HIGH-PRESSURE GAS PIPELINES PROJECTS
BH-GAS D.O.O. SARAJEVO,
JASENOVAC
VEL. KLADUSA
TR.RASTELA
BOS. BROD
BOS. DUBICA
BOS. NOVI
BOS. SAMAC
BOS. GRADISKA
CAZIN
BOS. KRUPA PRIJEDOR
DERVENTA
LAKTASI
PRNJAVOR
BANJA LUKA
BIHAC
PTG
4
PGG4
PETROVAC
PTG TRAVNIK
3
BUGOJNO
KAKANJ
VISOKO
BRNJACIILIJAS
TOMISLAVGRAD
JABLANICA
KONJIC
POSUŠJE
PTG
2
MOSTAR
5TH GAS FORUM
14 SEP 2010, BRDO
PLOCE
ZIVINICE
TPP
G. VAKUF
SPILT
LUKAVAC Tetima PTGS6
ZEPCE
TUZLA
ZAVIDOVICI
TPP
ZENICA
JAJCE
BIJELJINA
GRACANICA
TESANJ
MAGLAJ
KLJUC
BRCKO
DOBOJ
PTG
1
SANSKI MOST
ORASJE
MODRICA
GRADACAC
CAPLJINA
NEUM
SEKOVICI
SEPAK
ZVORNIK
KLADANJ
OLOVO
SREDNJE
VLASENICA
BRATUNAC
SEMIZOVAC
SARAJEVO
GORAZDE
BH‐GAS d.o.o. Sarajevo
Energy resources of BiH
Natural gas sector highlights –
opportunities for future development Natural gas network development – defined in the Strategic plan and program of development of energy sector in Federation BiH
TRANSMISSION GAS PIPELINE BOSANSKI BROD ‐ ZENICA
BOS. BROD
ƒ
ƒ
ƒ
ƒ
ƒ
Length: cca 130 km
Diameter: 16 inch/20 inch
Working pressure: 50 bar/75 bar
Max. capacity: 1.0/2.0 billion m3
Investment value: ‰ 16 inch cca 45 million EUR
‰ 20 inch cca 57 million EUR ƒ Project status: ‰ completed feasibility study
ƒ Investment cycle: 2011 – 2014
Note: In parallel with transmission gas pipeline construction, local authorities will start activities on distribution network development
BOS. SAM
KA
DERVENTA
NJAVOR
KA
MODR
GRADACAC
PTG1
DOBOJ
GRACA
TESANJ
MAGLAJ
ZAVIDOVICI
E
ZIVINICE
ZENICA
VNIK
PGG1
LUKAVAC
ZEPCE
KLADA
GASIFICATION OF UNA‐SANA CANTON
ƒ PROJECT PHASE I: Pipeline Trzac ‐ Cazin ‐ B. Krupa with branches to Bihac and Velika Kladusa
‐ Length: 40 km (branches 40 km)
‐ Diameter: 20 inch (10.75 inch)
‐ Working pressure: 50 bar
‐ Investment value: cca 25 million EUR
ƒ PROJECT PHASE II: Pipeline Bosanska Krupa – Kljuc
ƒ PROJECT PHASE III: Pipelines Kljuc – B. Petrovac and Pecingrad – Buzim
_________________________
Project status: Tender for Detailed Design for Phase I
Maximum capacity: 1 billion m3
Investment cycle: 2010 – 2013
Note: In parallel with transmission gas pipeline construction, local authorities will start activities on distribution network development
JASEN
VEL. KLADUSA
TR.RASTELA
BOS. DUBICA
BOS. NOVI
CAZIN
BOS. KRUPA
PRIJEDOR
L
BIHAC
PTG4
SANSKI MOST
PGG4
BOS. PETROVAC
KLJUC
GASIFICATION OF CENTRAL BOSNIA CANTON
ƒ PROJECT PHASE I: Lasva Region, Pipeline Zenica ‐ Travnik
‐ Length/Diameter: cca 40 km/16 inch
‐ Max. estimated consumption: cca 80 million m3/year
‐ Investment value: cca 17 million EUR
ƒ PROJECT PHASE II: Vrbas Region, Pipelines Travnik ‐ Gornji Vakuf and Travnik – Jajce
_______________________________
Project status: planned construction within Phase I
Maximum capacity: 1 billion m3
Investment cycle: 2010 – 2011
Note: In parallel with transmission gas pipeline construction, local authorities will start activities on distribution network development
MAGLAJ
ZAVIDOVIC
JAJCE
PTG3
ZENICA
TRAVNIK
PGG3
G. VAKUF
KAKAN
VIS
TRANSMISSION GAS PIPELINE SARAJEVO ‐
MOSTAR ‐ PLOCE
ƒ
ƒ
ƒ
ƒ
ƒ
Length: cca 175 km
Diameter: 16 inch/20 inch
Working pressure: 50/75 bar
Max. capacity: 1.0/2.0 billion m3
Investment value: ‰ 16 inch cca 59 million EUR
‰ 20 inch cca 73 million EUR ƒ Project status: Techno‐economic study completed
ƒ Investment cycle: 2014 – 2017
ƒ Interconnection on croatian transimission gas system
Note: In parallel with transmission gas pipeline construction, local authorities will start activities on distribution network development
BRNJACI ILIJAS
JABLANICA
KONJIC
PTG2
PGG2
MOSTAR
PLOCE
CAPLJINA
SEMIZO
S
TRANSMISSION GAS PIPELINE POSUSJE ‐
TOMISLAVGRAD ‐
BUGOJNO
ƒ Length: 107 km
ƒ Diameter: 16/20 inch
ƒ Working pressure: 50/75 bar
ƒ Investment value: 55 million EUR
ƒ Max. capacity: 1.0‐2.0 billion m3
ƒ Investment cycle: 2011‐2014
ƒ Project status: completed feasibility study
Note: In parallel with transmission gas pipeline construction, local authorities will start activities on distribution network development
NATURAL GAS INTRODUCTION IN TPP KAKANJ
ƒ Cooperation of BH‐Gas and Power Utility EPBiH
ƒ Project status: completion of the Techno‐economic study by the middle of 2010 ƒ Planned CCGT with capacity of 100 MW
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
ƒ Precondition: construction of compressor station with estimated value cca 10 million USD
ƒ Tender for Basic Design in 2010
UNDERGROUND NATURAL GAS STORAGE IN SALT MINE TETIMA
ƒ Minimal usefull volume of storage: 60 million m3
Tetima PTGS6
C
ƒ Number of storage caverns: 4
TUZLA
ƒ Investment value:
SEPAK
‰ I option: cca 42 million EUR
CE
ZVORNIK
SEKOVICI
‰ II option: cca 44 million EUR
‰ III option: cca 35 million EUR
ADANJ
ƒ Project status: completed Pre‐feasibility VLASENICA
study
OLOVO
SREDNJE
BRATUNAC
Projects financial arrangements
JASENOVAC
VEL. KLADUSA
TR.RASTELA
BOS. BROD
BOS. DUBICA
BOS. NOVI
BOS. SAMAC
BOS. GRADISKA
CAZIN
BOS. KRUPA PRIJEDOR
DERVENTA
LAKTASI
PRNJAVOR
BANJA LUKA
BIHAC
PTG
4
PGG4
PETROVAC
TE
KAKANJ
VISOKO
G. VAKUF
BRNJACIILIJAS
TOMISLAVGRAD
JABLANICA
SPILT
PLANNED GAS PIPLINES
EXISTING ENTRY
KONJIC
POSUŠJE
PTG
2
EXISTING GAS PIPELINE
MOSTAR
PLANNED ENTRY
PTG
TRANSPORTATION
PIPELINE PROJECT
PTGS
TRANSPORTATION
PIPELINE AND
UNDERGROUND STORAGE
PLOCE
ZIVINICE
ZENICA
PTG TRAVNIK
3
BUGOJNO
LEGENDA
LUKAVAC Tetima PTGS6
ZEPCE
TUZLA
ZAVIDOVICI
TE
JAJCE
BIJELJINA
GRACANICA
TESANJ
MAGLAJ
KLJUC
BRCKO
DOBOJ
PTG
1
SANSKI MOST
ORASJE
MODRICA
GRADACAC
CAPLJINA
NEUM
SEKOVICI
SEPAK
ZVORNIK
KLADANJ
OLOVO
SREDNJE
VLASENICA
BRATUNAC
SEMIZOVAC
SARAJEVO
GORAZDE
Position of BiH in the regional interconnections
NABUCCO
WHITE STREAM & PEGP
LNG?
IONIANADRIATIC GAS
PIPELINE
EC RING
SOUTH STREAM
LNG?
Offshore?
LNG?
TAP
SOURCE : ECA, SEE Regional Gasification Study World Bank i KfW
TGI
EXPLORE OPPORTUNITIES IN NATURAL GAS SECTOR IN BOSNIA AND HERZEGOVINA: BH‐GAS D.O.O. SARAJEVO
HAMDIJE CEMERLICA NO.2, SARAJEVO
00 387 33 724 220
MANAGEMENT@BH‐GAS.BA