philippine quality challenge journey
Transcription
philippine quality challenge journey
PHILIPPINE QUALITY CHALLENGE JOURNEY Francis I. Ferrer CHAIRMAN EMS Components Assembly Inc. was established in 2004 as a Microelectronics Assembly Sub-contractor. 117 A TECHNOLOGY AVENUE, LAGUNA TECHNOPARK, BINAN, LAGUNA, PHILIPPINES Perry A. Ferrer PRESIDENT Alliance Mansols Inc. was established in 2010 as an Off-site Management Solutions and a Learning Service provider for operators in the electronics and semiconductor industry. 117 A TECHNOLOGY AVENUE, LAGUNA TECHNOPARK, BINAN, LAGUNA, PHILIPPINES 7 Criteria Framework EMS Components Assembly Inc. started the Philippine Quality Challenge Journey in 2011 … 1st Batch November 2012 PQC Awarding Ceremony at the Dusit Thani Hotel, Makati City EMS GROUP OF COMPANIES PQC (2011): EMS BEFORE GROUP OF2 Companies COMPANIES PRESENT (2015) : 4 Companies Established 2004 Established 2010 Services Services • Microelectronics Assembly • Offsite Management Service • Value added Subcontracting • Learning Service • Operation Management Services Certifications • PEZA 12-68 Certifications • SEC Reg. CS201012228 • PEZA • Cert. No. ROIVA-08-10-1 • SEC Reg. CS200400731 DO18-A Series 2011 • DOLE • ISO29990(1ST in Philippines) • ISO9001:2008 • TCCLS Certified • Child Labor Free Establishment • TESDA Training Methodology Certified Established 2012 Established 2014 Services • Facilities Provider Services • Engineering Maintenance Support • Equipment Restoration & Upgrade • Product & Process Development Certifications • PEZA 12-06-F Certifications • PEZA 15-114 EMS GROUP WORKFORCE 16,000 14,000 275% INCREASE 14,246 12,000 10,000 8,000 6,000 3,792 4,000 2,000 0 2011 2015 BEFORE PQC 4 YEARS AFTER EMS GROUP DEMOGRAPHICS 7 Executive Management 14,246 With over 40 years of experience in Operations and Management in Electronics and Semiconductor Industry Total as of July2015 15 24 229 244 13,727 Quality Technical and Quality Assurance Team monitoring the implementation of quality procedures Learning & Training TESDA Certified Trainers Support Services Dynamic and flexible support group catering to HR, Finance, Compliance, Purchasing, Sales, Traffic and Facility requirement during operations Engineering & Technical Highly skilled and experienced in Process, Equipment and Maintenance Engineering equipped with intensive training on data analytics, problem solving and several engineering tools Operations Skilled and trained manufacturing workforce EMS GROUP Revenue Improvement (Php) 2,500 Others 19% 400% Improvement Automotive 2% 2,000 Semiconductor 5% Million Php 1,500 Consumer Electronics 15% 1,000 Electronic Parts 59% 500 REVENUE BY INDUSTRY IN 2014 0 2011 2015 BEFORE PQC 4 YEARS AFTER EMS GROUP Annual Production Volume 300 138 % Improvement 259 M 250 Million 200 Units 109 M 150 100 50 0 2011 2015 BEFORE PQC 4 YEARS AFTER TOTAL QUALITY MANAGEMENT MODEL CAPABILITIES MANUFACTURING SERVICES ELECTRONICS ASSEMBLY & INSPECTION OPERATIONS MANAGEMENT SERVICE SIX (6) HIGH SPEED SMT LINES CAPABILITIES SKILLED & TRAINED WORKFORCE CUSTOMIZED TECHNICAL TRAINING & DEVELOPMENT MULTI-SITE TALENT SOURCING KRA-FOCUSED PERFORMANCE MONITORING CAPABILITIES MANUFACTURING ENGINEERING PRODUCT, PROCESS, EQUIPMENT ENGINEERING MACHINE PREVENTIVE & SUSTAINING MAINTENANCE FACILITIES ENGINEERING LEARNING & DEVELOPMENT OPERATOR LEARNING MODULES: • • • • • • Work Ethics and Values Basic Lean Manufacturing Tools Electrostatic Discharge (ESD) Quality Management System (QMS) Environmental Management System (EMS) Occupational Health & Safety (OHSAS) • • • • • Cleanroom Standard Operating Procedures Institute of Printed Circuits Standards Electronics Assembly Basic Hand Soldering Computer Basics 1st in the country to be certified to ISO 29990 !!! Management System for Non-formal Education ENGINEERING LEARNING MODULES CERTIFICATION QUALITY PROGRAMS/IMPROVEMENTS 1. QUALITY MANAGEMENT SYSTEM • International Standard certifications ISO/TS 16949, ISO 9001, ISO 29990 • Recognitions The Philippine Quality Challenge Awardee (DTI) 2. CULTURE OF INNOVATION • Improvement projects on system, process and production and continuous improvement mindset. 3. MY PERFORMANCE SYSTEM • A key result area focused foundation, individual performance tracking and monitoring system QUALITY PROGRAMS/IMPROVEMENTS 4. ZERO DPPM MINDSET • Campaign on common mindset in achieving ZERO DPPM 5. CUSTOMER SUPPORT • A customer satisfaction survey system to obtain customer satisfaction rating from a customer’s perspective. • Immediate action, investigation and corrective action turn-around-time within 7 working days. CORPORATE SOCIAL RESPONSIBILITY HOUSE BUILDING PROJECTS WITH HABITAT FOR HUMANITY BLOOD DONATION DRIVE WITH PHIL. NATIONAL RED CROSS MEDICAL MISSIONS DONATION ACTIVITIES TREE PLANTING FIF SCHOLARSHIP PROGRAM OUR PARTNERS NIKKOSHI “I strongly believe that the road to success will be travelled by those who embrace constant innovation and continuous improvement. The Philippine Quality Challenge, which highlights the Seven Criteria Framework have been key contributor to our daily improvement. From the outside looking in, the assessors were able to identify gaps that are essential for our organization to address and lead us to the road of continuous improvement. The program has been instrumental in our relentless pursuit for excellence.” Perry A. Ferrer President EMS Group of Companies Thank you
Similar documents
10 Tips on Promoting EMS Week Activities
Create a media list – Ask your chamber of commerce or your city government offices for the latest PR agencies list. Watch local television, listen to the radio and read newspapers to find reporters who you think might like the story. For More Details Visit at http://tellemgrodypr.com/
More information