Presentation of GDC Engineering January 2015
Transcription
Presentation of GDC Engineering January 2015
Presentation of GDC Engineering February 2015 February 2015 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH 1 GDC Engineering Mission Statement We provide in the most cost effective way to our clients, products and services which conform to their standard of quality and integrity and encompass the following factors: • Creating trust • Developing partnership • A better identification of, and response to, client needs • Delivering commitments • Solving problems, not creating them • Providing value for money • Achieve customer and end-user satisfaction • Focus on the contribution that everyone can make to the business and thereby the community February 2015 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, do doc ocum ocum ume m nt, t is is no not ot permitted, ot pe p per e ermit miittted te ed, ed except with prior and express written permission by GDC Engineering GmbH 2 GDC Engineering GDC Engineering in a nutshell PEOPLE CUSTOMERS 140 qualified Engineers; 23 CVEs EADS incl. Airbus, Boeing, Lufthansa Technik APPROVALS EXPERIENCE Design Organisation EASA.21J.033 DIN EN 9100, ISO 9001 AP1020, …. est. 1995, but covers all experience of the DORNIER company CURRENTS PROJECTS Our offer (examples) TOOLS (examples) CATIA, CADAM, ENOVIA, PRIMES, PATRAN, NASTRAN A350XWB, A400M, B767, Do328, B787 to our customer February 2015 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH 3 GDC Engineering Company Milestones 20 years of experience in the aerospace sector History – key milestones 1995 Formation of ‘Garner CAD Technic GmbH' 1997 Formation of ‘GCT Garner Inc ' 1998 Formation of ‘GCT Engineering Services Ltd ' 2002 Fairchild Dornier Insolvency 2003 Formation of ‘GCT Projects GmbH’ 2006 Acquisition of Dornier EASA21J and Formation of ‘GCT Design Organisation GmbH' 2006 PFW Acquisition of 20% of GCT Group Key figures 2010/2011/2012 €M Sales Employees 2012 30.3 318 Sales Employees 2013 25.2 250 Sales Employees 2014 18.0 140 Group Products 2009 PFW Acquisition of 100% of GCT Group 2010 Rename GCT Projects to SG Aerospace GmbH and GCT Garner Inc to PFW GCT Inc 2011 Airbus took over 74.9% of the shares of PFW 2012 Formation of ‘PFW Engineering Inc’ in Canada 2013 2014 2015 February 2015 Rename of all GCT Companies to PFW Engineering GDC Technics Acquisition of 100% of PFW Engineering g g Group p Rename of all PFW Companies to GDC Engineering Certifications 3% Interiors 5% Structures 42% Technical Publications 5% Systems 45% © Al All ri All rights igh ght hts ts reserved. rese re serv se rved d Re Reproduction R Repr eprod oduc duc ucti tion ti on or di disclosure disc scllo sc losu losu sure re to to third thiir th ird parties of this document or any part thereof for purposes other than ird i t d d for f by b this thi document, d t iis nott permitted, itt d except with prior and express written permission by GDC Engineering GmbH intended 4 GDC Engineering Company structure & link shareholding companies, history historyy GCT Group Oberpfaffenhofen, Germany GDC Technics Ltd San Antonio, USA Airbus - PFW Aerospace Speyer, Germany GDC Engineering Eng GmbH Oberpfaffenhofen, Germany GDC Engineering Ltd. Poole, UK GDC Engineering Inc. Seattle, USA GDC Engineering Canada Inc. Montreal, Canada February 2015 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof th for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH 5 GDC Engineering Organisation By Jan 2015 Managing Director N. Garner EP - Programs ED - Head of DO G. Hieber EE - Engineering Design E. van der Pluijm A. Bischl EE1 - Structural Components M. Sehrschön EQ - Quality & ERM J. Bohlin EP2 - STC’s, Airlines, MRO T. Eilers EDS - Systems & Equipment E. Sunarkito EE2 - Aircraft Systems A. Kollofrath EF - Finance EP3 - OEM E. van der Pluijm (iPU) EDI - Interiors & Cabin Safety G. Hieber (iPU) EE3 - Concessions EI - IT Support & Services Ch. Klingler EP4 - Fuselage + WING BASI A350 T&D C. Bresson EDF - Flight Physics EE4 - Stress & Fatigue M. Heinrich EB - Procurement EP5 - Wing FISI + HYSI A350 T&D P. Garside EDO - Airworthiness Office Ch. Thallmayr EE5 - Tech Pub ES - Sales & Marketing N. Garner (iPU) EP6 - Fuselage FISI + CDSI A350 T&D D. Miquel EDC – Config. Management R. Kokke M. Pacher* EP1 - VIP EDA - Airframe K. Metzger M. von Hacht H. Schuller EH - Resource Management A. Jansen D. Mitov D. Escherich H. Kies Subsidiaries (UK, US, CA) N. Garner (iPU) *) responsible as Chief Executive as described in Main DOH Sect. 2.3 February 2015 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH 6 GDC Engineering Worldwide Presence Phone: +49 8153 9313 0 Fax: +49 8153 9313 999 USA GDC Engineering Inc 1700 Seventh Avenue Suite 2100 Seattle, WA 98101 Phone: +1 206 826 7188 Fax:+1 206 826 7189 Canada GDC Engineering Canada Inc 6500 TransCanada Hwy, 4th floor, Pointe-Claire, Quebec H9R 0A5 Phone: +1 514 426 6166 Fax:+1 514 426 6101 GDC Engineering Ltd. Unit A30 Arena Business Centre Holyrood Close, Poole Dorset. BH17 7FJ. United Kingdom Phone: +44 2476 321241 Fax:+44 2476 321270 Germany Headquarters GDC Engineering GmbH Sonderflughafen Oberpfaffenhofen Geb. 335 82234 Wessling UK GDC Engineering Canada Inc. Montreal, USA February 2015 GDC Engineering Ltd Bournemouth, UK GDC Engineering Inc. Seattle, USA GDC Engineering GmbH Oberpfaffenhofen Germany © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH 7 GDC Engineering Headquarters LOCATION: Airfield Oberpfaffenhofen Airfield data – Certified for all aircraft, only limitations in: – yearly noise contingent / runway and taxiway load factors – Runway 2,286 x 45 m – Landing systems: ILS/DME, CAT I, Min. 1000 m / 200 ft – Owners: 80% Dornier GmbH (EADS) / 20% DLR – Operator: EDMO GmbH (EADS) Locations 1. GDC Engineering Headquarters 2. RUAG 3. DLR Ground Traffic Connection – Expressway (300m) – Train Station (1000m) – Track Connection on-site 2 3 Distances – to Munich International Airport 55 km – to Munich downtown 20 km (train station and express way in walking distance) February 2015 1 2 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH 8 GDC Engineering Customer Base (outline) February 2015 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH 9 GDC Engineering Design Organization Approval (DOA) according EASA.21J.033 From January 2006 to September 2011, GDC Engineering took over the Design Organisation Approval EASA Part 21J for the 328 Aircraft with 328 SSG being the TC holder. The DOA of GDC Engineering offers today • employees 23 staff including CVEs (DREs) and Technical Publications which fulfils the Design Organisation Approval for all ATA chapters. • Supplemental Type Certificates (STCs) • Major and Minor Repairs • Continuous Airworthiness issues • Technical Publications February 2015 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH 10 GDC Engineering Our Service - we deliver to our customer complete engineering solutions, structures, systems, fight physics etc GDC Engineering undertakes work packages or turn-key projects in our own offices using the latest CAD and analysis tools. We provide a full service, including project management and sub-supplier coordination and monitoring. aircraft certification services As an EASA approved design and airworthiness organisation, GDC Engineering offers development and certification services ranging from individual systems to complete aircraft. supply of aerospace engineers GDC Engineering provides professional engineers and qualified technicians for all aspects of aerospace and for all development phases. design and build solutions Through our partnerships with prime aerospace manufacturing companies, GDC Engineering is able to offer design and build solutions supporting the complete product life cycle. technical publications GDC Engineering develops and provides update services for technical publications including Aircraft Flight Operation, Maintenance Planning, Maintenance Manuals, Structural Repair Manuals and Illustrated Parts Catalogues. customer services February 2015 GDC Engineering undertakes upgrades, repairs, training, concessions, STC’s, Tech Doc’s for Airlines and VVIP. © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH 11 GDC Engineering Certificates • EASA.21J.033 Design Organisation • Design changes and repairs for small aircraft CS23 • Design changes and repairs for large aircraft CS25 • Demonstration of compliance with all applicable airworthiness requirements to the authorities (EASA/FAA) • DIN EN • IAQG Oasis Membership February 2015 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH 12 GDC Engineering STC and Minor Changes Cert. Level Description Aircraft Type MSN EASA STC No. STC - Standard Fin Camera A319-100 4428 10040630 STC - Standard Belly Camera B747-8 ALL 10040680 Rev 1 STC - Standard Structural Provisions for VIP Pax Layout B767-400ER 34205 10047829 Minor Change Belly Camera Minor Change B747-8 ALL N/A STC - Standard Installation of AFIS on ATR42-500 ATR42-500 673 10047498 Minor Change Modification of Seat Covers D328 ALL N/A Minor Change New Floor Cover and Cargo Cabinets Removal D328-300 ALL N/A Minor Change Learjet 35 A interior Change Learjet 35A ALL N/A Minor Change Learjet 35 A interior Change Learjet 35A ALL N/A STC - Standard Air Astana Interior Change B757-200 ALL In work STC - Standard HCCAS Provisions A380 ALL In work Minor Change HCCAS Provisions B747-8 ALL N/A Minor Change CMC SATCOM A330-203 487 N/A STC - Standard WLAN System A330-203 487 10050272 February 2015 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH 13 GDC Engineering Structure by ATA chapter 021A Stress Analysis, Static Strength 50 Structure Interface 021B Stress Analysis, Static Strength 51 Structure General Structure Repair 021C Structural Tests, Static and Fatigue 52 Doors, Doors Structure Repair 021D Stress Analysis and Static Strength 52A Doors Mechanics 022A Fatigue Strength 52B Doors Structure 023 Bird Strike 53 Fuselage, Fuselage Structure Repair 027 Sonic Fatigue 54 Nacelles / Pylons Structure Repair 082 Levelling133 Lightning Protection direct and indirect effects and Bonding 541 Engine Support 134 Composites 543 Pylon 328-300 134A Surface Protection 55 Stabilisers, Stabilisers Structure Repair 135 Materials (non Composite) 56 Windows 542 Bridge 328-300 57 Wings, Wings Structure Repair 71 Power Plant Structure Repair 78 Exhaust Structure Repair February 2015 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH 14 GDC Engineering System by ATA chapter 024 Crash Worthiness 22 Auto Flight 36 Pneumatic 026 Cabin Decompression 23 Communication 38 Water Waste 046 Human Factors 24 Electric Power 45 047 MMEL 25 Equipment / Furnishing Central Maintenance System 11 26 Fire Detection 49 Auxiliary Power Unit 131 System Interfaces 27 Flight Controls 71 Power Plant 137 Emergency Evacuation 28 Fuel 72 Engine 136 Rotor Burst 29 Hydraulic Power 73 Engine Fuel and Control 151 EMC 30 Ice & Rain Protection 74 Ignition System 152 HIRF 31 Indicating & Recording 75 Air System 21 32 Landing Gear 77 Engine Indicating 33 Lights 76 Engine Controls 34 Navigation 78 Exhaust 35 Oxygen 79 Oil System 80 Starting 90 Electric Placards and Marking Air Conditioning February 2015 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH 15 GDC Engineering Avionics - Substantiation Approaches • GDC Engineering has gathered significant experience with different design and substantiation approaches, depending on – Customer (Aircraft/ Equipment OEM, Operator, Maintenance Organisation) – Available data (e.g. with operational documentation only, or with OEM data based on agreements with TC holder) Substantiation: e.g. CFD Analysis of 747-8 Camera Installation First installation: On-Site Conformity Inspection and Ground Test Certification: Boeing 747-8 Belly Camera – Display on Pilot‘s EFB Operation: GDC Engineering provides in Service Support for STC customers February 2015 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH 16 GDC Engineering Technical Publications - for all aircrafts and customers Entire Technical Publications Services required from an aircraft OEM: Develop and update all necessary Information in creation of Manuals or Documents for: – Aircraft Flight Operation (e.g. Airplane Flight Manual, AFM) – Maintenance Planning (e.g. Maintenance Planning Document, MPD) – Maintenance (e.g. Aircraft Maintenance Manual, AMM) – Repair (e.g. Structural Repair Manual, SRM) – Parts Identification (e.g. Illustrated Parts Catalogue, IPC) – Data Management – Approval of Manuals/ Changes to Manuals (as part of EASA 21J DOA – Administration – Distribution of Manual – Revision Service – Technical Publications as required for changes to external TCs (based on Supplemental Type Certificates, STCs) - Creation, Approval and Distribution of Manual Supplements as – Hard Copies – Electronic Data like SGML, HTML and PDF – Document Viewing System CAMSIS 3 – WEB-Format February 2015 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH 17 GDC Engineering Customer Services - History - Main activities GDC Engineering took over the Fairchild Dornier/AvCraft EASA21J033 certificate and the continuous airworthiness activities including customer support. Today's team still has that core competence and today we support , upgrades, training, STCs , Technical Publications etc. Original just for the Dornier 328 and Dornier 328Jet, but today for various aircraft including STC,s for A319, 747-800 and 767-400 VIP. GDC Engineering has a Total Quality Management System that meets worldwide recognized standards and reflects the state of the art for modern Quality Management Systems. Today’s GDC processes are based on Airworthiness Authority approvals:•EASA / LBA Design Organization approval to EASA Part 21 Subpart J •Production Organization approval to EASA Part 21 Subpart G •Maintenance Organization approval Part 145 •Approved Partner Training Organization to EASA Part 147 requirements. Additionally our company possesses a Quality Management System approval in accordance with ISO 9100 (equivalent to AS 9100) for Design, Production, Sales and Maintenance. February 2015 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH 18 GDC Engineering Customer Services - Capabilities - MRO • GDC Engineering expertise in MRO support covers the entire range of Engineering support, a Maintenance Organisation may require, e.g.: – Design and Approval o Repairs on large aircraft (part of Design Organisation‘s 21J DOA scope of approval) – Minor/Major Changes (Design and Certification) – Flight Testing under authority of an EASA 21J DOA Sample pictures of GDC Engineering repairs February 2015 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH 19 GDC Engineering Project Management - EPM System • Project Control • Budget Usage and Technical Progress • Document Management (MS SharePoint Services) • Change Control and Claim Management • Resource Management • Risk / Issues Management • Online Collaboration • Integrated Accounting – Realistic Business Planning • avoid any delays due to different time zones. February 2015 EPM – MS Project Server Navision Navision Resource = EPM Resource with costs Project X Project X EPM Resource = Available person for GCT projects Purpose: Project Availability, such as work hours, calendar and absence. EPM Resource Pool Deleted, with email notification, manuell update in SM EPM enabling seamless integration of all its engineering related activities with administration, communication, project management, and financial functions. Web based for Multi-site teams using Microsoft Project Server for Deleted With email notification Internal Resource (manual update) Temp Resource Pool Per Company (new, deleted) Navision Resource Pool Internal Resource in PayRoll Company independent resources Status Hired (not yet in EPM) + Email notification Microsoft Dynamics CRM SM Resource Skill Management SM Resource = people that have shown their interest for working at GCT. Purpose: Skills Integrated in Outlook Project X Opportunity © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH 20 GDC Engineering Comprehensive Development Infrastructure Design 2D & 3D • • • • CATIA V6 CATIA V5 CATIA V4 CADAM (CCD) Analysis Tools DMU Tools • • • • • CATIA V5 DMU Delmia CATIA V4 4D Navigator dVise Product View February 2015 PDM Tools • Enovia V6 • Smarteam • PRIMES • TAKSY • Systel • PDM Editor • • • • • • Patran / Nastran Isami Optistruct / Hypermesh Ansys MathCAD 2000 Interleaf © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH 21 GDC Engineering a System Integrator GDC Engineering – The System Integrator February 2015 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH 22 GDC Engineering Current Projects Current Projects February 2015 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH 23 GDC Engineering GDC Technics San Antonio FIRST Boeing 787 VIP February 2015 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH 24 GDC Engineering Boeing 787 - Overview • B787 Tubing and Ducting Systems for complete Aircraft with PFW. Build to Specification contract – Design, integration and build. • B787 Section 46 Door Surrounds for IAI to Alenia. Design to Speciation • B787 Horizontal Tail Plane, Section 30, leading & training edge and tip for IAI for Alenia. Design to Specification. • B787 Pax and Cargo Floor Sections 46 and 47. Supply of Manpower. • B787 Horizontal Tail Plane, Weight Saving Section 30, leading & training edge and tip for IAI for Boeing. Design to Speciation. • B787 KHI Manpower Supply for Section 43 • B787 FHI Systems integration and secondary structure for centre wing box Sections 11/45 • B787 Engineering Modifications for Boeing direct for all sections of Fuselage, with team located in Everett Final Assembly Line, GDC Engineering Mukilteo and GDC Engineering Munich. Approx 120 people. • B787 Design and Stress mods to Section 46 for Alenia located at GDC Engineering Munich. • B787 KHI Stress mods to Fuselage located at GDC Engineering Munich • Export License for sections of Boeing 787 and all commercial Boeing Aircraft February 2015 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH 25 GDC Engineering Boeing 787 - Overview – cont. Mods to Aircraft Sections for FAL Section 41, 43, 44, 46, 47, 48 Center Wing Box Section 30 Section 45 Horizontal Stabilizer Alenia Italy Section 11 KHI Japan FHI Japan Section11/45 (Integration) FHI Japan Section 46 Alenia Italy February 2015 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH 26 GDC Engineering Aerolia – Mechanical Systems Bombardier G7000 / G8000 Centre Fuselage Design and Installation of the following systems ATA 21 – ECS and LP Ducting February 2015 ATA 38 – Water and waste systems © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH ATA 24 – LRU’s 27 GDC Engineering Airbus A350XWB • A350 XWB Tubing and Ducting Systems. • A350 XWB Plateau Phase with EADS Germany for Fuselage Sections 13&14 and components of the Fuselage Sections 16&17. • A350 XWB Premium Aerotec Sections 16- 18 Side Shells and Pax Door Surrounds • A350XWB S16-18 Lower Cargo Framework. • A350XWB S16-18 Crossbeam Struts. • A350XWB S16-18 Floor Grid. • A350 XWB Aero Data for Loads Production. • A350 XWB CFD Calculations • A350 XWB Aerodynamics • A350 XWB Flap Sizing • Spice new galley system. Concept during last four ur years wi with ith A Airbus irbus and Airlines February 2015 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH 28 GDC Engineering Airbus A350-900 & 1000 - Tubes and Ducts • Marketing campaign started already in April 2007 with PFW • 2009, PFW was awarded six Tubes and Ducts packages for the A350-900&1000 • Fuselage Fuel/Inerting • Fuselage Pneumatics • Wing Fuel/Inerting • Wing Pneumatics • Wing Hydraulics • Cargo Drainage • The development program for these packages started at the e end of April 2009 A350 Wing with PFW Fuel Pipes February 2015 A350 Fuselage Section with PFW Fuel tubes and Pneumatic Ducts © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, exceptt with prior and express written permission by GDC Engineering GmbH 29 GDC Engineering Airbus A350-900 & 1000 - Tubes and Ducts – cont. • Multi-site teams – Hamburg, Toulouse and Filton • Concurrent Engineering – different disciplines, e.g. design, ME, stress, production, procurement etc. working together to ensure the most optimum design is achieved • Introducing new technologies – Wing Fuel System - Composite Tubes – Fuselage Fuel System - Injection Molded PEEK Connector – Cargo Drainage System – Heat forming of PEEK tubing February 2015 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH 30 GDC Engineering PAG - Airbus A400M - Systems WP Metallic pipes of A400M Hyraulic (ATA52) Water Waste ATA38) Bleed Air (ATA36) Hyraulic (ATA29) Fuel (ATA28) TCS (ATA21) Inerting (ATA47) design and build only build Fuel Tanker (ATA48)) Hydraulic (ATA32) Oxygen (ATA35) • Design: ATA 21, 28, 36, 38, 48, 52 February 2015 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH 31 GDC Engineering PAG - Airbus A350-900 & 1000, Sections 13/14-16/18 - Stress: F&DT • Fatigue justification for all metallic parts in Section 13/14-16/18 • According to the handbook FDT Issue 3, A350XWB • Typical Parts: – DFEMs typically used for • Z-Strut attachment (Frame side). • Shear ties • Corner Fittings – GFEM typically used for • Hybrid couplings • Metal couplings • Tool-set for F&DT analysis – – – – – – – – ISAMI version 7.2.1 or higher Detailed FE-work with HyperWorks / Patran Nastran 3D – Joint Analysis Frame Splicing Module ISAMI Spectrum Analysis (1D/2D - FUEgen) STF Tool AFI Analysis (by Hand) Lug analysis, February 2015 A350 Fuselage Section Definition of AP © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH 32 GDC Engineering PAG - A350-900 and -1000 Sections 16-18 • left & right CFRP side shells including: Skins, Frames & Stringers • Fibresim & V5 CPD February 2015 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH 33 GDC Engineering PAG - A350-900 Sections 16-18 Left & right PAX door surrounds February 2015 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH 34 GDC Engineering Air Astana: Boeing 757-200 Interior Change - STC • Interior Upgrade on Boeing 757-200 Fleet – – – – – – LOPA change Seat Integration New Inflight Entertainment New In Seat Power Supply Curtain, Carpet and Tedlar change Full On-Site Support during Production and installation – EASA STC Certification – Complete Project Management Visualization: of new Seats and appearance Cabin upgrades IFE: Integration of ZII RAVE Entertainment System February 2015 Project Management: On Site and project management support from start to finish LOPA: Integration of new Economy Class Seats and Integration of IFE and Astronics In Seat Power System © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH 35 GDC Engineering SeaWings • CVE Support for Definition and Specification for:- • ATA 290 Hydraulic System • ATA323 Hydraulic/LDG Extension-Retraction • ATA 28 Fuel System equipment. February 2015 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH 36 GDC Engineering LHT - B767VIP STC • Design of ALL attachments for Boeing 767 VIP in ALL ZONES. – Additional Seat rails – Floor and sidewall attachments – Ceiling attachments – Using Catia V5 and DMU • EASA and FAA STC for all Structural Attachments. • Supply of Attachments (3400 in total) with Form One. February 2015 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH 37 GDC Engineering LHT – B747i Cabin Attendant Seats • Additional Seatrails on a 747-8i for High Comfort Cabin Attendant Seats for a Patient Transport Compartment Airline Operations Minor Change Improved Floor Substructure February 2015 Modified Floor Panels © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH 38 GDC Engineering LHT – A380-800 STC • Additional Seatrails on a A380-800 for High Comfort Cabin Attendant Seats and additional Oxygen discharge Plug for a Patient Transport Compartment Airline Operations general STC Outboard Plug in Skin Improved Floor Substructure February 2015 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH 39 GDC Engineering LHT – B747-8i Belly Mounted Camera STC • Boeing 747-8i belly mounted camera system for use as part of a „Ground Manoeuvring Camera System” Design: e.g. Catia V5/V6 Substantiation: e.g. CFD Analysis, Stress and Fatigue Production and Installation: On-Site Conformity Inspection incl. Ground Test Certification: Flight Testing and Compliance Verification Customer Service Support: GDC Engineering provides Service Support their customers February 2015 © All rights reserved. served d Reproduction Reprod ducti tion or di dis disclosure closure l tto o tthird parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH 40 GDC Engineering LHT – A319 Fin Camera STC • Airbus A319 fin mounted camera for use in the In-Flight Entertainment System Installation: External View Documentation: AMM Extract for viewing angle adjustment Documentation: IPC extract STC for one special application February 2015 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH 41 GDC Engineering LHT – A319 Additional Water Tank STC • Airbus A319 additional 200l water tank installation Documentation: AMM Extract- Installation on existing Additional Cargo Tank (ACT) Interface Points Design: CATIA V5 3D model STC for one special application February 2015 Documentation: IPC extract © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH 42 GDC Engineering Previous Projects Previous Projects February 2015 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof of for purposes other than intended for by this th th thi hiis document, doc do d o oc cu um ment, is not permitted, except with prior and express written permission by GDC Engineering GmbH 43 GDC Engineering ATR 42-500 Flight Inspection Conversion • Integration of a Flight Inspection System on an ATR 42-500 – – – – – Special Mission Conversion Interior and exterior mods Full on-site support Extensive Ground and Flight Testing EASA STC Certification special missions Interior: LOPA change and integration of Operator Console February 2015 Exterior: Installation of 11 additional antennas Flight Deck: seamless integration of 2 additional displays, 2 pushbutton panels and relocation of basic aircraft systems Installation: On-Site support during installation Flight Test: Certification Ground and Flight Testing under GDC Engineering DOA EASA.21J.033 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH 44 GDC Engineering VIP STCs for a new Completion Centre February 2015 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH 45 GDC Engineering VIP STCs for a new Completion Centre GCT Activity prior 1st A/C Manuals Str. Cabinet Description A CTION Panel Joints (M&T, T&G, Folding) Concepts and Test Plans Floor Attachments DWG/Test Panel Splices DWG/Test Standard Access Panels DWG Ground studs Concept Edge filling SRT to issue PPS Bonding Concept/Test Inserts Concept/Test Cabinet Lighting concept improvement Concept Deco Panels attachment Concept Drawer Concept and Front Panel Concept Decompression Panels Preferred release elements - Definition Doors - concepts for Decompression As typical design Adjustable shelves - Concept As typical design Slides Slide Concepts/PN Waste Bin Concept Access Panels Concept Internal Door Locks Concept/PN Hard Point Standard Design (Boing/Airbus) Concept Tie Rods Attachment and Rods Definition Air conditioning balancing expertise Concept Temp sensor Instl Concept/PN Motor valve Standard Concept/PN Solenoid valve standard Concept/PN Water system Standard fittings Concept/PN Gray water chamber Concept/PN Water heater standard Concept/PN Vent muffler Concept/PN Typ Tape heater Concept/PN Air conditioning ducts Concept/PN Material Manual Manual Standard Part Catalog Manual Design Manual Manual - Update to be released Model and Drawing Manual Manual © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, February 2015 Standard Parts Electrical Catalog Manual except with prior and express written permission by GDC Engineering GmbH 46 GDC Engineering Airbus A380 • A380 Integration of ALL Tubes and Ducts Systems • A380 Design of Floor Structure and Integration of Systems Sections 13, 18 and 15. • A380 Interiors Furnishings, Project Managing Customer Requirements Galleys, Passenger and Cabin Attendant Seats, Trolley Lift IFE and Passenger Seat Electrical Integration • A380 PAX Interior Provisions and Electrical Brackets. Secondary Structure • A380 Technical Publication Transnational Network, AMM, TSM, TDUR, CMM, DRM, MAP, TLS • A380 Supply of Engineers • A380 FTI • A380 Change Management • A380 Wing jig Analysis • A380 Aircraft Master Surfacing & Geometry including Status 15a • A380 Slat and Flap Mechanical Systems and Flap Tracks February 2015 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH 47 GDC Engineering A380 Belly Fairing 2001-2002 2003 2003-2004 Preliminary Design Detail Design • Supply of Contractual Stress Engineers, Conceptual Designers and Detail Design Engineers using Catia Version 5 and VPM Certification • Supply of Certification Designers • Preparation of Technical Specifications in response to Airbus RFI and RFP. • Calculation of NRC and RC Costs • Project Managing Bidding Programme including Planning and QA activities • Development Design and Integration in DBT in Airbus Spain February 2015 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH 48 GDC Engineering A380 (EADS Ottobrunn) A380 – Design and Integration of all Standard System Mountings for Aluminium Crossbeams – Sections 13, 18 and 15 forward upper unit. • Responsible for full project management and control with a team ‘on-site’ in Airbus Hamburg. • Data Transfer established and managed to allow detail design and manufacturing drawing release by a team ‘off-site’. • Liaison and agreement of interfaces with the following systems: Hydraulics, Water/Waste/Vacuum, Electric/Fuel/Bleed Air, Supplementary Cooling, Air Conditioning • Involvement in all phases from joint definition, detail design through to release of manufacturing drawings and production support. • All designs agreed with the relative manufacturing partner. February 2015 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH 49 GDC Engineering A380 PAX A380 PAX Interior Provisions • Development Design Team located in CDBT at Airbus Hamburg • Development of Interior Components for different HOV • Development of Brackets and Structural provisions for: – Galley UD – Lavatory / BAR UD – Partitions / Minisiuts UD – Spacers UD – Bonding UD Monuments – Attachments for Stairs house lining FWD – Side wall Stowage February 2015 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH 50 GDC Engineering A380 – Analysis of transportation system for the wing • Combination of Wing, Jig and Trailer models • Calculation of total deflections of different combinations • Assessment of different models and design solutions February 2015 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH 51 GDC Engineering Airbus A400M • A400M Supply of Engineers • A400M Flap Tracks Structural Design • A400M Whole Aircraft Master Surfacing & Geometry • A400M Main Cargo Floor and Ramp. • A400M Cargo Loading System and Air Deployment System • A400M Inlet, Outlet and Heat Exchanger • A400M ECS NACA Inlet and Plenum • A400M OBIGGS Ram Air NACA Inlets and Outlets • A400M Technical Publication Transnational Network defining all WP for the all technical documentation of the A400M. February 2015 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH 52 GDC Engineering A400M main cargo floor, CLS and ADS A400M main Cargo Floor and Ramp • Development, Design and Stress • Compliance and certification documentation • Final release of Manufacturing drawings • Catia V5 and PRIMES February 2015 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH 53 GDC Engineering E2S A320 P2F – PAX to Freighter conversations • GDC Engineering has gained experience in PAX-Freighter-Conversions while working for Elbe Flugzeugwerke (EFW) • A320 P2F floor grids, floor panel modifications, development of a main deck cargo door frame shell including • Skin panels and doublers • Frame and frame coupling • Clips for frame skin connection • Stringer • Butt straps • Cleats • Door surrounding for cargo door • Brackets • System modifications • Stress February 2015 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH 54 GDC Engineering XAC PAX Door MA600 and MA700 Study on the MA600 door delivered successfully in September 2012 Offer MA700 all Doors design and build February 2015 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH 55 GDC Engineering Fairchild Dornier 328 JET and 728 JET VIP Interiors 328JET– Toliets Design & Mockup728JET February 2015 12 Seater 328JET VIP Cabin VIP Interiors 328JET 12 Seater 328JET VIP Cabin Airbus - SPICE © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH 56 GDC Engineering SPLICE • GDC Engineering objectives & deliverables; – Achieve next generation efficient modular cabin monument design concepts. – Make use of new advanced materials – Create mission adaptive onboard service equipment – Perform technical research and development into Modular / flexible definitions whilst achieving certification requirements. February 2015 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH 57 GDC Engineering SPLICE February 2015 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH 58 GDC Engineering A380 and RECARO Aircraft Seating A380 Interiors Business Class Business Seat 6510 (RECARO) February 2015 Economy Seat 3510 (RECARO) © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH 59 GDC Engineering Fairchild Dornier 728 JET • In-house Work package Milestones for Structure and Systems Integration • Supply of over 200 Aerospace Engineers February 2015 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH 60 GDC Engineering Fairchild Dornier 728 JET – Belly Fairing Wing Front Spar MLG Door Substructure Wing Rear Spar Fuselage Keelbeam February 2015 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH 61 GDC Engineering Fairchild Dornier 728 JET Complete Cabin Interiors Industrial Design and Full Size Mock-up for Farnborough 1998 • Development, Detail Design and Integration of the 728JET Insulation Blankets for Mexmil Inc. • Preparation of PDR and CDR documents. • Control of Concessions, Change Control and Configuration of first prototype. February 2015 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH 62 GDC Engineering ARJ 21 Controls Design of Rudder Pedals & Control Column for the ARJ21 February 2015 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH 63 GDC Engineering Fairchild Dornier 428 JET Wing Structure and Systems FD428JET Wing Prime Contractor to Fairchild Dornier and IAI Major Wing Components FEM - Pylon Pylon Spar Box “Hot” Leading Edge Wing/Fuselage Attachment Wing Tip Ground Spoiler 1 Aileron Roll Spoiler February 2015 Flap Ground Spoiler 2 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH 64 GDC Engineering Fairchild Dornier 428 JET Structures from IAI 428JET Cockpit, Fuselage& Empennage Prime Contractor to Fairchild Dornier and IAI FD 428JET & 728JET Cockpit & Cabin Layout 428JET Empennage February 2015 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH 65 GDC Engineering Aermacchi M346 Cockpit Structures and System Integration • Aermacchi M-346 Advanced Trainer Prime Contractor to Aermacchi • Flight & Engine Controls • Cabin Pressurisation • Canopy Locking & Explosives • Head-up Display • Anti-G • Emergency Landing Gear, Brake • Seat Installation & Ejection • Oxygen Supply • Hydraulics & Fuel and Park • Inflatable Seal • Electric Equipment • Consoles & Panels • Avionics • Air Distribution February 2015 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission by GDC Engineering GmbH 66 Thank you for your time! GDC Engineering Group Nigel Garner Sonderflughafen Oberpfaffenhofen Building 335 82234 Wessling Germany Phone: +49 8153 93 13 0 Fax:+49 8153 93 13 999 Email: Nigel.Garner@gdcengineering.com Web: http://www.gdcengineering.com February 2015 © All rights reserved. Reproduction or disclosure to third parties of this document or any part thereof for purposes other than intended for by this document, is not permitted, except with prior and express written permission byy GDC Engineering GmbH 67