Introduction of LVT - lv technology public company limited
Transcription
Introduction of LVT - lv technology public company limited
Introduction of LVT Project Implementation in Cement Industry LV Technology Public Company Limited L/O/G/O LVT Head Office & Subsidiaries LV Bradley LV CHINA LNV Technology Ceminter GCCP LVT & Subsidiaries LNV-India* 230 persons BLVT-USA 3 persons LV-China* 30 persons LVT 100 persons GCCP Ceminter Worldwide clients 4 Business Operation LVT offers customers a wide range of engineering services which include the design, development, make-to-order production of equipment and supervisory services which aims to improve plant operation efficiency by increasing plant capacity, reduce heat and power consumption. LVT has been awarded to implement the projects which carried out in many countries around the world i.e. Brazil, Argentina, Chile, Peru, Italy, Greece, Turkey, Saudi Arabia, Bahrain, Yemen, United Arab Emirates, Iran, Pakistan, South Korea, Philippines, Malaysia, Indonesia, India, Vietnam, Myanmar, China, and Thailand. L.V. Technology Public Company Limited LVT Involvement in Cement Business LVT has implemented projects in World-Wide which develops new technology designed for increasing efficiency of Vertical Roller Mills, Ball Mills by reduction of resistance force and the improvement of the flows of air and raw material, with the assistance of the ‘LVT Classifier”; an important components of the LV Pocket, the Rotor and the Cage Wheel Rotor. As well as projected implementation for plant upgrade which utilized experienced and extensive knowledge which designed to reduce pressure drop in the pyroprocessing system, improve of combustion efficiency and less heat consumption. Throughout many countries, LVT has such made the plant upgrade which contribute substantial L.V. Technology Public Company Limited LVT Involvement in Cement Business Throughout many countries, LVT has such made the plant upgrade which contribute substantial benefits to client. The capacity can rise upto 10-35% which less the investment cost 30-50% comparing to the investment for new cement plant. With this huge economic benefit, LVT has been awarded for more than 40 reference plant/kilns upgrade jobs around the world. L.V. Technology Public Company Limited LV Technology Raw mill with LV Classifier Calciner modification LV Classifier for Ball mill L.V. Technology Public Company Limited Preheater modification LVT Key reference plant/kilns upgrade jobs Client Project Name Country Detail CMS Plant upgrading to 2800 TPD Malaysia Turnkey Contract for plant upgrading from 2100 TPD to 2800 TPD (Actual achieve is 2880 TPD) NSCI Kiln upgrading to 4000 TPD, Bahau Plant Malaysia EP Contract for kiln upgrading from 3600 TPD to 4000 TPD (Actual achieve is 4300 TPD) NSCI Kiln upgrading to 2750 TPD, Perlis Plant Malaysia EP Contract for kiln upgrading from 1900 TPD to 2750 TPD (Actual achieve is 2850 TPD) Power Cement 2 Kiln upgrading to 1000 TPD and 1800 TPD Pakistan EP Contract for plant upgrading from 500 TPD to 1000 TPD and 1000 to 1800 TPD Cemex 2 Kiln upgrading to 1000TPD Thailand Hanil Kiln upgrading to 4800 TPD Korea Engineering supply for kiln upgrading 4800 TPD Apiai Kiln upgrading to 2850 TPD Brazil EP Contract for plant upgrading from 2200 TPD to 2850 TPD Bodoquena Kiln upgrading to 1900 TPD Brazil EP Contract for plant upgrading to 1900 TPD Hoang Mai Kiln upgrading to 4500 TPD Vietnam EP Contract for kiln upgrading to 4500 TPD Chinfong 2 Kiln upgrading to 4800 TPD and 5000 TPD Vietnam Engineering supply for kiln upgrading to 4500 TPD and 5000 TPD EP Contract for plant upgrading to 1000 TPD LVT Involvement in Cement Plant supply With many references on cement plant engineering and strong finance support in the past, LVT has expanded the business to cement plant engineering and equipment supply as following; Star Cement – Coal Grinding Plant 50TPH, RAK, UAE Star Cement – Cement Grinding Plant 80 TPH, Yemen Khamseh – Pyroprocessing 3500 TPD, Iran Mondehdasti – Pyroprocessing 3500 TPD, Iran Yura – Raw Vertical Mill 340 TPH, Peru Copiapo – Coal Mill 10 TPH, Chile SINOMA, Bahau Kiln No. 2 Raw Mill and Cement Mill, Malaysia Falcon Cement, Cement Ball Mill 70 TPH, Bahrain L.V. Technology Public Company Limited LVT Development In 1998 new classifier technology for control of the flow of gas and material in vertical mills. The result is increased production, improved size distribution of product and savings in power consumption of both mill and fan. Later the technology has been further developed for ball mills including a fluidised bed. In 2000 a concept for cyclones has been developed, applicable for both mills and preheaters. In 2008 LVT is offering complete mill departments such as Yura Raw Vertical Mill 340 tph, Peru, complete pyroprocessing departments. Khamseh – Pyroprocessing 3500 TPD, Iran In 2010 LVT is offering Complete cement plant, and Modification cement plant with turnkey work Today LVT provide complete engineering service and equipment supply in full integrated cement plant including plant services such as plant operation management. L.V. Technology Public Company Limited Why LVT will concern upgrade plant? When you need to upgrade plant….. No need to study for new plant location. Have good knowledge and experience staff in cement plant design Low investment cost Get higher revenue from existing material resource Shorten project period comparing to new plant installation Less Risk in project execution L.V. Technology Public Company Limited Why LVT will concern upgrade plant? When you need to build the new plant….. Seeking for Customer need Strength of Competitors Lack of Capital and Cash Flow Lack of laws and accounting knowledge Needed a number of competency staff Small business community network Lack of credibility because of less experience Location of Plant Layout High investment cost L.V. Technology Public Company Limited Cimento Apodi Complete Cement Plant 3500tpd, Brazil Client Name: Companhia Industrial de Cimento Apodi, Fortaleza, Brazil LVT Order No.: 759 LVT Role: engineering, supply of equipment and supervision for complete cement plant 3500tpd clinker Project period: August 2011– January 2015 Project status : Plant Construction Completion Plant Commercial Operation started since Mar’15 LVT is handing-over the project L.V. Technology Public Company Limited Cimento Apodi Plant Site L.V. Technology Public Company Limited Elizabeth Cement Plant 2500tpd, Brazil Client Name: Industria de Cementos do Conde Ltda, Joao Pessoa, Brazil LVT Order No.: 764 LVT Role: supply of equipment and supervision for the construction of a complete Elizabeth Cement Plant capable of delivering 2500tpd Project period: December 2011 – January 2015 Project status : Plant Construction Completion Plant Commercial Operation started since Mar’15 LVT is handing-over the project L.V. Technology Public Company Limited Elizabeth Plant Site L.V. Technology Public Company Limited CMS Clinker Line No. 1 Up-grading Project, Malaysia (Turnkey) Client Name: CMS Clinker Sdb. Bhd, Kuching, Sarawak, Malaysia LVT Order No.: 758 LVT Role: engineering, supply of equipment and supervision for new raw mill department, upgrading for kiln department, new coal mill department in turnkey basis Project Period: July 2011 – September 2012 Project status : Plant Construction Completion Plant Commercial Operation started since 2013 Project Closed L.V. Technology Public Company Limited CMS Clinker Plant Site L.V. Technology Public Company Limited CMS Clinker Plant Site L.V. Technology Public Company Limited NSCI Cement Mill No. 4, Cement Grinding Mill (Turnkey) Client Name: Negeri Sembilan cements industries SDN. BHD. LVT Order No.: 765 LVT Role: engineering, supply of equipment and supervision for increasing cement grinding capacity. Full scope of supply will encompass clinker extraction from the 2 existing clinker silos in turnkey basis. Project Period: March 2011 – June 2012 Project status : Plant Construction Completion Plant Commercial Operation started since 2012 Project Closed L.V. Technology Public Company Limited NSCI Cement Mill No. 4, Plant Site L.V. Technology Public Company Limited SINOMA, Bahau Kiln No. 2 Facility and Cement Mill Upgrade Client Name: Sinoma International Engineering co., Ltd, China LVT Order No.: 779 and 780 Beijing, P.R. LVT Role: supply of two vertical mills from UBE and equipped with LVT classifier for raw material grinding and cement grinding for SINOMA to their turnkey 5000 TPD project at NSCI-Bahau, Malaysia. Project Period: November 2011 – July 2013 Project status : Plant Construction Completion Plant Commercial Operation started since 2013 Project Closed L.V. Technology Public Company Limited SINOMA, NSCI Bahau Plant Site L.V. Technology Public Company Limited LVT Involvement in Middle East Cement Industry LVT has developed Cement Plant in Middle East to multiply efficiency of the cement production by designed and supplied equipment for new Cement Plant, Facility and/or Grinding Plant to clients in Middle East Sector. FALCON, 70tph Cement Grinding Department , Bahrain EPCC, 600 tpd Oil Well Cement Plant, Saudi Arabia AYCC, 50 tph Coal mill Department, Yemen L.V. Technology Public Company Limited Falcon 70tph Cement Grinding Department, The Kingdom of Bahrain Client Name: Falcon Cement Company B.S.C. (c), Manama, The Kingdom of Bahrain LVT Role: engineering and procurement of equipment for Clinker Transport, Cement Ball Mill Department and Compress Air Supply including civil design, electrical design and site supervision with the production capacity of 70tph Project Period: September 2013 – March 2016 Project status : Plant Construction is going on. Expected finish on March 2016 Project Active L.V. Technology Public Company Limited Falcon Cement Plant Site L.V. Technology Public Company Limited Falcon Cement Plant Site L.V. Technology Public Company Limited EPCC, Saudi Arabia 600 tpd Oil Well Cement Line Client Name: Eastern Province Cement Co. LVT Order No.: 743 LVT Role: engineering and procurement of equipment for Limestone crushing, Kiln system and Packing plant with the production capacity of 600 TPD Project Period: Jan 2010 – Jun 2014 Project status : Plant Construction Completion Plant Commercial Operation started since 2014 LVT is handing-over the project L.V. Technology Public Company Limited EPCC / Saudi Arabia Plant site L.V. Technology Public Company Limited AYCC, Yemen Coal grinding 50 tph Client Name: Arabian Yemen Cement Company Limited LVT Order No.: 752 LVT Role: engineering and procurement of equipment for coal grinding 50 tph Project Period: Jan 2010 – Jun 2013 Project status : Plant Construction Completion Plant Commercial Operation started June 2013 Project Closed L.V. Technology Public Company Limited AYCC / Yemen Plant site L.V. Technology Public Company Limited Al Humyin / Saudi Arabia Cement mill department with Packing plant Client Name: Al humyin trading & industry group LVT Role: engineering and procurement of equipment for cement mill department and packing plant Project Period: Jan 2011 - now Project status : Project Active LVT has to ship the mill by 10 months when the client opens L/C for this last shipment. L.V. Technology Public Company Limited Al Humyin / Saudi Arabia Plant layout C L.V. Technology Public Company Limited LVT Involvement in Myanmar Cement Industry LVT has performed on designed engineering technology and providing engineering services to cement industry in Myanmar. The scope of services given to customers so as to cover; - The improvement of technology for Vertical Roller Mill - The improvement of technology for Ball Mills - The improvement of technology for Rotary Kiln - The improvement of production process of cement plants including complete new plants, cement plant modification - Consultancy services. - Cement Plant Operation Management Some parts of our projects in Myanmar are herewith belows: L.V. Technology Public Company Limited LVT Involvement in Myanmar Cement Industry KBZI, Complete Cement Plant 1250tpd MAX, Conversion of 500tpd Wet Process to 2,100tpd Dry Process SINMIN, Plant Operation Management In addition, the proposed jobs are that LVT shall carry out in Myanmar as following. HNIDON Integrated cement plant 1.1 million ton per annum L.V. Technology Public Company Limited Complete Cement Plant 1250tpd, Kanbawza project, Taunggyi, Myanmar Client Name: Kanbawza Industries Limited LVT Role: engineering design, supply of equipment and site management for greenfield complete cement plant 1250tpd Project Period: May 2012 – January 2014 L.V. Technology Public Company Limited Kanbawza project Plant Site L.V. Technology Public Company Limited Conversion of 500tpd Wet Process to 2,100tpd Dry Process, Myanmar Client Name: Max (Myanmar) Manufacturing Co., Ltd. LVT Role: engineering, supply of equipment and supervision for conversion of a wet process plant with the production capacity of 500tpd into a dry-process plant with the production capacity of 2100tpd Project Period: May 2013– April 2016 L.V. Technology Public Company Limited Max Cement Plant Site L.V. Technology Public Company Limited SINMIN Supervisory Services for Plant Operation Management, Myanmar Client Name: Sinmin Cement Industry Co., Ltd. LVT Role: Supply of the supervisory services for the purpose of operation and project management of the SINMIN CEMENT PLANT at Qyaukse, Myanmar Project Period: November 2015 – April 2016 Achievement : Plant can operate upto design capacity for continuous period on January 2016 L.V. Technology Public Company Limited SINMIN Plant Site L.V. Technology Public Company Limited Qassim Cement, Saudi Arabia Client Name: Qassim Cement LVT Role: supply of equipment and services for modification of classifier for cement mill no.1 Project Period: Approx. 7 months L.V. Technology Public Company Limited Qassim Cement Flow sheet diagram L.V. Technology Public Company Limited Khash Cement, Iran Raw mill upgrade Client Name: Khash Cement LVT Role: supply of equipment and services for Raw mill upgrade Project Period: Approx. 8 months L.V. Technology Public Company Limited Khash Cement Flow sheet diagram for Raw mill upgrade L.V. Technology Public Company Limited Khash Cement, Iran Kiln upgrade Client Name: Khash Cement LVT Role: supply of equipment and services for Kiln upgrade Project Period: Approx. 8 months L.V. Technology Public Company Limited Khash Cement Flow sheet diagram for Kiln upgrade L.V. Technology Public Company Limited Khash Cement Plant site L.V. Technology Public Company Limited Mondedashty Cement, Iran Kiln upgrade 3,500 tpd Client Name: Mondedashty Cement Co. LVT Role: supply of equipment and services for New pyroprocessing L.V. Technology Public Company Limited Mondedashty Cement General arrangement for pyro-process dept. L.V. Technology Public Company Limited Bodoquen, Brazil Kiln upgrade to 1,900 tpd and modification of coal mill and cement mill Client Name: Carmargo Correa Cimentos S.A. LVT Role: supply of equipment and services for kiln upgrade to 1,900 tpd and modification of coal mill and cement mill Project Period: Approx. 15 months L.V. Technology Public Company Limited Bodoquena, Brazil GA for modification pre heater L.V. Technology Public Company Limited Bodoquena, Brazil Plant site L.V. Technology Public Company Limited Copiaco/ Chile Coal mill 10 tph Client Name: Cales inacesa S.A. LVT Role: engineering and procurement of equipment for coal mill department Project Period: Approx. 10 months L.V. Technology Public Company Limited Copiaco / Chile Plant layout L.V. Technology Public Company Limited Urumieh white cement / Iran Kiln upgrade 750 tpd Client Name: Urumieh white cement co. LVT Role: engineering and procurement of equipment for kiln upgrade to 750 tpd Project Period: Approx. 10 months L.V. Technology Public Company Limited Urumieh white cement / Iran GA for preheater L.V. Technology Public Company Limited Al Rashed / Saudi Arabia Clinker grinding plant 25 tph white cement Client Name: Rashed A. Al-Rashed & Sons Co. LVT Role: engineering and procurement of equipment for clinker grinding plant 25 tph Project Period: To delivery equipment : Approx. 10 months To finish plant construction : Approx 30 months Achievement : Plant operates at 20% more full capacity L.V. Technology Public Company Limited Al Rashed / Saudi Arabia Plant site L.V. Technology Public Company Limited Star cement / Mozambique Cement grinding 65 tph with packing plant Client Name: Star cement LDA. LVT Role: engineering and procurement of equipment for cement grinding and packing plant Project Period: Approx. 9 months L.V. Technology Public Company Limited Star cement / Mozambique Plant layout L.V. Technology Public Company Limited Star cement / Mozambique Piling foundation L.V. Technology Public Company Limited Aalborg White Cement / Malaysia Upgrade plant 1000 TPD Client Name: Aalborg Portland Malaysia SDN BHD LVT Role: Engineering, procurement of equipment and construction Project Period: Approx. 17 months L.V. Technology Public Company Limited Aalborg White Cement / Malaysia GA Pre heater L.V. Technology Public Company Limited Aalborg White Cement / Malaysia GA Raw mill L.V. Technology Public Company Limited Aalborg White Cement / Malaysia Plant site L.V. Technology Public Company Limited Max Cement II (PYI NYAUNG) / Myanmar Plant Upgrde 2100TPD Client Name: Sinomar LVT Role: engineering, procurement of equipment and erection Project Period: Approx. 24 months L.V. Technology Public Company Limited Max Cement II (PYI NYAUNG) / Myanmar Plant layout L.V. Technology Public Company Limited Max Cement II (PYI NYAUNG) / Myanmar Plant site L.V. Technology Public Company Limited Project done by LVT to the client in Thailand L.V. Technology Public Company Limited SCG Trading Closed warehouse and conveying system for coal (Engineering, Equipment Supply with Erection) Client Name: SCG Trading LVT Role: Engineering, procurement and erection Project Period: Approx. 12 months Type of material: Coal Type of storage: Longitude Capacity of storage: 2x8,000 tons Mode of operation : Direct and Warehouse mode L.V. Technology Public Company Limited SCG Trading Closed warehouse and conveying system for coal L.V. Technology Public Company Limited SCG Trading Closed warehouse and conveying system for coal L.V. Technology Public Company Limited SCG Trading Closed warehouse and conveying system for coal L.V. Technology Public Company Limited SCG Trading Closed warehouse and conveying system for coal L.V. Technology Public Company Limited Thank You! LV Technology Public Company Limited L/O/G/O