Silverwood Elementary School
Transcription
Silverwood Elementary School
Construction Manager: Eric Hatlen Architect: Charlie Ham Associates Contractor: BRCO Constructors, Inc. Inspector: Matthew Kelly Silverwood Elementary School - MDUSD School No: 179 Project Scope The modernization of this campus includes three major components: infrastructure upgrades, replacement of an existing portable classroom with new permanent classroom, and campus-wide upgrade to meet Americans with Disabilities Act needs as identified in the District's ADA Transition Plan. Infrastructure upgrades include replacing and upsizing the electrical service, distribution of new power throughout campus, parking lot and playground pavement overlays, exterior painting, additional exterior lighting, roofing replacement on selected buildings, upgrade telephone system including PBX and hand sets in each classroom, and upgrade the existing LAN. Project Budget The project bid on November 14, 2006 and was awarded to BRCO Constructors, Inc. This project is currently exceeding the current budget due to escalation and other soft cost overruns. Currently construction change orders, both approved and projected, for this project are minimal and within contingency allowance. No major change order costs are forecasted at this time. Committed Contracts Contract Changes Proposed Con Changes Projected Exposure * Original Budget * Budget Changes Current Budget * Amt Amt Amt Amt Amt Amt Amt Cost to Date * Amt Variance * $177,665.00 $0.00 $177,665.00 $126,606.04 $0.00 $0.00 $126,606.04 $60,648.48 $51,058.96 $24,227.00 ($2,000.00) $22,227.00 $25,521.44 $0.00 $0.00 $25,521.44 $19,874.24 ($3,294.44) Electrical Engineering Fees $8,307.00 $0.00 $8,307.00 $13,115.00 $0.00 $0.00 $13,115.00 $10,492.00 ($4,808.00) Technology Consultant Fees $7,059.00 $0.00 $7,059.00 $11,785.33 $0.00 $0.00 $11,785.33 $10,842.52 ($4,726.33) $23,414.00 ($5,000.00) $18,414.00 $36,669.00 $3,600.00 $0.00 $40,269.00 $36,316.56 ($21,855.00) Amt [179] Silverwood Elementary School - MDUSD Architectural Fees DSA Fees Specialty Consultants Bid Costs $3,230.00 $0.00 $3,230.00 $22,922.47 $0.00 $0.00 $22,922.47 $22,918.60 ($19,692.47) $159,143.00 ($14,600.00) $144,543.00 $137,257.96 $0.00 $0.00 $137,257.96 $37,416.43 $7,285.04 Construction Testing $17,298.00 $0.00 $17,298.00 $17,600.00 $0.00 $0.00 $17,600.00 $15,182.41 ($302.00) Inspection $29,407.00 $0.00 $29,407.00 $45,360.00 $0.00 $0.00 $45,360.00 $38,260.00 ($15,953.00) CDE Fees $0.00 $2,000.00 $2,000.00 $930.00 $0.00 $0.00 $930.00 $927.08 $1,070.00 Surveys $0.00 $5,000.00 $5,000.00 $2,632.50 $0.00 $0.00 $2,632.50 $0.00 $2,367.50 MDUSD Project Management $0.00 $14,600.00 $14,600.00 $20,000.00 $0.00 $0.00 $20,000.00 $6,845.69 ($5,400.00) Construction Management CO Contingency Construction Specialty Contractor Transitional Expenses Furniture and Equipment [179] Silverwood Elementary School MDUSD Total $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1,509,535.00 $830,256.00 $2,339,791.00 $2,622,450.45 $222,631.16 ($236,574.00) $2,608,507.61 $2,758,874.51 ($268,716.61) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $108,000.00 $0.00 $108,000.00 $0.00 $0.00 $8,000.00 $8,000.00 $158.40 $100,000.00 $6,672.00 $0.00 $6,672.00 $6,672.00 $0.00 $0.00 $6,672.00 $4,602.43 $0.00 $2,073,957.00 $830,256.00 $2,904,213.00 $3,089,522.19 $226,231.16 ($228,574.00) $3,087,179.35 $3,023,359.35 ($182,966.35) Project Schedule Notice to Proceed was issued on January 05, 2007. Contractor began work at Silverwood on March 05, 2007. The project is currently in the punch list phase. The new fire alarm system has been installed and tested, however we are awaiting the arrival of annunciator panel for completion of system. Site electrical work is complete and main switch gear has been energized by PG&E. Students and staff have full use of all buildings and classrooms on campus. Original Project Schedule Phase Start Finish Status Design 09/08/2003 01/08/2004 Completed DSA Approval 01/09/2004 04/02/2004 Completed Bid and Award 10/01/2006 12/31/2006 Completed Construction 04/01/2007 12/31/2007 In Closeout Phase 77 Construction Phase Schedule 78 Progress Photo New ADA Accessible Restroom Progress Photo New Hardcourt Play Ground 79
Similar documents
MT. DIABLO UNIFIED SCHOOL DISTRICT: DEMOGRAPHIC STUDY
closures and the reconfiguring of current school boundaries so that the appropriate facilities are provided for current and future students of the district. The following variables were analyzed an...
More information