Maersk Completer - Maersk Drilling

Transcription

Maersk Completer - Maersk Drilling
Maersk
Completer
375 ft premium jack-up rig
Maersk Completer
Maersk Drilling
Maersk
Completer
TYPE
Cantilever Jack-up, Baker Pacific Class 375
BUILT
Jurong Shipyard Pte. Ltd., 2007
CLASS
ABS X A1 self elevating drilling unit
FLAG
Singapore
The Maersk Completer is capable of drilling in water depths
of up to 375 ft and has a rated drilling depth of 30,000 ft.
The rig is capable of operating in Asia Pacific, the Middle East,
the Mediterranean, Latin America and West Africa.
The Rig distances itself from conventional jack ups in
several areas, not least on the drill floor where the highly
mechanized equipment ensures increased safety for the
crew. The sophisticated drilling equipment also makes the
rig qualified for drilling deep and difficult wells, including high
temperature/high pressure wells.
Main advantages
•High level of safety
•Fully mechanised tubular handling
•Year-round operation in 375 ft of water in benign areas
•18 ¾” 15,000 psi BOP system
•Maximised drilling efficiency and uptime, due to off-line
activities
•3,400 t variable load
•Prepared for HP/HT operations
•Combined drilling load of 1,179 t at 41 ft cantilever reach
(centreline) & 703 t at 70 ft cantilever reach (centreline)
•Dual pipe handling. While one string is working in the well
bore, a second string of drill pipe or bottom hole assembly
can be assembled/disassembled in the mousehole
•Accommodation for 118 people
Maersk Completer
Maersk Drilling
Main particulars
DIMENSIONS
IMPERIAL
METRIC
Length overall
236.5 ft
72.1 m
Width overall
224.4 ft
68.4 m
Hull depth
27.9 ft
8.5 m
Length of legs
506 ft
154.2 m
Cantilever – max. reach: aft of stern
70 ft
21.3 m
14.8 ft
4.5 m
Equivalent spudcan diameter
55.9 ft
17 m
PARTICULARS
IMPERIAL
METRIC
Rated drilling depth
30,000 ft
9,150 m
Hook load static w/top drive
1,500,000 lbs
680 t
Rotary load
1,500,000 lbs
680 t
Setback load
900,000 lbs
400 t
Variable load
7,500,000 lbs
3,400 t
Derrick
187 ft x 35 ft x 35 ft
57 m x 10.6 m x 10.6 m
Jacking speed
1.18 ft/min
0.36 m/min
WEATHER/DESIGN CRITERIA
IMPERIAL
METRIC
Water depth
375 ft
114 m
Wind speed
70 knots
36 m/sec
Penetration
10 ft
3m
Wave height
45 ft
13.7 m
Current (surface)
1.2 knots
0.64 m/sec
Air gap
50 ft
15.2 m
CAPACITIES
IMPERIAL
METRIC
Drill water
21,885 bbl
3,480 m³
Potable water
3,558 bbl
565 m³
Fuel oil
3,929 bbl
624 m³
Brine
1,292 bbl
205 m³
Nontoxic oil
1,274 bbl
202 m³
Liquid mud
4,265 bbl
678 m³
Bulk mud
5,829 ft³
165 m³
Bulk cement
5,829 ft³
165 m³
Accommodation
118 people
118 people
– transverse (STB/PS)
Maersk Completer
Maersk Drilling
Key features
DRAWWORKS
NOV D3000 AC, 3 each CM-628 AC traction motors, 35” x 72”.
Drum grooved for 1 ⅝” drill line.
TRAVELLING EQUIPMENT
NOV Capacity 680 t, 7 x 60” sheaves grooved for 1 ⅝ ” drill
line.
TOP DRIVE AND PIPE HANDLING
NOV HPS-750, 680 t capacity, 7,500 psi, 1,230 hp, max
continuous torque 65,450 ft/lbs @ 99 rpm, max intermittent
torque 91,800 ft/lbs. NOV HydraRacker pipe handler.
IRON ROUGHNECK
NOV Hydratong 3 ½” to 9 ¾”.
ROTARY TABLE
NOV D 495–7k 49 ½” rotary table. Hydraulically driven, max
torque 20,000 ft/lbs.
MUD PUMPS
Three National Oilwell 14-P-220 Triplex, 7,500 psi.
CEMENTING EQUIPMENT
15,000 psi wp. On free placement agreement.
WELL CONTROL EQUIPMENT
1 each Hydril GX 18 ¾” 10,000 psi annular, 2 each Hydril
18 ¾” – 15,000 LW double Ram BOP, Vetco Gray KFDJ Diverter
system, 500 psi.
MUD RETURN SYSTEM
Four Brandt VSM 100 high performance shale shakers. One
NOV vacuum degasser.
DRIVE PIPE SUPPORT DECK
Hinged deck for conductor support tensioner system. NOV
Vertical conductor tensioning system consisting of four 115 t
hydraulic cylinders with 1,500 mm stroke.
DRILLING INSTRUMENTATION
NOV Cyberbase
POWER SUPPLY
5 each Caterpillar 3516BDITA with Caterpillar generators,
output 2,150 kva at rotation speed of 1,200 rpm. 1 each
emergency generator, Caterpillar 3508 B output 968 kw at
1,800 rpm.
CRANES
One crane with 36.5 m (120 ft) boom, 50 t at minimum radius.
One crane with 36.5 m (120 ft) boom, 40.8 t at minimum radius.
One crane with 30,5 m (100 ft) boom, 22.7 t at minimum radius.
HELICOPTER DECK
The platform of the helicopter deck is designed and built to
Class, Regulatory, IMO and CAP 437 to accommodate the
Sikorsky S-92A helicopter.
SAFETY EQUIPMENT
Lifesaving and fire fighting equipment in accordance with
rules and regulations.
ACCOMMODATION
Living quarters block is located forward of the platform hull
and is designed to accommodate 118 people. The quarters
hold seven offices in total, of which one are with unrestricted
view of rig floor.
Maersk Completer
Maersk Drilling
Main layouts
TOP VIEW AND DRILL FLOOR
TANK TOP
Maersk Completer
Maersk Drilling
QUARTERS
SIDE VIEW
October 2014
Head office:
Maersk Drilling
50, Esplanaden
1098 Copenhagen K
Denmark
Follow us to learn more
www.maerskdrilling.com
www.facebook.com/MaerskDrilling
www.linkedin.com/company/maerskdrilling
Telephone: +45 3363 3363
Telefax: +45 3363 3182
www.twitter.com/maerskdrilling
E-mail: copenhagen@maerskdrilling.com
www.maerskdrilling.com
www.youtube.com/user/Maerskcom
www.vimeo.com/maerskdrilling
www.instagram.com/maerskdrilling
“DISCLAIMER: This brochure is for promotional purposes only. All descriptions, specifications and other information contained in this brochure and/or in any accompanying material is: (i) intended to give only a general indication of the sorts
of service or equipment or performance that might be available (ii) intended to be no more than an invitation to treat (iii) subject to contract and possible change or alteration at our discretion and without notice to you (iv) not to be relied
upon by you for any purposes whatsoever when entering into any legally binding agreement with us.”