Tables 16-17

Transcription

Tables 16-17
Doc Details
Author(s)
Type of Plan
Summary
Infrastructure planning
strategy
The study seeks an understanding of public
boating demands in the shire and recommends
appropriate facilities.
33 Walpole-Nornalup National
Park Management Plan
1992-2002
Final
1992
February
CALM
Management plan
Management stipulates that Coalmine Beach area
is to be redeveloped as a low-key caravan park,
coastal access will be rationalised and improved
and Park boundaries are to be extended.
Maintaining the progression of dieback into
coastal areas is another important issue for future
planning.
111 Leschenault Peninsula
Conservation Park
Management Plan 1999 - 2009
Final
1999
National Parks
and Nature
Conservation
Authority
Management plan
The key management issues addressed in the plan
are zoning (natural environment and
recreational zone), native flora and fauna,
rehabilitation and regulating recreation in
sensitive areas, further development of facilities,
extending public access to include foot and
vehicle access. It also aims to protect sensitive
estuarine vegetation on the eastern shore by
restricting sites for boat-landing and remove
redundant infrastructure and debris that presents a
hazard to public safety.
29 Leeuwin Naturaliste
National Park Management
Plan 1989 - 1999
Final
1989 April
CALM
Management plan
New subdivisions sort after by the WAPC will be
considered by CALM in light of their impact on
the Park.
Under
review,
draft
released
in May
2005
1988
January
CALM
Management plan
The plan reflects the increase in visitor demand,
especially in two wheel drive access to the coast
and planning for increased facilities such as for
camping (encouraged for Windy Harbour and
Camfield) and Park information. However access
and development should be considered in relation
to their effect on the environment, particularly
degradation, disease protection, wash down areas
and education. CALM is currently drafting a
revised management plan, which has been
released for public comment.
4 Shannon D'Entrecasteaux
National Parks
Management Plan
C AL M
P R O G R A M
Department of
Transport
P L A N N I N G
1996 M a y
C O A S TA L
Final
131
Ta b l e 1 6
368 Boating Facilities Study for
the Shire of Augusta
Margaret River
S o u t h - We s t C o a s t a l P l a n n i n g D o c u m e n t s 2 0 0 4 / 0 5
Status of Coastal Planning in Western Australia 2004/05 Report
Plan/Strategy
Author(s)
Type of Plan
Summary
D PI
Investigation
An investigation into the coastal erosion
threatening the popular recreational campsites
south of Busselton. It recommends consultation
with the local community on two feasibility
management options for the western side and six
for the eastern side of Busselton.
401 Usher Dalyellup Regional
Park Pl an
Fi nal
2003
City of Bunbury
Concept plan
A concept plan has been prepared that
provides a basis for the future enhancement and
management of the area.
365 Boating Facilities Study for
the Shire of Busselton
Final
1995 July
Department of
Transport
Infrastructure planning
strategy
The study seeks an understanding of public
boating demands in the shire and recommends
appropriate facilities.
500 Meelup-Bunker Bay
Structure Plan
Final,
not yet
endorsed
by t he
WAPC
Shire of Busselton
Structure plan
Stipulates the long-term development
boundaries for Eagle Bay and sets out
development criteria for future development in
Ea gl e B ay.
333 Peppermint Grove Beach
Estate (Northern Section)
Foreshore Management Plan
Final
1998
GR Crimp and
Partners
Foreshore management
plan
Originally prepared in 1994. Recommendations
for dune stabilisation, provision of vehicle access,
parking and pedestrian access.
332 Foreshore Reserve Dune
Reconstruction and
Rehabilitiation - McCourt
Hills Estate Peppermint
Grove Beach
F i nal
1991
January
Feilman Planning
Consultants
Foreshore management
plan
Specified actions for dune reconstruction and
rehabilitation, provision of vehicle access,
parking and pedestrian access.
327 Bunker Bay Foreshore
Management Plan
Final
2 0 0 1 Ma y
EPCAD
Foreshore management
pl an
Prepared as a condition of the Development and
Strata subdivision approval. Ensures integration
of the project with the existing dune
characteristics, appropriate beach access and
rehabiliation and protection of the beach.
305 Warren-Blackwood Rural
Strategy
Fi nal
December
2003
WAPC
Rural strategy
Was developed in response to the
Warren-Blackwood Regional Planning Strategy.
501 Augusta-Margaret River
Coastal Management Plan
Final
March
2005
Shi r e of
Augusta-Margaret
D PI
Coastal management plan
P R O G R A M
2004
P L A N N I N G
Final
C O A S TA L
Status of Coastal Planning in Western Australia 2004/05 Report
506 Locke Estate Busselton
Investigation of Beach
Stabilisation 2004
Ta b l e 1 6
Doc Details
S o u t h - We s t C o a s t a l P l a n n i n g D o c u m e n t s 2 0 0 4 / 0 5
132
Plan/Strategy
This statement of planning policy is a statutory
response by the WAPC and local authorities to
increasing development pressure between Cape
Naturaliste and Cape Leeuwin. It encompasses
relevant coastal considerations of the Leeuwin
Naturaliste Region Plan, Stages 1and 2. This
document is due to be reviewed, based upon the
identified need to do so every 5 years, and the
need for the policy to reflect current government
position.
DPI
Region scheme
This draft document will provide statutory effect
to many of the land use recommendations of the
Bunbury-Wellington Region Plan (1995). The
scheme will be implemented through the zoning
of land in the Harvey, Capel, Dardanup and
Bunbury town planning schemes, and through the
progressive acquisition of reserved land.
Acquisition of land for regional open space will
also facilitate creation of regional parks in
coastal areas and achieve appropriate coastal
setbacks and development control.
W APC
Strategic plan
This document covers sections of Mandurah,
Harvey and Waroona. Both Mandurah and
Harvey local governments have indicated the
strategy retains relevant, particularly for the
assessment of development applications. The
document has been incorporated into town
planning schemes and adopted as planning policy.
Final
waiting
endorsement
DPI
Strategic plan
This conservation strategy will provide guidance
for management and land use surrounding the
Vasse-Wonnerup, New River and Broadwater
wetlands. It is anticipated that the final document
be released during July 2005.
Dr a f t
South West
Catchments
Council
Strategic plan
This document provides a strategic natural
resource management framework for South-West
catchments. One component of the report is the
Coastal Environs study.
90 Draft Greater Bunbury
Region Scheme
Draft
43 Coastal and Lakelands
Planning Strategy
Fi na l
299 Busselton Wetlands
Conservation Strategy
89 South-West Regional
Strategy - Coastal Environs
Report
1999
February
2001
WAPC; Shire of
Busselton; Shire
of Augusta Margaret River
MfP
Institute for
Regional
Development
P R O G R A M
Statement of Planning
Policy
1998
September
P L A N N I N G
Summary
133
Ta b l e 1 6
Type of Plan
Final
Author(s)
C O A S TA L
108 Statement of Planning
Policy No. 6.1
Leeuwin-Naturaliste Ridge
Doc Details
S o u t h - We s t C o a s t a l P l a n n i n g D o c u m e n t s 2 0 0 4 / 0 5
Status of Coastal Planning in Western Australia 2004/05 Report
Plan/Strategy
Author(s)
1995
November
MfP
185 Geographe Catchment
Management Strategy
Fi nal
2000
Geographe
Catchment
Council
1985
November
Cape Naturaliste
Urban and
Rural Landowners Environmental
Assn, South West Planning Group
Development
Authority
232 Cape Naturaliste Planning
Final
and Development Study: Stage 1
GeoC at ch, N HT,
WR C
Strategic plan
Incorporates the Greater Bunbury and Collie
Basin Structure Plans. Implementation of
recommendations will be through integration
into the statutory Greater
Bunbury Region Scheme.
Strategic plan
This document follows on from a draft plan
developed in 1995, and is a framework for land
use and land and water management for the
Geographe Bay catchment. It address land use
pressures for the Busselton wetlands system,
including the Vasse-Wonnerup, a Ramsar wetland.
It has been endorsed in principle by relevant
State agencies, and is being actively implemented.
Strategic plan
The Shire of Busselton have indicated that this
document is neither held or used by the shire
planning staff.
S t r a te g i c p l a n
The Shire of Busselton have indicated that this .
document is neither held or used by shire
planning staff.
Final
1986 July
Busselton Shire
Council
109 Leeuwin-Naturaliste Region
Plan : [Stage One]
Final
1987
August
SPC
Strategic plan
This plan covers Busselton Shire. It has been
adopted by the SPC, and remains part of the
Statement of Planning Policy No. 8 (State
Planning Framework).
110 Leeuwin-Naturaliste Region
Plan: [Stage Two - Draft]
Draft
1988
November
SPC
Strategic plan
Endorsed as a draft by the SPC, this is being
implemented through the local government town
planning scheme and associated policies. The
document covers the Shire of Augusta-Margaret
River.
Urban And
Environmental
Planning Group;
Busselton Shire
Council ; Hames
Sharley Australia
P R O G R A M
Status of Coastal Planning in Western Australia 2004/05 Report
35 Cape Naturaliste Planning
and Development Study
P L A N N I N G
Fi nal
Summary
C O A S TA L
22 Bunbury-Wellington
Region Plan
Type of Plan
Ta b l e 1 6
Doc Details
S o u t h - We s t C o a s t a l P l a n n i n g D o c u m e n t s 2 0 0 4 / 0 5
134
Plan/Strategy
Doc Details
Author(s)
Type of Plan
Summary
Strategic plan
The focus of this document is the preparation of
a land use plan to address land and water
management, and development interest in the
study area within the Shires of Augusta-Margaret
River and Nannup. Several key
recommendations about management of unvested
coastal areas have been made.
172 Warren-Blackwood
Regional Planning Strategy
Final
1997
D e c e mb e r
W APC
Strategic plan
Land use strategy for the region incorporating
the coast in the Shires of Nannup and Manjimup,
much of which is CALM Estate.
167 Southern Prospects
Regional Strategy
Final
2001
South Coast
Regional Initiative
Planning Team
Strategic plan
Establishes actions to ensure sustainable land and
water practices across the southern portions of
the Great Southern and Goldfields-Esperance
regions. Does not directly develop coastal
management direction, however may impact on
aspects of coastal management. The major
change in this planning region is the
incorporation of the coastal and marine issues
into the catchment strategy in order to address
the objectives for integrated natural resource
management under NHT2. Achieving
integration is currently being discussed
by the groups.
180 Usher, Gelorup and
Dalyellup District
Structure Plan
Fi nal
1992
November
Structure plan
This document has been adopted as part of the
Shire of Capel's planning policy. Implementation
is dependant upon subdivision development in
the study area, and the development of more
detailed levels of planning, such as the Dalyellup
Beach Estate - Local Structure Plan (1999).
Final
1993
March
Coastal management plan
This plan was developed to address coastal
management issues for the City of Bunbury
coastline. There has been no indication from the
City as to the current usefulness or relevance of
the plan. Based upon the date of the plan and
developments since, it is suggested that it may be
in need of a review.
24 Bunbury Coastal Plan
Thompson Taylor
& Burrell
DPUD; City of
Bunbury
P R O G R A M
AWA, Scott
Coastal Plain
Steering Committee
P L A N N I N G
200 1
C O A S TA L
Final
135
Ta b l e 1 6
213 Scott Coastal Plain : A
Strategy for a
Sustainable Future
S o u t h - We s t C o a s t a l P l a n n i n g D o c u m e n t s 2 0 0 4 / 0 5
Status of Coastal Planning in Western Australia 2004/05 Report
Plan/Strategy
Author(s)
Foreshore management
plan
Study into managing coastal erosion and onshore
enhancement undertaken with the City of
Bunbury. The plan contains some controversial
elements, including a proposed groyne that has not
been approved. Stage two of the Bunbury Coastal
Enhancement Project is currently underway with
the construction of a shoreline rock protection
barrier to be completed by August 2005.
Landscape enhancement works at the Koombana
Bay foreshore were completed in May 2003.
Works included provision of public facilities
including shade shelters, barbeque facilities, paths
and dune revegetation. Occasional nourishment is
required to maintain the beach width and a
coastal investigation has been proposed.
175 Windy Harbour
Management Plan
Final,
unde r
r e v ie w
1999
Shire of
Manjimup
Thompson
McRobert
Coastal management plan
This management plan, which reviews a 1982 plan,
provides strategic direction for the Shire to ensure
sustainable future direction and management. A
detailed issues paper has been lodged with CALM
outlining concerns relating to Windy Harbour for assessment and consideration by CALM in its
current review of the Shannon and
D'Entrecasteaux National Parks Management
Plan. They are currently waiting for planning
consultants to present a draft report to council
and this report will then be available for public
comments in 4 months. A comprehensive review
of this plan will be commenced after the
finalisation of the Augusta-Walpole Coastal Strategy.
226 Northern Leschenault
Estuary Foreshore Plan
Final
1997
WRC, WRM2
Leshenault Inlet
Management
Authority, Shire of
Harvey
Foreshore management
pl a n
The Shire of Harvey have indicated this
document has been adopted as part of Council's
planning policy, and continues to be used to
assess development and subdivision applications
as development proceeds in this area.
Final
2001,
September
Shire of
Coastwise Pty Ltd
Busselton;
(O'Brien, R.)
Geographe
Catchment Council
Foreshore management
plan
The plan has been endorsed as a planning policy
to provide a framework for the future protection
and management of the Geographe Bay foreshore
in relation to both public and private land from
Dunsborough to Busselton.
P R O G R A M
Donaldson, Smith
& Hooke ; Tur en
Property
Consulting; MP
Rogers & Assoc.;
BSD Consulting
P L A N N I N G
South West
Development
Commission
C O A S TA L
Summary
2003
82 Geographe Bay Foreshore
Management Plan
Doc Details
Ta b l e 1 6
Status of Coastal Planning in Western Australia 2004/05 Report
Type of Plan
Final
S o u t h - We s t C o a s t a l P l a n n i n g D o c u m e n t s 2 0 0 4 / 0 5
136
Plan/Strategy
23 Bunbury Coastal
Enhancement Project
Doc Details
Author(s)
Summary
Quilty
Environmental
Consulting
Foreshore management
pl a n
Whilst the Shire of Busselton has indicated that
this document is not used or held by planning
staff in the shire, it is likely that it was developed
as part of the requirements of a development
approval process. As such, it is expected the
document has been fully implemented, and no
longer actively used for coastal management in
the study area.
ATA
Environmental/
Tingay and
Associates
Foreshore management
plan
This document has been prepared to provide
clear guidelines for the future management of the
coastal reserve following development of
Dalyellup Beach Estate. The document identifies
a foreshore reserve boundary and public use
proposals for the foreshore area.
1991
November
279 Dalyellup Beach Estate
Coastal Foreshore Plan
Final
2001
79 Forest Beach and Wonnerup
Dunes Access Study
F i nal
1997 May
Shire of Busselton Ecologia
Environmental
Consultants
Foreshore management
plan
This document has been adopted as a strategic
guide for management of the coastal study area,
and is continuing to be implemented.
55 Dunsborough Beach
Foreshore Management Plan
Final
2000 May
Shire of
Busselton;
Dunsborough and
Districts Progress
Foreshore management
plan
This document was commissioned jointly by the
Dunsborough and Districts Progress Association
and the Shire of Busselton to address
management of the Dunsborough town beach.
142 Prevelly Foreshore Reserve
Management Plan (Rifle
Butt; Gnarabup; Back and
Grunters Beaches)
Final
1993
N o v e mb e r
Cedervale
Investments Pty
Ltd
Foreshore management
pl an
This plan forms the framework for coastal
access, facilities and rehabilitation for the
adjoining subdivision. It has been incorporated
into the town planning scheme, and the Shire of
Augusta-Margaret River has established a
committee to further implement the plan.
190 Walpole-Nornalup Inlet
Management Plan
Final
120 Myalup Dune
Rehabilitation Plan
Final
Al an Ti ngay and
Associates
Shire of
Manjimup
1992
Foreshore management
plan
Quilty
Environmental
Site management plan
This document is being actively implemented by
the Myalup Community Association in
conjunction with the Shire of Harvey.
137
Ta b l e 1 6
P R O G R A M
Final
P L A N N I N G
179 Yallingup Foreshore
Stabilisation and
Management Plan
C O A S TA L
Surfside
Development
Type of Plan
S o u t h - We s t C o a s t a l P l a n n i n g D o c u m e n t s 2 0 0 4 / 0 5
Status of Coastal Planning in Western Australia 2004/05 Report
Plan/Strategy
Type of Plan
Summary
Koltasz Smith and
P a r tn e r s
Foreshore management
plan
The purpose of the study is to review publicly vested lands which
abut the foreshore areas adjacent to Koombana Bay, Casurina Bay
and the Leschenault Inlet. The study will develop a vision for the
area that guarantees community access to the beach, community
supported land uses, development of community facilities and
conservation of the foreshore reserve.
325 City of Three Waters Strategy
City of Bunbury
Koltasz Smith and
Partners
Strategic plan
Draws on Koombana-Casuarina Strategic Plan Study for a vision
and strategy to guide land use adjacent to the ocean and inlets.
328 Wyadup to Injidup Beach
Foreshore Management Plan
Bowman Bishaw
Gorham
Foreshore management
plan
Identified works to effectively manage access to the
beach from the subdivision and ensure protection and
rehabilitation of the coastal dune environment (Required as a
condition of subdivision approval). Not yet endorsed by the shire.
351 South West Regional Strategy for
Natural Resource Management
South West Catchments
Council
NRM Plan
Provides a series of recommendations for planning work across
the South West principally focusing upon coastal and marine
issues, rivers and wetlands, and vegetation management.
376 Augusta: A Study of options that
provide sustainable ocean access
DP I
Infrastructure planning
strategy
Will Evaluate and recommend maritime facility development that
provide sustainable navigable access to the ocean at Flinders Bay.
402 Augusta Walpole Coastal Strategy
DPI
Coastal strategy
This strategy will address issues including tenure, access,
recreation, indusry and conservation and will also include
consideration of the values and threats to the marine
environment within the state territorial waters. A draft strategy is
expected to be released for public comment in the second half of
2005.
ERM
P L A N N I N G
City of Bunbury
C O A S TA L
P R O G R A M
Status of Coastal Planning in Western Australia 2004/05 Report
306 Koombana-Casurina Strategic
Plan Study
Ta b l e 1 7
Author(s)
S o u t h - We s t P l a n n i n g D o c u m e n t s i n P r e p a r a t i o n 2 0 0 4 / 0 5
138
Plan/Strategy
Author(s)
Type of Plan
Summary
Strategies and actions of the strategy are currently being reviewed.
The coastal local governments have assisted in the development
of a working paper on coastal issues, which has also drawn heavily
upon Southern Shores. This working paper is the basis for the
regional strategies recommendations. The large amount of
unallocated Crown land is seen to be a significant coastal planning
issue.
Hames Sharley
Architects
Master plan
504 Norman Street Foreshore
Management Plan
Shire of Busselton
Foreshore management
plan
This plan covers an area of foreshore in the Broadwater area which
is in need of protection and rehabilitation. The Shire of Busselton is
currently in the process of engaging consultants to prepare the plan.
505 Foreshore Management Plan for
Reserve 34111
Shire of Busselton
Foreshore management
pl an
A Foreshore Management Plan for Reserve 34111 has been
commissioned in response to community group need for a
boatshed on the coast. The plan is to consider impacts of the proposed
shed and to how to manage natural aspects of the reserve.
514 Shire of Capel Coastal Strategy
Shire of Capel
Coastal management plan
A shire-wide coastal management plan using the existing
unpublished Capel Coastal Plan, prepared by the former Ministry
for Planning in 1995, is to be developed. Finalisation
of the coastal plan will provided an overall context for the
preparation of further detailed foreshore improvement plans and
funding implementation proposals in accordance with the
priorities identified by the community. Consultancy work on the
Shire of Capel Coastal Strategy has produced a first draft and a
further draft will be submitted for review by the steering
committee in the near future. It will then be reported to Council and
put out for public consultation.
515 Shire of Harvey Coastal
Management Plan
Shire of Harvey
Coastal management plan
The Council has recently selected a consultant to undertake the
coastal management plan.
539 Back Beach Precinct Plan
City of Bunbury
Site Plan
As part of the City Vision process consultants have been
appointed to prepare this plan. The draft is expected to be
finished by June and public consultation should be underway during
July.
P R O G R A M
502 Turkey Point Master Plan
P L A N N I N G
Regional Strategy
C O A S TA L
DPI
139
Ta b l e 1 7
404 Lower Great Southern Regional
Strategy
S o u t h - We s t P l a n n i n g D o c u m e n t s i n P r e p a r a t i o n 2 0 0 4 / 0 5
Status of Coastal Planning in Western Australia 2004/05 Report
Plan/Strategy
A3 Map Figure 12