ADDENDUM No. 4
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of RFP 7184: Discovery Museum Exhibit Fabrication
OPENING DATE: 3:00 P.M. (Our Clock) February 25, 2011
To all prospective bidders under the specifications and contract documents described
above, the following additions are hereby made.
•
The opening date has been changed from February 22, 2011 to February 25,
2011.
•
The last day to submit questions is February 15, 2011 5:00 p.m..
This addendum contains the following:
1. Questions & Answers
2. Bid Bond
3. Design-Builder Interface
4. Tate Access Flooring Load Data Sheets
Please contact John D. Stephen, CPPO, LEED AP, Senior Buyer at (970) 221-6777
with any questions regarding this addendum.
RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN
STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS
ADDENDUM HAS BEEN RECEIVED.
1. Questions and Answers:
Please review the questions in black and the answers are in green.
RFP 7184 - Conference Calls Clarifications/Changes
Item
Area
Drawing/ Component
Questions
1
General
Bid Bond
The form needed for the Bid Bond is attached.
2
General
Evaluation Team
3
General
LEED Certification
4
General
Media
The media content will be updated by the Museum Staff. The Museum Staff will also perform
editing and post production development.
5
General
Exhibit Buyouts
The Museum or Gyroscope will provide the contacts for exhibit buyouts from other sources.
Please provide requests for the contacts you need that are not readily available from the
information we have already provided.
6
General
Warranties
The Warranties for buyout/purchased items will be supported by the Fabricator duing the first
year, along with their materials and workmanship warranty. If purchased items have
Warranties that go beyond the first year, the Museum will work directly with the manufacturer.
7
General
Access Floor
Attached are the data sheets for the access flooring that provide the allowable loading.
8
General
Archive Cases
Glass should be priced as specified; no need for starfire or anti-glare tempered glass. Labels
for the artifacts will be provided by the Owner.
9
General
Touch Screen Monitors
Some have shrouds to enclose, some do not; if not clear in the drawings, request
clarification.
10
General
Technical Components
Owner will provide technical components, as specified. Fabricator will need to work with
Owner to facilitate fabrication; the Owner intends to provide one of each type for the
Fabricator's use.
The Evaluation Team is comprised of: Annette Gieselmen, Cheryl Donaldson, Brent
Carmack, Jason Wolvington, Jill Stilwell, Ron Davis, Jeanne Shoaf, Dennis Meyer, John
Stephen & Ron Kechter.
The project is shooting to attain LEED Platinum certification, but due to timing we will not be
able to include the Fabricator's sustainability measures with our submission. However, we
still expect the Fabricator to be sustainable, as called out in the RFP.
11
General
Coordination w/ General
Contractor
Attached is a spreadsheet that outlines interface areas. Coordination with the GC will be
through Ron Kechter.
12
General
Value Engineering
We request you follow the plans for the purposes of your proposal, but keep track of value
engineering opportunities.
13
General
Aluminum Cut-out Letters
These letters should be 1/4" thickness, matte finish and welded to an aluminum strip.
14
General
Aluminum Cut-out Letters
Any details on costing should be included as a backup to the cost sheet outlined in the
drawings.
15
General
Refurbishment Scopes
Mr. Bones - requires new bicycles and update of exhibit electronics.
16
General
Refurbishment Scopes
Tennis Ball Race - paint only.
17
General
Refurbishment Scopes
Plazma Display - new case only.
18
General
Refurbishment Scopes
Watts the Cost - complete update.
19
General
Refurbishment Scopes
Match the Tone - update electronics only.
20
Zone 1
1.0.0
21
Zone 1
1.25.0
22
Zone 1
1.29.0
The Juke Box is screwed to the wall.
23
Zone 1
2.2
Whimsical Water is provided by the Fabricator; water fill will be without plumbing; power is
provided.
24
Zone 2
2.4.0
Tree canopy is printed on vinyl. Coordinate location of tree with light fixtures and match
shape.
Music wall soundproofing panels should be fabricated using duct liner, unless the Fabricator
can determine a better alternative. Piano and performance area is elseware. Walls not at
the perimeter are the responsibility of the Fabricator.
The Overhead Door is operated by an electric garage door opener. The interactive can be
directly purchased from Exporitorium, but their geometry may need to be modified. Add a
sneeze guard to protect the screen.
25
Zone 2
2.6.0
The non-slip epoxy surface is in the Fabricator's scope.
26
Zone 2
2.11.0
Metal scrim is needed for the Wind Chime Babies.
27
Zone 3
3.1.0-3.1.6
A 4" hole is provided in the building glass for the bee tube to pass through. Material for the
hexagon structure is recommended to be appleply. Use a standare bee frame so Museum
Staff can place hive on a cart and go outside.
28
Zone 3
3.2.0-3.2.9
The animanl habitats are to be pet store style; flexibility is the key. These enclosures will be
outfitted by the Museum Staff. Recommend construction with appleply.
29
Zone 3
3.4.0
Pin specimens are by Owner.
30
Zone 4
4.0.0
The Fabricator will not be providing any of the taxidermy or fossil items.
31
Zone 4
4.1.0-4.1.3
The projection globe is a Global Imaginations stock image.
32
Zone 4
4.2.0-4.2.9
The large skeleton will be purchaced by the Museum and the Fabricator is to install. The
Fabricator must coordinate shipping to Fort Collins with the Project Manager.
33
Zone 4
4.3.15
The short grass is a replica.
34
Zone 4
4.4.0-4.4.9
The bison and the skeleton will be purchaced by the Museum and the Fabricator is to install.
The Fabricator must coordinate shipping to Fort Collins with the Project Manager. It needs to
look like prarie under the Bison.
35
Zone 5
5.1.1
This exhibit requires a wall panel system.
36
Zone 5
5.2.4
Include table and cone in scope; cone is on scrim.
6.0.0
The linear irrigator will be installed through a combination of the General Contractor, Valley
Irrigation and the Museum Staff. There is no responsibility of the Fabricator for this
installation. The Fabricator will need to coordinate graphic 6.1.1 installation with the irrigator
and wall finish work.
37
Zone 6
38
Zone 6
6.1.1
This graphic does not show up in the graphics schedule, but is clarified by Item 59 below.
39
Zone 6
6.2.0
The artifacts that are standing up with points on them are not a safety concern, since they are
tall enough to be out of reach.
40
Zone 6
6.5.0-6.5.1
The beet interactive is intended to be composed of the following: beets are turned wood;
tops are fabric; and the two halves are held together by magnets.
41
Zone 6
6.6.0
The case is custom built, not a buyout item.
42
Zone 6
6.7.4
The windmill is static; the lenticular graphics animate the pump action.
43
Zone 6
6.8.0
Media for this exhibit is by the Owner. Fabricator is to do the wiring and build it according to
plans. Taps with appliques are by the Fabricator, plus the technology.
44
Zone 7
7.5.0
Fabricator is to make parts for the table game; Owner will provide details for custom camp
parts.
45
Zone 7
7.7.0
The Museum will provide the location of the cameras for the video of trains outside. The
Fabricator will need to coordinate the location of the conduit to be supplied by the General
Contractor for the motion sensor, soon after Award, with the Project Manager.
46
Zone 8
8.4.0-8.4.3
The rising of the water in the water wall will need to be rapid and tied to the presentation for
timing; sycroniztion could be with a media signal or a timer.
47
Zone 9
9.11.0
The PV Panel is by the Owner.
48
Zone 10
10.4.0
Fabricator constructs LED Media Wall enclosure and coordinates the installation of the flat
screen.
49
Zone 10
10.5.0
Fabricator installs equipment and provides 36 pucks. The veriscope is stationary.
50
Zone 10
10.3.0
Fabricator constructs wall and installs metal cladding. Interactive is by Creative Machines,
through the Owner's contract with Gyroscope.
51
Zone 10
10.12.0-10.12.2
The Funky Forest is to be purchased by the Fabricator from the Subcontractor and the
Fabricator must obtain a quote from the Subcontractor directly.
52
Zone 11
11.4.0-11.4.4
The plants are outside of the ferret enclosures.
53
Zone 11
11.8.0
Build the ripple tank as you see it, but add an acrylic lid.
54
Zone 12
12.2.1
The Atomic Clock is wireless.
55
Zone 13
13.2.0
Fabricator is to provide fountains for the Musical Glenn - Outdoors.
56
Zone 13
13.4.0
The Owner will have the Vestas Blade installed on the in-ground structure. The Fabricator is
to fabricate and install the coweling over the end of the blade.
57
Graphics
G1.22.3
The quantity is one.
58
Graphics
G5.1.3
The quantity for the graphic on the monitor is 9 cut-out letters.
59
Graphics
G6.1.1
The environmental graphic is on the wall; the size is 16'-0" H X 22'-0" W (V.I.F.).
60
Graphics
G6.2.16-G6.2.20
The quantity is 12 for the drawer graphics; add 6 more, which will be numbered G2.21
through G2.26.
61
Graphics
G6.8.4
The flip book content is by the Owner. The Fabricator supplies 12 pages.
62
Graphics
G7.12.1
The 22" X 28" graphic panel is lambda on greencore. Greencore is something like masonite
from DPI in Toledo, OH; it replaces ABS Sintra as a backing material for these graphics.
63
Graphics
G8.5.0
Not on the list is the graphic that is 2'-4" X 3'-6" and should be lamda on greencore.
64
Graphics
G9.11.4
This is a lambda print.
65
Graphics
G10.5.3
The size is determined by the sterioscopic viewer card image dimensions, which are
approximately 5" H X 9" W.
66
Graphics
G11.3.9
Screen savers are N.I.C.
67
Graphics
G11.4.10
Dependent on the layout, this should be 6 X 6.
68
Graphics
G11.5.1
Screen savers are N.I.C.
2. Bid Bond:
SECTION 00410
BID BOND
KNOW ALL MEN BY THESE PRESENTS: that we, the undersigned _____________________
as Principal, and ________________________________as Surety, are hereby held and firmly
bound unto the City of Fort Collins, Colorado, as OWNER, in the sum of
________________________________________________________($_______________) for
the payment of which, well and truly to be made, we hereby jointly and severally bind ourselves,
successors, and assigns.
THE CONDITION of this obligation is such that whereas the Principal has submitted to the City
of Fort Collins, Colorado the accompanying Bid and hereby made a part hereof to enter into a
Construction Agreement for the construction of Fort Collins Project, RFP 7184 DISCOVERY
MUSEUM EXHIBIT FABRICATION
NOW THEREFORE,
(a)
If said Bid shall be rejected, or
(b)
If said Bid shall be accepted and the Principal shall execute and deliver a Contract in the
form of Contract attached hereto (properly completed in accordance with said Bid) and
shall furnish a BOND for his faithful performance of said Contract, and for payment of all
persons performing labor or furnishing materials in connection therewith, and shall in all
other respects perform the Agreement created by the acceptance of said Bid, then this
obligation shall be void; otherwise the same shall remain in force and effect, it being
expressly understood and agreed that the liability of the Surety for any and all claims
hereunder shall, in no event, exceed the penal amount of this obligation as herein
stated.
The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety
and its BOND shall be in no way impaired or affected by any extension of the time within which
the OWNER may accept such Bid; and said Surety does hereby waive notice of any such
extension.
Surety Companies executing bonds must be authorized to transact business in the State of
Colorado and be accepted by the OWNER.
IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals
this_____ day of _____________, _____, and such of them as are corporations have caused
their corporate seals to be hereto affixed and these presents to be signed by their proper
officers, the day and year first set forth above.
PRINCIPAL
SURETY
Name: ___________________________
_________________________________
Address:__________________________
Address: __________________________
_________________________________
__________________________________
_________________________________
__________________________________
By: ______________________________
__________________________________
Title: _____________________________
Title: ______________________________
ATTEST:
By: ______________________________
(SEAL)
(SEAL)
3. Design-Builder Interface
FTC EXHIBITS/ ARCH INTERFACE
Drawing #
Component Name
1/27/11
Arch Interface
Y/(N)
GYROSCOPE INC.
Status as of
1/27/11
Notes
ZONE 0: GENERAL
0.0.0
0.0.1
0.0.2
0.0.3
0.0.4
0.0.5
0.0.6
0.1.0
0.1.1
0.1.2
0.2.0
0.2.1
0.2.2
0.2.3
FTC Cover Sheet
FTC Index
FTC Symbols
FTC Notes
Materials
Materials
Materials
Exhibit Plan
Exhibit Zone Key Plan
Enclosed Exhibit Spaces Plan
Power-Data Source Plan-A
Power-Data Source Plan-B
Power-Data Distributor Plan-A
Power-Data Distributor Plan-B
Y
Y
Y
Y
Y
Coordinate any sprinkers or HVAC
Coordinated these, dwg sent. Need
Coordinated these, dwg sent. Need
Coordinated these, dwg sent. Need
Coordinated these, dwg sent. Need
Y
Coordinate floor box vs. pass thru to j-boxes for power/ data locations
Y
coordinate use of accesss floor opening for Sound Spot elements (7)
TBD
Y
Coordinate any sprinkers or HVAC
TBD
Y
Coordinate any sprinkers or HVAC
TBD
to
to
to
to
review
review
review
review
final
final
final
final
shop
shop
shop
shop
drawings
drawings
drawings
drawings
in
in
in
in
TBD
process
process
process
process
ZONE 1: MUSIC & SOUND
1.0.0
1.0.1
1.0.2
1.0.3
1.1.0
1.1.1
1.1.2
1.1.3
1.1.4
1.1.5
1.2.0
1.3.0
1.4.0
1.5.0
1.5.1
1.5.2
1.5.3
1.5.4
1.5.5
1.5.6
1.6.0
1.6.1
1.6.2
1.6.3
1.6.4
1.7.0
1.8.0
1.8.1
1.9.0
1.9.1
1.10.0
1.11.0
1.11.1
1.12.0
1.12.1
1.13.0
1.14.0
1.15.0
1.16.0
1.17.0
1.18.0
1.18.1
1.18.2
1.18.3
1.19.0
1.20.0
1.20.1
1.20.2
1.20.3
1.20.4
1.20.5
1.21.0
1.22.0
1.23.0
1.23.1
1.23.2
1.23.3
1.24.0
1.24.1
1.24.2
1.24.3
1.24.4
1.24.5
Zone Plan - Music
Music & Sound Renderings
Music & Sound Renderings
Music & Sound Renderings
Giant Piano Lever
Giant Piano Lever
Giant Piano Lever
Giant Piano Lever
Giant Piano Lever
Giant Piano Lever
Sound Spots
Drum-O-Jam
EMP Trio Stations
Media Enclosure
Media Enclosure
Media Enclosure
Media Enclosure
Media Enclosure
Media Enclosure
Media Enclosure
Edison to iPod Case
Edison to iPod Case
Edison to iPod Case
Radio Case
Radio Case
Sound Spectrogram
Styrene Wave Forms
Styrene Wave Forms
Bubbling Ripple Tank
Bubbling Ripple Tank
Impact on Hearing
Media Theater
Media Theater
Drums, Strings, and Horns
Drums, Strings, and Horns
Hole Saw Rhythms
Wash Tub Base
Oscylinderscope
Pitch Slider
Find the Highest Note/Auditory Illusion
Horn Instrument Interactive
Horn Instrument Interactive
Horn Instrument Interactive
Horn Instrument Interactive
Reactable
The Garage
The Garage
The Garage
The Garage
The Garage
The Garage
Mash-Up Station
DJ Scratch Table
Listening Lounge
Listening Lounge
Listening Lounge
Listening Lounge
Fort Collins Music Story
Fort Collins Music Story
Fort Collins Music Story
Fort Collins Music Story
Fort Collins Music Story
Fort Collins Music Story
Page 1
in process
FTC EXHIBITS/ ARCH INTERFACE
1.24.6
1.25.0
1.25.1
1.26.0
1.26.1
1.26.2
1.26.3
1.27.0
1.28.0
1.29.0
1.30.0
1.31.0
Typical Acrylic Case Details
Percussion Booth
Percussion Booth
Music Innovation Wall
Music Innovation Wall
Music Innovation Wall
Music Innovation Wall
Sound Bite
Feel the Bass (See 1.23.0)
Match the Tone
Juke Box Doorway
Bass Interactive
1/27/11
GYROSCOPE INC.
Y
Coordinate any sprinkers or HVAC
TBD
Y
Walls near water interactive could substitute wonder board instead of sheetrock
in this area
Y
Coordinate floor drain location and floor slope
done
Y
Provide 4" D. access hole for bee flight tube through window glazing.
done
ZONE 2: EARLY CHILDHOOD
2.0.0
2.0.1
2.1.0
2.1.1
2.1.2
2.2.0
2.2.1
2.2.2
2.3.0
2.4.0
2.4.1
2.4.2
2.4.3
2.4.4
2.5.0
2.5.1
2.5.2
2.5.3
2.6.0
2.6.1
2.6.2
2.6.3
2.7.0
2.8.0
2.9.0
2.10.0
2.11.0
Zone Plan-Kids
Early Childhood Renderings
EC Divider
EC Divider
EC Divider
Musical Water Cube
Musical Water Cube
Musical Water Cube
Flooring Plan
Crawl Through Tree
Crawl Through Tree
Crawl Through Tree
Crawl Through Tree
Crawl Through Tree
Train Table
Train Table
Train Table
Train Table
EC Water Table
EC Water Table
EC Water Table
EC Water Play Plumbing Plan
Dress-Up Area
Art Station
Portraits of Me
Building Play
Wind Chime Babies
ZONE 3: LIVE ANIMALS
3.0.0
3.0.1
3.0.2
3.1.0
3.1.1
3.1.2
3.1.3
3.1.4
3.1.5
3.1.6
3.1.7
3.1.8
3.2.0
3.2.1
3.2.2
3.2.3
3.2.3
3.2.4
3.2.5
3.2.6
3.2.7
3.2.8
3.2.9
3.3.0
3.4.0
3.4.1
3.4.2
3.4.3
Zone Plan-Live Animals
Live Animals Renderings
Interior Partition
Bee Wall
Bee Wall Detail
Bee Wall Detail
Bee Wall Detail
Bee Wall Detail
Bee Wall Detail
Bee Wall Detail
Bee Wall Detail
Bee Wall Detail
Animal Habitats
Animal Habitats
Animal Habitats
Animal Habitats
Animal Habitats
Animal Habitats
Animal Habitats
Animal Habitats
Animal Habitats
Animal Habitats
Animal Habitats
Support Area
Animal Study Station
Animal Study Station
Animal Study Station
Animal Study Station
ZONE 4: WILDLANDS & WILDLIFE
4.0.0
4.0.1
4.0.2
4.1.0
4.1.1
4.1.2
4.1.3
4.2.0
Zone Plan-Wildlife
Wildlife & Wildlands Renderings
Wildlife & Wildlands Renderings
Pangea Story: Projection Globe
Pangea Story: Projection Globe
Pangea Story: Projection Globe Details
Pangea Story: Projection Globe Details
Fossil Wall
Page 2
FTC EXHIBITS/ ARCH INTERFACE
4.2.1
4.2.2
4.2.3
4.2.4
4.2.5
4.2.6
4.2.7
4.2.8
4.2.9
4.3.0
4.3.1
4.3.2
4.3.3
4.3.4
4.3.5
4.3.6
4.3.7
4.3.8
4.3.9
4.3.10
4.3.11
4.3.12
4.3.13
4.3.14
4.3.15
4.3.16
4.3.17
4.3.18
4.3.19
4.3.20
4.4.0
4.4.1
4.4.2
4.4.3
4.4.4
4.4.5
4.4.6
4.4.7
4.4.8
4.4.9
4.5.0
1/27/11
GYROSCOPE INC.
Fossil Wall
Fossil Wall
Fossil Wall
Fossil Wall
Fossil Wall
Fossil Wall
Fossil Wall
Fossil Wall
Fossil Wall
Regional Biodiversity Wall
Regional Biodiversity Wall
Regional Biodiversity Wall
Regional Biodiversity Wall
Regional Biodiversity Wall
Regional Biodiversity Wall
Regional Biodiversity Wall
Regional Biodiversity Wall
Regional Biodiversity Wall
Regional Biodiversity Wall
Regional Biodiversity Wall
Regional Biodiversity Wall
Regional Biodiversity Wall
Regional Biodiversity Wall
Regional Biodiversity Wall
Regional Biodiversity Wall
Regional Biodiversity Wall
Regional Biodiversity Wall
Regional Biodiversity Wall
Regional Biodiversity Wall
Regional Biodiversity Wall
Bison Enclosure
Bison Enclosure
Bison Enclosure
Bison Enclosure
Bison Enclosure
Bison Enclosure
Bison Enclosure
Bison Enclosure
Bison Enclosure
Bison Enclosure
Spotting Scopes & Field Guides
ZONE 5: FIRST PEOPLES
5.0.0
5.0.1
5.1.0
5.1.1
5.1.2
5.1.3
5.1.4
5.1.5
5.1.6
5.1.7
5.1.8
5.1.9
5.2.0
5.2.1
5.2.2
5.2.3
5.3.0
5.3.1
5.3.2
5.3.3
5.3.4
5.3.5
5.3.6
5.3.7
5.3.8
Zone Plan-First People
First Peoples Rendering
Archaeology Plan
Archaeology Rendering
Archaeology
Archaeology
Archaeology
Archaeology
Archaeology
Archaeology
Archaeology
Archaeology Details
Lithic Tools
Lithic Tools
Lithic Tools
Lithic Tools
Perspectives
Perspectives
Perspectives
Perspectives
Perspectives
Perspectives - Skateboard Display
Perspectives - Council Tree
Perspectives - Echo Heart
Perspectives - Graphics
ZONE 6: FOOD, FORAGE & FARM
6.0.0
6.0.1
6.1.0
Zone Plan - Food Forage & Farm
Food, Forage and Farm Renderings
Irrigator
6.2.0
6.2.1
6.2.2
6.2.3
6.2.4
6.2.5
6.2.6
6.2.7
6.2.8
Agriculture
Agriculture
Agriculture
Agriculture
Agriculture
Agriculture
Agriculture
Agriculture
Agriculture
Y
Add blocking in wall to create tube to accept irrigator pipe and additional support
sections
Page 3
TBD
FTC EXHIBITS/ ARCH INTERFACE
6.3.0
6.3.1
6.3.2
6.3.3
6.3.4
6.4.0
6.4.1
6.5.0
6.5.1
6.5.2
6.5.3
6.5.4
6.5.5
6.6.0
6.6.1
6.6.2
6.6.3
6.6.4
6.6.5
6.6.6
6.6.7
6.6.8
6.6.9
6.6.10
6.7.0
6.7.1
6.7.2
6.7.3
6.7.4
6.7.5
6.8.0
6.8.1
6.8.2
6.9.0
6.9.1
6.9.2
6.9.3
Irrigation
Irrigation
Irrigation
Irrigation
Irrigation
Sheep Farming & Finishing
Sheep Farming & Finishing
Beet Farming
Beet Farming
Beet Farming
Beet Farming
Beet Farming
Beet Farming
Home & Hearth
Home & Hearth
Home & Hearth
Home & Hearth
Home & Hearth
Home & Hearth
Home & Hearth
Home & Hearth
Home & Hearth
Home & Hearth
Home & Hearth
Ranching, Windmill Water Pump
Ranching, Windmill Water Pump
Ranching, Windmill Water Pump
Ranching, Windmill Water Pump
Ranching, Windmill Water Pump
Ranching, Windmill Water Pump
Local Brewing
Local Brewing
Local Brewing
Dairy
Dairy
Dairy
Dairy
1/27/11
GYROSCOPE INC.
Y
Coordinate any sprinkers or HVAC
TBD
Y
Add blocking in wall for Milk Carton artifact bracket
TBD
Y
Motion sensor and camera for passing trains may need conduit from location
outdoors, back to tele closet, then can run to exhibit. Locations TBD
TBD
ZONE 7: PEOPLE ON THE MOVE
7.0.0
7.0.1
7.0.2
7.0.3
7.1.0
7.2.0
7.2.1
7.2.2
7.3.0
7.4.0
7.4.1
7.5.0
7.5.1
7.5.2
7.5.3
7.5.4
7.5.5
7.6.0
7.6.1
7.6.2
7.6.3
7.6.4
7.6.5
7.6.6
7.6.7
7.6.8
7.6.9
7.6.10
7.7.0
7.7.1
7.7.2
7.7.3
7.7.4
7.7.5
7.7.6
7.8.0
7.8.1
7.8.2
7.8.3
7.8.4
7.8.5
7.8.6
7.8.7
Zone Plan - People on the Move
People on the Move Rendering
People on the Move Rendering
People on the Move Rendering
Compass Projection
Arrival of Europeans
Arrival of Europeans
Arrival of Europeans
Arrival of Europeans
American Indian Culture
American Indian Culture
Camp Collins
Camp Collins
Camp Collins
Camp Collins
Camp Collins
Camp Collins
Westward Expansion
Westward Expansion
Westward Expansion
Westward Expansion
Westward Expansion
Westward Expansion
Westward Expansion
Westward Expansion
Westward Expansion
Westward Expansion
Westward Expansion
Trains Through Fort Collins
Trains Through Fort Collins
Trains Through Fort Collins
Trains Through Fort Collins
Trains Through Fort Collins
Trains Through Fort Collins
Trains Through Fort Collins
Growth
Growth
Growth
Growth
Growth
Growth
Growth
Growth
of
of
of
of
of
of
of
of
the
the
the
the
the
the
the
the
City
City
City
City
City
City
City
City
Page 4
FTC EXHIBITS/ ARCH INTERFACE
7.8.8
7.8.9
7.9.0
7.9.1
7.10.0
7.11.0
7.12.0
7.12.1
7.12.2
7.13.0
7.14.0
7.15.0
7.16.0
7.17.0
1/27/11
GYROSCOPE INC.
Growth of the City
Growth of the City
City Building
City Building
Mythology of the West
Climb-on Penny Farthing
Historic & Contemporary Bikes
Bike Ramp
Ice Cream Bike
Bike Resources
Spokin’ Stories
Mr. Bones
Bike Innovation Display
Gear Interactive
ZONE 8: WATER
8.0.0
8.0.1
8.0.2
8.1.0
8.1.1
8.1.2
8.1.3
8.1.4
8.1.5
8.1.6
8.1.7
8.2.0
8.3.0
8.4.0
8.4.1
8.4.2
8.4.3
8.5.0
Zone Plan - Water
Water Plan Rendering
Water Plan Rendering
Water Table
Water Flow
Water Table Structure
Water Table
Hydro Power
Water Choices
Water Wheels
Water Power Wall
Water Recreation
Where Our Water Comes From
Flood Experiences
Rain Curtain
Floor and Walls
Historic Floods
Extreme Weather Station
Y
Coordinate floor drain location and floor slope
done
Y
Coordinate location of solatube
done
Y
Coordinate any sprinkers or HVAC
TBD
ZONE 9: ENERGY & SUSTAINABLITY
9.0.0
9.0.1
9.0.2
9.1.0
9.1.1
9.1.2
9.1.3
9.1.4
9.1.5
9.1.6
9.1.7
9.2.0
9.2.1
9.2.2
9.3.0
9.4.0
9.5.0
9.6.0
9.6.1
9.7.0
9.8.0
9.8.1
9.9.0
9.9.1
9.10.0
9.11.0
9.11.1
9.12.0
9.13.0
Zone Plan-Energy & Sustainability
Energy & Sustainability Renderings
Energy & Sustainability Renderings
Energy Exhibits Structure
Energy Exhibits Structure
Energy Exhibits Structure
Energy Exhibits Structure
Energy Exhibits Structure
Energy Exhibits Structure
Energy Exhibits Structure
Energy Exhibits Structure
Historic Bulbs
Historic Bulbs
Historic Bulbs
Energy Timeline
Plasma Discharge
Jacob's Ladder
Electricity & Magnetism
Electricity & Magnetism
Wind Power
Heat Detective
Heat Detective
Watts the Cost
Watts the Cost
Green Materials Workbench
Power from the Sun
Power from the Sun
Sustainable Fort Collins
Solatube
ZONE 10: SCIENCE
10.0.0
10.0.1
10.0.2
10.1.0
10.1.1
10.1.2
10.1.3
10.1.4
10.1.5
10.1.6
10.1.7
10.2.0
Zone Plan - Science
Science Science Experience Renderings
Science Science Experience Renderings
Intro Wall Plan
Intro Wall Rendering
Intro Wall
Intro Wall Frame
Intro Wall Graphics
Intro Wall Back Panels
Intro Wall Elements
Intro Wall Elements
Media Enclosure
Page 5
FTC EXHIBITS/ ARCH INTERFACE
10.2.1
10.2.2
10.3.0
10.4.0
10.5.0
10.5.1
10.5.2
10.5.3
10.5.4
10.5.5
10.5.6
10.5.7
10.5.8
10.6.0
10.6.1
10.7.0
10.7.1
10.7.2
10.8.0
10.9.0
10.10.0
10.10.1
10.10.2
10.11.0
10.12.0
10.12.1
10.12.2
10.13.0
10.13.1
10.13.2
10.14.0
10.14.1
10.14.2
10.15.0
10.16.0
10.17.0
10.18.0
10.18.1
10.18.2
10.19.0
10.19.1
10.20.0
1/27/11
GYROSCOPE INC.
Media Enclosure
Media Enclosure
Ball Run Wall
LED Media Wall
Magnification Station
Magnification Station
Magnification Station
Magnification Station
Magnification Station
Magnification Station
Magnification Station
Magnification Station
Magnification Station
Information Station
Information Station
Moire Interactive Wall
Moire Interactive Wall
Moire Interactive Wall
Laser & Fiber Optics
Color Mixing: Aurora
Color Room
Color Room
Color Room
Shadow Wall
Funky Forest
Funky Forest
Funky Forest
Wind Wall with Wind Rail
Wind Wall with Wind Rail
Wind Wall with Wind Rail
Bernoulli Table
Bernoulli Table
Bernoulli Table
P.I.E. Wind Tube
Tornado Simulator
Innovation Lab
Project Display Wall
Project Display Wall
Project Display Wall
Local Project Spotlight - Biofuels
Local Project Spotlight - Biofuels
Tennis Ball Race
ZONE 11: NATURAL AREAS
11.0.0
11.0.1
11.1.0
11.1.1
11.2.0
11.2.1
11.3.0
11.3.1
11.4.0
11.4.1
11.4.2
11.4.3
11.4.4
11.5.0
11.6.0
11.7.0
11.8.0
11.9.0
11.9.1
Zone Plan - Natural Areas
Natural Areas Renderings
Welcome Panel
Y
Coordinate blocking in ceiling to allow graphic wire rope connections to attach
to building structure
TBD
Y
Coordinate blocking in ceiling to allow flying creature ring to attach to building
structure
TBD
Y
Coordinate power and location of outlets to Atomic Clock exhibit
TBD
Y
Coordinate with landscape design and owner.
TBD
Y
Coordinate with landscape design and owner.
TBD
Graphic Mount Details
Zone Title Lettering
Zone Title Lettering
Seven Values Wall with Kiosk
Seven Values Wall with Kiosk
Prairie Habitat
Prairie Habitat
Prairie Habitat
Prairie Habitat
Prairie Habitat
Interactive Map
Seasonal Graphic
Seating
Ripple Interactive Table
Flying Creatures Sculpture
Flying Creatures Sculpture
ZONE 12: FREE ZONE/ LOBBY
12.0.0
12.0.1
12.1.0
12.1.1
12.2.0
12.2.1
Zone Plan - Free Zone Experiences
Free Zone Experiences Renderings
Piano Ring
Piano Ring
Atomic Clock - Lobby
Atomic Clock
ZONE 13: OUTDOOR EXHIBITS
13.0.0
13.1.0
13.2.0
13.2.1
13.2.2
13.2.3
13.3.0
Outdoor Ground Renderings
Typical Outdoor Graphics
Musical Glen Plan
Musical Glen
Musical Glen - Details
Musical Glen - Details
Log Scramble
Page 6
FTC EXHIBITS/ ARCH INTERFACE
13.4.0
13.4.1
13.4.2
13.4.3
Vestas
Vestas
Vestas
Vestas
Blade Plan
Blade
Blade Unit
Mini Turbine
1/27/11
Y
Coordinate with landscape design and owner.
Y
Coordinate with Gyro/ Lightswitch
GYROSCOPE INC.
TBD
ZONE 14: ROOFTOP
14.0.0
Outdoor Signage Wall Mount
ZONE L: LIGHTING
L.1.0
Lighting Plans - See Separate Lighting
PDF
in process
ZONE G: GRAPHICS
G
Graphics Schedule - See Separate Graphic Schedule PDF
ZONE E: POWER & DATA
E
Power & Data Schedule - See Separate Power & Data PDF
Coordinate with Gyro/ and owner
Page 7
in process
4. Tate Access Flooring Load Data Sheets