Coalfields Expressway A Coal Synergy PPTA Project
Transcription
Coalfields Expressway A Coal Synergy PPTA Project
Coalfields Expressway A Coal Synergy PPTA Project December 7, 2011 Michael A. Russell, P.E. VDOT Bristol District Administrator Vaughn R. Groves Alpha Natural Resources Executive Vice President General Counsel & Secretary Coalfields Expressway Coal Synergy PPTA Project Project Overview • • • • • • 50 mile four-lane highway From US 23 near Pound to Paynesville, WV Traverses Wise, Dickenson, and Buchanan counties in southwestern Virginia Made possible by “Coal Synergy” Alpha Natural Resources LLC and the Pioneer Group to develop 30 miles and 20 miles respectively under a PPTA agreement Compatible with Corridor Q of the AHDS 2 Coalfields Expressway Coal Synergy PPTA Project 3 Coalfields Expressway Coal Synergy PPTA Project Accelerated Project Delivery • • • • • • March 2008 – FHWA concurs with VDOT request for use of (SEP-14) procurement May 2008 – Hawks Nest Public Hearing June 2008 – CTB approval of the Hawks Nest Location September 2008 – Agreement for Hawks Nest executed Summer 2011 – Hawks Nest Section is at rough grade Currently negotiating Doe Branch and Pound Connector Sections of the CFX. 4 Coalfields Expressway Coal Synergy PPTA Project CFX Coal Synergy Benefits • • • Leverages value of incidental coal reserves Use of large-scale earth moving equipment Significant reduction in cost of rough-grade roadbed 5 Coalfields Expressway Coal Synergy PPTA Project Economic Development Benefits • • Improves prospect of economic growth that has currently limited due to lack of adequate transportation system Creation of thousands of acres of developable property critical for economic development in the region 6 Coalfields Expressway Coal Synergy PPTA Project Alpha Natural Resources Benefits • • • • • Reduction of operation costs (but for’s) Operating Diversification Ability to recover reserve pockets Creates potential for several satellite operations Permitting/GFE Requirements 7 Coalfields Expressway Coal Synergy PPTA Project Hawks Nest Section of the CFX • • • • • • Two mile section in Buchanan County (to rough grade) Near South Gap Industrial Park Part of Corridor Q of the AHDS Cost to VDOT $10M DBB cost estimate $100M Developed as a Post Mined Land Use option 8 Coalfields Expressway Coal Synergy PPTA Project Hawks Nest Section of the CFX 9 Coalfields Expressway Coal Synergy PPTA Project Hawks Nest Section of the CFX 10 Coalfields Expressway Coal Synergy PPTA Project Hawks Nest Section of the CFX 11 Coalfields Expressway Coal Synergy PPTA Project 12
Similar documents
PPTA Continuing Education Planning – Master Calendar Posted November 5,... Date or Topic
More information
imPeTus - Philippine Physical Therapy Association
members and renewal of oath were done during this session. PPTA President Gayline F. Manalang Jr., MOH, PTRP and PPTA Treasurer Arthur Bhenedict K. King, PTRP also presented the President’s and Tre...
More information