view - City of Fort Collins Records Database
Transcription
view - City of Fort Collins Records Database
Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing ADDENDUM No. 4 SPECIFICATIONS AND CONTRACT DOCUMENTS Description of RFP 7184: Discovery Museum Exhibit Fabrication OPENING DATE: 3:00 P.M. (Our Clock) February 25, 2011 To all prospective bidders under the specifications and contract documents described above, the following additions are hereby made. • The opening date has been changed from February 22, 2011 to February 25, 2011. • The last day to submit questions is February 15, 2011 5:00 p.m.. This addendum contains the following: 1. Questions & Answers 2. Bid Bond 3. Design-Builder Interface 4. Tate Access Flooring Load Data Sheets Please contact John D. Stephen, CPPO, LEED AP, Senior Buyer at (970) 221-6777 with any questions regarding this addendum. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED. 1. Questions and Answers: Please review the questions in black and the answers are in green. RFP 7184 - Conference Calls Clarifications/Changes Item Area Drawing/ Component Questions 1 General Bid Bond The form needed for the Bid Bond is attached. 2 General Evaluation Team 3 General LEED Certification 4 General Media The media content will be updated by the Museum Staff. The Museum Staff will also perform editing and post production development. 5 General Exhibit Buyouts The Museum or Gyroscope will provide the contacts for exhibit buyouts from other sources. Please provide requests for the contacts you need that are not readily available from the information we have already provided. 6 General Warranties The Warranties for buyout/purchased items will be supported by the Fabricator duing the first year, along with their materials and workmanship warranty. If purchased items have Warranties that go beyond the first year, the Museum will work directly with the manufacturer. 7 General Access Floor Attached are the data sheets for the access flooring that provide the allowable loading. 8 General Archive Cases Glass should be priced as specified; no need for starfire or anti-glare tempered glass. Labels for the artifacts will be provided by the Owner. 9 General Touch Screen Monitors Some have shrouds to enclose, some do not; if not clear in the drawings, request clarification. 10 General Technical Components Owner will provide technical components, as specified. Fabricator will need to work with Owner to facilitate fabrication; the Owner intends to provide one of each type for the Fabricator's use. The Evaluation Team is comprised of: Annette Gieselmen, Cheryl Donaldson, Brent Carmack, Jason Wolvington, Jill Stilwell, Ron Davis, Jeanne Shoaf, Dennis Meyer, John Stephen & Ron Kechter. The project is shooting to attain LEED Platinum certification, but due to timing we will not be able to include the Fabricator's sustainability measures with our submission. However, we still expect the Fabricator to be sustainable, as called out in the RFP. 11 General Coordination w/ General Contractor Attached is a spreadsheet that outlines interface areas. Coordination with the GC will be through Ron Kechter. 12 General Value Engineering We request you follow the plans for the purposes of your proposal, but keep track of value engineering opportunities. 13 General Aluminum Cut-out Letters These letters should be 1/4" thickness, matte finish and welded to an aluminum strip. 14 General Aluminum Cut-out Letters Any details on costing should be included as a backup to the cost sheet outlined in the drawings. 15 General Refurbishment Scopes Mr. Bones - requires new bicycles and update of exhibit electronics. 16 General Refurbishment Scopes Tennis Ball Race - paint only. 17 General Refurbishment Scopes Plazma Display - new case only. 18 General Refurbishment Scopes Watts the Cost - complete update. 19 General Refurbishment Scopes Match the Tone - update electronics only. 20 Zone 1 1.0.0 21 Zone 1 1.25.0 22 Zone 1 1.29.0 The Juke Box is screwed to the wall. 23 Zone 1 2.2 Whimsical Water is provided by the Fabricator; water fill will be without plumbing; power is provided. 24 Zone 2 2.4.0 Tree canopy is printed on vinyl. Coordinate location of tree with light fixtures and match shape. Music wall soundproofing panels should be fabricated using duct liner, unless the Fabricator can determine a better alternative. Piano and performance area is elseware. Walls not at the perimeter are the responsibility of the Fabricator. The Overhead Door is operated by an electric garage door opener. The interactive can be directly purchased from Exporitorium, but their geometry may need to be modified. Add a sneeze guard to protect the screen. 25 Zone 2 2.6.0 The non-slip epoxy surface is in the Fabricator's scope. 26 Zone 2 2.11.0 Metal scrim is needed for the Wind Chime Babies. 27 Zone 3 3.1.0-3.1.6 A 4" hole is provided in the building glass for the bee tube to pass through. Material for the hexagon structure is recommended to be appleply. Use a standare bee frame so Museum Staff can place hive on a cart and go outside. 28 Zone 3 3.2.0-3.2.9 The animanl habitats are to be pet store style; flexibility is the key. These enclosures will be outfitted by the Museum Staff. Recommend construction with appleply. 29 Zone 3 3.4.0 Pin specimens are by Owner. 30 Zone 4 4.0.0 The Fabricator will not be providing any of the taxidermy or fossil items. 31 Zone 4 4.1.0-4.1.3 The projection globe is a Global Imaginations stock image. 32 Zone 4 4.2.0-4.2.9 The large skeleton will be purchaced by the Museum and the Fabricator is to install. The Fabricator must coordinate shipping to Fort Collins with the Project Manager. 33 Zone 4 4.3.15 The short grass is a replica. 34 Zone 4 4.4.0-4.4.9 The bison and the skeleton will be purchaced by the Museum and the Fabricator is to install. The Fabricator must coordinate shipping to Fort Collins with the Project Manager. It needs to look like prarie under the Bison. 35 Zone 5 5.1.1 This exhibit requires a wall panel system. 36 Zone 5 5.2.4 Include table and cone in scope; cone is on scrim. 6.0.0 The linear irrigator will be installed through a combination of the General Contractor, Valley Irrigation and the Museum Staff. There is no responsibility of the Fabricator for this installation. The Fabricator will need to coordinate graphic 6.1.1 installation with the irrigator and wall finish work. 37 Zone 6 38 Zone 6 6.1.1 This graphic does not show up in the graphics schedule, but is clarified by Item 59 below. 39 Zone 6 6.2.0 The artifacts that are standing up with points on them are not a safety concern, since they are tall enough to be out of reach. 40 Zone 6 6.5.0-6.5.1 The beet interactive is intended to be composed of the following: beets are turned wood; tops are fabric; and the two halves are held together by magnets. 41 Zone 6 6.6.0 The case is custom built, not a buyout item. 42 Zone 6 6.7.4 The windmill is static; the lenticular graphics animate the pump action. 43 Zone 6 6.8.0 Media for this exhibit is by the Owner. Fabricator is to do the wiring and build it according to plans. Taps with appliques are by the Fabricator, plus the technology. 44 Zone 7 7.5.0 Fabricator is to make parts for the table game; Owner will provide details for custom camp parts. 45 Zone 7 7.7.0 The Museum will provide the location of the cameras for the video of trains outside. The Fabricator will need to coordinate the location of the conduit to be supplied by the General Contractor for the motion sensor, soon after Award, with the Project Manager. 46 Zone 8 8.4.0-8.4.3 The rising of the water in the water wall will need to be rapid and tied to the presentation for timing; sycroniztion could be with a media signal or a timer. 47 Zone 9 9.11.0 The PV Panel is by the Owner. 48 Zone 10 10.4.0 Fabricator constructs LED Media Wall enclosure and coordinates the installation of the flat screen. 49 Zone 10 10.5.0 Fabricator installs equipment and provides 36 pucks. The veriscope is stationary. 50 Zone 10 10.3.0 Fabricator constructs wall and installs metal cladding. Interactive is by Creative Machines, through the Owner's contract with Gyroscope. 51 Zone 10 10.12.0-10.12.2 The Funky Forest is to be purchased by the Fabricator from the Subcontractor and the Fabricator must obtain a quote from the Subcontractor directly. 52 Zone 11 11.4.0-11.4.4 The plants are outside of the ferret enclosures. 53 Zone 11 11.8.0 Build the ripple tank as you see it, but add an acrylic lid. 54 Zone 12 12.2.1 The Atomic Clock is wireless. 55 Zone 13 13.2.0 Fabricator is to provide fountains for the Musical Glenn - Outdoors. 56 Zone 13 13.4.0 The Owner will have the Vestas Blade installed on the in-ground structure. The Fabricator is to fabricate and install the coweling over the end of the blade. 57 Graphics G1.22.3 The quantity is one. 58 Graphics G5.1.3 The quantity for the graphic on the monitor is 9 cut-out letters. 59 Graphics G6.1.1 The environmental graphic is on the wall; the size is 16'-0" H X 22'-0" W (V.I.F.). 60 Graphics G6.2.16-G6.2.20 The quantity is 12 for the drawer graphics; add 6 more, which will be numbered G2.21 through G2.26. 61 Graphics G6.8.4 The flip book content is by the Owner. The Fabricator supplies 12 pages. 62 Graphics G7.12.1 The 22" X 28" graphic panel is lambda on greencore. Greencore is something like masonite from DPI in Toledo, OH; it replaces ABS Sintra as a backing material for these graphics. 63 Graphics G8.5.0 Not on the list is the graphic that is 2'-4" X 3'-6" and should be lamda on greencore. 64 Graphics G9.11.4 This is a lambda print. 65 Graphics G10.5.3 The size is determined by the sterioscopic viewer card image dimensions, which are approximately 5" H X 9" W. 66 Graphics G11.3.9 Screen savers are N.I.C. 67 Graphics G11.4.10 Dependent on the layout, this should be 6 X 6. 68 Graphics G11.5.1 Screen savers are N.I.C. 2. Bid Bond: SECTION 00410 BID BOND KNOW ALL MEN BY THESE PRESENTS: that we, the undersigned _____________________ as Principal, and ________________________________as Surety, are hereby held and firmly bound unto the City of Fort Collins, Colorado, as OWNER, in the sum of ________________________________________________________($_______________) for the payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, successors, and assigns. THE CONDITION of this obligation is such that whereas the Principal has submitted to the City of Fort Collins, Colorado the accompanying Bid and hereby made a part hereof to enter into a Construction Agreement for the construction of Fort Collins Project, RFP 7184 DISCOVERY MUSEUM EXHIBIT FABRICATION NOW THEREFORE, (a) If said Bid shall be rejected, or (b) If said Bid shall be accepted and the Principal shall execute and deliver a Contract in the form of Contract attached hereto (properly completed in accordance with said Bid) and shall furnish a BOND for his faithful performance of said Contract, and for payment of all persons performing labor or furnishing materials in connection therewith, and shall in all other respects perform the Agreement created by the acceptance of said Bid, then this obligation shall be void; otherwise the same shall remain in force and effect, it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the penal amount of this obligation as herein stated. The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its BOND shall be in no way impaired or affected by any extension of the time within which the OWNER may accept such Bid; and said Surety does hereby waive notice of any such extension. Surety Companies executing bonds must be authorized to transact business in the State of Colorado and be accepted by the OWNER. IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals this_____ day of _____________, _____, and such of them as are corporations have caused their corporate seals to be hereto affixed and these presents to be signed by their proper officers, the day and year first set forth above. PRINCIPAL SURETY Name: ___________________________ _________________________________ Address:__________________________ Address: __________________________ _________________________________ __________________________________ _________________________________ __________________________________ By: ______________________________ __________________________________ Title: _____________________________ Title: ______________________________ ATTEST: By: ______________________________ (SEAL) (SEAL) 3. Design-Builder Interface FTC EXHIBITS/ ARCH INTERFACE Drawing # Component Name 1/27/11 Arch Interface Y/(N) GYROSCOPE INC. Status as of 1/27/11 Notes ZONE 0: GENERAL 0.0.0 0.0.1 0.0.2 0.0.3 0.0.4 0.0.5 0.0.6 0.1.0 0.1.1 0.1.2 0.2.0 0.2.1 0.2.2 0.2.3 FTC Cover Sheet FTC Index FTC Symbols FTC Notes Materials Materials Materials Exhibit Plan Exhibit Zone Key Plan Enclosed Exhibit Spaces Plan Power-Data Source Plan-A Power-Data Source Plan-B Power-Data Distributor Plan-A Power-Data Distributor Plan-B Y Y Y Y Y Coordinate any sprinkers or HVAC Coordinated these, dwg sent. Need Coordinated these, dwg sent. Need Coordinated these, dwg sent. Need Coordinated these, dwg sent. Need Y Coordinate floor box vs. pass thru to j-boxes for power/ data locations Y coordinate use of accesss floor opening for Sound Spot elements (7) TBD Y Coordinate any sprinkers or HVAC TBD Y Coordinate any sprinkers or HVAC TBD to to to to review review review review final final final final shop shop shop shop drawings drawings drawings drawings in in in in TBD process process process process ZONE 1: MUSIC & SOUND 1.0.0 1.0.1 1.0.2 1.0.3 1.1.0 1.1.1 1.1.2 1.1.3 1.1.4 1.1.5 1.2.0 1.3.0 1.4.0 1.5.0 1.5.1 1.5.2 1.5.3 1.5.4 1.5.5 1.5.6 1.6.0 1.6.1 1.6.2 1.6.3 1.6.4 1.7.0 1.8.0 1.8.1 1.9.0 1.9.1 1.10.0 1.11.0 1.11.1 1.12.0 1.12.1 1.13.0 1.14.0 1.15.0 1.16.0 1.17.0 1.18.0 1.18.1 1.18.2 1.18.3 1.19.0 1.20.0 1.20.1 1.20.2 1.20.3 1.20.4 1.20.5 1.21.0 1.22.0 1.23.0 1.23.1 1.23.2 1.23.3 1.24.0 1.24.1 1.24.2 1.24.3 1.24.4 1.24.5 Zone Plan - Music Music & Sound Renderings Music & Sound Renderings Music & Sound Renderings Giant Piano Lever Giant Piano Lever Giant Piano Lever Giant Piano Lever Giant Piano Lever Giant Piano Lever Sound Spots Drum-O-Jam EMP Trio Stations Media Enclosure Media Enclosure Media Enclosure Media Enclosure Media Enclosure Media Enclosure Media Enclosure Edison to iPod Case Edison to iPod Case Edison to iPod Case Radio Case Radio Case Sound Spectrogram Styrene Wave Forms Styrene Wave Forms Bubbling Ripple Tank Bubbling Ripple Tank Impact on Hearing Media Theater Media Theater Drums, Strings, and Horns Drums, Strings, and Horns Hole Saw Rhythms Wash Tub Base Oscylinderscope Pitch Slider Find the Highest Note/Auditory Illusion Horn Instrument Interactive Horn Instrument Interactive Horn Instrument Interactive Horn Instrument Interactive Reactable The Garage The Garage The Garage The Garage The Garage The Garage Mash-Up Station DJ Scratch Table Listening Lounge Listening Lounge Listening Lounge Listening Lounge Fort Collins Music Story Fort Collins Music Story Fort Collins Music Story Fort Collins Music Story Fort Collins Music Story Fort Collins Music Story Page 1 in process FTC EXHIBITS/ ARCH INTERFACE 1.24.6 1.25.0 1.25.1 1.26.0 1.26.1 1.26.2 1.26.3 1.27.0 1.28.0 1.29.0 1.30.0 1.31.0 Typical Acrylic Case Details Percussion Booth Percussion Booth Music Innovation Wall Music Innovation Wall Music Innovation Wall Music Innovation Wall Sound Bite Feel the Bass (See 1.23.0) Match the Tone Juke Box Doorway Bass Interactive 1/27/11 GYROSCOPE INC. Y Coordinate any sprinkers or HVAC TBD Y Walls near water interactive could substitute wonder board instead of sheetrock in this area Y Coordinate floor drain location and floor slope done Y Provide 4" D. access hole for bee flight tube through window glazing. done ZONE 2: EARLY CHILDHOOD 2.0.0 2.0.1 2.1.0 2.1.1 2.1.2 2.2.0 2.2.1 2.2.2 2.3.0 2.4.0 2.4.1 2.4.2 2.4.3 2.4.4 2.5.0 2.5.1 2.5.2 2.5.3 2.6.0 2.6.1 2.6.2 2.6.3 2.7.0 2.8.0 2.9.0 2.10.0 2.11.0 Zone Plan-Kids Early Childhood Renderings EC Divider EC Divider EC Divider Musical Water Cube Musical Water Cube Musical Water Cube Flooring Plan Crawl Through Tree Crawl Through Tree Crawl Through Tree Crawl Through Tree Crawl Through Tree Train Table Train Table Train Table Train Table EC Water Table EC Water Table EC Water Table EC Water Play Plumbing Plan Dress-Up Area Art Station Portraits of Me Building Play Wind Chime Babies ZONE 3: LIVE ANIMALS 3.0.0 3.0.1 3.0.2 3.1.0 3.1.1 3.1.2 3.1.3 3.1.4 3.1.5 3.1.6 3.1.7 3.1.8 3.2.0 3.2.1 3.2.2 3.2.3 3.2.3 3.2.4 3.2.5 3.2.6 3.2.7 3.2.8 3.2.9 3.3.0 3.4.0 3.4.1 3.4.2 3.4.3 Zone Plan-Live Animals Live Animals Renderings Interior Partition Bee Wall Bee Wall Detail Bee Wall Detail Bee Wall Detail Bee Wall Detail Bee Wall Detail Bee Wall Detail Bee Wall Detail Bee Wall Detail Animal Habitats Animal Habitats Animal Habitats Animal Habitats Animal Habitats Animal Habitats Animal Habitats Animal Habitats Animal Habitats Animal Habitats Animal Habitats Support Area Animal Study Station Animal Study Station Animal Study Station Animal Study Station ZONE 4: WILDLANDS & WILDLIFE 4.0.0 4.0.1 4.0.2 4.1.0 4.1.1 4.1.2 4.1.3 4.2.0 Zone Plan-Wildlife Wildlife & Wildlands Renderings Wildlife & Wildlands Renderings Pangea Story: Projection Globe Pangea Story: Projection Globe Pangea Story: Projection Globe Details Pangea Story: Projection Globe Details Fossil Wall Page 2 FTC EXHIBITS/ ARCH INTERFACE 4.2.1 4.2.2 4.2.3 4.2.4 4.2.5 4.2.6 4.2.7 4.2.8 4.2.9 4.3.0 4.3.1 4.3.2 4.3.3 4.3.4 4.3.5 4.3.6 4.3.7 4.3.8 4.3.9 4.3.10 4.3.11 4.3.12 4.3.13 4.3.14 4.3.15 4.3.16 4.3.17 4.3.18 4.3.19 4.3.20 4.4.0 4.4.1 4.4.2 4.4.3 4.4.4 4.4.5 4.4.6 4.4.7 4.4.8 4.4.9 4.5.0 1/27/11 GYROSCOPE INC. Fossil Wall Fossil Wall Fossil Wall Fossil Wall Fossil Wall Fossil Wall Fossil Wall Fossil Wall Fossil Wall Regional Biodiversity Wall Regional Biodiversity Wall Regional Biodiversity Wall Regional Biodiversity Wall Regional Biodiversity Wall Regional Biodiversity Wall Regional Biodiversity Wall Regional Biodiversity Wall Regional Biodiversity Wall Regional Biodiversity Wall Regional Biodiversity Wall Regional Biodiversity Wall Regional Biodiversity Wall Regional Biodiversity Wall Regional Biodiversity Wall Regional Biodiversity Wall Regional Biodiversity Wall Regional Biodiversity Wall Regional Biodiversity Wall Regional Biodiversity Wall Regional Biodiversity Wall Bison Enclosure Bison Enclosure Bison Enclosure Bison Enclosure Bison Enclosure Bison Enclosure Bison Enclosure Bison Enclosure Bison Enclosure Bison Enclosure Spotting Scopes & Field Guides ZONE 5: FIRST PEOPLES 5.0.0 5.0.1 5.1.0 5.1.1 5.1.2 5.1.3 5.1.4 5.1.5 5.1.6 5.1.7 5.1.8 5.1.9 5.2.0 5.2.1 5.2.2 5.2.3 5.3.0 5.3.1 5.3.2 5.3.3 5.3.4 5.3.5 5.3.6 5.3.7 5.3.8 Zone Plan-First People First Peoples Rendering Archaeology Plan Archaeology Rendering Archaeology Archaeology Archaeology Archaeology Archaeology Archaeology Archaeology Archaeology Details Lithic Tools Lithic Tools Lithic Tools Lithic Tools Perspectives Perspectives Perspectives Perspectives Perspectives Perspectives - Skateboard Display Perspectives - Council Tree Perspectives - Echo Heart Perspectives - Graphics ZONE 6: FOOD, FORAGE & FARM 6.0.0 6.0.1 6.1.0 Zone Plan - Food Forage & Farm Food, Forage and Farm Renderings Irrigator 6.2.0 6.2.1 6.2.2 6.2.3 6.2.4 6.2.5 6.2.6 6.2.7 6.2.8 Agriculture Agriculture Agriculture Agriculture Agriculture Agriculture Agriculture Agriculture Agriculture Y Add blocking in wall to create tube to accept irrigator pipe and additional support sections Page 3 TBD FTC EXHIBITS/ ARCH INTERFACE 6.3.0 6.3.1 6.3.2 6.3.3 6.3.4 6.4.0 6.4.1 6.5.0 6.5.1 6.5.2 6.5.3 6.5.4 6.5.5 6.6.0 6.6.1 6.6.2 6.6.3 6.6.4 6.6.5 6.6.6 6.6.7 6.6.8 6.6.9 6.6.10 6.7.0 6.7.1 6.7.2 6.7.3 6.7.4 6.7.5 6.8.0 6.8.1 6.8.2 6.9.0 6.9.1 6.9.2 6.9.3 Irrigation Irrigation Irrigation Irrigation Irrigation Sheep Farming & Finishing Sheep Farming & Finishing Beet Farming Beet Farming Beet Farming Beet Farming Beet Farming Beet Farming Home & Hearth Home & Hearth Home & Hearth Home & Hearth Home & Hearth Home & Hearth Home & Hearth Home & Hearth Home & Hearth Home & Hearth Home & Hearth Ranching, Windmill Water Pump Ranching, Windmill Water Pump Ranching, Windmill Water Pump Ranching, Windmill Water Pump Ranching, Windmill Water Pump Ranching, Windmill Water Pump Local Brewing Local Brewing Local Brewing Dairy Dairy Dairy Dairy 1/27/11 GYROSCOPE INC. Y Coordinate any sprinkers or HVAC TBD Y Add blocking in wall for Milk Carton artifact bracket TBD Y Motion sensor and camera for passing trains may need conduit from location outdoors, back to tele closet, then can run to exhibit. Locations TBD TBD ZONE 7: PEOPLE ON THE MOVE 7.0.0 7.0.1 7.0.2 7.0.3 7.1.0 7.2.0 7.2.1 7.2.2 7.3.0 7.4.0 7.4.1 7.5.0 7.5.1 7.5.2 7.5.3 7.5.4 7.5.5 7.6.0 7.6.1 7.6.2 7.6.3 7.6.4 7.6.5 7.6.6 7.6.7 7.6.8 7.6.9 7.6.10 7.7.0 7.7.1 7.7.2 7.7.3 7.7.4 7.7.5 7.7.6 7.8.0 7.8.1 7.8.2 7.8.3 7.8.4 7.8.5 7.8.6 7.8.7 Zone Plan - People on the Move People on the Move Rendering People on the Move Rendering People on the Move Rendering Compass Projection Arrival of Europeans Arrival of Europeans Arrival of Europeans Arrival of Europeans American Indian Culture American Indian Culture Camp Collins Camp Collins Camp Collins Camp Collins Camp Collins Camp Collins Westward Expansion Westward Expansion Westward Expansion Westward Expansion Westward Expansion Westward Expansion Westward Expansion Westward Expansion Westward Expansion Westward Expansion Westward Expansion Trains Through Fort Collins Trains Through Fort Collins Trains Through Fort Collins Trains Through Fort Collins Trains Through Fort Collins Trains Through Fort Collins Trains Through Fort Collins Growth Growth Growth Growth Growth Growth Growth Growth of of of of of of of of the the the the the the the the City City City City City City City City Page 4 FTC EXHIBITS/ ARCH INTERFACE 7.8.8 7.8.9 7.9.0 7.9.1 7.10.0 7.11.0 7.12.0 7.12.1 7.12.2 7.13.0 7.14.0 7.15.0 7.16.0 7.17.0 1/27/11 GYROSCOPE INC. Growth of the City Growth of the City City Building City Building Mythology of the West Climb-on Penny Farthing Historic & Contemporary Bikes Bike Ramp Ice Cream Bike Bike Resources Spokin’ Stories Mr. Bones Bike Innovation Display Gear Interactive ZONE 8: WATER 8.0.0 8.0.1 8.0.2 8.1.0 8.1.1 8.1.2 8.1.3 8.1.4 8.1.5 8.1.6 8.1.7 8.2.0 8.3.0 8.4.0 8.4.1 8.4.2 8.4.3 8.5.0 Zone Plan - Water Water Plan Rendering Water Plan Rendering Water Table Water Flow Water Table Structure Water Table Hydro Power Water Choices Water Wheels Water Power Wall Water Recreation Where Our Water Comes From Flood Experiences Rain Curtain Floor and Walls Historic Floods Extreme Weather Station Y Coordinate floor drain location and floor slope done Y Coordinate location of solatube done Y Coordinate any sprinkers or HVAC TBD ZONE 9: ENERGY & SUSTAINABLITY 9.0.0 9.0.1 9.0.2 9.1.0 9.1.1 9.1.2 9.1.3 9.1.4 9.1.5 9.1.6 9.1.7 9.2.0 9.2.1 9.2.2 9.3.0 9.4.0 9.5.0 9.6.0 9.6.1 9.7.0 9.8.0 9.8.1 9.9.0 9.9.1 9.10.0 9.11.0 9.11.1 9.12.0 9.13.0 Zone Plan-Energy & Sustainability Energy & Sustainability Renderings Energy & Sustainability Renderings Energy Exhibits Structure Energy Exhibits Structure Energy Exhibits Structure Energy Exhibits Structure Energy Exhibits Structure Energy Exhibits Structure Energy Exhibits Structure Energy Exhibits Structure Historic Bulbs Historic Bulbs Historic Bulbs Energy Timeline Plasma Discharge Jacob's Ladder Electricity & Magnetism Electricity & Magnetism Wind Power Heat Detective Heat Detective Watts the Cost Watts the Cost Green Materials Workbench Power from the Sun Power from the Sun Sustainable Fort Collins Solatube ZONE 10: SCIENCE 10.0.0 10.0.1 10.0.2 10.1.0 10.1.1 10.1.2 10.1.3 10.1.4 10.1.5 10.1.6 10.1.7 10.2.0 Zone Plan - Science Science Science Experience Renderings Science Science Experience Renderings Intro Wall Plan Intro Wall Rendering Intro Wall Intro Wall Frame Intro Wall Graphics Intro Wall Back Panels Intro Wall Elements Intro Wall Elements Media Enclosure Page 5 FTC EXHIBITS/ ARCH INTERFACE 10.2.1 10.2.2 10.3.0 10.4.0 10.5.0 10.5.1 10.5.2 10.5.3 10.5.4 10.5.5 10.5.6 10.5.7 10.5.8 10.6.0 10.6.1 10.7.0 10.7.1 10.7.2 10.8.0 10.9.0 10.10.0 10.10.1 10.10.2 10.11.0 10.12.0 10.12.1 10.12.2 10.13.0 10.13.1 10.13.2 10.14.0 10.14.1 10.14.2 10.15.0 10.16.0 10.17.0 10.18.0 10.18.1 10.18.2 10.19.0 10.19.1 10.20.0 1/27/11 GYROSCOPE INC. Media Enclosure Media Enclosure Ball Run Wall LED Media Wall Magnification Station Magnification Station Magnification Station Magnification Station Magnification Station Magnification Station Magnification Station Magnification Station Magnification Station Information Station Information Station Moire Interactive Wall Moire Interactive Wall Moire Interactive Wall Laser & Fiber Optics Color Mixing: Aurora Color Room Color Room Color Room Shadow Wall Funky Forest Funky Forest Funky Forest Wind Wall with Wind Rail Wind Wall with Wind Rail Wind Wall with Wind Rail Bernoulli Table Bernoulli Table Bernoulli Table P.I.E. Wind Tube Tornado Simulator Innovation Lab Project Display Wall Project Display Wall Project Display Wall Local Project Spotlight - Biofuels Local Project Spotlight - Biofuels Tennis Ball Race ZONE 11: NATURAL AREAS 11.0.0 11.0.1 11.1.0 11.1.1 11.2.0 11.2.1 11.3.0 11.3.1 11.4.0 11.4.1 11.4.2 11.4.3 11.4.4 11.5.0 11.6.0 11.7.0 11.8.0 11.9.0 11.9.1 Zone Plan - Natural Areas Natural Areas Renderings Welcome Panel Y Coordinate blocking in ceiling to allow graphic wire rope connections to attach to building structure TBD Y Coordinate blocking in ceiling to allow flying creature ring to attach to building structure TBD Y Coordinate power and location of outlets to Atomic Clock exhibit TBD Y Coordinate with landscape design and owner. TBD Y Coordinate with landscape design and owner. TBD Graphic Mount Details Zone Title Lettering Zone Title Lettering Seven Values Wall with Kiosk Seven Values Wall with Kiosk Prairie Habitat Prairie Habitat Prairie Habitat Prairie Habitat Prairie Habitat Interactive Map Seasonal Graphic Seating Ripple Interactive Table Flying Creatures Sculpture Flying Creatures Sculpture ZONE 12: FREE ZONE/ LOBBY 12.0.0 12.0.1 12.1.0 12.1.1 12.2.0 12.2.1 Zone Plan - Free Zone Experiences Free Zone Experiences Renderings Piano Ring Piano Ring Atomic Clock - Lobby Atomic Clock ZONE 13: OUTDOOR EXHIBITS 13.0.0 13.1.0 13.2.0 13.2.1 13.2.2 13.2.3 13.3.0 Outdoor Ground Renderings Typical Outdoor Graphics Musical Glen Plan Musical Glen Musical Glen - Details Musical Glen - Details Log Scramble Page 6 FTC EXHIBITS/ ARCH INTERFACE 13.4.0 13.4.1 13.4.2 13.4.3 Vestas Vestas Vestas Vestas Blade Plan Blade Blade Unit Mini Turbine 1/27/11 Y Coordinate with landscape design and owner. Y Coordinate with Gyro/ Lightswitch GYROSCOPE INC. TBD ZONE 14: ROOFTOP 14.0.0 Outdoor Signage Wall Mount ZONE L: LIGHTING L.1.0 Lighting Plans - See Separate Lighting PDF in process ZONE G: GRAPHICS G Graphics Schedule - See Separate Graphic Schedule PDF ZONE E: POWER & DATA E Power & Data Schedule - See Separate Power & Data PDF Coordinate with Gyro/ and owner Page 7 in process 4. Tate Access Flooring Load Data Sheets