The perfect fit.
Transcription
The perfect fit.
The perfect fit. Find out why ISG is the perfect shopfitter for your store. 2 3 Sustainable Why ISG? Read our 2020 Sustainability Vision page 11 People Consistent The right people for each shop fit page 6 Dedicated to delivering a high quality project, every time page 16 Experience Flexible Large shopping centres, bespoke joinery and store-in-store page 12 Working to tight deadlines and within challenging environments page 16 4 5 United Kingdom Birmingham Bradford Bristol Cardiff Chorley Exeter Glasgow Huntingdon Ipswich Our global reach ISG has an extensive international office network delivering fit out, construction, engineering services and a range of specialist solutions, delivered by local people and supply chains. Leeds Liverpool London Manchester Reading Whitstable Austria Belgium Czech Republic Denmark Qatar UAE Abu Dhabi Dubai South Africa Brazil Finland France Germany Holland Italy Luxembourg Spain Sweden Switzerland Russia Thailand Australia China Beijing Shanghai Hong Kong Japan Malaysia Macau Singapore South Korea 6 7 People “I have known ISG and ISG’s business for over 15 years so they weren’t new to me. For me it was a no brainer to use them.” Ray Clacher, Gieves & Hawkes We pick the best people to deliver your shop. Winner of two NAS Design Partnership Awards 2015 – “Best in Retail” & “Best British Heritage Building”. Our people are focused, consistent and dedicated to every shop fit – no matter the size or sector. Communication is key, we work closely with our customers to deliver the quality of work they expect. Named as the UK’s number one shopfitter, we combine our experience with our global reach of suppliers, and we are confident in the quality of work we deliver – every time. isgplc.com/retail 7 8 9 John Lewis, Birmingham Selfridges, Birmingham Brent Cross Shopping Centre, London “ISG went over and beyond what they needed to do. From beginning to end, they have been vital in making the store what it is today, so we are very happy. ISG has one of the best group of guys I have worked with in 15 years – I am very impressed.” Peter Bracken CEO, The Toy Store ISG joinery facility, Whitstable Watches of Switzerland, Oxford St 10 11 Sustainable ISG is committed to being a sustainable business. ISG Academy Fundraising for CARE Joinery apprenticeships 10 Our 2020 Sustainability Vision has been produced to provide ISG with an ambitious sustainability strategy for the years leading up to and including 2020. It covers a wide range of environmental, social and economic issues including our business, stakeholders, resources and communities. Open doors weekend Women in construction event University recruitment day isgplc.com/retail 13 13 12 Experience Please click on each title for specific examples of our work. Our customers include: Asda Gieves & Hawkes Hackett London Halfords Hammerson Home Retail Group House of Fraser JD Sports John Lewis Lloyds Longchamp Louis Vuitton Marks & Spencer Morrisons Nike Paul Smith Qela RBS Sainsbury’s Selfridges Tesco The Toy Store TSB Uniqlo Waitrose Watches of Switzerland ISG has been at the top of the Retail Week Shopfitter’s League table for three years in a row. ISG works with many high-profile retailers, some of which wish to remain anonymous. The above represents a sample of our customer base. isgplc.com/retail High Street Supermarkets Shopping Centres Department Stores Luxury Banking Store-in-store Aviation “ISG went over and beyond what they needed to do to make sure the job was finished on time. From beginning to end, they have been vital in making the store what it is today, so we are very happy.” Peter Bracken, The Toy Store CEO High Street *printed case studies available Our customers include: Gieves & Hawkes* Primark Hackett London* Uniqlo Halfords The Toy Store Monsoon Victoria’s Secret Post Office Watches of Switzerland The Toy Store, Oxford Street NEW ENTRANT TO UK MARKET The Toy Store The Toy Store selected ISG to deliver its very first store in the UK. The company’s headquarters, based in Dubai, will use the new Oxford Street-based flagship as a vehicle to expand into Europe. On-site building began in May, and completed in September, ready for the shop’s opening. The work included fitting the shop’s 27,000 sq ft ground and first floor with all core and non-core fixtures and fittings. The team adapted to unexpected requirements such as re-designing a sweet store written into the brief at the last minute. Adding value The ISG team used its building expertise to assist the architects in creating workable designs when the originals did not suit the space. Due to the central location of the store, the team had to overcome delivery restrictions. In line with ISG’s sustainability values, we designated a waste removal carrier which also facilitated segregation for recycling. Clear communication Collaborative planning sessions were held with sub contractors and suppliers at pre-development stages, while weekly meetings were held with central management throughout. Maintaining a transparent relationship ensured that all parties were involved in each stage of development, allowing ISG to meet the customer’s high expectations. For more case studies visit isgplc.com/highstreet Customer Toy Store Value £3.6m Programme duration 16 weeks Completion date September 2015 Start on site May 2015 Core and non-core fixtures and fittings Creating new designs with the architects Opening the store to deadline September 2015 Collaborative Flexible Sustainable approach waste disposal design planning Supermarkets Our customers include: Asda Sainsbury’s Marks & Spencer Waitrose Morrisons Tesco Sainsbury’s, Thanet Sainsbury’s Thanet ISG was awarded the 75,000 sq ft Sainsbury’s store in Thanet. This was the first Sainsbury’s scheme to trial the effectiveness of a comprehensive Building Information Modelling (BIM) process. BIM is a process involving the generation and management of digital representations of physical and functional characteristics of buildings. Adding value This project was split into two phases. Phase one was completed in 32 weeks, in time for the store’s first launch in November 2014. This included the new-build on stilts with car parking for 780 cars and provisions for petrol filling stations. This required ISG to establish a benefit from the use of BIM. ISG and Sainsbury’s worked together to identify its BIM needs going forward and the data it would require in the system. The in-depth analysis enabled ISG to tailor the programme to suit Sainsbury’s long-term. Clear communication Phase two was completed within 20 weeks. This included the demolition of the existing store and ground remediation in preparation for the further retail development. ISG overcame the challenge of finding affordable waste removal by working with authorities to establish a solution which saved the customer substantial project costs. Both phases include the new highway construction under s278 & s38 agreements. The team overcame the challenges posed by the fast-track delivery programme and project costs. Customer Sainsbury’s Stores Ltd Programme duration 52 weeks Completion date April 2015 Start on site March 2014 Phase one completed in 32 weeks Phase two completed in 20 weeks Managed cost challenges Opening the store to deadline November 2014 For more case studies visit isgplc.com/supermarkets First Reliable Efficient Sainsbury’s scheme to trial BIM fast-track delivery programme waste & contamination disposal “ISG has continuously proven their ability to be a competent and well organised principal contractor.” Keith Philpott CDMC L&M Shopping Centres Our customers include: West Quay Brent Cross Queensgate Yate Riverside Tunsgate West Quay Shopping Centre, Southampton Brent Cross In early 2013, ISG was awarded the £7.2m fit out project to deliver the West Court extension in Brent Cross Shopping Centre, London. The work was carried out during opening hours, without interruption to shoppers. Over the course of 65 weeks, this project was split into multiple tasks including the replacement of the skylight, the creation of two large shopping units (internal and external) and future proofing the construction works for later plans to deliver a ten screen cinema. Working in a live environment Before the works could begin the existing steel structure of the glass atrium had to be removed, which ISG enacted using the largest tower crane in London. The customer was also anxious not to disrupt its customers and avoid platforms that rested on the central floor space, so ISG installed and continually redesigned suspended crash decks throughout the project. The existing West Court skylight was then reconfigured at a high level, and impressed with new lighting, a smoke curtain and vent systems for a Life Safety system. Following this, ISG demolished and amalgamated five units to create one large one for a new tenant – this required a new steel work mezzanine and skylights to be installed. Finally, we built an external standalone unit for Regis hairdressers by entrance six. This formed part of the future proofing works that consisted of 30m deep, 750 sleeved piles with a 1000m concrete slab which would later facilitate a ten screen cinema. For more case studies visit isgplc.com/shoppingcentres Customer Hammersons Value £7.2m Programme duration 65 weeks Completion date November 2014 Start on site August 2013 Existing steel structure removed Skylights reconfigured and installed Regis Hairdresser unit built outside Opening the centre to deadline November 2014 Zero defects Innovative Sustainable at project completion by recycling 90% of materials suspended crash deck solution “The ISG team has approached all the challenges of fitting out the full line department store with passion, creativity and a commitment to excellence.” Jamie Strathearn Construction Programme Manager, John Lewis Partnership Property Services Department Stores Our customers include: Fenwick House of Fraser John Lewis Marks & Spencer Selfridges John Lewis, Birmingham New Street John Lewis In 2015, ISG delivered the fit out of John Lewis’ new store above Birmingham New Street – one of the Partnership’s largest stores outside of London. As part of the development of Birmingham New Street, the busiest train station outside of London, ISG fitted out four floors from a developer shell to a high specification retail environment over a fast-track programme of 33 weeks. The team began by building the raised access floor on the ground level, before adding ceramic tiles to all other floors, installing new lifts, and forming an enclosure around the escalators and atrium. To finish, advanced LED lighting and sprinkler systems were incorporated, before the final fit out finishes were delivered. Challenging logistics The project was logistically very challenging to enact, with restricted access for deliveries, and a very public location with heavy footfall near the station. However, ISG created a bespoke delivery process with an off-site holding area for materials to be kept until they were needed on site; the team also created a complex programme plan for completing the floor screed within the allotted time frame. Both John Lewis and ISG had rigorous sustainability objectives, which were adhered to throughout the project. The store was successfully opened in September 2015. For more case studies visit isgplc.com/departmentstore Customer John Lewis Value £15.5m Programme duration 33 weeks Completion date September 2015 Start on site January 2014 Built raise-access floors on level one Enclosure built around staircase & escalators Fit out finishes delivered Opening the store to deadline September 2015 Reliable Bespoke Sustainable fast-track delivery programme delivery process created minimal carbon emissions Luxury Retail Our customers include: A. Lange & Söhne Hugo Boss Armani Piaget Billionnaire Paul Smith Le Bon Marché Longchamp Louis Vuitton Tod’s Louis Vuitton, Kuala Lumpur Louis Vuitton ISG was awarded the refurbishment and expansion project of Louis Vuitton’s two-storey flagship store in Kuala Lumpur. Customer Louis Vuitton Value $1.2m Programme duration 22 weeks Completion date December 2013 Situated in the Starhill Gallery, a luxury mall based in the Bukit Bintang shopping district, this store was a key piece of the brand’s portfolio and its footprint needed to increase from 6,000 sq ft to 15,000 sq ft. Delivered in three main phases to achieve Absolute Completion, we engaged in significant coordination with the millwork contractor, Redwood, and the façade contractor, MBM, from the start. By working sequentially across the store and in coordination with the direct specialist contractors, we achieved all targeted completion dates and ensured the timely opening of the store to positive acclaim. With a street frontage of 46m and a location immediately adjacent to the Marriott Hotel’s main entrance, logistics and minimising disruption to the local area was paramount to our store delivery being deemed successful. Through close coordination, we managed to complete the store’s impressive expansion with little interruption to adjacent retail and hotel operations. The store was delivered to a supreme luxury standard, to the delight of the customer and its discerning clients. The work was started in June 2013 and the store was successfully opened in December 2013. For more case studies visit isgplc.com/luxuryretail Coordination Consistent Supreme with all contractors from the start luxury standard achieved by achieving all targeted completion dates Banking Our customers include: HSBC Nationwide Lloyds RBS TSB Williams and Glynn Banking ISG is proud to be an approved contractor for six major high street financial institutions in the UK. Our appointment to carry out award winning renovations is through frameworks and our relationships date back in excess of 15 years. Projects have varied from full office and branch fit outs, to installing ATM solutions and replacing shop fronts. Award-winning ISG provides bespoke resources and supply partners to transform our customer’s estate with a consistent brand and image. Works are often completed out of hours to avoid operational impact to the customer. Our team takes a collaborative approach by conducting meticulous planning with multiple stakeholders including security, IT, local planning and consultants. ISG’s approach ensures full preparation for the project delivery, including planning, consultation and implementation. In 2015 our team received 12 Client-People awards for outstanding behaviour, good practice and customer relations. ISG also received an RoSPA and GOLD CCS award for a branch refurbishment in Chelmsford. The awards recognised considerate construction, safety and occupational health in the workplace. Expertise Design guide standards Global engineering guide standards Responsible, accountable, consulted, informed Key Events Schedule KPI and benchmarking targets UK National coverage Rapid speed to market Promote performance targets Adding value Our offer is diverse. In addition to supporting the branches, we work in back offices and data centres providing engineering solutions and resilience support. Furthermore, our ATM solution team has a high success rate, providing skilled teams across the country. For more case studies visit isgplc.com/banking Quality Collaborative Flexible with 95% of customers satisfied approach to working approach to delivery “I just wanted to express my appreciation with the snag free handover today at Salisbury. Thanks for all your hard work.” Piers Hunter, PM of Home Retail Group Store-in-store Our customers include: Belstaff Home Retail Group Habitat Hugo Boss Hackett London Habitat, Newcastle-under-Lyme Home Retail Group ISG was awarded fit out projects for Argos stores across the UK, by parent company Home Retail Group. The projects were initiated as Home Retail Group increased its market presence by building a series of Argos concessions within existing Homebase stores. In addition to the completion of 20 Argos concessions, the ISG team was selected to fit out Habitat mini-stores simultaneously, all of which were situated within existing Homebase stores. Customer Home Retail Group Value £2.5m Programme duration 7 months Completion date March 2015 Start on site February 2015 Planning with all Homebase outlets The team completed all Argos concession builds, and finished the Habitat programme at the end of October – the last in the seven-month programme. Adding value At each location, the team worked in both a live environment and out of hours, in order to minimise the impact on customers. ISG delivered each programme within two weeks. Meticulous planning, streamlining all direct processes and close liaison with Homebase stores was central to the projects’ successes. Innovative design The new look digital Argos stores include concept browser tables and tablet terminals. Their digital concessions can now be found nationwide. Meanwhile, Habitat’s mini-stores refreshed the brand and increased its visibility in the retail market place. Fitting stores in a live environment Stores ready to open to deadline Opening the stores to deadline On-going For more case studies visit isgplc.com/storeinstore Successful Reliable Experienced delivery of 33 projects fast-track delivery programme in working in live environments 14 Hackett London, Regent St Selfridges, Birmingham 15 Lloyds, Ilford International Services Lounge, Selfridges, Oxford Street “ISG communicated exceptionally well throughout this project and delivered a world-class lounge for our customers.” Allie Stenson Project Manager, International Services Lounge, Selfridges, Oxford Street Gieves & Hawkes, Savile Row 15 16 17 Flexible “The ISG team has approached all the challenges of fitting out the full line department store with passion, creativity and a commitment to excellence.” We are flexible and consistent in all our projects. Jamie Strathearn Construction Programme Manager, John Lewis Partnership Property Services Our vast experience allows us to intelligently plan around tight deadlines and restricted environments to deliver your shop to a high standard. isgplc.com/retail 18 Hackett London, Regent Street Contact us for more information development@isgplc.com isgplc.com/retail @360RetailISG John Lewis, Birmingham