Lessons Learned Medlar Field at Lubrano Park
Transcription
Lessons Learned Medlar Field at Lubrano Park
Lessons Learned Medlar Field at Lubrano Park Project Number: 03-43001.00 Medlar Field at Lubrano Park University U e s ty Park a Project Cost: $ 31,400,000 Commonwealth Funding: $ 12,000,000 Scope: p Accommodations for 6,000 Spectators PSU Baseball Offices Minor League Baseball Offices 20 Suites A hi Architect: L Robert L. R b Kimball Ki b ll andd Associates A i & DLR Sports Group CM: Barton Malow Labor & Industry LL’s • L&I Inspector to attend job conferences (L&I Inspectors to be part of team). team) • CM assigns their QA/QC representative as the L&I Inspector’s contact. QA/QC representative schedules all inspections with L&I inspector. QA/QC representative walks the job site with L&I Inspector p for all inspections. p • Design Professional assigns their representative as the L&I inspector’ss contact inspector contact. • Involve L&I Inspector early on with project (before arrival of job site trailer). Review delivery process and schedule. Labor & Industry LL’ss (cont) LL • CM to assign g space p in jjob trailer for L&I Inspector. p • Maintain log of deficiency reports at job trailer. • L&I Inspectors to reference code section on deficiency report. • Design i Professional f i l to meet/discuss /di with i h L&I & Inspector regarding any disagreement with an item listed on the deficiency p report. • Explain role of deficiency report with CM. CM not to be offended when L&I Inspector issues deficiency report report. Labor & Industry LL’s (cont) • Involve L&I Inspector with trade contractor meetings and ppre-construction meetings. g • Define/review special inspections with L&I Inspector. Indicate who will be performing the special inspections. inspections • Review special inspections as indicated by the Design Professional f i l prior i to submittal b i l to L&I. & Make k sure that h we are in agreement with special inspections as indicated. • Post building permit, L&I Inspection log, UCC Form 7 at the job trailer. Approved L&I documents shall be on site and available to L&I Inspectors. Inspectors Construction Manager LL’s • Identify roll of all OPP staff. Provide CM with our organizational g charts. Highlight g g individuals who will be involved with the project and review their role as it relates to the project. • Explain role of CQR staff • CM C to hhave a ffulltime ll i QA/QC person on site. i p CM Agency g y Not at Risk expectations. p • Explain/Review • Quality issues. • Safety. Construction Manager LL’s (cont) • Teamwork/Partnering. • Pre-construction phase: Many user groups. Identify user groups and role of user groups. Design Professional LL’s • Unrealistic design schedule • Two clients • Quality of rendering too good? • No preliminary design phase due to schedule • Project Manager/Project Architect to attend job conferences. • Refine Construction Administrator staff role. Limited oon site s e inspections/quality spec o s/qu y control co o issues? ssues? Design Professional LL’s (cont) • Submittal review slow (especially MPE staff). • MPE services lacking. • Survey issues with underground vault. vault • Geotechnical issue with probing not identified on documents. p Issue with core • Miscellaneous tests and inspections: break tests. Rendering July 2005 August 2005 September 2005 October 2005 November 2005 December 2005 February 2006 March 2006 April 2006 May 2006