high-pressure gas pipelines projects
Transcription
high-pressure gas pipelines projects
HIGH-PRESSURE GAS PIPELINES PROJECTS BH-GAS D.O.O. SARAJEVO, JASENOVAC VEL. KLADUSA TR.RASTELA BOS. BROD BOS. DUBICA BOS. NOVI BOS. SAMAC BOS. GRADISKA CAZIN BOS. KRUPA PRIJEDOR DERVENTA LAKTASI PRNJAVOR BANJA LUKA BIHAC PTG 4 PGG4 PETROVAC PTG TRAVNIK 3 BUGOJNO KAKANJ VISOKO BRNJACIILIJAS TOMISLAVGRAD JABLANICA KONJIC POSUŠJE PTG 2 MOSTAR 5TH GAS FORUM 14 SEP 2010, BRDO PLOCE ZIVINICE TPP G. VAKUF SPILT LUKAVAC Tetima PTGS6 ZEPCE TUZLA ZAVIDOVICI TPP ZENICA JAJCE BIJELJINA GRACANICA TESANJ MAGLAJ KLJUC BRCKO DOBOJ PTG 1 SANSKI MOST ORASJE MODRICA GRADACAC CAPLJINA NEUM SEKOVICI SEPAK ZVORNIK KLADANJ OLOVO SREDNJE VLASENICA BRATUNAC SEMIZOVAC SARAJEVO GORAZDE BH‐GAS d.o.o. Sarajevo Energy resources of BiH Natural gas sector highlights – opportunities for future development Natural gas network development – defined in the Strategic plan and program of development of energy sector in Federation BiH TRANSMISSION GAS PIPELINE BOSANSKI BROD ‐ ZENICA BOS. BROD Length: cca 130 km Diameter: 16 inch/20 inch Working pressure: 50 bar/75 bar Max. capacity: 1.0/2.0 billion m3 Investment value: 16 inch cca 45 million EUR 20 inch cca 57 million EUR Project status: completed feasibility study Investment cycle: 2011 – 2014 Note: In parallel with transmission gas pipeline construction, local authorities will start activities on distribution network development BOS. SAM KA DERVENTA NJAVOR KA MODR GRADACAC PTG1 DOBOJ GRACA TESANJ MAGLAJ ZAVIDOVICI E ZIVINICE ZENICA VNIK PGG1 LUKAVAC ZEPCE KLADA GASIFICATION OF UNA‐SANA CANTON PROJECT PHASE I: Pipeline Trzac ‐ Cazin ‐ B. Krupa with branches to Bihac and Velika Kladusa ‐ Length: 40 km (branches 40 km) ‐ Diameter: 20 inch (10.75 inch) ‐ Working pressure: 50 bar ‐ Investment value: cca 25 million EUR PROJECT PHASE II: Pipeline Bosanska Krupa – Kljuc PROJECT PHASE III: Pipelines Kljuc – B. Petrovac and Pecingrad – Buzim _________________________ Project status: Tender for Detailed Design for Phase I Maximum capacity: 1 billion m3 Investment cycle: 2010 – 2013 Note: In parallel with transmission gas pipeline construction, local authorities will start activities on distribution network development JASEN VEL. KLADUSA TR.RASTELA BOS. DUBICA BOS. NOVI CAZIN BOS. KRUPA PRIJEDOR L BIHAC PTG4 SANSKI MOST PGG4 BOS. PETROVAC KLJUC GASIFICATION OF CENTRAL BOSNIA CANTON PROJECT PHASE I: Lasva Region, Pipeline Zenica ‐ Travnik ‐ Length/Diameter: cca 40 km/16 inch ‐ Max. estimated consumption: cca 80 million m3/year ‐ Investment value: cca 17 million EUR PROJECT PHASE II: Vrbas Region, Pipelines Travnik ‐ Gornji Vakuf and Travnik – Jajce _______________________________ Project status: planned construction within Phase I Maximum capacity: 1 billion m3 Investment cycle: 2010 – 2011 Note: In parallel with transmission gas pipeline construction, local authorities will start activities on distribution network development MAGLAJ ZAVIDOVIC JAJCE PTG3 ZENICA TRAVNIK PGG3 G. VAKUF KAKAN VIS TRANSMISSION GAS PIPELINE SARAJEVO ‐ MOSTAR ‐ PLOCE Length: cca 175 km Diameter: 16 inch/20 inch Working pressure: 50/75 bar Max. capacity: 1.0/2.0 billion m3 Investment value: 16 inch cca 59 million EUR 20 inch cca 73 million EUR Project status: Techno‐economic study completed Investment cycle: 2014 – 2017 Interconnection on croatian transimission gas system Note: In parallel with transmission gas pipeline construction, local authorities will start activities on distribution network development BRNJACI ILIJAS JABLANICA KONJIC PTG2 PGG2 MOSTAR PLOCE CAPLJINA SEMIZO S TRANSMISSION GAS PIPELINE POSUSJE ‐ TOMISLAVGRAD ‐ BUGOJNO Length: 107 km Diameter: 16/20 inch Working pressure: 50/75 bar Investment value: 55 million EUR Max. capacity: 1.0‐2.0 billion m3 Investment cycle: 2011‐2014 Project status: completed feasibility study Note: In parallel with transmission gas pipeline construction, local authorities will start activities on distribution network development NATURAL GAS INTRODUCTION IN TPP KAKANJ Cooperation of BH‐Gas and Power Utility EPBiH Project status: completion of the Techno‐economic study by the middle of 2010 Planned CCGT with capacity of 100 MW ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ Precondition: construction of compressor station with estimated value cca 10 million USD Tender for Basic Design in 2010 UNDERGROUND NATURAL GAS STORAGE IN SALT MINE TETIMA Minimal usefull volume of storage: 60 million m3 Tetima PTGS6 C Number of storage caverns: 4 TUZLA Investment value: SEPAK I option: cca 42 million EUR CE ZVORNIK SEKOVICI II option: cca 44 million EUR III option: cca 35 million EUR ADANJ Project status: completed Pre‐feasibility VLASENICA study OLOVO SREDNJE BRATUNAC Projects financial arrangements JASENOVAC VEL. KLADUSA TR.RASTELA BOS. BROD BOS. DUBICA BOS. NOVI BOS. SAMAC BOS. GRADISKA CAZIN BOS. KRUPA PRIJEDOR DERVENTA LAKTASI PRNJAVOR BANJA LUKA BIHAC PTG 4 PGG4 PETROVAC TE KAKANJ VISOKO G. VAKUF BRNJACIILIJAS TOMISLAVGRAD JABLANICA SPILT PLANNED GAS PIPLINES EXISTING ENTRY KONJIC POSUŠJE PTG 2 EXISTING GAS PIPELINE MOSTAR PLANNED ENTRY PTG TRANSPORTATION PIPELINE PROJECT PTGS TRANSPORTATION PIPELINE AND UNDERGROUND STORAGE PLOCE ZIVINICE ZENICA PTG TRAVNIK 3 BUGOJNO LEGENDA LUKAVAC Tetima PTGS6 ZEPCE TUZLA ZAVIDOVICI TE JAJCE BIJELJINA GRACANICA TESANJ MAGLAJ KLJUC BRCKO DOBOJ PTG 1 SANSKI MOST ORASJE MODRICA GRADACAC CAPLJINA NEUM SEKOVICI SEPAK ZVORNIK KLADANJ OLOVO SREDNJE VLASENICA BRATUNAC SEMIZOVAC SARAJEVO GORAZDE Position of BiH in the regional interconnections NABUCCO WHITE STREAM & PEGP LNG? IONIANADRIATIC GAS PIPELINE EC RING SOUTH STREAM LNG? Offshore? LNG? TAP SOURCE : ECA, SEE Regional Gasification Study World Bank i KfW TGI EXPLORE OPPORTUNITIES IN NATURAL GAS SECTOR IN BOSNIA AND HERZEGOVINA: BH‐GAS D.O.O. SARAJEVO HAMDIJE CEMERLICA NO.2, SARAJEVO 00 387 33 724 220 MANAGEMENT@BH‐GAS.BA