011 Evaluator Name: Brian Dennis Total Maintenance Events Next 5 years: 5 year Facility Condition Index (FCI): $2,348,055 22.01% General Summary: The Nellie McClung Elementary School, constructed in 1969, is a single storey masonry structure of 3800 sq.m which includes an attached portion owned and operated by a local community association. A 71 sq.m addition to the community portion was added in 2003, bringing the area of the community centre to 290 sq.m. The gross floor area of the school portion of the building is 3581 sq.m. The school incorporates kindergarten through grade 6 and has a reported capacity of 500 students. The building's placement on the site is skewed away from a north-south or an east-west orientation which makes describing the location of school components overly complicated. Therefore, for the sake of simplicity, we shall refer to the long axis of the school (parallel to Palliser Drive) as the east-west axis. Structural Summary: Where visible, the building has reinforced concrete foundation walls. The main floor is a concrete slab-on-grade. The structural framing is mainly load-bearing concrete masonry block walls. The structural framing of the roof is wood decking supported by open web steel joists (OWSJ's). The roof over the Library area is wood decking supported by structural steel framing. No major work associated with the building structure was identified during the assessment. Overall, the school's structural elements are in generally acceptable condition. Envelope Summary: Exterior cladding for the building consists mainly of textured concrete masonry block. Gymnasium exterior walls and fascias are clad with a stucco finish. The upper portion of the The building has several flat roof sections covered with an SBS assembly. The entrances to the building are steel storefronts with painted wood doors. Exterior windows for the building are unsealed, double glazing units, operable and non-operable, set within aluminum curtain wall frames. Metal blinds are installed between the glazing units. Remedial work recommended includes repair of the spalled stucco on the upper portion of the Gymnasium walls, and re-caulking/sealing around all penetrations in the exterior wall assemblies. The remainder of the building's envelope and exterior components are in acceptable condition. Interior Summary: The flooring for the majority of the building is resilient sheet and floor tile. Carpet is installed in the Library. Wood flooring is provided in the Gymnasium and Stage areas. The majority of the interior walls consist of painted masonry block and painted gypsum board partitions. The ceiling in the majority of the building is gypsum board with a stippled plaster finish. A suspended T-bar ceiling with acoustic tiles is installed in the Library and painted gypsum board is installed in the washrooms, storage rooms, and utility rooms. Major remedial work recommended is to repair firestopping at all penetrations through fire separations, refinish the wood floor of the Stage, and repaint the concrete floors. Additionally, it is recommended that a mechanical lift be installed to the Stage, an automatic door opener be installed at the main entrance, and that the designated barrier-free washrooms be renovated to be compliant with the code. Other elements that will reach or exceed their theoretical lives within the next five years appeared to be in acceptable condition at the time of the site visit. Overall, the building's interior finishes are in generally acceptable condition. Report run on: March 27, 2012 10:11 AM Page 2 of 44 Calgary - Nellie McClung Elementary School (B2729A) Mechanical Summary: Nellie McClung Elementary School was originally constructed in 1969 with no subsequent major renovations or additions. The domestic water, sanitary, and rain water drainage piping is original to the construction of the building. There are backflow prevention devices (BFPs) present on the domestic water supply and the fire protection system. The domestic hot water system includes a natural gas fired domestic hot water heater in the main boiler room. The central heating sources in the building is two central glycol boilers. Glycol distribution is through cast iron piping to heating coils in the rooftop air handling units serving the building. Two inline pumps circulate heating glycol to the rooftop units. Seven rooftop air handling units provide tempered ventilation air to the building. The heating components in the air handling units were converted from natural gas burners to glycol heating coils in approximately 1972. Building exhaust is provided by roof and wall mounted exhaust fans. The entire the building is protected by a fire standpipe system complete with fire hoses throughout the building. The stage is protected by a wet-pipe sprinkler system. Fire extinguishers are located in fire hose cabinets throughout the building. The following are recommended actions for the next five years, including scheduled replacements: - Replace boilers and related venting - Replace Roof Top Air Handling Units - Replace Sinks Other than the items noted above the mechanical systems in the building are in acceptable condition. Electrical Summary: Main service is 1600 Amp 120/208 volt three phase. Sub panels are located as required. Fire alarm system, emergency lighting, exit signage, and intrusion detection are functional.Communication systems are acceptable. Recommend the following: 1- Replace main distribution switch gear . 2- Replace sub panels. 3-Replace lighting in gym with T8 units. 4- Add strobes in wash rooms. Overall, the electrical systems are in acceptable condition. Condition Rating 1 - Critical 2 - Poor 3 - Marginal 4 - Acceptable 5 - Good 6 - Excellent Rating Guide Performance Unsafe, high risk of injury or critical system failure. Does not meet requirements, has significant deficiencies. May have high operating/maintenance costs. Meets minimum requirements, has significant deficiencies. May have above average operating maintenance costs. Meets present requirements, minor deficiencies. Average operating/maintenance costs. Meets all present requirements. No deficiencies. As new/state of the art, meets present and foreseeable requirements. Report run on: March 27, 2012 10:11 AM Page 3 of 44 Calgary - Nellie McClung Elementary School (B2729A) S1 STRUCTURAL A1010 Standard Foundations* Where visible, the building has reinforced concrete foundation walls. Rating 4 - Acceptable Installed Design Life Updated 1969 0 MAR-12 A1030 Slab on Grade* The main floor is concrete slab-on-grade. Rating 4 - Acceptable Installed Design Life Updated 1969 0 MAR-12 B1010.01 Floor Structural Frame (Building Frame)* ????? Mainly load-bearing concrete block walls. Structural steel framing is utilized in the Library area. Rating 4 - Acceptable Installed Design Life Updated 1969 0 MAR-12 B1010.02 Structural Interior Walls Supporting Floors (or Roof)* Load-bearing concrete masonry block walls. Rating 4 - Acceptable Installed Design Life Updated 1969 0 MAR-12 B1020.01 Roof Structural Frame* Mainly wood decking supported by open web steel joists (OWSJ's). The raised, pitched roof over the Library is wood decking supported by structural steel framing. Rating 4 - Acceptable Installed Design Life Updated 1969 0 MAR-12 B1020.04 Canopies* Canopies are provided over most school entrances and are presumably constructed with wood framing. Rating 4 - Acceptable Installed Design Life Updated 1969 0 MAR-12 B1020.06 Roof Construction Fireproofing* Fire rating is provided by a gypsum board ceiling above the mechanical room. The remainder of the roof is not rated. Rating 4 - Acceptable Installed Design Life Updated 1969 Report run on: March 27, 2012 10:11 AM 0 MAR-12 Page 4 of 44 Calgary - Nellie McClung Elementary School (B2729A) B1020.07 Roof Construction Firestopping* Gaps in gypsum board ceiling from previous line repairs were observed. Rating Installed Design Life Updated 2 - Poor Event: 1969 0 MAR-12 Repair gaps in ceiling assembly BOE 4 sq m Concern: Gaps in gypsum board ceiling from previous line repairs were observed. Recommendation: Repair gaps in ceiling assembly. Consequences of Deferral: Accelerated smoke and flame migration in case of fire. Type Year Cost Priority Repair 2012 Low $2,000 Updated: MAR-12 Report run on: March 27, 2012 10:11 AM Page 5 of 44 Calgary - Nellie McClung Elementary School (B2729A) S2 ENVELOPE B2010.01.02.02 Concrete Block: Ext. Wall Skin* The building is mainly clad with textured concrete block. Rating Installed Design Life Updated 4 - Acceptable 1969 0 MAR-12 B2010.01.08 Cement Plaster (Stucco): Ext. Wall* The upper 0.75m of the Gymnasium exterior walls and the fascias of the entrance canopies are clad with a stucco finish. Rating Installed Design Life Updated 2 - Poor 1969 0 MAR-12 Event: Repair Stucco Fascia on Gymnasium - BOE: 70 sq.m Concern: The exterior face of the upper stucco portions of the exterior walls of the Gymnasium are set back from the face of the concrete block wall below. A sill is formed where these two wall portions are joined. The stucco is significantly cracked and spalling, especially on the east elevation. Recommendation: Replace stucco on Gymnasium. The replacement cost only includes the replacement of the stucco; it does not allow for widespread repair of underlying surfaces or change to the wall detail. Consequences of Deferral: Accelerated deterioration of stucco finish, moisture entry into the building envelope, potential for injury to pedestrians from falling pieces of stucco, and loss of aesthetics. Type Year Cost Priority Failure Replacement 2012 Medium $7,000 Updated: MAR-12 B2010.01.09 Expansion Control: Ext. Wall* Expansion/control joints are present at regular intervals in the exterior concrete block cladding. Rating 4 - Acceptable Installed Design Life Updated 1969 Report run on: March 27, 2012 10:11 AM 0 MAR-12 Page 6 of 44 Calgary - Nellie McClung Elementary School (B2729A) B2010.01.11 Joint Sealers (caulking): Ext. Wall** Sealant is provided in construction joints, between cladding types and around window and door units on the school perimeter. Rating Installed Design Life Updated 3 - Marginal Event: 1985 20 MAR-12 Replace Joint Sealers (caulking) - BOE: 430 lm Concern: Sealants/caulking around the building envelope are exhibiting signs of failure (loss of adhesion, cracking, gaps, etc.). Recommendation: Replace sealants/caulking. Consequences of Deferral: Accelerated deterioration of the building envelope due to air and moisture penetration. Type Year Cost Priority Failure Replacement 2012 Medium $12,900 Updated: MAR-12 B2010.01.13 Paints (& Stains): Ext. Wall** Wood doors, the metal and plywood panels in the curtain wall sections, a portion of the concrete masonry block wall, and the stucco fascias and soffits have received a paint finish. Rating Installed Design Life Updated 2 - Poor Event: 1985 15 MAR-12 Repaint affected areas - BOE: 485 sq.m Concern: Paint finish on the curtain wall panels, doors, and stucco fascias and soffits is faded, cracked, and peeling. Recommendation: Re-paint affected areas. Consequences of Deferral: Accelerated deterioration of painted areas and loss of aesthetics. Type Year Cost Priority Repair 2012 Medium $8,730 Updated: MAR-12 Event: Replace Paints (& Stains): Exterior Wall - BOE: 560 sq.m Type Year Cost Priority Lifecycle Replacement 2015 Unassigned $16,800 Updated: MAR-12 Report run on: March 27, 2012 10:11 AM Page 7 of 44 Calgary - Nellie McClung Elementary School (B2729A) B2010.02.03 Masonry Units: Ext. Wall Const.* Exterior back-up walls are load-bearing concrete masonry block walls. Rating Installed Design Life Updated 4 - Acceptable 1969 0 MAR-12 B2010.03 Exterior Wall Vapour Retarders, Air Barriers, and Insulation* Not observed. The building is presumed to be equipped with a vapour barriers and insulation. Due to the age of the school, it is unlikely that an air barrier membrane was installed in the exterior walls. Rating Installed Design Life Updated 4 - Acceptable 1969 0 MAR-12 B2010.06 Exterior Louvers, Grilles, and Screens* Several pre-finished metal louvres, vents, etc. are provided in the exterior walls. Rating Installed Design Life Updated 4 - Acceptable 1969 0 MAR-12 B2010.09 Exterior Soffits* Stucco-clad exterior soffits are located on the entrance canopies and along the exterior walls of the circular-shaped portion of the school. Rating Installed Design Life Updated 4 - Acceptable 1969 0 MAR-12 B2020.03 Glazed Curtain Wall** All exterior windows on the school perimeter are comprised of fixed and operable, unsealed double glazed units set in 17 aluminum framed curtain wall sections. Rating Installed Design Life Updated 4 - Acceptable Event: 1969 40 MAR-12 Replace Glazed Curtain Wall - BOE: 38 sq.m Type Year Cost Priority Lifecycle Replacement 2015 Unassigned $92,000 Updated: MAR-12 Report run on: March 27, 2012 10:11 AM Page 8 of 44 Calgary - Nellie McClung Elementary School (B2729A) B2030.01.02 Steel-Framed Storefronts: Doors** - CBE Steel framed storefronts with wood doors are used at all building entrances. Rating Installed Design Life Updated 4 - Acceptable Event: 1969 30 MAR-12 Replace Steel-Framed Storefronts: Doors - BOE: 11 doors in 29 sq.m of storefronts Type Year Cost Priority Lifecycle Replacement 2015 Unassigned $34,200 Updated: MAR-12 B2030.01.02 Steel-Framed Storefronts: Doors** - Community Steel framed storefront with a steel door is used at the entrance. Rating Installed Design Life Updated 5 - Good Event: 2003 30 MAR-12 Replace Steel-Framed Storefronts: Doors - BOE: 1 door in 5 sq.m of storefront Type Year Cost Priority Lifecycle Replacement 2033 Unassigned $5,900 Updated: MAR-12 B2030.02 Exterior Utility Doors** - CBE Service and secondary exit doors are painted wood set in painted metal frames. Rating Installed Design Life Updated 4 - Acceptable Event: 1969 40 MAR-12 Replace Exterior Utility Doors - 5 single doors Type Year Cost Priority Lifecycle Replacement 2015 Unassigned $10,000 Updated: MAR-12 Report run on: March 27, 2012 10:11 AM Page 9 of 44 Calgary - Nellie McClung Elementary School (B2729A) B2030.02 Exterior Utility Doors** - Community Service and secondary exit doors are painted steel set in painted metal frames. Rating Installed Design Life Updated 5 - Good Event: 2003 40 MAR-12 Replace Exterior Utility Doors - BOE: 5 single doors, 1 double door Type Year Cost Priority Lifecycle Replacement 2043 Unassigned $14,000 Updated: MAR-12 B3010.01 Deck Vapour Retarder and Insulation* Not observed during inspection. Roof is presumed to be provided with an air/moisture barrier and insulation. Rating Installed Design Life Updated 4 - Acceptable 1969 0 MAR-12 B3010.02.01.08 Wood Shakes** Wood shakes are installed on the conical pitched roof over the Library area. Shakes were observed to be extremely faded and cracked from age. Rating Installed Design Life Updated 4 - Acceptable Event: 1969 30 MAR-12 Replace Wood Shakes - BOE: 250 sq. m Type Year Cost Priority Lifecycle Replacement 2015 Unassigned $23,750 Updated: MAR-12 Report run on: March 27, 2012 10:11 AM Page 10 of 44 Calgary - Nellie McClung Elementary School (B2729A) B3010.04.01 Built-up Bituminous Roofing (Asphalt & Gravel)** - Community ???? The roofing system for roof sections E1 and E2 are a built-up asphaltic membrane (BUR) assembly. Rating Installed Design Life Updated 3 - Marginal Event: 1969 25 MAR-12 Repair BUR Roofing BOE 80 sq m Concern: The BUR roofing assembly is showing signs of aging and there is a potential for localized failures within the next three years. Recommendation: Provide localized repairs within the next 3 years. Consequences of Deferral: Accelerated deterioration of the roofing assembly and the roof envelope. Type Year Cost Priority Repair 2012 Low $13,600 Updated: MAR-12 Event: Replace Built-up Bituminous Roofing (Asphalt & Gravel) - BOE: 250 sq.m Type Year Cost Priority Lifecycle Replacement 2015 Unassigned $43,000 Updated: MAR-12 B3010.04.04 Modified Bituminous Membrane Roofing (SBS)** - CBE Flat roof areas (A1, A2, A3, A4, B, C, D1, D2, & D3) are equipped with a modified bituminous membrane (SBS) assembly. The original roofing was replaced in 2011. Rating Installed Design Life Updated 5 - Good Event: 2011 25 MAR-12 Replace Modified Bituminous Membrane Roofing (SBS) - BOE: 3624 sq.m Type Year Cost Priority Lifecycle Replacement 2036 Unassigned $616,100 Updated: MAR-12 Report run on: March 27, 2012 10:11 AM Page 11 of 44 Calgary - Nellie McClung Elementary School (B2729A) B3010.04.04 Modified Bituminous Membrane Roofing (SBS)** - Community ???? Flat roof area E3 is equipped with a modified bituminous membrane (SBS) assembly. Rating Installed Design Life Updated 4 - Acceptable Event: 2006 25 MAR-12 Replace Modified Bituminous Membrane Roofing (SBS) - BOE: 80 sq.m Type Year Cost Priority Lifecycle Replacement 2031 Unassigned $13,600 Updated: MAR-12 B3020.01 Skylights** There is a dome skylight at the peak of the pitched roof over the Library which has been infilled on the interior side. Five dome skylights are also located on the roof of the community hall. Rating Installed Design Life Updated 4 - Acceptable Event: 1969 25 MAR-12 Replace Skylight above Library BOE 2 sq m Type Year Cost Priority Lifecycle Replacement 2015 Unassigned $2,400 Updated: MAR-12 B3020.02 Other Roofing Openings (Hatch, Vent, etc)* The roof is accessed by a metal hatch over the Mechanical Room. Rating 4 - Acceptable Installed Design Life Updated 1969 Report run on: March 27, 2012 10:11 AM 0 MAR-12 Page 12 of 44 Calgary - Nellie McClung Elementary School (B2729A) S3 INTERIOR C1010.01 Interior Fixed Partitions* Unit concrete block masonry and gypsum board walls. Rating Installed Design Life Updated 4 - Acceptable 1969 0 MAR-12 C1010.02 Interior Demountable Partitions* Vinyl clad demountable partitions divide the majority of the classrooms in the circular area surrounding the Library. Rating Installed Design Life Updated 4 - Acceptable 1969 0 MAR-12 C1010.03 Interior Operable Folding Panel Partitions** - CBE Operable accordion partitions are located between Classrooms 3 & 4, 5 & 6, and 7 & 8. A ceiling-mounted, operable folding fabric partition is located in the Gymnasium. Rating Installed Design Life Updated 4 - Acceptable Event: 1969 30 MAR-12 Replace Operable Folding Panel Partitions - BOE: 200 sq.m Type Year Cost Priority Lifecycle Replacement 2015 Unassigned $220,000 Updated: MAR-12 C1010.03 Interior Operable Folding Panel Partitions** - Community An operable & lockable metal folding partition is provided in the Community Hall storage room. Rating Installed Design Life Updated 5 - Good 2003 30 MAR-12 Event: Replace Folding Metal Partition - BOE: 24 sq.m Type Year Cost Priority Lifecycle Replacement 2033 Unassigned $26,400 Updated: MAR-12 C1010.06 Interior Glazed Partitions and Storefronts* Interior windows are wired glazing units set in painted metal storefront frames, located in the General Office, Conference Room, and the Library Workroom. Rating 4 - Acceptable Installed Design Life Updated 1969 Report run on: March 27, 2012 10:11 AM 0 MAR-12 Page 13 of 44 Calgary - Nellie McClung Elementary School (B2729A) C1010.07 Interior Partition Firestopping* Interior partitions that are fire walls or fire separations are constructed with masonry block or are gypsum board assemblies. Penetrations are filled with a fire-rated sealant. Rating Installed Design Life Updated 3 - Marginal Event: 1969 0 MAR-12 Repair Interior Partition Firestopping BOE 4 sq m Concern: Firewall penetrations (i.e. piping, electrical conduit, etc.) in several areas were lacking required firestopping. Recommendation: Seal or repair the voids and gaps as necessary to provide a proper firestopping barrier. Consequences of Deferral: Potential accelerated migration of smoke or flame in the event of a fire. Type Year Cost Priority Code Repair 2012 Medium $4,000 Updated: MAR-12 C1020.01 Interior Swinging Doors (& Hardware)* Painted wood doors set in painted metal frames are typical.. Rating Installed Design Life Updated 4 - Acceptable 1969 0 MAR-12 C1020.03 Interior Fire Doors* Interior fire doors are double and single, painted, metal or wood doors set in painted metal frames. Corridor fire doors have wired glass inserts. Rating Installed Design Life Updated 4 - Acceptable 1969 0 MAR-12 C1030.01 Visual Display Boards** Whiteboards and tackboards are typically provided in each classroom. Six original blackboards are remaining. Rating Installed Design Life Updated 4 - Acceptable Event: 1969 20 MAR-12 Replace 6 blackboards, 14 whiteboards, 61 tackboards Type Year Cost Priority Lifecycle Replacement 2015 Unassigned $48,600 Updated: MAR-12 Report run on: March 27, 2012 10:11 AM Page 14 of 44 Calgary - Nellie McClung Elementary School (B2729A) C1030.02 Fabricated Compartments (Toilets/Showers)** - CBE Prefinished metal toilet partitions are provided in student and staff washrooms. Prefabricated metal shower stall is located in physical education office. Rating Installed Design Life Updated 4 - Acceptable Event: 1969 30 MAR-12 Replace toilet partitions - BOE: 23 toilet stalls, 1 shower stall Recommendation: Type Year Cost Priority Lifecycle Replacement 2015 Unassigned $27,600 Updated: MAR-12 C1030.02 Fabricated Compartments (Toilets/Showers)** - Community A prefinished metal toilet partition is provided in the washroom. Rating Installed Design Life Updated 4 - Acceptable Event: 1969 30 MAR-12 Replace toilet partitions - BOE: 2 toilet stalls Type Year Cost Priority Lifecycle Replacement 2015 Unassigned $2,400 Updated: MAR-12 C1030.05 Wall and Corner Guards* Stainless steel corner guards are provided to gypsum board corners in common areas. Rating 4 - Acceptable Installed Design Life Updated 1969 0 MAR-12 C1030.06 Handrails* Wall-mounted wood handrails on metal brackets are provided at the three sets of stairs leading to the Stage area. Rating 4 - Acceptable Installed Design Life Updated 1969 0 MAR-12 C1030.08 Interior Identifying Devices* Engraved plastic room labels are mounted to doors. Rating 4 - Acceptable Installed Design Life Updated 1969 Report run on: March 27, 2012 10:11 AM 0 MAR-12 Page 15 of 44 Calgary - Nellie McClung Elementary School (B2729A) C1030.12 Storage Shelving* Metal shelving units are provided in one storage room. Rating Installed Design Life Updated 4 - Acceptable 1969 0 MAR-12 C1030.12 Storage Shelving* - Community Metal storage shelving is provided in the Community Hall storage rooms. Rating Installed Design Life Updated 4 - Acceptable 1969 0 MAR-12 C1030.14 Toilet, Bath, and Laundry Accessories* Standard commercial quality washroom hardware is located in the washrooms. Rating Installed Design Life Updated 4 - Acceptable 1969 0 MAR-12 C2010 Stair Construction* Three stairs of wood construction lead to the Stage area. Rating Installed Design Life Updated 4 - Acceptable 1969 0 MAR-12 C2020.05 Resilient Stair Finishes** The three stairs leading to the Stage are finished with textured resilient treads. Rating Installed Design Life Updated 4 - Acceptable Event: 1969 20 MAR-12 Replace Resilient Stair Finishes - BOE: 6 sq.m Type Year Cost Priority Lifecycle Replacement 2015 Unassigned $1,200 Updated: MAR-12 Report run on: March 27, 2012 10:11 AM Page 16 of 44 Calgary - Nellie McClung Elementary School (B2729A) C3010.06 Tile Wall Finishes** Quarry tile is provided to the urinal dado in the boys washrooms. Rating Installed Design Life Updated 4 - Acceptable Event: 1969 40 MAR-12 Replace Tile Wall Finishes - BOE: 4 sq.m Type Year Cost Priority Lifecycle Replacement 2015 Unassigned $1,200 Updated: MAR-12 C3010.09 Acoustical Wall Treatment** A series of textured acoustic panels are mounted on the upper portion of the Library walls. Rating Installed Design Life Updated 4 - Acceptable Event: 1969 20 MAR-12 Replace Acoustical Panels - BOE: 13 sq.m Type Year Cost Priority Lifecycle Replacement 2015 Unassigned $2,900 Updated: MAR-12 C3010.09 Acoustical Wall Treatment** - Pegboard Painted pegboard wall paneling is installed on the upper portion of the west wall of the Gymnasium. Rating Installed Design Life Updated 4 - Acceptable Event: 1969 30 MAR-12 Replace Pegboard Paneling - BOE: 35 sq.m Type Year Cost Priority Lifecycle Replacement 2015 Unassigned $7,700 Updated: MAR-12 C3010.11 Interior Wall Painting* The interior gypsum board and concrete masonry block walls have received a paint finish. Rating 4 - Acceptable Installed Design Life Updated 1999 Report run on: March 27, 2012 10:11 AM 0 MAR-12 Page 17 of 44 Calgary - Nellie McClung Elementary School (B2729A) C3020.01.01 Epoxy Concrete Floor Finishes* The floors in the entrance vestibules and washrooms are provided with epoxy flooring. The epoxy was observed to be discoloring and wearing due to its age and heavy use. Rating Installed Design Life Updated 4 - Acceptable 1969 0 MAR-12 C3020.01.02 Painted Concrete Floor Finishes* Painted concrete floors are located in utility and storage rooms. The paint finish was noted to be worn, faded, and peeling. Rating Installed Design Life Updated 3 - Marginal Event: 1969 0 MAR-12 Repaint Concrete Floors BOE 50 sq m Concern: Paint finish on the concrete floors of the mechanical room, the electrical room and the former storage room across from classroom 3 is worn, faded, and peeling Recommendation: Repaint concrete floors Consequences of Deferral: Difficult to clean and poor image Type Year Cost Priority Failure Replacement 2013 Low $2,000 Updated: MAR-12 C3020.02 Tile Floor Finishes** The portion of the floor surrounding the urinals in the Boy's washrooms is finished with quarry tile. Rating Installed Design Life Updated 4 - Acceptable Event: 1969 50 MAR-12 Replace Tile Floor Finishes - BOE: 56 sq.m Type Year Cost Priority Lifecycle Replacement 2019 Unassigned $15,000 Updated: MAR-12 Report run on: March 27, 2012 10:11 AM Page 18 of 44 Calgary - Nellie McClung Elementary School (B2729A) C3020.04 Wood Flooring** The floors of the Gymnasium and the Stage are finished with hardwood strip flooring. reportedly refinished in 2004. Rating Installed Design Life Updated 3 - Marginal Event: The Gymnasium floor was 2004 30 MAR-12 Refinish Stage Wood Flooring - BOE: 72 sq.m Concern: The finish on the Stage area wood floor is worn, faded, scratched, etc. Recommendation: Refinish the Stage floor. Consequences of Deferral: Loss of ease of cleaning, accelerated deterioration of the flooring, loss of aesthetics, damage to wood. Type Year Cost Priority Repair 2012 Medium $3,700 Updated: MAR-12 Event: Replace Wood Flooring - BOE: 429 sq.m Type Year Cost Priority Lifecycle Replacement 2034 Unassigned $107,250 Updated: MAR-12 C3020.07 Resilient Flooring** - CBE (Sheet) Resilient sheet flooring is provided in all the classrooms in the circular portion of the school (Classrooms 3 thru 16). Rating Installed Design Life Updated 4 - Acceptable Event: 2002 20 MAR-12 Replace Resilient Sheet Flooring - BOE: 1350 sq.m Type Year Cost Priority Lifecycle Replacement 2022 Unassigned $108,000 Updated: MAR-12 Report run on: March 27, 2012 10:11 AM Page 19 of 44 Calgary - Nellie McClung Elementary School (B2729A) C3020.07 Resilient Flooring** - CBE (Tile) Resilient tile flooring is provided in the Administration area, and in Classroom 17 and in the Art Room. Refer to K4030.01 Asbestos* Rating Installed Design Life Updated 5 - Good 2010 20 MAR-12 Event: Replace Resilient Tile Flooring - BOE: 209 sq.m Type Year Cost Priority Lifecycle Replacement 2030 Unassigned $10,700 Updated: MAR-12 C3020.07 Resilient Flooring** - CBE (VAT Tile) The flooring in the Staff Room, an adjacent storage room, Library and Staff Workrooms, Classrooms 19 and 21, the majority of the corridors outside of the circular area, and the Music Room are reportedly finished with vinyl asbestos tile (VAT). Refer to K4030.01 Asbestos* Rating Installed Design Life Updated 4 - Acceptable Event: 1969 20 MAR-12 Replace Resilient VAT Tile Flooring - BOE: 840 sq.m Type Year Cost Priority Lifecycle Replacement 2015 Unassigned $85,700 Updated: MAR-12 C3020.07 Resilient Flooring** - Community (VAT Tile) The floor in the majority of the Community Hall is reportedly finished with vinyl asbestos tile (VAT). Rating Installed Design Life Updated 4 - Acceptable Event: 1969 20 MAR-12 Replace Resilient VAT Tile Flooring - BOE: 240 sq.m Type Year Cost Priority Lifecycle Replacement 2015 Unassigned $24,500 Updated: MAR-12 Report run on: March 27, 2012 10:11 AM Page 20 of 44 Calgary - Nellie McClung Elementary School (B2729A) C3020.08 Carpet Flooring** - CBC Carpet flooring is provided in the Library. Rating Installed Design Life Updated 4 - Acceptable Event: 2002 15 MAR-12 Replace Carpet Flooring - BOE: 253 sq.m Type Year Cost Priority Lifecycle Replacement 2017 Unassigned $25,300 Updated: MAR-12 C3020.08 Carpet Flooring** - Community The community hall office and conference room are provided with carpet flooring. Rating Installed Design Life Updated 4 - Acceptable Event: 1969 15 MAR-12 Replace Carpet Flooring - BOE: 38 sq.m Type Year Cost Priority Lifecycle Replacement 2015 Unassigned $3,800 Updated: MAR-12 C3020.11 Floor Painting* Sports lines are painted on the Gymnasium floor. Rating 4 - Acceptable Installed Design Life Updated 2004 0 MAR-12 C3030.02 Ceiling Paneling (Wood)* The ceiling in the Gymnasium consists of painted, perforated, acoustic wood panels. Rating 4 - Acceptable Installed Design Life Updated 1969 0 MAR-12 C3030.05 Veneer Plaster Finishes (Stipple)* The majority of the ceilings in the school consist of gypsum board that are finished with a stippled plaster. Rating 4 - Acceptable Installed Design Life Updated 1969 Report run on: March 27, 2012 10:11 AM 0 MAR-12 Page 21 of 44 Calgary - Nellie McClung Elementary School (B2729A) C3030.06 Acoustic Ceiling Treatment (Susp. T-Bar)** A suspended T-bar ceiling with acoustic tiles has been installed over the Library. Rating Installed Design Life Updated 4 - Acceptable Event: 1990 25 MAR-12 Replace Acoustic Ceiling tile(Susp.T-Bar) - BOE: 255 sq.m Type Year Cost Priority Lifecycle Replacement 2015 Unassigned $11,500 Updated: MAR-12 C3030.07 Interior Ceiling Painting* Gypsum board ceilings in the washrooms, storage rooms, and Library corridor, and the pegboard ceilings in the Gymnasium have received a paint finish. Rating 4 - Acceptable Installed Design Life Updated 1999 0 MAR-12 C3030.09 Other Ceiling Finishes* - Linear Wood - CBE The perimeter of the ceiling in the Library is finished with stained linear wood decking on painted steel beams. Rating 4 - Acceptable Installed Design Life Updated 1969 0 MAR-12 C3030.09 Other Ceiling Finishes* - Linear Wood - Community The ceilings in the majority of the Community Hall are finished with stained linear wood decking on glulam beams. Rating 4 - Acceptable Installed Design Life Updated 1969 Report run on: March 27, 2012 10:11 AM 0 MAR-12 Page 22 of 44 Calgary - Nellie McClung Elementary School (B2729A) S4 MECHANICAL D2010.04 Sinks** - 1969 Sinks in the classrooms and staff room are enameled steel. The slop sinks in the janitorial rooms are iron and enamel. Rating Installed Design Life Updated 3 - Marginal Event: 1969 30 MAR-12 Replace Sinks BOE (18) Concern: Sinks have exceeded life expectancy and are showing signs of wear. Recommendation: Replace sinks Type Year Cost Priority Failure Replacement 2015 Low $29,400 Updated: MAR-12 D2010.04 Sinks** - 1999 Stainless steel sinks that have been installed to replace enameled steel sinks. Rating Installed Design Life Updated 4 - Acceptable Event: 1999 30 MAR-12 Replace Sinks BOE (2) Type Year Cost Priority Lifecycle Replacement 2029 Unassigned $3,300 Updated: MAR-12 D2010.05 Showers** 1 fiber glass shower. Not used. Rating Installed Design Life Updated 4 - Acceptable Event: 1969 30 MAR-12 Replace Shower BOE (1) Type Year Cost Priority Lifecycle Replacement 2015 Unassigned $2,200 Updated: MAR-12 Report run on: March 27, 2012 10:11 AM Page 23 of 44 Calgary - Nellie McClung Elementary School (B2729A) D2010.08 Drinking Fountains/Coolers** There are 5 non-refrigerated vitreous china drinking fountains in the building. Rating Installed Design Life Updated 4 - Acceptable Event: 1999 35 MAR-12 Replace Drinking Fountains BOE (5) Type Year Cost Priority Lifecycle Replacement 2034 Unassigned $8,100 Updated: MAR-12 D2010.10 Washroom Fixtures (WC, Lav, Urnl)** - 1969 There are vitreous china water closets, lavatories and floor mounted urinals in the building. Rating Installed Design Life Updated 4 - Acceptable Event: 1969 35 MAR-12 Replace Washroom Fixutures BOE (21) WC, (31) Lav, (12) Urnl Type Year Cost Priority Lifecycle Replacement 2015 Unassigned $101,200 Updated: MAR-12 D2010.10 Washroom Fixtures (WC, Lav, Urnl)** - 1999 There are newer Water Closets in the building. Rating Installed Design Life Updated 4 - Acceptable Event: 1999 35 MAR-12 Replace Water Closets BOE (6) Type Year Cost Priority Lifecycle Replacement 2034 Unassigned $10,600 Updated: MAR-12 D2020.01.01 Pipes and Tubes: Domestic Water* Domestic water piping is copper throughout the building. Rating 4 - Acceptable Installed Design Life Updated 1969 Report run on: March 27, 2012 10:11 AM 0 MAR-07 Page 24 of 44 Calgary - Nellie McClung Elementary School (B2729A) D2020.01.02 Valves: Domestic Water** Isolation valves located on hot and cold water lines to various fixtures located throughout the facility. Rating Installed Design Life Updated 4 - Acceptable Event: 1969 40 MAR-12 Replace Valves: Domestic Water BOE (20) Type Year Cost Priority Lifecycle Replacement 2015 Unassigned $25,100 Updated: MAR-12 D2020.01.03 Piping Specialties (Backflow Preventers)** - 1999 There are backflow prevention devices on the main fire protection standpipe system. . Rating Installed Design Life Updated 4 - Acceptable Event: 1999 20 MAR-12 Replace Backflow Preventors BOE (1) Type Year Cost Priority Lifecycle Replacement 2019 Unassigned $6,000 Updated: MAR-12 D2020.01.03 Piping Specialties (Backflow Preventers)** - 2009 Main Backflow prevention for the building supply Rating Installed Design Life Updated 4 - Acceptable Event: 2009 20 MAR-12 Replace Backflow Preventer BOE (1) Type Year Cost Priority Lifecycle Replacement 2029 Unassigned $6,000 Updated: MAR-12 D2020.02.02 Plumbing Pumps: Domestic Water** Domestic Hot Water Recirculation Pump Rating Installed Design Life Updated 4 - Acceptable Event: 2004 20 MAR-12 Replace Pump BOE (1) Type Year Cost Priority Lifecycle Replacement 2024 Unassigned $1,600 Updated: MAR-12 Report run on: March 27, 2012 10:11 AM Page 25 of 44 Calgary - Nellie McClung Elementary School (B2729A) D2020.02.06 Domestic Water Heaters** Domestic hot water is supplied by a natural gas fired State domestic hot water heater tank (100gal) located in the main boiler room. Serial # J9254121. Rating Installed Design Life Updated 4 - Acceptable Event: 2004 20 MAR-12 Replace Domestic Water Heater BOE (1) Type Year Cost Priority Lifecycle Replacement 2024 Unassigned $3,500 Updated: MAR-12 D2020.03 Water Supply Insulation: Domestic* Pipe insulation on both hot and cold water lines. Rating 4 - Acceptable Installed Design Life Updated 1969 0 MAR-12 D2030.01 Waste and Vent Piping* Waste and vent piping is generally cast iron and original to the construction of the building. Rating 4 - Acceptable Installed Design Life Updated 1969 0 MAR-07 D2030.02.04 Floor Drains* Brass covers on floor drains located in washrooms and other service areas. Rating 4 - Acceptable Installed Design Life Updated 1969 0 MAR-12 D2040.01 Rain Water Drainage Piping Systems* Rain water drainage piping is generally cast iron and original to the building construction. Rating 4 - Acceptable Installed Design Life Updated 1969 0 MAR-07 D2040.02.04 Roof Drains* The roof incorporates roof drains which are each fitted with gravel/debris strainers. Rating 4 - Acceptable Installed Design Life Updated 1969 Report run on: March 27, 2012 10:11 AM 0 MAR-12 Page 26 of 44 Calgary - Nellie McClung Elementary School (B2729A) D3010.02 Gas Supply Systems* The natural gas supply is provided below grade on the north side of the building. The piping feeds the central heating boilers, domestic hot water heater, and heating equipment in the adjacent community center. Rating Installed Design Life Updated 4 - Acceptable 1969 0 MAR-07 D3020.02.01 Heating Boilers and Accessories: H.W.** Heating glycol is provided to the rooftop air handling units via two natural gas fired Super Hot boilers (1,200 MBH each). Rating Installed Design Life Updated 3 - Marginal Event: 1972 35 MAR-12 Replace Heating Boilers BOE (2) Concern: Boilers require relining every two years. Maintenance costs are increasing. Recommendation: Replace boilers. Type Year Cost Priority Failure Replacement 2012 Low $65,862 Updated: MAR-12 D3020.02.02 Chimneys (& Comb. Air): H.W. Boiler** Boiler venting as required by boiler manufacturer Rating Installed Design Life Updated 3 - Marginal Event: 1969 35 MAR-12 Replace Chimneys (&Comb. Air): H.W. Boile BOE (12m) Concern: Need to be replaced with boilers. Recommendation: Replace with boilers. Type Year Cost Priority Failure Replacement 2012 Medium $8,600 Updated: MAR-12 Report run on: March 27, 2012 10:11 AM Page 27 of 44 Calgary - Nellie McClung Elementary School (B2729A) D3020.02.03 Water Treatment: H. W. Boiler* In addition to standard filters the system is fed with glycol feeder complete with storage tanks. Rating Installed Design Life Updated 4 - Acceptable 1969 0 MAR-12 D3040.01.03 Air Cleaning Devices: Air Distribution* Filters located in roof top air handlers. Rating Installed Design Life Updated 4 - Acceptable 1969 0 MAR-12 D3040.01.04 Ducts: Air Distribution* Supply air ductwork connected to RTU and supplied to classrooms and offices. Rating Installed Design Life Updated 4 - Acceptable 1969 0 MAR-12 D3040.01.07 Air Outlets & Inlets: Air Distribution* Round supply air diffusers. Rating Installed Design Life Updated 4 - Acceptable 1969 0 MAR-12 D3040.03.01 Hot Water Distribution Systems** Heating distribution is through cast iron piping to heating coils in rooftop air handling units. Rating Installed Design Life Updated 4 - Acceptable Event: 1972 40 MAR-12 Replace Hot Water Distribution Systems BOE (3581m2/gfa) Type Year Cost Priority Lifecycle Replacement 2015 Unassigned $333,100 Updated: MAR-12 Report run on: March 27, 2012 10:11 AM Page 28 of 44 Calgary - Nellie McClung Elementary School (B2729A) D3040.04.01 Fans: Exhaust** Washroom and gymnasium exhaust is provided by six roof mounted exhaust fans. Rating Installed Design Life Updated 4 - Acceptable Event: 1969 30 MAR-12 Replace Exhaust Fans BOE (6) Type Year Cost Priority Lifecycle Replacement 2015 Unassigned $12,100 Updated: MAR-12 D3040.04.03 Ducts: Exhaust* Ductwork between exhaust fans on roof and washrooms and gym. Rating Installed Design Life Updated 4 - Acceptable 1969 0 MAR-12 D3040.04.05 Air Outlets and Inlets: Exhaust* Grilles in washrooms and gym. Rating Installed Design Life Updated 4 - Acceptable 1969 0 MAR-12 D3050.01.02 Packaged Rooftop Air Conditioning Units (& Heating Units)** Seven Lennox packaged rooftop air handling units provide conditioned ventilation air to the building. The air handling units each have integral heating and cooling components and range in capacity from 12 to approximately 30 tons. The heating components of the original air handling unit were converted from natural gas fired to glycol heating coils in approximately 1972. Rating Installed Design Life Updated 3 - Marginal Event: 1969 30 MAR-12 Replace Packaged Rooftop Units BOE (7) Concern: Units are rusting out and have exceeded their life expectancy by 12 years Recommendation: Replace units. Type Year Cost Priority Failure Replacement 2012 Medium $497,800 Updated: MAR-12 Report run on: March 27, 2012 10:11 AM Page 29 of 44 Calgary - Nellie McClung Elementary School (B2729A) D3050.05.02 Fan Coil Units** Four electric entrance heaters. Rating Installed Design Life Updated 4 - Acceptable Event: 1969 30 MAR-12 Replace Fan Coil Units BOE (4) Type Year Cost Priority Lifecycle Replacement 2015 Unassigned $23,100 Updated: MAR-12 D3060.02.01 Electric and Electronic Controls** Controls for electric entrance heaters. Rating Installed Design Life Updated 4 - Acceptable Event: 1969 30 MAR-12 Replace Electric and Electronic Controls BOE (3581m2/gfa) Type Year Cost Priority Lifecycle Replacement 2015 Unassigned $6,000 Updated: MAR-12 D3060.02.02 Pneumatic Controls** Building controls are pneumatic and control air is supplied by a compressor. Rating Installed Design Life Updated 4 - Acceptable Event: 1969 40 MAR-12 Replace Pneumatic Controls BOE (3581m2/gfa) Type Year Cost Priority Lifecycle Replacement 2015 Unassigned $20,900 Updated: MAR-12 Report run on: March 27, 2012 10:11 AM Page 30 of 44 Calgary - Nellie McClung Elementary School (B2729A) D3060.02.05 Building Systems Controls (BMCS, EMCS)** Some mechanical and electrical building systems are remotely controlled via a JC-80 computer control system. Rating Installed Design Life Updated 4 - Acceptable Event: 1990 20 MAR-12 Replace Building Systems Controls BOE (3581m2/gfa) Type Year Cost Priority Lifecycle Replacement 2015 Unassigned $89,900 Updated: MAR-12 D4010 Sprinklers: Fire Protection* Only stage is protected by a wet-pipe sprinkler system. Rating 4 - Acceptable Installed Design Life Updated 1969 0 MAR-12 D4020 Standpipes* The building is equipped with a cast iron standpipe system complete with fire hose cabinets. A Siamese connection is located on the north side by the mechanical room. Rating 4 - Acceptable Installed Design Life Updated 1969 0 MAR-12 D4030.01 Fire Extinguisher, Cabinets and Accessories* Fire extinguishers are located at fire hose stations and other locations throughout the building. Fire extinguishers have an estimated average installation date of 1990. Rating 4 - Acceptable Installed Design Life Updated 1990 Report run on: March 27, 2012 10:11 AM 0 MAR-12 Page 31 of 44 Calgary - Nellie McClung Elementary School (B2729A) S5 ELECTRICAL D5010.01.02 Main Electrical Transformers (Utility Owned)* Pad mounted transformer located on south side of school. Owned by ENMAX. Rating Installed Design Life Updated 4 - Acceptable 1969 0 MAR-12 D5010.03 Main Electrical Switchboards (Main Distribution)** Westinghouse 1600 Amp 120/208 volt three phase main breaker and MDP. 100% full. Rating Installed Design Life Updated 3 - Marginal Event: 1969 40 MAR-12 Replace 1600 amp MDP and main breaker Concern: Equipment have exceeded its theoretical life. Spare parts not available. Recommendation: Replace 1600 Amp 120/208 volt three phase MDP and breakers. Consequences of Deferral: Possible loss of power due to equipment failure. Type Year Cost Priority Failure Replacement 2012 Medium $45,000 Updated: MAR-12 D5010.05 Electrical Branch Circuit Panelboards (Secondary Distribution)** Eight Westinghouse, Federal and Cutler Hammer panels located throughout the school. 80% full. Rating Installed Design Life Updated 3 - Marginal Event: 1969 30 MAR-12 Repalce eight panels and related breakers. Concern: Equipment have exceeded its theoretical life span. Spare parts not available. Recommendation: Replace eight panels. Consequences of Deferral: Possible loss of power due to equipment failure. Type Year Cost Priority Failure Replacement 2012 Medium $24,000 Updated: MAR-12 Report run on: March 27, 2012 10:11 AM Page 32 of 44 Calgary - Nellie McClung Elementary School (B2729A) D5010.07.02 Motor Starters and Accessories** Six Allen Bradley motor starters located as required. Rating Installed Design Life Updated 4 - Acceptable Event: 1969 30 MAR-12 Replace six motor starters. Type Year Cost Priority Lifecycle Replacement 2015 Unassigned $3,016 Updated: MAR-12 D5020.01 Electrical Branch Wiring* Wiring in EMT conduit. AC90 flex cabling for final connection to motors and light fixtures. Rating Installed Design Life Updated 4 - Acceptable 1969 0 MAR-12 D5020.02.01 Lighting Accessories: Interior (Lighting Controls)* Low voltage switching in library. Line voltage switching in other areas. Rating Installed Design Life Updated 4 - Acceptable 1969 0 MAR-12 D5020.02.02.02 Interior Fluorescent Fixtures** Fluorescent fixtures are used throughout the school and consist of recessed and surface mounted T8 fixtures with electronic ballasts. Rating Installed Design Life Updated 4 - Acceptable Event: 2002 30 MAR-12 Replace T8 lighting for 3581 m2/gfa Type Year Cost Priority Lifecycle Replacement 2032 Unassigned $195,965 Updated: MAR-12 Report run on: March 27, 2012 10:11 AM Page 33 of 44 Calgary - Nellie McClung Elementary School (B2729A) D5020.02.02.05 Other Interior Fixtures* Interior lighting in the main gym is provided by suspended high-bay mercury vapor fixtures. Rating Installed Design Life Updated 3 - Marginal Event: 1969 0 MAR-12 Replace 30 Mercury Vapour fixtures in Gym with T8 units Concern: Obsolete technology. High maintenance and operational costs. Recommendation: Replace 30 Mercury Vapor recessed light fixtures with T8 units. Consequences of Deferral: Continued high operation and maintenance costs. Type Year Cost Priority Failure Replacement 2012 Medium $15,807 Updated: MAR-12 D5020.02.03.02 Emergency Lighting Battery Packs** Ready-Lite emergency lighting battery packs and remote heads. Rating Installed Design Life Updated 4 - Acceptable Event: 2003 20 MAR-12 Replace emergency lighting for 3581 m2/gfa Type Year Cost Priority Lifecycle Replacement 2023 Unassigned $6,980 Updated: MAR-12 D5020.02.03.03 Exit Signs* LED exit signs located as required. Rating 4 - Acceptable Installed Design Life Updated 2003 0 MAR-12 D5020.03.01.04 Exterior H.P. Sodium Fixtures* Wall packs located around perimeter of school. Rating 4 - Acceptable Installed Design Life Updated 2002 Report run on: March 27, 2012 10:11 AM 0 MAR-12 Page 34 of 44 Calgary - Nellie McClung Elementary School (B2729A) D5020.03.02 Lighting Accessories: Exterior (Lighting Controls)* Time clock and photo cell controlled. Rating Installed Design Life Updated 4 - Acceptable 2002 0 MAR-12 D5030.01 Detection and Fire Alarm** The building has manual pull stations, heat detectors, and smoke detectors connected to a monitored Notifier AFP-200 fire alarm panel with 14 zones which controls fire alarm bells and strobes throughout the building. Rating Installed Design Life Updated 4 - Acceptable Event: 2004 25 MAR-12 Install six strobes in wash rooms. Concern: Wash rooms do not have fire alarm signal notification in them. Recommendation: Install six strobes in wash rooms. Consequences of Deferral: Loss of fire alarm signal notification in affected areas. Type Year Cost Priority Code Upgrade 2012 Medium $3,000 Updated: MAR-12 Event: Replace fire alarm system for 3581 m2/gfa Type Year Cost Priority Lifecycle Replacement 2029 Unassigned $61,152 Updated: MAR-12 D5030.02.02 Intrusion Detection** The building is equipped with a Silent Knight security system, complete with motion detectors throughout the building. The system is externally monitored. Card swipe system installed. Rating Installed Design Life Updated 4 - Acceptable Event: 2001 25 MAR-12 Install intrusion detection system for 3581 m2/gfa Type Year Cost Priority Lifecycle Replacement 2026 Unassigned $35,971 Updated: MAR-12 Report run on: March 27, 2012 10:11 AM Page 35 of 44 Calgary - Nellie McClung Elementary School (B2729A) D5030.03 Clock and Program Systems* Simplex Master clock system. Battery operated clocks in classrooms. Rating Installed Design Life Updated 4 - Acceptable 2006 0 MAR-12 D5030.04.01 Telephone Systems* Nortel Meridian telephone system. Handsets in classrooms. Interlocked to public address system. Rating Installed Design Life Updated 4 - Acceptable 1985 0 MAR-12 D5030.04.05 Local Area Network Systems* WIFI and Supernet in school. Cat 5 cabling. 3 Amp hubs and 4 Cisco and Nortel switches. Rating Installed Design Life Updated 4 - Acceptable 2002 0 MAR-12 D5030.05 Public Address and Music Systems** Bogen amplifier with 50 channels, radio, tape and CD player. Speakers in classrooms. Interlocked to telephone system. Rating Installed Design Life Updated 4 - Acceptable Event: 1985 20 MAR-12 Replace PA system for 3581m2/gfa Type Year Cost Priority Lifecycle Replacement 2015 Unassigned $12,250 Updated: MAR-12 Report run on: March 27, 2012 10:11 AM Page 36 of 44 Calgary - Nellie McClung Elementary School (B2729A) S6 EQUIPMENT, FURNISHINGS AND SPECIAL CONSTRUCTION E1020.03 Theatre and Stage Equipment* The Stage area is equipped with wall-mounted speakers and ceiling-mounted spot lights. Rating Installed Design Life Updated 4 - Acceptable 1969 0 MAR-12 E1090.04 Residential Equipment* - CBE Stove, refrigerator, dishwasher, and microwave oven are provided in the Staff Room. Rating Installed Design Life Updated 4 - Acceptable 2000 0 MAR-12 E1090.04 Residential Equipment* - Community Stove, refrigerator, and microwave oven are provided in the kitchen. Rating Installed Design Life Updated 4 - Acceptable 2000 0 MAR-12 E1090.07 Athletic, Recreational, and Therapeutic Equipment* The gymnasium contains four wall-mounted basketball hoops, four portable basketball hoops, and a wall-mounted wood & metal climbing/gymnastics apparatus. Rating Installed Design Life Updated 4 - Acceptable 1969 0 MAR-12 E2010.02 Fixed Casework** - CBE Fixed wooden casework with laminated or painted finishes are typically installed in each classroom, office area, work room, the Library, and the Staff Room. Adjustable wood bookshelf units are provided in the Library. Adjustable wood shelving is provided in the storage rooms. Laminated wood vanities are provided in the staff washrooms. Glass-fronted display cabinets are set into the corridor walls. Rating Installed Design Life Updated 4 - Acceptable Event: 1969 35 MAR-12 Replace Fixed Casework - BOE: 3230 sq.m/gfa Type Year Cost Priority Lifecycle Replacement 2015 Unassigned $284,240 Updated: MAR-12 Report run on: March 27, 2012 10:11 AM Page 37 of 44 Calgary - Nellie McClung Elementary School (B2729A) E2010.02 Fixed Casework** - Community Fixed wooden casework with laminated and stained finishes is provided in the kitchen and conference room. Rating Installed Design Life Updated 4 - Acceptable Event: 2003 35 MAR-12 Replace Fixed Casework - BOE: 290 sq.m/gfa Type Year Cost Priority Lifecycle Replacement 2038 Unassigned $25,520 Updated: MAR-12 E2010.03.01 Blinds** Exterior windows are equipped with metal blinds. The majority of the blinds are installed internally within the windows (between the two glazing units), the remainder are installed on the interior side of the windows. Rating Installed Design Life Updated 4 - Acceptable Event: 1969 30 MAR-12 Replace Blinds - BOE: 28 sq.m Type Year Cost Priority Lifecycle Replacement 2015 Unassigned $2,900 Updated: MAR-12 E2010.03.06 Curtains and Drapes** There are two sets of curtains in the Stage area. Rating Installed Design Life Updated 4 - Acceptable Event: 1969 30 MAR-12 Replace Stage Curtains - BOE: 72 sq.m Type Year Cost Priority Lifecycle Replacement 2015 Unassigned $32,400 Updated: MAR-12 E2010.04 Fixed Floor Grilles and Mats* Recessed metal floor grilles are provided at entry doors. Grille at main entrance has been removed and replaced with a rubber floor mat. Rating 4 - Acceptable Installed Design Life Updated 1969 Report run on: March 27, 2012 10:11 AM 0 MAR-12 Page 38 of 44 Calgary - Nellie McClung Elementary School (B2729A) E2020.02.03 Furniture* Desks, chairs, and tables are located in classrooms and office areas. Rating 4 - Acceptable Installed Design Life Updated 1969 0 MAR-12 E2020.04 Moveable Multiple Seating* The Music Room contains a three tier, metal framed, portable seating apparatus. Folding cafeteria tables are provided in the Gymnasium and Stage areas. Rating 4 - Acceptable Installed Design Life Updated 1995 Report run on: March 27, 2012 10:11 AM 0 MAR-12 Page 39 of 44 Calgary - Nellie McClung Elementary School (B2729A) S8 SPECIAL ASSESSMENT K4010.01 Barrier Free Route: Parking to Entrance* The concrete sidewalk leading from the parking lot to the main entrance is low slope and contains no impediments to barrier-free access to the school. However, there is no designated handicap parking stall in the parking lot. Rating Installed Design Life Updated 3 - Marginal Event: 1969 0 MAR-12 Provide Handicap Parking Stall (1) Concern: No designated handicap parking stall, drop-off area, or signage are provided in the parking area. Recommendation: Designate a handicap parking stall in the parking lot complete with the appropriate line painting and signage. Consequences of Deferral: Non-compliance with current barrier-free standards and poor accessibility for handicapped persons. Type Year Cost Barrier Free Access Upgrade 2012 Priority $2,500 Medium Updated: MAR-12 K4010.02 Barrier Free Entrances* All entrances to the school are manually-operated (i.e., no automated door-openers). Rating Installed Design Life Updated 2 - Poor 1969 0 MAR-12 Event: Install Automated Door-Openers BOE 2 doors Concern: The main entrance doors are not equipped with an automatic door opener. Recommendation: Install automated entrance door openers. Consequences of Deferral: Non-compliance with current barrier-free codes/standards and an impedance for handicapped users. Type Year Cost Barrier Free Access Upgrade 2012 $25,000 Priority Medium Updated: MAR-12 Report run on: March 27, 2012 10:11 AM Page 40 of 44 Calgary - Nellie McClung Elementary School (B2729A) K4010.03 Barrier Free Interior Circulation* Circulation within the majority of the school is barrier-free, however, there is no barrier-free access to the Stage area. Rating Installed Design Life Updated 3 - Marginal Event: 1969 0 MAR-12 Install Barrier-Free Lift to Stage (1) Concern: There is no barrier-free access to the Stage area. Recommendation: Install a mechanical/hydraulic lift. Consequences of Deferral: Non-compliance with current barrier-free codes/standards and an impedance for handicapped users. Type Year Cost Barrier Free Access Upgrade 2012 Priority $23,250 Medium Updated: MAR-12 K4010.04 Barrier Free Washrooms* The main Boy's and Girl's washrooms located on the north and south sides of the circular portion of the school each have a handicap stall. Rating Installed Design Life Updated 3 - Marginal Event: 1969 0 MAR-12 Provide Barrier Free Washrooms BOE 2 sets of signage and grab bars Concern: The washrooms designated as barrier-free do not have the standard signage. Additionally, several required hardware items have not been installed (such as a horizontal grab bar behind the water closet, flush lever, tap levers for sink, etc.). Recommendation: Install signage and all required hardware for barrier-free washrooms in compliance with the code. Consequences of Deferral: Non-compliance with current barrier-free codes/standards and an impedance for handicapped users. Type Year Cost Barrier Free Access Upgrade 2012 $4,000 Priority Medium Updated: MAR-12 Report run on: March 27, 2012 10:11 AM Page 41 of 44 Calgary - Nellie McClung Elementary School (B2729A) K4030.01 Asbestos* Suspected asbestos containing elements are the gypsum board joint compound, pipe insulation/wrappings located in the Mechanical Room, and the resilient floor tile (VAT). Refer to C3020.07 Resilient Flooring** - CBE (VAT Tile) and C3020.07 Resilient Flooring** - Community (VAT Tile) Rating 4 - Acceptable Installed Design Life Updated 1969 0 MAR-12 K4030.02 PCBs* The school has T-8 fluorescent fixtures which use electronic ballasts. There reportedly are several T-12 ballasts remaining in the school, however, no visible signs of staining which would indicate leaking of PCB's was observed. Rating 4 - Acceptable Installed Design Life Updated 1969 0 MAR-12 K4030.04 Mould* None observed or reported. Rating 4 - Acceptable Installed Design Life Updated 1969 0 MAR-12 K4030.07 Ozone Depleting Substances (CFC's, HCFC's, Halon)* None observed or reported. Rating 4 - Acceptable Installed Design Life Updated 1969 0 MAR-12 K4030.09 Other Hazardous Materials* None observed or reported. Rating 4 - Acceptable Installed Design Life Updated 1969 Report run on: March 27, 2012 10:11 AM 0 MAR-12 Page 42 of 44 Calgary - Nellie McClung Elementary School (B2729A) K5010.01 Site Documentation* Prime Consultant: ARUP DATTA ARCHITECT LTD. Year of Evaluation: 2011 Site description: The Nellie McClung Elementary School, constructed in 1969, is a single storey masonry structure with an attached portion owned and operated by a local community association. The school is located on an irregular shaped lot at 2315 Palliser Drive SW in Calgary, AB. The property is bounded on the north by Palliser Drive SW, on the south by municipal playfields, on the east by a residential development and a municipal alleyway, and on the west by playfields. An asphalt paved parking area is located on the northwest side of the building. Asphalt paved recreational areas are located along the north, south, and east sides of the building. A concrete paved sidewalk runs along the north and the west sides of the building and another runs from Palliser Drive to the main entrance on the north side of the building. Soft landscaping (grassed areas, trees, hedges, etc.) surround the building on all sides. An asphalt paved basketball court and two prefabricated playgrounds in aggregate beds are located south of the building. Rating 4 - Acceptable Installed Design Life Updated 1969 0 MAR-12 Google site map Report run on: March 27, 2012 10:11 AM Page 43 of 44 Calgary - Nellie McClung Elementary School (B2729A) K5010.02 Building Documentation* Prime Consultant: ARUP DATTA ARCHITECT LTD. Year of Evaluation: 2011 Building area evaluated: Original one-storey building and attached community section. Building / building sections not evaluated: All areas evaluated Anomalies regarding evaluation environment, drawings or areas evaluated: and operated by a local community association. An attached portion of 290 sq.m is owned The Nellie McClung Elementary School, constructed in 1969, is a single storey masonry structure of 3800 sq.m which includes an attached portion owned and operated by a local community association. A 71 sq.m addition to the community portion was added in 2003, bringing the area of the community centre to 290 sq.m. The gross floor area of the school portion of the building is 3581 sq.m. Rating 4 - Acceptable Installed Design Life Updated 1969 0 MAR-12 Floor plan Report run on: March 27, 2012 10:11 AM Page 44 of 44