COMPANY MISSION
To maintain and strengthen its core business activities in Civil Construction
Construction,
Power, Petrochemicals, Oil & Gas, Energy, Environment, Infrastructure, Automotive
Dealership, Telecommunication and Shipping sectors in Kuwait as well as
Internationally by responding to the constantly changing needs of clients and
markets by providing excellent quality services through right skills and latest
technology that will exceed the expectation of our clients.
To achieve excellence in areas of core competence.
To allow our employees the opportunity to grow and prosper in a safe environment.
To maintain the highest levels of professionalism, integrity, honesty and fairness in
our relationship with customers
customers, suppliers
suppliers, subcontractors and all business
associates.
Group Overview
Alghanim International, a part of the Fouad Alghanim & Sons Group of
Companies engaged in a wide range of activities related to different types
of Industries & Services, and is backed by the support of all other
Companies of the Group in terms of Financial and Operational activities.
Contracting.
Alghanim
I t
International
ti
l
Upstream
Advance
Energy
Company
Shipping
Alghanim Group of
Shipping &
Transport
Hotels
• KuwaitContinental
• Hurghada Continental
(Egypt)
Medical
Kuwait
Medical Center
Fouad
Alghanim
& Sons
Trading
Automotives
Agent of:
Audi Lamborghini
Skoda
IT
KNETCO
Aviation
JJett stream
t
Alghanim International...
Highlights
Oil & Gas ( Specialist in Down Stream Work)
• Gathering Centers
• Cross Country Pipelines
• Petroleum Refinery & Plant Maintenance
• Installation of all Civil, Mechanical,
Electrical, Instrumentation works for
Oil & Gas, Petrochemical industries.
Energy ( Advance Energy Company)- Specialist in Upstream Work
• Joint ventures with Drilling in Iraq , Oman & GCC companies
• IPM projects for complete Oil Fields
• Implementation
I l
t ti off New
N
T
Technology
h l
, expertise
ti and
d ffamiliarizing
ili i i
with clients
Civil
• Infrastructure Projects
j
• Industrial & Commercial Buildings
Power
• Reliable and environmentally responsible
Combined Cycle Power Plants on an EPC basis.
• Power plant Operation & Maintenance
Projected at
1,490.961
Revenues
Financial performance of Alghanim International
for the past 5 years of operations
1471.658
543 663
543.663
600
US $ Millions
500
400
306.519
300
156.205
200
75.3
95.4
56.4
100
2003
2004
2005
2006
2007
2008
2009
2010
Alghanim Highlights
Emergency Power Plant – Alzour 2008
Gas Turbine Power Project – Alzour South
Emergency Power Project - Subiya
Sheraton 4 Points - Kuwait
– Pride
of Kuwait
TruckAvenues
Loading Mall
Facility
at Shuaiba
Refinery
Expertise
• Procurement & Construction of Oil & Gas Plants.
p in Upstream
p
Specialty
p
y Project
j
, Drilling
g , Well
• Expert
Servicing , Production , Optimization ( Onshore and
Offshore)
• Operation & Maintenance of Oil & Gas Plants.
• Conversion of Open Cycle Gas Fired Power Projects
to Combined Cycle Power Plants.
• Cross Country pipeline.
• All Mechanical, Electrical and Civil construction of
all types of on-shore Industrial Establishments.
• All types of Electrical and Instrumentation works for
Oil & Gas Power
Power, Energy and Water Sector
Sector.
• Civil Engineering & Construction of all types
of on-shore industrial establishments
p
y in the Oil & Gas, Power, Energy
gy
especially
and Water Sectors.
Expertise
Emphasis on QUALITY and SAFETY
Our Strength…We make it happen
• Over 100 specialist Engineers with International
experiences in various knowledge areas.
• We have a competent Tendering and proposal
Services team.
• A committed team in Upstream and Downstream
works with vast experience in the field of Rigging , Well
servicing and updated on latest technology
• Self Sufficient Engineering department
with Specialists and international
standard Office Infrastructures.
• Over 3,000 skilled Technical Specialists from
across the world.
• IInternational
t
ti
l Procurement
P
t Department
D
t
t having
h i
tie up with reputed OEM’s.
• In house Logistics Department capable of
fulfilling
g the requirements
q
of any
y Project
j
any time anywhere.
Qualifications
A few feathers in our cap…
Our Projects in Kuwait
New Crude Oil TL-04 30”
Pipeline from Point A to
CMM Burgan Total 123 Kms
Sabiya
Emergency
Power Plant
294 MW
New Crude Oil
Pipeline from TL-03 to
Doha Total 25 Kms
ESP in Mina
Ahmadi Refinery
Emergency Power
Project Shuwaikh
252 MW
Construction of
Storage Bitumen
Tank in MAA
Olefin-Equate
Integrated Digital
Field Project
Weatherford/Burgan
Truck loading Facility in
Mina Shuaiba Refinery
FWP Works in 16
GC’s at KOC Burgan
CAN-K Twin Screw Esp
Pilot Project at Minagish ,
West Kuwait
Az-Zour EPP 08
Project
880 MW
FWP Works in 16
GC’s at KOC Magwa
Az-Zour South Combined
Cycle Conversion Project
550 MW
Az-Zour South Gas
Turbine Project
1000 MW
Note :This presentation consists of few key project
executed by AIGTCC in the last 5 years.
O&G Projects Completed
Power Projects
O&G Projects on board
Safety First -Alghanim motto
• Company HSE policy
• HSE
S training
a
gp
program
og a
• HSE Personnel
• Project specific HSE plan
• HSE Committee meetings
• HSE inspection and audits
• Safety recognition & rewards
Man hours for 2009:
13.7 million
Frequency
q
y rate:
0.91
Fire Water Pumping System
Replacement of FWP system in all GC’s and BS’s in S/E Kuwait Contract No: KOC/23968
Fire Water Pumping
p g System
y
Replacement of FWP system in all GC’s and BS’s in S/E Kuwait Contract No: KOC/23968
Scope of Work : To upgrade the existing Fire Fighting System with higher
pump capacity to all KOC Production Facilities at Burgan Area in 16 Locations.
•South Kuwait: GC 3,4,6,7,8,21 & BS150.
•East
E t Kuwait
K
it : GC 1
1,2,9,10,11,19,20,22
2 9 10 11 19 20 22 & BS140
Contract Type:
yp Design,
g , Procurement,, Construction & Commissioning
g for
•Civil & Structural works.
•Mechanical works.
•Electrical works
works.
•Instrumentation works.
ESP Works
CA/PD/3603 Provision of Electrostatic Precipitator in FCC unit in Mina Ahmadi Refinery
ESP Works
CA/PD/3603 Provision of Electrostatic Precipitator in FCC unit in Mina Ahmadi Refinery
This is a first of its kind of project in Kuwait initiated by EIA to bring a Zero
Flaring system. The residues ( in form of hydrocarbon dust and sulphur
particles) as a byproduct of Catalytic cracking from FCCU unit , goes to the
stack through Electrostatic Precipitator. The precipitator unit has electrodes
inside. When high voltage is given to these electrodes , Electrode acts as
cathode and chamber plates as Anodes. The ESP precipitates the dust from
the Flue gas which accumulates on the chamber which is rapped out from the
collection plate and rapped out to the stack.
Alghanim anticipates ESP implementation projects the other two refineries by
KNPC
Emergency Power Plant, Shuwaikh (252 MW)
Project
: EPC Contract for 252 MW Gas Turbine Plant
at Shuwaikh
Shuwaikh, Kuwait
Client
: Ministry of Energy (Electricity and Water)
Duration
: 6 Months Construction + 5 Years O&M
Configuration
: 6 x GE LM6000 Turbines totalling 252 MW output
Az-Zour Emergency Power Project 2008 (890 MW)
Project
Client
Duration
Configuration
: EPC Contract for 890 MW Gas Turbine Power
Plant at Az
Az-Zour
Zour South,
South Kuwait
: Ministry of Energy (Electricity and Water)
: 10 Months (from Award of Contract to First Fire)
: 5 x Alstom GT13E2 totalling 890 MW output
Truck loading Facility
Revamping of Truck Loading Facilities at Shuaiba Refinery CS/PD/1717
GC 28, Capacity Expansion for Crude Processing
GC 28, Capacity Expansion for Crude Processing
Project Highlights
Fabrication & Erection of 990 Tons of Structural Works
Excavation of around 5
5,000
000 Cu
Cu.m
m for cable laying
Around 3,000 Cubic meter of Concreting works including Storage Tanks ring beam and bund walls
Olefin-II Infrastructure Project
U/G Piping, Road and Temporary Facility
New Crude Oil Pipeline from TL#03 to Doha Power Station
Project
: New Crude Oil Pipeline from TL#03 to Doha Power Station
Nature of Contract
: Engineering , Procurement and Construction
Client
: Kuwait Oil Company
Project Status
: Project in Progress
New Crude Oil Pipeline from TL#03 to Doha Power Station
This project consists of a new Pipe line, Pig Launcher / Receiver stations and
g systems
y
along
g with associated Electrical, CP & Instrumentation works.
metering
The New Pipe line (20” NB) connects into the TL-3 Pipeline via a hot tapped tee
at KP39 on Transit Line 3. It runs south east to the Doha power station for
approximately 25 km.
km A leak detection system is provided and the pipeline has
sectionalizing valve stations installed along its length.
The function of the pipeline system is to be provided is to•Take crude oil from the existing TL-3 Pipeline
•Transport 929 MTPH (1086.1 m3/hr) of crude oil to the Doha East Power Station
so that the east and west power stations can operate when fuel supply is
interrupted
Measure the quantity of crude transported
Advance Energy Company
Advanced Energy Company (AEC) is an integral part of Alghanim International Oil &
Gas (AIGTCC) group, under the visionary guidance of Fouad Alghanim & Sons group
of companies. Being one of the largest business conglomerates established in Kuwait
in early 60’s, we are involved in various essential core sectors of businesses in this
part of the world.
world
In line with diversifying our presence in the Oil & Gas sector and spreading our
expertise in harnessing the potential in Upstream and Downstream oil field
operations. AEC in coordination with AIGTCC is actively channelizing services and
technologies to promote its interests in the respective work fronts.
fronts
Being in the Oil & gas sector, we have been involved in various projects with Kuwait
Oil Company (KOC), Chevron/KGOC Joint Operations, Kuwait National Petroleum
Company (KNPC) and with co-operation with Fluor Corporation (A leading company
involved in Oil & Gas sectors including Project Management,
Management Consultancy,
Consultancy
Procurement and Engineering), we have established a Joint Venture undertaking with
them in Kuwait. AEC’s primary aim is to add to the history and accomplishments of
the Alghanim group through a vast number of success shares with our global partners
in many diverse business Mega Projects.
Projects
Our acquaintances with Top officials of JO , KOC , KJOC , KNPC and Other
international Oil Companies gives us a wide scope spectrum for expansion with
opportunities
CAN-K TWIN SCREW Pilot Project at KOC West Kuwait
Project
: CAN-K Twin Screw Pilot Project
Nature of Contract
: Artificial Lift and production Optimization
Client
: Kuwait Oil Company
Main Contractor
: Advance Energy Company / CAN K
Project to Start
:February 2011
Our valued customers and partners
POTENTIAL BUSINESS AREA:
™
According to the latest updates from KNPC , Retendering of the NEW REFINERY PROJECT is in its
final stage of approval by the supreme petroleum council and is expected to commence by early
2011.
™
KOC and KNPC intend to release mega million projects in 2011 . For more details , please explore
https://www.knpc.com/commercial/page.php ,
http://mcsetender kockw com/ET/Services/Common/Home aspx
http://mcsetender.kockw.com/ET/Services/Common/Home.aspx
™
Existing oil well servicing/ reconditioning for enhanced production in reduced cost to meet the global
demand of oil & Gas (North Kuwait fields, Sabriya, Abdaly, Rawdhatain & Ratqa fields). There is
going to be a boom in Midstream piping works.
™
Facility development to increase the production of non-associated natural gas wells in Umm Niqa
field, 2006 (estimated 35trn cu feet deposit gas) with KOC target on going raising rig count from 28
to 74 rigs by end 2011.
™
p
the big
gg
gates for extra Drilling
g & well servicing
g companies
p
to fulfill the p
production target
g
To open
in Oil & gas fields and make up the shortage in servicing and gates for New experts to achieve
Drilling, well services and work over targets of KOC and JO ( JO plans to go from 1878 wells to
13000 well by 2020).
™
Development of Cat-3
Cat 3 high pressure deep gas wells in north Kuwait at Umm Nigga and Mutriba
Jurassic formation fields, igniting new era into no associated gas production lacking expertise and
seeking the international experts to enhance the production in optimum cost.
™
™
™
KOC new projects to start Low scale pilot thermal recovery solutions for shallow heavy crude wells.
Offshore explorations and drilling planned to start 2012.
With JO development plan, 2 tenders was released this year and 3rd will be 2Q next year 2011 for
ESP services, also KOC plans to float cat B ESP tender by Q1 next year.
SOME IMPORTANT TIPS FOR INTERNATIONAL COMPANIES:
™
Kuwait is 4th biggest oil producer and always been stable with the support of government &
bankers despite of any global crisis or any difficulties arises.
™
Kuwait has a good platform to explore business opportunities & to earn good profits
™
AIGTCC has varied level of influence with major K-Companies (Clients ) which has helped
us pre-qualify products / services in Kuwait.
™
Manufacturers / Service providers hooked up with AIGTCC can ensure an amicable
business environment to rake profit
™
We foresee many upcoming mega billion projects in Kuwait and in this regard, we have
subdivided
bdi id d Al
Alghanim
h i IInternational
t
ti
l to
t form
f
an associate
i t company named
d M/s.
M/ Advance
Ad
energy general trading & contracting co. Mainly to focus on upstream activities & trading
business to meet market demand. Our expertise is much appreciated by our clients whom
we associate with.
™
We look forward to invite potential international companies in joining us , get prequalified ,
establish their foot prints in Kuwait and see a grand success in business, being together.
:
ALGHANIM INTERNATIONAL – OIL & GAS
P.O.BOX -2118 , 13022 SAFAT KUWAIT
PHONE: +965 23988580 FAX:+ 965 23989349
WEBSITE: www.alghanimportal.com