NEBRASKA ASPHALT CONFERENCE
Transcription
NEBRASKA ASPHALT CONFERENCE
NEBRASKA ASPHALT CONFERENCE ALMOST EVERYTHING YOU NEED TO KNOW ABOUT COLD MIX Unique Paving Materials Corp. 3993 East 93rd Street Cleveland, OH 44105 www.uniquepavingmaterials.com 1 2 Ever wondered what a $3,340,000 pothole looks like? 3 Maintenance and rehabilitation consume about 80% of the typical local budget. Pothole patching is likely the single most common pavement maintenance technique in the U.S. and possibly the most overlooked opportunity to improve local maintenance effectiveness. Wilson, Thomas; Strategic Highway Research Program; SHRP-H-353 4 5 TYPICAL PAVEMENT DETERIORATION CURVE Effective The combined maintenance effects of traffic practices slow loading and the down or resetwill the environment deterioration cause every process. pavement, no matter how wellEffectively designed orapplied, maintenance constructed to actions are over proven deteriorate to extend pavement time. life. As Pavement Condition Index declines repair cost increase 6 THERE ARE BASICALLY 2 TYPES OF COLD MIX Conventional High Performance 7 The differences between high-performance and conventional cold mix are determined by: • Components used • Manufacturing process • Field performance (most important). High-performance cold mix is engineered to provide near zero failure rate using selected components produced in a controlled process. 8 The decision process involved in purchasing cold mix should be similar to the process used to purchasing maintenance equipment. Define critical features, then compare market offerings. 9 Parameters are interdependent. Maximum performance is achieved when all parameters are optimized. Control as many parameters as possible. Train maintenance personnel to maximum survivability. 10 CITY OF LEXINGTON, KY POTHOLE COUNT 2003-2012 The collected data from the previous nine years established a base line for evaluation of candidate pothole repair materials. Maintenance labor was redirect to other projects 11 POTHOLE REPAIR COST REDUCTION In 2012, the city repaired 5,972 potholes spending $191,104, significantly less than the nine-year average of $564,324. This represents a $373,220 annual savings or a 66% annual savings for the city. 12 INSTALLATION PROCEDURES • Hole preparation • Edging • Crowning • Layering • Compaction Following these procedures will increase your success rate regardless of what material you use 13 Fake Potholes. They work great for speed control. Easy to repair 14 The Throw And Go method provided the least performance, contributing to significant road debris and re-patching. It is reasonable to assume this method is used occasionally. 15 THIS WILL NOT WORK EITHER 16 HOLE PREPARATION • Get rid of loose chunks of asphalt or concrete. • Sweep out hole. • Make sure the cold mix has something to adhere to. 17 EDGING • Definite compacted edges work best • Keep material over the hole, do not go beyond 18 CROWNING Proper crowning will leave patches at proper level once finally compacted. Too high Snow plows will destroy patch Too low Traffic will destroy edges 19 LAYERING • Patches deeper than 3” should be applied and compacted in separate lifts • Proper compaction can not be achieved with lifts deeper than 2”. 20 COMPACTION METHODS If all you’re able to do is stomp on the patches…….. Please let the biggest guy on the crew take care of it!! •Manny Yarbrough •6’ 8” •740 lbs. •World’s Largest Sumo Wrestler 21 COMPACTION METHODS Truck Rolling Plate Compactor 22 Roller Hand Tamper WORDS OF WISDOM 23 John Kida jkida@uniquepavingmaterials.com 816-868-9438 Cell 877-291-7609 Fax Providing valuable products, from valuable people, to valuable customers. Unique Paving Materials Corp. 3993 East 93rd Street Cleveland, OH 44105 www.UniquePavingMaterials.com Customer Service: 800-441-4880 Fax Number: 866-448-8979 24