LAKELAND LINDER REGIONAL AIRPORT
Transcription
LAKELAND LINDER REGIONAL AIRPORT
LAKELAND LINDER REGIONAL AIRPORT CONSTRUCTION PLANS FOR TAXIWAY "D" EXTENSION ISSUED FOR BID LAKELAND LINDER REGIONAL AIRPORT LAKELAND CITY COMMISSION MEMBERS R. HOWARD WIGGS JUSTIN TROLLER PHILLIP WALKER BILL READ EDIE YATES DON SELVAGE JIM MALLESS MAYOR COMMISSIONER COMMISSIONER COMMISSIONER COMMISSIONER COMMISSIONER COMMISSIONER FDOT FM NO. 433638-1-94-01 CITY OF LAKELAND BID NO. 6062 AHC PROJECT NO. 14050.26 LAKELAND CITY MANAGEMENT TONY DELGADO BRAD JOHNSON CITY MANAGER INTERIM DEPUTY CITY MANAGER LAKELAND LINDER REGIONAL AIRPORT EUGENE B. CONRAD, III, C.M. AIRPORT DIRECTOR MARIANNA FERNANDINA BEACH PENSACOLA TALLAHASSEE JACKSONVILLE ST. AUGUSTINE NORTH TO TAMPA INTERSTATE 4 LEESBURG ORLANDO KISSIMMEE TAMPA ST. PETERSBURG HAINES CITY LAKELAND BARTOW PLANT CITY MELBOURNE VERO BEACH BRADENTON W. PALM BEACH FT. MYERS LAKELAND, FLORIDA 1000 LEGION PLACE, SUITE 1285 ORLANDO, FL 32801 CERTIFICATE OF AUTHORIZATION #29728 MIAMI LAKELAND 98 E EDGEWOOD DR FOUNTAIN HEIGHTS 37 MEDULLA RD 39 SMITH RYALS RD LOCATION OF PROJECT DRANE FIELD RD ARIANA ST POLK COUNTY PARKWAY CORONET MEDULA RD FT. PIERCE OKEECHOBEE 92 HARDEN BLVD OCALA TO ORLANDO AIRPORT RD ORMOND BEACH DAYTONA BEACH EWELL RD YATES RD CROSS CITY SHEPHERD RD 60 FEBRUARY, 2016 LAKELAND LINDER REGIONAL AIRPORT WILLOW OAK KEY WEST VICINITY MAP LAKELAND HIGHLANDS RD. S. COMBEE RD NORTH GAINESVILLE COUNTY LINE RD APALACHICOLA REYNOLDS RD PERRY LAKE CITY LOCATION MAP HALLAM DR LAKE MIRIAM DR 540 COLBERT RD YARBOROUGH LN PANAMA CITY CLUBHOUSE RD 540A LAKELAND LINDER REGIONAL AIRPORT 3900 DON EMERSON DRIVE SUITE 210 LAKELAND, FLORIDA 33811 SURVEY CONTROL PLAN GEOMETRY PLAN GEOMETRY PLAN TYPICAL PAVEMENT SECTION & PAVEMENT DETAILS PLAN & PROFILE PLAN & PROFILE PAVEMENT ELEVATION PLAN PAVEMENT ELEVATION PLAN DRAINAGE PLAN DRAINAGE PLAN PAVEMENT MARKING PLAN PAVEMENT MARKING PLAN PAVEMENT MARKING PLAN PAVEMENT MARKING DETAILS TAXIWAY RPM LAYOUT PLAN TAXIWAY RPM LAYOUT PLAN SODDING PLAN PCC PAVEMENT REHABILITATION PLAN JOINT SEALING DETAILS CRACK AND SPALL REPAIR DETAILS BY C01 C02 C03 C04 C05 C06 C07 C08 C09 C10 C11 C12 C13 C14 C15 C16 C17 C18 C19 C20 AIRFIELD SIGNAGE E01 E02 E03 E04 AHC DEMOLITION PLAN DEMOLITION PLAN DEMOLITION PLAN DEMOLITION NOTES DESCRIPTION CD01 CD02 CD03 CD04 DATE COVER SHEET INDEX OF DRAWINGS SUMMARY OF QUANTITIES CONTRACT LAYOUT PLAN GENERAL NOTES & SECURITY NOTES SAFETY NOTES IMAGINARY SURFACES PLAN MISCELLANEOUS DETAILS EROSION CONTROL PLAN EROSION CONTROL NOTES EROSION CONTROL DETAILS BORING & CORING LOCATION PLAN SOIL BORING PROFILES EXISTING CONDITIONS LEGEND EXISTING CONDITIONS PLAN EXISTING CONDITIONS PLAN PHASING PLAN NOTES PHASING PLAN (PHASE 1) PHASING PLAN (PHASE 2) PHASING PLAN (PHASE 3) CERTIFICATE OF AUTHORIZATION #29728 SHEET NO. DESCRIPTION 02/04/16 ISSUED FOR BID G01 G02 G03 G04 G05 G06 G07 G08 G09 G10 G11 G12 G13 G14 G15 G16 G17 G18 G19 G20 DESCRIPTION 1000 LEGION PLACE, SUITE 1285 ORLANDO, FLORIDA 32801 NO. SHEET NO. CIVIL 1 GENERAL PROJECT NAME: SIGNAGE DEMOLITION PLAN SIGNAGE DEMOLITION PLAN SIGNAGE PLAN SIGNAGE TABLE & DETAILS TAXIWAY "D" EXTENSION SHEET TITLE: INDEX OF DRAWINGS ENGINEER OF RECORD: GUNTHER B. ZURSTADT FL PE #58224 JOB NO.: 14050.26 DRAWN: DATE: FEB 2016 DESIGN: SHEET NO. CHECKED: G02 GW GZ AHC LAKELAND LINDER REGIONAL AIRPORT 3900 DON EMERSON DRIVE SUITE 210 LAKELAND, FLORIDA 33811 1000 LEGION PLACE, SUITE 1285 ORLANDO, FLORIDA 32801 AHC 02/04/16 1 ISSUED FOR BID DATE NO. DESCRIPTION BY CERTIFICATE OF AUTHORIZATION #29728 PROJECT NAME: TAXIWAY "D" EXTENSION SHEET TITLE: SUMMARY OF QUANTITIES ENGINEER OF RECORD: GUNTHER B. ZURSTADT FL PE #58224 JOB NO.: 14050.26 DRAWN: DATE: FEB 2016 DESIGN: SHEET NO. CHECKED: G03 GW GZ AHC UNSUITABLE WASTE DISPOSAL - ALL UNSUITABLE CLAYEY MATERIAL OR EXCESS LIME ROCK BASE COURSE MATERIAL (AS DETERMINED BY THE ENGINEER) EXCAVATED AND/OR REMOVED UNDER THIS PROJECT SHALL BE DISPOSED OF OFF AIRPORT PROPERTY. ALL PERMITS, LICENSES OR OTHER APPROVALS REQUIRED TO DISPOSE OF THE WASTE MATERIALS OFF AIRPORT PROPERTY SHALL BE OBTAINED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER. 4. SUITABLE MATERIALS THAT ARE HAULED TO THE MATERIAL STOCKPILE AREA SHALL BE SEGREGATED BY TYPE (I.E. CONCRETE RUBBLE SHALL BE DUMPED IN A DISTINCT AREA AND NOT MIXED WITH LIMEROCK OR OTHER SOILS THAT ARE BEING HAULED TO THE MATERIAL STOCKPILE AREA). THE CONTRACTOR AND ENGINEER SHALL JOINTLY ESTABLISH DESIGNATED AREAS FOR EACH TYPE OF MATERIAL THAT IS BEING MOVED TO THE MATERIAL STOCKPILE AREA. THE CONTRACTOR SHALL MAINTAIN NEAT AND CLEAR ACCESS PATHS TO THE STOCKPILED MATERIALS AT ALL TIMES. STOCKPILES SHALL BE PUSHED UP AND CONSOLIDATED TO MINIMIZE THE GROUND AREA THAT IS CONSUMED BY EACH MATERIAL TYPE. THE AREAS SURROUNDING THE STOCKPILES SHALL BE GRADED TO ESTABLISH POSITIVE DRAINAGE FLOW IN A MANNER THAT AVOIDS THE PONDING OF STORM WATER. 3. CONTRACTOR PERSONNEL SECURITY ORIENTATION - THE CONTRACTOR SECURITY OFFICER SHALL BE RESPONSIBLE FOR BRIEFING ALL CONTRACTOR AND SUBCONTRACTOR PERSONNEL ON THESE REQUIREMENTS AND, FROM TIME TO TIME, OTHER SECURITY PROVISIONS ADOPTED BY THE CONSTRUCTION SECURITY COMMITTEE. ALL NEW CONTRACTOR EMPLOYEES SHALL BE BRIEFED ON THESE REQUIREMENTS PRIOR TO WORKING IN THE CONSTRUCTION AREA. 4. ACCESS TO THE SITE - CONTRACTOR'S ACCESS TO THE SITE SHALL BE AS SHOWN ON THE PLANS OR AS DIRECTED BY THE ENGINEER. THE CONTRACTOR SHALL NOT PERMIT ANY UNAUTHORIZED CONSTRUCTION PERSONNEL OR TRAFFIC ON THE SITE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR TRAFFIC CONTROL TO AND FROM THE VARIOUS CONSTRUCTION AREAS ON THE SITE. THE CONTRACTOR IS RESPONSIBLE FOR THE IMMEDIATE CLEAN-UP OF ANY DEBRIS DEPOSITED ALONG THE ACCESS ROAD AS A RESULT OF HIS/HER CONSTRUCTION TRAFFIC. DIRECTIONAL SIGNING AT THE ACCESS GATE AND ALONG THE DELIVERY ROUTE TO THE STORAGE AREA OR WORK SITE SHALL BE AS DIRECTED BY THE ENGINEER. THE CONTRACTOR SHALL SPECIFICALLY PREVENT TRACKING OF TACK COAT ON FINISHED RUNWAYS, TAXIWAYS, APRONS AND ROADS. 5. MATERIALS DELIVERY TO THE SITE - ALL CONTRACTOR'S MATERIAL ORDERS FOR DELIVERY TO THE SITE WILL USE THE ACCESS POINTS AS INDICATED ON THE CONTRACT LAYOUT PLAN. THE CONTRACTOR SHALL PROVIDE ADEQUATE ROADWAY SIGNS TO DIRECT DELIVERIES. THIS WILL PRECLUDE DELIVERY TRUCKS FROM ENTERING INTO THE AIRPORT OR TAKING SHORT-CUTS THROUGH THE PERIMETER GATES AND ENTERING INTO AIRCRAFT OPERATIONS AREAS INADVERTENTLY. 5. CONTRACTOR UTILITIES - THE CONTRACTOR'S STAGING AREAS ARE SHOWN IN THESE DRAWINGS. THE CONTRACTOR SHALL MAKE PROVISIONS FOR THE USE OF UTILITIES AS SPECIFIED IN THE SPECIAL PROVISIONS. 6. 6. EXISTING FACILITIES - EXISTING FACILITIES, STRUCTURES AND UTILITIES HAVE BEEN PLOTTED FROM SURVEYS AND BEST AVAILABLE INFORMATION. LOCATIONS MUST BE CONSIDERED APPROXIMATE ONLY, VERIFICATION OF THESE ITEMS WILL BE THE RESPONSIBILITY OF THE CONTRACTOR PRIOR TO BEGINNING RELATED WORK. ANY DAMAGE TO EXISTING SERVICES SHALL BE REPAIRED IMMEDIATELY PRIOR TO PROCEEDING WITH ANY WORK. THE OWNER WILL MARK THE LOCATIONS OF EXISTING AIRFIELD CIRCUITRY IN THE FIELD PRIOR TO CONSTRUCTION. CONSTRUCTION AREA LIMITS - THE LIMITS OF CONSTRUCTION, MATERIAL STORAGE AREAS, EQUIPMENT STORAGE AREA, PARKING AREA AND OTHER AREAS DEFINED AS REQUIRED FOR THE CONTRACTOR'S EXCLUSIVE USE DURING CONSTRUCTION SHALL BE MARKED BY THE CONTRACTOR AND APPROVED BY THE ENGINEER. THE CONTRACTOR SHALL ERECT AND MAINTAIN AROUND THE PERIMETER OF THESE AREAS SUITABLE FENCING, SIGNAGE AND WARNING DEVICES VISIBLE FOR BOTH DAY/NIGHT USE TO DELINEATE THE PERIMETER OF ALL SUCH AREAS. 7. 7. EXISTING AIRFIELD LIGHTING SYSTEM - INTERRUPTION TO EXISTING AIRFIELD LIGHTING SYSTEMS, IF NECESSARY, SHALL BE LIMITED TO DAYLIGHT HOURS ONLY AND IN ACCORDANCE WITH THE SPECIAL PROVISIONS. 8. CONTRACTOR'S STAGING AREA - CONTRACTOR'S STAGING AREAS ARE SHOWN IN THESE DRAWINGS. UPON COMPLETION OF THE PROJECT, THE CONTRACTOR'S STAGING AREAS SHALL BE RESTORED TO THEIR ORIGINAL CONDITIONS. UNPAVED STAGING AREAS SHALL ALSO BE HYDRO-SEEDED AS PART OF RESTORATION. VEHICLE IDENTIFICATION - THE CONTRACTOR, THROUGH THE CONTRACTOR SECURITY OFFICER, SHALL ESTABLISH AND MAINTAIN A LIST OF CONTRACTOR AND SUB-CONTRACTOR VEHICLES AUTHORIZED TO OPERATE ON THE SITE. THE CONTRACTOR SECURITY OFFICER WILL REQUIRE EACH VEHICLE TO DISPLAY A LARGE COMPANY SIGN (WITH NOT LESS THAN 6" LETTERING) ON BOTH SIDES OF VEHICLE AND ADVISE AIRPORT OPERATIONS, AND FLAGMEN THROUGH THE ENGINEER. THE CONTRACTOR SHALL PROVIDE A CURRENT LISTING OF VEHICLES AND COMPANIES AUTHORIZED TO ENTER AND CONDUCT WORK ON THE AIRPORT. CONTRACTOR EMPLOYEE PERSONAL VEHICLES SHALL BE RESTRICTED TO THE CONTRACTOR'S STAGING AREA OR CONTRACTOR EMPLOYEE PARKING AREA AND ARE NOT ALLOWED ON THE AIRFIELD AT ANY TIME. 9. CONTRACTOR WILL HAVE ACCESS TO WATER AT FIRE HYDRANT LOCATED NEARBY TO GATE 44. COORDINATE USAGE WITH CITY OF LAKELAND UTILITY DEPARTMENT. 8. GROUND CONTROL - ALL CONTRACTOR VEHICLES THAT ARE REQUIRED TO CROSS ACTIVE RUNWAYS, TAXIWAYS AND APPROACH CLEAR ZONES SHALL DO SO UNDER THE DIRECT CONTROL OF A FLAGMAN IN RADIO CONTACT WITH THE AIRPORT GROUND CONTROLLER. THE FLAGMAN SHALL BE BADGED, TRAINED AND INSTRUCTED BY AIRPORT OPERATIONS IN THE REGULATIONS GOVERNING OPERATIONS ON THE AOA AND THE RADIO PROCEDURES AT THE AIRPORT. THE FLAGMAN SHALL REMAIN WITH HIS/HER COMPANY VEHICLE AT ALL TIMES. THE FLAGMEN AND RADIOS SHALL BE FURNISHED BY THE CONTRACTOR. IT SHALL BE UNDERSTOOD BY THE CONTRACTOR THAT AIRPORT TRAFFIC ON RUNWAYS, TAXIWAYS AND APRONS SHALL HAVE PRIORITY OVER THE CONTRACTOR'S TRAFFIC 10. CONTRACTOR SHALL SUPPLY A FLAGMAN AT THE INTERSECTION OF ACTIVE ROADWAYS AND CONSTRUCTION HAUL ROUTES (AT ALL TIMES) WHEN TRUCKS AND/OR CONTRACTOR VEHICLES ARE OPERATING IN THESE AREAS. THE CONTRACTOR SHALL ALSO PROVIDE A SWEEPER AT THESE LOCATIONS (AT ALL TIMES) WHEN TRUCKS AND/OR CONTRACTOR VEHICLES ARE OPERATING. 11. CONTRACTOR SHALL FURNISH AND INSTALL A PROJECT SIGN PRIOR TO START OF CONSTRUCTION, (SEE MISCELLANEOUS DETAILS SHEET). 12. IF REQUIRED BY THE ENGINEER, CONTRACTOR SHALL COORDINATE WORK ACTIVITIES WITH OTHER CONTRACTORS DURING THE COURSE OF THIS PROJECT. THE INTENT IS TO MINIMIZE, TO THE EXTENT POSSIBLE, WORK CONFLICTS WHICH MAY ARISE. 13. CONTRACTOR SHALL SUBMIT A MAINTENANCE OF TRAFFIC PLAN FOR APPROVAL PRIOR TO CONSTRUCTION. 14. THE CONTRACTOR SHALL CONTACT SUNSHINE STATE ONE CALL OF FLORIDA (SSOCOF) AT BY DIALING 811 AT LEAST TWO (2) FULL BUSINESS DAYS PRIOR TO DIGGING OR DISTURBING EARTH. AS NOT ALL UTILITIES PARTICIPATE IN THIS PROGRAM, THE CONTRACTOR SHALL CONTACT ALL NON-PARTICIPATING UTILITIES SEPARATELY FOR FIELD LOCATION OF THEIR FACILITIES AT LEAST TWO (2) FULL BUSINESS DAYS PRIOR TO DIGGING OR DISTURBING EARTH. 9. IDENTIFICATION - EMPLOYEES - ALL CONTRACTOR EMPLOYEES AND EMPLOYEES OF APPROVED SUBCONTRACTORS SHALL BE IDENTIFIED BY MEANS OF CONTRACTOR ISSUED IDENTIFICATION BADGES APPROVED BY THE OWNER AT ALL TIMES WHEN THEY ARE INSIDE THE AOA. THE AIRPORT ID PROGRAM IS UNDER CONSTANT REVIEW BY THE FAA AND THE AUTHORITY AND ALL CONTEMPORARY REQUIREMENTS WILL GOVERN. THE CONTRACTOR SHALL PROVIDE A SINGLE POINT CONTACT FOR ALL IDENTIFICATION AND BADGING REQUIREMENTS. THE CONTRACTOR SHALL ASSIGN THE CONTRACTOR SAFETY OFFICER DESCRIBED ABOVE AS THE SINGLE POINT CONTACT FOR ALL IDENTIFICATION AND BADGING REQUIREMENTS. 10. CONTINUING REQUIREMENTS FOR BADGING - ALL OTHER REQUIREMENTS OF THE AIRPORTS WRITTEN POLICY ON AIRPORT CONSTRUCTION IDENTIFICATION BADGING SHALL BE ADHERED TO, INCLUDING ANY APPLICABLE UPDATES OR CHANGES WHICH BECOME EFFECTIVE DURING THE COURSE OF THE PROJECT. 1000 LEGION PLACE, SUITE 1285 ORLANDO, FLORIDA 32801 CERTIFICATE OF AUTHORIZATION #29728 BY 3. CONSTRUCTION SECURITY COMMITTEE - A COMMITTEE SHALL BE ESTABLISHED CONCURRENT WITH THE LIFE OF THIS CONTRACT TO MONITOR, COORDINATE SECURITY PROVISIONS, ADOPT NEW SECURITY PROVISIONS IF REQUIRED AND REVIEW AND APPROVE ALL MATTERS OF AIRPORT SECURITY RELATING TO THIS CONTRACT. MEETINGS SHALL BE SCHEDULED BY THE ENGINEER. COMMITTEE MEMBERSHIP SHALL INCLUDE THE "CONTRACTOR SECURITY OFFICERS", ENGINEER AND AIRPORT OPERATIONS. 3900 DON EMERSON DRIVE SUITE 210 LAKELAND, FLORIDA 33811 AHC SAFETY AND SECURITY - THE CONTRACTOR SHALL CONDUCT HIS ACTIVITIES IN A SAFE AND SECURE MANNER AS SPECIFIED IN THE "CONTRACTOR'S SAFETY AND SECURITY REQUIREMENTS" STIPULATED IN THE CONTRACT SPECIAL PROVISIONS. 2. LAKELAND LINDER REGIONAL AIRPORT 15. CONTRACTOR WILL PROVIDE A DAILY LOG OF ALL EMPLOYEES WORKING ON THE PROJECT INCLUDING SUB-CONTRACTORS. THIS LOG SHALL PROVIDE THE DATE, EMPLOYEES NAME AND EMPLOYEES COMPANY FOR ALL INDIVIDUALS WORKING ON THIS PROJECT FOR THAT DAY. DESCRIPTION 2. GENERAL NOTES - THE CONTRACTOR SHALL COMPLY WITH ALL SECURITY REQUIREMENTS SPECIFIED HEREIN. THE CONTRACTOR SHALL DESIGNATE IN WRITING TO THE ENGINEER THE NAME OF HIS/HER "CONTRACTOR SECURITY OFFICER". THE CONTRACTOR SECURITY OFFICER SHALL REPRESENT THE CONTRACTOR ON THE SECURITY REQUIREMENTS OF THE CONTRACT. DATE 1. HAUL ROUTES - LOCATION OF HAUL ROUTES ON THE AIRPORT SITE SHALL BE AS SPECIFIED ON THE PLANS OR AS APPROVED BY THE ENGINEER. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE OFF-SITE HAUL ROUTES (STATE HIGHWAYS, COUNTY ROADS OR CITY STREETS) WITH THE APPROPRIATE OWNER WHO HAS JURISDICTION OVER THE AFFECTED ROUTE. ON-SITE HAUL ROUTES SHALL BE MAINTAINED BY THE CONTRACTOR AND SHALL BE RESTORED TO THEIR ORIGINAL CONDITION UPON COMPLETION OF PROJECT. THE BEFORE AND AFTER CONDITION OF ON-SITE HAUL ROUTES SHALL BE JOINTLY INSPECTED AND DETERMINED BY THE CONTRACTOR AND THE ENGINEER. FENCING, DRAINAGE, GRADING AND OTHER MISCELLANEOUS CONSTRUCTION REQUIRED TO CONSTRUCT TEMPORARY HAUL ROUTES OR ACCESS POINTS ON THE AIRPORT WILL BE THE CONTRACTOR'S RESPONSIBILITY AND SHALL BE APPROVED BY THE ENGINEER PRIOR TO THE WORK. THE COST OF HAUL ROUTES AND MAINTENANCE OF HAUL ROUTES SHALL BE CONSIDERED INCIDENTAL TO THE CONTRACT. 02/04/16 ISSUED FOR BID 1. 1 SECURITY NO. GENERAL NOTES PROJECT NAME: TAXIWAY "D" EXTENSION SHEET TITLE: GENERAL NOTES & SECURITY NOTES ENGINEER OF RECORD: 11. THE CONTRACTOR SHALL INSTALL A 3'x3' SIGN AT THE CONSTRUCTION SITE ENTRANCE GATE THAT SAYS: "THIS AREA IS A DESIGNATED CONSTRUCTION SITE AND ANYONE WHO TRESPASSES ON THIS PROPERTY COMMITS A FELONY." ADDITIONAL SIGNAGE SIMILAR TO SIGN SHOWN ON SHEET G11 MAY BE REQUIRED BY THE OWNER AND SHALL BE INSTALLED AND MAINTAINED BY THE CONTRACTOR. 12. THE CONTRACTOR MUST PROVIDE LAL OPERATIONS DEPARTMENT WITH A LIST OF ALL EMPLOYEES AND CORRESPONDING ID BADGE NUMBERS. A WEEKLY UPDATED LIST SHALL BE PROVIDED TO LAL OPERATIONS EVERY MONDAY UNTIL THE CONTRACT IS COMPLETE. 13. THE CONTRACTOR SHALL PROVIDE A GATE GUARD WHO IS BADGED AND WHO HAS A CELLULAR PHONE AT THE PROPOSED ACCESS GATES AT ALL TIMES WHILE THE GATES ARE BEING USED. GUNTHER B. ZURSTADT FL PE #58224 JOB NO.: 14050.26 DRAWN: DATE: FEB 2016 DESIGN: SHEET NO. 14. CONTRACTOR SHALL PROVIDE A 24-HOUR EMERGENCY CONTACT LIST FOR ALL SUB-CONTRACTORS THROUGHOUT CONSTRUCTION. CHECKED: G05 GW GZ AHC SAFETY NOTES 4. AIRCRAFT USE OF AREAS NEAR THE CONTRACTOR'S WORK WILL BE CONTROLLED TO MINIMIZE DISTURBANCE TO THE CONTRACTOR'S OPERATION. THE CONTRACTOR SHALL YIELD TO ALL AIRCRAFT. 5. 6. 7. THE CONTRACTOR SHALL NOT CONDUCT ANY CONSTRUCTION ACTIVITY WITHIN NAVIGATIONAL AID RESTRICTED AREAS WITHOUT PRIOR APPROVAL FROM THE LOCAL FAA AIRWAY FACILITIES SECTOR REPRESENTATIVE. NAVIGATIONAL AIDS INCLUDE INSTRUMENT LANDING SYSTEM (ILS) COMPONENTS. 19. OPEN-FLAME WELDING OR TORCH CUTTING OPERATIONS ARE PROHIBITED UNLESS ADEQUATE FIRE SAFETY PRECAUTIONS ARE PROVIDED AND THESE OPERATIONS HAVE BEEN APPROVED BY THE AIRPORT. A PERMIT IS REQUIRED FOR THESE ACTIVITIES. A PERMIT IS ALSO REQUIRED FOR INTERFERENCE OR USE OF ANY LIFE-SAFETY SYSTEM, E.G. FIRE HYDRANTS. THE CONTRACTOR SHALL NOT ALLOW HIS/HER EMPLOYEES, SUBCONTRACTORS, SUPPLIERS OR ANY PERSON OVER WHOM HE/SHE HAS CONTROL TO ENTER OR REMAIN IN ANY PART OF THE AIRPORT WHICH WOULD BE HAZARDOUS TO PERSONS OR TO AIRCRAFT OPERATIONS. 20. THE AIRPORT OPERATOR OR OTHER AUTHORIZED REPRESENTATIVE MAY ORDER THE CONTRACTOR TO SUSPEND OPERATIONS THAT ARE IN CONFLICT WITH AIRCRAFT OPERATIONS IN AREAS OF TEMPORARY CLOSURES OR IN CONDITIONS OF LOW VISIBILITY. PERSONNEL, EQUIPMENT AND MATERIALS MUST BE MOVED TO A SAFE LOCATION AND STAND BY UNTIL USE BY AIRCRAFT IS COMPLETED. 21. BEFORE BEGINNING ANY CONSTRUCTION ACTIVITY, THE CONTRACTOR SHALL, THROUGH THE AIRPORT OPERATIONS GROUP, GIVE NOTICE USING THE NOTICE TO AIRMAN (NOTAM) SYSTEM OF PROPOSED LOCATION TIME AND DATE OF COMMENCEMENT OF CONSTRUCTION AND SHALL VERIFY THAT THE APPROPRIATE NOTAM HAS BEEN ISSUED. UPON COMPLETION OF WORK AND RETURN OF ALL SUCH AREAS TO STANDARD CONDITIONS, THE CONTRACTOR MUST, THROUGH AIRPORT OPERATIONS GROUP, VERIFY THE CANCELLATION OF ALL NOTICES ISSUED VIA THE NOTAM SYSTEM. THROUGHOUT THE DURATION OF THE CONSTRUCTION PROJECT THE CONTRACTOR SHALL: A. BE AWARE OF AND UNDERSTAND THE SAFETY PROBLEMS AND HAZARDS DESCRIBED IN AC150/5370-2F,"OPERATIONAL SAFETY ON AIRPORTS DURING CONSTRUCTION". 22. OPEN TRENCHES, EXCAVATIONS AND STOCKPILED MATERIALS SHALL BE PROMINENTLY MARKED. THESE OBSTACLES SHALL BE PROMINENTLY LIGHTED DURING HOURS OF RESTRICTED VISIBILITY AND DARKNESS. VEHICLES LOCATED IN OR CROSSING AN ACTIVE MOVEMENT AREA MUST HAVE A WORKING RADIO CAPABLE OF CONTACTING GROUND CONTROL (121.4 ) OR UNICOM (122.95) AND A WORKING CELL PHONE IN CONTACT WITH AIRPORT OPERATIONS (863.834.3298) OR BE CONTROLLED BY CONSTRUCTION FLAGGERS. CONSTRUCTION PERSONNEL MAY OPERATE IN A MOVEMENT AREA WITHOUT TWO-WAY RADIO COMMUNICATION PROVIDED A NOTAM IS ISSUED CLOSING THE AREA AND THE AREA IS PROPERLY MARKED TO PREVENT INCURSIONS. DEBRIS CONTROL - DEBRIS, WASTE AND LOOSE MATERIAL SHALL NOT BE ALLOWED ON ACTIVE AIRCRAFT MOVEMENT AREAS. IF OBSERVED TO BE ON ACTIVE AIRCRAFT MOVEMENT AREAS, THE MATERIAL WILL BE REMOVED IMMEDIATELY BY THE CONTRACTOR. THE ENGINEER MAY DIRECT THAT DEBRIS PROBLEMS DURING CONSTRUCTION, NOT CORRECTED BY THE CONTRACTOR, BE CORRECTED BY OTHERS AT THE EXPENSE OF THE CONTRACTOR. ACTIVE RUNWAYS AND TAXIWAYS SHALL BE FREE OF ALL DEBRIS AT ALL TIMES. CONTRACTOR SHALL PROVIDE APPROVED PAVEMENT CLEANING EQUIPMENT AND OPERATORS TO IMMEDIATELY REMOVE ANY DEBRIS, WASTE OR LOOSE MATERIALS. 23. STOCKPILE EROSION AND DUST CONTROL - STOCKPILED MATERIAL AND OPEN EXCAVATIONS SHALL BE TREATED IN SUCH A MANNER AS TO PREVENT MOVEMENT RESULTING FROM AIRCRAFT BLAST OR WIND CONDITIONS. (SEE SPECIAL PROVISIONS FOR ADDITIONAL REQUIREMENTS). STOCKPILING OF MATERIALS SHALL NOT BE PERMITTED WITHIN 250' OF ACTIVE RUNWAY CENTERLINE OR 100' OF ACTIVE TAXIWAY EDGE OF PAVEMENT. C. EXCAVATIONS - OPEN TRENCHES OR EXCAVATIONS ARE NOT PERMITTED WITHIN THE RSA WHILE THE RUNWAY IS OPEN. IF POSSIBLE, BACKFILL TRENCHES BEFORE THE RUNWAY IS OPENED. IF THE RUNWAY MUST BE OPENED BEFORE EXCAVATIONS ARE BACKFILLED, COVER THE EXCAVATIONS APPROPRIATELY. COVERING FOR OPEN TRENCHES MUST BE DESIGNED TO ALLOW THE SAFE OPERATION OF THE HEAVIEST AIRCRAFT OPERATING ON THE RUNWAY ACROSS THE TRENCH WITHOUT DAMAGE TO THE AIRCRAFT. 24. ALL ACCIDENTS CAUSING PERSONAL INJURY OR PROPERTY DAMAGE SHALL BE REPORTED TO THE OWNER IMMEDIATELY. THE CONTRACTOR SHALL PROVIDE, AT THE SITE, SUCH EQUIPMENT AND MEDICAL FACILITIES AS ARE NECESSARY TO SUPPLY FIRST AID SERVICE TO ANYONE WHO MAY BE INJURED IN CONNECTION WITH THE PERFORMANCE OF THE WORK, WHETHER ON OR ADJACENT TO THE SITE. IN ADDITION, IF DEATH OR SERIOUS INJURIES OR SERIOUS DAMAGES ARE CAUSED, THE ACCIDENT SHALL BE REPORTED IMMEDIATELY BY CALLING 911. D. BE AWARE OF AND UNDERSTAND FAA AC 150/5210-5D, "PAINTING, MARKING AND LIGHTING OF VEHICLES USED ON AN AIRPORT". 25. ANY PERSON FOUND WITHIN ANY SECURITY RESTRICTED AREA WITHOUT PROPER IDENTIFICATION SHALL BE IN VIOLATION OF FEDERAL LAW AND THE AIRPORT RULES AND REGULATIONS. ALL SUCH PERSONS SHALL BE ESCORTED OFF THE AOA AND MAY BE CITED BY AIRPORT SECURITY. IN ADDITION, THE PERSON MAY HAVE THEIR IDENTIFICATION BADGE REVOKED. B. CONDUCT ACTIVITIES SO AS NOT TO VIOLATE ANY SAFETY STANDARDS CONTAINED IN AC 150/5370-2F, "OPERATIONAL SAFETY ON AIRPORTS DURING CONSTRUCTION" OR ANY OF THE REFERENCES THEREIN. E. BE AWARE OF AND UNDERSTAND FAA AC 150/5210-24 "AIRPORT FOREIGN OBJECT DEBRIS (FOD) MANAGEMENT". OBSTACLE-FREE ZONE (OFZ). THE AIRSPACE BELOW 150 FEET (45M) ABOVE THE ESTABLISHED AIRPORT ELEVATION AND ALONG THE RUNWAY AND EXTENDED RUNWAY CENTERLINE THAT IS REQUIRED TO BE CLEAR OF ALL OBJECTS, EXCEPT FOR FRANGIBLE VISUAL NAVAIDS THAT NEED TO BE LOCATED IN THE OFZ BECAUSE OF THEIR FUNCTION, IN ORDER TO PROVIDE CLEARANCE PROTECTION FOR AIRCRAFT LANDING OR TAKING OFF FROM THE RUNWAY AND FOR MISSED APPROACHES. PART 77 SURFACES. IMAGINARY SURFACES WITH THE PRIMARY SURFACES CENTERED ALONG THE RUNWAY CENTERLINE PLUS TRANSITIONAL SURFACES THAT LIMIT THE HEIGHTS OF OBSTRUCTIONS, INCLUDING CONSTRUCTION EQUIPMENT. TAXIWAY SAFETY AREA (TSA). A DEFINED SURFACE ALONGSIDE THE TAXIWAY PREPARED OR SUITABLE FOR REDUCING THE RISK OF DAMAGE TO AN AIRPLANE UNINTENTIONALLY DEPARTING THE TAXIWAY. THRESHOLD. THE BEGINNING OF THAT PORTION OF THE RUNWAY AVAILABLE FOR LANDING. IN SOME INSTANCES, THE LANDING THRESHOLD MAY BE DISPLACED. 8. UNLESS THE RUNWAY OR TAXIWAY IS CLOSED, CONSTRUCTION ACTIVITY SHALL BE LIMITED TO OUTSIDE OF THE RUNWAY OFZ OR THE TAXIWAY SAFETY AREA AS SHOWN ON THE CONSTRUCTION PHASING AND SAFETY PLANS. CONSTRUCTION ACTIVITY WITHIN THE RUNWAY OFZ OR TAXIWAY SAFETY AREA IS NOT PERMISSIBLE WHEN THE TAXIWAY IS OPEN TO AIRCRAFT TRAFFIC. 9. CONTRACTOR SHALL COMPLY WITH THE CONSTRUCTION SAFETY PHASING PLAN (CSPP) ASSOCIATED WITH THIS PROJECT AND ENSURE THAT CONSTRUCTION PERSONNEL ARE FAMILIAR WITH SAFETY PROCEDURES AND REGULATIONS ON THE AIRPORT. NO. C/L RUNWAY 9-27 HORIZONTAL SURFACE ELEV. (283') 150' 1 PROJECT NAME: PRIMARY SURFACE (PS) 7 1 ESTABLISHED AIRPORT ELEV= 142 7 1000' PRIMARY SURFACE SHEET TITLE: SAFETY NOTES N.T.S. 11. CONTRACTOR SHALL PROVIDE A SAFETY OFFICER/CONSTRUCTION INSPECTOR FAMILIAR WITH AIRPORT SAFETY TO MONITOR CONSTRUCTION ACTIVITIES. ENGINEER OF RECORD: TRANSITIONAL SURFACE 12. PRIOR TO WORKING INSIDE RUNWAY OFZ, THE CONTRACTOR SHALL SUBMIT A "TSA/RSA SAFETY PLAN" DEPICTING THE DETAILS OF HIS PROPOSED PROCEDURES FOR THAT PARTICULAR AREA OF WORK. WHEN ANY VEHICLE MUST TRAVEL OVER ANY PORTION OF AN AIRCRAFT MOVEMENT AREA, IT MUST BE CONTROLLED BY CONSTRUCTION FLAGGERS AS SHOWN ON PHASING PLANS AND PROPERLY IDENTIFIED. TO OPERATE IN THOSE AREAS DURING DAYLIGHT HOURS, THE VEHICLE MUST HAVE A 3' SQUARE WHITE/ORANGE CHECKERED FLAG OR ROTATING BEACON ATTACHED TO IT. ANY VEHICLE OPERATING ON THE MOVEMENT AREAS DURING HOURS OF DARKNESS OR REDUCED VISIBILITY MUST BE EQUIPPED WITH A FLASHING DOME-TYPE AMBER LIGHT. 14. IN ADDITION, VEHICLES SHALL DISPLAY IDENTIFICATION MEDIA, AS SPECIFIED IN THE AIRPORTS SECURITY PLAN. 15. EMPLOYEE PARKING SHALL BE PROVIDED AS SHOWN IN THE DRAWINGS. TAXIWAY "D" EXTENSION RUNWAY 9-27 TYPICAL SECTION FAR PART 77 IMAGINARY SURFACES 10. CONTRACTOR SHALL PROVIDE A 24/7 POINT OF CONTACT WHO WILL COORDINATE AN IMMEDIATE RESPONSE TO CORRECT ANY CONSTRUCTION RELATED ACTIVITY THAT MAY ADVERSELY AFFECT THE OPERATIONAL SAFETY OF THE AIRPORT. 13. CERTIFICATE OF AUTHORIZATION #29728 RUNWAY SAFETY AREA (RSA). A DEFINED SURFACE SURROUNDING THE RUNWAY PREPARED OR SUITABLE FOR REDUCING THE RISK OF DAMAGE TO AIRPLANES IN THE EVENT OF AN UNDERSHOOT, OVERSHOOT OR EXCURSION FROM THE RUNWAY. TRANSITIONAL SURFACE H. PROMPTLY TAKE ALL ACTIONS NECESSARY TO PREVENT OR REMEDY ANY UNSAFE OR POTENTIALLY UNSAFE CONDITIONS AS SOON AS THEY ARE DISCOVERED. 1000 LEGION PLACE, SUITE 1285 ORLANDO, FLORIDA 32801 RUNWAY PROTECTION ZONE (RPZ). AN AREA OFF THE RUNWAY END TO ENHANCE THE PROTECTION OF PEOPLE AND PROPERTY ON THE GROUND. F. BE AWARE OF AND UNDERSTAND FAA AC 150/5200-18C "AIRPORT SAFETY SELF-INSPECTION. G. INSPECT ALL CONSTRUCTION AND STORAGE AREAS AS OFTEN AS NECESSARY TO BE AWARE OF CONDITIONS. 3900 DON EMERSON DRIVE SUITE 210 LAKELAND, FLORIDA 33811 BY DURING PERFORMANCE OF THIS CONTRACT, THE AIRPORT RUNWAYS, TAXIWAYS AND AIRCRAFT PARKING APRONS SHALL REMAIN IN USE BY AIRCRAFT TO THE MAXIMUM EXTENT POSSIBLE. 18. OBJECT FREE AREA (OFA). AN AREA ON THE GROUND CENTERED ON THE RUNWAY, TAXIWAY, OR TAXILANE CENTERLINE PROVIDED TO ENHANCE SAFETY OF AIRCRAFT OPERATIONS BY HAVING THE AREA FREE OF OBJECTS EXCEPT FOR THOSE OBJECTS THAT NEED TO BE LOCATED IN THE OFA FOR AIR NAVIGATION OR AIRCRAFT GROUND MANEUVERING PURPOSES. AHC 3. ALL VEHICLE OPERATORS HAVING ACCESS TO THE MOVEMENT AREA MUST BE FAMILIAR WITH AIRPORT PROCEDURES FOR THE OPERATION OF GROUND VEHICLES AND THE CONSEQUENCES OF NONCOMPLIANCE. THE CONTRACTOR SHALL COORDINATE WITH THE AIRPORT FOR APPROPRIATE DRIVER TRAINING AND BADGING. DEFINITIONS: DESCRIPTION THE CONTRACTOR SHALL PERFORM ONSITE INSPECTIONS THROUGHOUT THE DURATION OF THE PROJECT, WITH IMMEDIATE REMEDY OF ANY DEFICIENCIES, WHETHER CAUSED BY NEGLIGENCE, OVERSIGHT OR PROJECT SCOPE CHANGE. 17. LAKELAND LINDER REGIONAL AIRPORT DATE 2. AIRPORT OPERATIONS - THE CONTRACTOR SHALL ACQUAINT HIS/HER SUPERVISORS AND EMPLOYEES WITH THE AIRPORT ACTIVITIES AND OPERATIONS THAT ARE INHERENT AT THIS AIRPORT AND SHALL CONDUCT HIS/HER CONSTRUCTION ACTIVITIES TO CONFORM TO ALL ROUTINE AND EMERGENCY AIR TRAFFIC REQUIREMENTS AND GUIDELINES ON SAFETY SPECIFIED ACCESS/EGRESS TO/FROM THE JOB SITE WILL BE AS SHOWN IN THE DRAWINGS. USE OF ANY OTHER GATE MUST BE APPROVED BY AIRPORT OPERATIONS AND AIRPORT SECURITY. THE CONTRACTOR WILL BE RESPONSIBLE FOR GUARDING ANY GATE USED FOR ACCESS IN ACCORDANCE WITH THE "AIRPORT SECURITY PLAN". 02/04/16 ISSUED FOR BID 1. 16. 1 THROUGHOUT THE CONSTRUCTION PROJECT, THE FOLLOWING SAFETY AND OPERATIONAL PRACTICES SHALL BE OBSERVED: C/L RUNWAY 5-23 HORIZONTAL SURFACE ELEV. (291') PRIMARY SURFACE (PS) 150' 1 1 7 500' PRIMARY SURFACE RUNWAY 5-23 TYPICAL SECTION FAR PART 77 IMAGINARY SURFACES N.T.S. ESTABLISHED AIRPORT ELEV= 142 7 GUNTHER B. ZURSTADT FL PE #58224 JOB NO.: 14050.26 DRAWN: DATE: FEB 2016 DESIGN: SHEET NO. CHECKED: G06 GW GZ AHC DRANE FIELD RD. LAKELAND LINDER REGIONAL AIRPORT FA AP SU PR R OA FA C C H E 400 O 350 R SA PE CH :1 34 OA PR AP :1 O 0 15 SL 3900 DON EMERSON DRIVE SUITE 210 LAKELAND, FLORIDA 33811 E AC RF SU 34 300 4 SA FA R O 250 SA R RSA OFA FACE OFA RSA OFA RSA OFA RSA OFA RSA OFA O FA SA OFA OFA RSA RSA RSA OFA RSA RSA OFA 150 APPROACH SURFACE SLOPE 34:1 KEY MAP RSA OFA OFA 34:1 APPR O ACH SUR 150 FACE PROJECT AREA DESCRIPTION SA R 5 O 12 20 0 O DATE FA R 9 9. NO. FA SA 15 0 B1 350 400 1 O 7:1 TRANSITIONAL SURFACE 300 02/04/16 ISSUED FOR BID FA SA R O FA R SA 250 O FA O 7:1 TRANSITIONAL SURFACE 200 R SA FA R SA H SUR PROAC 50:1 AP RSA FA RSA 9-27 RSA RSA O 141.6 RSA OFA 500.0' GROUP IV RSA RSA OFA 800.0' GROUP IV R/W OFA RSA OFA 1000.00' PRIMARY SURFACE RSA OFA 131.7 150 APPROACH SURFACE SLOPE 50:1 RSA OFA U 80 P 0 IV .0' R /W A 0' R S 0. 50 P IV U O RSA OFA R OFA R O BY G 150 OFA FA R SA O CERTIFICATE OF AUTHORIZATION #29728 R G 0' 0. R Y 50 M A C E I FA PR UR S 200 1000 LEGION PLACE, SUITE 1285 ORLANDO, FLORIDA 32801 AHC 7:1 TRANSITIONAL SURFACE O 23 3A FA 0 1. 14 B2 2A 3B 1 2B H 25 0 SA PROJECT NAME: AIRSIDE CENTER 0 15 30 0 R FA AP O S SL UR O FA PE C 34 E :1 AC O PR TAXIWAY "D" EXTENSION 35 0 NO OBJECT SHALL PENETRATE PART 77 IMAGINARY SURFACES (TYP) E NO OBJECT SHALL PENETRATE PART 77 IMAGINARY SURFACES (TYP) DR. SU 40 RF 0 AC SHEET TITLE: IMAGINARY SURFACES PLAN MEDULLA RD. 0 20 AIRSIDE CENTER DR. CH OA AP PR 50 :1 AIRCRAFT DRIVE ENGINEER OF RECORD: 0 1 7: RF SU LEGEND O TI SI AN TR 800' GRAPHIC SCALE IN FEET E AC L NA 400' WORK AREA BOUNDARY ACCESS / HAUL ROUTE 0 25 280 WEST PIPKIN RD. PART 77 IMAGINARY CONTOUR GUNTHER B. ZURSTADT FL PE #58224 JOB NO.: 14050.26 DRAWN: DATE: FEB 2016 DESIGN: SHEET NO. CHECKED: G07 GW GZ AHC LAKELAND LINDER REGIONAL AIRPORT LAKELAND LINDER REGIONAL AIRPORT 3900 DON EMERSON DRIVE SUITE 210 LAKELAND, FLORIDA 33811 TAXIWAY "D" EXTENSION LOW PROFILE BARRICADE NOTES: (OWNER PROVIDED) LAKELAND CITY COMMISSION MEMBERS R. HOWARD WIGGS JUSTIN TROLLER PHILLIP WALKER BILL READ EDIE YATES DON SELVAGE JIM MALLESS 1. MAXIMUM TOTAL HEIGHT OF BARRICADES SHALL NOT BE MORE THAN 18 INCHES 2. TYPICAL BARRICADE SHALL BE PLACED, ALONG THE LIMITS OF THE PHASES OF WORK, AS SHOWN IN THESE PLANS TO DELINEATE THE CONTRACTOR'S WORK AREAS AND CLOSED RUNWAYS/TAXIWAYS/TAXILANES. 3. BARRICADE SECTIONS SHALL BE ALL WHITE WITH REFLECTIVE ORANGE MEDIA AS SHOWN ON DETAIL. ALL INCIDENTAL CONNECTORS, SPACERS, SPLICE PLATES, ETC. SHALL BE PAINTED WHITE. MAYOR COMMISSIONER COMMISSIONER COMMISSIONER COMMISSIONER COMMISSIONER COMMISSIONER 1000 LEGION PLACE, SUITE 1285 ORLANDO, FLORIDA 32801 LAKELAND CITY MANAGEMENT 4. ALL BARRICADES SHALL BE CHECKED VISUALLY FOR SIGNS OF WEAR AND TEAR ON A DAILY BASIS AND SHALL BE REPAINTED WHEN DEEMED APPROPRIATE BY THE OWNER. ALL LIGHT FIXTURES SHALL BE IN GOOD WORKING ORDER AND SHALL BE CHECKED BY THE CONTRACTOR ON A DAILY BASIS BEFORE THE CONTRACTOR CEASES OPERATIONS FOR THE DAY. TONY DELGADO BRAD JOHNSON CERTIFICATE OF AUTHORIZATION #29728 CITY MANAGER INTERIM DEPUTY CITY MANAGER AIRPORT DIRECTOR EUGENE B. CONRAD III, C.M. 5. ALL BARRICADES SHALL BE MOVED AT LEAST ONCE EACH WEEK AND THE CONTRACTOR SHALL SWEEP THE ACCUMULATED DEBRIS AND REMOVE AND DISPOSE OF THE DEBRIS OFFSITE AT AN APPROVED DISPOSAL FACILITY. THE BARRICADES SHALL THEN BE REPLACED AT THE APPROPRIATE LOCATION. LAKELAND, FLORIDA POLK COUNTY 6. CAUTION LIGHTS SHALL BE RED IN COLOR AND FLASHING DURING HOURS OF DARKNESS. FDOT FM NO. XXXXXX-X-XX-XX CITY OF LAKELAND BID NO. XXXX 7. THERE WILL BE NO SEPARATE MEASUREMENT OR DIRECT PAYMENT FOR FURNISHING, MAINTAINING, RELOCATION OR REMOVAL OF THESE BARRICADES. PRICE FOR BARRICADES SHALL BE INCLUDED IN LUMP SUM BID PRICE FOR MOBILIZATION. GENERAL CONTRACTOR 1000 LEGION PLACE., SUITE 1285 ORLANDO, FL 32801 CITY OF LAKELAND FLORIDA DEPARTMENT OF TRANSPORTATION BY 9. THE CONTRACTOR MAY SUBSTITUTE AN APPROVED EQUAL LOW PROFILE BARRICADE GENERALLY CONFORMING TO THE ABOVE DETAILS AND CONFORMING TO THE SPECIFICATIONS WITH APPROVAL OF THE ENGINEER. 3 AHC PROJECT FUNDED BY: 8. ALL LOW PROFILE BARRICADES ARE TO BE PLACED AT A MAXIMUM INTERVAL OF TWENTY FIVE FEET (25') ON CENTER. PROJECT SIGN DETAIL NTS THIS SIGN SHALL BE CONSTRUCTED IN ACCORDANCE WITH FDOT INDEX 11200 - STANDARD ROADSIDE SIGN TYPE "A" BREAK-AWAY PANEL DETAILS. SEE SPECIAL PROVISION 6, SECTION III C. 2. COLOR: LEGEND- BLACK (NON-REFLECTIVE) BACKGROUND- WHITE (REFLECTORIZED) 3. AT PROJECT COMPLETION, REMOVE SIGN AND FOUNDATION AND RESTORE AREAS TO ORIGINAL CONDITION. 4. CONTRACTOR TO CONSTRUCT TWO SIGNS, PLACING ONE AT THE FRONT ENTRANCE TO THE AIRPORT AND THE SECOND AS DIRECTED BY THE ENGINEER. SANDBAG, 25 LB. MIN. ONE EACH END WHEN BARRICADE LINE CROSSES TAXIWAY/TAXILANE LOW PROFILE BARRICADE SHALL BE CENTERED ON TAXIWAY/TAXILANE CENTERLINE. NO. 0" 8'- DESCRIPTION 1. DATE 12"x12" FLAG BRIGHT ORANGE PROVIDE 12 GA. WIRE STIFFENER 8' SQUARE BARRICADE 1 RED FLASHING LIGHTS 02/04/16 ISSUED FOR BID NOTES PROJECT NAME: TAXIWAY "D" EXTENSION LOW PROFILE BARRICADE DETAIL 1 NTS ' 30 SHEET TITLE: 5' MISCELLANEOUS DETAILS 12 NOTE: ALL VEHICLES SHALL BE EQUIPPED WITH A FLAG WHILE IN THE AIR OPERATION AREA. .5 ' ENGINEER OF RECORD: 3' YELLOW, VINYL COATED WINDSCREEN MATERIAL WITH GROMMETS 3' TAXIWAY CENTERLINE 4 AVIATION ORANGE AVIATION WHITE 2 VEHICLE FLAG NOTES 1. MARKINGS SHALL CONFORM TO FAA AC 150/5340-1L. 2. CONTRACTOR SHALL PROVIDE 3 NEW TAXIWAY CLOSURE MARKERS WITH 16 - 16" x 16' WOVEN POLYPROPYLENE SANDBAGS. 3. AIRPORT SHALL RETAIN MARKERS AND SANDBAGS AT THE END OF THE PROJECT. CLOSED TAXIWAY MARKING NTS GUNTHER B. ZURSTADT FL PE #58224 JOB NO.: 14050.26 DRAWN: DATE: FEB 2016 DESIGN: SHEET NO. CHECKED: NTS G08 GW GZ AHC LAKELAND LINDER REGIONAL AIRPORT PAPI 3900 DON EMERSON DRIVE SUITE 210 LAKELAND, FLORIDA 33811 TWY "A4" TAXIWAY "A" A5" Y" IWA TAX 0 200' 400' GRAPHIC SCALE IN FEET RUNWAY 9-27 1000 LEGION PLACE, SUITE 1285 ORLANDO, FLORIDA 32801 CERTIFICATE OF AUTHORIZATION #29728 "B " PAPI TA X IW AY TYPE 2 BARRIER FOR UNPAVED DITCH TAXIWAY "D" TAXIWAY "D" BY TYPE 2 BARRIER FOR UNPAVED DITCH 5- 23 B3 TA XI W AY AY "D " NO. R U N W DATE T/ W TAXIWAY "E" PAPI DESCRIPTION SOUTHWEST APRON TYPE 2 BARRIER FOR UNPAVED DITCH 02/04/16 ISSUED FOR BID VORTAC RCO AHC TYPE III SILT FENCE 1 TAXIWAY "D1" TA AY W XI PROJECT NAME: 1" "B TAXIWAY "D" EXTENSION TAXIWAY "E" SHEET TITLE: LEGEND EROSION CONTROL PLAN ENGINEER OF RECORD: AIRSIDE CENTER DRIVE BARRIER FOR UNPAVED TAXIWAY "E1" TAXILANE "F" KEY MAP DITCHES APRON FLIGHT LINE DRIVE TYPE III SILT FENCE AIRSIDE CENTER SEE SHEET G10 FOR NOTES AND SHEET G11 FOR DETAILS. GUNTHER B. ZURSTADT FL PE #58224 JOB NO.: 14050.26 DRAWN: DATE: FEB 2016 DESIGN: SHEET NO. CHECKED: G09 GW GZ AHC LAKELAND LINDER REGIONAL AIRPORT 6. CONSTRUCTION OPERATIONS SHALL BE CARRIED OUT IN SUCH A MANNER THAT EROSION AND WATER POLLUTION SHALL BE MINIMIZED. II. CONTROLS - EROSION AND SEDIMENT CONTROLS 1. STABILIZATION PRACTICES: STABILIZATION MEASURES SUCH AS SODDING OR SEEDING OF SIDE SLOPES SHALL BE INITIATED AS SOON AS PRACTICABLE IN PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED BUT IN NO CASE SHALL THE TIME BE GREATER THAN 14 DAYS AFTER THE CONSTRUCTION ACTIVITY TEMPORARILY OR PERMANENTLY CEASES. 2. STRUCTURAL PRACTICES SHALL BE IN ACCORDANCE WITH FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION "FLORIDA STORMWATER AND SEDIMENTATION CONTROL INSPECTOR'S MANUAL", AND SHALL INCLUDE, BUT NOT BE LIMITIED TO: A. SILT FENCES B. HAY BALES C. ROCK BAGS D. SOIL TRACKING PREVENTION DEVICES AT CONSTRUCTION ENTRANCES/EXITS 3. SILT FENCE LOCATIONS: A. SILT FENCE SHALL BE USED ALONG THE LENGTH OF THE PROJECT WHERE THE EXISTING GROUND SLOPES AWAY FROM THE PROJECT LIMITS OR WHERE THERE IS POTENTIAL FOR SEDIMENT TO BE DIRECTED OFFSITE. B. STOCKPILE AREAS SHALL INCLUDE SILT FENCE AROUND THE PERIMETER. C. SILT FENCE SHALL BE USED AROUND ROADWAY INLETS (UNTIL INFRASTRUCTURE CONSTRUCTION IS COMPLETE) AND DITCH BOTTOM INLETS. 4. HAY BALE LOCATIONS: GENERALLY HAY BALES SHALL BE INSTALLED AT DITCH BOTTOM INLET LOCATIONS, AND AT DITCH BLOCKS TO AVOID DOWNSTREAM SILTATION. 5. ROCK BAG LOCATIONS: GENERALLY, ROCK BAGS SHALL BE INSTALLED FOR THE PURPOSE OF CONTROLLING SILTATION AT INLETS WHERE ONE CAN NOT DRIVE A STAKE. 6. CONSTRUCTION ENTRANCES/EXITS: SOIL TRACKING PREVENTION DEVICES (INDEX 106) SHALL BE PROVIDED FOR BOTH ON-SITE AND OFF-SITE LOCATIONS OF STOCKPILED OR EXCAVATED MATERIAL, INCLUDING POND SITES. IF IMMEDIATELY ADJACENT TO A PUBLIC ROADWAY. THE ENGINEER SHALL BE RESPONSIBLE FOR MODIFYING THE SYSTEM OR PROCEDURES AS NEEDED. THE CONTRACTOR SHALL PROVIDE TRUCK WASHING FACILITY OR OTHER APPROVED METHOD TO PREVENT DISPOSITION OF MATERIALS ONTO PUBLIC ROADS. IF A TRUCK WASHING FACILITY IS INSTALLED, WATER WILL BE PROVIDED BY CONTRACTOR AND WASTE RUNOFF FROM THIS OPERATION SHALL BE CONTAINED BY THE CONTRACTOR. 7. USE WATER MIST, TEMPORARY ENCLOSURES, AND OTHER SUITABLE METHODS TO LIMIT THE SPREAD OF DUST AND DIRT, DO NOT CREATE HAZARDOUS OR OBJECTIONABLE CONDITIONS SUCH AS FLOODING, AND POLLUTION, WHEN USING WATER. CERTIFICATE OF AUTHORIZATION #29728 3. APPLICATION OF FERTILIZERS AND PESTICIDES: FERTILIZERS AND PESTICIDES WILL BE USED ON THIS PROJECT IN ACCORDANCE WITH "FDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION", SECTIONS 570, 577, AT THE DISCRETION OF THE CONTRACTOR WITH THE COORDINATION OF THE PROJECT ENGINEER. IV. MAINTENANCE 1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTENANCE AND REPAIRS OF EROSION AND SEDIMENT CONTROL DEVICES, AND REMOVAL OF EROSION AND SEDIMENT CONTROL DEVICES WHEN NOTICE OF TERMINATION IS MAILED. BY 3. THE FOLLOWING PRACTICES WILL BE USED TO MAINTAIN EROSION AN SEDIMENT CONTROLS: GENERAL - ALL CONTROL MEASURES WILL BE MAINTAINED DAILY BY THE CONTRACTOR. ALL MEASURES WILL BE MAINTAINED IN GOOD WORKING ORDER. IF A REPAIR IS NECESSARY, IT WILL BE INITIATED WITHIN 24 HOURS OF NOTICE. 4. STRUCTURAL PRACTICES - BUILD UP SEDIMENT WILL BE REMOVED FROM SILT FENCE WHEN IT HAS REACHED ONE QUARTER OF THE HEIGHT OF THE FENCE. SODDING WILL BE INSPECTED FOR BARE SPOTS, WASHOUTS, AND HEALTHY GROWTH. HAY BALES SHALL BE REPLACED EVERY THREE (3) MONTHS OR WHEN THEY HAVE SERVED THEIR USEFULNESS SO AS NOT TO BLOCK OR IMPEDE STORM WATER FLOW OR DRAINAGE. SILT FENCES SHALL BE REPLACED EVERY TWELVE (12) MONTHS OR WHEN IT HAS SERVED ITS USEFULNESS SO AS NOT TO BLOCK OR IMPEDE STORM-WATER FLOW OR DRAINAGE. STABILIZED CONSTRUCTION ENTRANCES SHALL BE MAINTAINED TO PREVENT CLOGGING OR ROCK BEDDING WHICH MAY IMPEDE THE USEFULNESS OF THE STRUCTURE. V. INSPECTION 1. THE CONTRACTOR SHALL INSTALL AND MAINTAIN RAIN GAUGES ON THE PROJECT SITE AND RECORD WEEKLY RAINFALL IN ACCORDANCE WITH NPDES PERMIT. ALL CONTROL MEASURES WILL BE MAINTAINED DAILY BY THE CONTRACTOR. 2. ALL EROSION AND WATER POLLUTION ABATEMENT AND CONTROL MEASURES WILL BE INSPECTED DAILY BY CONTRACTOR'S PERSONNEL WHO ARE F.D.E.P. CERTIFIED STORM-WATER MANAGEMENT INSPECTORS. 3. THE CONTRACTOR SHALL COMPLETE ALL SWPPP INSPECTION REPORT FORMS REQUIRED FOR THE NPDES PERMIT. 4. THE CONTRACTOR SHALL HAVE ALL EROSION CONTROL MEASURES INSPECTED AND APPROVED BY THE INSPECTOR PRIOR TO BEGINNING ANY LAND DISTURBANCES. MINOR SEDIMENT CONTROL DEVICE LOCATION ADJUSTMENTS MAY BE MADE IN THE FIELD WITH THE APPROVAL OF THE INSPECTOR. THE CONTRACTOR SHALL ENSURE THAT ALL RUNOFF FROM DISTURBED AREAS IS DIRECTED TO THE SEDIMENT CONTROL DEVICES, AND SHALL NOT REMOVE ANY EROSION CONTROL OR SEDIMENT CONTROL MEASURE WITHOUT PRIOR PERMISSION FROM THE INSPECTOR. 5. THE INSPECTOR HAS THE OPTION OF REQUIRING ADDITIONAL SAFETY OR SEDIMENT CONTROL MEASURES IF DEEMED NECESSARY. IT IS THE CONTRACTOR'S SOLE RESPONSIBILITY TO SECURE ALL APPROVALS FROM THE INSPECTOR. VI. TRACKING AND REPORTING AHC 2. INSTALLATION, MAINTENANCE, REPAIR, AND REMOVAL REQUIRED FOR THE CONTROL AND ABATEMENT OF EROSION AND WATER POLLUTION SHALL BE INCLUDED IN THE INDIVIDUAL COSTS OF THE EROSION CONTROL DEVICES OR THE LUMP SUM COST OF THE PROJECT. DESCRIPTION 5. STORMWATER POLLUTION PREVENTION MEASURES IDENTIFIED IN THESE PLANS ARE SUGGESTIONS FOR THE CONTRACTOR FOR SUBMITTING THE NOTICE OF INTENT FOR THE NPDES CONSTRUCTION PERMIT. THE CONTRACTOR IS REQUIRED TO USE MEASURES DEEMED NECESSARY BY THE CERTIFIED STORMWATER INSPECTOR NEEDED TO COMPLY WITH THE PERMIT. 1000 LEGION PLACE, SUITE 1285 ORLANDO, FLORIDA 32801 2. OFF SITE VEHICLE TRACKING - WILL BE CONTROLLED BY THE FOLLOWING METHODS: A. LOADED HAUL TRUCKS ARE TO BE COVERED BY A TARPAULIN AT ALL TIMES. B. EXCESS DIRT ON ROAD WILL BE REMOVED DAILY. DATE 3. GENERAL NOTES: A. ALL EROSION CONTROL DEVICES FOR EACH PHASE OF WORK ARE TO BE INSTALLED PRIOR TO BEGINNING WORK ON THAT PHASE. B. INSTALL SILT FENCE WHERE LISTED IN THE CONTRACTOR'S APPROVED EROSION CONTROL PLAN FOR PERIMETER CONTROLS BEFORE THE LAND IS DISTURBED. C. PROVIDE HAY BALES WHERE LISTED IN THE CONTRACTOR'S APPROVED EROSION CONTROL PLAN FOR DITCH-BLOCKS DURING CONSTRUCTION. D. PROVIDE ROCK BAGS AT INLET OPENINGS. E. COVER OR STABILIZE DISTURBED AREAS AS SOON AS POSSIBLE. F. DO NOT DISTURB AN AREA UNTIL IT IS NECESSARY FOR CONSTRUCTION TO PROCEED. G. TIME CONSTRUCTION ACTIVITIES TO LIMIT IMPACT FROM SEASONAL CLIMATE CHANGES OR WEATHER EVENTS. H. DO NOT REMOVE PERIMETER CONTROLS UNTIL AFTER ALL UPSTREAM AREAS ARE FULLY STABILIZED AND PERMANENT GRASSING IS ESTABLISHED. 4. SITE DATA: A. SOILS ON THE SITE CONSIST MOSTLY OF POMONA FINE SANDS, CLASSIFIED AS TYPE B/D, BY THE U.S SOIL CONSERVATION SERVICE. B. LOCATED IN SECTION 5, TOWNSHIP 29, RANGE 22E 02/04/16 ISSUED FOR BID 2. SEQUENCE OF MAJOR SOLID DISTURBING ACTIVITIES. THE CONTRACTOR SHALL BE REQUIRED TO PREPARE A SITE SPECIFIC EROSION CONTROL PLAN ALONG WITH A DETAILED CONSTRUCTION SCHEDULE TO INDICATE DATES OF MAJOR GRADING ACTIVITIES AND DETERMINE SEQUENCES OF TEMPORARY AND PERMANENT SOIL DISTURBING ACTIVITIES ON ALL PORTIONS OF THE PROJECT. EROSION CONTROL PLAN SHALL BE MODIFIED BY CONTRACTOR AS NECESSARY TO ACCOMMODATE PHASING OF CONSTRUCTION. CONTRACTOR SHALL SUBMIT EROSION CONTROL PLAN TO ENGINEER OF RECORD FOR APPROVAL PRIOR TO IMPLEMENTATION. 1. WASTE DISPOSAL: A. THE CONTRACTOR WILL PROVIDE LITTER CONTROL AND COLLECTION WITHIN THE PROJECT BOUNDARIES DURING CONSTRUCTION ACTIVITIES. B. ALL FERTILIZER AND CHEMICAL CONTAINERS SHALL BE DISPOSED OF BY THE CONTRACTOR ACCORDING TO EPA'S STANDARD PRACTICES AS DETAILED BY THE MANUFACTURER. C. NO SOLID MATERIALS, INCLUDING BUILDING AND CONSTRUCTION MATERIALS, SHALL BE DISCHARGED TO WETLAND OR BURIED ON SITE. D. ALL SANITARY WASTE WILL BE COLLECTED FROM PORTABLE UNITS BY A LICENSED SANITARY WASTE MANAGEMENT CONTRACTOR AS REQUIRED BY STATE REGULATIONS. 1 1. NATURE OF CONSTRUCTION ACTIVITY: TAXIWAY D EXTENSION 3900 DON EMERSON DRIVE SUITE 210 LAKELAND, FLORIDA 33811 III. OTHER CONTROLS NO. I. SITE DESCRIPTION PROJECT NAME: TAXIWAY "D" EXTENSION SHEET TITLE: EROSION CONTROL NOTES ENGINEER OF RECORD: 1. THE CONTRACTOR SHALL SUBMIT A WEEKLY REPORT TO THE CITY DOCUMENTING THE DAILY INSPECTIONS AND MAINTENANCE OR REPAIRS TO THE SEDIMENT CONTROL DEVICES. THE CONTRACTOR SHALL MAINTAIN ALL REQUIRED REPORTS AND COMPLETE ALL SWPPP INSPECTION FORMS. 2. PREPARATION OF ALL THE CONTRACTOR'S REPORTS OF INSPECTION, MAINTENANCE AND REPAIRS REQUIRED FOR THE CONTROL AND ABATEMENT OF EROSION AND WATER POLL\UTION, SHALL BE INCLUDED IN THE INDIVIDUAL COSTS OF THE EROSION CONTROL DEVISES OR LUMP SUM CONST OF THE PROJECT. 3. THE CONTRACTOR SHALL USE THE CONSTRUCTION INSPECTION REPORT (#650-040-03), DATED 2/01, FOR DAILY INSPECTIONS. GUNTHER B. ZURSTADT FL PE #58224 JOB NO.: 14050.26 DRAWN: DATE: FEB 2016 DESIGN: SHEET NO. CHECKED: G10 GW GZ AHC 6' MAX. PRINCIPLE POST POSITION (CANTED 20° TOWARD FLOW) 20° + - 8" 15" - 18" 3' OR MORE VERTICAL OPTIONAL POST POSITIONS POST OPTIONS: WOOD 2-1/2" Ø MIN. WOOD 2"X4" OAK 1-1/2"X1-1/2" STEEL 1.33 LBS/FT. 12" MIN. LAKELAND LINDER REGIONAL AIRPORT 3900 DON EMERSON DRIVE SUITE 210 LAKELAND, FLORIDA 33811 FILTER FABRIC SILT FLOW SECTION ELEVATION FILTER FABRIC SHALL BE IN ACCORDANCE WITH FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION "FLORIDA STORMWATER AND SEDIMENTATION CONTROL INSPECTOR'S MANUAL". 1 1000 LEGION PLACE, SUITE 1285 ORLANDO, FLORIDA 32801 CERTIFICATE OF AUTHORIZATION #29728 TYPE III SILT FENCE BY WOVEN FILTER FABRIC IN ABSENCE OF ESTABLISHED GRASS (APPROX. 12' X 12'). SECURE EDGES BY ENTRENCHING AND EXTEND UNDER BAGS AND BALES. AHC NTS SAND BAGS DESCRIPTION NO. DATE PLAN LOOSE SOIL PLACED BY SHOVEL AND LIGHTLY COMPACTED ALONG THE UPSTREAM EDGE OF BALES. 02/04/16 ISSUED FOR BID LOOSE SOIL PLACED BY SHOVEL AND LIGHTLY COMPACTED ALONG THE UPSTREAM EDGE OF BALES. 1 PLAN FLOW FLOW 5' MIN. PROJECT NAME: TAXIWAY "D" EXTENSION SHEET TITLE: RAIL TYPE III SILT FENCE PROTECTION AROUND DITCH BOTTOM INLETS. POST EROSION CONTROL DETAILS TYPE III SILT FENCE 1' MIN. RECOMMENDED 5' TYP. DO NOT DEPLOY IN A MANNER THAT SILT FENCES WILL ACT AS A DAM ACROSS PERMANENT FLOWING WATERCOURSES. SILT FENCES ARE TO BE USED AT UPLAND LOCATIONS AND TURBIDITY BARRIERS USED AT PERMANENT BODIES OF WATER. ANCHOR LOWER BALES WITH 2 -2"X2"X4' STAKES PER BALE. ANCHOR TOP BALES TO LOWER BALES WITH 2 -2"X2"X4' STAKES PER BALE. 5' TYP. SILT FENCE APPLICATIONS NTS 3 ENGINEER OF RECORD: ANCHOR BALES WITH 2 -2"X2"X4' STAKES PER BALE ELEVATION TYPE II 2 1' MIN. RECOMMENDED ELEVATION TYPE I BARRIER FOR UNPAVED DITCHES NTS GUNTHER B. ZURSTADT FL PE #58224 JOB NO.: 14050.26 DRAWN: DATE: FEB 2016 DESIGN: SHEET NO. CHECKED: G11 GW GZ AHC LAKELAND LINDER REGIONAL AIRPORT RUNWAY 9-27 R U N W AY 523 3900 DON EMERSON DRIVE SUITE 210 LAKELAND, FLORIDA 33811 0 100' 200' GRAPHIC SCALE IN FEET 1000 LEGION PLACE, SUITE 1285 ORLANDO, FLORIDA 32801 CERTIFICATE OF AUTHORIZATION #29728 TAXIWAY E 44+00 44+00 43+00 43+00 46+00 46+00 45+00 45+00 TAXIWAY D B2 47+00 47+00 48+00 48+00 49+00 49+00 51+00 51+00 52+00 52+00 53+00 53+00 54+00 54+00 CBR6 55+00 55+00 B6 CBR5 B4 B3 CBR3 56+00 56+00 57+00 57+00 58+00 58+00 B7 60+00 60+00 59+00 59+00 61+00 61+00 BC1 KEY MAP BY CBR1 CBR4 B5 50+00 50+00 AHC CBR2 B1 42+00 42+00 NO. DATE DESCRIPTION D 1 IW AY 02/04/16 ISSUED FOR BID TA X PROJECT NAME: TAXIWAY "D" EXTENSION SHEET TITLE: BORING & CORING LOCATION PLAN BORE NUMBER B1 B2 B3 B4 B5 B6 B7 TW Y BORE / CORE LOCATION DATA ENGINEER OF RECORD: D NORTHING 1328118.00 1328098.56 1328074.06 1328099.57 1328125.08 1328100.59 1328076.10 EASTING 652129.15 652354.20 652579.25 652804.20 653029.14 653254.20 653479.25 CBR NUMBER CBR1 CBR2 CBR3 CBR4 CBR5 CBR6 NORTHING 1328055.51 1328130.31 1328057.92 1328137.00 1328063.79 1328132.38 EASTING 652180.51 652708.71 652882.27 653112.84 653305.35 653604.27 BORE-CORE NUMBER BC1 NORTHING 1328098.55 EASTING 653735.70 NOTE: 1. SUBCONSULTANT TO COORDINATE SCHEDULE AND ACCESS WITH THE OWNER, WHO WILL BE RESPONSIBLE FOR THE SUNSHINE ONE CALL. GUNTHER B. ZURSTADT FL PE #58224 JOB NO.: 14050.26 DRAWN: DATE: FEB 2016 DESIGN: SHEET NO. CHECKED: G12 GW GZ AHC LAKELAND LINDER REGIONAL AIRPORT 3900 DON EMERSON DRIVE SUITE 210 LAKELAND, FLORIDA 33811 1000 LEGION PLACE, SUITE 1285 ORLANDO, FLORIDA 32801 BY DESCRIPTION DATE 02/04/16 ISSUED FOR BID 1 NO. AHC CERTIFICATE OF AUTHORIZATION #29728 PROJECT NAME: TAXIWAY "D" EXTENSION SHEET TITLE: SOIL BORING PROFILES ENGINEER OF RECORD: GUNTHER B. ZURSTADT FL PE #58224 JOB NO.: 14050.26 DRAWN: DATE: FEB 2016 DESIGN: SHEET NO. CHECKED: G13 GW GZ AHC LAKELAND LINDER REGIONAL AIRPORT SURVEYOR'S NOTES: 3900 DON EMERSON DRIVE SUITE 210 LAKELAND, FLORIDA 33811 1) TOPOGRAPHIC SURVEY OF A PORTION OF TAXIWAY "D" EXTENSION AT LAKELAND LINDER AIRPORT IN SECTIONS 4 AND 5, TOWNSHIP 29 SOUTH, RANGE 23 EAST, POLK COUNTY, FLORIDA. 2) THIS IS NOT A BOUNDARY SURVEY. 3) THE STORM UTILITIES SHOWN ON THIS DRAWING ARE BASED ON INFORMATION COLLECTED AT EACH STRUCTURE. THE SURVEYOR DOES NOT CERTIFY TO THE COMPLETENESS AND INTEGRITY OF THE UTILITIES. 4) ELEVATIONS BASED ON THE UNITED STATES COAST AND GEODETIC SURVEY MONUMENT "T 117 1945", ELEVATION 136.596 FEET. NATIONAL GEODETIC VERTICAL DATUM 1929 (NGVD29). 5) COORDINATES BASED ON THE STATE OF FLORIDA STATE PLANE COORDINATE SYSTEM, NORTH AMERICAN DATUM OF 1983, ADJUSTMENT OF 2011, FLORIDA, WEST ZONE. 1000 LEGION PLACE, SUITE 1285 ORLANDO, FLORIDA 32801 BY DESCRIPTION DATE 02/04/16 ISSUED FOR BID 1 NO. AHC CERTIFICATE OF AUTHORIZATION #29728 PROJECT NAME: TAXIWAY "D" EXTENSION SHEET TITLE: EXISTING CONDITIONS LEGEND ENGINEER OF RECORD: GUNTHER B. ZURSTADT FL PE #58224 JOB NO.: 14050.26 DRAWN: DATE: FEB 2016 DESIGN: SHEET NO. CHECKED: G14 GW GZ AHC LAKELAND LINDER REGIONAL AIRPORT 0 50' 100' GRAPHIC SCALE IN FEET SEE SHEET G16 3900 DON EMERSON DRIVE SUITE 210 LAKELAND, FLORIDA 33811 1000 LEGION PLACE, SUITE 1285 ORLANDO, FLORIDA 32801 CERTIFICATE OF AUTHORIZATION #29728 BY 48+00 49+00 50+00 51+00 52+00 53+00 DATE DESCRIPTION 47+00 02/04/16 ISSUED FOR BID 46+00 45+00 1 44+00 NO. 43+00 PROJECT NAME: TAXIWAY "D" EXTENSION TA XI SHEET TITLE: W AY D MATCHLINE STA. 53+00 42+00 AHC KEY MAP EXISTING CONDITIONS PLAN ENGINEER OF RECORD: GUNTHER B. ZURSTADT FL PE #58224 JOB NO.: 14050.26 DRAWN: DATE: FEB 2016 DESIGN: SHEET NO. CHECKED: G15 GW GZ AHC LAKELAND LINDER REGIONAL AIRPORT SEE SHEET G15 TAXIWAY E 3900 DON EMERSON DRIVE SUITE 210 LAKELAND, FLORIDA 33811 0 50' 100' GRAPHIC SCALE IN FEET 1000 LEGION PLACE, SUITE 1285 ORLANDO, FLORIDA 32801 CERTIFICATE OF AUTHORIZATION #29728 BY 56+00 57+00 58+00 59+00 60+00 61+00 NO. DATE DESCRIPTION 55+00 02/04/16 ISSUED FOR BID 54+00 1 53+00 AHC KEY MAP PROJECT NAME: TAXIWAY "D" EXTENSION EXISTING CONDITIONS PLAN TAXIWAY E MATCHLINE STA. 53+00 SHEET TITLE: ENGINEER OF RECORD: GUNTHER B. ZURSTADT FL PE #58224 JOB NO.: 14050.26 DRAWN: DATE: FEB 2016 DESIGN: SHEET NO. CHECKED: G16 GW GZ AHC 7. IN THE EVENT TEMPORARY HAUL ROUTES ARE REQUIRED, THE CONTRACTOR SHALL CONSTRUCT HAUL ROUTES CAPABLE OF ADEQUATELY SUPPORTING HAULING UNITS. WHEN A HAULING ROUTE IS NO LONGER NEEDED, THE AREA (INCLUDING ALL NEW PAVEMENT DAMAGED FROM HAUL ROUTE CROSSINGS) SHALL BE RESTORED TO ITS ORIGINAL CONDITION UNLESS OTHERWISE SPECIFIED. IF TEMPORARY HAUL ROUTES CROSS THE AIRFIELD PAVEMENT, 1/2 INCH STEEL PLATES, OR APPROVED EQUAL, SHALL BE PLACED TO PROTECT AGAINST EQUIPMENT AND VEHICULAR LOADS. NO SEPARATE PAYMENT WILL BE MADE FOR THIS WORK. 8. THE INTENT OF THE PHASING PLANS IS TO MINIMIZE THE IMPACT OF CONSTRUCTION ON THE OPERATION OF THE AIRPORT. THE CONTRACTOR SHALL CONSTRUCT THE PROJECT IN CONSECUTIVE PHASES AS OUTLINED IN THE PLANS UNLESS OTHERWISE APPROVED BY THE ENGINEER AND THE AUTHORITY. 1000 LEGION PLACE, SUITE 1285 ORLANDO, FLORIDA 32801 4. ANY INCURSIONS INTO ACTIVE TAXIWAY/RUNWAYS OR OTHER AREAS MAY RESULT IN THE CONTRACTOR BEING FINED. CERTIFICATE OF AUTHORIZATION #29728 5. ALL WORK MUST BE PERFORMED ON DAYS, OR WITHIN PERIODS OF TIME, WHERE THERE ARE NO SCHEDULED COMMERCIAL FLIGHTS. 13. ELECTRICAL WORK SHALL BE SEQUENCED TO MAINTAIN THE AIRFIELD LIGHTING SYSTEM, CONTROLS AND OTHER EQUIPMENT THROUGHOUT CONSTRUCTION. TEMPORARY WIRING WILL BE REQUIRED IN ACCORDANCE WITH FAA TECHNICAL SPECIFICATION L-125. 14. DRAINAGE MODIFICATIONS SHALL BE SEQUENCED TO PROVIDE POSITIVE DRAINAGE AT ALL TIMES. 15. BEFORE ANY WORK IS STARTED ON ANY PHASE OF THIS PROJECT AND AGAIN BEFORE FINAL ACCEPTANCE, AIRPORT PERSONNEL AND THE ENGINEER SHALL MAKE AN INSPECTION OF THE EXISTING STORM SEWERS, CATCH BASINS, MANHOLES, HANDHOLES, DUCTBANKS, TAXIWAY AND RUNWAY LIGHTS WHICH ARE TO REMAIN IN SERVICE OR WHICH MAY BE AFFECTED BY THE WORK. THE CONDITION OF THE EXISTING CONDUITS, FIXTURES AND THEIR RELATED APPURTENANCES SHALL BE DETERMINED FROM FIELD OBSERVATIONS. RECORDS OF THE INSPECTION WILL BE KEPT BY THE ENGINEER. BY 6. ALL EQUIPMENT, MATERIAL AND CONSTRUCTION PERSONNEL SHALL BE KEPT BEHIND THE RUNWAY HOLDING POSITION LINES OF ACTIVE RUNWAYS AT ALL TIMES, UNLESS PROPERLY ESCORTED BY AIRPORT OPERATIONS. 12. THE CONTRACTOR SHALL PROVIDE, MAINTAIN, MOVE AND REMOVE (AS DIRECTED) CONSTRUCTION BARRICADES AND PAVEMENT MARKINGS TO DELINEATE AREAS CLOSED TO AIRCRAFT TRAFFIC. 3. CONTRACTOR TO EXERCISE EXTREME CAUTION WHEN OPERATING IN THESE AREAS TO PREVENT INTERFERENCE WITH AIRCRAFT OPERATIONS IN THE ADJACENT AREAS. AHC 5. COMPLETION OF EACH PHASE SHALL INCLUDE REMOVING TEMPORARY MARKINGS, RESTORING THE ORIGINAL MARKINGS OR, IF APPLICABLE, INSTALLING MARKINGS AS REQUIRED FOR THE FOLLOWING PHASE, RESTORATION OF ALL PAVEMENT (ASPHALT AND/OR CONCRETE), GRASS, ETC. AND REMOVAL AND PROPER DISPOSAL OF ALL DEBRIS OUTSIDE THE AIRPORT PROPERTY ALONG WITH THE WORK SHOWN IN THE PLANS AND AS DESCRIBED IN THE PROJECT MANUAL. 11. THE CONTRACTOR SHALL SUBMIT A CONSTRUCTION SCHEDULE. STRICT ADHERENCE TO THE APPROVED SCHEDULE WILL BE ENFORCED TO AVOID CONFLICTS WITH OTHER CONSTRUCTION ACTIVITIES ON THE AIRPORT AND THE ADVERSE EFFECTS THEY COULD HAVE ON AIRPORT OPERATIONS. 2. ALL WORK ACCOMPLISHED DURING PHASES SHALL COMPLY WITH THE SAFETY AND SECURITY REQUIREMENTS STIPULATED IN THESE DRAWINGS AND OTHER CONTRACT PROVISIONS. 16. ALL EXISTING FACILITIES, INSPECTED INITIALLY BY THE ABOVE MENTIONED PARTIES, SHALL BE PROTECTED, MAINTAINED, AND LEFT IN A CONDITION REASONABLY COMPARABLE TO THAT DETERMINED BY THE ORIGINAL INSPECTION. ANY CHANGES IN THE CONDITION RESULTING FROM THE CONTRACTOR'S OPERATIONS SHALL BE CORRECTED BY THE CONTRACTOR AT HIS EXPENSE TO THE SATISFACTION OF THE ENGINEER AND AIRPORT PERSONNEL. DESCRIPTION 4. CONTRACTOR SHALL REMOVE ALL EQUIPMENT FROM SAFETY AND OBJECT FREE AREAS DURING HOURS OF AIRCRAFT OPERATIONS. 10. PRIOR TO REOPENING AN AIRCRAFT MOVEMENT AREA, THE ADJACENT PAVEMENT EDGES MUST MEET FAA CRITERIA. FAA CRITERIA REQUIRES THAT THERE BE NO OPEN EXCAVATIONS OR TRENCHES, THE MAXIMUM DROP-OFF BE 3 INCHES, AND ALL GRADES IN ANY DIRECTION BE LESS THAN 5 PERCENT. TEMPORARY WEDGING OF SOIL BASE COURSE OR BITUMINOUS CONCRETE MAY BE REQUIRED TO MEET CRITERIA. DATE 3. CONTRACTOR SHALL RELOCATE AND RESTORE AFTER COMPLETION OF CONSTRUCTION, ANY TAXIWAY LIGHTS, EDGE MARKERS, OR GUIDANCE SIGNS THAT MAY EXIST WITHIN THE CONSTRUCTION AREA. IF REMOVED OR RELOCATED, CONTRACTOR SHALL PROVIDE ''JUMPER CABLES'' TO KEEP ELECTRICAL CIRCUITS IN OPERATION. JUMPERS IN TAXIWAYS OR VEHICLE TRAVEL LANES SHALL BE PLACED IN CONDUIT AND COVERED WITH SANDBAGS. 3900 DON EMERSON DRIVE SUITE 210 LAKELAND, FLORIDA 33811 1. THESE PHASING PLANS ARE NOT INTENDED TO BE ALL ENCOMPASSING. CONTRACTOR SHALL SUBMIT HIS OWN WORK PHASING PLAN TO THE ENGINEER FOR REVIEW AND APPROVAL PRIOR TO COMMENCING CONSTRUCTION. 02/04/16 ISSUED FOR BID 2. AFTER COMPLETION OF WORK, THE CONTRACTOR SHALL RE-STRIPE ALL/ANY EXISTING AIRFIELD PAVEMENT MARKINGS WHICH MAY HAVE BEEN AFFECTED BY CONSTRUCTION, AT NO ADDITIONAL COST TO THE OWNER. GENERAL NOTES 1 1. ALL PHASES SHALL REMAIN SEPARATE AND INDEPENDENT. 9. IF REQUIRED, THE CONTRACTOR SHALL PROVIDE PORTABLE FLOOD LIGHTING FOR NIGHTTIME CONSTRUCTION. SUFFICIENT UNITS SHALL BE PROVIDED SO THAT WORK AREAS ARE ILLUMINATED TO A LEVEL OF FIVE HORIZONTAL FOOT CANDLES. THE LIGHTING LEVELS SHALL BE CALCULATED AND MEASURED IN ACCORDANCE WITH THE CURRENT STANDARDS OF THE ILLUMINATION ENGINEERING SOCIETY. LIGHTS SHALL BE POSITIONED SO AS NOT TO INTERFERE WITH AIRPORT OPERATIONS. NO. OVERALL PHASING NOTES: LAKELAND LINDER REGIONAL AIRPORT PROJECT NAME: TAXIWAY "D" EXTENSION SHEET TITLE: PHASING PLAN NOTES ENGINEER OF RECORD: GUNTHER B. ZURSTADT FL PE #58224 JOB NO.: 14050.26 DRAWN: DATE: FEB 2016 DESIGN: SHEET NO. CHECKED: G17 GW GZ AHC PROCUREMENT PHASE OPERATIONAL CONSTRAINTS 1. SUBMIT AND SEEK APPROVALS ON SHOP DRAWINGS. 1. TAXIWAY D IS CLOSED BETWEEN EASTERLY RUNWAY 5-23 SAFETY AREA AND TAXIWAY E. 2. ALL NOTAMS TO BE ISSUED AND COORDINATED BY AIRPORT REPRESENTATIVES. 2. ORDER ALL LONG LEAD TIME ITEMS. 2. ALL OTHER RUNWAYS AND TAXIWAYS TO REMAIN OPEN. 3. AIRPORT TO LOCATE ANY UNDERGROUND ELECTRICAL LINES WITHIN WORK AREAS PRIOR TO THE START OF A CONSTRUCTION. TAXIWAY CONSTRUCTION ITEMS: NONE, ALL RUNWAYS AND TAXIWAYS ARE OPEN UNTIL PHASE 1 BEGINS. CERTAIN ITEMS OF WORK COULD START WITHIN THE 30-DAY PROCUREMENT PHASE. THE AIRPORT OWNER AND ENGINEER WILL CONSIDER DEVIATIONS, PROVIDED THEY DO NOT COMPROMISE SAFETY AND PROVIDED A THEY ARE NOT TAXIWAY DETRIMENTAL TO THE CONSTRUCTION SCHEDULE OR BUDGET. SEE OPERATIONAL CONSTRAINTS FOR EACH PHASE. RSA RSA RSA RSA 0 150' 300' A5 GRAPHIC SCALE IN FEET RSA RSA RSA RSA 1000 LEGION PLACE, SUITE 1285 ORLANDO, FLORIDA 32801 CERTIFICATE OF AUTHORIZATION #29728 RSA RSA RSA RSA NOTE: ALL CONSTRUCTION VEHICLES MUST ACCESS SITE FROM EAST ENTRANCE IN PHASE 1. BY KEY MAP R SA R SA 7 9-2 RSA RSA 500' RUNWAY 9-27 RSA 3900 DON EMERSON DRIVE SUITE 210 LAKELAND, FLORIDA 33811 AHC Y IWA TAX RSA RSA RSA RSA RSA RSA LAKELAND LINDER REGIONAL AIRPORT RWY 9-27 SAFETY AREA 2. DURATION: 42 DAYS (ESTIMATE CALENDAR DAYS 1 - 42) 1. CONTRACTOR SHALL DEMONSTRATE THE ABILITY TO ACCESS THE CONSTRUCTION SITE WHILE MAINTAINING AIRFIELD SECURITY DURING ALL PHASES OF CONSTRUCTION. R SA 1. NOTES (PHASES 1-3): PHASE 1 OPERATIONAL CONSTRAINTS PROCUREMENT PHASE WORK TO BE ACCOMPLISHED TSA TSA TSA AY NO. PROJECT NAME: TAXIWAY "D" EXTENSION 23 5- TA SHEET TITLE: XI W D PHASING PLAN PHASE 1 LEGEND R SA PHASE 1 WORK TO BE ACCOMPLISHED AY COORDINATE "NOTICE TO AIRMEN" (NOTAM) INFORMATION WITH AIRPORT STAFF THROUGH THE RESIDENT PROJECT REPRESENTATIVE. 2. COORDINATE "WORK BY OTHERS" AS REQUIRED. 3. CLOSE PORTIONS OF TAXIWAY D, AND OTHER PAVEMENTS AS SHOWN. 4. PLACE PHASE 1 BARRICADES AND CLOSURE MARKERS AS SHOWN. 5. REMOVE TAXIWAY D FULL DEPTH THICKNESS ASPHALT AND BASE. STOCKPILE MILLINGS ON AIRPORT PROPERTY AS DIRECTED BY THE ENGINEER. STRIP GROUND PER DEMOLITION DRAWING LIMITS. 6. REMOVE EXISTING DRAINAGE STRUCTURE, AND INSTALL NEW DRAINAGE FEATURES. LOW PROFILE BARRICADE ENGINEER OF RECORD: TAXIWAY CLOSURE MARKER PHASE WORK AREA SA 1. R R SA U R W N TAXIWAY E R SA ' SA 23 EA 5- R Y A W Y R ET F SA 50 0 R TA XI W AY B DATE DESCRIPTION STA. 58+54± TAXIWAY D1 R SA TSA PHASE 1 02/04/16 ISSUED FOR BID R SA TAXIWAY D 1 TSA TSA TAXIWAY E 7. CONSTRUCT EARTHWORK AND LIMEROCK FOR PHASE 1 TAXIWAY SECTION. 8. GRADE AND SOD PHASE 1 AREA PER PLANS. 9. CLEAN PHASE 1 WORK AREA. LEAVE PHASE 1 BARRICADES IN PLACE FOR PHASE 2 USE. TAXIWAY E GUNTHER B. ZURSTADT FL PE #58224 JOB NO.: 14050.26 DRAWN: DATE: FEB 2016 DESIGN: SHEET NO. CHECKED: G18 GW GZ AHC 4. 5. 1. TAXIWAY D IS CLOSED BETWEEN EASTERLY RUNWAY 5-23 SAFETY AREA AND TAXIWAY E. TAXIWAY CLOSURE MARKER PHASE 2 BARRICADES AND CLOSURE MARKERS IN PLACE FROM PHASE 1 AS SHOWN. 2. TAXIWAY E IS CLOSED BETWEEN RUNWAY 27 SAFETY AREA AND THE SOUTH FUEL FARM APRON. PHASE WORK AREA REMOVE PORTIONS OF TAXIWAY E PAVEMENT AND STRIP GROUND PER DEMOLITION DRAWING LIMITS. 3. ALL OTHER RUNWAYS AND TAXIWAYS TO REMAIN OPEN. TAXIWAY A 6. CONSTRUCT EARTHWORK AND LIMEROCK FOR PHASE 2 TAXIWAY SECTION. 7. GRADE AND SOD PHASE 2 AREA PER PLANS. 8. CLEAN PHASE 2 WORK AREA. LEAVE IWAPHASE 2 BARRICADES IN PLACE FOR TAX PHASE 3 USE RSA RSA RSA RSA 0 RSA RSA RSA RSA RSA RSA RSA KEY MAP NOTE: ALL CONSTRUCTION VEHICLES MUST ACCESS SITE FROM EAST ENTRANCE IN PHASE 2. SA R SA R PHASE 2 TSA R SA STA. 58+54± R SA TSA R SA ' AY NO. PROJECT NAME: TAXIWAY "D" EXTENSION 23 5- SHEET TITLE: PHASING PLAN PHASE 2 R R SA SA U R W N TAXIWAY E 23 EA 5- R Y A W Y R ET F SA 50 0 R SA TA XI W AY B DATE TAXIWAY D1 1000 LEGION PLACE, SUITE 1285 ORLANDO, FLORIDA 32801 CERTIFICATE OF AUTHORIZATION #29728 TAXIWAY D TSA 300' TSA TSA TSA RSA 500' RUNWAY 9-27 7 9-2 RSA RSA 150' GRAPHIC SCALE IN FEET REMOVE PAVEMENT MARKINGS AND RESTORE CONCRETE AT TAXIWAY E AND EXISTING TAXIWAY D INTERSECTION. RSA RSA A5 RWY 9-27 SAFETY AREA 9. Y TAXIWAY A RSA RSA RSA RSA RSA 3900 DON EMERSON DRIVE SUITE 210 LAKELAND, FLORIDA 33811 BY CLOSE PORTIONS OF TAXIWAYS D AND E. AHC 3. LOW PROFILE BARRICADE DURATION: 7 DAYS (ESTIMATE CALENDAR DAYS 43 - 50) DESCRIPTION COORDINATE "WORK BY OTHERS" AS REQUIRED. LAKELAND LINDER REGIONAL AIRPORT LEGEND 02/04/16 ISSUED FOR BID 2. PHASE 2 OPERATIONAL CONSTRAINTS 1 COORDINATE "NOTICE TO AIRMEN" (NOTAM) INFORMATION WITH AIRPORT STAFF THROUGH THE RESIDENT PROJECT REPRESENTATIVE. R SA PHASE 2 WORK TO BE ACCOMPLISHED 1. R SA ENGINEER OF RECORD: TAXIWAY E TAXIWAY E PHASE 2 GUNTHER B. ZURSTADT FL PE #58224 JOB NO.: 14050.26 DRAWN: DATE: FEB 2016 DESIGN: SHEET NO. CHECKED: G19 GW GZ AHC PHASE 3 OPERATIONAL CONSTRAINTS COORDINATE "NOTICE TO AIRMEN" (NOTAM) INFORMATION WITH AIRPORT STAFF THROUGH THE RESIDENT PROJECT REPRESENTATIVE. LOW PROFILE BARRICADE DURATION: 5 DAYS (ESTIMATE CALENDAR DAYS 51-55 - WEEKDAY ONLY) CLOSE PORTIONS OF TAXIWAY D AND TAXIWAY E. 4. PLACE PHASE 3 BARRICADES AND CLOSURE MARKERS AS SHOWN. A TAXIWAY 5. CONSTRUCT ASPHALT SURFACE COURSE. 6. ALLOW FOR PAVEMENT CURE. CLEAN PAVEMENT AND APPLY TEMPORARY PAVEMENT MARKINGS AND RPM'S IN PHASE 3 AREA. 7. INSTALL / RELOCATE SIGNS. 8. I GRADE PHASE 3 AREA NOT GRADED TAX IN PRIOR PHASES PER PLANS. 9. SOD REQUIRED PHASE 3 AREAS. TAXIWAY CLOSURE MARKER 2. TAXIWAY E IS CLOSED BETWEEN RUNWAY 27 SAFETY AREA AND THE SOUTH FUEL FARM APRON. 3. ALL OTHER RUNWAYS AND TAXIWAYS TO REMAIN OPEN. 3900 DON EMERSON DRIVE SUITE 210 LAKELAND, FLORIDA 33811 TAXIWAY A RSA RSA RSA 0 RUNWAY 9-27 11. REMOVE PHASE 3 BARRICADES AND CLOSURE MARKERS. RSA SA R SA R RSA RSA CERTIFICATE OF AUTHORIZATION #29728 RSA RSA RSA RSA KEY MAP NOTE: ALL CONSTRUCTION VEHICLES MUST ACCESS SITE FROM EAST ENTRANCE IN PHASE 3. R SA TAXIWAY D TSA PHASE 3 TSA AY NO. PROJECT NAME: TAXIWAY "D" EXTENSION 23 5- SHEET TITLE: PHASING PLAN PHASE 3 R R SA SA U R W N TAXIWAY E R SA ' SA 23 EA 5- R Y A W Y R ET F SA 50 0 R TA XI W AY B DATE DESCRIPTION TAXIWAY D1 R SA TSA 1000 LEGION PLACE, SUITE 1285 ORLANDO, FLORIDA 32801 TSA TSA TSA 300' BY RSA 7 9-2 RSA RSA 150' GRAPHIC SCALE IN FEET 10. CLEAN HAUL ROUTES AND PHASE 3 WORK AREA. RSA RSA RSA RSA RSA A5 500' Y WA TAXIWAY D IS CLOSED BETWEEN EASTERLY RUNWAY 5-23 SAFETY AREA AND TAXIWAY E. PHASE WORK AREA RSA RSA 1. AHC 3. 02/04/16 ISSUED FOR BID COORDINATE "WORK BY OTHERS" AS REQUIRED. 1 2. RSA LAKELAND LINDER REGIONAL AIRPORT RWY 9-27 SAFETY AREA 1. LEGEND R SA PHASE 3 WORK TO BE ACCOMPLISHED R SA ENGINEER OF RECORD: TAXIWAY E TAXIWAY E GUNTHER B. ZURSTADT FL PE #58224 JOB NO.: 14050.26 DRAWN: DATE: FEB 2016 DESIGN: SHEET NO. CHECKED: G20 GW GZ AHC LAKELAND LINDER REGIONAL AIRPORT LEGEND 3900 DON EMERSON DRIVE SUITE 210 LAKELAND, FLORIDA 33811 STRIPPING LIMITS VARIABLE DEPTH ASPHALT MILLING (1.5" TO 4") CALL 48 HOURS BEFORE YOU DIG IT'S THE LAW! DIAL 811 0 FULL DEPTH PAVEMENT REMOVAL (ASPHALT & BASE, DEPTH VARIES, SEE GEOTECHNICAL REPORT) Know what's below. Callbefore you dig. X SUNSHINE STATE ONE CALL OF FLORIDA, INC. 50' SEE SHEET CD02 FULL DEPTH PAVEMENT (MIX IN PLACE) REMOVAL (ASPHALT & BASE, DEPTH VARIES, SEE GEOTECHNICAL REPORT) 100' GRAPHIC SCALE IN FEET MISCELLANEOUS ITEM TO BE REMOVED 1000 LEGION PLACE, SUITE 1285 ORLANDO, FLORIDA 32801 CERTIFICATE OF AUTHORIZATION #29728 BY REMOVE EXISTING INLET, SEE NOTE 1. 43+00 44+00 X 45+00 46+00 47+00 48+00 49+00 50+00 51+00 52+00 53+00 NO. DATE DESCRIPTION 42+00 02/04/16 ISSUED FOR BID TAXIWAY D PROPOSED PAVEMENT OUTLINE (TYP) 1 STA. 42+05.03 30.00' LT AHC KEY MAP PROJECT NAME: TAXIWAY "D" EXTENSION SHEET TITLE: IW AY MATCHLINE STA. 53+50 TA X D NOTE: 1. REMOVE EXISTING INLET. CONTRACTOR SHALL VERIFY SIZE AND TYPE OF PIPE. IF THE EXISTING 15" RCP IS DETERMINED TO BE IN SATISFACTORY CONDITION, THE CONTRACTOR TO COLLAR AND EXTEND PIPE RATHER THAN REPLACE. CONTRACTOR TO MIX EXISTING ASPHALT AND SUBGRADE. GRADE COMPACT AND SOD TO EXISTING ELEVATIONS. DEMOLITION PLAN ENGINEER OF RECORD: GUNTHER B. ZURSTADT FL PE #58224 MATCHLINE SEE SHEET CD03 JOB NO.: 14050.26 DRAWN: DATE: FEB 2016 DESIGN: SHEET NO. CHECKED: CD01 GW GZ AHC LAKELAND LINDER REGIONAL AIRPORT SEE SHEET CD01 TAXIWAY E 3900 DON EMERSON DRIVE SUITE 210 LAKELAND, FLORIDA 33811 STA. 59+43.23 307.42' LT SAW CUT EXISTING ASPHALTIC PAVEMENT. VARIABLE DEPTH MILL EXISTING ASPHALT 1.5" MINIMUM UP TO 4". PROTECT EXISTING TAXIWAY E PAVEMENT TO REMAIN. STA. 59+93.17 309.85' LT 0 50' 100' 1000 LEGION PLACE, SUITE 1285 ORLANDO, FLORIDA 32801 CERTIFICATE OF AUTHORIZATION #29728 GRAPHIC SCALE IN FEET CONTRACTOR TO MIX EXISTING ASPHALT AND SUBGRADE. GRADE COMPACT AND SOD TO EXISTING ELEVATIONS. FULL DEPTH SAW CUT EXISTING ASPHALTIC PAVEMENT. STA. 59+51.74 132.62' LT BY AHC KEY MAP PROPOSED PAVEMENT OUTLINE (TYP) 58+00 59+00 60+00 61+00 DATE DESCRIPTION 57+00 NO. 25.0' 02/04/16 ISSUED FOR BID 56+00 1 55+00 268.0' 54+00 PROJECT NAME: FULL DEPTH SAW CUT EXISTING ASPHALTIC PAVEMENT. STA. 59+64.84 135.06' RT TAXIWAY "D" EXTENSION STA. 60+19.36 227.67' RT LEGEND SAW CUT EXISTING ASPHALTIC PAVEMENT. VARIABLE DEPTH MILL EXISTING ASPHALT 1.5" MINIMUM UP TO 4". PROTECT EXISTING TAXIWAY E PAVEMENT TO REMAIN. DEMOLITION PLAN FULL DEPTH PAVEMENT (MIX IN PLACE) REMOVAL (ASPHALT & BASE, DEPTH VARIES, SEE GEOTECHNICAL REPORT) ENGINEER OF RECORD: VARIABLE DEPTH ASPHALT MILLING (1.5" TO 4") FULL DEPTH PAVEMENT REMOVAL (ASPHALT & BASE, DEPTH VARIES, SEE GEOTECHNICAL REPORT) X CALL 48 HOURS BEFORE YOU DIG IT'S THE LAW! DIAL 811 MATCHLINE SEE SHEET CD03 SHEET TITLE: STRIPPING LIMITS TAXIWAY E MATCHLINE STA. 53+50 STA. 59+69.42 230.11' RT Know what's below. Callbefore you dig. SUNSHINE STATE ONE CALL OF FLORIDA, INC. MISCELLANEOUS ITEM TO BE REMOVED GUNTHER B. ZURSTADT FL PE #58224 JOB NO.: 14050.26 DRAWN: DATE: FEB 2016 DESIGN: SHEET NO. CHECKED: CD02 GW GZ AHC LAKELAND LINDER REGIONAL AIRPORT SEE SHEET CD02 SEE SHEET CD01 MATCHLINE XX 3900 DON EMERSON DRIVE SUITE 210 LAKELAND, FLORIDA 33811 X X X IT'S THE LAW! DIAL 811 LEGEND 1000 LEGION PLACE, SUITE 1285 ORLANDO, FLORIDA 32801 CERTIFICATE OF AUTHORIZATION #29728 Know what's below. Callbefore you dig. STRIPPING LIMITS FULL DEPTH PAVEMENT REMOVAL (ASPHALT & BASE, DEPTH VARIES, SEE GEOTECHNICAL REPORT) SUNSHINE STATE ONE CALL OF FLORIDA, INC. VARIABLE DEPTH ASPHALT MILLING (1.5" TO 4") X MISCELLANEOUS ITEM TO BE REMOVED BY 0 50' AHC KEY MAP CONTRACTOR TO MIX EXISTING ASPHALT AND SUBGRADE. GRADE COMPACT AND SOD TO EXISTING ELEVATIONS. 100' 1 DESCRIPTION DATE NO. 02/04/16 ISSUED FOR BID GRAPHIC SCALE IN FEET 10 PROJECT NAME: 0' 0. TAXIWAY "D" EXTENSION X X X X SHEET TITLE: X X X X X X X X X X X X DEMOLITION PLAN X X X X X X X X X X X X ENGINEER OF RECORD: X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X TAXIWAY E X X X REMOVE EXISTING PAVEMENT MARKINGS X X X FULL DEPTH SAW CUT EXISTING ASPHALTIC PAVEMENT. PROTECT EXISTING ASPHALTIC PAVEMENT TO REMAIN. X X X CALL 48 HOURS BEFORE YOU DIG REMOVE EXISTING PAVEMENT MARKINGS (TYP 5 PLACES) X X XX X X X XX FULL DEPTH SAW CUT EXISTING ASPHALTIC PAVEMENT. PROTECT EXISTING ASPHALTIC PAVEMENT TO REMAIN. GUNTHER B. ZURSTADT FL PE #58224 JOB NO.: 14050.26 DRAWN: DATE: FEB 2016 DESIGN: SHEET NO. CHECKED: CD03 GW GZ AHC LAKELAND LINDER REGIONAL AIRPORT DEMOLITION NOTES 3900 DON EMERSON DRIVE SUITE 210 LAKELAND, FLORIDA 33811 1. REFER TO THE GENERAL PROVISIONS, SPECIAL PROVISIONS AND TECHNICAL SPECIFICATIONS OF THE CONTRACT DOCUMENTS FOR ADDITIONAL REQUIREMENTS APPLICABLE TO DEMOLITION WORK. 2. PROTECT EXISTING FEATURES TO REMAIN, INCLUDING TEMPORARY PROTECTION OF FEATURES SCHEDULED FOR DEMOLITION LATER IN THE PROJECT. 3. THE DEMOLITION PLANS SHOW ALL DEMOLITION WORK. CERTAIN WORK ELEMENTS MUST BE PHASED. COORDINATE THE DEMOLITION WORK AND TRANSPORT WITH THE CONSTRUCTION PHASING PLAN. 1000 LEGION PLACE, SUITE 1285 ORLANDO, FLORIDA 32801 4. THE LIMITS OF DEMOLITION SHOWN ON THE PLANS ARE GENERAL AND ARE SUBJECT TO MINOR ADJUSTMENT IN THE FIELD AS DETERMINED AND ORDERED BY THE ENGINEER. CERTIFICATE OF AUTHORIZATION #29728 5. DEMOLITION WORK IS SPECIFIED AND PAID UNDER ITEMS CONTAINED IN THE BID SCHEDULE. 6. SALVAGED ITEMS: ALL MATERIALS RESULTING FROM DEMOLITION AND CLEARING AND GRUBBING OPERATIONS SHALL BECOME THE CONTRACTOR'S PROPERTY UNLESS NOTED BELOW: A) MILLED BITUMINOUS PAVEMENT MATERIAL,CONTRACTOR SHALL PROPERLY DISPOSE OF MATERIALS ON AIRPORT PROPERTY AS DIRECTED BY THE ENGINEER. B) CONCRETE REMOVED SHALL BE RE-USED AS SPECIFIED IN THE PLANS OR OTHERWISE NOTED. C) UTILITIES - ANYTHING ENCOUNTERED AT THE TIME OF DEMOLITION COMMENCEMENT IS ASSUMED TO BE THE CONTRACTOR'S PROPERTY. BY 8. REMOVE EXISTING BITUMINOUS PAVEMENTS BY MILLING TO THE LIMITS REQUIRED. REMOVAL LIMITS SHOWN ON THE DEMOLITION PLANS ARE APPROXIMATE. ENGINEER WILL DETERMINE ACTUAL LIMITS IN THE FIELD. AHC 7. CONTRACTOR TO PROVIDE FULL DEPTH SAW CUT EDGE AT ALL PAVEMENT TIES AS SHOWN OR INSTRUCTED BY ENGINEER. 9. PAVEMENT MARKINGS SHALL BE REMOVED BY SAND BLASTING OR WATER BLASTING. NO CHEMICAL PAINT REMOVERS OR METAL BEAD BLASTING WILL BE ALLOWED. SEE DEMOLITION PLAN FOR MARKING REMOVAL LIMITS. 10. STRIPPING SHALL BE TO A 4 INCH DEPTH MINIMUM AND PAID FOR UNDER UNCLASSIFIED EXCAVATION. 1 DESCRIPTION DATE NO. 11. ALL UTILITY LOCATIONS PROVIDED HEREIN ARE APPROXIMATE IN NATURE, CONTRACTOR IS RESPONSIBLE FOR THE LOCATION OF ALL FACILITIES IN THE AREA THROUGH AIRPORT OPERATIONS PRIOR TO CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR USING CARE WITH ANY EXCAVATIONS ADJACENT TO KNOWN FACILITIES. BEFORE DIGGING CONTACT SUNSHINE STATE ONE CALL OF FLORIDA AT 1-800-432-4770 TO LOCATE EXISTING UTILITIES. 02/04/16 ISSUED FOR BID STRIPPING MATERIAL SHALL BE STOCKPILED FOR USE AS TOPSOIL. PROJECT NAME: TAXIWAY "D" EXTENSION SHEET TITLE: DEMOLITION NOTES ENGINEER OF RECORD: GUNTHER B. ZURSTADT FL PE #58224 JOB NO.: 14050.26 DRAWN: DATE: FEB 2016 DESIGN: SHEET NO. CHECKED: CD04 GW GZ AHC W XI LAKELAND LINDER REGIONAL AIRPORT B AY TA 3900 DON EMERSON DRIVE SUITE 210 LAKELAND, FLORIDA 33811 TAXIWAY A N.T.S. 1000 LEGION PLACE, SUITE 1285 ORLANDO, FLORIDA 32801 CERTIFICATE OF AUTHORIZATION #29728 RUNWAY 9-27 B "E 5.79 °55'5 7' 0 7 N .0 279 S71 TAXIWAY D EXTENSION 46+00 45+00 47+00 48+00 50+00 49+00 51+00 52+00 53+00 54+00 55+00 56+00 57+00 58+00 59+00 60+00 61+00 5"E N84°27'29.5 917.94' S87°50'06.95"E 562.72' TBM 60004 5/8" IRON ROD AND CAP "CSI TRAV PT" ELEVATION 131.79' NORTHING 1328028.44 EASTING 651400.14 R W N U AY 23 5- TBM 60005 5/8" IRON ROD AND CAP "CSI TRAV PT" ELEVATION 135.36' NORTHING 1328007.09 EASTING 651962.48 TBM 60006 5/8" IRON ROD AND CAP "CSI TRAV PT" ELEVATION 137.82' NORTHING 1328095.67 EASTING 652876.06 N 1328101.96 E 653862.21 DESCRIPTION 44+00 DATE 43+00 1 42+00 TAXIWAY D NO. N 1328097.67 651962.22 02/04/16 ISSUED FOR BID TAXIWAY E °59'1 120 2.63"E 7.30 ' N3 6 E 0" .6 '16 ' 31 3.85 67 9° S3 AY W I X TA KEY MAP BY 6'45 521 .56"E .48' 5/8" IRON ROD AND CAP "CSI TRAV PT" ELEVATION 135.30' NORTHING 1328468.99 EASTING 651728.19 AHC TBM 101 4"X4" CONCRETE MONUMENT WITH CAP "CHASTAIN-SKILLMAN - PRM" ELEVATION 133.82' NORTHING 1328377.76 S70 EASTING 651464.46 °5 °3 8 54 '41 9.3 .62 0' "E 7 9-2 SITE BENCH MARK SET IR & C PORTER 3340 N=1328548.05 E=650971.51 EL=131.38 PROJECT NAME: TA XI W AY TAXIWAY "D" EXTENSION D SHEET TITLE: SURVEY CONTROL PLAN ENGINEER OF RECORD: NOTES: 1. ELEVATIONS SHOWN HEREON REFER TO THE NORTH AMERICAN VERTICAL DATUM OF 1988. 2. HORIZONTAL CONTROL SHOWN HERON IS BASED ON FLORIDA STATE PLANE COORDINATE SYSTEM, NORTH AMERICAN DATUM OF 1983 (1990 ADJUSTMENT) (WEST ZONE). LEGEND TAXIWAY D EXTENSION PROJECT AREA GUNTHER B. ZURSTADT FL PE #58224 JOB NO.: 14050.26 DRAWN: DATE: FEB 2016 DESIGN: SHEET NO. CHECKED: C01 GW GZ AHC LAKELAND LINDER REGIONAL AIRPORT 3900 DON EMERSON DRIVE SUITE 210 LAKELAND, FLORIDA 33811 SEE SHEET C03 LEGEND NEW P-401 ON NEW BASE SECTION NEW P-401 SURFACE COURSE (2" NOMINAL DEPTH) 2.0' BUTT JOINT 0 50' 100' 1000 LEGION PLACE, SUITE 1285 ORLANDO, FLORIDA 32801 GRAPHIC SCALE IN FEET CERTIFICATE OF AUTHORIZATION #29728 BY STA. 42+05.03 30.00' LT 46+00 47+00 48+00 TAXIWAY D EXTENSION 49+00 50+00 51+00 52+00 53+00 54+00 N 89°52'14" E DESCRIPTION 45+00 NO. DATE STA. 42+05.03 30.00' RT 02/04/16 ISSUED FOR BID 44+00 1 2.0' BUTT JOINT 43+00 PROJECT NAME: TAXIWAY "D" EXTENSION SHEET TITLE: GEOMETRY PLAN ENGINEER OF RECORD: MATCHLINE STA. 54+00 3 C04 42+00 1 C04 60.0' N 1328097.67 E 651962.22 AHC KEY MAP GUNTHER B. ZURSTADT FL PE #58224 JOB NO.: 14050.26 DRAWN: DATE: FEB 2016 DESIGN: SHEET NO. CHECKED: C02 GW GZ AHC LAKELAND LINDER REGIONAL AIRPORT 3900 DON EMERSON DRIVE SUITE 210 LAKELAND, FLORIDA 33811 TAXIWAY E SEE SHEET C02 LEGEND NEW P-401 ON NEW BASE SECTION NEW P-401 SURFACE COURSE (2" NOMINAL DEPTH) 2.0' BUTT JOINT 3 VARIES 2.0' BUTT JOINT C04 1000 LEGION PLACE, SUITE 1285 ORLANDO, FLORIDA 32801 CERTIFICATE OF AUTHORIZATION #29728 STA. 59+93.17 309.85' LT STA. 59+43.23 307.42' LT 0 50' 100' GRAPHIC SCALE IN FEET 2 C04 STA. 59+51.74 132.62' LT STA. 59+43.75 132.24' LT BY STA. 59+76.70 133.84' LT TAXIWAY D EXTENSION 58+00 57+00 59+00 60+00 61+00 N 1328101.96 E 653862.21 N 89°52'14" E DESCRIPTION 56+00 STA. 57+83.60 30.00' RT STA. 58+49.23 33.00' RT STA. 59+31.29 54.54' RT 3 2.0' BUTT JOINT C04 NO. STA. 59+89.76 133.84' RT DATE 55+00 02/04/16 ISSUED FOR BID 60.0' 54+00 STA. 59+27.12 53.45' LT 1 1 C04 STA. 58+49.23 33.00' LT STA. 57+83.60 30.00' LT AHC KEY MAP PROJECT NAME: STA. 59+56.79 135.45' RT TAXIWAY "D" EXTENSION STA. 59+64.79 135.06' RT STA. 60+19.02 227.69' RT STA. 59+65.77 230.28' RT VARIES 3 SHEET TITLE: 2.0' BUTT JOINT C04 GEOMETRY PLAN TAXIWAY E MATCHLINE STA. 54+00 ENGINEER OF RECORD: GUNTHER B. ZURSTADT FL PE #58224 JOB NO.: 14050.26 DRAWN: DATE: FEB 2016 DESIGN: SHEET NO. CHECKED: C03 GW GZ AHC LAKELAND LINDER REGIONAL AIRPORT CL 85.5' 85.5' 30.0' 1.50% 1.50% 5.0 % % 5.0 SOD DISTURBED AREAS (SEE SODDING PLANS) TAXIWAY SAFETY AREA 1.5" DROP PAVED TO UNPAVED EOP 1.5" DROP PAVED TO UNPAVED EOP TAXIWAY SAFETY AREA 30.0' 3900 DON EMERSON DRIVE SUITE 210 LAKELAND, FLORIDA 33811 1.5" DROP 1.0' 4" P-401 BITUMINOUS SURFACE COURSE, FINE GRADED (2 LIFTS) 10" P-211 LIME ROCK SUBBASE COURSE TAXIWAY D EXTENSION TYPICAL SECTION TYPICAL PAVEMENT EDGE DETAIL NTS NTS MILL & OVERLAY 2.0" MIN. P-401SP BITUMINOUS SURFACE COURSE, FINE GRADED P-603 BITUMINOUS TACK COAT EXISTING BASE THICKNESS VARIES 0" - 6" EXISTING ASPHALT THICKNESS VARIES 1.8" - 8.0" BY UNIFORMLY REMOVE 2.0" OF PAVEMENT MATERIAL WHICH MAY INCLUDE ONLY ASPHALT OR A COMBINATION OF ASPHALT AND BASE MATERIAL BUTT JOINT NOTES: 1. THIS BUTT JOINT IS REQUIRED AT EVERY LOCATION WHERE A NEW BITUMINOUS PAVEMENT IS CONSTRUCTED TO MEET AN EXISTING BITUMINOUS PAVEMENT OR TO MEET ANY BITUMINOUS PAVEMENT NOT CONSTRUCTED AS A CONTINUOUS OPERATION. 2. IF THE EXISTING PAVEMENT EXCEEDS THE DEPTH OF THE PROPOSED PAVEMENT, THE EXISTING PAVEMENT SHALL BE MILLED THE DEPTH OF THE PROPOSED PAVEMENT FOR THE 2.0' SHOWN AND P-603 TACK COAT SHALL BE APPLIED PRIOR TO PAVING. 3. THE SAWCUT SHALL BE CLEANED TO REMOVE ALL DUST AND LOOSE MATERIAL PRIOR TO PLACING TACK COAT. EXISTING SUBGRADE - 2" MILL AND OVERLAY (TAXIWAY E) DATE 2 NTS SAWCUT, TACK COAT, MATCH EXISTING PAVEMENT POINT OF CONNECTION TO EXISTING A.C. 1.0' 1.0' NO. TYPICAL SECTION NOTES: TO BE MILLED AND TACK COATED PRIOR TO PAVING 1. SLOPES SHOWN ARE DESIGN VALUES. SEE GRADING DRAWINGS FOR SPECIFIC GRADING INFORMATION WHERE NON-TYPICAL SECTION AREAS ARE DESIGNED. 2. EXISTING TYPICAL SECTIONS FROM AS-BUILTS, RECORD DRAWINGS, AND FIELD INVESTIGATIONS. 3. REFER TO GEOMETRY PLANS FOR LOCATIONS OF PAVEMENT SECTIONS. 4. REFER TO THE PROJECT MANUAL FOR EXISTING SUBSURFACE INFORMATION. 5. TOPSOIL SHALL BE PLACED ON ALL EMBANKMENT AREAS OUTSIDE THE PAVEMENT PER SPECIFICATION T-905. 2.0" NEW A.C. AHC - DESCRIPTION 1 CERTIFICATE OF AUTHORIZATION #29728 4" 02/04/16 ISSUED FOR BID P-603 BITUMINOUS TACK COAT 1000 LEGION PLACE, SUITE 1285 ORLANDO, FLORIDA 32801 SHOULDER DRESSING (INCIDENTAL TO SODDING OPERATION) 1 P-602 BITUMINOUS PRIME COAT PROJECT NAME: TAXIWAY "D" EXTENSION SHEET TITLE: TYPICAL PAVEMENT SECTION & PAVEMENT DETAILS EXISTING A.C. ENGINEER OF RECORD: SUBGRADE COMPACTION SCHEDULE EXISTING BASE COURSE NEW BASE COURSE 10" FILL AREAS: DEPTH BELOW LIMEROCK BASE/SUBBASE COMPACTION REQUIREMENTS 0 TO 20" 20" TO 33" 33" TO 47" 47" TO 61" 100% MODIFIED PROCTOR 95% MODIFIED PROCTOR 90% MODIFIED PROCTOR 85% MODIFIED PROCTOR CUT AREAS: A MINIMUM OF 19" BELOW THE LIMEROCK BASE SHALL BE COMPACTED TO 100% MODIFIED PROCTOR IN AREAS OF CUT OR COMBINATION CUT/FILL AREAS TO OBTAIN A MINIMUM 19" LAYER OF 100% COMPACTED MATERIAL. 3 - FLEXIBLE/FLEXIBLE PAVEMENT BUTT JOINT DETAIL NTS GUNTHER B. ZURSTADT FL PE #58224 JOB NO.: 14050.26 DRAWN: DATE: FEB 2016 DESIGN: SHEET NO. CHECKED: C04 GW GZ AHC 50' SEE SHEET C06 0 LAKELAND LINDER REGIONAL AIRPORT 100' 3900 DON EMERSON DRIVE SUITE 210 LAKELAND, FLORIDA 33811 GRAPHIC SCALE IN FEET 1000 LEGION PLACE, SUITE 1285 ORLANDO, FLORIDA 32801 CERTIFICATE OF AUTHORIZATION #29728 44+00 45+00 46+00 47+00 48+00 TAXIWAY D 49+00 50+00 51+00 52+00 53+00 54+00 MATCHLINE STA. 54+00 TAXIWAY D EXTENSION 150 145 145 140 AHC BY DESCRIPTION 150 DATE 155 NO. 155 KEY MAP 02/04/16 ISSUED FOR BID 43+00 1 42+00 PROJECT NAME: TAXIWAY "D" EXTENSION 140 PROPOSED GRADE SHEET TITLE: 135 135 PLAN & PROFILE EXISTING GROUND 130 EXIST 15" RCP 130 CONSTRUCT 36" CL IV RCP ENGINEER OF RECORD: 125 125 120 120 GUNTHER B. ZURSTADT FL PE #58224 PROPOSED GRADE EXISTING GROUND H 0 25' V 0 5' SCALE IN FEET 50' 100' 10' JOB NO.: 14050.26 DRAWN: DATE: FEB 2016 DESIGN: SHEET NO. CHECKED: C05 GW GZ AHC 3900 DON EMERSON DRIVE SUITE 210 LAKELAND, FLORIDA 33811 TAXIWAY E SEE SHEET C05 LAKELAND LINDER REGIONAL AIRPORT 0 50' 100' GRAPHIC SCALE IN FEET 1000 LEGION PLACE, SUITE 1285 ORLANDO, FLORIDA 32801 CERTIFICATE OF AUTHORIZATION #29728 54+00 55+00 56+00 57+00 58+00 59+00 60+00 61+00 TAXIWAY D EXTENSION 145 AHC BY 145 DESCRIPTION 150 DATE 150 02/04/16 ISSUED FOR BID 155 NO. 155 1 MATCHLINE STA. 54+00 KEY MAP PROJECT NAME: TAXIWAY "D" EXTENSION PROPOSED GRADE 140 140 SHEET TITLE: EXISTING GROUND 135 135 PLAN & PROFILE CONSTRUCT 18" CL IV RCP 130 130 ENGINEER OF RECORD: 125 125 120 120 GUNTHER B. ZURSTADT FL PE #58224 PROPOSED GRADE EXISTING GROUND H 0 25' V 0 5' SCALE IN FEET 50' 100' 10' JOB NO.: 14050.26 DRAWN: DATE: FEB 2016 DESIGN: SHEET NO. CHECKED: C06 GW GZ AHC LAKELAND LINDER REGIONAL AIRPORT SEE SHEET Cxx 3900 DON EMERSON DRIVE SUITE 210 LAKELAND, FLORIDA 33811 0 40' 80' 1000 LEGION PLACE, SUITE 1285 ORLANDO, FLORIDA 32801 GRAPHIC SCALE IN FEET CERTIFICATE OF AUTHORIZATION #29728 BY AHC KEY MAP 44+00 45+00 46+00 47+00 48+00 49+00 50+00 51+00 52+00 DESCRIPTION TAXIWAY D EXTENSION DATE 25.0' NO. (TYP) 02/04/16 ISSUED FOR BID 43+00 1 42+00 25.0' 25.0' GRID ALIGNED WITH BASELINE STATIONS, (TYP) PROJECT NAME: TAXIWAY "D" EXTENSION SHEET TITLE: MATCHLINE STA. 52+00 PAVEMENT ELEVATION PLAN ENGINEER OF RECORD: GUNTHER B. ZURSTADT FL PE #58224 JOB NO.: 14050.26 DRAWN: DATE: FEB 2016 DESIGN: SHEET NO. CHECKED: C07 GW GZ AHC SEE SHEET Cxx TAXIWAY E LAKELAND LINDER REGIONAL AIRPORT 3900 DON EMERSON DRIVE SUITE 210 LAKELAND, FLORIDA 33811 0 40' 80' 1000 LEGION PLACE, SUITE 1285 ORLANDO, FLORIDA 32801 GRAPHIC SCALE IN FEET CERTIFICATE OF AUTHORIZATION #29728 BY AHC KEY MAP 54+00 55+00 56+00 57+00 58+00 59+00 60+00 DESCRIPTION TAXIWAY D EXTENSION NO. DATE 25.0' (TYP) 61+00 02/04/16 ISSUED FOR BID 53+00 1 52+00 25.0' 25.0' GRID ALIGNED WITH BASELINE STATIONS, (TYP) PROJECT NAME: TAXIWAY "D" EXTENSION SHEET TITLE: PAVEMENT ELEVATION PLAN TAXIWAY E MATCHLINE STA. 52+00 ENGINEER OF RECORD: GUNTHER B. ZURSTADT FL PE #58224 JOB NO.: 14050.26 DRAWN: DATE: FEB 2016 DESIGN: SHEET NO. CHECKED: C08 GW GZ AHC LAKELAND LINDER REGIONAL AIRPORT VARIES VARIES : 1V VARIES 10.0' FLAT BOTTOM 0 SECTION A-A DITCH TYPICAL SECTION 50' 100' 3900 DON EMERSON DRIVE SUITE 210 LAKELAND, FLORIDA 33811 SEE SHEET C10 4H :8H 1V 1000 LEGION PLACE, SUITE 1285 ORLANDO, FLORIDA 32801 GRAPHIC SCALE IN FEET NTS CERTIFICATE OF AUTHORIZATION #29728 D-1 CONST. MITERED END SECTION SINGLE 36" RCP (CLASS 4) FDOT INDEX NO. 272 FL 132.00 REFERENCE POINT INDICATED STA 46+86.86 OFFSET 86.07' LT STA. 50+04.00 109.90' LT A KEY MAP BY STA. 48+01.00 109.80' LT AHC CONSTRUCT 216 LF SINGLE 36" RCP (CLASS 4) @ 0.05% A 43+00 44+00 45+00 46+00 TAXIWAY D 47+00 48+00 49+00 50+00 51+00 52+00 53+00 54+00 DATE DESCRIPTION CONST. MITERED END SECTION SINGLE 36" RCP (CLASS 4) FDOT INDEX NO. 272 FL 131.90 REFERENCE POINT INDICATED STA 47+36.41 OFFSET 86.07' RT 1 D-2 NO. CONSTRUCT 24 LF SINGLE 15" RCP (CLASS 4) W/CONCRETE COLLARS AT EACH TIE-IN (FDOT SECTION 430) 02/04/16 ISSUED FOR BID TAXIWAY D EXTENSION PROJECT NAME: CONSTRUCT RUBBLE RIPRAP 2,675 SF @ 2.5 FT DEPTH TAXIWAY "D" EXTENSION SHEET TITLE: DRAINAGE PLAN MATCHLINE STA. 54+00 42+00 ENGINEER OF RECORD: GUNTHER B. ZURSTADT FL PE #58224 JOB NO.: 14050.26 DRAWN: DATE: FEB 2016 DESIGN: SHEET NO. CHECKED: C09 GW GZ AHC LAKELAND LINDER REGIONAL AIRPORT SEE SHEET C09 3900 DON EMERSON DRIVE SUITE 210 LAKELAND, FLORIDA 33811 0 50' 100' 1000 LEGION PLACE, SUITE 1285 ORLANDO, FLORIDA 32801 GRAPHIC SCALE IN FEET D-3 TAXIWAY E CONSTRUCT DBI TYPE C FDOT INDEX NO. 232 GRATE ELEV 137.25 INV 134.75 S REFERENCE POINT INDICATED STA 58+91.22 OFFSET 85.50' LT CERTIFICATE OF AUTHORIZATION #29728 CONSTRUCT 184 LF SINGLE 18" RCP (CLASS 4) @ 0.14% BY 54+00 55+00 56+00 57+00 58+00 59+00 60+00 AHC KEY MAP 61+00 1 DESCRIPTION DATE NO. D-4 CONSTRUCT MITERED END SECTION SINGLE 18" RCP (CLASS 4) FDOT INDEX NO. 272 FL 134.50 REFERENCE POINT INDICATED STA 58+91.22 OFFSET 89.52' RT 02/04/16 ISSUED FOR BID TAXIWAY D EXTENSION PROJECT NAME: TAXIWAY "D" EXTENSION CONSTRUCT RUBBLE RIPRAP 20' x 25' (500 SF) @ 2.5 FT DEPTH SHEET TITLE: MATCHLINE STA. 54+00 DRAINAGE PLAN ENGINEER OF RECORD: GUNTHER B. ZURSTADT FL PE #58224 JOB NO.: 14050.26 DRAWN: DATE: FEB 2016 DESIGN: SHEET NO. CHECKED: C10 GW GZ AHC LAKELAND LINDER REGIONAL AIRPORT 50' 100' SEE SHEET C12 0 3900 DON EMERSON DRIVE SUITE 210 LAKELAND, FLORIDA 33811 1000 LEGION PLACE, SUITE 1285 ORLANDO, FLORIDA 32801 GRAPHIC SCALE IN FEET CERTIFICATE OF AUTHORIZATION #29728 BY STA. 42+05.03 44+00 45+00 46+00 47+00 48+00 49+00 50+00 51+00 52+00 53+00 54+00 TAXIWAY D EXTENSION DESCRIPTION 43+00 NO. DATE MATCH EXISTING MARKING 02/04/16 ISSUED FOR BID TAXIWAY D TAXIWAY CENTERLINE MARKING C14 1 42+00 1 AHC KEY MAP PROJECT NAME: TAXIWAY "D" EXTENSION SHEET TITLE: MATCHLINE STA. 54+00 PAVEMENT MARKING PLAN ENGINEER OF RECORD: GUNTHER B. ZURSTADT FL PE #58224 JOB NO.: 14050.26 DRAWN: DATE: FEB 2016 DESIGN: SHEET NO. MATCHLINE CHECKED: SEE SHEET C13 C11 GW GZ AHC LAKELAND LINDER REGIONAL AIRPORT SEE SHEET C11 TAXIWAY E 3900 DON EMERSON DRIVE SUITE 210 LAKELAND, FLORIDA 33811 1000 LEGION PLACE, SUITE 1285 ORLANDO, FLORIDA 32801 CERTIFICATE OF AUTHORIZATION #29728 MATCH EXISTING MARKING 0 50' 100' GRAPHIC SCALE IN FEET STA. 59+20.24 60.00' LT 57+00 TAXIWAY D EXTENSION 58+00 60 . BY STA. 59+80.17 62.92' LT 0' R 59+00 2 TAXIWAY DOUBLE EDGE C14 MARKING, (TYP) 61+00 60+00 STA. 59+20.24 00.00' .0' R 60 STA. 59+26.09 00.00' DESCRIPTION 56+00 93.0' NO. DATE STA. 59+26.09 00.00' STA. 59+86.02 57.08' RT 02/04/16 ISSUED FOR BID 55+00 INTERMEDIATE HOLDING POSITION MARKING, (TYP) KEY MAP 1 54+00 C14 93.0' C14 3 TAXIWAY CENTERLINE MARKING, TYP) 93.0' 1 TAXIWAY CENTERLINE MARKING, (TYP) AHC 1 C14 PROJECT NAME: TAXIWAY "D" EXTENSION MATCHLINE STA. 54+00 SHEET TITLE: MATCH EXISTING MARKING PAVEMENT MARKING PLAN ENGINEER OF RECORD: TAXIWAY E GUNTHER B. ZURSTADT FL PE #58224 JOB NO.: 14050.26 DRAWN: DATE: FEB 2016 DESIGN: SHEET NO. MATCHLINE CHECKED: SEE SHEET C13 C12 GW GZ AHC MATCHLINE SEE SHEET C11 SEE SHEET C12 LAKELAND LINDER REGIONAL AIRPORT 3900 DON EMERSON DRIVE SUITE 210 LAKELAND, FLORIDA 33811 0 50' 100' 1000 LEGION PLACE, SUITE 1285 ORLANDO, FLORIDA 32801 GRAPHIC SCALE IN FEET CERTIFICATE OF AUTHORIZATION #29728 TAXIWAY E BY DESCRIPTION DATE 02/04/16 ISSUED FOR BID 1 NO. AHC KEY MAP PROJECT NAME: TAXIWAY "D" EXTENSION SHEET TITLE: PAVEMENT MARKING PLAN STA. 55+24.87 1,281.67' RT ENGINEER OF RECORD: .0' 125 R 2 C14 TAXIWAY DOUBLE EDGE MARKING, (TYP) TAXIWAY E GUNTHER B. ZURSTADT FL PE #58224 CLEAN AND RE-STRIPE TAXIWAY CENTERLINE AND EDGE STRIPES IN THIS AREA JOB NO.: 14050.26 DRAWN: DATE: FEB 2016 DESIGN: SHEET NO. CHECKED: C13 GW GZ AHC (3) 6" WIDE BLACK STRIPES (CONTINUOUS) 1 YELLOW LINE AND 2 BLACK LINES @ 12" EA. (2) 6" WIDE YELLOW STRIPES (CONTINUOUS) 93' TO TAXIWAY CENTERLINE 6" WIDE YELLOW STRIPE (CONTINUOUS) LAKELAND LINDER REGIONAL AIRPORT 3900 DON EMERSON DRIVE SUITE 210 LAKELAND, FLORIDA 33811 6" TAXIWAY C L MARKING, YELLOW 3' YELLOW DASHES ARE TO BE PLACED SYMMETRICALLY ABOUT CL 6" WIDE BLACK BORDER 3' EDGE OF TAXIWAY OR APRON 6" TAXIWAY CENTERLINE MARKING, YELLOW, (TYP), SEE DETAIL THIS SHEET - NTS DESCRIPTION BY NTS INTERMEDIATE HOLDING POSITION MARKINGS AHC 3 DATE - TAXIWAY DOUBLE EDGE MARKING DETAIL CONTINUOUS 02/04/16 ISSUED FOR BID NTS 2 NO. - TAXIWAY CENTERLINE MARKINGS CERTIFICATE OF AUTHORIZATION #29728 1 CL TAXIWAY 1 1000 LEGION PLACE, SUITE 1285 ORLANDO, FLORIDA 32801 AIRCRAFT HOLDING SIDE PROJECT NAME: TAXIWAY "D" EXTENSION SHEET TITLE: PAVEMENT MARKING DETAILS ENGINEER OF RECORD: GENERAL NOTES NOTE: DO NOT APPLY BLACK PAINT FULL WIDTH OF MARKING AND THEN APPLY YELLOW OR WHITE PAINT OVER BLACK PAINT. 1. UNLESS OTHERWISE INDICATED IN THIS SET OF PLANS, ALL TAXIWAY MARKINGS SHALL BE AVIATION REFLECTIVE YELLOW WITH GLASS BEADS. 2. ALL MARKINGS SHALL BE OUTLINED IN BLACK (MIN. 6" ALL SIDES, UNLESS OTHERWISE NOTED). GUNTHER B. ZURSTADT FL PE #58224 3. THE TYPE OF PAINT TO BE USED MUST BE IN ACCORDANCE WITH THE P-620 SPECIFICATION. JOB NO.: 14050.26 DRAWN: 4. CONTRACTOR SHALL REPAINT AT ITS OWN EXPENSE ANY EXISTING MARKINGS THAT HAVE BEEN DAMAGED DURING CONSTRUCTION. DATE: FEB 2016 DESIGN: SHEET NO. CHECKED: C14 GW GZ AHC LAKELAND LINDER REGIONAL AIRPORT 50' SEE SHEET C16 0 3900 DON EMERSON DRIVE SUITE 210 LAKELAND, FLORIDA 33811 100' 1000 LEGION PLACE, SUITE 1285 ORLANDO, FLORIDA 32801 GRAPHIC SCALE IN FEET CERTIFICATE OF AUTHORIZATION #29728 BY EXISTING RPM AHC KEY MAP 8 SPACES @ 188.66' = 1509.28'' STA. 42+74.29 188.66' 45+00 46+00 47+00 48+00 49+00 50+00 51+00 52+00 53+00 DESCRIPTION DATE SOLAR EDGE RPM (TYP) 02/04/16 ISSUED FOR BID TAXIWAY D EXTENSION TAXIWAY D 1 44+00 NO. 43+00 PROJECT NAME: TAXIWAY "D" EXTENSION SHEET TITLE: MATCHLINE STA. 53+50 42+00 TAXIWAY RPM LAYOUT PLAN ENGINEER OF RECORD: GUNTHER B. ZURSTADT FL PE #58224 JOB NO.: 14050.26 DRAWN: DATE: FEB 2016 DESIGN: SHEET NO. CHECKED: C15 GW GZ AHC LAKELAND LINDER REGIONAL AIRPORT SEE SHEET C15 TAXIWAY E 3900 DON EMERSON DRIVE SUITE 210 LAKELAND, FLORIDA 33811 ALIGN 1000 LEGION PLACE, SUITE 1285 ORLANDO, FLORIDA 32801 2 SPACES @ 87.51' 0 50' CERTIFICATE OF AUTHORIZATION #29728 100' GRAPHIC SCALE IN FEET ALIGN ALIGN 58+00 60+00 2 SP AC @ 42 ES .41' TAXIWAY D EXTENSION 2 SPACES @ 32.84' ALIGN S ACE 2 SP 2.41' @4 SOLAR EDGE RPM (TYP) ALIGN BY 61+00 DESCRIPTION 57+00 DATE 56+00 ALIGN 02/04/16 ISSUED FOR BID 55+00 S ACE 2 SP .26' @ 40 59+00 1 54+00 ALIGN 3 SPACES @ 34.52' 50.0' 2 SPACES @ 32.84' NO. 8 SPACES @ 188.66' = 1509.28'' ALIGN AHC 2 SPA CE @ 40.2 S 6' KEY MAP PROJECT NAME: 2 SPACES @ 47.63 ALIGN TAXIWAY "D" EXTENSION ALIGN SHEET TITLE: MATCHLINE STA. 53+50 TAXIWAY RPM LAYOUT PLAN ENGINEER OF RECORD: GUNTHER B. ZURSTADT FL PE #58224 JOB NO.: 14050.26 DRAWN: DATE: FEB 2016 DESIGN: SHEET NO. CHECKED: C16 GW GZ AHC LAKELAND LINDER REGIONAL AIRPORT RUNWAY 9-27 3900 DON EMERSON DRIVE SUITE 210 LAKELAND, FLORIDA 33811 TAXIWAY E 1000 LEGION PLACE, SUITE 1285 ORLANDO, FLORIDA 32801 CERTIFICATE OF AUTHORIZATION #29728 0 100' 200' GRAPHIC SCALE IN FEET 48+00 49+00 50+00 51+00 52+00 53+00 54+00 55+00 56+00 57+00 58+00 59+00 60+00 61+00 BY 47+00 TAXIWAY D EXTENSION APPROXIMATE SODDING AREA LIMITS 34,150 SY DESCRIPTION 46+00 DATE 45+00 02/04/16 ISSUED FOR BID 44+00 1 43+00 NO. 42+00 TAXIWAY D AHC KEY MAP PROJECT NAME: TAXIWAY E TAXIWAY "D" EXTENSION SHEET TITLE: SODDING PLAN ENGINEER OF RECORD: GUNTHER B. ZURSTADT FL PE #58224 JOB NO.: 14050.26 DRAWN: DATE: FEB 2016 DESIGN: SHEET NO. CHECKED: C17 GW GZ AHC LAKELAND LINDER REGIONAL AIRPORT NOTES: 1. REMOVE EXISTING JOINT MATERIAL. A.REMOVE JOINT SEALANT MATERIAL/BACKER RODS BY SAWCUTTING OR ROUTING. 3900 DON EMERSON DRIVE SUITE 210 LAKELAND, FLORIDA 33811 2. REMOVE JOINT DEBRIS FROM AREA TO BE PRESSURE CLEANED. PA 0' 0. 10 3. APPLY PRAMITOL HERBICIDE TO JOINT, OR APPROVED EQUAL. M CT E TE R O TO PR NT E M VE 4. PRESSURE WASH THE CONCRETE. A.USING WATER, PRESSURE CLEAN/WASH THE CONCRETE SURFACE. B. THE POWER WASHER SHALL BE RATED AT LEAST 3,000 P.S.I. WITH A MINIMUM FLOW RATE OF 5 GPM. C.THE PRESSURE WASHER SHALL UTILIZE A ROTARY NOZZLE. D. THE PRESSURE WASHER SHALL BE A WALK-BEHIND WHEEL-MOUNTED TYPE. E. MINIMIZE THE EXPOSURE OF AGGREGATE WHICH MAY RESULT FROM THE REMOVAL OF CEMENTITIOUS MATERIAL. 0 20' 40' GRAPHIC SCALE IN FEET 1000 LEGION PLACE, SUITE 1285 ORLANDO, FLORIDA 32801 AI CERTIFICATE OF AUTHORIZATION #29728 N 5. AIR BLAST JOINT WITH COMPRESSED AIR (OIL AND WATER FREE) TO REMOVE SAND, DUST AND WATER. 6. APPLY BACKER RODS AS REQUIRED. 7. APPLY JOINT SEALANT MATERIAL (CRAFCO ROADSAVER 221 OR APPROVED EQUAL). 8. SEE P-605 SPECIFICATION FOR ADDITIONAL INFORMATION. 30 KEY MAP CLEAN PCC (45,000 SF) LS 1 CLEAN AND RE-SEAL JOINT LF 4,950 CRACK REPAIR AND SEAL LF 2,700 NO. DATE DESCRIPTION E 02/04/16 ISSUED FOR BID REHAB AREA QUANTITY 1 AY W XI TA UNIT BY ITEM AHC 0' 0. PCC REHAB QUANTITIES PROJECT NAME: TAXIWAY "D" EXTENSION SHEET TITLE: PCC PAVEMENT REHABILITATION PLAN 0' 0. 15 ENGINEER OF RECORD: TAXIWAY E GUNTHER B. ZURSTADT FL PE #58224 CLEAN AND RE-STRIPE TAXIWAY CENTERLINE AND TAXIWAY EDGE MARKINGS. SEE PAVEMENT MARKING PLAN FOR EXACT LOCATIONS. JOB NO.: 14050.26 DRAWN: DATE: FEB 2016 DESIGN: SHEET NO. CHECKED: C18 GW GZ AHC LAKELAND LINDER REGIONAL AIRPORT 3900 DON EMERSON DRIVE SUITE 210 LAKELAND, FLORIDA 33811 1000 LEGION PLACE, SUITE 1285 ORLANDO, FLORIDA 32801 BY NTS NO. DATE *NOTE: A VOID OF 1/4" TO 1/2" IS RECOMMENDED TO ALLOW FOR SURFACE IMPERFECTIONS ON BOTTOM SHELF AND TO ALLOW FOR POSSIBLE PUMPING OF OLD JOINT FILLING MATERIAL. DESCRIPTION RESEALING EXPANSION JOINT NTS 02/04/16 ISSUED FOR BID RESEALING CONSTRUCTION JOINTS NTS 1 RESEALING CONTRACTION JOINTS AHC CERTIFICATE OF AUTHORIZATION #29728 PROJECT NAME: TAXIWAY "D" EXTENSION NOTES: RESEALING JOINT BETWEEN PCC & ASPHALT PAVEMENT 1. BACKER RODS SHALL BE 25% LARGER THAN JOINT WIDTH. 2. BACKER RODS SHALL BE MANUFACTURED FROM CLOSED CELL POLYETHYLENE FOAM COMPATIBLE WITH APPROVED SEALANT. 3. CONTRACTOR SHALL HAVE MANUFACTURER TECHNICAL REPRESENTATIVE ON THE PROJECT SITE AT THE START OF THE PROJECT TO ENSURE THAT JOINT SEALING, CRACK SEALING AND SPALL REPAIRS SHALL CONFORM TO THE MANUFACTURER'S REQUIREMENTS AND RECOMMENDATIONS. THIS REQUIREMENT IS TO ENSURE THAT THE MANUFACTURER WILL PROVIDE GUARANTEE ON THE PERFORMANCE OF THE MATERIAL. 4. SEE SPECIFICATIONS P-605 FOR DETAILED DESCRIPTION OF INSTALLATION AND ACCEPTANCE CRITERIA OF JOINT SYSTEMS. 5. CONTRACTOR TO REMOVE ANY EXCESS SEALANT FROM THE PAVEMENT SURFACE. 6. JOINT SIZES ARE BASED ON RECORD DRAWINGS AND MINIMAL SPOT VERIFICATION. CONTRACTOR SHALL VERIFY EXISTING WIDTH AND ESTIMATE JOINT WIDTH AFTER CLEANING DURING THE BIDDING PROCESS. NTS 7. SEE NOTE 7 THIS SHEET REGARDING PAYMENT FOR THE JOINT BETWEEN THE PCC AND ASPHALT PAVEMENTS. THE JOINT BETWEEN THE PCC AND ASPHALT PAVEMENTS SHALL NOT BE MEASURED FOR PAYMENT BUT SHALL BE INCIDENTAL TO THE COST OF PAY ITEM P-401-1 (BITUMINOUS SURFACE COURSE). SHEET TITLE: JOINT SEALING DETAILS ENGINEER OF RECORD: GUNTHER B. ZURSTADT FL PE #58224 JOB NO.: 14050.26 DRAWN: DATE: FEB 2016 DESIGN: SHEET NO. CHECKED: C19 GW GZ AHC LAKELAND LINDER REGIONAL AIRPORT 3900 DON EMERSON DRIVE SUITE 210 LAKELAND, FLORIDA 33811 1000 LEGION PLACE, SUITE 1285 ORLANDO, FLORIDA 32801 CERTIFICATE OF AUTHORIZATION #29728 EXISTING CRACK OR PREVIOUSLY SEALED CRACK NTS DETAIL "A" GROOVE FOR JOINT SEALANT AT SPALL REPAIR NTS GENERAL NOTES: JOINT/CRACK RESEALING AIR BLAST JOINT/CRACK WITH OIL AND WATER FREE COMPRESSED AIR TO REMOVE SAND, DUST AND ALL INCOMPRESSIBLE MATERIALS. 5. INSTALL TEMPORARY BACKER ROD TO PREVENT DEBRIS FROM ENTERING JOINT/CRACK PRIOR TO SEALING. 6. ALL SPALLS, CRACKS OR PAVEMENT DISTRESSES THAT ARE CAUSED BY THE CONTRACTOR'S JOINT RESEALING OPERATIONS SHALL BE REPAIRED BY THE CONTRACTOR AT NO COST TO THE OWNER. 7. ANY MARKINGS AFFECTED BY THE JOINT AND CRACK RESEALING EFFORTS MUST BE REPLACED IN-KIND. MARKINGS FOR THESE AREAS WILL BE INCIDENTAL TO THE JOINT AND CRACK REALING. JOINT/CRACK RESEALING 1. 2. SINCE ORIGINAL CONSTRUCTION, JOINT/CRACK MOVEMENT HAVE RESULTED IN JOINTS AND CRACKS OF VARYING AND NON-UNIFORM DIMENSIONS. THE BIDDER IS URGED TO VISIT THE SITE IN ORDER TO ACHIEVE SATISFACTION AS TO THE QUANTITY AND CONDITIONS OF THE WORK. ALL JOINT RESEALING SHALL BE DONE IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS REGARDING JOINT/CRACK SEALING AND PREPARATION, SEALANT BEAD THICKNESS, MINIMUM JOINT DEPTH, BACKER ROD DIAMETER AND PLACEMENT DEPTH. THE QUANTITY OF CRACKS TO BE SEALED IS PROVIDED FOR ESTIMATING PURPOSES ONLY. CRACKS WILL BE SEALED AS DIRECTED BY THE RESIDENT PROJECT REPRESENTATIVE IN THE FIELD. 2. CLEAN ALL EXPOSED CAVITY SURFACES AS SPECIFIED. 3. PROVIDE NEW JOINT FILLER TO MAINTAIN EXISTING JOINTS AND WORKING CRACKS. (SEE DETAIL "A"). 4. FLUSH AREA WITH WATER TO REMOVE ALL DUST. AIR BLAST WITH OIL-FREE AIR TO REMOVE ALL WATER AND REMAINING DUST BEFORE PLACING HIGH PERFORMANCE CONCRETE. (SEE NOTE BELOW) 5. FORM JOINT RESERVOIR FOR JOINT SEALANT PER MANUFACTURER'S RECOMMENDATIONS AND APPLY PRIMER. 6. BUILD THE CONCRETE SLAB BACK WITH MATERIAL AS INDICATED IN THE SPECIFICATIONS IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATION. 7. ONCE THE SPALL AND PATCH REPAIR HAS CURED, CLEAN AND SEAL JOINTS USING JOINT SEALANT. 8. THE WIDTH OF JOINT FILLER AT CONSTRUCTION AND CONTRACTION JOINTS AND WORKING CRACKS SHALL BE APPROXIMATELY EQUAL TO THE WIDTH OF THE EXISTING GAP AT THE JOINT OR CRACK BUT NOT LESS THAN 1/4" OR 3/4" ON EXPANSION JOINTS. FILLER SHALL BE INSTALLED NEATLY TO PREVENT NEW HIGH PERFORMANCE CONCRETE MATERIAL FROM BY-PASSING THE FILLER AND SPANNING THE GAP. BY 4. SPALL AT CONSTRUCTION JOINT NTS AHC AFTER DRYING, SANDBLAST JOINT/CRACK TO REMOVE ADHESIVE RESIDUE (100% REMOVAL REQUIRED). DESCRIPTION 3. NTS SAWCUT AROUND SPALLED AND/OR BROKEN PATCHED AREAS TO A DIMENSION OF 1" MINIMUM BEYOND THE DISTRESSED AREA. CONCRETE WITHIN THE REPAIR AREA SHALL BE REMOVED AND ALL UNSOUND CONCRETE REMOVED TO A DEPTH OF 2" OR PER THE MANUFACTURER'S MINIMUM RECOMMENDATION. THE ULTIMATE REQUIRED REPAIR DEPTH SHALL BE JOINTLY DETERMINED IN THE FIELD BY THE CONTRACTOR'S SUPERINTENDENT AND AIRPORT OWNER'S RESIDENT PROJECT REPRESENTATIVE BY SOUNDING WITH A HAMMER. DATE IMMEDIATELY WATER WASH THE JOINT/CRACK TO REMOVE SAWING RESIDUE (WASH IN ONE DIRECTION). 1. PANORAMIC VIEW OF SPALL & PATCH REPAIR 02/04/16 ISSUED FOR BID 2. SPALL AND PATCH REPAIR LEGEND 1 REMOVE OLD SEALANT BY SAWCUTTING OR ROUTING TO SLIGHTLY WIDEN THE JOINT/CRACK. IMMEDIATELY CLEAN UP DEBRIS TO AVOID OLD MATERIAL BEING TRACKED ON AND ADHERING TO THE SURFACES, WHICH WILL BE MUCH MORE DIFFICULT TO CLEAN. NO. 1. PROJECT NAME: TAXIWAY "D" EXTENSION NOTE: CONCRETE SPALL REPAIR SHALL BE MADE USING SSI FLEXPATCH OR APPROVED EQUAL. SHEET TITLE: SPALL AND PATCH REPAIR 1. LENGTH (L) AND WIDTH (W) FOR EACH SPALL AND PATCH REPAIR SHALL BE DETERMINED IN THE FIELD AS REQUIRED. SPALL AT CONTRACTION JOINT JOINT / CRACK SEALING & SPALL REPAIR DETAILS NTS ENGINEER OF RECORD: 2. IN AREAS WHERE SPALL REPAIRS ARE REQUIRED ON EACH SIDE OF JOINT OR CRACK, A NON-FLEXIBLE TYPE BOND BREAKER OR INSERT SHALL BE SECURED IN A STRAIGHT ALIGNMENT WITH THE JOINT OR CRACK AFTER BREAKING OUT THE SPALLED CONCRETE. THE SPALL REPAIR SHALL BE COMPLETED ON ONE SIDE AT A TIME SIMILAR TO SECTION B-B. A SEALED GROOVE SHALL BE PROVIDED IN ACCORDANCE WITH DETAIL "A". 3. SEE "SPALL AND PATCH REPAIR LEGEND" FOR MEANING OF CIRCLED NUMBERS ON SECTIONS A-A, B-B AND C-C. 4. AT TRIANGULAR SPALLS, THE REPAIRS SHALL BE MADE TO AVOID FEATHER EDGED CORNERS. SAWCUTS SHALL BE MADE TO INTERSECT JOINT LINES AT APPROXIMATELY 90° FOR NOT LESS THAN THE MINIMUM 2" DIMENSION SHOWN. 5. GUNTHER B. ZURSTADT FL PE #58224 ANY MARKINGS AFFECTED BY SPALL AND PATCH REPAIR MUST BE REPLACED IN-KIND. MARKINGS FOR THESE AREAS WILL BE INCIDENTAL TO PATCHING. JOB NO.: 14050.26 DRAWN: DATE: FEB 2016 DESIGN: SHEET NO. SPALL AT EXPANSION JOINT NTS CHECKED: C20 GW GZ AHC LAKELAND LINDER REGIONAL AIRPORT 3900 DON EMERSON DRIVE SUITE 210 LAKELAND, FLORIDA 33811 0 50' 100' 1000 LEGION PLACE, SUITE 1285 ORLANDO, FLORIDA 32801 GRAPHIC SCALE IN FEET CERTIFICATE OF AUTHORIZATION #29728 EXISTING SIGN D-3 D D EXISTING SIGN, SIGN PANELS, AND ACCESSORIES TO BE REMOVED. SIGN TO BE RELOCATED TO NEW LOCATION. DEMOLISH EXISTING SIGN PAD. BY 47+00 48+00 49+00 DESCRIPTION 46+00 DATE EXISTING SIGN D-2 EXISTING SIGN, SIGN PANELS, AND ACCESSORIES TO BE REMOVED. SIGN TO BE RELOCATED TO NEW LOCATION. DEMOLISH EXISTING SIGN PAD. 45+00 02/04/16 ISSUED FOR BID D D 44+00 1 INSTALL NEW SIGN FACE ON SIGN D-3 43+00 NO. 42+00 TAXIWAY D AHC KEY MAP PROJECT NAME: TAXIWAY "D" EXTENSION SHEET TITLE: SIGNAGE DEMOLITION PLAN ENGINEER OF RECORD: GUNTHER B. ZURSTADT FL PE #58224 JOB NO.: 14050.26 DRAWN: DATE: FEB 2016 DESIGN: SHEET NO. CHECKED: E01 GW GZ AHC LAKELAND LINDER REGIONAL AIRPORT 3900 DON EMERSON DRIVE SUITE 210 LAKELAND, FLORIDA 33811 50' 100' GRAPHIC SCALE IN FEET TAXIWAY E 0 1000 LEGION PLACE, SUITE 1285 ORLANDO, FLORIDA 32801 CERTIFICATE OF AUTHORIZATION #29728 BY D EXISTING SIGN D-1 AHC KEY MAP 1 DESCRIPTION DATE NO. PROJECT NAME: TAXIWAY "D" EXTENSION E D D E EXISTING SIGN, SIGN PANELS, AND ACCESSORIES TO BE REMOVED. SIGN TO BE RELOCATED TO NEW LOCATION. DEMOLISH EXISTING SIGN PAD, (TYP 3 SIGNS THIS SHEET) 02/04/16 ISSUED FOR BID E EXISTING SIGN E-3 SHEET TITLE: TAXIWAY E EXISTING SIGN E-2 SIGNAGE DEMOLITION PLAN ENGINEER OF RECORD: GUNTHER B. ZURSTADT FL PE #58224 JOB NO.: 14050.26 DRAWN: DATE: FEB 2016 DESIGN: SHEET NO. CHECKED: E02 GW GZ AHC LAKELAND LINDER REGIONAL AIRPORT TAXIWAY E 3900 DON EMERSON DRIVE SUITE 210 LAKELAND, FLORIDA 33811 0 50' 100' GRAPHIC SCALE IN FEET 1000 LEGION PLACE, SUITE 1285 ORLANDO, FLORIDA 32801 CERTIFICATE OF AUTHORIZATION #29728 NEW SIGN E-2 E D 30.0' ALIGN WITH P.I. OF 5 TAXIWAY D STA. 59+43.7 P.I. BY 30.0' E KEY MAP AHC D NOTE: RELOCATED SIGNS AND NEW CONCRETE SIGN PADS TO BE INSTALLED WITHOUT ELECTRICAL COMPONENTS OR CABLES, BUT SHALL BE READY FOR FUTURE INSTALLATION OF ELECTRICAL COMPONENTS AND CABLING, (TYP 3 SIGNS THIS SHEET). ALIGN WITH P.I. OF TAXIWAY D STA. 58+49.23 NEW SIGN D-1 P.I. 55+00 56+00 57+00 58+00 59+00 60+00 61+00 TAXIWAY D EXTENSION DESCRIPTION 54+00 DATE 53+00 ALIGN WITH P.I. OF 9 TAXIWAY D STA. 59+56.7 P.I. 30.0' 02/04/16 ISSUED FOR BID 52+00 1 51+00 NO. 50+00 PROJECT NAME: INSTALL NEW CONCRETE SIGN PAD, RELOCATED SIGN, AND NEW SIGN PANELS. INSTALL SIGN WITH NO ELECTRICAL COMPONENTS OR CABLING, (TYP 3 PLACES THIS SHEET) TAXIWAY "D" EXTENSION D E NEW SIGN E-3 SHEET TITLE: SIGNAGE PLAN ENGINEER OF RECORD: TAXIWAY E GUNTHER B. ZURSTADT FL PE #58224 JOB NO.: 14050.26 DRAWN: DATE: FEB 2016 DESIGN: SHEET NO. CHECKED: E03 GW GZ AHC LAKELAND LINDER REGIONAL AIRPORT C L EXISTING SIGN NUMBER SIGN MESSAGE NEW SIGN NUMBER NOTES: Y L BLANK 2 2 2 1 D D L Y BLANK 2 2 2 1 E L Y BLANK 3 2 2 1 E D L Y BLANK 2 2 2 1 D E Y L BLANK 2 2 2 1 E L Y BLANK 3 2 2 2 E D L Y BLANK 2 2 2 2 Y L BLANK - 2 2 2 2 D D D-3 D D-1 E-2 E-3 D-1 EXISTING/PROPOSED GRADE STYLE SIDE 2 NUMBER OF MODULES SIZE SIDE 1 SIDE 1 D-2 SIGN TYPE L-858 D SIDE 2 3900 DON EMERSON DRIVE SUITE 210 LAKELAND, FLORIDA 33811 1000 LEGION PLACE, SUITE 1285 ORLANDO, FLORIDA 32801 CERTIFICATE OF AUTHORIZATION #29728 D E NOTES: 1. RUBBER GROMMET TYPICAL 2. 2" SCHEDULE 40 PVC IN 4" SAND ENVELOPE TYPICAL END BELL TYPICAL REMOVE EXISTING SIGN AND FRANGIBLE COUPLINGS. DEMOLISH EXISTING CONCRETE SIGN PAD. RELOCATE EXISTING SIGN TO LOCATIONS SHOWN IN PLANS. (EXISTING SIGNS TO BE REUSED TO BE DETERMINED BY OWNER). INSTALL NEW CONCRETE PAD, BASE CAN ETC. PER DETAILS AT THE LOCATIONS SHOWN IN THE PLANS. INSTALL SIGN PREVIOUSLY REMOVED FROM OTHER LOCATIONS. FURNISH AND INSTALL NEW SIGN PANELS IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. THE QUANTITY OF SIGN MODULES IS BASED ON ONE OR TWO CHARACTERS PER MODULE. PAYMENT SHALL BE MADE ON THE BASIS OF A MODULE CONSISTING OF TWO CHARACTERS, REGARDLESS OF THE MANUFACTURING METHODS OR TECHNIQUES. THE EXISTING SIGNS ARE ADB-SEIMENS. SIGN PANELS SHALL BE MANUFACTURED BY ADB-SEIMENS. TYPE DESIGNATIONS L = L-858L LOCATION SIGN Y = L-858Y DIRECTION OR BOUNDARY SIGN BLANK = SIGN PANEL WITHOUT INSCRIPTION SIDE 2 END TOWARD T/W OR R/W BY E-3 6" MIN. AHC E-2 SIDE 1 TO EDGE OF FULL STRENGTH PAVEMENT TERMINATE WITH END CAPS 5' OUTSIDE OF CONCRETE PAD (TYP) DATE 2" RIGID GALVANIZED STEEL CONDUIT DESCRIPTION EXISTING SIGN NUMBERS AND NEW SIGN NUMBERS DEPICTED IN THE PLAN SET AND SIGNAGE TABLE ARE FOR IDENTIFICATION PURPOSES ONLY. THE FINAL SIGN ID NUMBERS ARE TO BE DETERMINED BY OWNER. APPROXIMATE SIGN OUTLINE NO. RUBBER GROMMET TYPICAL 3'-0" L-867B 24" DEEP BASE CAN 02/04/16 ISSUED FOR BID N.T.S. 1 3. SIDE VIEW PROJECT NAME: END BELL TYPICAL TAXIWAY "D" EXTENSION SHEET TITLE: VARIES 2" SCHED. 40 PVC IN A 4" SAND ENVELOPE SIGNAGE TABLE & DETALS VARIES 3'-0" ENGINEER OF RECORD: MIN. 3000 PSI CL1 6" THICK CONCRETE PAD WITH 6"X6" WELDED WIRE FABRIC 3" FROM THE TOP 3'-0" VARIES PLAN VIEW N.T.S. 2'-0" 1'-0" NEW SIGN NOTES: 1. ALL TAXIWAY GUIDANCE SIGNS SHALL BE LOCATED 30' OFF THE EDGE OF FULL STRENGTH PAVEMENT, AS SHOWN ON PLANS, UNLESS NOTED OTHERWISE. 2. FOR LOCATION AND ORIENTATION OF SIGNS AND FOUNDATIONS, SEE PLANS. THE LOCATION SHOWN ON THE PLANS IS THE PERPENDICULAR DISTANCE FROM THE DEFINED TAXIWAY/RUNWAY EDGE OF FULL STRENGTH PAVEMENT, TO THE NEAR SIDE OF THE SIGN'S LONGITUDINAL CENTERLINE (SEE PLAN VIEW). 3. THE CONCRETE BASE SHALL EXTEND 3'-0" BEYOND EACH SIDE OF THE SIGN. THE EDGE OF THE CONCRETE BASE SHALL EXTEND 12" BEYOND THE CENTERLINE OF THE L-867B BASE CAN. GUNTHER B. ZURSTADT FL PE #58224 JOB NO.: 14050.26 DRAWN: DATE: FEB 2016 DESIGN: SHEET NO. CHECKED: E04 GW GZ AHC