Addendum No. 2 - City of Kodiak
Transcription
Addendum No. 2 - City of Kodiak
City of Kodiak Mill Bay Road Pavement Rehabilitation FY2017 PN 17-02/5036 Addendum No. 2 July 27, 2016 The following changes and/or clarifications are made to the Specifications and Contract Documents of Invitation to Bid for the Mill Bay Road Pavement Rehabilitation FY2017 PN 1702/5036 project: A. Mill Bay Road Pavement Rehabilitation: CONTRACT DOCUMENTS AND SPECIFICATIONS 1. Section 402 – ASPHALT CONCRETE PAVEMENT, Article 402.2 - Composition of Mixture – Job Mix Design Replace subsection “C” from Addendum No1_Mill Bay Road Pavement Rehabilitation FY2017 PN 17-02 dated July 22, 2016 with the following: C. Course Aggregate (retained on the No. 4 sieve): Crushed stone or crushed gravel consisting of sound, tough, durable rock of uniform quality. Free from clay balls, vegetative matter or other deleterious matters. Not coated with dirt or other finely divided mineral matter. The asphalt aggregates shall meet the following requirements according to station range: STATION RANGE: 48+60 to 77+00 (BASE BID) MATERIAL CHARACTERISTICS Material Designation Percent of Wear Degradation Value Percent Sodium Sulfate Loss Percent Fracture Thin B Elongated Pieces REQUIREMENT Local Rock 45 maximum 20 minimum 9 maximum (5 cycles) 80 minimum (single face) 8% maximum STATION RANGE: 24+50 to 38+10 (Add Alt #1) MATERIAL CHARACTERISTICS Material Designation Percent of Wear Degradation Value Percent Sodium Sulfate Loss Percent Fracture Thin B Elongated Pieces REQUIREMENT Local Rock 45 maximum 20 minimum 9 maximum (5 cycles) 80 minimum (single face) 8% maximum 1 City of Kodiak Mill Bay Road Pavement Rehabilitation FY2017 PN 17-02/5036 Addendum No. 2 July 27, 2016 STATION RANGE: 11+68 to 24+50+10 (Add Alt #2) MATERIAL CHARACTERISTICS Material Designation Percent of Wear Degradation Value Nordic Abrasion Percent Sodium Sulfate Loss Percent Fracture Thin B Elongated Pieces REQUIREMENT Hard Rock 45 maximum 30 minimum 9 maximum 9 maximum (5 cycles) 80 minimum (single face) 8% maximum 2. General Questions/Answers; a. Question: “The original Bid Proposal for the basic bid had a Leveling Course quantity of 277 TN. The revised Bid Proposal for the basic bid, issued with addendum #1, has a Leveling Course quantity of 166 TN and a RAP quantity of 166 TN, which totals 332 TN. Why did the quantity change if the digout typical still shows 3” of D1 or RAP below the new pavement? Also, it doesn’t seem necessary to have a D1 and RAP item. In situations like this, the D1 spec generally allows us to use RAP in lieu of D1 as long as it meets the specifications. Basically, the contractor decides which method he would like to use and prices the work accordingly. The issues outlined above also apply to the alternative #1 and alternative #2 bid schedules.” i. Answer: The revised quantities of RAP and D1 included in Addendum #1 dated July 22, 2016 have been determined to be more accurate than the previous estimated quantities included in the original Contract Documents and should be used in determining the bid amount. The Bid Proposal included in Addendum #1 for the Basic Bid, Add Alt #1 and Add Alt #2 will not be revised and will include both Bid Items 205(1) Borrow Leveling Course, D-1 and 205(2) Recycled Asphalt Product (RAP). b. The revised Bid Proposal does not include a Traffic Control item paid on a contingent sum basis. That item seems like a must since the contractor does not have an approved TCP to tell him/her how many devices, flaggers, etc. are necessary for determining a bid price. Without this information the contractor can only make risky assumptions about what is necessary. High risk items generally have a great deal of contingency to help account for the unexpected. It would be 2 City of Kodiak Mill Bay Road Pavement Rehabilitation FY2017 PN 17-02/5036 Addendum No. 2 July 27, 2016 in the best interest of the city to have a contingent sum traffic item to pay for devices and hourly flagging as needed. i. Answer: Using the two attached approved Traffic Control plan example from the 2015 Mill Bay Road Pavement Rehabilitation work, provided by the City of Kodiak, and the Contractor’s estimated project schedule it is anticipated that a Lump Sum value for item 802(2) Traffic Maintenance can be determined. c. The Erosion and Pollution Control item paid on a contingent sum basis was also removed with addendum #1. This also seems like a necessary item to pay for Erosion and Pollution control work on a Time and Materials basis as the need arises. i. Answer: Within the project limits all stormwater runoff is captured in the existing storm drain system. Assuming the use of standard BMPs and an estimated project schedule it is anticipated that a Lump Sum value for item 803(1) Erosion and Pollution Control Plan can be determined. There are no changes to the Bid opening Time and Location. 3 www.invarion.com Legend Work Area ALTERNATE WAL MART ENTRANCE Type III Barricade flagger symbol ALTERNATE SAFEWAY ENTRANCE Date: 6/14/2015 Project: City of Kodiak 2015 Mill Bay Road Overlay Author: Louis Rocheleau (ATSSA TCS#51193) Traffic Control Plan: #1 - Island Lake Rd. to Benny Benson Road Closure Comments: *Road Closure is only permitted between the hours of 7:00 pm & 6:00 am. *All Flagging Stations and Work Zone will be illuminated. *All Flaggers will have radio communication. *Portable Changeable Message Board Signs will be used in prominent locations to alert traffic. *Fire & Police Department & All Emergency Personnel will have access at all times. *Safeway Traffic Use Von Scheele Entrance from Selief Rd. for Access. *Walmart Traffic Use Island Lake Rd. Entrance for Access. www.invarion.com Access to Municipal Airport Legend Type II Barricade Type III Barricade flagger symbol Work Area Date: 6/14/2015 Project: City of Kodiak 2015 Road Maintenance Author: Louis Rocheleau (ATSSA TCS#51193) Traffic Control Plan: #2 - Benny Benson to Bartel Closure Comments: *Road Closure is only permitted between the hours of 7:00 pm & 6:00 am. *All Flagging Stations and Work Zone will be illuminated. *All Flaggers will have radio communication. *Portable Changeable Message Board Signs will be used in prominent locations to alert traffic. *Fire & Police Department & All Emergency Personnel will have access at all times. *Municipal Airport Traffic use North Entrance as Shown on Drawing.