olympic - SMI Snowmakers
Transcription
olympic - SMI Snowmakers
Sochi 2014 Olympic snowmaking Rosa Khutor Resort near Sochi in Russia will be the host of the alpine, snowboard, freestyle and cross competitions for the 2014 Olympic Games. More than 8 MW of primary and booster pumping power delivers over 2,750 m3/hr (12,000 gpm) of high-pressure water to the slopes, while 35,000 meters (115,000 feet) of piping feeds 450 snowmaking stations. A fiber-optic backbone provides fast and reliable communications to each of the hardwired pods and portable radio snowguns, which are all interconnected in real time. A total of 403 fully automated Puma and Super PoleCat Snowmakers – mounted on a combination of towers, swing arms and carriages – are deployed for snow production in all areas. The entire snowmaking system is controlled by SMI’s SmartSnow Automation software. The company’s local partner Skado from Samara, Russia, assisted with content sourcing and manufacturing along with the installation of all the pumping stations and snowguns. A l p i n e S n o w b oa r d Slopes Covered n n n n n n n n n n n Downhill Super giant slalom Giant slalom Slalom Alpine training slopes Aerials Moguls Boarder cross Parallel giant slalom Half pipe Skier cross System Highlights Coverage summary 46 m³ Water capacity n 23 m³ Water cooling capacity n 359 Towers n 22 Swing arms n 22 Mobile carriages n 450 Snowmaking stations n Fully Automatic System with fiber optic, hardwire and radio communications n n n n n 35 Km Slopes 130 Hectares 1,400 m Vertical snowmaking 400,000 m³ Water to open weather and terrain n n n n n Proximity close to Black Sea 42º Latitude 850 m to 2,250 m Elevation Marginal conditions Wide slopes Sochi 2014 Olympic snowmaking Freestylesnowmaking Water Summary n n n n n n Mountain gravity fed river water supply 2 Large lakes for storage of ≈ 120,000 m³ 2,750 m³/hr (12,000 gpm) Primary pumping capacity 900 m³/hr D Lift Booster pumping station 400 m³/hr Downhill booster pumping station 1,400 m³/hr Water cooling capacity Level of automation n n n n Fully automated with SMI SmartSnow 6.0 Fiber optic communications backbone Hardwire to all fixed towers Radio communications to all portables Snow Makers snowmakers.com 1512 North Rockwell Dr Midland, MI 48642 Tel: +1.989.631.6091 Skado Company Samara, Russia