westlane greenhouse – general contract work district school board
Transcription
westlane greenhouse – general contract work district school board
Page 1 Issued: February 10, 2015 WESTLANE GREENHOUSE – GENERAL CONTRACT WORK DISTRICT SCHOOL BOARD OF NIAGARA RFT#16070 ADDENDUM #4 The following information supplements and / or supersedes the bid documents issued on January 13, 2016. This addendum forms part of the contract documents and is to be read, interpreted, and coordinated with all other parts. The cost of all contained herein is to be included in the contract sum. The following revisions supersede the information contained in the original drawings and specifications issued for the above-named project to the extent referenced and shall become part thereof. Acknowledge receipt of this Addendum by inserting its number and date on the Tender Form. Failure to do so may subject the bidder to disqualification. 1.0 Reference: Form of Tender 1.1 See attached “Revised” Form of Tender must be used to submit bids. Failure to use this “Revised” Form of Tender will result in an informal bid which will be rejected. 2.0 Clarification – Addendum #3 2.1 Addendum No.3 (Final) and Addendum 3 (Drawings to Scale) contain the same information, only change is that the drawings to scale. 3.0 Reference: Specification Section 0100 05 – General Instructions & Addendum #3 3.1 General Contractor to carry Erie Structures for the value of $393,000.00 in their tender price. 4.0 Reference: Section 09 96 59 High Build Glazed Coatings 4.1 Delete item 2.1.3 – Glazed Coating in all areas. 4.2 Add Item 2.1.3 Exterior Application-New Block: 1 coat Epoxal WB Blockfiller, 2 coats Liquidstone 20 by Niagara Protective Coatings 5.0 Clarification – Division 8 5.1 Doors within the greenhouse to be supplied by Greenhouse Vendor. Doors located at existing block wall/fire wall new mechanical room to be done under Division 8. 6.0 Clarification – Division 9 6.1 No finish schedule included, reference architectural drawings for finishes. 7.0 Reference Drawing A2.0 – Proposed Floor Plan 7.1 New Staircase +/- 14 risers, contractor to site verify, no paint required. 7.2 No glazing required in new hollow metal doors. Page 2 7.3 7.4 7.5 7.6 7.7 Poly Teks Glaze by NPC shall be applied as per the specification on new block walls within the new greenhouse, interior face of firewall only, and interior face of block infill at existing high hazard classroom. Liquistone 50 shall be applied on exterior face of new block walls, see specification. High build glazed coatings required only at exposed areas of brick and block. Not needed within firewall cavity. Horticultural Lab - No new flooring planned, exposed concrete floor to match existing. Concrete pads are still required. 8.0 Reference Drawing A4.0 – Proposed Section, Foundation, and Wall Infill Details Detail 4/A4.0 8.1 Studs within cavity is correct, drywall not required at door frame 9.0 Reference Greenhouse Shop Drawings 9.1 See attached Erie Structures Shop Drawings, Issued February 8th, 2016, 15 page 10.0 Reference – Locates Report 10.1 See attached report prepared by Bob Robinson, dated Dec 10, 2015, 3 pages 11.0 Reference – Mechanical Addendum 11.1 See attached Mechanical Addendum M-002-R1 dated February 8, 2016, issued by ARC Engineering, 2pages *** END OF ADDENDUM*** 27 pages total cc: General Contractors, Client, File J:\2015\15-102 ~ DSBN Westlane Greenhouse\09-Tender Administration\01 - Addenda\Addendum 04\Addendum_04.doc DISTRICT SCHOOL BOARD OF NIAGARA FACILITY SERVICES DEPARTMENT FORM OF TENDER – Revised as per Addendum #4 BIDDER /COMPANYNAME: ADDRESS: Westlane Greenhouse – General Contract Work 5960 Pitton Road, Niagara Falls ON TENDER NO: #16070 REVISED CLOSING DATE AND TIME: TO: 1. Wednesday, February 17, 2016 before 2:00:00 P.M. DISTRICT SCHOOL BOARD OF NIAGARA 191 CARLTON STREET ST. CATHARINES ON L2R 7P4 I/We the undersigned, are duly authorized to bind the company and declare that we have carefully examined the Contract Documents and investigated the sites and examined all conditions effecting this Work; and if notified in writing of the acceptance of this Bid within sixty (60) days of the date above, we agree to provide all materials and perform all Work shown and described in these documents, in lawful money of Canada; included in which are all Excise taxes, customs, duties, freight, exchange, and all other charges are included. Prices quoted shall EXCLUDE Harmonized Sales Tax (HST). We hereby acknowledge that we have read and understood the Addenda numbered ______ to ______ which form part of the contract documents. Bid Price, (HST extra): $ Cash Allowance, (HST extra): $ 40,000.00 Allowance – Erie Structures, (HST extra): $ 393,000.00 Total Price, (Including Allowances – HST extra): $ Total Price, (Including Allowances - In Words) dollars (HST extra) AS PER SECTION 13 OF THE INSTRUCTIONS TO BIDDERS THE LOWEST BID OR ANY BID NOT NECESSARILY ACCEPTED. 2. Voluntary Alternates We submit the following voluntary alternate prices for consideration. We hereby agree to amend the Total Price by the following amounts (HST excluded), should the alternates be accepted. Alternate Description 3. Add Deduct $ $ $ $ $ $ Mandatory Alternates – N/A to this tender We submit the following pricing that is included in the total stipulated bid price. We hereby agree to amend the Total Price by the following amounts (HST excluded), should the alternate be selected. Alternate Description Add Deduct $ $ $ $ $ $ 4. The undersigned hereby declares that we have carefully examined the site of the proposed Work and existing conditions; the requirements of the construction schedule; and have satisfied ourselves that the Subcontractors, material suppliers and equipment suppliers on which this Bid is based are capable of meeting all requirements of the schedule, and of executing the Work in accordance with the Drawing and Specifications, the Instructions to Bidders, Bid Form, together with Addenda listed in paragraph 1, of this Bid Form. 5. The undersigned hereby agrees that the contract schedule as stated in the Specifications will be met. 6. The undersigned agrees that this Bid is valid and subject to acceptance by the DSBN for a period of sixty (60) days from the date of Bid receipt, and that if notified of award of the contract we will: a) furnish the DSBN, copies of Insurance policies as required by the General Conditions of the Contract b) furnish the DSBN evidence that all Workplace Safety and Insurance Board dues, in accordance with the laws of the Province of Ontario, have been paid. 7. We have submitted with this Bid Form the following documents: a) 9. Subcontractor list – Appendix A (if applicable) We the undersigned agree if notified of award of a Contract, to immediately commence work actively and to complete work in weeks and ready for occupancy by the day of (the month) , 20 , and to pay all extra wages and premiums necessary for overtime work daily and on weekends for all trades required to complete the work on or before this date without extra compensation, barring strikes and Acts of God for which extra time will be allowed. 10. Upon award of tender the following WSIB and liability insurance certificates will be required for this tender: √ WSIB √ Commercial Liability $2,000,000 √ Automobile Liability $2,000,000 √ Non-owned automobile $2,000,000 √ Builders Risk N/A Hook Insurance N/A Pollution Liability $2,000,000 11. Signature of Bidder Name of Bidder (Print) ______________________________________ (Dated at) (Name of Firm) ____________________ (Postal Code) This _____ day of _________ (Address of Firm) (Phone Number) (Fax Number) 20 _____ A RC A RC Engineering Inc. Creating Solutions Through Engineering Excellence 1100 South Service Rd., Suite #417 Stoney Creek ON L8E 0C5 Tel: (905) 643-8530 Fax: (905) 643-8510 Website: www.arcengineering.ca Email: contact@arcengineering.ca FORWARDED VIA Email: angelo@raimondoarchitects.com February 8, 2016 Raimondo & Associates Architects Inc. 4686 Queen Street, Studio 2 Niagara Falls, Ontario L2E 2L9 Attention: Angelo Ramos RE: Westlane Greenhouse 15-109-140 ADDENDUM M-002-R1 The following tender clarifications are to be included in the tender for this project and are to be completed in accordance with the specifications and all terms and conditions of the contract documents. The following are responses to questions from Serianni Construction issued February 8, 2016. Note that drawings and specifications will not be reissued. The questions and responses are to clarify scope of work delineation and to identify coordination scope of work required. All work indicated on the drawings and specifications must be completed to achieve fully completed operating systems. # Question/response 1 Question: Indicates installation of in-floor heating system, will Erie Structures be supplying the system? Are they including the manifold and protective cabinet? Mechanical addendum #11.3 indicates that the radiant floor system is by the mechanical contractor, please resolve this contradiction. Response - Delete the scope of supply and installation of the in-floor radiant tubing system from Div. 15. - Supply and installation of the in-floor radiant tubing in the greenhouse vendor scope including extending capped tubing loops 3-4’ above floor slab for connection by Div. 15 to manifolds provided by Div. 15. The Greenhouse vendor will include in-slab tubing supports and include pressure verification and monitoring during the pouring of the greenhouse concrete floor slab. 2 Question: Indicates hanging/mounting of hot water unit heaters, will Erie Structures be supplying these heaters? Mechanical addendum #11.3 indicates that the unit heaters are by the mechanical contractor, please resolve this contradiction. Response - Delete the scope of supply and mounting/hanging of the four (4) unit heaters from Div. 15. - Supply and mounting/hanging of the four (4) unit heaters included in the greenhouse vendor scope. 15-109-140 ADD-M002-R1a.Doc Page 1 of 1 A 3 4 5 RC A RC Engineering Inc. Creating Solutions Through Engineering Excellence Question: Indicates supply of two boilers, will Erie Structures be installing these boilers? Mechanical addendum #11.3 indicates that the boilers are by the mechanical contractor, please resolve this contradiction. Response - Delete the scope of supply of the two (2) heating boilers from Div. 15. - Div 15 scope includes the installation of the two (2) heating boilers - The Greenhouse vendor supplies the two (2) heating boilers including specified control panel. - Include the testing, startup/commissioning/training of heating boilers in the greenhouse vendor scope. Question: Indicates that the environmental control system will be moved and remounted, however, they have not included line and low voltage wiring. Is the electrical or mechanical contractor responsible for any wiring related to this system? Response - Wiring of control system (Argus) within the greenhouse is included in the greenhouse vendor’s scope of work, including the wiring and placement of the inslab temperature sensor. - Div. 15 control contractor scope of work is within the shop area including interface wiring with the Argus panel, and coordination of interface wiring between the boiler control system and Argus system.. Question: Who is responsible for the gutter and rain water leader? Response - Provision for gutter and rain water leader to ground in greenhouse vender scope. - Buried storm drain to existing catch basin in parking lot and connection to vertical RWL at greenhouse provided by Div. 15 End of Addendum No. M-002-R1 15-109-140 ADD-M002-R1a.Doc Page 2 of 2