93-7068 - Naples
Transcription
93-7068 - Naples
Agenda Item 29-d 11/17/93 RESOLUTION NO. 93-7068 A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE TASK ORDER NO. SEVEN, FOR ENGINEERING SERVICES TO BE PROVIDED BY HOLE, MONTES AND ASSOCIATES, INC., ASSOCIATED WITH THE EXTENSION OF A, SIX INCH WATER MAIN AMONG ACADIA LANE; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, by Resolution No. 93-6971, the City of Naples entered into a contract with Hole, Montes and Associates, Inc. to serve as "Consulting Engineer" for the operation of the City's general utilities; and WHEREAS, the City of Naples wishes to extend its potable water system approximately 850 feet along Acadia Lane; and WHEREAS, Hole, Montes and Associates, Inc. has agreed to provide engineering services for a cost of $4,300; and WHEREAS, it is in the best interests of the City to execute Task Order No. Seven, for engineering services to be provided by Hole, Montes and Associates, Inc., associated with the extension of a six inch water main along Acadia Lane; NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF NAPLES, FLORIDA: Section 1. That the City Manager is hereby authorized to execute Task Order No. Seven, for engineering services to be provided by Hole, Montes and Associates, Inc., associated with the extension of a six inch water main along Acadia Lane, in the amount of $4,300, a copy of which is attached hereto and made a part hereof. Section 2. This resolution shall take effect immediately upon adoption. PASSED IN OPEN AND REGULAR SESSION OF THE CITY COUNCIL OF THE CITY Resolution No. 93-7068 Page 2 OF NAPLES, FLORIDA, THIS 17TH DAY OF NOVEMBER, 1993. W. Muenze Mayor Approved as to form and legality: Attest: Ja t Cason, City Clerk Maria J. ro, City At orney Prepared by: Charles E. Vandevelde, P.E., Engineering M:\REF\COUNCIL\RES\93-7068 93-7068 Anderson Herms Korest S Y Pennington Sullivan MY VanArsdale Muenzer (7-0) M=Motion S=Second Y=Yes N=No A=Absent TASK ORDER NO. HMA 7-93 ENGINEERING SERVICES TO THE CITY OF NAPLES ATTACHED TO THE AGREEMENT TO FURNISH PROFESSIONAL SERVICES AND CONSULTING SERVICES TO THE UTILITY DEPARTMENT CITY OF NAPLES, FLORIDA A. SCOPE OF SERVICES The specific services which the ENGINEER agrees to furnish are summarized on the attached statement entitled TASK ORDER NO. HMA 7-93, "SCOPE OF SERVICES". The "Scope of Services" defines the work effort referred to as "the project". B. TIME OF COMPLETION Work under this Task Order will begin immediately following acceptance and completed expeditiously subject to coordination with City of Naples Utility Department staff. Estimated level of effort expressed in labor requirements for work task is shown on the attached statement entitled TASK ORDER NO. HMA 7-93 "SCOPE OF SERVICES". This Amendment expires one hundred eighty (180) days after date of execution. C. COMPENSATION Professional fees for TASK ORDER NO. HMA 7-93 will be based on rates and charges as stipulated in the Agreement between HOLE, MONTES AND ASSOCIATES, INC. and CITY OF NAPLES to provide professional services. The estimated amount of compensation is shown on the attached statement entitled TASK ORDER NO. HMA 7-93, "SCOPE OF SERVICES". D. ACCEPTANCE By signature, the parties each accept the provisions of this TASK ORDER NO. HMA 7-93 and authorizes the ENGINEER to proceed at the direction of the CITY OF NAPLES representative in accordance with the "Scope of Services". For HOLE, MONTES AND ASSOCIATES, INC. By: A- • Thomas M. Taylor Vice President CITY 0 By: Dr. Richard L. W City Manager Dated this tees. c/ 3 - 9OGg IT/It day of November, 1993. uff TASK ORDER HMA 7-93 SCOPE OF SERVICES CITY OF NAPLES WATER MAIN EXTENSION ACADIA LANE INTRODUCTION The City of Naples wishes to extend its existing potable water system. A six (6) inch PVC water main is to be extended on Acadia Lane from the existing main located on Thomasson Drive. A new fire hydrant assembly is to be added at the terminal end of the water main on Acadia Lane. Approximately 850 lineal feet of six (6) inch PVC water main is to be installed. SCOPE OF SERVICES TASK 1 PLAN/PROFILE SPECIFICATIONS DESIGN, PREPARATION OF TECHNICAL Prepare designs, plan and profile drawing and detail sheet for extension of a 6 inch water main on Acadia Lane. Prepare technical specifications for water main construction for inclusion in the bidding and contract documents. The City of Naples shall prepare general specifications and incorporate HMA technical specifications into bidding and contract documents for use on this Project. Prepare an estimate of quantities and opinion of probable construction cost for the improvements designed. 1 - Submit the drawings for review and approval by the City of Naples. A total of five (5) copies shall be provided for the City of Naples for review. Upon approval, one (1) mylar reproducible copy shall be provided for the City of Naples. TASK 2 - The OWNER shall provide all construction bid services. TASK 3 - CONSTRUCTION CONTRACT ADMINISTRATION The OWNER shall provide all construction contract administration. TASK 4 - CONSTRUCTION BID SERVICES DETAILED OBSERVATION OF CONSTRUCTION The OWNER shall provide all detailed observation. TASK 5 ADDITIONAL SERVICES - PREDICTABLE - Perform all design survey, including horizontal and vertical control for the proposed water main extension. - The OWNER shall secure all permits. COMPENSATION The professional fees established for the services are consistent with Article 6 of the Agreement. Projected fees for the services required are provided below: Task 1 - Plan/Profile Design, Technical Specifications Lump Sum per Article 6A $ 3,000 4.1=IIIMMI, I, -2 _ Task 2 - Construction Bid Services Task 3 - Construction Contract Administration Task 4 - Detailed Observation of Construction By Owner By Owner By Owner Task 5 - Additional Services Predictable Professional Fee Schedule Per Article 6C Survey Estimated $ 1,300 3 I hereby certify that this page in the official records of the City of Naples was intentionally left blank. City Clerk