installation instructions for wall tub sets, two handle shower sets and
Transcription
installation instructions for wall tub sets, two handle shower sets and
P 99061 INSTALLATION INSTRUCTIONS FOR WALL TUB SETS, TWO HANDLE SHOWER SETS AND WALL LAVATORY SET VALVES NUMBERED: 8090536RC & 9090536RC 2222 Camden Court, Oak Brook, IL 60523 Telephone: 800-PHYLRICH (749-5742) Fax: 866-800-9774 www.phylrich.com P99061 Step 1 Step 3 Connect hot and cold corner valves using 1/2" copper adaptors(A), copper lines (B) and copper tee (C). Note: DO NOT APPLY HEAT DIRECTLY TO VALVE BODIES. Center-to-center dimension to be specified by customer. Connect 12" adaptors and copper supply lines to 1/2” unions (part #7). Secure the assembled valve once the proper location has been determined. Connect the copper supply lines to the hot and cold supplies. Forshower showerinstallation head installation go to For go to step 4. step 4. For wall lavatory and wall tub spout installation go to For tub installation go to step 5. For stepwall 5. lavatory installation go to step 6. Step 4 Shower Installation Step2 Please refer to rough-in specifications P99061A to deterPlease refer to rough-in specifications P99005A to determine “A”"A" and “B” dimensions and proper locations minethe the dimension and the proper location for for the the valves. The “A” dimension is from the tip of the valve. The "A" dimension is from the tip of the stemstem to the tofinished the finished The “B” is between from the the tip of wall. wall. Installation of adimension crossbeam wall studs at thisvalve location is recommended. the threaded shank to the finished wall. Installation of a crossbeam between the wall studs at this location is recommended. Page 1 Determine the proper locations for the showerhead. Install a crossbeam and secure a 1/2" brass 90° elbow. Connect elbow 3 to tee using copper lines and '/2" male adaptor. Check all connections for leaks and flush all lines. Wall is now ready to be closed. Proceed to step 4.1. P99061 Step 4.1 Step 5.1 Once finished wall is installed, attach showerhead to the long end of the 8" shower arm and slide fiange onto the short end. attach shower arm to brass elbow. Check connections for leaks Slide fiange against wall. Proceed to step 6 Once finished wall is installed, cut the spout tube so that it extends ¼” from the finished wall. Be sure to remove any burrs around the cut surface. All burrs must be removed to prevent damage to spout o-rings. Take note that spout tube may need to be removed from wall in order to be cut. Step 5 Spout Installation Step 5.2 Wall Lavatory Installation B D E Determine the proper locations for the spout. (Note: the outlet of the spout must be a minimum of 2” above the floodplain of the tub.) Install a crossbeam and secure a 90° elbow. Connect elbow to tee using copper lines and ½” male adaptor. Connect adaptor nut (D) and spout tube (E) to elbow. Check all connections for leaks and flush lines. Wall is now ready to be closed. Proceed to step 5.1. Page 2 Thread the spout mount base (F) onto the spout tube (E) and secure in place by tightening setscrews (G). Be careful to mount the spout mount base (F) as close to the wall as possible while maintaining horizontal alignment. Use the alignment screws (H) as reference and align them parallel to the floor. P99061 Step 5.3 Step 6 Align alignment grooves on the spout with the alignment screws (H). Insert the spout adaptor (I) into the spout tube (E). Be sure not to damage o-rings. Refer to valve trim number and page P99061A to determine proper valve installation specifications. Proceed to step 7 Step 5.4 Step 7 Once spout is flush against the wall secure in place with setscrew (J). Proceed to step 6. Once the finished wall is in place, attach o-rings (K), escutcheons (L), wear washers (M), and handles (N), to the valve stems. Secure handle with setscrew (P) If the valve stem is too short to accept handle see step 7.1 If the valve stem is too long see step 7.2 and 7.3. Page 3 P99061 Step 7.1 Step 7.3 Remove handle, escutcheon and stern assembly (#6) Make appropriate cuts on sterm (#4) and nipple (#5). Reinstall stern assemblies, escutcheons and handles. If the valve is installed too deep behind the wall, extension stems are available. Please contact your local distributor to order part number EXTWALL65_001 Step 7.2 Step 7.4 15 14 13 HANDLE CLEARANCE If the valve is installed too far out of the wall the stems and nipples may be trimmed. to determine amount to be cut measure the gap between the escutcheon and the wall and/or the gap between the handle and escutcheon, Attach handle (14) to handle escutcheon (13). Tighten spacer nut (15) into the handle (14) so that there is clearance (~1/13”) between the handle (14) and the handle base (13). See clearance diagram above. Page 4 P99061 Step 7.5 Step 7.6 16 18 17 14 13 14 Secure handle (14) to the handle escutcheon (13) by tightening the cap screw (16) into the valve stem. Complete the handle installation by placing the o-ring (17) and decorative cover plate (18) into the recess in the handle (14). Page 5 P99061 (5/09)