2014 Budget Report
Transcription
2014 Budget Report
2014 City of Pickerington Budget City of Pickerington Pickerington, Ohio For the year 2013 City of Pickerington, Ohio 2014 Budget Highlights 2% increase in wages for Union and Non-union employees 2% projected increase in actual income tax revenues. Eliminated staff construction inspection engineers (replaced with contractual inspectors). Budgeted 15% increase in health insurance rates (actual 6 percent increase). 1 additional police officer. 1 additional stormwater employee. 2 new patrol vehicles paid from Police Fund and 1 new vehicle for Commander paid from Law Enforcement Seizure Fund. Diley Road softball field shelter, restroom, and water fountain project Conversion of Victory Park tennis courts to basketball courts. Sycamore Park parking lot expansion. Willow Pond shelter, restroom, and water fountain project. Comprehensive park paths design and construction. 1 3% increase in Water and Sewer revenues. $450,000 allocated for New Well project. $193,000 allocated for Hereford Drive – Raw Water Conversion project. $156,000 allocated for Water Treatment Plant Reverse Osmosis Discharge Line. $145,000 allocated annually for water tank maintenance. $279,000 allocated for wastewater treatment plant generator replacement. $125,000 allocated for wastewater treatment plant water line replacement. $1,800,000 allocated for completion of Sycamore Creek East Relief Line Phases II and III (Water Pollution Control Loan Fund Proceeds – project carried forward from 2013) $850,000 allocated for the Leasure Drive Pump Station improvements (project carried forward from 2013). $90,000 allocated for State Route 256 Safety Grant right-of-way acquisitions. $25,000 allocated for Willow Run Storm Sewer. 2 City of Pickerington, Ohio 2014 Operating Budget Fund 1/1/2014 Cash Balance General Fund Estimated Revenues Estimated Transfers-In Estimated Expenditures Estimated Transfers-Out 12/31/2014 Unencumbered Balance $2,759,910 $7,605,034 $0 $3,520,586 $4,210,125 $2,634,233 413,823 79,771 189,857 108,237 24,661 4,624 18,273 446,398 1,774 1,060 41,973 1,330,451 703,092 47,545 120,000 161,797 9,750 700 0 1,915,091 0 125 30,000 2,988,100 250,000 0 0 542,000 0 0 0 2,885,000 0 0 50,300 3,727,300 1,002,980 51,070 0 703,927 8,650 1,685 18,000 4,940,331 250 0 95,300 6,822,193 0 0 86,341 0 0 0 0 0 0 0 0 86,341 363,935 76,246 223,516 108,107 25,761 3,639 273 306,158 1,524 1,185 26,973 1,137,317 18,801 9,250 119,095 169,429 316,575 0 0 0 0 0 860,277 0 0 0 860,277 860,275 0 78,000 200 938,475 0 0 0 0 0 18,803 9,250 41,095 169,229 238,377 165 277,834 625 71,688 67,312 395,249 159,653 0 0 0 972,526 0 85,100 0 66,580 70 130,135 50,045 72,000 245,000 81,000 729,930 0 0 0 0 0 0 0 0 9,000 9,000 0 0 625 0 67,000 492,500 20,000 72,000 245,000 90,000 987,125 0 50,000 0 75,000 0 0 0 0 0 0 125,000 165 312,934 0 63,268 382 32,884 189,698 0 0 0 599,331 1,527,399 2,400,167 0 19,145 46,217 949,907 0 609,407 0 569,647 0 68,977 0 3,984 3,250 61,954 6,260,054 2,395,793 3,547,460 1,800,000 0 10,000 300,811 0 312,146 0 726,960 0 0 0 0 0 170,235 9,263,405 0 0 0 468,146 0 0 63,320 0 0 0 1,358,537 0 0 0 0 0 1,890,003 2,433,741 3,363,227 1,800,000 468,146 12,500 349,000 63,320 125,000 0 537,585 1,358,537 0 0 0 0 215,324 10,726,380 120,199 1,237,617 0 0 0 278,970 0 310,714 0 48,637 0 68,977 0 0 0 0 2,065,114 1,369,252 1,346,783 0 19,145 43,717 622,748 0 485,839 0 710,385 0 0 0 3,984 3,250 16,865 4,621,968 95,500 3,570 278,989 23,864 1,710 68,847 4,358 476,838 100 500 100 10 2 22 0 734 0 0 0 0 0 0 0 0 95,600 3,000 0 0 0 0 0 98,600 0 0 0 0 0 0 0 0 0 1,070 279,089 23,874 1,712 68,869 4,358 378,972 Special Revenue Funds Street Fund State Highway Route 256 Highway Parks and Recreation Computer Fund OMVI Fund Law Enforcement Seizure Police Fund Mandatory Drug Fund Immobilization Fund Urban Forestry Total Special Revenue Funds Debt Service Funds Debt Service TIF Old Town Debt TIF Windmiller/ Diley Debt TIF Cover Debt Total Debt Service Funds Capital Projects Funds Street Construction Fund Street Impact Fee Fund Park Capital Improvement Fund Police Impact Fee Fund CDBG Revolving Loan Fund Park Impact Fee Fund Municipal Building Impact Fee Fund TIF Equity Construction Fund Safe Routes to Schools Fund State Route 256 Safety Grant Total Capital Projects Funds Enterprise Funds Water Fund Sewer Fund Water Pollution Control Loan Water Debt Retirement Fund Utility Deposit Guarantee Fund Water Capital Improvement Fund OWDA Sewer Repair and Replacement Fund Sewer Plant Line Construction Fund Stormwater Fund Sewer Debt Retirement Fund Water Tower Construction Fund Stormwater Construction Stormwater Debt Retirement Water Pollution Control Loan Fund - Water Aquatic Fund Total Enterprise Funds Fiduciary Funds Trust Fund Unclaimed Fund Street Trust Stormwater Improvement Trust Sidewalk Improvement Trust Stormwater Basin Cemetery Fund Total Fiduciary Funds Total Budget $ 12,116,354 $ 20,587,203 $ 3 6,486,580 $ 23,093,359 $ 6,486,580 $ 9,610,198 City of Pickerington, Ohio General Fund Comparative History Revenue Summary for the Years 2011-2016 % of Change 2012 Budget to 2013 Budget Projected 2015 Projected 2016 $865,000 0 0 5,332,985 100 110,000 6,308,085 3.59% 0.00% 0.00% -1.31% -93.33% 10.00% -0.51% $865,000 0 0 5,439,645 0 110,000 6,414,645 $865,000 0 0 5,548,438 0 110,000 6,523,438 56,220 570 29,642 19,696 162,000 102,710 0 0 370,838 0 500 29,000 19,700 163,649 100,000 0 0 312,849 0.00% 0.00% 7.41% 9.44% -0.24% 2.04% -100.00% 0.00% 1.40% 0 500 29,000 19,000 163,649 100,000 0 0 312,149 0 500 29,000 19,000 163,649 100,000 0 0 312,149 6,000 6,000 11,202 11,202 10,000 10,000 66.67% 66.67% 10,000 10,000 10,000 10,000 168,646 0 168,646 165,000 250 165,250 159,000 0 159,000 160,000 100 160,100 -3.03% -60.00% -3.12% 160,000 100 160,100 160,000 100 160,100 317,854 78,915 39,052 32,525 468,346 351,984 145,685 45,009 36,611 579,289 310,000 75,000 32,000 36,000 453,000 325,000 67,932 38,100 37,055 468,087 330,000 75,000 32,000 36,000 473,000 6.45% 0.00% 0.00% 0.00% 4.42% 330,000 75,000 32,000 36,000 473,000 330,000 75,000 32,000 36,000 473,000 Other Revenue Interest Donations/Contributions Franchise Fees Miscellaneous Refunds/ Reimbursements Transfers In Advances from Other Funds Subtotal - Other Revenue 50,110 26,485 253,843 40,093 50,139 0 782,880 1,203,550 35,092 39,007 262,588 8,051 64,754 0 0 409,493 28,000 39,000 200,000 5,800 24,200 0 0 297,000 26,000 34,284 259,297 9,350 33,386 175,000 0 537,317 26,000 20,000 250,000 8,500 36,500 0 0 341,000 -7.14% -48.72% 25.00% 46.55% 50.83% 0.00% 0.00% 14.81% 26,000 20,000 250,000 8,500 36,500 0 0 341,000 26,000 20,000 250,000 8,500 36,500 0 0 341,000 Total Operating Revenue $8,340,999 $7,686,195 $7,569,943 $7,775,590 $7,605,034 0.46% $7,710,894 $7,819,687 Revenue Source Taxes, Assessment & Related Revenue Property Tax - Real Estate Personal Property Tax Intangible Tax Income Tax Income Tax - Electric Light Hotel/ Motel Tax Subtotal - Tax Revenue Actual 2011 Actual 2012 Budgeted 2013 Estimated 2013 Proposed 2014 $899,120 351 2,150 5,010,595 3,682 101,391 6,017,289 $854,342 21 0 5,116,287 2,306 107,033 6,079,990 $835,000 0 0 5,403,652 1,500 100,000 6,340,152 $894,283 0 0 5,218,613 250 116,000 6,229,146 Intergovernmental Revenue Estate Taxes Cigarette Tax Liquor Tax Local Government - State Local Government - County Homestead/ Rollback Public Utility Reimbursement Personal Property Tax Reimbursement Subtotal - Intergovernmental Revenue 39,069 525 23,167 19,701 284,960 99,739 836 2,295 470,292 84,006 593 29,088 24,308 206,225 100,847 0 0 445,067 0 500 27,000 18,000 164,041 98,000 1,000 0 308,541 4,072 4,072 3,712 3,712 Fines and Forfeiture Revenue Mayor's Court Receipts Indigent Driver's Alcohol Monitoring Subtotal - Fines and Forfeitures 177,450 0 177,450 Development Revenue Building Permit Fees Engineering Fees Zoning Fees License/ Permit Fees Subtotal - Development Revenue Charges for Services Vacant Property Maintenance Subtotal - Charges for Services 4 City of Pickerington, Ohio General Fund Comparative History Expenditure Summary for the Years 2011-2016 Revised Budget 2013 Estimated 2013 Proposed 2014 $576,172 263,841 48,227 153,415 714,335 176,715 233,202 111,107 278,815 433,965 105,106 135,950 257,335 23,428 3,511,613 $409,216 292,898 54,304 162,142 730,057 190,124 279,000 137,786 245,447 450,221 312,134 159,506 266,756 49,900 3,739,491 $362,603 268,900 48,955 151,550 691,950 181,805 276,650 122,063 260,072 409,665 277,025 143,400 284,371 12,750 3,491,759 $454,783 280,108 54,303 168,481 639,446 179,248 264,500 136,968 198,203 443,332 188,190 171,188 297,838 42,500 3,519,086 202 44,685 3,613,247 722,880 4,381,014 250 46,619 4,745,581 0 4,792,449 1,500 0 4,497,838 0 4,499,338 150 0 4,099,048 0 4,099,198 7,559,076 8,304,062 8,238,829 7,590,957 Actual 2011 Actual 2012 General Government Legislative Mayor City Manager Finance Department Personnel Department Legal Department Mayor's Court Engineering Land and Buildings Planning and Zoning Department Development Department Building Department Public Information Total Operating Expenditures $502,019 229,464 33,285 139,954 650,614 178,124 225,736 109,191 237,302 340,015 118,845 110,491 279,039 23,983 3,178,062 Refunds School District TIF Payment Transfers Advances Total Non-Operating Expenditures Total Expenditures Expenditures Net Change in Fund Balance Estimated Fund Balance, January 1 Total Available Funds 781,923 (617,867) (668,886) 184,633 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 11.14% -4.37% 0.00% 3.91% -12.41% -5.72% -5.20% -0.59% -19.25% -1.53% -39.71% 7.32% 11.65% -14.83% -5.89% $398,844 289,594 54,977 173,937 650,536 181,146 259,500 136,572 184,728 463,073 189,716 158,958 307,679 37,175 3,486,434 $414,311 305,125 55,559 174,410 661,050 186,400 259,500 140,627 186,308 493,422 195,672 161,896 318,122 37,870 3,590,273 1,500 0 4,180,125 0 4,181,625 0.00% 0.00% -7.06% 0.00% -7.06% 1,500 0 5,119,920 0 5,121,420 1,500 0 4,652,575 0 4,654,075 7,700,711 -6.53% 8,607,854 8,244,348 (95,677) -85.70% (896,961) (424,661) 2,411,221 3,193,144 2,575,277 2,575,277 2,759,910 7.17% 2,664,233 1,767,272 $3,193,144 $2,575,277 $1,906,391 $2,759,910 $2,664,233 39.75% $1,767,272 $1,342,611 5 City of Pickerington, Ohio 101 General Fund General Government % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 $95,680 1,850 0 5,500 103,030 2.88% 0.00% -100.00% -4.35% 4.23% $98,550 1,850 0 5,665 106,065 $101,507 1,850 0 $5,835 109,192 0 0 0 250 0 250 0.00% 0.00% -100.00% 250 0 250 250 0 250 102,000 98,850 103,280 1.25% 106,315 109,442 12,000 500 104,807 0 5,000 122,307 12,500 0 109,089 750 0 122,339 12,500 0 109,089 0 0 121,589 12,500 0 112,362 750 5,000 130,612 0.00% 0.00% 3.00% 0.00% 100.00% 7.42% 12,500 0 115,733 750 5,000 133,983 12,500 0 119,204 750 5,000 137,454 6,126 6,126 5,581 5,581 7,000 7,000 0 0 7,000 7,000 0.00% 0.00% 7,210 7,210 7,426 7,426 Total Public Health 99,074 127,888 129,339 121,589 137,612 6.40% 141,193 144,881 Leisure Time Activities Contractual Services 101.396.53410 Olde Pick Village Association 101.398.53410 Violet Festival 101.398.53420 Fourth of July Activities 101.396.53430 Parade Supplies 101.398.53430 LEADS Class Play-A-Palooza 101.398.53430 Bicentennial Celebration Subtotal Contractual Services 2,500 0 26,466 0 1,000 0 29,966 5,000 0 29,429 0 0 0 34,429 7,500 0 32,000 500 0 10,000 50,000 7,500 0 23,246 124 0 0 30,870 7,500 0 30,000 900 0 60,000 98,400 0.00% 0.00% -6.25% 80.00% 0.00% 0.00% 96.80% 5,000 0 30,000 900 0 0 35,900 5,000 0 30,000 900 0 0 35,900 Total Leisure Time Activities 29,966 34,429 50,000 30,870 98,400 96.80% 35,900 35,900 Miscellaneous General Government Personal Services 101.795.51500 Worker's Comp General Fund Subtotal Personal Services 22,386 22,386 26,049 26,049 29,175 29,175 25,019 25,019 28,021 28,021 -3.95% -3.95% 31,384 31,384 35,150 35,150 738 18,393 17,500 24,500 0 2,200 3,844 15,282 17,000 0 16,080 2,270 7,000 19,000 20,000 0 0 2,300 0 16,905 16,680 0 0 2,340 7,000 20,000 17,500 0 0 2,350 0.00% 5.26% -12.50% 0.00% 0.00% 2.17% 2,500 22,000 20,000 0 0 2,350 7,000 22,000 20,000 0 0 2,350 (continued) Acct No. Security of Persons & Property Contractual Services 101.100.53110 Street Lights 101.100.53120 Christmas Lights - Electricity 101.100.53410 Professional Services 101.100.53130 Festival Service Subtotal Contractual Services 101.100.54230 101.100.54250 Supplies and Materials Miscellaneous Supplies Tornado Sirens Subtotal Supplies and Materials Total Security of Persons & Property Actual 2011 Actual 2012 Revised Budget 2013 Estimated 2013 $85,502 1,850 0 3,881 91,233 $89,462 1,850 0 3,876 95,188 $93,000 1,850 1,150 5,750 101,750 $92,000 1,850 0 5,000 98,850 250 0 250 0 0 0 250 0 250 91,483 95,188 10,000 0 82,948 0 0 92,948 Proposed 2014 Public Health 101.602.53430 101.200.53410 101.200.53411 101.200.53422 101.200.53424 Contractual Services Paratransit Subsidy Donations Health Dept - Franklin County Indigent Burial Pickerington Food Pantry Subtotal Contractual Services 101.298.54220 Supplies and Materials Supplies - Mosquito Control Subtotal Supplies and Materials 101.700.53410 101.707.53460 101.708.53410 101.708.53420 101.792.53410 101.795.53410 Contractual Services Election Expense County Auditor Fees Annual Audit Performance Audit Public Opinion Survey Gates McDonald Worker's Compensation 6 City of Pickerington, Ohio 101 General Fund General Government (Continued) Acct No. Revised Budget 2013 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 $9,279 4,552 2,300 1,489 5,000 6,000 0 12,000 87,470 4.85% 0.00% 0.00% 24.08% -33.33% 0.00% 0.00% -40.00% -11.38% $9,650 4,552 2,300 1,500 1,200 6,000 0 12,000 84,052 $10,036 4,552 2,300 1,500 1,200 6,000 0 12,000 88,938 111,294 115,491 -9.69% 115,436 124,088 $362,603 $454,783 11.14% $398,844 $414,311 Actual 2011 Actual 2012 Miscellaneous General Government (Continued) Contractual Services 101.797.53910 Mid Ohio Regional Planning Commission 101.797.53920 Fairfield Regional Planning 101.797.53930 Ohio Municipal League Dues 101.797.53940 National League of Cities 101.797.53950 Pickerington Chamber of Commerce 101.797.53975 Route 33 Alliance 101.798.53480 Legal Resolution 101.800.53410 Violet Twp Annexation Agreement Subtotal Contractual Services $6,890 1,947 1,560 1,117 10,000 6,000 150,000 18,265 259,110 $8,462 4,551 2,286 1,117 10,000 6,000 189,746 15,980 292,618 $8,850 4,552 2,300 1,200 7,500 6,000 0 20,000 98,702 $8,850 4,552 2,286 1,162 7,500 6,000 0 20,000 86,275 Total Miscellaneous General Government 281,496 318,667 127,877 $502,019 $576,172 $409,216 Total General Government 7 Estimated 2013 Proposed 2014 City of Pickerington, Ohio 101 General Fund 401, 402, and 403 Planning and Zoning Department Acct No. Planning and Zoning Department Personal Services 101.401.51100 Salaries and Wages 101.401.51210 Retirement Benefits 101.401.51300 Insurance 101.401.51600 Unemployment 101.401.52200 Professional Development Subtotal Personal Services 101.401.53410 101.401.53415 101.401.53513 Contractual Services Professional Services Property Maint/ Nuisance Abatement Vehicle Maintenance/ Repair Subtotal Contractual Services 101.401.54100 101.401.57230 Supplies and Materials Office Supplies Gasoline Rotary Subtotal Supplies and Materials 101.401.55211 Capital Vehicle Subtotal Capital Total Planning and Zoning Department Actual 2011 Actual 2012 Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 $67,596 10,437 7,373 20,112 237 105,755 $66,409 10,958 10,940 0 856 89,163 $117,850 18,209 29,775 0 1,500 167,334 $106,000 16,400 11,500 0 125 134,025 $119,912 $18,527 13,750 0 4,000 156,190 1.75% 1.75% -53.82% 0.00% 166.67% -6.66% $121,711 18,805 15,400 0 2,000 157,916 $123,537 19,087 17,248 0 2,000 161,872 11,528 0 0 11,528 14,939 0 0 14,939 119,000 0 300 119,300 119,000 0 0 119,000 12,700 10,000 300 23,000 -89.33% 100.00% 0.00% -80.72% 15,000 10,000 300 25,300 17,000 10,000 300 27,300 852 710 1,562 1,004 0 1,004 3,500 2,000 5,500 3,500 500 4,000 6,000 3,000 9,000 71.43% 50.00% 63.64% 3,500 3,000 6,500 3,500 3,000 6,500 0 0 0 0 20,000 20,000 20,000 20,000 0 0 -100.00% -100.00% 0 0 0 0 $118,845 $105,106 $312,134 $277,025 $188,190 -39.71% $189,716 $195,672 8 City of Pickerington, Ohio 101 General Fund 405 Development Department Acct No. Development Department Personal Services 101.405.51100 Salaries and Wages 101.405.51113 Unemployment 101.405.51210 Retirement Benefits 101.405.51300 Insurance 101.405.52200 Professional Development Subtotal Personal Services 101.405.53300 101.405.53410 Contractual Services Olde Downtown Revitalization Economic Development Services Subtotal Contractual Services 101.405.54100 Supplies and Materials Office Supplies Subtotal Supplies and Materials Total Development Department Actual 2011 Actual 2012 Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 $53,670 10,062 7,744 5,782 1,301 78,559 $70,600 0 12,256 7,193 2,724 92,773 $80,835 0 12,489 12,682 4,000 110,006 $79,500 0 12,400 11,000 3,000 105,900 $90,678 0 14,010 10,000 4,000 118,688 12.18% 0.00% 12.18% -21.15% 0.00% 7.89% $92,038 0 14,220 11,200 4,000 121,458 $93,419 0 14,433 12,544 4,000 124,396 10,385 20,661 31,046 12,378 29,510 41,888 12,000 35,000 47,000 0 35,000 35,000 0 50,000 50,000 -100.00% 42.86% 6.38% 0 35,000 35,000 0 35,000 35,000 886 886 1,289 1,289 2,500 2,500 2,500 2,500 2,500 2,500 0.00% 0.00% 2,500 2,500 2,500 2,500 $110,491 $135,950 $159,506 $143,400 $171,188 7.32% $158,958 $161,896 9 City of Pickerington, Ohio 101 General Fund 499 Building Department Acct No. Building Department Personal Services 101.499.51100 Salaries and Wages 101.499.51101 Overtime 101.499.51210 Retirement Benefits 101.499.51300 Insurance 101.499.51600 Unemployment 101.499.52200 Professional Development Subtotal Personal Services 101.499.53410 101.499.53411 101.499.53415 101.499.53513 Contractual Services CBO/ Plan Review Professional Services Building Contract Inspectors Vehicle Maintenance/ Repair Subtotal Contractual Services 101.499.54100 101.499.57200 Supplies and Materials Office Supplies Gasoline Rotary Subtotal Supplies and Materials Total Building Department Actual 2011 Actual 2012 Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 $111,975 406 16,746 42,169 13,427 325 185,048 $79,562 1,700 13,872 20,360 6,192 654 122,340 $88,862 2,000 14,038 30,356 0 600 135,856 $92,800 2,000 14,800 27,500 0 600 137,700 $98,683 1,000 15,405 30,750 0 1,000 146,838 11.05% -50.00% 9.74% 1.30% 0.00% 66.67% 8.08% $100,163 1,000 15,636 34,440 0 1,000 152,239 $101,666 1,000 15,871 38,573 0 1,000 158,109 23,870 8,208 59,268 97 91,443 28,519 7,683 93,320 1,567 131,089 30,900 12,000 85,000 0 127,900 35,000 14,171 95,000 0 144,171 35,000 18,000 95,000 0 148,000 13.27% 50.00% 11.76% 0.00% 15.72% 36,050 18,540 97,850 0 152,440 37,132 19,096 100,786 0 157,013 686 1,862 2,548 3,906 0 3,906 3,000 0 3,000 2,500 0 2,500 3,000 0 3,000 0.00% 0.00% 0.00% 3,000 0 3,000 3,000 0 3,000 $279,039 $257,335 $266,756 $284,371 $297,838 11.65% $307,679 $318,122 10 City of Pickerington, Ohio 101 General Fund 701 Mayor Acct No. Actual 2011 Actual 2012 Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 $25,286 3,907 46 643 29,882 $35,195 5,962 3,055 332 44,544 $38,248 5,601 3,055 1,900 48,804 $36,000 5,600 3,055 250 44,905 $38,248 5,600 3,055 1,900 48,803 0.00% -0.02% 0.00% 0.00% 0.00% $38,822 5,600 3,055 1,900 49,377 $39,404 5,600 3,055 1,900 49,959 640 640 1,349 1,349 2,250 2,250 1,500 1,500 2,250 2,250 0.00% 0.00% 2,250 2,250 2,250 2,250 2,538 225 2,763 2,256 78 2,334 2,950 300 3,250 2,400 150 2,550 2,950 300 3,250 0.00% 0.00% 0.00% 3,000 350 3,350 3,000 350 3,350 $33,285 $48,227 $54,304 $48,955 $54,303 0.00% $54,977 $55,559 Mayor 101.701.51100 101.701.51210 101.701.51300 101.701.52200 Personal Services Salaries and Wages Retirement Benefits Insurance Professional Development Subtotal Personal Services 101.701.53420 Contractual Services Professional Services Subtotal Contractual Services 101.701.54100 101.701.54232 Supplies and Materials Office Supplies Condolences/Remembrances Subtotal Supplies and Materials Total Mayor 11 City of Pickerington, Ohio 101 General Fund 702 and 710 Legislative (Council and Municipal Clerk) Acct No. Actual 2011 Actual 2012 Revised Budget 2013 Estimated 2013 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 $50,723 7,227 42,818 37 100,805 $51,276 8,026 71,068 91 130,462 $51,000 7,240 78,350 250 136,840 $49,900 7,200 72,000 250 129,350 $51,000 7,319 80,000 500 138,819 0.00% 1.09% 2.11% 100.00% 1.45% $51,765 7,429 89,600 250 149,044 $52,541 7,540 100,352 250 160,684 10,782 10,782 11,481 11,481 15,000 15,000 14,000 14,000 20,000 20,000 33.33% 33.33% 15,000 15,000 15,000 15,000 508 508 788 788 1,800 1,800 500 500 1,800 1,800 0.00% 0.00% 1,800 1,800 1,800 1,800 112,095 142,731 153,640 143,850 160,619 4.54% 165,844 177,484 83,051 12,279 20,219 37 115,586 88,824 14,301 15,483 203 118,811 89,829 13,879 24,300 1,750 129,758 88,000 13,800 20,250 1,000 123,050 83,479 11,260 19,500 1,250 115,489 -7.07% -18.87% -19.75% -28.57% -11.00% 84,731 11,429 21,840 1,750 119,750 86,002 11,429 24,461 1,750 123,642 365 365 352 352 500 500 0 0 500 500 0.00% 0.00% 500 500 500 500 1,418 1,418 1,947 1,947 9,000 9,000 2,000 2,000 3,500 3,500 -61.11% -61.11% 3,500 3,500 3,500 3,500 117,369 121,110 139,258 125,050 119,489 -14.20% 123,750 127,642 $229,464 $263,841 $292,898 $268,900 $280,108 -4.37% $289,594 $305,125 Proposed 2014 Council 101.702.51100 101.702.51210 101.702.51300 101.702.52300 Personal Services Salaries and Wages Retirement Benefits Insurance Professional Development Subtotal Personal Services 101.702.53410 Contractual Services Professional Services Subtotal Contractual Services 101.702.54100 Supplies and Materials Office Supplies Subtotal Supplies and Materials Total Council Municipal Clerk 101.710.51100 101.710.51210 101.710.51300 101.710.52200 Personal Services Salaries and Wages Retirement Benefits Insurance Professional Development Subtotal Personal Services 101.710.53430 Contractual Services Professional Services Subtotal Contractual Services 101.710.54100 Supplies and Materials Office Supplies Subtotal Supplies and Materials Total Municipal Clerk Total Legislative 12 City of Pickerington, Ohio 101 General Fund 703 Mayor's Court Clerk Acct No. Mayor's Court Clerk Personal Services 101.703.51100 Salaries and Wages 101.703.51210 Retirement Benefits 101.703.51300 Insurance 101.703.52200 Professional Development Subtotal Personal Services 101.703.53410 101.703.53413 101.703.53414 101.703.54100 Contractual Services Professional Services Magistrate Prosecutor Subtotal Contractual Services Supplies and Materials Office Supplies Total Mayor's Court Actual 2011 Actual 2012 Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 $48,883 7,530 18,740 508 75,661 $49,653 8,429 19,314 790 78,185 $59,191 9,187 22,195 2,500 93,073 $52,500 8,250 20,000 1,000 81,750 $58,754 9,001 22,500 2,000 92,255 -0.74% -2.03% 1.37% -20.00% -0.88% $59,636 9,136 25,200 1,800 95,772 $60,530 9,273 28,224 1,800 99,827 2,381 14,400 12,000 28,781 3,100 14,400 12,000 29,500 8,113 17,000 13,800 38,913 8,113 14,400 12,000 34,513 8,113 17,000 13,800 38,913 0.00% 0.00% 0.00% 0.00% 5,000 17,000 13,800 35,800 5,000 17,000 13,800 35,800 4,749 4,749 3,422 3,422 5,800 5,800 5,800 5,800 5,800 5,800 0.00% 0.00% 5,000 5,000 5,000 5,000 $109,191 $111,107 $137,786 $122,063 $136,968 -0.59% $136,572 $140,627 13 City of Pickerington, Ohio 101 General Fund 704 and 751 Finance Department Acct No. Finance Department Personal Services 101.704.51100 Salaries and Wages - Finance 101.704.51101 Overtime - Tax Clerks 101.704.51102 Overtime - Finance Clerk 101.704.51110 Salaries and Wages - Tax 101.704.51210 Retirement Benefits - Finance 101.704.51211 Retirement Benefits - Tax 101.704.51300 Insurance - Finance 101.704.51310 Insurance - Tax 101.704.52200 Professional Development - Finance 101.704.52300 Professional Development - Tax Subtotal Personal Services Actual 2011 Actual 2012 Revised Budget 2013 Estimated 2013 $81,038 3,036 59 157,988 15,501 20,324 20,671 56,193 3,244 545 358,599 $85,325 895 0 202,885 14,004 34,014 21,311 44,054 2,393 1,527 406,409 $87,024 2,000 500 236,628 13,446 32,272 24,486 38,451 3,000 2,000 439,807 $86,000 1,000 200 214,000 13,300 30,500 22,250 33,500 2,750 1,500 405,000 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 $84,329 1,000 500 177,654 13,107 27,605 23,000 14,500 3,500 2,000 347,196 -3.10% -50.00% 0.00% -24.92% -2.52% -14.46% -6.07% -62.29% 16.67% 0.00% -21.06% $85,594 2,000 500 $180,319 13,304 28,019 25,760 16,240 3,500 1,600 356,836 $86,878 2,000 500 $183,024 13,503 28,440 28,851 18,189 3,500 1,600 366,485 Proposed 2014 101.704.53230 101.704.53400 101.704.53410 101.704.53411 Contractual Services Postage - Tax Professional Services - Finance Professional Services - GAAP Professional Services - Tax Total Contractual Services 18,788 22,552 3,432 6,400 51,172 14,699 21,456 2,657 5,673 44,485 16,000 22,000 4,000 8,000 50,000 16,000 21,000 2,250 7,500 46,750 16,000 24,000 3,000 8,250 51,250 0.00% 9.09% -25.00% 3.13% 2.50% 16,480 24,720 3,250 8,250 52,700 16,974 $25,091 3,250 8,250 53,565 101.704.54100 101.704.54109 Supplies and Materials Office Supplies - Finance Office Supplies - Tax Subtotal Supplies and Materials 2,672 10,723 13,395 3,694 10,156 13,851 3,250 12,000 15,250 3,200 12,000 15,200 3,500 12,500 16,000 7.69% 4.17% 4.92% 3,500 12,500 16,000 3,500 12,500 16,000 101.751.57300 Transfers/ Reimbursements Income Tax Refunds Subtotal Transfers/ Reimbursements 227,448 227,448 249,591 249,591 225,000 225,000 225,000 225,000 225,000 225,000 0.00% 0.00% 225,000 225,000 225,000 225,000 $650,614 $714,335 $730,057 $691,950 $639,446 -12.41% $650,536 $661,050 Total Finance Department 14 City of Pickerington, Ohio 101 General Fund 705, 715, 716, 722, and 723 Land and Buildings (Facilities Operations) Acct No. Actual 2011 Land and Buildings Personal Services 101.722.52200 Professional Development - Technology Subtotal Personal Services Actual 2012 Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 $1,511 1,511 $0 0 $1,500 1,500 $0 0 $1,500 1,500 0.00% 0.00% $1,500 1,500 $1,500 1,500 31,831 3,730 48,241 12,984 40,574 1,231 23,206 393 8,160 10,691 22,429 203,470 35,697 2,872 90,249 15,641 24,947 687 24,924 0 7,325 34,982 31,561 268,885 38,000 4,750 55,000 16,000 36,000 1,500 28,186 800 10,000 25,000 12,000 227,236 35,500 3,400 65,000 16,000 34,000 1,000 23,815 450 9,750 15,000 6,300 210,215 37,500 4,000 70,000 16,000 30,000 1,500 26,197 600 10,000 22,000 1,000 218,797 -1.32% -15.79% 27.27% 0.00% -16.67% 0.00% -7.06% -25.00% 0.00% -12.00% -91.67% -3.71% 40,314 5,039 56,650 16,974 38,192 1,500 28,816 849 10,609 26,523 2,500 227,966 41,523 5,190 72,100 17,483 39,338 1,500 31,698 874 10,927 27,319 2,500 250,453 101.705.53110 101.716.53110 101.722.53415 101.705.53230 101.705.53410 101.705.53513 101.705.53620 101.716.53410 101.705.53310 101.705.53520 101.716.53520 Contractual Services Utilities Utilities - Carnegie Professional Services - Technology Postage Professional Services Vehicle Maintenance / Repair General Liability Insurance Professional Services - Carnegie Copier Maintenance Facility Maintenance Facility Maintenance - Carnegie Subtotal Contractual Services 101.705.54100 101.722.54120 101.722.54230 Supplies and Materials Office Supplies Computer Software Annual Capital Technology Equipment Subtotal Supplies and Materials 20,574 5,741 10,690 37,005 32,314 22,387 10,192 64,893 28,000 28,500 34,500 91,000 25,000 28,500 30,500 84,000 28,000 24,000 28,000 80,000 0.00% -15.79% -18.84% -12.09% 29,705 29,705 37,132 96,542 30,596 30,596 38,246 99,438 101.705.55200 101.705.55208 101.705.55300 101.705.55210 101.722.55210 Capital Annual Capital Maintenance Equipment Phone/ Network Lease Equipment Facility/Property Insurance Claims Copier Lease Computer Equipment Subtotal Capital 12,600 16,992 0 12,077 0 41,669 3,207 16,992 0 11,423 9,085 40,707 1,500 18,500 6,000 14,000 0 40,000 0 17,000 6,000 12,750 0 35,750 20,000 17,500 0 13,500 0 51,000 1233.33% -5.41% -100.00% -3.57% 0.00% 27.50% 7,957 19,627 0 14,000 0 41,584 8,196 20,216 0 14,000 0 42,412 101.705.57200 Transfers/ Reimbursements Gasoline Rotary Subtotal Transfers/ Reimbursements 1,117 1,117 1,694 1,694 2,500 2,500 1,400 1,400 3,500 3,500 40.00% 40.00% 2,652 2,652 2,732 2,732 284,772 376,179 362,236 331,365 354,797 -2.05% 370,244 396,534 (continued) Total Land and Buildings 15 City of Pickerington, Ohio 101 General Fund 705, 715, 716, 722, and 723 Land and Buildings (Facilities Operations) (Continued) Acct No. Facilities Operation Administrator Personal Services 101.715.51100 Salaries and Wages 101.715.51210 Retirement Benefits 101.715.51300 Insurance 101.715.52200 Professional Development Subtotal Personal Services Actual 2011 Actual 2012 Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 $33,172 5,975 14,990 0 54,137 $34,906 6,006 15,449 77 56,438 $53,733 8,302 22,200 1,250 85,485 $49,000 7,700 20,000 500 77,200 $54,382 8,403 22,500 1,250 86,535 1.21% 1.21% 1.35% 0.00% 1.23% $55,198 8,529 25,200 1,250 90,177 $56,026 8,657 28,224 1,250 94,157 101.715.53220 Contractual Services Professional Services Subtotal Contractual Services 412 412 541 541 1,000 1,000 750 750 1,000 1,000 0.00% 0.00% 1,061 1,061 1,093 1,093 101.715.54100 Supplies and Materials Office Supplies Subtotal Supplies and Materials 694 694 807 807 1,500 1,500 350 350 1,000 1,000 -33.33% -33.33% 1,591 1,591 1,639 1,639 55,243 57,786 87,985 78,300 88,535 0.63% 92,829 96,888 $340,015 $433,965 $450,221 $409,665 $443,332 -1.53% $463,073 $493,422 Total Facilities Operations Administrator Total Land and Buildings Department 16 City of Pickerington, Ohio 101 General Fund 709 Legal Department Actual 2011 Actual 2012 Revised Budget 2013 Estimated 2013 Proposed 2014 Legal Department Contractual Services 101.709.53422 General Legal Counsel 101.709.53423 Litigation Legal Counsel 101.709.53440 Lancaster Prosecutor 101.709.53460 Filing Fees/ Court Costs 101.709.53462 FOP Negotiations/ Arbitration 101.709.53463 AFSCME Negotiations/ Arbitration 101.709.53470 Annexation/ Economic Development Subtotal Contractual Services $192,072 5,099 24,999 124 0 0 3,442 225,736 $186,224 1,514 24,999 129 2,161 979 17,195 233,202 $188,000 5,000 25,000 500 3,000 3,000 54,500 279,000 $185,000 4,500 25,000 150 2,000 0 60,000 276,650 Total Legal Department $225,736 $233,202 $279,000 $276,650 Acct No. 17 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 $205,000 5,000 25,000 500 2,000 2,000 25,000 264,500 9.04% 0.00% 0.00% 0.00% -33.33% -33.33% -54.13% -5.20% $200,000 5,000 25,000 500 2,000 2,000 25,000 259,500 $200,000 5,000 25,000 500 2,000 2,000 25,000 259,500 $264,500 -5.20% $259,500 $259,500 City of Pickerington, Ohio 101 General Fund 711 and 712 City Manager Acct No. Manager's Administrative Assistant Personal Services 101.711.51100 Salaries and Wages 101.711.51210 Retirement Benefits 101.711.51300 Insurance 101.711.52200 Professional Development Subtotal Personal Services 101.711.54100 Supplies and Materials Office Supplies Subtotal Supplies and Materials Total Manager's Administrative Assistant Actual 2011 Actual 2012 Revised Budget 2013 Estimated 2013 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 $32,272 4,986 4,700 115 42,073 $31,158 5,283 4,867 614 41,922 $30,948 4,782 5,703 1,000 42,433 $25,500 4,200 3,600 250 33,550 $30,952 4,783 4,100 500 40,335 0.01% 0.02% -28.11% -50.00% -4.95% $31,416 4,855 4,592 500 41,363 $31,887 4,927 5,143 500 42,458 391 391 319 319 750 750 750 750 750 750 0.00% 0.00% 773 773 796 796 42,464 42,241 43,183 34,300 41,085 -4.86% 42,135 43,253 63,000 9,600 9,820 11,564 752 94,736 76,827 6,000 11,805 11,906 1,014 107,553 80,000 6,000 10,550 13,409 4,500 114,459 80,000 6,000 11,750 12,250 3,750 113,750 90,000 6,000 11,346 13,800 2,000 123,146 12.50% 0.00% 7.55% 2.92% -55.56% 7.59% 90,000 6,000 11,346 15,456 4,500 127,302 90,000 6,000 11,346 17,311 2,000 126,657 1,895 1,895 2,934 2,934 3,500 3,500 3,000 3,000 3,500 3,500 0.00% 0.00% 3,500 3,500 3,500 3,500 859 859 687 687 1,000 1,000 500 500 750 750 -25.00% -25.00% 1,000 1,000 1,000 1,000 97,490 111,174 118,959 117,250 127,396 7.09% 131,802 131,157 $139,954 $153,415 $162,142 $151,550 $168,481 3.91% $173,937 $174,410 Proposed 2014 City Manager 101.712.51100 101.712.51113 101.712.51210 101.712.51300 101.712.52200 Personal Services Salaries and Wages Contract Benefits Retirement Benefits Insurance Professional Development Subtotal Personal Services 101.712.53410 Contractual Services Professional Services Subtotal Contractual Services 101.712.54100 Supplies and Materials Office Supplies Subtotal Supplies and Materials Total City Manager Total City Manager Department 18 City of Pickerington, Ohio 101 General Fund 706, 714, 718 and 720 Human Resources Department Actual 2011 Actual 2012 Revised Budget 2013 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 $44,826 71 6,913 19,086 70,896 $49,890 0 8,483 20,429 78,802 $48,411 0 7,480 8,188 64,079 $48,250 0 7,425 8,300 63,975 $49,414 0 7,636 8,200 65,250 2.07% 0.00% 2.08% 0.15% 1.83% $50,155 0 7,750 9,184 67,089 $50,907 0 7,867 10,286 69,060 28 28 116 116 850 850 350 350 850 850 0.00% 0.00% 850 850 850 850 Total Administrative Support 70,924 78,917 64,929 64,325 66,100 1.80% 67,939 69,910 Human Resources Department Personnel Services 101.720.51100 Salaries and Wages 101.720.51210 Retirement Benefits 101.720.51300 Insurance 101.720.52200 Professional Development Subtotal Personal Services 67,600 8,136 13,374 576 89,686 53,288 9,066 13,569 830 76,752 68,258 10,547 15,410 3,480 97,695 62,500 9,750 14,250 3,480 89,980 59,677 9,221 13,750 3,500 86,148 -12.57% -12.57% -10.77% 0.57% -11.82% 60,572 9,359 15,400 3,500 88,831 61,481 9,499 17,248 3,500 91,728 13,944 0 103 29 1,605 15,681 12,358 0 853 21 6,349 19,581 11,500 5,500 1,500 100 7,000 25,600 11,500 5,500 1,500 100 7,000 25,600 12,500 3,000 1,500 100 8,000 25,100 8.70% -45.45% 0.00% 0.00% 14.29% -1.95% 12,875 0 1,500 100 8,000 22,475 13,261 0 1,500 100 8,000 22,861 1,072 761 1,833 1,135 331 1,465 1,500 400 1,900 1,500 400 1,900 1,500 400 1,900 0.00% 0.00% 0.00% 1,500 400 1,900 1,500 400 1,900 Total Human Resources Department 107,200 97,798 125,195 117,480 113,148 -9.62% 113,206 116,490 Total Human Resources Department $178,124 $176,715 $190,124 $181,805 $179,248 -5.72% $181,146 $186,400 Acct No. Administrative Support Personal Services 101.714.51100 Salaries and Wages 101.714.51101 Overtime 101.714.51210 Retirement Benefits 101.714.51300 Insurance Subtotal Personal Services 101.714.54100 Supplies and Materials Office Supplies Subtotal Supplies and Materials 101.720.53410 101.720.53411 101.720.53412 101.720.53413 101.720.53430 Contractual Services Professional Services Wellness Grant Employee Recognition Volunteer Recognition Training Subtotal Contractual Services 101.720.54100 101.720.54232 Supplies and Materials Office Supplies Condolences/ Remembrances Subtotal Supplies and Materials 19 Estimated 2013 Proposed 2014 City of Pickerington, Ohio 101 General Fund 721 Public Information Department Acct No. Actual 2011 Public Information Department Personal Services 101.721.51100 Salaries and Wages Subtotal Personal Services Actual 2012 Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 $0 0 $0 0 $13,900 13,900 $0 0 $6,000 6,000 -56.83% -56.83% $6,000 6,000 $6,000 6,000 $2,190 12,000 9,793 23,983 $12,760 870 9,798 23,428 $4,000 2,500 12,000 18,500 $1,500 750 10,500 12,750 $2,000 22,500 12,000 36,500 -50.00% 800.00% 0.00% 97.30% $2,000 23,175 12,000 37,175 $2,000 23,870 12,000 37,870 101.721.53410 101.721.53411 101.721.53700 Contractual Services Website Professional Services Advertising Subtotal Contractual Services 101.721.54231 Supplies and Materials Promotional Items Subtotal Supplies and Materials 0 0 0 0 0 0 0 0 0 0 0.00% 0.00% 0 0 0 0 101.721.55210 Capital Equipment Subtotal Capital 0 0 0 0 17,500 17,500 0 0 0 0 -100.00% -100.00% 0 0 0 0 $23,983 $23,428 $49,900 $12,750 $42,500 -14.83% $37,175 $37,870 Total Public Information Department 20 City of Pickerington, Ohio 101 General Fund 799 Engineering Department Actual 2011 Actual 2012 Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 $22,584 3,585 5,976 1,850 33,995 $43,698 7,567 4,905 1,791 57,962 $41,777 7,978 10,810 3,000 63,565 $31,000 4,300 4,300 1,400 41,000 $26,724 4,129 7,350 2,500 40,703 -36.03% -48.25% -32.01% -16.67% -35.97% $27,125 4,191 8,232 2,500 42,048 $27,532 4,191 9,220 2,500 43,442 1,407 43,140 44,547 2,896 52,136 55,032 5,000 44,000 49,000 1,200 85,000 86,200 2,000 75,000 77,000 -60.00% 70.45% 57.14% 2,060 60,000 62,060 2,122 60,000 62,122 1,261 0 1,261 740 0 740 3,000 0 3,000 500 0 500 1,000 3,000 4,000 -66.67% 100.00% 33.33% 1,030 3,090 4,120 1,061 3,183 4,244 79,803 113,734 115,565 127,700 121,703 5.31% 108,228 109,808 Engineering Department - Construction Inspection Engineers Personal Services 101.799.51101 Salaries and Wages 94,646 101.799.51110 Overtime - Inspection Engineers 536 101.799.51211 Retirement Benefits 14,659 101.799.51310 Insurance 37,475 101.799.51410 Uniforms 150 101.799.52310 Professional Development 250 Subtotal Personal Services 147,716 96,690 45 16,429 38,622 60 224 152,070 16,357 4,000 14,579 13,946 500 1,000 50,382 30,252 521 1,364 6,035 0 0 38,172 0 0 0 0 0 0 0 -100.00% -100.00% -100.00% -100.00% -100.00% -100.00% -100.00% 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Acct No. Engineering Department - Staff Engineering Personal Services 101.799.51100 Salaries and Benefits 101.799.51210 Retirement Benefits 101.799.51300 Insurance 101.799.52300 Professional Development Subtotal Personal Services 101.799.53220 101.799.53448 Contractual Services Professional Services Engineer - Consulting Services Subtotal Contractual Services 101.799.54100 101.799.54210 Supplies and Materials Office Supplies Gasoline Rotary Subtotal Supplies and Materials Total Staff Engineers 101.799.53221 101.799.53513 Contractual Services Professional Services Vehicle Maintenance Repair Subtotal Contractual Services 4,097 996 5,093 4,783 2,784 7,567 68,500 3,000 71,500 90,000 1,200 91,200 75,000 1,500 76,500 9.49% -50.00% 6.99% 75,000 1,500 76,500 75,000 1,500 76,500 101.799.54110 101.799.57210 Supplies and Materials Office Supplies Gasoline Rotary Subtotal Supplies and Materials 565 4,125 4,690 538 4,906 5,444 3,000 5,000 8,000 0 3,000 3,000 0 0 0 -100.00% -100.00% -100.00% 0 0 0 0 0 0 157,499 165,081 129,882 132,372 76,500 -41.10% 76,500 76,500 $237,302 $278,815 $245,447 $260,072 $198,203 -19.25% $184,728 $186,308 Total Construction Inspection Engineers Total Engineering Department 21 City of Pickerington, Ohio 101 General Fund 901 Transfers/Advances/Reimbursements/Refunds Acct No. Actual 2011 Reimbursements/Refunds 101.751.57310 Refunds - Miscellaneous 101.901.57109 School District TIF Payment Subtotal Reimbursements/ Refunds Transfers 101.901.57110 101.901.57112 101.901.57114 101.901.57117 101.901.57118 101.901.57120 101.901.57121 101.901.57123 101.901.57124 101.901.57150 101.901.57160 101.901.57165 101.901.57186 101.901.57187 101.901.59240 101.901.59250 Park Debt Retirement - Center Street Urban Forestry Debt Retirement - Courtright Road Debt Retirement - Police Facilities Police Debt Retirement - Street Improvement Debt Retirement - Diley Rd Improvement Debt Retirement - Traffic Light Street Capital Improvement Street Debt Retirement - SIB Loan Debt Retirement - TIF Old Town Debt Retirement - TIF Windmiller/ Diley Subtotal Transfers Advances Advance to Refugee Road Improvement Advance to WPCLF - Water Subtotal Advances Total Transfers/Advances/Reimbursements/Refunds Revised Budget 2013 Actual 2012 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 $202 44,685 44,887 $250 46,619 46,869 $1,500 0 1,500 $300 0 300 $1,500 0 1,500 0.00% 0.00% 0.00% $1,500 0 1,500 $1,500 0 1,500 350,000 29,375 0 171,250 213,500 2,116,137 127,000 202,500 2,500 0 0 393,004 7,981 0 3,613,247 370,000 42,750 20,000 177,063 379,784 2,215,500 70,125 0 204,750 44,233 786,000 393,523 41,853 0 4,745,581 450,000 20,187 40,000 124,873 215,860 2,875,000 43,400 0 0 0 722,500 6,018 0 0 4,497,838 450,000 17,092 40,000 115,602 200,808 2,530,000 70,546 0 0 0 675,000 0 0 0 4,099,048 542,000 16,700 50,300 118,075 229,400 2,885,000 109,650 0 0 9,000 220,000 0 0 0 4,180,125 20.44% -17.27% 25.75% -5.44% 6.27% 0.35% 152.65% 0.00% 0.00% 0.00% -69.55% -100.00% 0.00% 0.00% -7.06% 525,000 16,500 20,000 116,275 249,300 3,105,000 110,850 0 0 776,995 200,000 0 0 0 5,119,920 525,000 21,300 20,000 119,475 254,200 3,215,000 114,050 0 0 0 275,000 108,550 0 0 4,652,575 0 722,880 722,880 0 0 0 0 0 0 0 0 0 0 0 0 0.00% 0.00% 0.00% 0 0 0 0 0 0 $4,381,014 $4,792,449 $4,499,338 $4,099,348 $4,181,625 -7.06% $5,121,420 $4,654,075 22 City of Pickerington, Ohio Street Fund Actual 2011 Actual 2012 Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 $78,457 153,210 484,360 716,027 $82,566 125,716 509,957 718,239 $78,000 100,000 500,000 678,000 $83,157 144,526 493,105 720,788 $78,000 125,000 490,000 693,000 0.00% 25.00% -2.00% 2.21% $78,000 125,000 490,000 693,000 $78,000 125,000 490,000 693,000 9,165 474 40 4,038 10,553 0 239 24,509 0 656 2,646 8,539 3,287 786,000 48,316 849,444 0 351 0 5,000 0 722,500 0 727,851 0 0 40 8,856 4,455 675,000 29,981 718,332 0 350 0 9,742 0 220,000 0 230,092 0.00% -0.28% 0.00% 94.84% 0.00% -69.55% 0.00% -68.39% 0 300 0 10,716 0 200,000 0 211,016 0 300 0 11,788 0 275,000 0 287,088 Total Revenues 740,536 1,567,683 1,405,851 1,439,120 923,092 -34.34% 904,016 980,088 201.602.51100 201.602.51101 201.602.51104 201.602.51105 201.602.51210 201.602.51211 201.602.51300 201.602.51310 201.602.51400 201.602.51500 201.602.52200 Personal Services Salaries and Wages - AFSCME Overtime - AFSCME Salaries and Wages - Nonunion Overtime Retirement Benefits - AFSCME Retirement Benefits - Nonunion Insurance - Nonunion Insurance - AFSCME Uniforms Worker's Compensation Professional Development Subtotal Personal Services 162,282 10,800 28,823 274 26,733 4,182 8,450 51,722 3,736 4,506 347 301,855 166,714 6,610 32,474 0 29,278 4,965 8,711 72,672 2,050 5,031 812 329,317 173,552 10,500 46,758 1,500 28,736 7,249 10,010 83,471 2,655 6,000 1,000 371,431 174,030 13,644 37,337 100 24,978 4,890 8,998 75,049 2,000 6,909 750 348,684 180,591 10,500 51,985 1,500 29,564 8,029 10,143 84,543 2,000 7,738 1,000 387,593 4.06% 0.00% 11.18% 0.00% 2.88% 10.75% 1.33% 1.28% -24.67% 28.97% 0.00% 4.35% 183,300 10,500 52,765 1,500 30,007 8,149 11,360 94,688 3,000 8,512 1,000 404,781 186,049 10,500 53,557 1,500 30,457 8,271 12,723 106,051 3,000 9,363 1,000 422,472 201.699.53110 201.602.53407 201.602.53408 201.602.53410 201.602.53413 201.602.53510 201.602.53513 201.602.53530 201.699.53610 Contractual Services Utilities Mowing Contract Pavement Striping Contract Professional Services Crack Sealing Equipment Maintenance Vehicle Maintenance/ Repair Annual Street Resurfacing Insurance - General Liability Subtotal Contractual Services 15,638 0 2,188 81,862 1,875 11,493 18,347 1,680 14,656 $147,739 15,186 4,650 21,412 115,078 67,948 16,598 19,587 561,509 18,112 $840,081 18,300 8,500 48,000 84,000 22,000 18,000 28,000 546,000 21,839 $794,639 15,461 4,470 48,000 84,000 22,000 18,000 15,000 546,000 19,017 771,948 18,000 6,500 50,000 86,518 25,000 18,000 17,000 70,000 20,919 311,937 -1.64% -23.53% 4.17% 3.00% 13.64% 0.00% -39.29% -87.18% -4.21% -60.74% 18,540 6,695 25,000 89,114 20,000 18,540 17,510 0 23,011 218,410 19,096 6,896 25,000 91,787 20,000 19,096 18,035 0 25,312 225,223 (continued) Acct No. Revenues 201.000.41600 201.000.42400 201.000.42600 Intergovernmental Revenue Permissive Tax Motor Vehicle License Fees Motor Vehicle Gas Tax Subtotal Intergovernmental Revenue 201.000.48100 201.000.48200 201.000.48400 201.000.48441 201.000.48800 201.000.49110 201.000.49900 Other Revenue Sale of Capital Assets Interest Miscellaneous Insurance Employee Contribution Reimbursements Transfers from the General Fund Insurance Reimbursement Subtotal Other Revenue Expenditures 23 City of Pickerington, Ohio Street Fund (Continued) Acct No. Actual 2011 Actual 2012 Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 201.603.54200 201.602.54230 201.602.54250 201.602.54311 201.602.54320 201.602.57200 Supplies and Materials Salt Miscellaneous Supplies Miscellaneous Equipment Vehicle / Equipment Replacement Facility Maintenance Gasoline Rotary Subtotal Supplies and Materials $97,071 42,239 16,074 3,221 1,562 28,170 188,337 $32,598 42,694 14,397 38,177 2,018 42,529 172,414 $60,000 50,000 37,200 32,548 3,200 32,000 214,948 $58,479 45,000 33,835 10,000 2,000 32,000 181,314 $65,000 45,000 15,548 20,000 10,000 34,000 189,548 8.33% -10.00% -58.20% -38.55% 212.50% 6.25% -11.82% $60,000 45,000 15,500 20,000 2,500 35,020 178,020 $60,000 45,000 15,500 20,000 2,500 36,071 179,071 201.602.55201 201.602.55206 201.602.55208 201.602.55210 201.607.55527 201.602.55300 Capital Traffic Lights ODOT Safety Grant Engineering Phone/ Network Lease Equipment Equipment/Lease Purchase Sidewalks Building/ Structures/Infrastructure Subtotal Capital 13,592 7,640 3,420 0 4,242 0 28,894 57,833 45,797 3,420 24,330 16,161 0 147,541 15,000 0 2,500 34,767 25,000 74,685 151,952 15,000 15,767 3,420 34,767 25,000 74,685 168,639 10,000 0 3,420 66,952 25,000 8,530 113,902 -33.33% 0.00% 36.80% 92.57% 0.00% -88.58% -25.04% 15,000 0 2,300 20,000 25,000 10,000 72,300 15,000 0 2,300 20,000 25,000 90,000 152,300 666,825 1,489,353 1,532,970 1,470,585 1,002,980 -34.57% 873,511 979,065 73,711 78,329 (127,119) (31,465) (79,888) 37.16% 30,505 1,023 293,248 366,959 445,288 445,288 413,823 -7.07% 333,935 364,441 $366,959 $445,288 $318,169 $413,823 $333,935 4.96% $364,441 $365,463 Total Expenditures Net Change in Fund Balance Estimated Fund Balance, January 1 Total Available Funds 24 City of Pickerington, Ohio State Highway Fund Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 $10,193 41,348 51,541 $8,000 38,000 46,000 $10,300 43,950 54,250 $9,000 38,000 47,000 12.50% 0.00% 2.17% $9,000 38,000 47,000 $9,000 38,000 47,000 44 397 361 802 79 508 378 966 5 400 0 405 65 483 561 1,109 45 500 0 545 800.00% 25.00% 0.00% 34.57% 45 500 0 545 45 500 0 545 Total Revenues 52,497 52,507 46,405 55,359 47,545 2.46% 47,545 47,545 202.699.51100 202.699.51210 202.699.51300 202.699.51500 Personal Services Salaries and Wages - AFSCME Retirement Benefits Insurance Worker's Compensation Subtotal Personal Services 10,674 1,636 4,702 290 17,302 10,949 1,838 4,845 348 17,981 11,491 1,776 5,565 400 19,232 10,694 1,284 5,003 1,004 17,985 11,961 1,848 5,637 1,124 20,570 4.09% 4.07% 1.29% 181.01% 6.96% 12,140 1,876 6,313 1,236 21,566 12,322 1,904 7,071 1,360 22,657 202.605.53110 Contractual Services Utilities Subtotal Contractual Services 7,697 7,697 8,823 8,823 9,900 9,900 8,230 8,230 9,000 9,000 -9.09% -9.09% 9,270 9,270 9,548 9,548 202.603.54200 202.605.54240 Supplies and Materials Salt Miscellaneous Supplies Subtotal Supplies and Materials 17,929 0 17,929 0 0 0 20,000 1,500 21,500 16,441 1,500 17,941 20,000 1,500 21,500 0.00% 0.00% 0.00% 20,000 1,500 21,500 20,000 1,500 21,500 Total Expenditures 42,928 26,803 50,632 44,155 51,070 0.00% 52,336 53,705 9,569 25,704 (4,227) 11,204 (3,525) 16.61% (4,791) (6,160) 33,295 42,864 68,568 68,568 79,771 16.34% 76,246 71,456 $42,864 $68,568 $64,341 $79,771 $76,246 18.50% $71,456 $65,295 Acct No. Actual 2011 Actual 2012 $12,423 39,272 51,695 Revenues 202.000.42400 202.000.42600 Intergovernmental Revenue Motor Vehicle License Fees Motor Vehicle Gasoline Tax Subtotal Intergovernmental Revenue 202.000.48200 202.000.48441 202.000.49310 Other Revenue Interest Insurance Employee Contribution Reimbursements Subtotal Other Revenue Expenditures Net Change in Fund Balance Estimated Fund Balance, January 1 Total Available Funds 25 City of Pickerington, Ohio State Route 256 Fund Actual 2011 Actual 2012 Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 $117,685 117,685 $123,849 123,849 $115,000 115,000 $124,735 124,735 $120,000 120,000 4.35% 4.35% $120,000 120,000 $120,000 120,000 Total Revenues 117,685 123,849 115,000 124,735 120,000 4.35% 120,000 120,000 Transfers Transfer to Debt Service Subtotal Transfers 100,000 100,000 100,000 100,000 100,000 100,000 84,634 84,634 86,341 86,341 -13.66% -13.66% 62,550 62,550 100,000 100,000 Total Expenditures 100,000 100,000 100,000 84,634 86,341 -13.66% 62,550 100,000 17,685 23,849 15,000 40,101 33,659 124.39% 57,450 20,000 108,222 125,907 149,756 149,756 189,857 26.78% 223,516 280,966 $125,907 $149,756 $164,756 $189,857 $223,516 35.67% $280,966 $300,966 Acct No. Revenues 203.000.41600 Intergovernmental Revenue Permissive Tax Subtotal Intergovernmental Revenue Expenditures 203.901.57190 Net Change in Fund Balance Estimated Fund Balance, January 1 Total Available Funds 26 City of Pickerington, Ohio Parks and Recreation Fund Acct No. Actual 2011 Actual 2012 Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 Revenues 204.000.45318 204.000.45317 204.000.45312 204.000.45370 Charges for Services Miscellaneous Recreation Classes Miscellaneous Special Events Adult Leagues Facility Rental Subtotal Charges for Services $73,658 0 16,425 8,009 98,092 $78,019 0 14,715 13,938 106,672 $75,000 0 15,000 8,000 98,000 $87,000 400 11,625 10,967 109,992 $85,000 4,000 15,000 9,000 113,000 13.33% 100.00% 0.00% 12.50% 15.31% $75,000 4,000 15,000 9,000 103,000 $75,000 4,000 15,000 9,000 103,000 204.000.48100 204.000.48309 204.000.48310 204.000.48317 204.000.48400 204.000.48404 204.000.48415 204.000.48441 204.000.48450 204.000.49150 204.000.49310 204.000.49900 Other Revenue Sale of Capital Assets Movie Donations Band Donation 4th of July Donation Miscellaneous Receipts Community Garden Plot Sale Security Deposits Received Insurance Employee Contribution Vending Income Transfers from General Fund Refunds/ Reimbursements Insurance Reimbursements Subtotal Other Revenue 1,025 3,135 18,000 4,775 300 1,510 500 3,175 204 350,000 368 0 382,992 0 3,365 18,000 3,325 250 1,670 0 4,596 827 370,000 225 9,648 411,906 0 3,000 18,000 0 0 1,200 0 3,500 500 450,000 7,000 0 483,200 0 3,500 0 150 7 1,395 0 5,566 900 450,000 2,060 0 463,577 0 3,000 22,500 0 0 1,200 15,000 6,122 750 542,000 225 0 590,797 0.00% 0.00% 25.00% 0.00% 0.00% 0.00% 100.00% 74.92% 50.00% 20.44% -96.79% 0.00% 22.27% 0 3,000 18,000 0 0 1,200 15,000 6,214 750 525,000 225 0 569,389 0 3,000 18,000 0 0 1,200 15,000 6,307 750 525,000 225 0 569,482 Total Revenues 481,084 518,578 581,200 573,569 703,797 21.09% 672,389 672,482 Personal Services Salaries and Wages - Nonunion Salaries and Wages - AFSCME Overtime - AFSCME Overtime - Nonunion Retirement Benefits - Nonunion Retirement Benefits - AFSCME Insurance - Nonunion Insurance - AFSCME Uniforms - AFSCME Uniforms - Nonunion Workers Compensation Professional Development Subtotal Personal Services 119,210 41,223 5,816 2,374 18,622 9,088 21,841 18,722 1,870 64 2,424 1,109 242,363 132,737 41,782 5,784 1,123 21,258 9,584 27,754 19,379 1,232 90 3,177 1,286 265,188 162,266 43,493 6,500 1,000 25,074 8,336 33,514 22,259 2,000 750 3,500 3,500 312,192 173,562 42,644 5,100 2,147 22,486 6,045 22,515 21,693 1,750 500 3,175 1,713 303,331 167,969 44,387 6,500 2,000 26,109 7,884 25,431 22,545 1,750 850 3,556 6,000 314,980 3.51% 2.06% 0.00% 100.00% 4.13% -5.43% -24.12% 1.28% -12.50% 13.33% 1.60% 71.43% 0.89% 170,488 45,053 6,500 2,000 26,340 6,961 28,483 25,250 1,750 750 3,500 8,500 325,575 173,045 45,729 6,500 2,000 26,735 7,065 31,901 28,280 1,750 750 3,500 8,500 335,756 11,000 0 42,970 15,272 7,675 9,740 3,011 53,565 0 12,530 0 44,206 19,073 6,830 4,650 2,886 52,365 0 11,500 500 54,250 30,750 15,000 0 4,000 75,000 0 16,699 0 48,000 30,000 8,002 0 0 54,000 0 18,000 0 52,000 33,000 15,000 5,000 2,500 75,000 3,600 56.52% -100.00% -4.15% 7.32% 0.00% 100.00% -37.50% 0.00% 100.00% 18,540 0 47,500 30,000 15,000 5,000 3,000 75,000 3,600 19,096 0 48,000 30,000 15,000 5,000 3,000 75,000 3,600 (continued) Expenditures 204.301.51100 204.302.51100 204.302.51101 204.302.51103 204.301.51210 204.302.51210 204.301.51300 204.302.51300 204.302.51400 204.302.51409 204.302.51500 204.301.52200 204.302.53110 204.301.53210 204.301.53410 204.302.53410 204.301.53411 204.302.53411 204.302.53412 204.301.53422 204.301.53423 Contractual Services Utilities - Parks Utilities - Recreation Professional Services - Recreation Professional Services - Parks League Officials - Recreation Contract Mowing Contract Landscaping Miscellaneous Recreation Classes Miscellaneous Special Events 27 City of Pickerington, Ohio Parks and Recreation Fund (Continued) Acct No. 204.301.53510 204.302.53513 204.302.53520 204.302.53610 204.301.57300 204.301.57310 Equipment Maintenance - Recreation Vehicle Maintenance/ Repair Facility Equipment Maintenance/ Repair Insurance - General Liability Program Refunds Security Deposits Refunded Subtotal Contractual Services 204.301.54230 204.302.54230 204.302.57200 Supplies and Materials Miscellaneous Supplies - Recreation Miscellaneous Supplies - Parks Gasoline Rotary Subtotal Supplies and Materials 204.302.55209 204.302.55210 204.302.55220 Capital Gator Trade-in Program Equipment - Parks Vehicle/Mower Subtotal Capital Total Expenditures Net Change in Fund Balance Estimated Fund Balance, January 1 Total Available Funds Actual 2011 Actual 2012 Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 $161 3,314 26,989 9,103 6,332 700 189,832 $5,149 1,680 39,223 7,659 7,439 0 203,690 $500 4,500 45,000 8,291 10,000 0 259,291 $0 3,817 39,241 8,042 6,357 0 214,158 $3,000 5,000 47,000 8,846 10,000 15,000 292,946 500.00% 11.11% 4.44% 6.70% 0.00% 100.00% 12.98% $500 4,000 40,000 9,731 10,000 15,000 276,871 $500 4,000 40,000 10,704 10,000 15,000 278,900 18,207 19,536 6,951 44,694 10,250 16,966 5,483 32,700 18,000 31,000 6,000 55,000 18,000 24,000 6,000 48,000 25,000 51,500 6,000 82,500 38.89% 66.13% 0.00% 50.00% 20,000 30,000 6,000 56,000 20,000 30,000 6,000 56,000 1,000 0 0 1,000 1,200 5,811 0 7,011 1,200 0 10,000 11,200 1,200 0 3,748 4,948 1,500 0 12,000 13,500 25.00% 0.00% 20.00% 20.54% 1,500 0 12,000 13,500 1,500 0 0 1,500 477,889 508,588 637,683 570,436 703,927 10.39% 671,946 672,156 3,195 9,990 (56,483) 99.77% 443 326 91,919 95,114 105,104 105,104 108,237 2.98% 108,107 108,550 $95,114 $105,104 $48,621 $108,237 $108,107 122.35% $108,550 $108,876 28 3,133 (129) Projected 2016 City of Pickerington, Ohio Computer Fund Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 $10,773 10,773 $9,750 9,750 $10,334 10,334 $9,750 9,750 0.00% 0.00% $9,750 9,750 $9,750 9,750 11,527 10,773 9,750 10,334 9,750 0.00% 9,750 9,750 450 321 6,147 6,918 600 500 8,462 9,563 500 850 6,150 7,500 600 700 5,465 6,765 600 800 5,750 7,150 20.00% -5.88% -6.50% -4.67% 600 824 5,923 7,347 600 849 6,100 7,549 454 0 454 462 1,319 1,781 1,000 2,000 3,000 0 0 0 500 1,000 1,500 -50.00% -50.00% -50.00% 500 1,000 1,500 500 1,000 1,500 Total Expenditures 7,372 11,344 10,500 6,765 8,650 -17.62% 8,847 9,049 Net Change in Fund Balance 4,155 3,568 1,100 246.67% 904 701 Acct No. Actual 2011 Actual 2012 $11,527 11,527 Revenues 205.000.46120 Fines and Forfeitures Court Fines Subtotal Fines and Forfeitures Total Revenues Expenditures 205.100.53410 205.100.53220 205.100.53510 Contractual Services Leads Contract Communications Maintenance Equipment Subtotal Contractual Services 205.100.54230 205.100.54240 Supplies and Materials Miscellaneous Supplies Miscellaneous Equipment Subtotal Supplies and Materials Estimated Fund Balance, January 1 Total Available Funds (571) (750) 17,509 21,664 21,093 21,093 24,661 16.92% 25,761 26,665 $21,664 $21,093 $20,343 $24,661 $25,761 26.63% $26,665 $27,366 29 City of Pickerington, Ohio OMVI Education Fund Acct No. Actual 2011 Actual 2012 Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 Revenues 206.000.46120 Fines and Forfeitures Court Fines Subtotal Fines and Forfeitures $680 680 $731 731 $700 700 $700 700 $700 700 0.00% 0.00% $700 700 $700 700 Total Revenues 680 731 700 700 700 0.00% 700 700 206.100.53410 206.100.53430 206.100.53920 Contractual Services Professional Services Education DARE Memberships Subtotal Contractual Services 0 360 35 395 50 783 35 868 375 500 150 1,025 0 500 35 535 150 500 35 685 -60.00% 0.00% -76.67% -33.17% 150 500 35 685 150 500 35 685 206.100.54230 Supplies and Materials Miscellaneous Supplies Subtotal Supplies and Materials 333 333 1,099 1,099 1,500 1,500 500 500 1,000 1,000 -33.33% -33.33% 1,000 1,000 1,000 1,000 Total Expenditures 728 1,967 2,525 1,035 1,685 -33.27% 1,685 1,685 Net Change in Fund Balance (48) (1,235) (1,825) 6,242 6,194 4,959 4,959 4,624 -6.76% 3,639 2,654 $6,194 $4,959 $3,134 $4,624 $3,639 16.12% $2,654 $1,669 Expenditures Estimated Fund Balance, January 1 Total Available Funds 30 (335) (985) 46.03% (985) (985) City of Pickerington, Ohio Law Enforcement Seizure Fund Acct No. Actual 2011 Actual 2012 Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 Revenues 207.000.42900 207.000.43000 Intergovernmental Revenue License Impoundment - BMV Major Crimes Unit Income Distribution Subtotal Intergovernmental Revenue 207.000.48100 Other Revenue Sale of Capital Assets Subtotal Other Revenue $665 20,000 20,665 $305 10,405 10,710 $400 0 400 $0 14,076 14,076 $0 0 0 -100.00% 0.00% -100.00% $0 0 0 $0 0 0 1,900 1,900 0 0 0 0 0 0 0 0 0.00% 0.00% 0 0 0 0 Total Revenues 22,565 10,710 400 14,076 0 -100.00% 0 0 207.100.54230 Supplies and Materials Miscellaneous Supplies Subtotal Supplies and Materials 21,435 21,435 0 0 16,300 16,300 15,984 15,984 0 0 -100.00% -100.00% 0 0 0 0 207.100.55220 Capital Cruisers/ Equipment Subtotal Capital 0 0 0 0 0 0 0 0 18,000 18,000 100.00% 100.00% 0 0 0 0 Total Expenditures 21,435 0 16,300 15,984 18,000 10.43% 0 0 Net Change in Fund Balance 1,130 10,710 (15,900) (1,908) (18,000) -13.21% 0 0 Estimated Fund Balance, January 1 8,341 9,471 20,181 20,181 18,273 -9.45% 273 273 $9,471 $20,181 $4,281 $18,273 $273 -93.63% $273 $273 Expenditures Total Available Funds 31 City of Pickerington, Ohio Police Fund Acct No. Actual 2011 Actual 2012 Revised Budget 2013 Estimated 2013 Proposed 2014 $1,539,269 839 1,540,108 $1,469,077 50 1,469,128 $1,435,000 0 1,435,000 $1,534,266 0 1,534,266 $1,485,000 0 1,485,000 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 3.48% $1,499,850 0.00% 0 3.48% 1,499,850 $1,514,849 0 1,514,849 Revenues 208.000.41100 208.000.41200 Taxes, Assessment & Related Revenue Property Tax - Real Estate Personal Property Tax Subtotal Tax Revenue 208.000.42800 208.000.42809 208.000.42810 208.000.44200 208.000.44250 Intergovernmental Revenue Homestead/ Rollback Public Utility Reimbursement Personal Property Tax Reimbursement DARE Grant CPT Reimbursement from State Subtotal Intergovernmental Revenue 170,119 1,999 5,488 16,086 540 194,232 172,378 0 0 8,063 0 180,441 169,000 0 0 11,786 0 180,786 176,550 0 0 11,197 0 187,747 178,200 0 0 11,197 0 189,397 5.44% 0.00% 0.00% -5.00% 0.00% 4.76% 179,982 0 0 10,000 0 189,982 181,782 0 0 10,000 0 191,782 208.000.45120 208.000.45122 208.000.46210 Charges for Services School Contract Special Duty/ OT Task Force 911 Wireless Fee Subtotal Charges for Services 53,176 6,362 44,457 103,995 66,952 0 42,604 109,555 56,000 0 38,000 94,000 62,561 15,887 33,912 112,360 64,144 5,000 35,000 104,144 14.54% 100.00% -7.89% 10.79% 65,767 5,000 35,000 105,767 67,431 5,000 35,000 107,431 208.000.48100 208.000.48300 208.000.48320 208.000.48400 208.000.48413 208.000.48421 208.000.48441 208.000.48500 208.000.48520 208.000.48900 Other Income Sale of Fixed Assets DARE Program Donation Donations Miscellaneous Revenue DARE Fundraisers DARE Pop Machine Insurance Employee Contribution Police Reports Fingerprint Copies Worker's Comp Refund Subtotal Other Income 70 250 0 421 152 178 43,517 810 74,357 0 119,755 0 2,525 0 13,467 298 173 58,297 40 75,434 0 150,235 0 0 100 0 100 125 48,000 150 68,000 0 116,475 0 0 0 1,038 171 104 62,046 120 68,000 23,836 155,314 0 0 0 0 100 100 68,250 100 68,000 0 136,550 0.00% 0.00% -100.00% 0.00% 0.00% -20.00% 42.19% -33.33% 0.00% 0.00% 17.24% 0 0 0 0 100 100 75,075 100 68,000 0 143,375 0 0 0 0 100 100 82,583 100 68,000 0 150,883 208.000.49150 208.000.49300 208.000.49900 Transfers/ Reimbursements Transfers from the General Fund Refunds Insurance Reimbursements Subtotal Transfers/ Reimbursements 2,116,137 421 0 2,116,558 2,215,000 0 1,480 2,216,480 2,875,000 0 0 2,875,000 2,530,000 0 1,498 2,531,498 2,885,000 0 0 2,885,000 0.35% 0.00% 0.00% 0.35% 3,105,000 0 0 3,105,000 3,215,000 0 0 3,215,000 Total Revenues 4,074,648 4,125,838 4,701,261 4,521,186 4,800,091 2.10% 5,043,974 5,179,944 Personal Services Salary and Wages - Nonunion Overtime - Nonunion Salaries and Wages - FOP Overtime - FOP Vacation Payout Sick Leave Sellback Salaries and Wages - AFSCME Dispatchers Overtime - AFSCME Dispatchers Retirement Benefits - AFSCME Retirement Benefits - Nonunion Retirement Benefits - FOP 391,898 386 1,553,817 79,038 0 17,831 315,162 15,522 50,242 70,950 341,372 403,732 1,034 1,599,216 96,056 0 9,319 324,535 10,364 57,190 75,254 342,955 423,623 2,500 1,731,060 80,000 8,000 10,809 356,280 16,000 57,887 86,959 385,918 415,425 1,750 1,697,526 120,000 0 23,340 342,611 12,454 48,156 71,058 353,369 433,391 2,500 1,858,030 100,000 0 20,000 389,345 16,000 62,540 82,927 413,574 2.31% 0.00% 7.33% 25.00% -100.00% 85.03% 9.28% 0.00% 8.04% -4.64% 7.17% 439,892 2,500 1,895,191 102,000 0 20,000 395,185 16,000 63,478 84,171 421,846 446,490 2,500 1,933,094 104,040 0 20,000 401,113 16,000 64,431 85,434 430,283 Expenditures 208.100.51100 208.100.51103 208.100.51110 208.100.51112 208.100.51116 208.100.51118 208.100.51120 208.100.51121 208.100.51210 208.100.51211 208.100.51220 (continued) 32 City of Pickerington, Ohio Police Fund (Continued) Acct No. 208.100.51300 208.100.51330 208.100.51340 208.100.51400 208.100.51410 208.100.51411 208.100.51412 208.100.51413 208.100.51500 208.100.52200 208.100.53110 208.100.53410 208.100.53412 208.100.53419 208.100.53422 208.100.53430 208.200.53430 208.100.53460 208.100.53480 208.100.53513 208.100.53520 208.100.53610 208.100.53620 Insurance - FOP Insurance - Nonunion Insurance - AFSCME Uniforms - FOP Uniforms - AFSCME Uniforms - Nonunion Uniform Accessories Uniform Cleaning/ Altering Workers Compensation Professional Development Subtotal Personal Services Contractual Services Utilities Professional Services Webcheck/ Fingerprinting Leads 911 FOP - Grievances/ Arbitration Training - Officers Training - 911 Wireless Auditor/ Treasurer Fees Physicals Vehicle Maintenance/ Repair Facility Equipment Maintenance/ Repair General Liability Insurance Professional Liability Insurance Subtotal Contractual Services Actual 2011 Actual 2012 Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 $380,901 96,843 63,083 15,301 1,928 3,000 3,930 7,400 34,953 290 3,443,847 $411,363 103,979 53,161 21,744 4,628 2,000 5,936 7,800 42,195 4,825 3,577,286 $490,023 119,442 83,932 20,000 3,200 3,000 5,600 10,800 48,934 5,875 3,949,842 $424,693 108,021 75,944 15,500 1,500 3,000 5,600 10,800 42,658 5,875 3,779,280 $518,564 120,869 98,685 20,000 3,500 3,000 5,800 10,800 46,924 6,300 4,212,749 5.82% 1.19% 17.58% 0.00% 9.38% 0.00% 3.57% 0.00% -4.11% 7.23% 6.66% $580,792 135,373 110,527 20,000 3,500 3,000 5,800 10,800 51,616 6,300 4,367,971 $650,487 151,618 123,790 20,600 3,605 3,000 5,974 11,124 56,778 6,300 4,536,660 48,571 39,645 58,444 55,948 664 8,319 0 30,005 8,476 31,148 38,203 23,244 9,000 351,667 47,450 32,085 59,490 60,988 0 9,249 0 23,820 7,062 32,851 26,209 23,388 9,000 331,592 52,500 45,225 59,000 60,000 4,000 15,000 0 28,000 10,000 40,000 26,300 27,632 9,900 377,557 52,500 45,225 64,424 62,200 1,750 9,000 0 25,251 6,233 20,766 23,416 24,557 9,000 344,322 54,075 64,000 65,000 48,000 0 15,000 5,000 28,000 8,500 35,000 26,300 27,013 9,000 384,888 3.00% 41.51% 10.17% -20.00% -100.00% 0.00% 100.00% 0.00% -15.00% -12.50% 0.00% -2.24% -9.09% 1.94% 55,697 65,920 66,950 49,440 0 10,000 3,000 28,000 8,500 35,000 26,300 29,714 9,000 387,522 57,368 67,898 68,959 50,923 0 10,000 3,000 28,000 8,500 35,000 26,300 32,686 9,000 397,633 (continued) 33 City of Pickerington, Ohio Police Fund (Continued) Acct No. 208.100.54211 208.100.54212 208.100.54230 208.100.54231 208.100.54232 208.100.54233 208.100.54238 208.200.54240 208.100.54241 208.100.54242 208.100.54318 208.100.54320 208.100.57200 Supplies and Materials Ammunition/ Firing Range Supplies DARE Program Miscellaneous Supplies Personal Radios Cruiser Radios Guns Employee Recognition/ Awards Picnic Miscellaneous Equipment - 911 System Miscellaneous Equipment Computers/ Software Cruiser Miscellaneous Equipment Facility Maintenance Supplies Gasoline Rotary Subtotal Supplies and Materials 208.200.55200 208.100.55204 208.100.55211 208.100.55215 208.100.55218 208.100.55220 208.100.55210 208.100.55300 Capital 911 Wireless Equipment Dispatching Equipment Audio/ Visual Equipment Recorder System Phone/ Network Lease Equipment Cruisers/ Equipment Miscellaneous Equipment Bldging Structures Subtotal Capital Total Expenditures Net Change in Fund Balance Estimated Fund Balance, January 1 Total Available Funds Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Actual 2011 Actual 2012 $8,847 2,468 36,851 5,283 4,291 91 0 431 13,100 7,901 11,007 166 78,456 168,892 $17,630 4,560 30,076 2,602 274 6,218 827 19,647 2,382 6,081 13,394 187 81,415 185,293 $6,000 5,000 44,500 4,500 6,500 4,150 800 20,000 10,300 4,354 5,000 500 90,000 201,604 $6,000 3,500 42,000 2,000 2,000 3,500 800 0 10,887 3,000 5,000 0 80,500 159,187 $16,000 5,000 38,000 3,500 4,500 4,000 800 5,000 8,200 3,500 5,000 250 85,000 178,750 166.67% 0.00% -14.61% -22.22% -30.77% -3.61% 0.00% -75.00% -20.39% -19.61% 0.00% -50.00% -5.56% -11.34% $6,000 5,000 36,000 3,500 4,500 4,000 800 5,000 8,500 3,500 5,000 250 85,000 167,050 $6,000 5,000 36,000 3,500 4,500 4,000 800 5,000 8,500 3,500 5,000 250 85,000 167,050 0 0 5,048 0 15,636 19,790 0 0 40,474 63,426 0 8,283 6,723 15,636 93,185 11,500 0 198,753 0 0 10,500 0 18,000 107,000 4,000 48,000 187,500 0 0 10,500 0 15,636 91,896 4,000 48,000 170,032 0 52,307 15,000 0 15,636 75,000 6,000 0 163,943 0.00% 100.00% 42.86% 0.00% -13.13% -29.91% 50.00% -100.00% -12.56% 0 0 10,500 0 13,000 112,500 0 0 136,000 0 0 10,500 0 13,000 75,000 0 0 98,500 4,004,880 4,292,925 4,716,503 4,452,821 4,940,331 4.75% 5,058,543 5,199,844 69,769 (167,087) (15,242) 68,365 (140,240) 475,352 545,121 378,033 378,033 446,398 $545,121 $378,033 $362,791 $446,398 $306,158 34 -820.09% Projected 2015 Projected 2016 (14,569) (19,900) 18.08% 306,158 291,589 -15.61% $291,589 $271,689 City of Pickerington, Ohio Mandatory Drug Fund Acct No. Actual 2011 Actual 2012 Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 Revenues 209.000.46119 Fines and Forfeitures Court Fines Subtotal Fines and Forfeitures $125 125 $75 75 $125 125 $0 0 $0 0 -100.00% -100.00% $0 0 $0 0 Total Revenues 125 75 125 0 0 -100.00% 0 0 Supplies and Materials Miscellaneous Supplies Subtotal Supplies and Materials 703 703 91 91 250 250 250 250 250 250 0.00% 0.00% 250 250 250 250 Total Expenditures 703 91 250 250 250 0.00% (578) (16) (125) (250) (250) Expenditures 209.100.54230 Net Change in Fund Balance Estimated Fund Balance, January 1 Total Available Funds -100.00% 250 250 (250) (250) 2,618 2,040 2,024 2,024 1,774 -12.35% 1,524 1,274 $2,040 $2,024 $1,899 $1,774 $1,524 -19.75% $1,274 $1,024 35 City of Pickerington, Ohio Immobilization Fund Acct No. Actual 2011 Actual 2012 Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 Revenues 213.000.42910 Intergovernmental Revenue Police Vehicle Impoundment Subtotal Intergovernmental Revenue $0 0 $0 0 $0 0 $140 140 $125 125 100.00% 100.00% $125 125 $125 125 Total Revenues 0 0 0 140 125 100.00% 125 125 Supplies and Materials Miscellaneous Supplies Subtotal Supplies and Materials 0 0 0 0 0 0 0 0 0 0 0.00% 0.00% 0 0 0 0 Total Expenditures 0 0 0 0 0 0.00% 0 0 Net Change in Fund Balance 0 0 0 140 125 100.00% 125 125 920 920 920 920 1,060 15.22% 1,185 1,310 $920 $920 $920 $1,060 $1,185 28.80% $1,310 $1,435 Expenditures 213.100.54230 Estimated Fund Balance, January 1 Total Available Funds 36 City of Pickerington, Ohio Urban Forestry Fund Acct No. Actual 2011 Actual 2012 Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 Revenues 214.000.44210 Intergovernmental Revenue Ash Tree Removal Grant & Canopy Restor. Subtotal Intergovernmental Revenue 214.000.46210 Fees and Permits Subdivision Trees Subtotal Fees and Permits 214.000.49110 Other Revenue Transfers from General Fund Subtotal Other Revenue Total Revenues $0 0 $0 0 $10,000 10,000 $10,000 10,000 $0 0 -100.00% -100.00% $0 0 $0 0 $27,353 27,353 $51,445 51,445 $35,000 35,000 $37,000 37,000 $30,000 30,000 -14.29% -14.29% $30,000 30,000 $30,000 30,000 0 0 20,000 20,000 40,000 40,000 40,000 40,000 50,300 50,300 25.75% 25.75% 20,000 20,000 20,000 20,000 27,353 71,445 85,000 87,000 80,300 -5.53% 50,000 50,000 350 350 0 0 0 0 0 0 0 0 0.00% 0.00% 0 0 0 0 Expenditures 214.498.51500 Personal Services Worker's Compensation Subtotal Personal Services 214.498.53300 214.498.53410 Contractual Services Equipment Rental Professional Services Subtotal Contractual Services 570 45,513 46,083 244 37,664 37,908 0 27,200 27,200 0 27,200 27,200 0 40,300 40,300 0.00% 48.16% 48.16% 0 20,000 20,000 0 20,000 20,000 214.498.54235 214.496.54240 Supplies and Materials Subdivision/Replacement Trees Arboretum Supplies Subtotal Supplies and Materials 14,428 0 14,428 23,790 0 23,790 55,000 0 55,000 54,672 0 54,672 55,000 0 55,000 0.00% 0.00% 0.00% 30,000 0 30,000 30,000 0 30,000 Total Expenditures 60,861 61,698 82,200 81,872 95,300 15.94% 50,000 50,000 (33,508) 9,746 2,800 5,128 (15,000) -635.71% 0 0 60,607 27,099 36,845 36,845 41,973 13.92% 26,973 26,973 $27,099 $36,845 $39,645 $41,973 $26,973 -31.96% $26,973 $26,973 Net Change in Fund Balance Estimated Fund Balance, January 1 Total Available Funds 37 City of Pickerington, Ohio Fleet Maintenance Fund Acct No. Actual 2011 Actual 2012 Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 Revenues 215.000.49900 215.000.49910 Other Revenue Gasoline Rotary Reimbursement MRDD Gasoline Rotary Reimbursement Subtotal Other Revenue $140,728 15,477 156,205 $0 0 0 $0 0 0 $0 0 0 $0 0 0 0.00% 0.00% 0.00% $0 0 0 $0 0 0 Total Revenues 156,205 0 0 0 0 0.00% 0 0 Supplies and Materials Gasoline Subtotal Supplies and Materials 165,945 165,945 0 0 0 0 0 0 0 0 0.00% 0.00% 0 0 0 0 Total Expenditures 165,945 0 0 0 0 0.00% 0 0 (9,740) 0 0 0 0 0.00% 0 0 9,740 0 0 0 0 0.00% 0 0 $0 $0 $0 $0 $0 0.00% $0 $0 Expenditures 215.602.54220 Net Change in Fund Balance Estimated Fund Balance, January 1 Total Available Funds 38 City of Pickerington, Ohio Debt Service Fund Acct No. Actual 2011 Actual 2012 Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 Revenues 300.000.47201 300.000.47213 300.000.47216 300.000.47218 300.000.47220 300.000.47221 300.000.47222 300.000.47310 300.000.47313 300.000.47316 300.000.47317 300.000.47330 300.000.47350 Note Proceeds Note Rollover - Municipal Building Note Rollover - Police Facilities Note Rollover - Courtright, Diley, Downtown 2012 Refunding Bond Proceeds SIB Loan Proceeds Note Rollover - Traffic Control Device Note Rollover - Center Street Premium - Municipal Building Note Premium - Police Facilities Note Premium - Center Street Note Premium - Traffic Control Note Premium - Courtright, Diley, Downtown Premium on Notes/Bonds Subtotal Note Proceeds $70,000 150,000 1,550,000 0 0 200,000 325,000 444 951 2,061 1,268 9,827 0 2,309,551 $35,000 100,000 1,415,000 5,460,000 0 180,000 295,000 289 827 2,440 1,489 11,702 194,325 7,696,072 $0 0 0 0 4,740,000 0 0 0 0 0 0 0 192,824 4,932,824 $0 0 0 0 4,740,000 0 0 0 0 0 0 0 226,032 4,966,032 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00% 0.00% 0.00% 0.00% -100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% -100.00% -100.00% $0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 300.000.49110 300.000.49114 300.000.49115 300.000.49160 300.000.49171 300.000.49181 300.000.49182 300.000.49190 300.000.49191 300.000.49192 300.000.49195 300.000.49196 300.000.49198 300.000.49199 300.000.49200 300.000.49201 Transfers Transfer - From General - Courtright Notes/Bonds Transfer - From General - TIF Old Town Bonds Transfer - From Street Trust Fund for SIB Transfer - From General - East St. Bonds Transfer - From General - Diley Rd Notes Transfer - From St. Rt. 256 Highway Transfer - From General - SIB Loan Transfer - From General - Police Lease/ Notes/Bonds Transfer - From Police Impact Fee Fund Transfer - From Muni Bldg Impact Fee Fund Transfer - From General - Center Street Notes Transfer - From General - Traffic Control Notes Transfer - From Street Impact Fee Fund Transfer - From Sewer Capital for SIB Transfer - From Stormwater for SIB Transfer - From Water Capital for SIB Subtotal Transfers 171,250 0 0 127,000 202,500 100,000 393,004 213,500 75,000 61,625 29,375 2,500 55,000 100,000 100,000 0 1,630,754 177,061 0 0 70,125 0 100,000 393,523 379,784 50,000 71,313 42,750 204,750 50,000 126,474 48,636 47,011 1,761,426 115,602 0 0 70,818 0 100,000 6,018 200,808 100,000 0 17,092 0 50,000 126,474 48,637 0 835,449 115,602 0 0 70,546 0 84,634 0 200,808 100,000 0 17,092 0 50,000 126,474 48,637 0 813,793 118,075 0 0 109,650 0 86,341 0 229,400 75,000 0 16,700 0 50,000 126,474 48,637 0 860,277 2.14% 0.00% 0.00% 54.83% 0.00% -13.66% -100.00% 14.24% -25.00% 0.00% -2.29% 0.00% 0.00% 0.00% 0.00% 0.00% 2.97% 116,275 0 150,000 110,850 0 62,550 0 249,300 50,000 0 16,500 0 100,000 0 0 0 855,475 119,475 0 0 114,050 0 100,000 108,550 254,200 50,000 0 21,300 0 100,000 0 0 0 867,575 Total Revenues 3,940,305 9,457,498 5,768,273 5,779,824 860,277 -85.09% 855,475 867,575 0 0 101,466 101,466 59,840 59,840 59,361 59,361 0 0 -100.00% -100.00% 0 0 0 0 (continued) Expenditures 300.602.53420 Contractual Services Legal Fees/ Issuance Costs Subtotal Contractual Services 39 City of Pickerington, Ohio Debt Service Fund (Continued) Actual 2011 Actual 2012 Revised Budget 2013 Estimated 2013 Principal, Interest, and Note Rollovers Principal - Police Facility Note Note Rollover - Police Facility Note Principal - Police Facility Lease/Bond Note Rollover - Center Street Note Principal - TIF Windmiller Bonds Principal - East Street Bonds Principal - Courtright, Diley, Downtown Note/Bond Payment to Escrow Agent - 2004 Refunding Bonds Note Rollover - Municipal Building Note Principal - Municipal Building Note Principal - Center Street Note/Bond Note Rollover - Courtright, Diley, Downtown Note Rollover - Traffic Control Device Note Principal - SIB Loan Principal - Traffic Control Device Note Principal - Diley Road Note Interest - Police Facility Note Interest - Police Facility Lease/Bond Interest - TIF Windmiller Bonds Interest - East Street Bonds Interest - Courtright, Diley, Downtown Note/Bond Interest - Diley Rd Note Interest - Municipal Building Note Interest - Center Street Note/Bond Interest - Traffic Control Device Note Interest - SIB Loan Subtotal Principal, Interest, and Note Rollovers $50,000 150,000 186,000 325,000 0 65,000 150,000 0 70,000 60,000 25,000 1,550,000 200,000 574,816 0 200,000 2,500 40,549 0 62,000 21,250 2,500 1,625 4,375 2,500 173,188 3,916,303 $150,000 100,000 2,957,000 295,000 0 65,000 1,550,000 1,061,023 35,000 70,000 325,000 1,415,000 180,000 605,725 200,000 0 3,125 57,371 0 58,750 37,063 0 1,313 7,750 4,750 159,919 9,338,788 $0 0 245,000 0 0 85,000 85,000 0 0 0 10,000 0 0 5,075,204 0 0 0 55,810 0 32,722 30,602 0 0 10,186 0 140,193 5,769,717 $0 0 245,000 0 0 85,000 85,000 0 0 0 10,000 0 0 5,075,204 0 0 0 55,809 0 29,046 30,602 0 0 7,092 0 140,193 5,762,946 $0 0 255,000 0 0 85,000 90,000 0 0 0 10,000 0 0 195,000 0 0 0 49,400 0 24,650 28,075 0 0 6,700 0 116,450 860,275 0.00% 0.00% 4.08% 0.00% 0.00% 0.00% 5.88% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% -96.16% 0.00% 0.00% 0.00% -11.49% 0.00% -24.67% -8.26% 0.00% 0.00% -34.22% 0.00% -16.94% -85.09% $0 0 255,000 0 0 90,000 90,000 0 0 0 10,000 0 0 200,000 0 0 0 44,300 0 20,850 26,275 0 0 6,500 0 112,550 855,475 $0 0 265,000 0 0 95,000 95,000 0 0 0 15,000 0 0 200,000 0 0 0 39,200 0 19,050 24,475 0 0 6,300 0 108,550 867,575 Total Expenditures 3,916,303 9,440,254 5,829,557 5,822,307 860,275 -85.24% 855,475 867,575 Net Change in Fund Balance 24,002 17,244 (61,284) (42,483) 2 100.00% 0 0 Estimated Fund Balance, January 1 20,038 44,040 61,284 61,284 18,801 -69.32% 18,803 18,803 $44,040 $61,284 $18,801 $18,803 100.00% $18,803 $18,803 Acct No. 300.801.56110 300.801.56111 300.801.56112 300.801.56113 300.801.56130 300.801.56132 300.801.56133 300.801.56141 300.801.56143 300.801.56144 300.801.56145 300.801.56153 300.801.56192 300.801.56193 300.801.56194 300.801.56195 300.802.56110 300.802.56112 300.802.56230 300.802.56232 300.802.56233 300.802.56234 300.802.56280 300.802.56291 300.802.56292 300.802.56293 Total Available Funds 40 ($0) Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 City of Pickerington, Ohio Tax Increment Financing Cycle Way Debt Service Fund Acct No. Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 $161,196 161,196 $0 0 $0 0 $0 0 0.00% 0.00% $0 0 $0 0 57,140 161,196 0 0 0 0.00% 0 0 1,918 1,918 2,855 2,855 0 0 0 0 0 0 0.00% 0.00% 0 0 0 0 Actual 2011 Actual 2012 $57,140 57,140 Revenues 302.000.42700 Payment in Lieu of Taxes Revenue Real Estate Proceeds - County Subtotal Payment in Lieu of Taxes Revenue Total Revenues Expenditures 302.602.53460 Contractual Services Auditor Fees Subtotal Contractual Services 302.801.56110 302.802.56209 Principal, Interest, and Note Rollovers Principal Interest Subtotal Principal, Interest and Note Rollovers 25,000 758 25,758 205,986 0 205,986 0 0 0 0 0 0 0 0 0 0.00% 0.00% 0.00% 0 0 0 0 0 0 Total Expenditures 27,676 208,841 0 0 0 0.00% 0 0 Net Change in Fund Balance 29,464 (47,645) 0 0 0 0.00% 0 0 Estimated Fund Balance, January 1 18,181 47,645 (0) (0) (0) 0.00% (0) (0) ($0) ($0) ($0) 0.00% ($0) ($0) Total Available Funds $47,645 ($0) 41 City of Pickerington, Ohio Tax Increment Financing Old Town Debt Service Fund Acct No. Actual 2011 Actual 2012 Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 Revenues 303.000.42700 Payment in Lieu of Taxes Revenue Real Estate Proceeds - County Subtotal Payment in Lieu of Taxes Revenue 303.000.47201 Note Proceeds Note Rollover Subtotal Note Proceeds 303.000.48200 Interest Income Interest Subtotal Interest Income 303.000.49150 Transfers Transfers Subtotal Transfers Total Revenues $4,643 4,643 $0 0 $0 0 $0 0 $0 0 0.00% 0.00% $0 0 $0 0 371,000 371,000 340,000 340,000 0 0 0 0 0 0 0.00% 0.00% 0 0 0 0 0 0 2,812 2,812 0 0 0 0 0 0 0.00% 0.00% 0 0 0 0 7,981 7,981 41,853 41,853 0 0 0 0 0 0 0.00% 0.00% 0 0 0 0 383,624 384,665 0 0 0 0.00% 0 0 1,320 63 1,383 0 0 0 0 0 0 0 0 0 0 0 0 0.00% 0.00% 0.00% 0 0 0 0 0 0 Expenditures 303.602.53420 303.602.53460 Contractual Services Legal Fees Auditor Fees Subtotal Contractual Services 303.801.56110 303.801.56120 303.802.56209 Principal, Interest, and Note Rollovers Principal Note Rollover Interest Subtotal Principal, Interest and Note Rollovers 0 371,000 11,241 382,241 371,000 0 4,415 375,415 0 0 0 0 0 0 0 0 0 0 0 0 0.00% 0.00% 0.00% 0.00% 0 0 0 0 0 0 0 0 Total Expenditures 383,624 375,415 0 0 0 0.00% 0 0 Net Change in Fund Balance 0 9,250 0 0 0 0.00% 0 0 Estimated Fund Balance, January 1 0 0 9,250 9,250 9,250 0.00% 9,250 9,250 $0 $9,250 $9,250 $9,250 $9,250 0.00% $9,250 $9,250 Total Available Funds 42 City of Pickerington, Ohio Tax Increment Financing Windmiller/ Diley Debt Service Fund Acct No. Actual 2011 Actual 2012 Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 Revenues 304.000.42700 Payment in Lieu of Taxes Revenue Real Estate Proceeds - County Subtotal Payment in Lieu of Taxes Revenue $212,854 212,854 $302,162 302,162 $0 0 $95,324 95,324 $0 0 0.00% 0.00% $0 0 $0 0 304.000.47200 304.000.47201 304.000.47300 Note/ Bond Proceeds Bond Proceeds Note Rollover Premium Subtotal Note Proceeds 0 1,675,000 0 1,675,000 1,245,000 1,225,000 35,385 2,505,385 0 0 0 0 0 0 0 0 0 0 0 0 0.00% 0.00% 0.00% 0.00% 0 0 0 0 0 0 0 0 304.000.49160 Transfers/Advances Transfers Subtotal Transfers/ Advances 0 0 257,292 257,292 0 0 0 0 0 0 0.00% 0.00% 0 0 0 0 1,887,854 3,064,838 0 95,324 0 0.00% 0 0 0 0 0 22,566 0 22,566 0 3,500 3,500 0 3,430 3,430 0 0 0 0.00% -100.00% -100.00% 0 0 0 0 0 0 100,000 1,675,000 54,124 1,829,124 1,675,000 1,225,000 55,111 2,955,111 50,000 0 12,019 62,019 50,000 0 9,959 59,959 50,000 0 28,000 78,000 0.00% 0.00% 132.96% 25.77% 0 0 0 0 0 0 0 0 Total Revenues Expenditures 304.602.53420 304.602.53460 Contractual Services Issuance Costs Auditor Fees Subtotal Contractual Services 304.801.56110 304.801.56120 304.802.56209 Principal, Interest, and Note Rollovers Principal Note Rollover Interest Subtotal Principal, Interest and Note Rollovers 304.901.59240 Advances Advance Repayment Subtotal Advances 60,000 60,000 0 0 0 0 0 0 0 0 0.00% 0.00% 0 0 Total Expenditures 1,889,124 2,977,678 65,519 63,389 78,000 19.05% 0 0 (65,519) 31,935 (78,000) -19.05% 0 0 Net Change in Fund Balance Estimated Fund Balance, January 1 Total Available Funds (1,270) 87,160 1,270 0 87,160 87,160 119,095 36.64% 41,095 41,095 $0 $87,160 $21,641 $119,095 $41,095 89.89% $41,095 $41,095 43 City of Pickerington, Ohio Tax Increment Financing Cover Debt Service Fund Acct No. Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 $196,099 196,099 $0 0 $0 0 $0 0 0.00% 0.00% $0 0 $0 0 43,750 43,750 0 0 0 0 0 0 0 0 0.00% 0.00% 0 0 0 0 0 0 137,922 137,922 0 0 0 0 0 0 0.00% 0.00% 0 0 0 0 133,901 334,021 0 0 0 0.00% 0 0 2,768 2,768 2,283 2,283 22,107 22,107 0 0 0 0 -100.00% -100.00% 0 0 0 0 Actual 2011 Actual 2012 $90,151 90,151 Revenues 305.000.42700 Payment in Lieu of Taxes Revenue Real Estate Proceeds - County Subtotal Payment in Lieu of Taxes Revenue 305.000.47201 Note Proceeds Note Rollover Subtotal Note Proceeds 305.000.49160 Transfers Transfers Subtotal Transfers Total Revenues Expenditures 305.602.53460 Contractual Services Auditor Fees Subtotal Contractual Services 305.801.56110 305.801.56120 305.802.56209 Principal, Interest, and Note Rollovers Principal Note Rollover Interest Subtotal Principal, Interest and Note Rollovers 43,750 43,750 2,651 90,151 177,764 0 5,475 183,239 0 0 20,052 20,052 0 0 20,052 20,052 0 0 200 200 0.00% 0.00% -99.00% -99.00% 50,000 0 27,200 77,200 55,000 0 26,200 81,200 Total Expenditures 92,919 185,522 42,159 20,052 200 -99.53% 77,200 81,200 Net Change in Fund Balance 40,982 148,499 (42,159) (20,052) (200) 99.53% (77,200) (81,200) 0 40,982 189,481 189,481 169,429 -10.58% 169,229 92,029 $40,982 $189,481 $147,322 $169,429 $169,229 14.87% $92,029 $10,829 Estimated Fund Balance, January 1 Total Available Funds 44 City of Pickerington, Ohio Street Construction Fund Acct No. Actual 2011 Actual 2012 Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 Revenues 402.000.48200 Other Revenue Interest Subtotal Other Revenue $0 0 $0 0 $0 0 $0 0 $0 0 0.00% 0.00% $0 0 $0 0 Total Revenues 0 0 0 0 0 0.00% 0 0 Capital Traffic Light Equipment - St 15 Subtotal Capital 0 0 0 0 0 0 0 0 0 0 0.00% 0.00% 0 0 0 0 Total Expenditures 0 0 0 0 0 0.00% 0 0 Net Change in Fund Balance 0 0 0 0 0 0.00% 0 0 165 165 165 165 165 0.00% 165 165 $165 $165 $165 $165 $165 0.00% $165 $165 Expenditures 402.607.55200 Estimated Fund Balance, January 1 Total Available Funds 45 City of Pickerington, Ohio Street Impact Fee Fund Actual 2011 Actual 2012 Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 $67,364 18,971 86,335 $99,341 28,508 127,849 $50,000 9,500 59,500 $62,739 90,634 153,373 $60,000 25,000 85,000 20.00% 163.16% 42.86% $60,000 25,000 85,000 $60,000 25,000 85,000 92 92 156 156 75 75 116 116 100 100 33.33% 33.33% 100 100 100 100 Total Revenues 86,427 128,005 59,575 153,489 85,100 42.85% 85,100 85,100 Transfers/ Reimbursements Transfer - to Debt Service Refunds Subtotal Transfers/ Reimbursements 55,000 0 55,000 50,000 0 50,000 50,000 0 50,000 50,000 0 50,000 50,000 0 50,000 0.00% 0.00% 0.00% 100,000 0 100,000 100,000 0 100,000 Total Expenditures 55,000 50,000 50,000 50,000 50,000 0.00% 100,000 100,000 Net Change in Fund Balance 31,427 78,005 9,575 103,489 35,100 266.58% (14,900) (14,900) Estimated Fund Balance, January 1 64,913 96,340 174,345 174,345 277,834 59.36% 312,934 298,034 $96,340 $174,345 $183,920 $277,834 $312,934 70.15% $298,034 $283,134 Acct No. Revenues 403.000.46230 403.000.46240 Impact Fees Revenue Impact Fees - Residential Impact Fees - Commercial Subtotal Impact Fees 403.000.48200 Other Revenue Interest Subtotal Other Revenue Expenditures 403.901.57100 403.901.57300 Total Available Funds 46 City of Pickerington, Ohio Park Capital Improvement Fund Acct No. Actual 2011 Actual 2012 Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 Revenues 404.000.44200 Intergovernmental Revenue Natureworks Grant Subtotal Intergovernmental Revenue $0 0 $0 0 $0 0 $0 0 $0 0 0.00% 0.00% $0 0 $0 0 0 0 0 0 0 0.00% 0 0 Capital Annual Facility Improvements Subtotal Capital 6,948 6,948 0 0 0 0 0 0 625 625 100.00% 100.00% 0 0 0 0 Total Expenditures 6,948 0 0 0 625 0.00% 0 0 (6,948) 0 0 0 (625) 0.00% 0 0 Total Revenues Expenditures 404.302.55111 Net Change in Fund Balance Estimated Fund Balance, January 1 7,573 625 625 625 625 0.00% 0 0 Total Available Funds $625 $625 $625 $625 $0 0.00% $0 $0 47 City of Pickerington, Ohio Community Development Block Grant Fund Acct No. Actual 2011 Actual 2012 Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 Revenues 405.000.44224 Intergovernmental Revenue Fairfield County CDBG Formula Grant Subtotal Intergovernmental Revenue $30,800 30,800 $0 0 $0 0 $0 0 $0 0 0.00% 0.00% $0 0 $0 0 30,800 0 0 0 0 0.00% 0 0 $30,800 30,800 $0 0 $0 0 0 0 0 0 0.00% 0.00% 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00% 0.00% 30,800 0 0 0 0 0.00% 0 0 Net Change in Fund Balance 0 0 0 0 0 0.00% 0 0 Estimated Fund Balance, January 1 0 0 0 0 0 0.00% 0 0 $0 $0 $0 $0 $0 0.00% $0 $0 Total Revenues Expenditures 405.204.53410 Contractual Services Professional Services Subtotal Contractual Services 405.204.55100 Capital Handicap Ramps Subtotal Capital Total Expenditures Total Available Funds 48 0 0 0 0 City of Pickerington, Ohio Police Impact Fee Fund Actual 2012 Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 $69,720 5,071 74,791 $102,494 6,779 109,273 $52,000 3,000 55,000 $64,344 25,314 89,658 $60,000 6,500 66,500 15.38% 116.67% 20.91% $60,000 6,500 66,500 $60,000 6,500 66,500 79 79 102 102 80 80 61 61 80 80 0.00% 0.00% 80 80 80 80 Total Revenues 74,870 109,375 55,080 89,719 66,580 20.88% 66,580 66,580 Transfers/ Reimbursements Transfer - to Debt Service Refunds Subtotal Transfers/ Reimbursements 75,000 0 75,000 50,000 0 50,000 100,000 0 100,000 100,000 0 100,000 75,000 0 75,000 -25.00% 0.00% -25.00% 50,000 0 50,000 50,000 0 50,000 Total Expenditures 75,000 50,000 100,000 100,000 75,000 -25.00% 50,000 50,000 59,375 (44,920) (10,281) (8,420) 81.26% 16,580 16,580 22,724 22,594 81,969 81,969 71,688 -12.54% 63,268 79,848 $22,594 $81,969 $37,049 $71,688 $63,268 70.77% $79,848 $96,428 Acct No. Actual 2011 Revenues 407.000.46230 407.000.46240 Impact Fees Revenue Impact Fees - Residential Impact Fees - Commercial Subtotal Impact Fees Revenue 407.000.48200 Other Revenue Interest Subtotal Other Revenue Expenditures 407.901.57100 407.901.57300 Net Change in Fund Balance Estimated Fund Balance, January 1 Total Available Funds (130) 49 City of Pickerington, Ohio Community Development Block Grant Revolving Loan Fund Acct No. Actual 2011 Actual 2012 Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 Revenues 408.000.48210 Other Revenue Interest Subtotal Other Revenue $99 99 $96 96 $85 85 $70 70 $70 70 -17.65% -17.65% $70 70 $70 70 99 96 85 70 70 -17.65% 70 70 Contractual Services Revolving Loan Projects Subtotal Contractual Services 0 0 0 0 65,000 65,000 0 0 67,000 67,000 3.08% 3.08% 0 0 0 0 Total Expenditures 0 0 65,000 0 67,000 3.08% 0 0 99 96 (64,915) 70 (66,930) -3.10% 70 70 67,047 67,146 67,242 67,242 67,312 0.10% 382 452 $67,146 $67,242 $2,327 $67,312 $382 -83.58% $452 $522 Total Revenues Expenditures 408.495.53410 Net Change in Fund Balance Estimated Fund Balance, January 1 Total Available Funds 50 City of Pickerington, Ohio Tax Increment Financing Agreement Cycle Way Construction Fund Acct No. Actual 2011 Actual 2012 Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 Revenues 411.000.42700 Payment in Lieu of Taxes Revenue Real Estate Taxes Subtotal Payment in Lieu of Taxes Revenue $75,000 75,000 $0 0 $0 0 $0 0 $0 0 0.00% 0.00% $0 0 $0 0 75,000 0 0 0 0 0.00% 0 0 Contractual Services TIF School Obligation Subtotal Contractual Services 0 0 75,000 75,000 0 0 0 0 0 0 0.00% 0.00% 0 0 0 0 Total Expenditures 0 75,000 0 0 0 0.00% 0 0 (75,000) 0 0 0 0.00% 0 0 0 75,000 0 0 0 0.00% 0 0 $75,000 $0 $0 $0 $0 0.00% $0 $0 Total Revenues Expenditures 411.602.53430 Net Change in Fund Balance Estimated Fund Balance, January 1 Total Available Funds 75,000 51 City of Pickerington, Ohio Tax Increment Financing Agreement Windmiller/ Diley Construction Fund Acct No. Actual 2011 Actual 2012 Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 Revenues 412.000.42700 Payment in Lieu of Taxes Revenue Real Estate Taxes Subtotal Payment in Lieu of Taxes Revenue Total Revenues $228,922 228,922 $0 0 $0 0 $0 0 $0 0 0.00% 0.00% $0 0 $0 0 228,922 0 0 0 0 0.00% 0 0 3,344 15,700 19,044 2,592 6,246 8,838 0 0 0 0 0 0 0 0 0 0.00% 0.00% 0.00% 0 0 0 0 0 0 0 0 231,934 231,934 0 0 0 0 0 0 0.00% 0.00% 0 0 0 0 19,044 240,772 0 0 0 0.00% 0 0 209,878 (240,772) 0 0 0 0.00% 0 0 30,894 240,772 0 0 0 0.00% 0 0 $240,772 $0 $0 $0 $0 0.00% $0 $0 Expenditures 412.607.53420 412.607.53460 Contractual Services Legal Fees Auditor Fees Subtotal Contractual Services 412.901.57100 Transfers/ Reimbursements Debt Retirement Fund Subtotal Transfers/ Reimbursements Total Expenditures Net Change in Fund Balance Estimated Fund Balance, January 1 Total Available Funds 52 City of Pickerington, Ohio Tax Increment Financing Agreement Cover Construction Fund Acct No. Actual 2011 Actual 2012 Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 Revenues 413.000.42700 Payment in Lieu of Taxes Revenue Real Estate Taxes Subtotal Payment in Lieu of Taxes Revenue $145,051 145,051 $9,504 9,504 $0 0 $0 0 $0 0 0.00% 0.00% $0 0 $0 0 145,051 9,504 0 0 0 0.00% 0 0 812 1,437 2,249 0 0 0 0 0 0 0 0 0 0 0 0 0.00% 0.00% 0.00% 0 0 0 0 0 0 76,355 76,355 102,300 102,300 0 0 0 0 0 0 0.00% 0.00% 0 0 0 0 0 0 137,921 137,921 0 0 0 0 0 0 0.00% 0.00% 0 0 0 0 Total Expenditures 78,604 240,221 0 0 0 0.00% 0 0 Net Change in Fund Balance 66,447 (230,717) 0 0 0 0.00% 0 0 164,270 230,717 0 0 0 0.00% 0 0 $230,717 $0 $0 $0 $0 0.00% $0 $0 Total Revenues Expenditures 413.602.53420 413.602.53460 Contractual Services Legal Fees Auditor Fees Subtotal Contractual Services 413.607.55501 Capital Stonecreek Drive - Equity Payments Subtotal Capital 413.901.57110 Transfers/ Reimbursements Debt Retirement Fund Subtotal Transfers/ Reimbursements Estimated Fund Balance, January 1 Total Available Funds 53 City of Pickerington, Ohio Diley Road Improvement Fund Acct No. Actual 2011 Actual 2012 Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 Revenues 414.000.44200 Intergovernmental Revenue MORPC State Grant Subtotal Intergovernmental Revenue 414.000.47220 $868 868 $0 0 $0 0 $0 0 $0 0 0.00% 0.00% $0 0 $0 0 Note/ Loan Proceeds State Infrastructure Bank Loan Proceeds Subtotal Note/ Loan Proceeds 58,069 58,069 0 0 0 0 0 0 0 0 0.00% 0.00% 0 0 0 0 Total Revenues 58,937 0 0 0 0 0.00% 0 0 414.607.55500 Capital Diley Road Widening Subtotal Capital 58,937 58,937 0 0 0 0 0 0 0 0 0.00% 0.00% 0 0 0 0 414.901.59240 Transfers/Advances Transfers/Advances Subtotal Transfers/Advances 0 0 25,358 25,358 0 0 0 0 58,937 25,358 0 0 0 0.00% 0 0 (25,358) 0 0 0 0.00% 0 0 25,358 25,358 0 0 0 0.00% 0 0 $25,358 $0 $0 $0 $0 0.00% $0 $0 Expenditures Total Expenditures Net Change in Fund Balance Estimated Fund Balance, January 1 Total Available Funds 0 54 0 0 0.00% 0.00% 0 0 0 0 City of Pickerington, Ohio Park Impact Fee Fund Actual 2011 Actual 2012 Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 $150,602 150,602 $221,415 221,415 $96,000 96,000 $140,763 140,763 $130,000 130,000 35.42% 35.42% $130,000 130,000 $130,000 130,000 158 158 388 388 135 135 230 230 135 135 0.00% 0.00% 135 135 135 135 150,760 221,803 96,135 140,993 130,135 35.37% 130,135 130,135 Capital Park Master Plan Improvements Subtotal Capital 0 0 74,999 74,999 115,000 115,000 75,000 75,000 492,500 492,500 328.26% 328.26% 75,000 75,000 75,000 75,000 Total Expenditures 0 74,999 115,000 75,000 492,500 328.26% 75,000 75,000 150,760 146,804 (18,865) 65,993 (362,365) -1820.83% 55,135 55,135 31,692 182,452 329,256 329,256 395,249 20.04% 32,884 88,019 $182,452 $329,256 $310,391 $395,249 $32,884 -89.41% $88,019 $143,154 Acct No. Revenues 416.000.46230 Impact Fees Revenue Impact Fees - Residential Subtotal Impact Fees Revenue 416.000.48200 Other Revenue Interest Subtotal Other Revenue Total Revenues Expenditures 416.302.55515 Net Change in Fund Balance Estimated Fund Balance, January 1 Total Available Funds 55 City of Pickerington, Ohio Municipal Facility Impact Fee Fund Acct No. Actual 2011 Actual 2012 Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 $46,736 8,934 55,670 $68,706 25,968 94,674 $27,000 500 27,500 $43,133 33,004 76,137 $40,000 10,000 50,000 48.15% 1900.00% 81.82% $40,000 10,000 50,000 $40,000 10,000 50,000 52 52 90 90 45 45 67 67 45 45 0.00% 0.00% 45 45 45 45 55,722 94,764 27,545 76,204 50,045 81.68% 50,045 50,045 0 0 0 0 0 0 0 0 20,000 20,000 100.00% 100.00% 75,000 75,000 0 0 Revenues 417.000.46230 417.000.46240 Impact Fees Revenue Impact Fees - Residential Impact Fees - Commercial Subtotal Impact Fees Revenue 417.000.48200 Other Revenue Interest Subtotal Other Revenue Total Revenues Expenditures 417.705.55300 Capital Building Improvements Subtotal Capital 417.901.57114 417.901.57300 Transfers/ Reimbursements Transfer - to Debt Service Refunds Subtotal Transfers/ Reimbursements 61,625 0 61,625 71,313 0 71,313 0 0 0 0 0 0 0 0 0 0.00% 0.00% 0.00% 0 0 0 0 0 0 Total Expenditures 61,625 71,313 0 0 20,000 100.00% 75,000 0 Net Change in Fund Balance (5,903) 23,451 27,545 76,204 30,045 9.08% (24,955) 50,045 Estimated Fund Balance, January 1 65,901 59,998 83,449 83,449 159,653 91.32% 189,698 164,743 $59,998 $83,449 $110,994 $159,653 $189,698 70.91% $164,743 $214,788 Total Available Funds 56 City of Pickerington, Ohio Tax Increment Financing Equity Construction Fund Actual 2011 Actual 2012 Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 $75,622 75,622 $59,785 59,785 $50,000 50,000 $74,002 74,002 $72,000 72,000 44.00% 44.00% $72,000 72,000 $72,000 72,000 Total Revenues 75,622 59,785 50,000 74,002 72,000 44.00% 72,000 72,000 Contractual Services Auditor Fees Stonecreek Drive - Equity Payments Subtotal Contractual Services 1,951 73,671 75,622 803 58,982 59,785 2,000 48,000 50,000 989 73,013 74,002 2,000 70,000 72,000 0.00% 45.83% 44.00% 2,000 70,000 72,000 2,000 70,000 72,000 Total Expenditures 75,622 59,785 50,000 74,002 72,000 44.00% 72,000 72,000 Net Change in Fund Balance 0 0 0 0 0 0.00% 0 0 Estimated Fund Balance, January 1 0 0 0 0 0 0.00% 0 0 $0 $0 $0 $0 $0 0.00% $0 $0 Acct No. Revenues 418.000.42700 Payment in Lieu of Taxes Revenue Real Estate Taxes Subtotal Payment in Lieu of Taxes Revenue Expenditures 418.602.53460 418.602.55501 Total Available Funds 57 City of Pickerington, Ohio Safe Route to Schools Fund Actual 2012 Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 $302,576 302,576 $35,557 35,557 $300,000 300,000 $19,885 19,885 $245,000 245,000 -18.33% -18.33% $0 0 $0 0 Total Revenues 302,576 35,557 300,000 19,885 245,000 -18.33% 0 0 Capital PID 86639 - Sidewalk Improvements Subtotal Capital 302,576 302,576 35,557 35,557 300,000 300,000 19,885 19,885 245,000 245,000 -18.33% -18.33% 0 0 0 0 Total Expenditures 302,576 35,557 300,000 19,885 245,000 -18.33% 0 0 Net Change in Fund Balance 0 0 0 0 0 0.00% 0 0 Estimated Fund Balance, January 1 0 0 0 0 0 0.00% 0 0 $0 $0 $0 $0 $0 0.00% $0 $0 Acct No. Actual 2011 Revenues 419.000.44200 Intergovernmental Revenue Safe Route to Schools - ODOT 8663 Subtotal Intergovernmental Revenue Expenditures 419.705.55110 Total Available Funds 58 City of Pickerington, Ohio State Route 256 Safety Grant Fund Acct No. Actual 2011 Actual 2012 Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 Revenues 420.000.44200 420.000.44210 Intergovernmental Revenue ODOT Grant OPWC Grant/Loan Subtotal Intergovernmental Revenue 420.000.49150 $0 0 0 $0 0 0 $300,000 0 300,000 $398,096 0 398,096 $81,000 0 81,000 -73.00% 0.00% -73.00% $5,221,855 285,000 5,506,855 $0 0 0 Transfers Transfers Subtotal Transfers 0 0 44,233 44,233 0 0 16,141 16,141 9,000 9,000 100.00% 100.00% 776,995 776,995 0 0 Total Revenues 0 44,233 300,000 414,237 90,000 -70.00% 6,283,850 0 Capital SR 256 Engineering/Infrastructure SR 256 - Paving Project Subtotal Capital 0 0 0 3,886 0 3,886 300,000 0 300,000 454,584 0 454,584 90,000 0 90,000 -70.00% 0.00% -70.00% 5,114,419 1,169,431 6,283,850 0 0 0 Total Expenditures 0 3,886 300,000 454,584 90,000 -70.00% 6,283,850 0 Net Change in Fund Balance 0 40,347 0 (40,346) 0 0.00% Estimated Fund Balance, January 1 0 0 40,347 40,347 0 $0 $40,347 $40,347 $0 $0 Expenditures 420.607.55200 420.607.55200 Total Available Funds 59 (0) 0 -100.00% 0 0 -100.00% $0 $0 City of Pickerington, Ohio Water Fund Acct No. Actual 2011 Actual 2012 Revised Budget 2013 Estimated 2013 Proposed 2014 $1,924,318 129,949 1,325 63,999 1,382 2,120,973 $2,106,338 162,559 1,936 60,193 3,221 2,334,247 $1,989,188 132,613 1,545 63,500 1,000 2,187,846 $2,036,301 168,763 1,250 59,636 1,372 2,267,322 $2,097,390 173,826 1,250 61,426 1,000 2,334,891 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 5.44% $2,160,311 31.08% 179,041 -19.09% 1,288 -3.27% 63,268 0.00% 1,000 6.72% 2,404,908 $2,225,121 184,412 1,326 65,166 1,000 2,477,025 Revenues 501.000.45511 501.000.45512 501.000.45513 501.000.45514 501.000.45530 Charges for Services User Fees - City User Fees - Mingo User Fees - Delinquent User Fees - Canal Winchester Agreement Water Purchases Subtotal Charges for Services 501.000.45540 501.000.45541 501.000.45542 501.000.45560 501.000.45561 501.000.45570 501.000.46400 Fees and Permits Meter Fee - Residential Deduct Meters Meter Fee - Commercial Inspection Fee - Residential Inspection Fee - Commercial Turn on Charge Installers Fee Subtotal Fees and Permits 12,589 4,206 9,618 2,040 200 25,200 120 53,973 23,026 4,949 969 3,720 40 18,250 120 51,074 12,500 4,000 0 2,000 0 15,000 0 33,500 17,131 4,000 1,329 2,640 0 21,000 360 46,460 12,500 4,000 1,000 2,000 0 20,000 0 39,500 0.00% 0.00% 100.00% 0.00% 0.00% 33.33% 0.00% 17.91% 12,500 4,000 1,000 2,000 0 20,000 0 39,500 12,500 4,000 1,000 2,000 0 20,000 0 39,500 501.000.48100 501.000.48400 501.000.48441 501.000.49100 501.000.49200 501.000.49310 501.000.49900 Other Revenue Sale of Assets/ Vehicles/ Meters Miscellaneous Receipts Insurance Employee Contribution Refunds Reimbursements Electric Capital Credit Refund Insurance Reimbursement Subtotal Other Revenue 250 190 9,431 1,000 343 646 0 11,860 0 0 13,385 389 869 3,486 4,000 22,130 0 0 11,500 0 0 0 0 11,500 0 1,310 16,365 2,165 80 3,430 0 23,350 0 0 18,002 0 0 3,400 0 21,402 0.00% 0.00% 56.54% 0.00% 0.00% 0.00% 0.00% 86.10% 0 0 20,162 0 0 3,400 0 23,562 0 0 22,582 0 0 3,400 0 25,982 2,186,806 2,407,451 2,232,846 2,337,132 2,395,793 7.30% 2,467,970 2,542,507 209,460 9,206 293,085 1,739 7,348 37,458 39,917 51,442 67,568 234,114 9,612 324,035 1,200 1,693 41,003 54,488 56,509 77,703 220,407 8,500 416,380 3,088 0 34,206 63,471 109,194 75,490 223,203 7,580 347,572 1,000 0 34,485 53,654 74,281 84,846 215,427 10,000 413,417 1,500 2,000 36,281 53,797 125,300 80,000 -2.26% 17.65% -0.71% -51.42% 100.00% 6.07% -15.24% 14.75% 5.97% 218,658 8,500 419,618 1,000 2,000 36,826 54,604 140,336 89,600 221,938 8,500 425,913 1,000 2,000 37,378 55,423 157,176 100,352 (continued) Total Revenues Expenditures 501.503.51100 501.503.51101 501.503.51104 501.503.51116 501.503.51117 501.503.51210 501.503.51211 501.503.51300 501.503.51310 Personal Services Salaries and Wages - AFSCME Overtime - AFSCME Salaries and Wages - Nonunion Overtime - Nonunion Sick Leave Buyout Retirement Benefits - AFSCME Retirement Benefits - Nonunion Insurance - Nonunion Insurance - AFSCME 60 City of Pickerington, Ohio Water Fund (Continued) Acct No. Actual 2011 Actual 2012 Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 Expenditures 501.503.51400 501.503.51500 501.503.52200 Personal Services Uniforms Workers Compensation Professional Development Subtotal Personal Services $5,016 4,729 2,902 729,870 $4,500 5,427 3,648 813,933 $4,500 6,500 3,500 945,236 $4,500 3,874 3,597 838,591 $4,500 4,261 3,500 949,984 0.00% -34.44% 0.00% 0.50% $4,500 4,687 3,500 983,830 $4,500 5,156 3,500 1,022,837 501.503.53110 501.503.53230 501.503.53408 501.503.53409 501.503.53426 501.503.53450 501.503.53452 501.503.53470 501.503.53513 501.503.53520 501.503.53530 501.503.53459 501.503.53610 Contractual Services Utilities Postage - Utility Billing Operators Certifications Professional Services Right of Way Use Fee Engineer - Category B/ Retainer Well Maint/ Repair Water Tank Maintenance Vehicle Maintenance/ Repair Facility Equipment Maintenance/ Repair Annual Distribution System Repair/ Maint. Water System Study Insurance - General Liability Subtotal Contractual Services 176,672 13,500 7,745 63,560 3,000 0 1,336 635 8,079 44,673 4,056 22,705 27,191 373,152 254,629 14,349 8,176 59,598 3,000 0 9,549 0 0 58,332 8,029 0 35,754 451,416 255,000 13,500 8,200 142,862 3,000 10,000 27,000 100,000 10,000 66,000 25,000 0 45,938 706,500 268,500 13,500 8,200 142,862 3,000 2,130 24,871 100,000 4,903 30,000 9,500 0 37,542 645,008 281,925 13,905 8,200 82,200 3,000 10,000 20,000 145,000 6,500 43,630 10,000 0 41,296 665,656 10.56% 3.00% 0.00% -42.46% 0.00% 0.00% -25.93% 45.00% -35.00% -33.89% -60.00% 0.00% -10.11% -5.78% 296,021 14,322 8,200 84,666 3,000 10,000 10,000 145,000 6,500 35,000 10,000 0 45,425 668,135 310,822 14,752 8,200 87,206 3,000 10,000 10,000 145,000 6,500 35,000 10,000 0 49,968 690,448 Supplies and Materials Salt Softening Computer Equipment/ Software Chemicals Miscellaneous Supplies Miscellaneous Equipment 156,323 1,430 75,246 21,714 6,906 0 18,055 169,811 36,033 5,234 0 13,000 220,000 39,000 24,000 0 11,000 160,000 42,000 15,000 0 10,000 178,302 45,000 15,000 0.00% -23.08% -18.95% 15.38% -37.50% 0 7,500 187,217 35,014 32,000 0 7,500 196,577 42,717 32,000 (continued) 501.503.54200 501.503.54209 501.503.54220 501.503.54230 501.503.54242 61 City of Pickerington, Ohio Water Fund (Continued) Acct No. Revised Budget 2013 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 $2,000 35,000 30,000 25,000 12,000 352,302 -33.33% 40.00% -14.29% 92.31% 20.00% -7.77% $1,500 25,000 30,000 5,000 10,500 72,000 $1,500 25,000 30,000 5,000 11,000 72,500 0 3,300 5,768 14,000 13,500 0 80,000 88,475 46,950 251,993 0 3,300 0 0 12,500 0 450,000 0 0 465,800 -100.00% 0.00% -100.00% -100.00% -78.98% 0.00% 462.50% -100.00% 0.00% 79.67% 500 2,200 0 0 25,000 200,000 0 0 0 227,700 500 2,200 0 0 25,000 300,000 0 0 0 327,700 203,310 1,000 204,310 189,176 645 189,821 120,199 0 120,199 -40.88% -100.00% -41.17% 189,176 1,000 190,176 189,176 1,000 190,176 2,497,296 2,236,302 2,553,940 2.27% 2,141,841 2,303,661 40.20% 326,129 238,846 7.07% 1,369,251 1,695,381 17.82% $1,695,381 $1,934,227 Actual 2011 Actual 2012 Estimated 2013 $1,445 24,895 28,748 4,215 10,581 331,503 $1,025 28,929 25,565 3,286 9,563 297,502 $3,000 25,000 35,000 13,000 10,000 382,000 $1,465 23,000 34,000 13,000 11,425 310,890 0 3,300 9,932 12,714 27,525 16,950 0 0 0 70,421 270 3,300 6,669 0 52,784 0 0 8,900 18,446 90,369 1,500 3,300 12,500 14,000 59,475 0 80,000 88,475 0 259,250 209,360 74 209,434 798,911 965 799,876 1,714,380 2,453,095 Proposed 2014 Expenditures 501.503.54400 501.503.54500 501.503.54505 501.503.54600 501.503.54210 Supplies and Materials Tools Meter Change Program Meters New Construction Hydrants Gasoline Rotary Subtotal Supplies and Materials 501.503.55208 501.503.55216 501.503.55217 501.503.55220 501.503.55240 501.503.55300 501.503.55600 501.503.55610 501.503.55630 Capital Computer Program Upgrade Phone/ Network Lease Equipment Billing Equipment Lease - Utility Billing Vehicle Miscellaneous Equipment Buildings & Structures & Infrastructure New Well Project - W-05 Longview Tank Altitude Valve Vault Reverse Osmosis Construction Subtotal Capital 501.901.57111 501.998.57300 Transfers/ Reimbursements Water Debt Retirement Refunds Subtotal Transfers/ Reimbursements Total Expenditures Net Change in Fund Balance 472,426 Estimated Fund Balance, January 1 999,787 1,472,213 1,426,569 1,426,569 1,527,399 $1,472,213 $1,426,569 $1,162,119 $1,527,399 $1,369,251 Total Available Funds (45,644) 62 (264,450) 100,830 (158,147) City of Pickerington, Ohio Sewer Fund Acct No. Actual 2011 Actual 2012 Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget $2,922,657 4,451 535,017 3,462,125 $2,879,567 6,255 535,114 3,420,936 $2,935,500 2,500 540,750 3,478,750 $2,875,363 2,669 542,376 3,420,409 $2,961,624 2,500 558,647 3,522,772 1,120 200 120 1,440 1,920 40 120 2,080 1,000 0 0 1,000 1,400 80 480 1,960 1,000 40 120 1,160 0.00% 100.00% 100.00% 16.00% 1,000 40 120 1,160 1,000 40 120 1,160 0 11,275 0 0 323 750 12,348 888 15,841 0 1,154 3,466 10,117 31,467 0 13,500 0 0 0 0 13,500 1,891 18,571 2,926 1,474 3,134 0 27,995 0 20,428 0 0 3,100 0 23,528 0.00% 51.32% 0.00% 0.00% 100.00% 0.00% 74.28% 0 22,471 0 0 3,100 0 25,571 0 24,718 0 0 3,100 0 27,818 3,475,913 3,454,483 3,493,250 3,450,363 3,547,460 1.55% 3,655,111 3,766,134 191,834 5,873 294,033 0 7,347 34,993 39,896 64,052 70,250 216,571 5,123 320,028 0 1,693 37,114 53,737 77,297 75,833 251,646 5,250 354,566 1,338 0 39,002 54,825 101,454 104,701 234,424 4,000 345,608 0 0 37,612 55,461 82,422 91,605 236,390 6,500 437,192 1,500 2,000 36,824 66,301 91,250 122,057 -6.06% 23.81% 23.30% 12.11% 100.00% -5.58% 20.93% -10.06% 16.58% 239,936 6,598 443,750 1,523 2,030 37,376 67,296 102,200 136,704 243,535 6,696 450,407 1,545 2,060 37,937 68,305 114,464 153,108 (continued) Projected 2015 Projected 2016 0.89% $3,050,473 0.00% 2,500 3.31% 575,407 1.27% 3,628,380 $3,141,987 2,500 592,669 3,737,156 Revenues 502.000.45610 502.000.45611 502.000.45614 Charges for Services User Fees - City User Fees - Delinquent User Fees - Canal Winchester Agreement Subtotal Charges for Services 502.000.46220 502.000.46221 502.000.46400 Fees and Permits Inspection Fee - Residential Inspection Fee - Commercial Installers Fee Subtotal Fees and Permits 502.000.48400 502.000.48441 502.000.49100 502.000.49300 502.000.49310 502.000.49500 Other Revenue Miscellaneous Receipts Insurance Employee Contribution Worker's Comp Refund Reimbursements Electric Capital Credit Refund Insurance Reimbursement Subtotal Other Revenue Total Revenues Expenditures 502.504.51100 502.504.51101 502.504.51102 502.504.51103 502.504.51117 502.504.51210 502.504.51211 502.504.51300 502.504.51310 Personal Services Salaries and Wages - AFSCME Overtime - AFSCME Salaries and Wages - Nonunion Overtime - Nonunion Sick Leave Buyout Retirement Benefits - AFSCME Retirement Benefits - Nonunion Insurance - Union Insurance - Nonunion 63 City of Pickerington, Ohio Sewer Fund (Continued) Acct No. Actual 2011 Actual 2012 Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 Expenditures 502.504.51400 502.504.51500 502.504.52200 Personal Services Uniforms Workers Compensation Professional Development Subtotal Personal Services $5,894 4,031 3,811 722,014 $4,196 5,296 3,269 800,157 $5,200 5,750 4,200 927,932 $4,200 5,236 3,500 864,067 $5,200 5,864 4,000 1,015,079 0.00% 1.99% -4.76% 9.39% $5,200 6,451 4,000 1,053,063 $5,200 7,096 4,000 1,094,354 502.504.53110 502.504.53230 502.504.53233 502.504.53405 502.504.53409 502.504.53414 502.504.53423 502.504.53426 502.504.53450 502.504.53462 502.504.53513 502.504.53520 502.504.53530 502.504.53610 Contractual Services Utilities Postage - Utility Billing Canal Winchester Sewer Agreement Operators Certification Professional Services Bio Solids Contract Infiltration Study & Repair Right of Way Fees Engineer - Category B/ Retainer Sanitary Sewer Master Plan Vehicle Maintenance/ Repair Facility Equipment Maintenance/ Repair Annual System Repair/ Maintenance Insurance - General Liability Subtotal Contractual Services 176,096 11,791 286,951 54 96,398 125,156 35,005 3,000 24,036 50,762 3,633 52,457 24,543 48,594 938,476 199,776 14,348 341,225 250 78,342 168,634 9,850 3,000 5,985 0 3,124 60,740 23,067 50,025 958,366 233,700 13,500 345,000 150 181,630 115,000 10,000 3,000 15,000 0 6,000 75,000 75,000 54,386 1,127,366 204,750 13,500 365,963 150 181,630 168,391 0 3,000 2,000 0 6,000 15,000 52,554 52,526 1,065,465 214,988 13,905 376,942 150 110,200 175,095 10,000 3,000 10,000 0 6,000 58,630 65,000 57,779 1,101,689 -8.01% 3.00% 9.26% 0.00% -39.33% 52.26% 0.00% 0.00% -33.33% 0.00% 0.00% -21.83% -13.33% 6.24% -2.28% 225,737 14,322 388,251 150 113,506 180,348 10,000 3,000 10,300 0 6,000 60,389 66,950 63,557 1,142,509 237,024 14,752 399,898 150 116,911 185,758 10,000 3,000 10,609 0 6,000 62,201 68,959 69,912 1,185,174 2,300 4,670 5,000 5,000 5,000 0.00% 5,000 5,000 (continued) 502.504.54208 Supplies and Materials Computer Equipment/ Software 64 City of Pickerington, Ohio Sewer Fund (Continued) Acct No. Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 $41,000 19,000 1,000 4,500 70,500 $32,500 19,000 1,000 4,500 62,000 $37,000 19,000 1,000 4,635 66,635 -9.76% 0.00% 0.00% 3.00% -5.48% $38,110 19,570 1,000 4,774 68,454 $39,253 20,157 1,000 4,917 70,328 729 81,806 3,324 6,669 0 0 0 92,527 11,000 81,350 3,200 12,500 46,000 850,000 11,900 1,015,950 11,000 46,000 3,324 5,768 45,651 194,875 11,900 318,518 5,000 12,500 3,324 0 30,000 1,129,000 0 1,179,824 -54.55% -84.63% 3.88% -100.00% -34.78% 32.82% -100.00% 16.13% 0 20,000 2,224 0 0 200,000 0 222,224 0 20,000 2,224 0 0 270,000 0 292,224 Actual 2011 Actual 2012 $25,705 8,776 722 4,628 42,131 $28,913 10,045 665 4,280 48,573 0 57,326 3,324 9,932 12,714 0 0 83,296 Projected 2016 Expenditures 502.504.54230 502.504.54244 502.504.54400 502.504.54210 Supplies and Materials Miscellaneous Supplies Miscellaneous Equipment Tools Gasoline Rotary Subtotal Supplies and Materials 502.504.55209 502.504.55210 502.504.55216 502.504.55217 502.504.55220 502.504.55610 502.504.55630 Capital Computer Equipment/ Software Equipment Phone/ Network Lease Equipment Billing Equipment Lease - Utility Billing Vehicle Infrastructure/ Leisure Dr/Plant Generator Sycamore Creek Relief Sewer Subtotal Capital 502.901.57111 502.901.57112 502.998.57300 Transfers/ Reimbursements Sewer Debt Retirement OWDA Refunds/ Overpayments Subtotal Transfers/ Reimbursements 1,893,570 93,546 161 1,987,277 1,640,980 93,546 2,095 1,736,621 879,837 78,433 1,500 959,770 879,289 78,435 0 957,724 1,174,297 63,320 0 1,237,617 33.47% -19.27% -100.00% 28.95% 1,162,277 63,320 0 1,225,597 965,388 63,320 0 1,028,708 Total Expenditures 3,773,194 3,636,244 4,101,518 3,267,774 4,600,844 12.17% 3,711,847 3,670,787 (1,053,384) -73.18% Net Change in Fund Balance Estimated Fund Balance, January 1 Total Available Funds (297,281) (181,761) (608,268) 182,589 2,696,619 2,399,338 2,217,577 2,217,577 2,400,167 $2,399,338 $2,217,577 $1,609,309 $2,400,167 $1,346,783 65 8.23% (56,736) 95,347 1,346,783 1,290,047 -16.31% $1,290,047 $1,385,394 City of Pickerington, Ohio Water Pollution Control Loan Fund Acct No. Actual 2011 Revised Budget 2013 Actual 2012 Estimated 2013 Proposed 2014 % of Change 2012 Budget to 2013 Budget Projected 2015 Projected 2016 Revenues 504.000.47200 Loan Proceeds EPA/ OWDA Loan Proceeds Subtotal Loan Proceeds 504.000.48200 Other Revenue Escrow Account - Interest Earnings Subtotal Other Revenue Total Revenues $51,042 51,042 $0 0 $1,800,000 1,800,000 $0 0 $1,800,000 1,800,000 0.00% 0.00% $0 0 $0 0 48 48 0 0 0 0 0 0 0 0 0.00% 0.00% 0 0 0 0 51,090 0 1,800,000 0 1,800,000 0.00% 0 0 446,573 446,573 0 0 1,800,000 1,800,000 0 0 1,800,000 1,800,000 0.00% 0.00% 0 0 0 0 0 0 0 0 79,929 79,929 79,929 79,929 0 0 -100.00% -100.00% 0 0 0 0 446,573 0 1,879,929 79,929 1,800,000 -4.25% 0 0 (395,483) 0 Expenditures 504.504.55300 Capital Infrastructure Improvements Subtotal Capital 504.901.57111 Transfers/ Reimbursements Sewer Debt Retirement Subtotal Transfers/ Reimbursements Total Expenditures Net Change in Fund Balance (79,929) (79,929) 0 100.00% 0 0 Estimated Fund Balance, January 1 475,412 79,929 79,929 79,929 0 -100.00% 0 0 Total Available Funds $79,929 $79,929 $0 $0 $0 0.00% $0 $0 66 City of Pickerington, Ohio Water Debt Retirement Fund Acct No. Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2012 Budget to 2013 Budget Projected 2015 Projected 2016 $0 0 0 0 0 0 0 $0 0 0 0 0 0 0 $0 0 0 0 0 0 0 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% $0 0 0 0 0 0 0 $0 0 0 0 0 0 0 275,488 798,911 1,074,399 276,000 204,310 480,310 416,710 19,086 435,796 347,947 120,199 468,146 26.07% -41.17% -2.53% 152,650 189,176 341,826 155,650 189,176 344,826 3,850,265 6,003,169 480,310 435,796 468,146 -2.53% 341,826 344,826 0 0 43,683 43,683 0 0 0 0 0 0 0.00% 0.00% 0 0 0 0 Actual 2011 Actual 2012 $1,200,000 0 1,900,000 7,609 12,046 0 3,119,655 $700,000 2,410,000 1,730,000 5,789 14,307 68,675 4,928,771 521,250 209,360 730,610 Revenues 507.000.47213 507.000.47212 507.000.47211 507.000.47300 507.000.47310 507.000.47350 Note Proceeds Note Rollover - Water Plant 2002 Bond Proceeds - 2012 Water System Improvement Note Rollover - Water Tower Premium - Plant Engineering Note Premium - Water Tower Note Premium Subtotal Note Proceeds 507.000.49111 507.000.49112 Transfers Transfer - From Water Capital / Water Tower Transfer - From Water Fund Subtotal Transfers Total Revenues Expenditures 507.503.53420 Contractual Services Refinancing Issuance Fees Subtotal Contractual Services 507.801.56109 507.801.56100 507.801.56110 507.801.56112 507.801.56108 507.801.56120 507.801.56130 507.802.56200 507.802.56210 507.802.56220 507.802.56240 507.802.56230 Principal, Interest, and Note Rollovers Principal - Water Plant Notes 2002 Principal - Water Tower Principal - Water Plant Bonds 1994 Principal - 2012 Water System Bonds Principal - WPCLF Note Rollover - Water Tower Notes Note Rollover - Water Plant Notes 2002 Interest - Water Tower Notes Interest - Water Plant Bonds 1994 Interest - 2012 Water System Bonds Interest - WPCLF Interest - Water Plant Notes 2002 Subtotal Principal, Interest, and Note Rollovers 500,000 100,000 110,000 0 0 1,900,000 1,200,000 25,000 16,045 0 0 21,250 3,872,295 530,000 170,000 110,000 2,400,000 133,088 1,730,000 700,000 23,638 12,195 30,375 56,088 15,112 5,910,496 0 0 115,000 85,000 137,976 0 0 0 8,345 82,789 51,200 0 480,310 0 0 115,000 95,000 137,976 0 0 0 8,345 58,121 51,200 0 465,642 0 0 120,000 100,000 143,044 0 0 0 4,320 54,650 46,132 0 468,146 0.00% 0.00% 4.35% 17.65% 3.67% 0.00% 0.00% 0.00% -48.23% -33.99% -9.90% 0.00% -2.53% 0 0 0 100,000 148,299 0 0 0 0 52,650 40,877 0 341,826 0 0 0 105,000 153,746 0 0 0 0 50,650 35,430 0 344,826 Total Expenditures 3,872,295 5,954,179 480,310 465,642 468,146 -2.53% 341,826 344,826 48,991 0 0 0.00% 0 0 22,030 0 48,991 48,991 19,145 -60.92% 19,145 19,145 $0 $48,991 $48,991 $19,145 $19,145 -60.92% $19,145 $19,145 Net Change in Fund Balance Estimated Fund Balance, January 1 Total Available Funds (22,030) 67 (29,846) City of Pickerington, Ohio Utility Deposit Guarantee Fund Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 $10,000 10,000 $14,573 14,573 $10,000 10,000 0.00% 0.00% $10,000 10,000 $10,000 10,000 15,643 10,000 14,573 10,000 0.00% 10,000 10,000 3,873 1,003 4,876 6,886 2,257 9,143 5,000 5,000 10,000 5,000 2,000 7,000 10,000 2,500 12,500 100.00% -50.00% 25.00% 5,000 2,500 7,500 5,000 2,500 7,500 Total Expenditures 4,876 9,143 10,000 7,000 12,500 25.00% 7,500 7,500 Net Change in Fund Balance 9,224 6,500 0 7,573 (2,500) -250.00% 2,500 2,500 22,920 32,144 38,644 38,644 46,217 19.60% 43,717 46,217 $32,144 $38,644 $38,644 $46,217 $43,717 13.13% $46,217 $48,717 Acct No. Actual 2011 Actual 2012 $14,100 14,100 $15,643 15,643 14,100 Contractual Services Utility Deposits - Applied Utility Deposits - Refunded Subtotal Contractual Services Revised Budget 2013 Revenues 508.000.49300 Other Income Deposits Subtotal Other Income Total Revenues Expenditures 508.551.56600 508.901.56500 Estimated Fund Balance, January 1 Total Available Funds 68 City of Pickerington, Ohio Water Capital Improvement Fund Actual 2011 Actual 2012 Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 $9,753 201,282 8,142 9,431 52,272 280,880 $22,902 362,962 0 9,276 35,989 431,129 $0 261,185 0 8,000 0 269,185 $56,702 330,334 0 2,142 22,499 411,677 $50,000 248,668 0 1,393 0 300,061 100.00% -4.79% 0.00% -82.58% 0.00% 11.47% $15,000 256,127 0 0 0 271,127 $15,000 263,811 0 0 0 278,811 6,268 6,268 3,212 3,212 1,500 1,500 893 893 750 750 -50.00% -50.00% 750 750 750 750 Total Revenues 287,148 434,340 270,685 412,570 300,811 11.13% 271,877 279,561 509.503.55671 509.503.55674 509.503.55690 509.503.55691 509.503.55695 509.503.55696 Capital Hereford Dr - Raw Water Conversion Water Plant Aeration Bypass W-24 TDS Treatment Water Treatment Plant RO Discharge Line Water Tower W-15 Reverse Osmosis Construction Subtotal Capital 0 0 69,325 0 3,237 31,046 103,608 0 29,142 0 0 0 3,250 32,392 50,000 0 0 100,000 0 0 150,000 28,672 0 0 21,177 0 0 49,849 193,000 0 0 156,000 0 0 349,000 286.00% 0.00% 0.00% 0.00% 0.00% 0.00% 132.67% 0 0 0 0 0 0 0 0 0 0 0 0 0 0 509.901.57111 509.901.57112 509.998.57300 Transfers/ Reimbursements Transfer - Water Debt Retirement Transfer - SIB Loan Water Refunds Subtotal Transfers/ Reimbursements 521,250 0 0 521,250 275,488 47,011 0 322,498 276,000 0 0 276,000 276,466 0 0 276,466 278,970 0 0 278,970 1.08% 0.00% 0.00% 1.08% 152,650 0 0 152,650 155,650 0 0 155,650 Total Expenditures 624,858 354,890 426,000 326,315 627,970 47.41% 152,650 155,650 (337,710) 79,450 (155,315) 86,255 (327,159) -110.64% 119,227 123,911 Acct No. Revenues 509.000.45520 509.000.45521 509.000.45523 509.000.45524 509.000.45525 Charges for Services Commercial Capacity Fees Residential Capacity Fees Canal/ Pickerington Capacity Fees Pearl Lane/ Columbus St Capacity Fee Pay Plan Fire Protection Capacity Fee Subtotal Charges for Services 509.000.48200 Interest Income Interest Subtotal Interest Income Expenditures Net Change in Fund Balance Estimated Fund Balance, January 1 1,121,912 784,202 863,652 863,652 949,907 9.99% 622,748 741,976 Total Available Funds $784,202 $863,652 $708,337 $949,907 $622,748 -12.08% $741,976 $865,887 69 City of Pickerington, Ohio OWDA Fund Acct No. Actual 2011 Revised Budget 2013 Actual 2012 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 Revenues 510.000.49120 Transfers Transfer - From Sewer Fund Subtotal Transfers $93,546 93,546 $93,546 93,546 $78,433 78,433 $78,433 78,433 $63,320 63,320 -19.27% -19.27% $63,320 63,320 $63,320 63,320 Total Revenues 93,546 93,546 78,433 78,433 63,320 -19.27% 63,320 63,320 Principal and Interest Sewer Lines - 1975 OWDA Principal Sewer Lines - 1975 OWDA Interest Sycamore Creek - WPCL Principal Sycamore Creek - WPCL Interest Subtotal Principal and Interest 25,961 4,265 38,674 24,646 93,546 27,583 2,643 40,489 22,831 93,546 14,698 415 42,390 20,930 78,433 14,698 415 42,390 20,930 78,433 0 0 44,379 18,941 63,320 -100.00% -100.00% 4.69% -9.50% -19.27% 0 0 46,462 16,858 63,320 0 0 48,643 14,677 63,320 Total Expenditures 93,546 93,546 78,433 78,433 63,320 -19.27% 63,320 63,320 Net Change in Fund Balance 0 0 0 0 0 0.00% 0 0 Estimated Fund Balance, January 1 0 0 0 0 0 0.00% 0 0 $0 $0 $0 $0 $0 0.00% $0 $0 Expenditures 510.801.56100 510.802.56200 510.801.56110 510.802.56210 Total Available Funds 70 City of Pickerington, Ohio Sewer Repair and Replacement Fund Acct No. Actual 2011 Actual 2012 Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 $133,935 9,336 143,271 $236,343 38,285 274,627 $135,000 2,500 137,500 $210,065 40,976 251,041 $209,296 102,500 311,796 55.03% 4000.00% 126.76% $215,575 2,500 218,075 $222,043 2,500 224,543 2,167 2,167 2,324 2,324 2,000 2,000 405 405 350 350 -82.50% 0.00% 350 350 350 350 145,438 276,951 139,500 251,446 312,146 123.76% 218,425 224,893 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 125,000 0 0 125,000 100.00% 0.00% 0.00% 100.00% 0 0 0 0 0 0 0 0 Revenues 511.000.45620 511.000.45630 Charges for Services Residential Capacity Fees Commercial Capacity Fees Subtotal Charges for Services 511.000.48200 Interest Income Interest Subtotal Interest Income Total Revenues Expenditures 511.851.55300 511.504.55662 511.851.55692 Capital Replace In-Plant Waterline Wastewater Treatment Plant Project Mgmt Hill Rd. S. Sanitary Sewer Subtotal Capital 511.901.57100 511.901.57120 511.998.57300 Transfers/ Reimbursements Transfer - Sewer Debt Retirement Transfer - SIB Loan Sewer Refunds Subtotal Transfers/ Reimbursements 237,913 100,000 0 337,913 123,341 126,474 0 249,815 187,390 126,474 0 313,864 187,390 126,474 0 313,864 184,240 126,474 0 310,714 -1.68% 0.00% 0.00% -1.00% 186,090 0 0 186,090 182,828 0 0 182,828 Total Expenditures 337,913 249,815 313,864 313,864 435,714 38.82% 186,090 182,828 (192,475) 27,136 (174,364) (62,418) (123,567) 29.13% 32,335 42,065 644,689 644,689 671,825 671,825 609,407 -9.29% 485,840 518,175 $452,214 $671,825 $497,461 $609,407 $485,840 -2.34% $518,175 $560,240 Net Change in Fund Balance Estimated Fund Balance, January 1 Total Available Funds 71 City of Pickerington, Ohio Sewer Plant Line Construction Fund Acct No. Actual 2011 Actual 2012 Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 Revenues 512.000.48200 Interest Income Interest Subtotal Interest Income 0 0 0 0 0 0 0 0 0 0 0.00% 0.00% 0 0 0 0 Total Revenues 0 0 0 0 0 0.00% 0 0 Transfers/ Reimbursements Transfer - Sewer Debt Retirement Subtotal Transfers/ Reimbursements 0 0 0 0 0 0 0 0 0 0 0.00% 0.00% 0 0 0 0 Total Expenditures 0 0 0 0 0 0.00% 0 0 Net Change in Fund Balance 0 0 0 0 0 0.00% 0 0 Estimated Fund Balance, January 1 0 0 0 0 0 0.00% 0 0 $0 $0 $0 $0 $0 0.00% $0 $0 Expenditures 512.901.57100 Total Available Funds 72 City of Pickerington, Ohio Stormwater Fund Actual 2011 Actual 2012 Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 $542,640 3,405 18,212 41,030 605,287 $585,548 926 11,860 77,167 675,501 $610,178 0 0 42,000 652,178 $615,979 1,246 59,259 63,411 739,894 $652,938 1,000 15,000 51,328 720,266 7.01% 100.00% 100.00% 22.21% 10.44% $692,114 1,000 15,000 51,328 759,442 $733,641 1,000 15,000 51,328 800,969 0 0 0 0 0 0 0 0 0 0 0.00% 0.00% 0 0 0 0 0 6,037 0 6,037 225 5,617 0 5,842 0 6,500 0 6,500 0 6,086 861 6,946 0 6,694 0 6,694 0.00% 2.99% 0.00% 2.99% 0 7,364 0 7,364 0 8,100 0 8,100 Total Revenues 611,324 681,344 658,678 746,841 726,960 10.37% 766,806 809,069 513.604.51100 513.604.51101 513.604.51104 513.604.51210 513.604.51211 513.604.51300 513.604.51310 513.604.51400 513.604.51500 513.604.52200 Personal Services Salaries and Wages - AFSCME Overtime - AFSCME Salary and Wages - Nonunion Retirement Benefits - AFSCME Retirement Benefits - Nonunion Insurance - Union Insurance - Nonunion Uniforms Workers Compensation Professional Development Subtotal Personal Services 89,952 1,888 100,467 14,384 15,080 56,424 16,309 2,699 1,364 0 298,567 91,231 1,489 80,311 15,764 13,284 38,759 18,037 1,851 1,687 0 262,413 94,601 2,500 83,686 15,563 12,465 44,518 20,770 3,700 1,900 0 279,703 93,052 2,500 62,077 14,912 9,945 40,565 14,102 2,100 1,540 0 240,793 134,573 3,000 62,221 21,387 9,010 67,633 16,311 3,600 2,100 750 320,585 42.25% 20.00% -25.65% 37.42% -27.72% 51.92% -21.47% -2.70% 10.53% 100.00% 14.62% 136,591 3,500 63,154 21,708 9,145 75,749 18,268 2,500 2,310 750 333,676 138,640 3,750 64,102 22,034 9,282 84,839 20,461 2,500 2,541 750 348,898 513.604.53410 513.604.53416 513.604.53417 513.604.53426 513.604.53428 513.604.53450 513.604.53510 513.604.53513 513.604.53530 Contractual Services Professional Services Annual Repair Curb and Gutter Annual Stormwater Ditch Maintenance Right of Way Permit Fees Stormwater System Study Engineer - Category B Retainer Equipment Maintenance Vehicle Maintenance/ Repair Annual System Repair/ Maintenance Subtotal Contractual Services 58,832 35,702 0 3,000 4,334 2,569 1,700 4,554 1,826 112,517 63,200 35,000 4,728 3,000 0 3,320 4,985 4,085 13,591 131,909 79,000 35,000 6,500 3,000 0 10,000 2,500 6,500 10,000 152,500 42,500 30,000 4,000 3,000 0 0 2,000 2,000 0 83,500 50,000 35,000 5,000 3,000 0 3,500 2,500 5,000 10,000 114,000 -36.71% 0.00% -23.08% 0.00% 0.00% -65.00% 0.00% -23.08% 0.00% -25.25% 50,000 35,000 5,000 3,000 0 3,500 2,500 5,000 10,000 114,000 51,500 35,000 5,000 3,000 0 3,500 2,500 5,000 10,000 115,500 513.604.54209 513.604.54230 513.604.54231 513.604.54400 513.901.57200 Supplies and Materials Computer Software Miscellaneous Supplies Miscellaneous Equipment Tools Gasoline Rotary Subtotal Supplies and Materials 0 3,391 1,823 512 6,678 12,404 0 6,693 100 102 7,157 14,053 1,000 8,500 3,000 500 5,600 18,600 0 8,500 500 500 5,600 15,100 0 8,500 2,000 500 6,000 17,000 -100.00% 0.00% -33.33% 0.00% 7.14% -8.60% 0 8,500 2,000 500 6,180 17,180 0 8,500 2,000 500 6,365 17,365 (continued) Acct No. Revenues 513.000.45900 513.000.45913 513.000.45919 513.000.45920 Charges for Services User Fees - City User Fees - Delinquent Capacity Fees - Commercial Capacity Fees - Residential Subtotal Charges for Services 513.000.46210 Fees and Permits Stream Permit Subtotal Fees and Permits 513.000.48402 513.000.48441 513.000.49300 Other Revenue Bid Specs Fee Insurance Employee Contribution Refunds Subtotal Other Revenue Expenditures 73 City of Pickerington, Ohio Stormwater Fund (Continued) Acct No. Actual 2011 Revised Budget 2013 Actual 2012 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 Expenditures 513.604.55220 513.604.55230 513.604.55500 513.604.55537 Capital Vehicle Equipment Annual Stormwater Improvement Projects Willow Pond Storm Sewer Subtotal Capital 513.901.57100 513.901.57101 513.901.57123 513.998.57300 $0 12,824 0 0 12,824 $0 33,072 13,944 0 47,016 $0 30,000 15,000 25,000 70,000 $0 24,900 0 0 24,900 $35,000 10,000 15,000 25,000 85,000 100.00% -66.67% 0.00% 0.00% 21.43% $0 20,000 15,000 305,000 340,000 $0 20,000 15,000 180,000 215,000 Transfers/ Reimbursements Stormwater Debt Retirement General Obligation Debt Stormwater Construction Fund Refunds/ Overpayments Subtotal Transfers/ Reimbursements 204,862 100,000 0 27 304,889 191,363 48,636 0 5,192 245,191 0 48,637 130,645 1,000 180,282 0 48,637 80,921 139 129,697 0 48,637 0 1,000 49,637 0.00% 0.00% -100.00% 0.00% -72.47% 0 0 0 1,000 1,000 0 0 0 1,000 1,000 Total Expenditures 741,201 700,582 701,085 493,990 586,222 -16.38% 805,856 697,763 (129,877) (19,238) (42,407) 252,850 140,738 431.88% (39,050) 111,306 465,912 336,035 316,797 316,797 569,647 79.81% 710,386 671,336 $336,035 $316,797 $274,390 $569,647 $710,386 158.90% $671,336 $782,641 Net Change in Fund Balance Estimated Fund Balance, January 1 Total Available Funds 74 City of Pickerington, Ohio Sewer Debt Retirement Acct No. Actual 2011 Actual 2012 Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 Revenues 514.000.47212 514.000.47214 514.000.47310 514.000.47314 514.000.47350 Note Proceeds Note Rollover - Plant & D-Line III & I Note Proceeds - 1999 Sanitary Sewer Refunding Premium - Sewer Phase III Premium - 1999 Sewer Refunding Premium Subtotal Note Proceeds $700,000 1,955,000 4,438 21,764 0 2,681,202 $350,000 0 2,895 0 0 352,895 $0 0 0 0 0 0 $0 0 0 0 0 0 $0 0 0 0 0 0 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% $0 0 0 0 0 0 $0 0 0 0 0 0 514.000.49112 514.000.49113 514.000.49114 Transfers Transfer - From Sewer Fund Transfer - From WPCLF Transfer - From Sewer Repair and Replacement Subtotal Transfers 1,893,570 0 237,913 2,131,483 1,640,980 0 123,341 1,764,322 879,837 79,929 187,390 1,147,156 879,289 79,929 187,390 1,146,608 1,174,297 0 184,240 1,358,537 33.47% -100.00% -1.68% 18.43% 1,162,277 0 186,090 1,348,367 965,388 0 182,828 1,148,216 Total Revenues 4,812,685 2,117,216 1,147,156 1,146,608 1,358,537 18.43% 1,348,367 1,148,216 50,331 50,331 0 0 0 0 0 0 0 0 0.00% 0.00% 0 0 0 0 Expenditures 514.504.53420 Contractual Services Refinancing Issuance Fees Subtotal Contractual Services 514.801.56100 514.801.56110 514.801.56130 514.801.56142 514.801.56143 514.801.56150 514.801.56152 514.801.56160 514.802.56209 514.802.56210 514.802.56251 514.802.56250 514.802.56252 514.802.56260 Principal, Interest, and Note Rollovers Principal - 1999 Refunding Bonds Principal - WPCLF Loan Principal - 1999 Sewer Bonds Note Rollover - Dline III, IV & Plant Principal - Dline III, IV & Plant Principal - 1995 Refunding Bonds Principal - Plant Engineering Notes Principal - DEFA Loan Interest - 1999 Sewer Bonds Interest - WPCLF Loan Interest - Dline III, IV & Plant Notes Interest - 1995 Refunding Bonds Interest - Plant Engineering Notes Interest - DEFA Loan Subtotal Principal, Interest, and Note Rollovers 1,920,000 0 115,000 700,000 393,000 170,000 500,000 445,760 72,579 0 13,662 32,633 6,250 405,041 4,773,925 0 0 140,000 350,000 700,000 180,000 0 288,680 50,540 0 13,125 26,683 0 368,189 2,117,216 0 0 140,000 0 0 185,000 0 421,676 47,390 0 0 20,383 0 332,159 1,146,608 0 0 140,000 0 0 185,000 0 421,676 47,390 0 0 20,383 0 332,159 1,146,608 0 156,654 140,000 0 0 195,000 0 435,706 44,240 54,900 0 13,908 0 318,129 1,358,537 0.00% 100.00% 0.00% 0.00% 0.00% 5.41% 0.00% 3.33% -6.65% 100.00% 0.00% -31.77% 0.00% -4.22% 18.48% 0 161,432 145,000 0 0 190,000 0 450,203 41,090 50,122 0 6,888 0 303,632 1,348,367 0 166,355 145,000 0 0 0 0 465,182 37,828 45,198 0 0 0 288,653 1,148,216 Total Expenditures 4,824,256 2,117,216 1,146,608 1,146,608 1,358,537 18.48% 1,348,367 1,148,216 (11,571) 0 548 0 0 -100.00% 0 0 11,571 0 0 0 0 -100.00% 0 0 $0 $0 $548 $0 $0 -100.00% $0 $0 Net Change in Fund Balance Estimated Fund Balance, January 1 Total Available Funds 75 City of Pickerington, Ohio Water Tower Construction Fund Acct No. Actual 2011 Revised Budget 2013 Actual 2012 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2014 Projected 2015 Revenues 516.000.47200 516.000.47300 516.000.47350 Note Proceeds Note Proceeds - Water Tower Premium - Water Tower Notes Premium Subtotal Note Proceeds Total Revenues $0 0 0 0 $0 0 0 0 $0 0 0 0 $0 0 0 0 $0 0 0 0 0.00% 0.00% 0.00% 0.00% $0 0 0 0 $0 0 0 0 0 0 0 0 0 0.00% 0 0 574,582 574,582 31,220 31,220 0 0 0 0 0 0 0.00% 0.00% 0 0 0 0 0 0 0 0 140,710 140,710 140,710 140,710 68,977 68,977 -50.98% -50.98% 0 0 0 0 574,582 31,220 140,710 140,710 68,977 -50.98% 0 0 (574,582) (31,220) (140,710) (140,710) (68,977) 50.98% 0 0 815,489 240,907 209,687 209,687 68,977 -67.10% 0 0 $240,907 $209,687 $68,977 $68,977 $0 -100.00% $0 $0 Expenditures 516.503.55300 Capital SR 256 E. Water Tower Construction Subtotal Capital 516.901.57100 Transfers/ Reimbursements Transfer - Water Debt Retirement Subtotal Transfers/Reimbursements Total Expenditures Net Change in Fund Balance Estimated Fund Balance, January 1 Total Available Funds 76 City of Pickerington, Ohio Stormwater Construction Fund Acct No. Actual 2011 Actual 2012 Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 Revenues 517.000.44220 Intergovernmental Revenue OPWC Stormwater Grant Subtotal Intergovernmental Revenue 517.000.49110 $0 0 $0 0 $312,748 312,748 $312,927 312,927 $0 0 -100.00% -100.00% $0 0 $0 0 Transfers Transfer - From Stormwater Fund Subtotal Transfers 0 0 0 0 96,645 96,645 80,921 80,921 0 0 -100.00% -100.00% 0 0 Total Revenues 0 0 409,393 393,848 0 -100.00% 0 0 517.604.53420 Contractual Services Issuance Fees Subtotal Contractual Services 0 0 0 0 0 0 0 0 0 0 0.00% 0.00% 0 0 0 0 517.604.55512 517.604.55513 Capital SR 256 Culvert OPWC and OEPA Projects Subtotal Capital 0 0 0 0 0 0 0 409,393 409,393 0 393,848 393,848 0 0 0 0.00% -100.00% -100.00% 0 0 0 0 0 0 517.901.57100 Transfers/ Reimbursements Transfer - Stormwater Debt Retirement Subtotal Transfers/ Reimbursements 0 0 0 0 0 0 0 0 0 0 0.00% 0.00% 0 0 0 0 Total Expenditures 0 0 409,393 393,848 0 -100.00% 0 0 Net Change in Fund Balance 0 0 0 0 0 0.00% 0 0 Estimated Fund Balance, January 1 0 0 0 0 0 0.00% 0 0 $0 $0 $0 $0 $0 0.00% $0 $0 Expenditures Total Available Funds 77 City of Pickerington, Ohio Stormwater Debt Retirement Acct No. Actual 2011 Revised Budget 2013 Actual 2012 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 Revenues 518.000.47210 518.000.47300 Note Proceeds Note Rollover - Downtown Outfall Premium Subtotal Note Proceeds 518.000.49110 518.000.49120 $189,000 1,198 190,198 $0 0 0 $0 0 0 $0 0 0 $0 0 0 0.00% 0.00% 0.00% $0 0 0 $0 0 0 Transfers Transfer - From Stormwater Fund Transfer - From Stormwater Construction Fund Subtotal Transfers 204,863 0 204,863 191,363 0 191,363 0 0 0 0 0 0 0 0 0 0.00% 0.00% 0.00% 0 0 0 0 0 0 Total Revenues 395,061 191,363 0 0 0 0.00% 0 0 Principal, Interest, and Note Rollovers Principal - SR 256 Culvert Note Rollover - Downtown Outfall Interest - SR 256 Culvert Interest - Downtown Outfall Subtotal Principal, Interest, and Note Rollovers 200,000 189,000 4,862 0 393,862 189,000 0 2,363 0 191,363 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00% 0.00% 0.00% 0.00% 0.00% 0 0 0 0 0 0 0 0 0 0 Total Expenditures 393,862 191,363 0 0 0 0.00% 0 0 Net Change in Fund Balance 1,199 0 0 0 0 0.00% 0 0 Estimated Fund Balance, January 1 2,785 3,984 3,984 3,984 3,984 0.00% 3,984 3,984 $3,984 $3,984 $3,984 $3,984 $3,984 0.00% $3,984 $3,984 Expenditures 518.801.56110 518.801.56120 518.802.56200 518.802.56210 Total Available Funds 78 City of Pickerington, Ohio Water Pollution Control Loan Fund - Water Acct No. Actual 2011 Revised Budget 2013 Actual 2012 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 Revenues 519.000.47200 Loan Proceeds EPA/ OWDA Loan Proceeds Subtotal Loan Proceeds 519.000.49200 Transfers/ Advances Advance from General Fund Subtotal Transfers/ Advances $1,493,755 1,493,755 $80,100 80,100 $0 0 $0 0 $0 0 0.00% 0.00% $0 0 $0 0 722,880 722,880 0 0 0 0 0 0 0 0 0.00% 0.00% 0 0 0 0 Total Revenues 2,216,635 80,100 0 0 0 0.00% 0 0 519.504.55300 Capital Reverse Osmosis Construction Subtotal Capital 1,464,505 1,464,505 106,100 106,100 0 0 0 0 0 0 0.00% 0.00% 0 0 0 0 519.901.59250 Advances Advance Repayment - General Fund Subtotal Advances 722,880 722,880 0 0 0 0 0 0 0 0 0.00% 0.00% 0 0 0 0 2,187,385 106,100 0 0 0 0.00% 0 0 (26,000) 0 0 0 0.00% 0 0 Expenditures Total Expenditures Net Change in Fund Balance Estimated Fund Balance, January 1 Total Available Funds 29,250 0 29,250 3,250 3,250 3,250 0.00% 3,250 3,250 $29,250 $3,250 $3,250 $3,250 $3,250 0.00% $3,250 $3,250 79 City of Pickerington, Ohio Aquatic Recreation Fund Acct No. Actual 2011 Actual 2012 Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 $159,042 17,711 2,945 2,766 2,368 184,832 $158,640 17,980 9,775 2,004 2,709 191,108 $154,000 17,000 7,500 2,500 2,000 183,000 $139,116 13,465 11,593 2,904 1,223 168,301 $143,800 13,000 9,500 2,500 1,200 170,000 -6.62% -23.53% 26.67% 0.00% -40.00% -7.10% $143,800 13,000 9,500 2,500 1,200 170,000 $143,800 13,000 9,500 2,500 1,200 170,000 346 235 26 607 102 389 0 491 0 235 0 235 0 235 0 235 0 235 0 235 0.00% 0.00% 0.00% 0.00% 0 235 0 235 0 235 0 235 185,439 191,599 183,235 168,536 170,235 -7.09% 170,235 170,235 Revenues 218.000.45300 218.000.45308 218.000.45321 218.000.45330 218.000.45340 Charges for Services Pool Memberships Guest Passes Swimming Lessons Pool Rental Concession Sales Subtotal Charges for Services 218.000.48400 218.000.49800 218.000.49920 Other Revenue Miscellaneous Income Petty Cash Refunds Subtotal Other Revenue Total Revenues Expenditures 218.301.51100 218.301.51210 218.301.51400 218.301.51500 218.301.52300 Personal Services Salaries and Wages Retirement Benefits Uniforms Workers Compensation Professional Development Subtotal Personal Services 65,697 7,602 2,121 765 776 76,961 67,752 10,605 1,839 845 829 81,870 69,750 10,777 2,250 1,000 1,200 84,977 71,640 10,065 1,926 840 340 84,811 71,640 10,065 2,250 924 1,200 86,079 2.71% -6.61% 0.00% -7.56% 0.00% 1.30% 71,640 10,216 2,250 1,016 350 85,472 71,640 10,369 2,250 1,118 350 85,727 218.301.53100 218.301.53400 218.301.53520 218.301.53600 Contractual Services Utilities Professional Services Facility Equipment Maintenance/ Repair General Liability Insurance Subtotal Contractual Services 20,126 5,450 29,551 2,731 57,858 21,843 11,969 47,379 2,794 83,985 22,000 9,000 37,500 3,000 71,500 25,760 6,000 10,500 3,500 45,760 30,000 7,500 25,745 3,500 66,745 36.36% -16.67% -31.35% 16.67% -6.65% 30,900 7,725 26,517 3,605 68,747 31,827 7,957 27,313 3,713 70,810 218.301.54230 218.301.54242 Supplies and Materials Miscellaneous Supplies Miscellaneous Equipment Subtotal Supplies and Materials 23,774 24,669 48,443 15,235 249 15,484 16,500 2,500 19,000 14,957 1,043 16,000 15,000 1,500 16,500 -9.09% -40.00% -13.16% 15,450 1,545 16,995 15,914 1,591 17,505 218.301.55210 218.301.55300 Capital Equipment Buildings/ Structures Subtotal Capital 0 0 0 10,590 0 10,590 30,000 0 30,000 29,693 0 29,693 45,000 0 45,000 50.00% 0.00% 100.00% 7,000 0 7,000 0 0 0 218.998.57300 Reimbursements Refunds Pool Memberships Subtotal Reimbursements 570 570 1,000 1,000 1,250 1,250 90 90 1,000 1,000 -20.00% -20.00% 1,000 1,000 1,000 1,000 183,832 192,930 206,727 176,355 215,324 4.16% 179,215 175,041 Total Expenditures Net Change in Fund Balance Estimated Fund Balance, January 1 Total Available Funds 1,607 (1,331) (23,492) (7,818) (45,089) -91.93% (8,980) (4,806) 69,496 71,103 69,772 69,772 61,954 -11.21% 16,865 7,885 $71,103 $69,772 $46,280 $61,954 $16,865 -63.56% $7,885 $3,079 80 City of Pickerington, Ohio Trust Fund Acct No. Actual 2011 Actual 2012 Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 $250 0 250 $276 95,500 95,776 $100 0 100 -60.00% 0.00% -60.00% $0 0 0 $0 0 0 Revenues 701.000.48200 701.000.48400 Interest Income Interest Hunters Ridge - Bond Escrow Subtotal Other Revenue 701.000.49400 Transfers/ Reimbursements Engineer Deposits Subtotal Transfers/ Reimbursements 1,000 1,000 0 0 0 0 0 0 0 0 0.00% 0.00% 0 0 0 0 Total Revenues 1,625 608 250 95,776 100 -60.00% 0 0 $625 0 625 $608 0 608 . Expenditures 701.799.53460 Contractual Services City Inspection Services Subtotal Contractual Services 0 0 0 0 0 0 7,107 7,107 0 0 0.00% 0.00% 0 0 0 0 701.907.57300 701.901.57100 Transfers/Reimbursements Refunds - Engineering Deposits Transfers - General Fund Subtotal Transfers/ Reimbursements 0 0 0 0 0 0 0 0 0 239,007 177,779 416,786 95,600 0 95,600 100.00% 0.00% 0.00% 0 0 0 0 Total Expenditures 0 0 0 423,894 95,600 100.00% 0 0 1,625 608 250 (328,118) (95,500) -38300.00% 0 0 421,384 423,009 423,617 423,617 95,500 -77.46% (0) (0) $423,009 $423,617 $423,867 $95,500 -100.00% ($0) ($0) Net Change in Fund Balance Estimated Fund Balance, January 1 Total Available Funds 81 ($0) City of Pickerington, Ohio Unclaimed Monies Fund Acct No. Actual 2011 Actual 2012 Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 Revenues 702.000.48400 702.000.48410 702.000.48420 Miscellaneous Income Mayor's Court Utility General Subtotal Miscellaneous Revenue $23 0 0 23 $0 0 2,884 2,884 $0 0 500 500 $0 0 0 0 $0 0 500 500 0.00% 0.00% 0.00% 0.00% $0 0 500 500 $0 0 500 500 23 2,884 500 0 500 0.00% 500 500 Reimbursements Unclaimed Funds Payment Subtotal Reimbursements 0 0 4,691 4,691 3,000 3,000 197 197 3,000 3,000 0.00% 0.00% 500 500 500 500 Total Expenditures 0 4,691 3,000 197 3,000 0.00% 500 500 23 (1,807) (2,500) (197) (2,500) 0.00% 0 0 5,551 5,574 3,767 3,767 3,570 -5.22% 1,070 1,070 $5,574 $3,767 $1,267 $3,570 $1,070 -15.53% $1,070 $1,070 Total Revenues Expenditures 702.907.57300 Net Change in Fund Balance Estimated Fund Balance, January 1 Total Available Funds 82 City of Pickerington, Ohio Street Trust Fund Acct No. Actual 2011 Actual 2012 Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 Revenues 703.000.48200 Interest Income Interest Subtotal Interest Income $398 398 $414 414 $100 100 $166 166 $100 100 0.00% 0.00% $100 100 $100 100 398 414 100 166 100 0.00% 100 100 Transfers/Reimbursements Transfers - Debt Retirement for SIB Loan Subtotal Transfers/ Reimbursements 0 0 0 0 0 0 0 0 0 0 0.00% 0.00% 150,000 150,000 0 0 Total Expenditures 0 0 0 0 0 0.00% 150,000 0 398 414 100 166 100 0.00% (149,900) 278,011 278,409 278,823 278,823 278,989 0.06% 279,089 129,189 $278,409 $278,823 $278,923 $278,989 $279,089 0.06% $129,189 $129,289 Total Revenues Expenditures 703.901.57100 Net Change in Fund Balance Estimated Fund Balance, January 1 Total Available Funds 83 100 City of Pickerington, Ohio Stormwater Improvement Trust Fund Acct No. Actual 2011 Actual 2012 Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 Revenues 704.000.48200 Interest Income Interest Subtotal Interest Income $13 13 $18 18 $14 14 $10 10 $10 10 -28.57% -28.57% $10 10 $10 10 13 18 14 10 10 -28.57% 10 10 Capital Long Road Stormwater Improvement Subtotal Capital 0 0 0 0 0 0 0 0 0 0 0.00% 0.00% 0 0 0 0 Total Expenditures 0 0 0 0 0 0.00% 0 0 13 18 14 10 10 28.57% 10 10 23,823 23,836 23,854 23,854 23,864 0.04% 23,874 23,884 $23,836 $23,854 $23,868 $23,864 $23,874 0.03% $23,884 $23,894 Total Revenues Expenditures 704.604.55110 Net Change in Fund Balance Estimated Fund Balance, January 1 Total Available Funds 84 City of Pickerington, Ohio Sidewalk Improvement Trust Acct No. Actual 2011 Actual 2012 Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 Revenues 705.000.48200 Interest Income Interest Subtotal Interest Income $3 3 $2 2 $2 2 $2 2 $2 2 0.00% 0.00% $2 2 $2 2 Total Revenues 3 2 2 2 2 0.00% 2 2 Contractual Services Professional Services Subtotal Contractual Services 0 0 0 0 0 0 0 0 0 0 0.00% 0.00% 0 0 0 0 Total Expenditures 0 0 0 0 0 0.00% 0 0 Net Change in Fund Balance 3 2 2 2 2 0.00% 2 2 1,703 1,706 1,708 1,708 1,710 0.12% 1,712 1,714 $1,706 $1,708 $1,710 $1,710 $1,712 0.12% $1,714 $1,716 Expenditures 705.602.53410 Estimated Fund Balance, January 1 Total Available Funds 85 City of Pickerington, Ohio Stormwater Basin Trust Fund Acct No. Actual 2011 Actual 2012 Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 Revenues 706.000.48200 Interest Income Interest Subtotal Interest Income $394 394 $254 254 $200 200 $22 22 $22 22 -89.00% -89.00% $22 22 $22 22 394 254 200 22 22 -89.00% 22 22 Reimbursements Reimbursement for Mowing Subtotal Reimbursements 0 0 0 0 0 0 0 0 0 0 0.00% 0.00% 0 0 0 0 Total Expenditures 0 0 0 0 0 0.00% 0 0 394 254 200 22 22 89.00% 22 22 68,177 68,571 68,825 68,825 68,847 0.03% 68,869 68,891 $68,571 $68,825 $69,025 $68,847 $68,869 -0.23% $68,891 $68,913 Total Revenues Expenditures 706.604.57125 Net Change in Fund Balance Estimated Fund Balance, January 1 Total Available Funds 86 City of Pickerington, Ohio Cemetery Trust Fund Acct No. Actual 2011 Actual 2012 Revised Budget 2013 Estimated 2013 Proposed 2014 % of Change 2013 Budget to 2014 Budget Projected 2015 Projected 2016 Revenues 707.000.48400 707.000.48401 707.000.48410 707.000.48411 Interest Income Daniel Morris Grave Deposit Daniel Morris Interest Earnings Dorothy Davis Grave Deposit Dorothy Davis Interest Earnings Subtotal Interest Income $0 4 0 2 6 $0 4 0 2 6 $0 0 0 0 0 $0 2 0 1 3 $0 0 0 0 0 0.00% 0.00% 0.00% 0.00% 0.00% $0 0 0 0 0 $0 0 0 0 0 Total Revenues 6 6 0 3 0 0.00% 0 0 Net Change in Fund Balance 6 6 0 3 0 0 0 4,343 4,349 4,355 4,355 4,358 0.07% 4,358 4,358 $4,349 $4,355 $4,355 $4,358 $4,358 0.07% $4,358 $4,358 Estimated Fund Balance, January 1 Total Available Funds 87 0 City of Pickerington - 2014 Budget 2014-2018 Debt Schedule Balance 2013 General Obligation Bonds 2004 - $1,550,000 Street Improvement - 5.00% Principal Interest 2012 - $1,045,000 Street Improvement Advance Refunding Bonds - 2.0-2.25% Principal Interest 2012 Various Purpose Bonds Police Station Serial Bonds - $2,715,000- 2.0% Principal Interest Courtright Road Street Improvement Serial Bonds - $1,405,000 - 2.0% - 2.50% $70,000 Real Estate Acquisition Serial Bonds - $295,000 - 2.0% - 3.0% Principal Interest State Infrastructure Bank Bond Principal Interest Total Principal and Interest Payments (General Obligation) Balance 2014 Budget 2015 1,030,000 1,320,000 1,230,000 90,000 28,075 1,195,000 1,145,000 50,000 28,200 285,000 275,000 10,000 6,700 4,540,000 4,345,000 195,000 116,450 $938,475 $10,225,000 $932,675 235,000 3,945,000 $948,775 220,000 15,000 5,700 3,740,000 205,000 106,050 $8,805,000 930,000 55,000 24,000 15,000 6,000 200,000 108,550 $9,530,000 985,000 250,000 4,145,000 855,000 95,000 20,675 55,000 25,100 15,000 6,300 200,000 112,550 950,000 1,040,000 265,000 1,150,000 275,000 28,500 95,000 22,575 55,000 26,200 10,000 6,500 1,425,000 1,045,000 1,095,000 635,000 100,000 15,250 270,000 33,900 95,000 24,475 50,000 27,200 735,000 1,695,000 1,140,000 90,000 26,275 $0 0 0 95,000 17,150 265,000 39,200 Balance 2018 $0 830,000 1,960,000 Budget 2018 0 0 95,000 19,050 255,000 44,300 Balance 2017 $0 925,000 2,215,000 Budget 2017 0 0 90,000 20,850 255,000 49,400 Balance 2016 $0 1,015,000 2,470,000 Budget 2016 0 0 15,000 21,150 $10,840,000 Balance 2015 $0 70,000 3,500 Principal Interest Windmiller/ Diley TIF Serial/Term Bonds - $1,245,000 - 2.0% - 3.0% Principal Interest Budget 2014 $945,775 3,535,000 205,000 101,950 $8,070,000 $941,075 $7,325,000 Business-Type Activities General Obligation Bonds 2003 - $1,210,000 Water System Refunding Bonds Principal Interest 2003 - $2,165,000 Sanitary Sewer System Refunding Bonds Principal Interest 2011 - $1,955,000 Sanitary Sewer System Current Refunding Bonds Principal Interest 120,000 0 0 0 0 0 0 0 0 0 120,000 4,320 385,000 190,000 195,000 13,908 1,560,000 190,000 6,888 1,420,000 140,000 44,240 1,275,000 145,000 41,090 88 1,130,000 145,000 37,828 980,000 150,000 34,565 830,000 150,000 31,190 2012 - $2,410,000 Water System Bonds Principal Interest 2,315,000 Total General Obligation Bonds (Utility Funds) 4,380,000 OWDA Loans 1973 - OWDA Sewer Loan $440,864 Principal Interest 2001 - OWDA Sewer Loan $819,398 Principal Interest 672,118 0 3,825,000 2011 - OWDA Water Loan $1,573,855 Principal Interest 1,302,791 2013 - OWDA Sewer Loan $1,800,000 Principal Interest Total OWDA Loans 1,800,000 535,628 3,390,000 9,312,604 0 175,443 7,916,559 7,419,907 496,652 257,183 698,309 159,393 29,783 1,315,559 2,625,000 53,317 10,003 480,660 273,175 166,355 45,198 337,640 228,760 857,702 1,481,915 161,432 50,122 2,885,000 50,927 12,393 153,746 35,430 1,795,000 110,000 46,450 0 8,397,219 1,011,448 1,643,346 338,115 279,686 465,182 288,653 148,299 40,877 156,654 54,900 3,140,000 0 8,862,401 1,159,746 1,905,000 105,000 48,550 48,643 14,677 450,203 303,632 143,044 46,132 338,478 328,329 46,462 16,858 435,706 318,129 2,010,000 105,000 50,650 0 374,792 44,379 18,941 9,748,310 2,115,000 100,000 52,650 0 419,171 2008 - OWDA Sewer Loan $10,973,040 Principal Interest Total Business-Type Activities 2,215,000 100,000 54,650 533,061 165,248 23,928 1,144,130 171,429 40,125 967,472 176,658 34,896 13,270,272 1,217,885 12,490,489 1,217,885 11,684,093 1,217,885 10,850,166 1,217,885 9,987,758 1,217,885 9,095,883 Grand Total Business-Type Activities $17,650,272 $1,890,002 $16,315,489 $1,753,512 $15,074,093 $1,556,362 $13,990,166 $1,556,000 $12,872,758 $1,555,525 $11,720,883 Overall Debt Outstanding - City Wide $22,030,272 $20,140,489 89 $18,464,093 $17,130,166 $15,757,758 $14,345,883 CITY OF PICKERINGTON 2013 VEHICLE INVENTORY YEAR MODEL VIN # 2001 2002 2010 MAKE ADMINISTRATION: DODGE DODGE DODGE DURANGO 2500 - 3/4 TON NITRO SXT 564580 268846 161977 87,272 62,582 17,286 125 224 1054 $23,883.00 $21,266.00 $18,841.00 2014 BUILDING: JEEP PATRIOT 627754 284 1426 $17,493.00 2010 ENGINEER: FORD RANGER A47705 21,277 1028 $19,135.00 1998 2001 PARKS: DODGE DODGE 3500 - 1 TON PU 2500 - 3/4 TON PU 251418 563597 89,994 64,139 9864 165 $22,023.00 $23,574.00 2004 2004 2007 2009 2010 2010 2010 2011 2011 2011 2012 2012 2012 2012 2012 2012 2013 POLICE: FORD FORD CHEVROLET DODGE DODGE DODGE DODGE CHEVROLET CHEVROLET DODGE CHEVROLET CHEVROLET CHEVROLET CHEVROLET CHEVROLET HONDA CHEVROLET CROWN VICTORIA EXPEDITION TAHOE 4X4 DURANGO CHARGER CHARGER CHARGER CAPRICE CAPRICE CHARGER CAPRICE CAPRICE CAPRICE CAPRICE TAHOE CIVIC LX MALIBU 139429 B38595 343374 705908 234783 234782 288662 548799 555097 582256 666260 666265 666304 666369 314076 1127 297450 39,825 57,074 38,044 75,324 87,495 36,753 44,963 7,137 20,707 53,413 5,890 4,069 20,751 23,115 11,516 12,448 2,778 414 419 400 404 407 415 418 408 416 403 401 406 402 405 409 412 420 $45,046.00 $54,142.00 $37,945.00 $47,665.00 $46,340.00 $26,940.00 $26,836.00 $49,500.00 $21,100.00 $25,086.00 $26,351.00 $26,351.00 $26,213.00 $26,213.00 $25,503.00 $28,652.00 $22,000.00 1997 2000 2009 SEWER PLANT: CHEVROLET JEEP DODGE 1500 - 1/2 TON PU CHEROKEE SE 2500 - 3/4 TON PU 153052 257441 554714 58,661 73,033 17,041 9732 23 934 $15,598.00 $18,740.00 $22,778.00 90 MILEAGE UNIT # COST NEW CITY OF PICKERINGTON 2013 VEHICLE INVENTORY YEAR 1990 1990 1991 1991 1992 1998 1998 1998 1998 2001 2001 2001 2003 2003 2004 2005 2005 2011 2011 2012 2013 2013 MAKE SERVICE DEPT: CHEVROLET CHEVROLET INTERNATIONAL INTERNATIONAL INTERNATIONAL DODGE INTERNATIONAL DODGE DODGE DODGE DODGE DODGE FORD INTERNATIONAL FREIGHTLINER INTERNATIONAL GMC INTERNATIONAL FORD FORD CHEVROLET GMC 2005 2009 WATER PLANT: GMC DODGE MODEL VIN # 1500 - 1/2 TON PU 3500 - 1 TON 4900 DUMP 4900 DUMP 4900 DUMP 1500 - 1/2 TON PU 4900 DUMP 2500 - 3/4 TON PU 2500 - 3/4 TON PU 2500 - 3/4 TON PU 2500 - 3/4 TON PU 3500 - 1 TON DUMP F-350 PU S30 DUMP SWEEPER TRUCK 7300 4X2 DUMP 2500 - 4X4 PU TERRASTAR F-350 PU F-250 PU SIERRA CREW CAB 211292 220994 358603 358604 462524 650628 574419 251402 251403 563598 563599 276555 C57789 053373 N04437 162297 296682 545666 A31028 A16742 199434 329738 88,941 69,670 54,000 15,911 45,329 67,510 19,384 81,428 52,790 56,019 98,725 67,105 79,277 27,927 8,902 13,313 56,486 3,679 35,307 11,476 2,394 3,317 9060 9000 9101 9103 9202 9822 9810 9811 9833 151 112 109 344 313 414 515 516 1117 1145 1118 1364 1354 $9,755.78 $18,862.84 $54,327.50 $54,327.50 $57,956.20 $15,000.00 $64,506.00 $21,387.00 $21,387.00 $23,574.00 $23,574.00 $21,461.00 $25,358.66 $73,219.00 $138,904.00 $80,457.00 $23,921.50 $79,802.00 $28,338.00 $26,448.00 $33,323.00 $30,213.00 1500 - 1/2 TON PU 2500 - 3/4 TON PU 302066 549228 70,922 4,994 552 953 $11,151.50 $20,064.00 SILVERADO CREW CAB 91 MILEAGE UNIT # COST NEW
Similar documents
2013 Budget Report
Personnel Department Legal Department Mayor's Court Engineering Land and Buildings Planning and Zoning Department Development Department Building Department Public Information Total Operating Expen...
More information2016 Budget Report
Cemetery Restoration Indigent Burial Pickerington Food Pantry Subtotal Contractual Services
More information