INVITATION TO BID (ITB/ NLDP/83642/MUL/01/01/2013) United Nations Development Programme Requirement LOT # : Implement Civil Works DESCRIPTION OF WORKS MINIMUM MINIMUM ICTAD SECURITY GRADE AMOUNT (BUILDING) Renovation of paddy processing centre includes construction of 90’x30’ Machine Room, Construction of 30’x20’ Cleaner Room, LOT 01: NLDP/83642/MUL/01/01 Construction of 30’x15’ Boiler room, 100’x 38’ C5/M4 Store Renovation work, Latrines, Motor room, Transformer room at Oddankulam in Manthai East DS Division - Mullaithivu Contract Modality Location Deadline for Submission Pre Bid Meeting BID LKR 280,000 : Civil Works : Mullaitivu District of Sri Lanka th : 26 July 2013 @ 2.00pm th : 12 July 2013 @ 10.00am UNDP Kilinochchi Office The technical drawings, bidding documents, price schedule, delivery terms/conditions and other relevant documents can be collected from the address below during weekdays from 09.00hrs to 15.00hrs free of charge or can be downloaded free of charge from www.lk.undp.org (operations >procurement). Head of Procurement United Nations Development Programme 202-204 Bauddhaloka Mawatha Colombo 07 Sri Lanka. rohana.dissanayake@undp.org UNDP reserves the right to accept or reject any bid. The procurement process will be governed by the rules and regulations of the United Nations Development Programme UNDP Sri Lanka 202-204, Bauddhaloka Mawatha, Colombo 7, Sri Lanka ■ P.O. Box 1505 Tel: +94(11)2580691-8 ■ Fax: +94(11)2581116 ■ Email: registry.lk@undp.org INVITATION TO BID Civil Works NLDP/83642/2013 SRI LANKA LOT 01 – ITB/NLDP/83642/MUL/01/01/2013 United Nations Development Programme July, 2013 1 Section 1. Letter of Invitation SRI LANKA July 4, 2013 NLDP/83642/2013 Dear Mr./Ms.: Bidder The United Nations Development Programme (UNDP) hereby invites you to submit a Bid to this Invitation to Bid (ITB) for the below referenced subjects. LOT # LOT 01: NLDP/83642/MUL/01/01 DESCRIPTION OF WORKS Renovation of paddy processing centre includes construction of 90’x30’ Machine Room, Construction of 30’x20’ Cleaner Room, Construction of 30’x15’ Boiler room, 100’x 38’ Store Renovation work, Latrines, Motor room, Transformer room at Oddankulam in Manthai East DS Division Mullaithivu MINIMUM MINIMUM BID ICTAD SECURITY GRADE AMOUNT (BUILDING) C5/M4 LKR 280,000 Eligible Civil Work Contractors are encouraged to bid for the above LOT. 1. In order for you to submit your bid, the following documents are provided as part of this solicitation Document for: Section 1 – This Letter of Invitation Section 2 – Instructions to Bidders (including Data Sheet) Section 3 – Scope of Works, Preambles, Bill of Quantity and Technical Drawings for: 3.1 For LOT 1 Section 4 – Bid Submission Form Section 5 – Documents Establishing the Eligibility and Qualifications of the Bidder Section 6 – Technical Bid Form Section 7 – Form for Bid Security Section 8 – Form for Performance Security 2 You are kindly requested to submit an acknowledgment letter to UNDP to the following address: United Nations Development Programme 202-204 Bauddhaloka Mawatha, Colombo 07, Sri Lanka Mr. Rohana Dissanayake/Head of Procurement Or emailed to rohana.dissanayake@undp.org The letter or email should be received by UNDP no later than 11th July 2013. The same letter should advise whether your company intends to submit a Bid. If that is not the case, UNDP would appreciate your indicating the reason, for our records. If you have received this ITB through a direct invitation by UNDP, transferring this invitation to another firm requires notifying UNDP accordingly. Should you require any clarification, kindly communicate with the contact person identified in the attached Data Sheet as the focal point for queries on this ITB. UNDP looks forward to receiving your Bid and thanks you in advance for your interest in UNDP procurement opportunities. Yours sincerely, Rohana Dissanayake, Head of Procurement 3 Section 2: Instruction to Bidders1 Definitions a) “Bid” refers to the Bidder’s response to the Invitation to Bid, including the Bid Submission Form, Technical Bid and Price Schedule and all other documentation attached thereto as required by the ITB. b) “Bidder” refers to any legal entity that may submit, or has submitted, a Bid for the supply of goods and provision of related services requested by UNDP. c) “Contract” refers to the legal instrument that will be signed by and between the UNDP and the successful Bidder, all the attached documents thereto, including the General Terms and Conditions (GTC) and the Appendices. d) “Country” refers to the country indicated in the Data Sheet. e) “Data Sheet” refers to such part of the Instructions to Bidders used to reflect conditions of the tendering process that are specific for the requirements of the ITB. f) “Day” refers to calendar day. g) “Goods” refer to any tangible product, commodity, article, material, wares, equipment, assets or merchandise that UNDP requires under this ITB. h) “Government” refers to the Government of the country where the goods and related services provided/rendered specified under the Contract will be delivered or undertaken. i) “Instructions to Bidders” refers to the complete set of documents which provides Bidders with all information needed and procedures to be followed in the course of preparing their Bid j) “ITB” refers to the Invitation to Bid consisting of instructions and references prepared by UNDP for purposes of selecting the best supplier or service provider to fulfil the requirement indicated in the Schedule of Requirements and Technical Specifications. k) “LOI” (Section 1 of the ITB) refers to the Letter of Invitation sent by UNDP to Bidders. l) “Material Deviation” refers to any contents or characteristics of the bid that is significantly different from an essential aspect or requirement of the ITB, and (i) substantially alters the scope and quality of the requirements; (ii) limits the rights of UNDP and/or the obligations of the offeror; and (iii) adversely impacts the fairness and principles of the procurement process, such as those that compromise the competitive position of other offerors. 1 Note: this Section 2 - Instructions to Bidders shall not be modified in any way. Any necessary changes to address specific country and project information shall be introduced only through the Data Sheet. 4 m) “Schedule of Requirements and Technical Specifications” refers to the document included in this ITB as Section 3 which lists the goods required by UNDP, their specifications, the related services, activities, tasks to be performed, and other information pertinent to UNDP’s receipt and acceptance of the goods. n) “Services” refers to the entire scope of tasks related or ancillary to the completion or delivery of the goods required by UNDP under the ITB. o) “Supplemental Information to the ITB” refers to a written communication issued by UNDP to prospective Bidders containing clarifications, responses to queries received from prospective Bidders, or changes to be made in the ITB, at any time after the release of the ITB but before the deadline for the submission of Bid. A. GENERAL 1. UNDP hereby solicits Bids as a response to this Invitation to Bid (ITB). Bidders must strictly adhere to all the requirements of this ITB. No changes, substitutions or other alterations to the rules and provisions stipulated in this ITB may be made or assumed unless it is instructed or approved in writing by UNDP in the form of Supplemental Information to the ITB. 2. Submission of a Bid shall be deemed as an acknowledgement by the Bidder that all obligations stipulated by this ITB will be met and, unless specified otherwise, the Bidder has read, understood and agreed to all the instructions in this ITB. 3. Any Bid submitted will be regarded as an offer by the Bidder and does not constitute or imply the acceptance of any Bid by UNDP. UNDP is under no obligation to award a contract to any Bidder as a result of this ITB. 4. UNDP implements a policy of zero tolerance on proscribed practices, including fraud, corruption, collusion, unethical practices, and obstruction. UNDP is committed to preventing, identifying and addressing all acts of fraud and corrupt practices against UNDP as well as third parties involved in UNDP activities. (See http://www.undp.org/about/transparencydocs/UNDP_Anti_Fraud_Policy_English_FINAL_june_ 2011.pdf and http://www.undp.org/content/undp/en/home/operations/procurement/procurement_protest/ for full description of the policies) 5. In responding to this ITB, UNDP requires all Bidders to conduct themselves in a professional, objective and impartial manner, and they must at all times hold UNDP’s interests paramount. Bidders must strictly avoid conflicts with other assignments or their own interests, and act without consideration for future work. All Bidders found to have a conflict of interest shall be disqualified. Without limitation on the generality of the above, Bidders, and any of their affiliates, shall be considered to have a conflict of interest with one or more parties in this solicitation process, if they: 5.1 Are, or have been associated in the past, with a firm or any of its affiliates which have been engaged UNDP to provide services for the preparation of the design, Schedule of 5 5.2 5.3 Requirements and Technical Specifications, cost analysis/estimation, and other documents to be used for the procurement of the goods and related services in this selection process; Were involved in the preparation and/or design of the programme/project related to the goods and related services requested under this ITB; or Are found to be in conflict for any other reason, as may be established by, or at the discretion of, UNDP. In the event of any uncertainty in the interpretation of what is potentially a conflict of interest, Bidders must disclose the condition to UNDP and seek UNDP’s confirmation on whether or not such conflict exists. 6. Similarly, the following must be disclosed in the Bid: 6.1 Bidders who are owners, part-owners, officers, directors, controlling shareholders, or key personnel who are family of UNDP staff involved in the procurement functions and/or the Government of the country or any Implementing Partner receiving the goods and related services under this ITB; and 6.4 Others that could potentially lead to actual or perceived conflict of interest, collusion or unfair competition practices. Failure of such disclosure may result in the rejection of the Bid. 7. The eligibility of Bidders that are wholly or partly owned by the Government shall be subject to UNDP’s further evaluation and review of various factors such as being registered as an independent entity, the extent of Government ownership/share, receipt of subsidies, mandate, access to information in relation to this ITB, and others that may lead to undue advantage against other Bidders, and the eventual rejection of the Bid. 8. All Bidders must adhere to the UNDP Supplier Code of Conduct, which may be found at this link: http://web.ng.undp.org/procurement/undp-supplier-code-of-conduct.pdf B. CONTENTS OF BID 9. Sections of Bid Bidders are required to complete, sign and submit the following documents: 9.1 9.2 9.3 9.4 9.5 Bid Submission Cover Letter Form (see ITB Section 4); Documents Establishing the Eligibility and Qualifications of the Bidder (see ITB Section 5); Technical Bid (see prescribed form in ITB Section 6); Scope of Works, Preambles, Bill of Quantity and Technical Drawings (section 3) Bid Security, if applicable (if required and as stated in the DS nos. 9-11, see prescribed Form in ITB Section 7); 9.6 Form for Performance Security (section 8) 6 10. Clarification of Bid 10.1 Bidders may request clarification of any of the ITB documents no later than the number of days indicated in the Data Sheet (DS no. 16) prior to the Bid submission date. Any request for clarification must be sent in writing via courier or through electronic means to the UNDP address indicated in the Data Sheet (DS no. 17). UNDP will respond in writing, transmitted by electronic means and will transmit copies of the response (including an explanation of the query but without identifying the source of inquiry) to all Bidders who have provided confirmation of their intention to submit a Bid. 10.2 UNDP shall endeavor to provide such responses to clarifications in an expeditious manner, but any delay in such response shall not cause an obligation on the part of UNDP to extend the submission date of the Bid, unless UNDP deems that such an extension is justified and necessary. 11. Amendment of Bid 11.1 At any time prior to the deadline for submission of Bid, UNDP may for any reason, such as in response to a clarification requested by a Bidder, modify the ITB in the form of a Supplemental Information to the ITB. All prospective Bidders will be notified in writing of all changes/amendments and additional instructions through Supplemental Information to the ITB and through the method specified in the Data Sheet (DS No. 18). 11.2 In order to afford prospective Bidders reasonable time to consider the amendments in preparing their Bid, UNDP may, at its discretion, extend the deadline for submission of Bid, if the nature of the amendment to the ITB justifies such an extension. C. PREPARATION OF BID 12. Cost The Bidder shall bear any and all costs related to the preparation and/or submission of the Bid, regardless of whether its Bid was selected or not. UNDP shall in no case be responsible or liable for those costs, regardless of the conduct or outcome of the procurement process. 13. Language The Bid, as well as any and all related correspondence exchanged by the Bidder and UNDP, shall be written in the language (s) specified in the Data Sheet (DS No. 4). Any printed literature furnished by the Bidder written in a language other than the language indicated in the Data Sheet, must be accompanied by a translation in the preferred language indicated in the Data Sheet. For purposes of interpretation of the Bid, and in the event of discrepancy or inconsistency in meaning, the version translated into the preferred language shall govern. Upon conclusion of a contract, the language of the contract shall govern the relationship between the contractor and UNDP. 7 14. Bid Submission Form The Bidder shall submit the Bid Submission Form using the form provided in Section 4 of this ITB. 15. Technical Bid Format and Content Unless otherwise stated in the Data Sheet (DS no. 28), the Bidder shall structure the Technical Bid as follows: 15.1 Expertise of Firm/Organization – this section should provide details regarding management structure of the organization, organizational capability/resources, and experience of organization/firm, the list of projects/contracts (both completed and ongoing, both domestic and international) which are related or similar in nature to the requirements of the ITB, manufacturing capacity of plant if Bidder is a manufacturer, authorization from the manufacturer of the goods if Bidder is not a manufacturer, and proof of financial stability and adequacy of resources to complete the delivery of goods and provision of related services required by the ITB (see ITB Clause 18 and DS No. 26 for further details). The same shall apply to any other entity participating in the ITB as a Joint Venture or Consortium. 15.2 Technical Specifications and Implementation Plan – this section should demonstrate the Bidder’s response to the Schedule of Requirements and Technical Specifications by identifying the specific components proposed; how each of the requirements shall be met point by point; providing a detailed specification and description of the goods required, plans and drawings where needed; the essential performance characteristics, identifying the works/portions of the work that will be subcontracted; a list of the major subcontractors, and demonstrating how the bid meets or exceeds the requirements, while ensuring appropriateness of the bid to the local conditions and the rest of the project operating environment during the entire life of the goods provided. Details of technical bid must be laid out and supported by an Implementation Timetable, including Transportation and Delivery Schedule where needed, that is within the duration of the contract as specified in the Data Sheet (DS noS. 29 and 30). Bidders must be fully aware that the goods and related services that UNDP require may be transferred, immediately or eventually, by UNDP to the Government partners, or to an entity nominated by the latter, in accordance with UNDP’s policies and procedures. All bidders are therefore required to submit the following in their bids : a) A statement of whether any import or export licences are required in respect of the goods to be purchased or services to be rendered, including any restrictions in the country of origin, use or dual use nature of the goods or services, including any disposition to end users; b) Confirmation that the Bidder has obtained license of this nature in the past, and have an expectation of obtaining all the necessary licenses, should their bid be rendered the most responsive; and c) Complete documentation, information and declaration of any goods classified or may be classified as “Dangerous Goods”. 8 15.3 Management Structure and Key Personnel – This section should include the comprehensive curriculum vitae (CVs) of key personnel that will be assigned to support the implementation of the technical bid, clearly defining their roles and responsibilities. CVs should establish competence and demonstrate qualifications in areas relevant to the requirements of this ITB. In complying with this section, the Bidder assures and confirms to UNDP that the personnel being nominated are available to fulfil the demands of the Contract during its stated full term. If any of the key personnel later becomes unavailable, except for unavoidable reasons such as death or medical incapacity, among other possibilities, UNDP reserves the right to render the Bid non-responsive. Any deliberate substitution of personnel arising from unavoidable reasons, including delay in the implementation of the project of programme through no fault of the Bidder, shall be made only with UNDP’s acceptance of the justification for substitution, and UNDP’s approval of the qualification of the replacement who shall be either of equal or superior credentials as the one being replaced. 15.4 Where the Data Sheet requires the submission of the Bid Security, the Bid Security shall be included along with the Technical Bid. The Bid Security may be forfeited by UNDP, and reject the Bid, in the event of any or any combination of the following conditions: a) If the Bidder withdraws its offer during the period of the Bid Validity specified in the Data Sheet (DS no. 11), or; b) If the Bid Security amount is found to be less than what is required by UNDP as indicated in the Data Sheet (DS no. 9), or; c) In the case the successful Bidder fails: i. ii. iii. to sign the Contract after UNDP has awarded it; to comply with UNDP’s variation of requirement, as per ITB Clause 35; or to furnish Performance Security, insurances, or other documents that UNDP may require as a condition to rendering effective the contract that may be awarded to the Bidder. 16. Price Schedule The Price Schedule shall be prepared using the attached standard form (Section 7). It shall list all major cost components associated with the goods and related services, and the detailed breakdown of such costs. All goods and services described in the Technical Bid must be priced separately on a one-to-one correspondence. Any output and activities described in the Technical Bid but not priced in the Price Schedule, shall be assumed to be included in the prices of the items or activities, as well as in the final total price of the bid. 17. Currencies All prices shall be quoted in the currency indicated in the Data Sheet (DS no. 15). However, where Bids are quoted in different currencies, for the purposes of comparison of all Bid: 9 17.1 UNDP will convert the currency quoted in the Bid into the UNDP preferred currency, in accordance with the prevailing UN operational rate of exchange on the last day of submission of Bid; and 17.2 In the event that the Bid found to be the most responsive to the ITB requirement is quoted in another currency different from the preferred currency as per Data Sheet (DS no. 15), then UNDP shall reserve the right to award the contract in the currency of UNDP’s preference, using the conversion method specified above. 18. Documents Establishing the Eligibility and Qualifications of the Bidder 18.1 The Bidder shall furnish documentary evidence of its status as an eligible and qualified vendor, using the forms provided under Section 5, Bidder Information Forms. In order to award a contract to a Bidder, its qualifications must be documented to UNDP’s satisfactions. These include, but are not limited to the following: a) That, in the case of a Bidder offering to supply goods under the Contract which the Bidder did not manufacture or otherwise produce, the Bidder has been duly authorized by the goods’ manufacturer or producer to supply the goods in the country of final destination; b) That the Bidder has the financial, technical, and production capability necessary to perform the Contract; and c) That, to the best of the Bidder’s knowledge, it is not included in the UN 1267 List or the UN Ineligibility List, nor in any and all of UNDP’s list of suspended and removed vendors. 18.2 Bids submitted by two (2) or more Bidders shall all be rejected by UNDP if they are found to have any of the following: a) they have at least one controlling partner, director or shareholder in common; or b) any one of them receive or have received any direct or indirect subsidy from the other/s; or c) they have the same legal representative for purposes of this ITB; or d) they have a relationship with each other, directly or through common third parties, that puts them in a position to have access to information about, or influence on the Bid of, another Bidder regarding this ITB process; e) they are subcontractors to each other’s bid, or a subcontractor to one bid also submits another Bid under its name as lead Bidder; or f) an expert proposed to be in the bid of one Bidder participates in more than one Bid received for this ITB process. This condition does not apply to subcontractors being included in more than one Bid. 19. Joint Venture, Consortium or Association If the Bidder is a group of legal entities that will form or have formed a joint venture, consortium or association at the time of the submission of the Bid, they shall confirm in their Bid that : (i) they have designated one party to act as a lead entity, duly vested with authority to legally bind 10 the members of the joint venture jointly and severally, and this shall be duly evidenced by a duly notarized Agreement among the legal entities, which shall be submitted along with the Bid; and (ii) if they are awarded the contract, the contract shall be entered into, by and between UNDP and the designated lead entity, who shall be acting for and on behalf of all entities that comprise the joint venture. After the bid has been submitted to UNDP, the lead entity identified to represent the joint venture shall not be altered without the prior written consent of UNDP. Furthermore, neither the lead entity nor the member entities of the joint venture can: a) Submit another Bid, either in its own capacity; nor b) As a lead entity or a member entity for another joint venture submitting another Bid. The description of the organization of the joint venture/consortium/association must clearly define the expected role of each of the entity in the joint venture in delivering the requirements of the ITB, both in the bid and in the Joint Venture Agreement. All entities that comprise the joint venture shall be subject to the eligibility and qualification assessment by UNDP. Where a joint venture is presenting its track record and experience in a similar undertaking as those required in the ITB, it should present such information in the following manner: a) Those that were undertaken together by the joint venture; and b) Those that were undertaken by the individual entities of the joint venture expected to be involved in the performance of the services defined in the ITB. Previous contracts completed by individual experts working privately but who are permanently or were temporarily associated with any of the member firms cannot be claimed as the experience of the joint venture or those of its members, but should only be claimed by the individual experts themselves in their presentation of their individual credentials. If the Bid of a joint venture is determined by UNDP as the most responsive Bid that offers the best value for money, UNDP shall award the contract to the joint venture, in the name of its designated lead entity, who shall sign the contract for and on behalf of all the member entities. 20. Alternative Bid Unless otherwise specified in the Data Sheet (DS nos. 5 and 6), alternative bid shall not be considered. Where the conditions for its acceptance are met, or justifications are clearly established, UNDP reserves the right to award a contract based on an alternative bid. 21. Validity Period 21.1 Bid shall remain valid for the period specified in the Data Sheet (DS no. 8), commencing on the submission deadline date also indicated in the Data Sheet (DS no. 21). A Bid valid for a shorter period shall be immediately rejected by UNDP and rendered non-responsive. 21.2 In exceptional circumstances, prior to the expiration of the Bid validity period, UNDP may request Bidders to extend the period of validity of their Bid. The request and the 11 responses shall be made in writing, and shall be considered integral to the Bid. 22. Bidder’s Conference When appropriate, a Bidder’s conference will be conducted at the date, time and location specified in the Data Sheet (DS no. 7). All Bidders are encouraged to attend. Non-attendance, however, shall not result in disqualification of an interested Bidder. Minutes of the Bidder’s conference will be either posted on the UNDP website, or disseminated to the individual firms who have registered or expressed interest with the contract, whether or not they attended the conference. No verbal statement made during the conference shall modify the terms and conditions of the ITB unless such statement is specifically written in the Minutes of the Conference, or issued/posted as an amendment in the form of a Supplemental Information to the ITB. D. SUBMISSION AND OPENING OF BID 23. Submission 23.1 The Technical Bid and the Price Schedule must be submitted together and sealed together in one and the same envelope, delivered either personally, by courier, or by electronic method of transmission. If submission will not be done by electronic means, the Technical Bid and Price Schedule must be sealed together in an envelope whose external side must : a) Bear the name of the Bidder; b) Be addressed to UNDP as specified in the Data Sheet (DS no.20); and c) Bear a warning not to open before the time and date for Bid opening as specified in the Data Sheet (DS no. 24). If the envelope is not sealed nor labeled as required, the Bidder shall assume the responsibility for the misplacement or premature opening of Bid due to improper sealing and labeling by the Bidder. 23.2 Bidders must submit their Bid in the manner specified in the Data Sheet (DS nos. 22 and 23). When the Bid is expected to be in transit for more than 24 hours, the Bidder must ensure that sufficient lead time has been provided in order to comply with UNDP’s deadline for submission. UNDP shall indicate for its record that the official date and time of receiving the Bid is the actual date and time when the said Bid has physically arrived at the UNDP premises indicated in the Data Sheet (DS no. 20). 23.3 Bidders submitting Bid by mail or by hand shall enclose the original and each copy of the Bid, in separate sealed envelopes, duly marking each of the envelopes as “Original Bid” and the others as “Copy of Bid”. The two envelopes, consisting of original and copies, shall then be sealed in an outer envelope. The number of copies required shall be as specified in the Data Sheet (DS no. 19). In the event of any discrepancy between the contents of the “Original Bid” and the “Copy of Bid”, the contents of the original shall govern. The original version of the Bid shall be signed or initialed by the Bidder or person(s) duly authorized to commit the Bidder on every page. The authorization shall be 12 communicated through a document evidencing such authorization issued by the highest official of the firm, or a Power of Attorney, accompanying the Bid. 23.4 Bidders must be aware that the mere act of submission of a Bid, in and of itself, implies that the Bidder accepts the General Contract Terms and Conditions of UNDP as attached hereto as Section 11. 24. Deadline for Submission of Bid and Late Bids Bid must be received by UNDP at the address and no later than the date and time specified in the Data Sheet (DS no. 20 and 21). UNDP shall not consider any Bid that arrives after the deadline for submission of Bid. Any Bid received by UNDP after the deadline for submission of Bid shall be declared late, rejected, and returned unopened to the Bidder. 25. Withdrawal, Substitution, and Modification of Bid 25.1 Bidders are expected to have sole responsibility for taking steps to carefully examine in detail the full consistency of its Bid to the requirements of the ITB, keeping in mind that material deficiencies in providing information requested by UNDP, or lack clarity in the description of goods and related services to be provided, may result in the rejection of the Bid. The Bidder shall assume any responsibility regarding erroneous interpretations or conclusions made by the Bidder in the course of understanding the ITB out of the set of information furnished by UNDP. 25.2 A Bidder may withdraw, substitute or modify its Bid after it has been submitted by sending a written notice in accordance with ITB Clause 23, duly signed by an authorized representative, and shall include a copy of the authorization (or a Power of Attorney). The corresponding substitution or modification of the Bid must accompany the respective written notice. All notices must be received by UNDP prior to the deadline for submission and submitted in accordance with ITB Clause 23 (except that withdrawal notices do not require copies). The respective envelopes shall be clearly marked “WITHDRAWAL,” “SUBSTITUTION,” or MODIFICATION”. 25.3 Bid requested to be withdrawn shall be returned unopened to the Bidders. 25.4 No Bid may be withdrawn, substituted, or modified in the interval between the deadline for submission of Bid and the expiration of the period of Bid validity specified by the Bidder on the Bid Submission Form or any extension thereof. 26. Bid Opening UNDP will open the Bid in the presence of an ad-hoc committee formed by UNDP of at least two (2) members. If electronic submission is permitted, any specific electronic Bid opening procedures shall be as specified in the Data Sheet (DS no. 23). 13 The Bidders’ names, modifications, withdrawals, the condition of the envelope labels/seals, the number of folders/files and all other such other details as UNDP may consider appropriate, will be announced at the opening. No Bid shall be rejected at the opening stage, except for late submission, for which the Bid shall be returned unopened to the Bidder. 27. Confidentiality Information relating to the examination, evaluation, and comparison of Bid, and the recommendation of contract award, shall not be disclosed to Bidders or any other persons not officially concerned with such process, even after publication of the contract award. Any effort by a Bidder to influence UNDP in the examination, evaluation and comparison of the Bid or contract award decisions may, at UNDP’s decision, result in the rejection of its Bid. In the event that a Bidder is unsuccessful, the Bidder may seek a meeting with UNDP for a debriefing. The purpose of the debriefing is discussing the strengths and weaknesses of the Bidder’s submission, in order to assist the Bidder in improving the bid presented to UNDP. The content of other bid and how they compare to the Bidder’s submission shall not be discussed. E. EVALUATION OF BID 28. Preliminary Examination of Bid UNDP shall examine the Bid to determine whether they are complete with respect to minimum documentary requirements, whether the documents have been properly signed, whether or not the Bidder is in the UN Security Council 1267/1989 Committee's list of terrorists and terrorist financiers, and in UNDP’s list of suspended and removed vendors, and whether the Bid are generally in order, among other indicators that may be used at this stage. UNDP may reject any Bid at this stage. 29. Evaluation of Bid 29.1 UNDP shall examine the Bid to confirm that all terms and conditions under the UNDP General Terms and Conditions and Special Conditions have been accepted by the Bidder without any deviation or reservation. 29.2 The evaluation team shall review and evaluate the Bids on the basis of their responsiveness to the Schedule of Requirements and Technical Specifications and other documentation provided, applying the procedure indicated in the Data Sheet (DS No. 25). Absolutely no changes may be made by UNDP in the criteria after all Bids have been received. 29.1 UNDP reserves the right to undertake a post-qualification exercise, aimed at determining, to its satisfaction the validity of the information provided by the Bidder. Such postqualification shall be fully documented and, among those that may be listed in the Data Sheet (DS No.33), may include, but need not be limited to, all or any combination of the following : a) Verification of accuracy, correctness and authenticity of the information provided by the 14 bidder on the legal, technical and financial documents submitted; b) Validation of extent of compliance to the ITB requirements and evaluation criteria based on what has so far been found by the evaluation team; c) Inquiry and reference checking with Government entities with jurisdiction on the bidder, or any other entity that may have done business with the bidder; d) Inquiry and reference checking with other previous clients on the quality of performance on on-going or previous contracts completed; e) Physical inspection of the bidder’s plant, factory, branches or other places where business transpires, with or without notice to the bidder; f) Testing and sampling of completed goods similar to the requirements of UNDP, where available; and g) Other means that UNDP may deem appropriate, at any stage within the selection process, prior to awarding the contract. 30. Clarification of Bid To assist in the examination, evaluation and comparison of bids, UNDP may, at its discretion, ask any Bidder to clarify its Bid. UNDP’s request for clarification and the Bidder’s response shall be in writing. Notwithstanding the written communication, no change in the prices or substance of the Bid shall be sought, offered, or permitted, except to provide clarification, and confirm the correction of any arithmetic errors discovered by UNDP in the evaluation of the Bid, in accordance with ITB Clause 35. Any unsolicited clarification submitted by a Bidder in respect to its Bid, which is not a response to a request by UNDP, shall not be considered during the review and evaluation of the Bid. 31. Responsiveness of Bid UNDP’s determination of a Bid’s responsiveness will be based on the contents of the Bid itself. A substantially responsive Bid is one that conforms to all the terms, conditions, and specifications of the ITB without material deviation, reservation, or omission. If a Bid is not substantially responsive, it shall be rejected by UNDP and may not subsequently be made responsive by the Bidder by correction of the material deviation, reservation, or omission. 32. Nonconformities, Reparable Errors and Omissions 32.3 Provided that a Bid is substantially responsive, UNDP may waive any non-conformities or omissions in the Bid that, in the opinion of UNDP, do not constitute a material deviation. 32.4 Provided that a Bid is substantially responsive, UNDP may request the Bidder to submit the necessary information or documentation, within a reasonable period of time, to rectify nonmaterial nonconformities or omissions in the Bid related to documentation requirements. Such omission shall not be related to any aspect of the price of the Bid. Failure of the Bidder to comply with the request may result in the rejection of its Bid. 15 32.5 Provided that the Bid is substantially responsive, UNDP shall correct arithmetical errors as follows: a) if there is a discrepancy between the unit price and the line item total that is obtained by multiplying the unit price by the quantity, the unit price shall prevail and the line item total shall be corrected, unless in the opinion of UNDP there is an obvious misplacement of the decimal point in the unit price, in which case the line item total as quoted shall govern and the unit price shall be corrected; b) if there is an error in a total corresponding to the addition or subtraction of subtotals, the subtotals shall prevail and the total shall be corrected; and c) if there is a discrepancy between words and figures, the amount in words shall prevail, unless the amount expressed in words is related to an arithmetic error, in which case the amount in figures shall prevail subject to the above. 32.6 If the Bidder does not accept the correction of errors made by UNDP, its Bid shall be rejected. F. AWARD OF CONTRACT 33. Right to Accept, Reject, or Render Non-Responsive Any or All Bid 33.1 UNDP reserves the right to accept or reject any Bid, to render any or all of the Bids as non-responsive, and to reject all Bids at any time prior to award of contract, without incurring any liability, or obligation to inform the affected Bidder(s) of the grounds for UNDP’s action. Furthermore, UNDP is not obligated to award the contract to the lowest price offer. 33.2 UNDP shall also verify, and immediately reject their respective Bid, if the Bidders are found to appear in the UN’s Consolidated List of Individuals and Entities with Association to Terrorist Organizations, in the List of Vendors Suspended or Removed from the UN Secretariat Procurement Division Vendor Roster, the UN Ineligibility List, and other such lists that as may be established or recognized by UNDP policy on Vendor Sanctions. (See http://www.undp.org/content/undp/en/home/operations/procurement/procurement_ protest/ 34. Award Criteria Prior to expiration of the period of Bid validity, UNDP shall award the contract to the qualified and eligible Bidder that is found to be responsive to the requirements of the Schedule of Requirements and Technical Specification, and has offered the lowest price (See DS No. 32). 35. Right to Vary Requirements at the Time of Award At the time of award of Contract, UNDP reserves the right to vary the quantity of the goods and/or related services, by up to a maximum twenty five per cent (25%) of the total offer, 16 without any change in the unit price or other terms and conditions. 36. Contract Signature Within fifteen (15) days from the date of receipt of the Contract, the successful Bidder shall sign and date the Contract and return it to UNDP. Failure of the successful Bidder to comply with the requirement of ITB Section F.3 and this provision shall constitute sufficient grounds for the annulment of the award, and forfeiture of the Bid Security if any, and on which event, UNDP may award the Contract to the Bidder with the second highest rated Bid, or call for new Bid. 37. Performance Security A performance security, if required, shall be provided in the amount and form provided in Section 9 and by the deadline indicated in the Data Sheet (DS no. 14), as applicable. Where a Performance Security will be required, the submission of the said document, and the confirmation of its acceptance by UNDP, shall be a condition for the effectivity of the Contract that will be signed by and between the successful Bidder and UNDP. 38. Bank Guarantee for Advanced Payment Except when the interests of UNDP so require, it is the UNDP’s preference to make no advanced payment(s) on contracts (i.e., payments without having received any outputs). In the event that the Bidder requires an advanced payment upon contract signature, and if such request is duly accepted by UNDP, and the said advanced payment exceeds 20% of the total Bid price, or exceed the amount of USD 30,000, UNDP shall require the Bidder to submit a Bank Guarantee in the same amount as the advanced payment. A bank guarantee for advanced payment shall be furnished in the form provided in Section 10. 39. Vendor Protest UNDP’s vendor protest procedure provides an opportunity for appeal to those persons or firms not awarded a purchase order or contract through a competitive procurement process. In the event that a Bidder believes that it was not treated fairly, the following link provides further details regarding UNDP vendor protest procedures: http://www.undp.org/procurement/protest.shtml 17 Instructions to Bidders DATA SHEET2 The following data for the supply of goods and related services shall complement / supplement the provisions in the Instruction to Bidders. In the case of a conflict between the Instruction to Bidders and the Data Sheet, the provisions in the Data Sheet shall prevail. DS No. Cross Ref. to Instructions Data Specific Instructions / Requirements 1 Project Title: ITB/NLDP/83642/MUL/01/01/2013 2 Title of Goods/Services/Work Required: Civil Works 3 Country: Sri Lanka Language of the Bid: ☐ English ☐ French Spanish ☐ Others (pls. specify) ________________________ Conditions for Submitting Bid for Parts or sub-parts of the Total Requirements ☐ Allowed [if yes, describe how, and ensure that requirements properly define the sub-parts] 4 5 C.13 C.20 ☐ ☐ Not allowed, no partial bidding 6 C.20 Conditions for Submitting Alternative Bid ☐ Shall not be considered ☐ Shall be considered. A Bidder may submit an alternative Bid, but only if it also submits a Bid that meets the base case (i.e., what is originally required by UNDP in this ITB). UNDP shall only consider the alternative bid offered by the Bidder whose Bid for the base case was determined to be a responsive Bid that offers the lowest price. 2 All DS number entries in the Data Sheet are cited as references in the Instructions to Bidders. All DS Nos. rd corresponding to a Data must not be modified. Only information on the 3 column may be modified by the user. If rd the information does not apply, the 3 column must state “n/a” but must not be deleted. 18 7 C.22 A pre-Bid conference will be held on: Location Scheduled time UNDP Field Office – Kilinochchi, Site Inspection No. 13 C, 2nd Farm Lane, 12th July, 2013, from Kanagapuram, Kilinochchi. 08.30 am to 09.30 am Tel : 021 228 5384 Contact person - S. Senthuran UNDP Field Office – Kilinochchi, Pre-bid Meeting No. 13 C, 2nd Farm Lane, 12th July, 2013 at Kanagapuram, Kilinochchi. 10.00 am Tel : 021 228 5384 Contact person - S. Senthuran The UNDP focal point for the arrangement is: Mr. Theeban Xavier Address: 12 Bagatale Road, Colombo 03 Telephone: 077 360 4100 E-mail: theeban.xavier@undp.org 8 C.21.1 9 B.9.5 C.15.4 b) Period of Bid Validity commencing on the submission date Bid Security ☐ 60 days ☐ 90 days ☐ 120 days ☐ Required Amount: LOT 1: LKR 280,000 Form: Bank Draft or Cashier Cheque ☐ Not Required 10 B.9.5 Acceptable forms of Bid Security 3 11 B.9.5 C.15.4 a) Validity of Bid Security ☐ Bank Guarantee (See Section 8 for template) ☐ Any Bank-issued Check / Cashier’s Check / Certified Check ☐ Other negotiable instrument ☐ Cash (exceptionally, if none of the other forms are feasible) ☐ Others [pls. specify] 120 days from the last day of Bid submission. 3 Surety bonds or other instruments issued by non-bank Financial Institutions are least preferred by UNDP. Unless stated otherwise, they shall be considered unacceptable to UNDP. 19 Bid Security of unsuccessful Bidders shall be returned. 12 Advanced Payment upon signing of contract ☐ Allowed up to a maximum of 20% of contract4 ☐ Not allowed 13 Liquidated Damages ☐ Will not be imposed ☐ Will be imposed under the following conditions: Percentage of contract price per week of delay 0.5% of contract value Max. no. of weeks of delay :20 weeks 14 F.37 Performance Security ☐ Required Amount :500,000 Form: Bank Guarantee ☐ Not Required 15 C.17 C.17.2 Preferred Currency of Bid and ☐ United States Dollars (US$) Method for Currency conversion ☐ Euro ☐ Local Currency Reference date for determining UN Operational Exchange Rate : Prevailing rate at the time 16 B.10.1 Deadline for submitting requests for clarifications/ questions 07 days before the submission date. 17 B.10.1 Contact Details for submitting clarifications/questions5 Focal Person in UNDP: Mr. Theeban Xavier Address:12 Bagatale Road, Colombo 03 E-mail address dedicated for this purpose: theeban.xavier@undp.org 18 B.11.1 Manner of Disseminating ☐ Direct communication to prospective 4 If the advanced payment that the Bidder will submit will exceed 20% of the Price Offer, or will exceed the amount of USD 30,000, the Bidder must submit an Advanced Payment Security in the same amount as the advanced payment, using the form and contents of the document in Section 10 5 This contact person and address is officially designated by UNDP. If inquiries are sent to other person/s or address/es, even if they are UNDP staff, UNDP shall have no obligation to respond nor can UNDP confirm that the query was officially received. 20 Bidders by email or fax ☐ Direct communication to prospective Bidders by email or fax, and Posting on the website6 [specify exact URL Address] No. of copies of Bid that must be submitted Original : 01 Copies : 01 Bid submission address Mr. Rohana Dissanayake Head of Procurement United Nations Development Programme 202-204 Bauddhaloka Mawatha Colombo 07 19 D.23.3 20 D.23.1 b) D.23.2 D.24 21 C.21.1 D.24 Deadline of Bid Submission Date and Time : July 26, 2013 2:00 PM 22 D.23.2 Manner of Submitting Bid ☐ Courier/Hand Delivery ☐ Electronic submission of Bid7 23 D.23.2 D.26 Conditions and Procedures for electronic submission and opening, if allowed ☐ Official Address for e-submission: [specify] ☐ Format : PDF files only, password protected ☐ Password must not be provided to UNDP until the date and time of Bid Opening as indicated in No. 24 ☐ Max. File Size per transmission: [specify] ☐ Max. No. of transmission : [specify] ☐ No. of copies to be transmitted : [specify] ☐ Mandatory subject of email : [specify] ☐ Virus Scanning Software to be Used prior to transmission: [specify] ☐ Digital Certification/Signature: [specify] ☐ Time Zone to be Recognized: [specify] ☐ Other conditions: [pls. specify] 24 D.23.1 c) Date, time and venue for opening of Bid Date and Time: July 26, 2013 2:30 PM Venue : UNDP Office, 202-204 Bauddhaloka Mawatha, Colombo 07 25 6 Supplemental Information to the ITB and responses/clarifications to queries Evaluation method to be used in ☐ Non-Discretionary “Pass/Fail” Criteria Posting on the website shall be supplemented by directly transmitting the communication to the prospective offerors. 7 If this will be allowed, security features (e.g., encryption, authentication, digital signatures, etc.) are strictly required and must be enforced to ensure confidentiality and integrity of contents. 21 26 C.15.1 selecting the most responsive Bid on the Technical Requirements; and ☐ Lowest price offer of technically qualified/responsive Bid Required Documents that must be Submitted to Establish Qualification of Bidders (In “Certified True Copy” form only) ☐ Company Profile, which should not [check all that apply, delete those that will not be required.] exceed fifteen (15) pages, including printed brochures and product catalogues relevant to the goods/services being procured ☐ Members of the Governing Board and their Designations duly certified by the Corporate Secretary, or its equivalent document if Bidder is not a corporation ☐ List of Shareholders and Other Entities Financially Interested in the Firm owning 5% or more of the stocks and other interests, or its equivalent if Bidder is not a corporation ☐ Tax Registration/Payment Certificate issued by the Internal Revenue Authority evidencing that the Bidder is updated with its tax payment obligations, or Certificate of Tax exemption, if any such privilege is enjoyed by the Bidder ☐ Certificate of Registration of the business, including Articles of Incorporation, or equivalent document if Bidder is not a corporation ☐ Trade name registration papers, if applicable ☐ Local Government permit to locate and operate in the current location of office or factory ☐ Official Letter of Appointment as local representative, if Bidder is submitting a Bid in behalf of an entity located outside the country ☐ Quality Certificate (e.g., ISO, etc.) and/or 22 other similar certificates, accreditations, awards and citations received by the Bidder, if any ☐Environmental Compliance Certificates, Accreditations, Markings/Labels, and other evidences of the Bidder’s practices which contributes to the ecological sustainability and reduction of adverse environmental impact (e.g., use of non-toxic substances, recycled raw materials, energy-efficient equipment, reduced carbon emission, etc.), either in its business practices or in the goods it manufactures ☐ Patent Registration Certificates, if any of technologies submitted in the Bid is patented by the Bidder ☐ Plan and details of manufacturing capacity, if Bidder is a manufacturer of the goods to be supplied ☐ Certification or authorization to act as Agent in behalf of the Manufacturer, or Power of Attorney, if bidder is not a manufacturer ☐ Latest Audited Financial Statement (Income Statement and Balance Sheet) including Auditor’s Report for the past [indicate number of years of reference] ☐ Statement of Satisfactory Performance from the Top [indicate number] Clients in terms of Contract Value the past [indicate number of years of reference] ☐ List of Bank References (Name of Bank, Location, Contact Person and Contact Details) 23 ☐ All information regarding any past and current litigation during the last five (5) years, in which the bidder is involved, indicating the parties concerned, the subject of the litigation, the amounts involved, and the final resolution if already concluded. 27 Other documents that may be Submitted to Establish Eligibility 28 C.15 Structure of the Technical Bid and List of Documents to be Submitted [Click here to insert list] 29 C.15.2 Latest Expected date for commencement of Contract August 15, 2013 30 C.15.2 Maximum Expected duration of contract To be Decided with Consultation with Contractor UNDP will award the contract to: ☐ One Bidder only ☐ One or more Bidders, depending on the following factors : [Bids may be awarded to one or more bidders based on LOT eligibility. In the event, one bidder is technically qualified and offers lowest bid for all three LOTS, this lowest bidder will be awarded all three LOTS] Criteria for the Award and Evaluation of Bid Award Criteria ☐ Non-discretionary “Pass” or “Fail” rating on the detailed contents of the Schedule of Requirements and Technical Specifications ☐ Compliance on the following qualification requirements : Bid Evaluation Criteria8 ☐ Minimum no. of years of experience in similar contracts: [indicate number]; ☐ Minimum annual turnover of [indicate amount and currency] for the past [indicate number of 31 32 8 N/app F.34 Pls. reconcile and ensure consistency with the contents of the Technical Specifications 24 years of reference]; ☐ Current ratio of not less than 1.0 [modify if a higher number is required]; ☐ Net Working Capital of [indicate amount and currency] for the past [indicate number of years of reference]; ☐ Minimum no. of similar projects undertaken over the past 3 years [indicate number]; ☐ Highest value of contract over the past 5 years [indicate number]; ☐ Full compliance of Bid to the Technical Requirements; ☐ Quality Inspection and Testing Certificates for the goods to be supplied; ☐ After-sales service of at least [indicate number]; ☐ Lowest Operating Costs Evidenced by a Table of Consummables, Rate of Consumption, and Unit Price; ☐ Warranty on parts and services for a minimum period of [indicate number]; ☐ User’s Training for a minimum of [indicate number of persons] to be conducted at [indicate location] for a period of [indicate duration]; ☐ Maximum percentage of supply/work that will be sub-contracted [indicate percentage]; ☐ Acceptability of the Transportation/Delivery Schedule; ☐ Appropriateness of the Implementation Timetable to Project Schedule; ☐ Qualification of the Team Leader to directly coordinate with UNDP [specify details]; ☐ Qualification of all other personnel to be assigned to the contract [specify details] ☐ Others [pls. specify and list further] 33 E.29 Post qualification Actions ☐ Verification of accuracy, correctness and authenticity of the information provided by the bidder on the legal, technical and financial documents submitted; ☐ Validation of extent of compliance to the ITB requirements and evaluation criteria based on what has so far been 25 found by the evaluation team; ☐ Inquiry and reference checking with Government entities with jurisdiction on the bidder, or any other entity that may have done business with the bidder; ☐ Inquiry and reference checking with other previous clients on the quality of performance on ongoing or previous contracts completed; ☐ Physical inspection of the bidder’s plant, factory, branches or other places where business transpires, with or without notice to the bidder; ☐ Testing and sampling of completed goods similar to the requirements of UNDP, where available; and ☐ Others [click here to specify] 9 34 Conditions for Determining Contract Effectivity 35 Other Information Related to the ITB9 ☐ UNDP’s receipt of Performance Bond [All other instructions and information not mentioned in DSs 1-33 but are relevant to the ITB must be cited here, and any further entries that may be added below this table row.] Where the information is available in the web, a URL for the information may simply be provided. 26 Section 4: Bid Submission Form10 (This should be written in the Letterhead of the Bidder. Except for indicated fields, no changes may be made in this template.) Sri Lanka 7/5/2013 To: Rohana Dissanayake, Head of Procurement Dear Sir/Madam: We, the undersigned, hereby offer to supply the goods and related services required for NLDP/83642/MUL-01/JAF-2A/JAF-2B/2013in accordance with your Invitation to Bid dated June 14, 2013. We are hereby submitting our Bid, which includes the Technical Bid and Price Schedule. We hereby declare that : a) All the information and statements made in this Bid are true and we accept that any misrepresentation contained in it may lead to our disqualification; b) We are currently not on the removed or suspended vendor list of the UN or other such lists of other UN agencies, nor are we associated with, any company or individual appearing on the 1267/1989 list of the UN Security Council; c) We have no outstanding bankruptcy or pending litigation or any legal action that could impair our operation as a going concern; and d) We do not employ, nor anticipate employing, any person who is or was recently employed by the UN or UNDP. We confirm that we have read, understood and hereby fully accept the Schedule of Requirements and Technical Specifications describing the duties and responsibilities required of us in this ITB, and the General Terms and Conditions of UNDP’s Standard Contract for this ITB. We agree to abide by this Bid for 120 days. We undertake, if our Bid is accepted, to initiate the supply of goods and provision of related services not later than the date indicated in the Data Sheet. We fully understand and recognize that UNDP is not bound to accept this Bid, that we shall bear all costs associated with its preparation and submission, and that UNDP will in no 10 No deletion or modification may be made in this form. Any such deletion or modification may lead to the rejection of the Bid. 27 case be responsible or liable for those costs, regardless of the conduct or outcome of the evaluation. We remain, Yours sincerely, Authorized Signature [In full and initials]: Name and Title of Signatory: Name of Firm: Contact Details: [please mark this letter with your corporate seal, if available] 28 Section 5: Documents Establishing the Eligibility and Qualifications of the Bidder Bidder Information Form11 Date: [insert date (as day, month and year] of Bid Submission] ITB No.: [insert number of bidding process] Page ________of ________ pages 1. Bidder’s Legal Name [insert Bidder’s legal name] 2. In case of Joint Venture (JV), legal name of each party: [insert legal name of each party in JV] 3. Actual or intended Country/ies of Registration/Operation: [insert actual or intended Country of Registration] 4. Year of Registration in its Location: [insert Bidder’s year of registration] 5. Countries of Operation 6. No. of staff in each Country 7.Years of Operation in each Country 8. Legal Address/es in Country/ies of Registration/Operation:[insert Bidder’s legal address in country of registration] 9. Value and Description of Top three (3) Biggest Contract for the past five (5) years 10. Latest Credit Rating (Score and Source, if any) 11. Brief description of litigation history (disputes, arbitration, claims, etc.), indicating current status and outcomes, if already resolved. 12. Bidder’s Authorized Representative Information Name: [insert Authorized Representative’s name] Address: [insert Authorized Representative’s Address] Telephone/Fax numbers: [insert Authorized Representative’s telephone/fax numbers] Email Address: [insert Authorized Representative’s email address] 13. Are you in the UNPD List 1267.1989 or UN Ineligibility List ? ☐ YES or ☐ NO 11 The Bidder shall fill in this Form in accordance with the instructions. Apart from providing additional information, no alterations to its format shall be permitted and no substitutions shall be accepted. 29 14. Attached are copies of original documents of: ☐ All eligibility document requirements listed in the Data Sheet ☐ If Joint Venture/Consortium – copy of the Memorandum of Understanding/Agreement or Letter of Intent to form a JV/Consortium, or Registration of JV/Consortium, if registered ☐ If case of Government corporation or Government-owned/controlled entity, documents establishing legal and financial autonomy and compliance with commercial law. Joint Venture Partner Information Form (if Registered)12 Date: [insert date (as day, month and year) of Bid Submission] ITB No.: [insert number of bidding process] Page ________ of ________ pages 1. Bidder’s Legal Name: [insert Bidder’s legal name] 2. JV’s Party legal name: [insert JV’s Party legal name] 3. JV’s Party Country of Registration: [insert JV’s Party country of registration] 4. Year of Registration: [insert Party’s year of registration] 5. Countries of Operation 6. No. of staff in each Country 7.Years of Operation in each Country 8. Legal Address/es in Country/ies of Registration/Operation: [insert Party’s legal address in country of registration] 9. Value and Description of Top three (3) Biggest Contract for the past five (5) years 10. Latest Credit Rating (if any) :Click 1. 12 here to enter text. Brief description of litigation history (disputes, arbitration, claims, etc.), indicating current status and outcomes, if already resolved. Click here to enter text. The Bidder shall fill in this Form in accordance with the instructions . Apart from providing additional information, alterations to its format shall be permitted and no substitutions shall be accepted. no 30 13. JV’s Party Authorized Representative Information Name: [insert name of JV’s Party authorized representative] Address: [insert address of JV’s Party authorized representative] Telephone/Fax numbers: [insert telephone/fax numbers of JV’s Party authorized representative] Email Address: [insert email address of JV’s Party authorized representative] 14. Attached are copies of original documents of: [check the box(es) of the attached original documents] ☐ All eligibility document requirements listed in the Data Sheet ☐ Articles of Incorporation or Registration of firm named in 2. ☐ In case of government owned entity, documents establishing legal and financial autonomy and compliance with commercial law. Section 6: Technical Bid Form13 INSERT TITLE OF THE ITB Name of Bidding Organization / Firm: Country of Registration: Name of Contact Person for this Bid: Address: Phone / Fax: Email: SECTION 1: EXPERTISE OF FIRM/ ORGANISATION This section should fully explain the Bidder’s resources in terms of personnel and facilities necessary for the performance of this requirement. 1.1 Brief Description of Bidder as an Entity: Provide a brief description of the organization / firm submitting the Bid, its legal mandates/authorized business activities, the year and country of incorporation, and approximate annual budget, etc. Include reference to reputation, or any history of litigation and arbitration in which the organisation / firm has been involved that could adversely affect or impact the delivery of goods and/or performance of related services, indicating the status/result of such litigation/arbitration. 1.2. Financial Capacity: Based on the latest Audited Financial Statement (Income Statement and Balance Sheet) describe the financial capacity (liquidity, stand-by credit lines, etc.) of the bidder to engage into the contract. Include any indication of credit rating, industry rating, etc. 1.3. Track Record and Experiences: Provide the following information regarding corporate experience within at least the last five (5) years which are related or relevant to those required for this Contract. 13 Technical Bids not submitted in this format may be rejected. 31 Name of project Client Contract Value Period of activity Types of activities undertaken Status or Date Completed References Contact Details (Name, Phone, Email) SECTION 2 - SCOPE OF SUPPLY, TECHNICAL SPECIFICATIONS, AND RELATED SERVICES This section should demonstrate the Bidder’s responsiveness to the specification by identifying the specific components proposed, addressing the requirements, as specified, point by point; providing a detailed description of the essential performance characteristics proposed; and demonstrating how the proposed bid meets or exceeds the specifications. 2.1. Scope of Supply: Please provide a detailed description of the goods to be supplied, indicating clearly how they comply with the technical specifications required by the ITB (see below table); describe how the organisation/firm will supply the goods and any related services, keeping in mind the appropriateness to local conditions and project environment. Item No. Description/ Specification of Goods Source/ Manufacturer Country of Origin Qty Quality Certificate/ Export Licences, etc. (indicate all that applies and if attached) A supporting document with full details may be annexed to this section 2.2. Technical Quality Assurance Mechanisms: The bid shall also include details of the Bidder’s internal technical and quality assurance review mechanisms, all the appropriate quality certificates, export licenses and other documents attesting to the superiority of the quality of the goods and technologies to be supplied. 2.3. Reporting and Monitoring: Please provide a brief description of the mechanisms proposed for this project for reporting to the UNDP and partners, including a reporting schedule. 2.4. Subcontracting: Explain whether any work would be subcontracted, to whom, how much percentage of the work, the rationale for such, and the roles of the proposed sub-contractors. Special attention should be given to providing a clear picture of the role of each entity and how everyone will function as a team. 2.5. Risks / Mitigation Measures: Please describe the potential risks for the implementation of this project that may impact achievement and timely completion of expected results as well as their quality. Describe measures that will be put in place to mitigate these risks. 2.6 Implementation Timelines: The Bidder shall submit a Gantt Chart or Project Schedule indicating the detailed sequence of activities that will be undertaken and their corresponding timing. 2.7. Partnerships (Optional): Explain any partnerships with local, international or other organizations that are planned for the implementation of the project. Special attention should be given to providing a clear picture 32 of the role of each entity and how everyone will function as a team. Letters of commitment from partners and an indication of whether some or all have successfully worked together on other previous projects is encouraged. 2.8. Anti-Corruption Strategy (Optional): Define the anti-corruption strategy that will be applied in this project to prevent the misuse of funds. Describe the financial controls that will be put in place. 2.9 Statement of Full Disclosure: This is intended to disclose any potential conflict in accordance with the definition of “conflict” under Section 4 of this document, if any. 2.10 Other: Any other comments or information regarding the bid and its implementation. 33 SECTION 3: PERSONNEL 3.1 Management Structure: Describe the overall management approach toward planning and implementing the contract. Include an organization chart for the management of the contract, if awarded. 3.2 Staff Time Allocation: Provide a spreadsheet will be included to show the activities of each personnel involved in the implementation of the contract. Where the expertise of the personnel is critical to the success of the contract, UNDP will not allow substitution of personnel whose qualifications had been reviewed and accepted during the bid evaluation. (If substitution of such a personnel is unavoidable, substitution or replacement will be subject to the approval of UNDP. No increase in costs will be considered as a result of any substitution). 3.3 Qualifications of Key Personnel. Provide the CVs for key personnel (Team Leader, Managerial and general staff) that will be provided to support the implementation of this project. CVs should demonstrate qualifications in area of expertise relevant to the Contract. Please use the format below: Name: Role in Contract Implementation: Nationality: Contact information: Countries of Relevant Work Experience: Language Skills: Education and other Qualifications: Summary of Experience: Highlight experience in the region and on similar projects. Relevant Experience (From most recent): Period: From – To Name of activity/ Project/ funding Job Title and Activities organisation, if applicable: undertaken/Description of actual role performed: e.g. June 2010-January 2011 Etc. Etc. References (minimum of 3): Name Designation Organization Contact Information – Address; Phone; Email; etc. Declaration: I confirm my intention to serve in the stated position and present availability to serve for the term of the proposed contract. I also understand that any wilful misstatement described above may lead to my disqualification, before or during my engagement. _________________________________________________ __________________________ Signature of the Nominated Team Leader/Member Date Signed 34 Section 7: FORM FOR BID SECURITY (This must be finalized using the official letterhead of the Issuing Bank. Except for indicated fields, no changes may be made in this template.) To: UNDP [Insert contact information as provided in Data Sheet] WHEREAS [name and address of Contractor] (hereinafter called “the Bidder”) has submitted a Bid to UNDP dated Click here to enter a date. , to deliver goods and execute related services for [indicate ITB title] (hereinafter called “the Bid”): AND WHEREAS it has been stipulated by you that the Bidder shall furnish you with a Bank Guarantee by a recognized bank for the sum specified therein as security in the event that the Bidder: a) b) c) d) Fails to sign the Contract after UNDP has awarded it; Withdraws its Bid after the date of the opening of the Bid; Fails to comply with UNDP’s variation of requirement, as per ITB Section F.3; or Fails to furnish Performance Security, insurances, or other documents that UNDP may require as a condition to rendering the contract effective. AND WHEREAS we have agreed to give the Bidder such this Bank Guarantee: NOW THEREFORE we hereby affirm that we are the Guarantor and responsible to you, on behalf of the Bidder, up to a total of [amount of guarantee] [in words and numbers], such sum being payable in the types and proportions of currencies in which the Price Bid is payable, and we undertake to pay you, upon your first written demand and without cavil or argument, any sum or sums within the limits of [amount of guarantee as aforesaid] without your needing to prove or to show grounds or reasons for your demand for the sum specified therein. This guarantee shall be valid until a date 30 days from the date of validity of the bids SIGNATURE AND SEAL OF THE GUARANTOR BANK Date ....................................................................................................................... Name of Bank ......................................................................................................... Address ................................................................................................................. 35 Section 8: FORM FOR PERFORMANCE SECURITY14 (This must be finalized using the official letterhead of the Issuing Bank. Except for indicated fields, no changes may be made in this template.) To: UNDP [Insert contact information as provided in Data Sheet] WHEREAS [name and address of Contractor] (hereinafter called “the Contractor”) has undertaken, in pursuance of Contract No. Click to enter dated Click to enter , to deliver the goods and execute related services Click here to enter text. (hereinafter called “the Contract”): AND WHEREAS it has been stipulated by you in the said Contract that the Contractor shall furnish you with a Bank Guarantee by a recognized bank for the sum specified therein as security for compliance with his obligations in accordance with the Contract: AND WHEREAS we have agreed to give the Contractor such a Bank Guarantee: NOW THEREFORE we hereby affirm that we are the Guarantor and responsible to you, on behalf of the Contractor, up to a total of [amount of guarantee] [in words and numbers], such sum being payable in the types and proportions of currencies in which the Contract Price is payable, and we undertake to pay you, upon your first written demand and without cavil or argument, any sum or sums within the limits of [amount of guarantee as aforesaid] without your needing to prove or to show grounds or reasons for your demand for the sum specified therein. This guarantee shall be valid until a date 30 days from the date of issue by UNDP of a certificate of satisfactory performance and full completion of services by the Contractor. SIGNATURE AND SEAL OF THE GUARANTOR BANK Date ....................................................................................................................... Name of Bank ......................................................................................................... Address ................................................................................................................. 14 If the RFP requires the submission of a Performance Security, which shall be made a condition to the signing and effectivity of the contract, the Performance Security that the Bidder’s Bank will issue shall use the contents of this template 36 Section 10: Form for Advanced Payment Guarantee15 (This must be finalized using the official letterhead of the Issuing Bank. Except for indicated fields, no changes may be made in this template.) _____________________________ [Bank’s Name, and Address of Issuing Branch or Office] Beneficiary: _________________ [Name and Address of UNDP] Date: ________________ ++++++++++++++ ADVANCE PAYMENT GUARANTEE No.: _________________ We have been informed that [name of Company] (hereinafter called "the Contractor") has entered into Contract No. [reference number of the contract] dated [insert: date] with you, for the provision of [brief description of ITB requirements] (hereinafter called "the Contract"). Furthermore, we understand that, according to the conditions of the Contract, an advance payment in the sum of [amount in words] ([amount in figures]) is to be made against an advance payment guarantee. At the request of the Contractor, we [name of Bank] hereby irrevocably undertake to pay you any sum or sums not exceeding in total an amount of [amount in words] ([amount in figures])16 upon receipt by us of your first demand in writing accompanied by a written statement stating that the Contractor is in breach of its obligation under the Contract because the Contractor has used the advance payment for purposes other than toward providing the goods and related services under the Contract. It is a condition for any claim and payment under this guarantee to be made that the advance payment referred to above must have been received by the Contractor on its account number ___________ at [name and address of Bank]. The maximum amount of this guarantee shall be progressively reduced by the amount of the advance payment repaid by the Contractor as indicated in copies of certified monthly statements which shall be presented to us. This guarantee shall expire, at the latest, upon our receipt of the monthly payment certificate indicating that the Consultants have made full repayment of the amount of the advance payment, or on the __ day of ___________, 2___, 20__ whichever is earlier. Consequently, any demand for payment under this guarantee must be received by us at this office on or before that date. This guarantee is subject to the Uniform Rules for Demand Guarantees, ICC Publication No. 458. _____________________ [signature(s)] 15 This Guarantee shall be required if the Contractor will require advanced payment of more than 20% of the contract amount, or if the absolute amount of the advanced payment required will exceed the amount of USD 30,000, or its equivalent if the price offer is not in USD, using the exchange rate stated in the Data Sheet. The Contractor’s Bank must issue the Guarantee using the contents of this template. 16 The Guarantor Bank shall insert an amount representing the amount of the advanced payment and denominated either in the currency/ies of the advanced payment as specified in the Contract. 37 Note: All italicized text is for indicative purposes only to assist in preparing this form and shall be deleted from the final product. 38 Annex 1.1.1 SCOPE OF WORKS LOT 1: NLDP/83642/MUL/01/01/2013 1. Scope of Work NLDP/83642/MUL/01/D: The scope of the work is to reconstruct the paddy processing centre (rice mill) at Oddankulam in Manthai East Divisional Secretariat Division, Mullaitivu District. The Buildings will have 8450.00 Sq.ft of floor area. The buildings have to be reconstructed with reference to the attached drawing and bill of quantities. The contractor shall make use of the labour of the local community by paying daily wages while the contractor attends to the other works with the project and should mobilize the total resources and implement the project in accordance with the bill of quantity and technical guidelines provided by UNDP. Also note that the industrial cum domestic wiring component will be done at the time of the installation of machineries. 2. Topography of Sites NLDP/83642/MUL/01/D: This work site is located in Oddankulam which is situated in Mul/14(Ponnagar) under the administrative area of Manthat East Divisional Secretariat Division in Mullaitivu. Mul/14 Ponnagar consists three villages namely Ponnahar West, Muriyakulam and Oddankulan. Oddankulam is located around 74 km from Mullaitivu Town, 26 Km from Mankulam A9 road junction and 7 Km from Malavi Town. Travel by public transport takes around 4 hours to reach Mullaitivu town and 2 hours to Mankulam. Malavi is the closest business centre for the villagers in the division which is around 7 Km. Ponnagar is bordering Poovarasankulam on the East, Thunukai on the West, Vinayahapuram on the North and Siraddikkulam on the South. 3. Bill of Quantities/Technical Specifications The Bill of Quantities is attached herewith. The Contractor shall adhere to the standard UNDP regulations / ICTAD “Specifications for Building Works” and all contractors should have minimum of C5/M4 /M4 level of ICTAD registration in the field of Building. 4. Construction Design Drawings The Design Drawings are attached herewith. 5. Site Plans/Locations The site plan/existing building pictures with exact location of project site is attached herewith. The contractor can visit the exact project location before the submission of bid. 6. Period of Implementation Five (05) months will be given to implement the project from the date of sign the contract. ANNEX 1.2.1 PRICING PREAMBLES (GENERAL) 1. The bidder should allow against the items or in the prices for everything contained in this Bill of Quantities which has a monetary value. 2. Lump sums shall not be given where unit rates are applicable. 3. Unit rates and extensions shall be given in Sri Lankan Rupees (SLR) to a maximum of two places decimals. 4. The various documents collectively referred to herein as the Bills of Quantities jointly constitute the Bill of Quantities referred to in the Conditions of Contract. 5. The method adopted in the preparation of bills of quantities shall be adopted for remeasurement of completed works. 6. Works have been measured net as fixed in position and each measurement shall be taken to the nearest 10millimeters. 7. Items in the preamble section of this bill of quantities are deemed to qualify and to form part of every description of measured work to which they refer including composite items. 8. The Contractor shall not use this-Bill of Quantities as a Construction programme or for the purposes of ordering materials or arranging Sub-Contracts. The references for these activities shall be the drawings, specifications and instructions issued by the Engineer. 9. The descriptions in the Bills of Quantities are for identification purposes only and the Contractor is referred to the Drawings, Specifications and Schedules for complete information regarding all relevant descriptions, quality, dimensions, capacities, design parameters and the like. 10. These pricing preambles are a standard and comprehensive set and hence may exceed the requirements of this particular project. 11. The Quantities given in the Bill of Quantities are estimated only and are intended to give an indication of the extent of the work to be carried out. Payment will however be made on Measure and pay basis. 12. The Quantities set out in the Bill of Quantities are provisional and cover the approximate scope of the work, which is anticipated to be performed by the Contractor. 13. The rates and prices entered in the Bill of Quantities shall, except in so far as it is otherwise provided under the Contract include cost of all constructional plant, supervision, materials erection and maintenance, duties/levies together with all general risks, liabilities and obligations as set out or implied in the Contract. 14. The rate or price shall be entered against each item in the Bill of Quantities, whether quantities are stated or not. The cost of items against which Contractor has failed to enter rate or prices shall be deemed to be covered in other rates and prices in the Bill of Quantities. 15. The whole cost of complying with the provisions of the Contract shall be included in the items provided in the Bill of Quantities and where no items are provided the cost shall be deemed to be distributed among the rates and prices entered for the related items of work. 16. General directions and descriptions of work and materials are not necessarily repeated nor summarized in the Bill of Quantities. Reference to the relevant sections of the Contract Document shall be made before entering prices each against item in the priced Bill of Quantities. 1 17. Provisional sums included and so designated in the Bill of Quantities shall be expended in whole or part at the direction and discretion of the Engineer in accordance with the stipulation made under General Conditions of Contract and/or Particular Conditions of Contract. 18. Where the determination for payment purposes of the quantity of any item of work depends upon the measurement of existing features or ground levels and the like, then prior to carrying out any operations which might affect such measurement, the Contractor shall first take such levels and measurements as the Engineer may direct and, after the Engineer has had the opportunity to check the same, they shall be certified as agreed by both the Engineer and the Contractor. In the event that the Contractor fails to observe the above procedure, the Engineer shall determine the quantity to be assumed for payment purposes using the best information available to him, and his decision in the matter shall be final. 19. Tenderer should visit the site and acquaint themselves with all existing conditions, the nature and extent of work to be done under this contract ascertaining the conditions governing access to the site, the extent of work and accordingly include for, in their prices 20. The following abbreviations are used in the Bill of Quantities and shall carry the meanings as listed hereunder: Sqft - Square feet cm - Centimetre L.Ft - Linear feet Sqrs - Squares Millimetre mm m - Liner meter 2 - square meter 3 m - cubic meter kg - Kilogram t - metric ton pr - Pair nr - Number hr - Hour P.S. - Provisional sum BOQ - Bills of Quantities BS - British Standard m Prices also deemed to include: 1. Rate shall be comprehensive and include for the following: a) All obligations imposed by the Contract. b) Complying in every respect with the requirements and the consideration of the specifications and drawings. c) All considerations arising from the definitions incorporated into each preamble section. d) Labour for fixing and all associated costs. 2 e) Materials and goods & all associated costs. f) Fixing and or fixing materials and goods in any position, hoisting to any height. g) Use of scaffolding, plant, equipment and tools h) Any additional labour usually associated with measured items. i) All necessary protection of the works, removing all casings and temporary coverings and making good and clearing away upon completion. 2. All measurements are net and the rates shall include for laps, waste, working space and trade or traditional allowances 3. The pricing of materials shall take account of the following: a) Pricing Preambles, Drawings and Specifications shall apply reciprocally between sections of the works unless otherwise described. b) Materials shall be of the best quality available unless otherwise described. c) All materials shall be transported, handled, stored and fixed in accordance with the printed instructions or recommendations of their manufacturer or suppliers. d) Protection of completed work, all casing and temporary coverings and making good and clearing away upon completion. Building paper, damp proof membrane, quilts and all non-rigid sheet materials shall include cutting or forming holes and notchings and-extra labour of turning up at edges and the like. 4. Duct shall include draw wires. 5. Holes, mortices, pockets, grooves, chases and the like and items described as "built in" and "cast in" shall include making in its fullest sense and through, around, into, over and up to the items concerned. ' 6. Items described as "cut" shall include general making good similarly. 7. Where the word "allow" is used the cost of the items shall be the responsibility of the Contractor. 8.The Contractor shall obtain from all sub-contractors (where nominated or not) their requirements for all recesses, chases, holes and the like in order that they may be built in or formed as the work proceeds. No additional charges shall be allowed for cutting recesses, chases and holes and the like after the construction of the works. 9. In the event of their being any discrepancies between details on drawings, descriptions in specifications and descriptions in the bills of quantities then the rates and pricing shall be deemed to relate to the documents order of precedence set out in the Form of Agreement. 10. The amounts set against any items of profit shall include for all costs in connection with letters of credit, bank charges, interest charges and insurance after the materials come under the control of the Contractor. 11. The contractor should leave the whole of the works ready for immediate occupation to the satisfaction of the Engineer including the following: a) Cleaning and touching up the buildings both inside and out, leaving all surfaces free of cracks, blemishes or splashes. b) Easing, oiling and adjusting and making good of finishes to all fittings, doors, windows, ironmongery and the like. c) Cleaning and polishing all marbles, glasses, anodized aluminium and sanitary ware, including the removal of all protective coverings, paint splashes and the like. Replacement of all or any chipped, cracked or broken items. 3 d) Balancing of air conditioning installation where applicable e) Removal of rubbish, debris or excess spoil from the site area and raking over and cleaning all unused parts of the site area. Fix Only: The expression "fix only" used in these Bills of Quantities means that the Contractor shall provide the following facilities: a) Fixing shall be understood to include unloading, storing, distributing and hoisting the goods and materials. b) Supplying full size templates, giving and "marking dimensions and taking responsibility for their accuracy. c) Getting in, protecting, handling, distributing and placing in position and assembling as required. d) Casing-up and protection, including clearing away protection on completion of the works including sub-contractors' works e) Full costs of replacement of any items, which are damaged, broken, lost or stolen after the acceptance of the items from the supplier or Employer and until handing over the complete works. f) Other necessary and usual facilities and documentation. Supply Only: The expression "Supply only" used in these Bills of Quantities means that the Contractor is provide for everything as defined in relevant method of measurement in connection with such items .except fixing in position. Supply only" shall further include: a) Labour and all associated costs b) Materials, goods and all associated costs c) Provision of plants d) Temporary works e) Establishment charges, overheads and profits 1. SITE-PREPARATION: 1.1 Extent of site clearing shall be determined by the Engineer. No payment shall be made for additional quantities unless the Engineer expressly required. 1.2 No trees shall be removed without consent of the Engineer. 2. EXCAVATION & EARTHWORKS 2.1 Prices also to include: Rates for excavation shall be deemed to include for the following. a) Excavating by whatever means are necessary including hand excavation in any kind of ground except rock and boulder rock. b) Leveling bottom of excavations. c) Trimming or grading ground to produce level surfaces or surfaces to falls or slopes. d) Compacting to bottom of excavation and to filled surfaces e) Keeping free from water including any dewatering as necessary. f) Any hand excavation required around existing services or the like. 4 g) Testing the bottom of excavations for foundations as instructed. h) Testing compaction on filled surfaces where necessary i) Backfilling with selected excavated material unless measured otherwise. j) Removing surplus excavated material from the site and dumping at approved location. Contractor shall arrange and obtain necessary permission from relevant authorities for disposal and dumping of earth. k) Contractor shall provide' due protection to avoid any damages to temporary work, any new or old structures during excavation. l) Necessary Planking and strutting m) Working space if required n) Bulking after excavation. o) Excavating at any height or any depth 2.2 The rates for excavation of trenches for services, pipes or drain pipes shall include for deepening and widening as necessary to enable the barrels of pipes, ducts, etc., to rest on firm ground and to facilitate jointing: 2.3 The rates for items of imported fillings, graded gravel fillings etc, shall include for: a) Leveling and compacting as required by the specification b) Grading to slopes and falls c) Special compacting to form vertical or battering faces d) Forming sinking 2.4 Volume of excavation for pile cap shall be measured as shown in drawings, but deduction shall be made for the volume, already excavated for pile hacking under previous contract. 2.5 The rate for filling with excavated material is deemed to include for using existing excavated material at the site. 2.6 Excavating top soil is carried out, if the Engineer expressly required only. 2.7 Contractor shall provide 10 years guarantee for anti-termite treatment. ROCK EXCAVATION Rates for rock excavation shall be strictly as per specifications and to be priced accordingly. Rates for rock excavation shall include for whole process as per specifications and leveling of the bottom etc., by using approved equipment. The contractor shall forward the method statement and obtain prior approval from the Engineer. Rate shall include for cart away weathered rock to waste as directed. Useful hard rock can be used for construction work with price adjustment, or delivered to the officer in charge. 3. CONCRETE WORK 3.1Concrete: 3.1.1 The rates for concrete works shall include for the following: 5 a) Concrete test cubes as instructed by the Engineer and testing costs b) Rate shall include for plant for mixing, handling, hoisting, depositing, compacting, vibrating, curing and making good after removal of formwork. c) Forming construction joints or the like d) Forming joints between new concrete and existing concrete unless otherwise measured separately. e) Shuttering to sloping upper surfaces not exceeding 15 degrees from horizontal g) All necessary keys to concrete surfaces to receive in-situ finishes (h)All costs in connection with the construction of "kickers” (i) Providing admixtures if required j) The rates for blinding shall include for the following. i) All necessary shuttering to edges or extra volume of concrete used in lieu of formwork. ii) Forming sloping upper surfaces where required. 3.1.2 All concrete works shall comply with the relevant specifications, filled into formwork and well packed around reinforcement. 3.1.3 Item for ground slab is deemed to include for thickening for partition walls 3.1.4 Concrete items are deemed to include projections, nibs, fillets and external splays 3.1.5 Concrete in suspended slabs is deemed to include up stand curbs 3.2 Formwork 3.2.1 The rates for formwork shall include for the following: a) b) c) d) e) f) g) h) i) j) k) All cutting and waste including raking, curved or circular cutting. Setting up strutting and supporting at any height above the structure subject to any limitations imposed by the Engineer including all props, stays, struts, wedges and bolts etc. Coating of shutter oil Easing; striking, removing and cleaning the surface of concrete. Overlaps and passings at angles and labour at intersections Shortening struts or shapes and re-strutting or re-shoring where required. Rubbing down, filling and making good the surface of concrete after removal of shuttering. Cutting or notching shutters or moulds to in-situ or precast concrete around projecting reinforcement. Scaffolding if necessary Formwork has been measured the net contact surface between concrete and formwork. Formwork to beams, columns and casings deemed to include ends. 3.2.2 The rates for wrought shuttering/ shuttering to produce a special finish shall include for the following. a) Any necessary rubbing down or filling allowed by the specification to produce the finish required. b) Cutting out and re-casting unsatisfactory work or work not fulfilling the requirement of the specification or carrying out remedial or any other work required by the Engineer as an alternative to cutting out substandard work 3.3 Reinforcement 3.3.1 The rates for bar reinforcement shall include for the following: a) Positioning and protecting starter bars 6 b) Straightening (if required), cutting to length and bending reinforcement to required shape. c) Cleaning and wire brushing d) Supporting in position (chairs etc) during concreting (excluding links and stirrups) e) Binding wire, ties and distance pieces. f) Additional cutting and bonding in connection with holes, mortices, pockets, grooves, chases and the like. g) Bends, hooks and laps shall be measured with the quantities. h) Preparation of bar reinforcement schedule for Engineer's approval before starting the work. 3.3.2 The rates for mesh reinforcement shall include for the following: a) Straight, raking, curved and circular cutting and waste, bending to profiles and laps as required by the drawings and specifications. b) Supporting in position during concreting (excluding special chairs), binding wires and distance pieces. c) Cutting, bending and notching around all obstructions. 3.3.3 For the purpose of measurement length of bar shall be considered as 6000mm 3.4 Pre-Cast Concrete: 3.4.1 The rates for pre-cast concrete shall include for the following: a) Provisions of moulds b) Forming a fair face finish in accordance with the specifications c) Hacking or forming keys to all other surfaces d) Lifting hooks or other devices approved by the Engineer for positioning e) Hoisting and fixing in position to approval of the Engineer. f) Bedding jointing in mortar as specified. g) All necessary temporary struts or supports h) Sills and copings etc. shall include for plain ends and angles where necessary. 4. MASONRY 4.1 Brick Work, Block Work and Rubble Work: 4.1.1 The rates for block or brick walls shall include for the following: a) Straight, raking, curved and circular rough or fair cutting, plumbing at angles, cutting and bonding at angles, openings and intersections, building into and/or against adjacent work, wedging and pinning up to soffits. b) Special or concrete filled blocks at angles, door, window and openings or the like, and intersections and load bearing wall. c) Providing any means necessary to prevent concrete cast on hollow block work or over cavities from falling into voids or cavities (subject to the approval of the Engineer) d) Preparation of surface to receive any external wall finish. e) Grouting up at back of walls built against other construction. f) All necessary cast in wall ties at junction between block work and concrete or between brickworks and concrete. g) All necessary expansion, contraction joints, slips strip or the like. 7 h) Measures to prevent cracks at joints of different materials and at joints between new and existing work. i) Providing pipe sleeves through walls. j) Preparation of existing surface for proper bonding. k) Scaffolding if necessary l) Reinforcement to in fill RCC concrete m) Stiffeners for all 115mm thick walls exceeding 2400mm length and up to the ceiling height. n) Builder's work in connection with services. 4.1.2 The rates for block walls and brick walls shall include for the following additional Labourers. a) Cutting or forming chases or grooves for slabs, partitions, staircases, etc. b) Cutting grooves for water bars, flashings and the like and making good and pointing in similar mortar. c) Building in or cutting and pinning in and making good ends of lintels, brackets, Timber, steelwork, and the like. d) Building in or cutting for and making good around pipes, ducting, fittings and the like 4.1.3. Brick walls are deemed to include walls in external ducts. 5. WATERPROOFING: 5.1 The rates for work in this section shall include for the following: a) Remove all loose and foreign materials and clean surface to receive water proofing materials. b) Laps, seams and narrow widths, straight, raking curved and circular cutting and all consequent wastage, fillets, arises, angles, chases for tucking in etc., returned ends and dressed ends on flashings, dressing up over up stands and around and into gargoyles, rainwater outlets, vent pipes and the like. c) Any additional or special materials at construction joints, expansion joints, edges and corners etc. d) Repairing surface cracks and filling uneven surface with approved materials. e) Base screed, temporary screed and protection screed unless measured separately. f) Tropical grade mastic pointing to all wall flashings. g) Testing as per Engineer's Instructions h) Work to be done as per standard details necessary for complete system but not measured. i) Providing all necessary tools and any other equipment required as recommended by the manufacturer. j) Providing product samples, finished specimen areas etc., as required by the Architect k) Forming or chasing groves, into masonry walls, concrete walls, concrete walls and slabs rebates etc., where necessary and turning waterproofing materials into chases and pointing as specified l) Lining to rain water outlets, cesspools, brackets, collars and filling around pipes, railing standards and the like m) Cutting to line and jointing new to old asphalt n) Obtaining manufacturer’s supervisory/consultancy services if necessary and providing and acceptable guarantees for 10 years in the name of the employer for the product and the workmanship. o) Submitting a detailed set of shop drawings approved by manufacturer to incorporate all construction and expansion joints as shown in drawings, structural and services elements, other details encountered in the areas to be waterproofed and with details against settlements between two buildings with reference to manufacturer’s proprietary details, specials and techniques. The arrangements shown in tender drawings are for proposes of guidance only and not construction drawings. 8 p) Working at any given height. q) Application of water proofing materials to specifications and manufacturer’s recommendation and as per approved shop drawings to cover all surfaces including angle fillets, chasings, sealing of construction joints and expansion joints, settlements joints etc. r) Submitting pre-shipment certificates by an acceptable international Surveyor certifying the product with respect to :i. Source and country of manufacture. ii. Country of Origin iii. Conformity to specification iv. Conformity to system offered v. Conformity to the product offered. 6. STRUCTURAL STEEL WORK 6.1 The rates for metal work shall include for the following: a) All fabrications and erections b) Preparation of shop drawings and obtaining approval from the Engineer. c) Angles and ends d) Application of two coats of anti-corrosive and paint to Engineer's approval e) Holes, notches, slots and the like f) Fixing with appropriate non-corroding countersunk screws including holes unless otherwise described. g) Riveted and bolted work shall include rivets, bolts and holes. h) Approved protection to cut ends or holes in galvanized work or other applied finish. i) Metal door frame shall include for assembling, fixing with clamps, and filling with mortar, temporary supports and removal of base ties. j) Floor plates, duct covers and the like shall include narrow widths laying in position and for all holes, slots and the like making good. 7. NON-STRUCTURAL STEEL WORK 7.1 All items in structural steel work shall equally apply to "Non -Structural Steelwork" 7.2 The rates for steel Work shall include for the following: a) All fabrications and fixing in positions b) Uncovering, cleaning and polishing c) Preparation of shop drawings and obtaining approval from the Engineer. d) Sub frames if specified e) Beadings and sealant as required f) Rates for doors and windows shall include for approved high quality ironmongery with master key system as specified. 8. WOODWORK 8.1 Woodwork shall be deemed to be fixed with non-corroding nails and screws unless otherwise described. 8.2 The rates for woodwork shall include for the following: a) Working to size and shape including short lengths, mitres and ends. 9 b) All joints in the running length including structural joints. c) Cutting and fittings to steelwork, trimming around openings, notchings, boring and sinking. d) Treating all timber by vacuum pressure impregnation with copper chrome boron (CCB) preservatives or equivalent. 8.3 Sizes given are nominal unless stated "finished size" 8.4 Doors and Windows Rates are deemed to include for master key system as specified. 8.5 Glazed doors and windows are deemed to include; a) Panes of any size b) All straight, raking, curved and circular cutting and all consequent wastage c) Patterned and wired glass shall include aligning adjacent panes 8.6 Each door and window sash shall be fitted with the accessories indicated in the specification and schedule and no extra payment whatsoever will be made for any standard fittings and accessories even if such are not incorporated in the specification, schedule and detail drawings. 9. ROOF COVERING & ROOF PLUMBING 9.1 L Rate for roof covering shall include for; a) J bolts, washers, nuts and all necessary fixing accessories b) Forming opening for ventilators/ extractions c) Straight, raking or curved cutting d) Forming required shape (pitched or curved) 9.2 Rate for eave gutter shall include for; (a) G.I fixing brackets at 300mm intervals unless stated otherwise (b) Gutter end caps (c) Extra material and labour on jointing with down pipes (d) Any special joints and connections (e) Gutters to straight or curved on plan 9.3 Rate for down pipes shall include for; (a) G.I fixing brackets at 300mm intervals unless stated otherwise (b) Extra labour and material in connection with making bends (c) Any special joints and connections (d) Pipes to vertical or angle 10. PLUMBING & SANITARY INSTALLATION: 10.1 The unit prices for furnishing, laying and jointing UPVC pipes shall be deemed to include, but not limited to the cost of excavation in trenches, covering joints in cement concrete grade 15 using 25 mm graded aggregate where necessary, refill of the excavated trenches in compacted layers not exceeding 150 mm thick and /or chasing the pipes in walls and columns covering up and finishing 10 and/or embedding pipes in concrete columns and slabs and/or fixing pipes to undersides/ soffits of slabs and vertical faces of columns and walls with brackets and/or taking the pipes through rubble masonry foundations and/or block work / brick walls and/or concrete slabs by means of pipe sleeves of larger size embedded therein and in addition the cost of all accessories and fittings such as sockets, bends, elbows, tees, Y junctions, end caps and cleaning eyes, except such items as are listed hereinafter which shall be measured and paid separately. 10.2 The rates for pipe works shall include for the following: a) All cutting, short lengths b) Elbows, bends, tees, stop ends, rodding eyes, junctions, reducers inspection opening and all other similar fittings on pipes whatever the diameter if not measured separately. c) Pipe sleeves through walls d) Thrust blocks as required e) Builders work 10.3 The rates for pipes in trenches shall include; a) Concrete or granular bed & surrounds to pipes and any necessary formwork as required by the Specifications. b) Caution tapes and tiles as specified. c) Excavation of trenches. The rates for excavating trenches shall include for all related work described in preambles for excavation and earth work. 10.4. Rates for structures such as manholes, chambers, gullies, septic tanks, soakage pits shall include for concrete, formwork, reinforcement, brick walls, excavation including related work described in preambles for excavation and earthwork, piping, haunching and benching and all related work as shown on detail drawing. 10.5The rates for sanitary fittings and accessories shall include for the following unless otherwise measured separately. a) Assembling component parts including suitable bedding compounds b) All necessary plugging and brass screwing. c) Joints to water services with straight or bent proprietary connection d) Joints to waste soils or drain pipes with approved proprietary connections. e) Cleaning off all protective wrappers and leaving ready for use. f) Leaving taps and valves greased, clean and in full working order. g) Builders work 10.6It shall be the responsibility of the Contractor to do all the necessary co-ordination work and obtaining of the necessary water supply/sewer connections from the relevant authorities unless otherwise measured separately. 11. ELECTRICAL INSTALLATION 11.1 The rates in general shall include for the following: a) All cutting, short lengths and small quantities b) All considerations arising from the specification c) Fixing conduits and ducts. d) Pipe sleeves through walls 11 e) Assembling component parts. f) Cleaning off protective wrappers and leaving ready for use. g) Leaving all equipment etc, clean and in full working order. h) Draw wires in empty conduits i) Supply, installing, testing and commissioning of the system for power and lighting complete to working order and to the entire satisfaction of the Engineer and the relevant authorities unless otherwise measured separately. j) It shall be the responsibility of the Contractor to do all the necessary co-ordination work and obtaining of the electrical power connections from the relevant authorities unless otherwise measured separately. k) Laying and jointing of conduits l) Cutting, trimming, dressing, connection cables, cutting holes and chases in brick/concrete works and connecting cable with accessories. m) chasing in walls, columns and slabs for conduits n) Covering up and making good the surfaces o) Fixing conduits underside of soffits and surfaces of walls by means of brackets p) Drilling holes of required sizes in walls and slabs for through conduits and such other items of works necessary to be done for a complete installation. 11.2 Rates for cables and ducts in trenches shall include concrete or granular bed & surrounds caution tapes, cover tiles etc, as required by the Specification. 11.3 Rates for mechanical and electrical equipment, plant or the like to include for all necessary connections to power supply. 11.4 All materials, equipment, wiring and workmanship shall confirm to local codes and .specifications, BS standards/ latest I.E.E. regulations and complying with Ceylon Electricity Board requirements 11.5 Rates for point wiring shall include for all cables, switches (1 way or 2 ways as necessary), junction boxes, conduits, switch boxes, clips, earth cables, draw wires, wiring accessories, Screws, nails, hardware, fixing and insulating materials, cutting holes, chases make good the same in all trades, holders, ceiling boxes, flexible codes and other wiring accessories required up to the final fixing point wherever necessary. 12. FLOOR&WALL FINISHES 12.1 General: The rates for all work in this section shall include for the following; a) Preparation of surfaces for proper bonding b) Straight, raking, curved and circular cutting and all consequent wastage. c) All setting out temporary rules, screeds, templates and supports. d) Curing and cleaning off/down upon completion e) Spacers, cover guards etc. to tiling or the like f) All labours and making good around pipes, ducting and fittings and the like 12 g) Brushing and cleaning off and damping down all backgrounds h) Square and rounded edges, floor and ceiling junctions, making good to frames and the like. i) Dubbing out as necessary to take up tolerances in the structure and cambers in floors and the like j) All feature grooves or the like. k) All construction joints including sealant. l) Cutting and grinding edges of tiles/ granite as necessary. m) Providing grooves between tiles which are not less than 2 mm using tile spacers. n) Using tile adhesives as directed by the Engineer. 12.2 Floor finishes: a) Ceramic or clay tiles are deemed to include rounded edges tiles and special tiles if required by the Engineer. b) Rate for floor tiling shall include for laying to pattern and design c) Rate shall include for preparation of sample panels of different finishes for approval d) Item is deemed to include laying tiles on curb and edges. e) Rate shall include for forming grooves and extra labour and materials on expansion Joints. f) Item is deemed to include curing, cleaning on completion and protection g) Item for finishes to steps shall include for forming nosing. 12.3 Wall Finishes: a) Rate for in-situ finishes shall include for; 1. Providing angle beads, end beads and wire mesh on different surfaces as directed by the Engineer 2. Providing grooves on surfaces between different surfaces as directed by the Engineer 3. Builders works in connection with services b) Item for plastering to walls is deemed to include door/ window reveals and returns c) Plastering to columns associated with walls shall be measured as plastering to walls d) Plastering to beams associated with walls shall be measured as plastering to walls e) Item is deemed to include finishes to rebates, grooves, chamfers, external and internal splays and nibs unless measured separately. f) Rates shall include for all temporary rules, screeds, grounds etc., for raking out joints of new brickwork or hacking new concrete for key. Internal and coved angles, joints between different surfaces and between new and old plastering, arises, quirks, inter sections between curved or irregular surfaces etc., and all making good around pipes, sanitary fittings and similar fixtures. g) Rate for plasterwork shall include for expanded metal or the like in areas of different modes of construction. (eg. Block work and concrete work.) h) Leaving soffits of slab of even finish to receive ceiling finishes. i) Rates shall include for making adequate space for drawing of all conduits of walls and partitions. 13 k)Fair joints, outlets, working over and around obstructions, pipes and the like into recesses and shaped inserts, forming shallow channels, bonding agents where included with the work, dividing strips where applicable, all extra work necessary for patterned work, are deemed to include where applicable with the items. l) Treads and risers are deemed to include fair edges, internal and external angles. j) Strings and aprons are deemed to include ends, angles, ramped and wreathed covers. k) Skirting, kerbs and edges of floors are deemed to include fair edges, rounded edges, covered junctions, angles and the like. Rates for plaster works shall include for a) Repair all plaster cracks as directed by the Engineer with application of galvanized wire mesh where appropriate. b) Prior to repairs to any plasterwork, the area to be re-plastered must be isolated from the rest of the plasterwork, to prevent cracks propagating in to adjacent areas, by cutting a groove in the plaster up to the brickwork. c) All materials removed from buildings to be protected carefully from element until takeover by the Employer. 13 PAINTING 13.1 All paint materials shall be best quality and shall be products of recognized manufacturer approved by the Engineer. 13.2 All surfaces to be painted shall be prepared as directed and the prepared surfaces shall be approved by the Engineer before painting. 13.3 The rates for painting shall include for the following: a) Preparation of surfaces which shall include for surface filling. b) Smoothing, knotting, stopping etc. c) Protection of floors and fittings, removing and replacing door and window fittings if required and cleaning upon completion and the like. d) Sample painting in different colour and on different surfaces as required by the Engineer e) Work on "Woodwork" shall include both soft wood and hardwood. f) Unless of a differing specification, work shall be deemed to cover internal or external painting. g) Work to curved surfaces. f) Preparation of surfaces cleaning down, smoothing knotting, stopping etc. g) removing existing paintwork from wall and timber (door window frames, sashes, architraves, skirting, cornices etc.) surfaces cleaning and preparing the surface to receive the paint. h) Painting in metal work is deemed to include work to attached holder bats, fastenings and the like. i) Work to services is deemed to include work to saddles, pipe hooks, holder bats, conduit box and the like. j) Painting door and window reveals unless otherwise measured separately. 14 Transition Recovery Programme BOQ-Summary sheet Srilanka Title of the Projects ReConstruction of Rice Mill at Oddankulam Project No NLDP/ 83642/MUL/1 Site Location Oddankulam, Panankamam District Mullaitivu Item No A- Preliminaries 1 Description Sub total(LKR) 280,000.00 1. Construction of Machine Room 2 1A- Earth work 3 1B- Concrete Work 4 1C-Masonary Work 5 1D- Plastering Work 6 1E- Roof Work & Iron Mongery 7 1G- Doors & Windows 8 1H- Painting Sub Total-1 2. Construction of Cleaning Room Unit 9 10 11 12 13 14 2A- Earth work 2B- Concrete Work 2C- Masonry Work 2D- Plastering Work 2E- Roof Work & Iron Mongery 2F- Painting Work Sub Total-2 3.Re-Construction of Store 15 16 17 18 19 20 21 3A-Earth Work 3B-Concrete work 3C-Masonrywork 3D-Plastering Work 3E-Roof work & Iron Mongery 3F-RCC Precast Fanlights 3G-Painting Work Sub Total-3 4.Construction of Boiler Room 22 23 24 25 26 27 4A-Earth Work 4B-Concrete work 4C-Masonrywork 4D-Plastering Work 4E-Roof work & Iron Mongery 4F-Painting Work Sub Total-4 28 29 30 31 32 33 34 5C.Construction of Latrine, Septic Tank & Soakage Pit 5A-Earth Work 5B-Concrete work 5C-Masonrywork 5D-Plastering Work 5E- Iron work 5F-Painting Work 5H- plumbing work 35 36 37 38 39 40 41 42 Sub Total-5 6.Repairing of Drying bed, Construction of Motor room, Transformer Room,repairing of well, repairing of soaking tank, construction of soaked water filtering system, fixing steel overhead tank stand, fencing, Construction of Hume pipe Cart crossing 6A- Earthwork & site clearing 6B- Concrete work 6C- Masonry work 6D- Plaster & render work 6E- Iron work 6F- Plumbing work 6G-Painting work 6J- External work Sub Total-6 Sub Total ( Priliminaries + Net Total 1-6) Add Contingencies ( Prov sum) 910,000.00 Net Total Less Discount if Bid Amount excluding Value Added Tax (VAT) Add Vallue added Tax (…....)% Bid Amount including Value Added Tax (VAT) Total in Words: _________________________________________________________________ _______________________________________________________________________________ Signature : Name of Bidder and Official Seal : Address : Transition Recovery Programme Sri Lanka Bill of Quantity Title of the Project Project No. Site Location District Item ReConstruction of Rice Mill at Oddankulam NLDP/ 83642/MUL/1 Oddankulam, Panankamam Mullaitivu Description Unit Qty Rate Amount Preliminaries A.1 Allow lump sum for providing of third party insurance Item Allow Provisional Sum 20,000.00 A.2 Allow lump sum for workmen compensation policy Item Allow Provisional Sum 20,000.00 A.3 Allow lump sum for insurance of Property, Material & works Item etc Allow Provisional Sum 20,000.00 A.4 Construction & maintain site office with water, electricity and sanitory facilities throughout the implementing period and Item remove on completion Allow Provisional Sum 50,000.00 A.5 Construct, equip & maintain temporary site store to protect and store construction materials and equipments at site and Item remove on completion Allow Provisional Sum 50,000.00 A.6 Allow lump sum for sanitary facilities and other facilities for workmen to create working environment in accordance with Item the Government Regulation and / or Municipal Authorities and remove them on completion Allow Provisional Sum 30,000.00 A.6 Allow lump sum for sanitary facilities and other facilities for workmen to create working environment in accordance with Item the Government Regulation and / or Municipal Authorities and remove them on completion Allow Provisional Sum 50,000.00 A.6 Provide lump sum for the cost of necessary fencing, hoarding, protection, night- lighting and watchmen. Item Allow Provisional Sum 25,000.00 A.7 Provide lump sum for erection of name board to giving details of the project, client, consultant and contractor . Item Allow Provisional Sum 15,000.00 A- Preliminaries 280,000.00 1/38 Transition Recovery Programme Sri Lanka Bill of Quantity Title of the Project Project No. Site Location District ReConstruction of Rice Mill at Oddankulam NLDP/ 83642/MUL/1 Oddankulam, Panankamam Mullaitivu Item Description Unit Qty Rate Amount Item Description Unit Qty Rate Amount 1 Construction of Machine Room 1A Earth Work Rates shall include for (a) Levelling bottom of trenches and keeping sides plumb (b) Back filling with selected excavated materials and consolidating (c) Planking and struting if required (d) Disposal of surplus earth and keeping all excavations free from water Manual Excavation over site to reduce level in any material 1A.1 (except rock requiring blasting ) including depositing and levelling as directed distance exceeding 30'-0" but not exceeding 1/4 mile. Clearing of approach road in size of 300m length, 5m width 1A.2 to proposed building premises including formation of road carriageway by using Motor Grader Cube 40.00 hrs 10.00 1A.3 Anti - termite treatment in Biflex or equivalent to area 1.00 m beyond the outer line of building, before and after earth Sqrs filling to approved specialist contractor's specification and technical literature. (Rate shall include for 5 years warranty). 1A.4 Wall foundation not exceeding 5'-0" deep in any soil except rock requiring blasting, part return filled and rammed and cart away surplus away from site Column foundation not exceeding 5'-0" deep in any soil except rock requiring blasting, part return filled and rammed and cart away surplus away from site Supplying, filling, spreading, watering & 1A.6 required compaction of Gravel under the floor. 1A. 5 64.00 Cube 17.00 Cube 11.00 Cube 52.00 1A- Earth work 2/38 Transition Recovery Programme Sri Lanka Title of the Project Project No. Site Location District Item Bill of Quantity ReConstruction of Rice Mill at Oddankulam NLDP/ 83642/MUL/1 Oddankulam, Panankamam Mullaitivu Description Unit Qty Rate Amount 1B Concrete work The rates shall include for plant for mixing, handling, hoisting, depositing, compacting etc curing and making good after removing form work etc. 1B.1 3" thick 1:3:6(1") mix concrete for foundation & column pad. Rate includes for hiring charges of concrete mixer, water,and mixing, placing, vibrating and curing of concrete 3" thick 1:21/2:5(1") concrete for floor & 4" thick for side 1B.2 wall & base of machinery plat form. Rate includes for mixing, placing, vibrating and curing of concrete 1B.3 1B.4 1B.5 1B.6 1B.7 1B.8 1:2:4(3/4"), Concreting for footing, Column & plinth beam. Rate includes for mixing, placing, vibrating and curing of concrete Tor steel reinforcement to columns, footings & plinth beams bent to shape laid in position and tied with G.I wire as directed. 10mm & 12mm dia Tor steel for reinforcement as per drg. Detail. Mild steel reinforcement for columns and plinth beam- @ 6" C/C & links for plinth beam @6" C/C. Form work by using Sawn timber/ Plywood form for casting of columns, footings & plinth beams. Rate includes making, assembling, dismandling and repairing for re-use -3 uses of mould 6"x 6" Lintol/tie beam in 1:2:4(3/4") concrete mix and reinforced with 4Nr. Y10 dia bar & R6 stirrups @8" c/c including reinforcenet, bent to shape laid in position and tied with G.I wire and Form work by using Sawn timber/ Plywood form for casting of beams. Rate includes making, assembling, dismandling and repairing for re-use -3 uses of mould and curing etc. as per details. 6"x 4" Roof band beam in 1:2:4(3/4") concrete mix and reinforced with 2 Nr. Y10 dia bar & R6 stirrups @8" c/c including reinforcenet, bent to shape laid in position and tied with G.I wire and Form work by using Sawn timber/ Plywood form for casting of beams. Rate includes making, assembling, dismandling and repairing for re-use -3 uses of mould and curing etc. as per details. Cube 2.70 Cube 9.20 Cube 7.50 Kg 1433.00 Kg 381.00 Sqrs 22.90 L.ft 440.00 L.ft 390.00 3/38 Transition Recovery Programme Sri Lanka Bill of Quantity Title of the Project Project No. Site Location District Item ReConstruction of Rice Mill at Oddankulam NLDP/ 83642/MUL/1 Oddankulam, Panankamam Mullaitivu Description Unit 3" thick 1:21/2:5(1") mass concrete for casting of pavement with drainage including Form work by using Sawn timber/ 1B.9 Plywood form for casting . Rate includes making, assembling, Cube dismandling and repairing for re-use -3 uses of mould and curing etc. 1B.10 Construction of Expansion joint using 15x70mm regiform and 15x30mm mastic sealent (flexible filler) as per the detail L.ft drawings. Qty Rate Amount 2.60 265.00 1B- Concrete Work 1C Masonrywork Rates shall include for all rough and fair cutting, plumbing, angles, forming related reveals, rough arches, raking out joints for pointing plastering etc, cutting and trimming forming or cutting chases, making good and sundry items of a like nature. 1C.1 6"-9" Random Rubble masonry work in cement mortar 1:5 in foundation Cube 16.83 1C.2 3/4" thick D.P.C. in cement sand 1:2 finished with 2 coats of D.P.C. tar and blinded with sand. Sqrs 1.20 6" thick Block work in 1:5 ct sand mix by using sandcrete blocks casted with 1:7 cement sand mix including required 1C.3 curing (on the request of Engineer Compressive strength reports to be produced by contractor) rate shall include for provision or casting of blocks Sqrs 40.00 1C-Masonary Work 4/38 Transition Recovery Programme Sri Lanka Bill of Quantity Title of the Project Project No. Site Location District Item 1D ReConstruction of Rice Mill at Oddankulam NLDP/ 83642/MUL/1 Oddankulam, Panankamam Mullaitivu Description Unit Qty Rate Amount Plastering Work Rates shall include for all temporary rules, screeds, grounds etc. for raking out joints of new brick work or hacking new concrete for key internal and coved angles, joints between different surfaces and between arises and all making good around pipes, electrical fittings, sanitary fittings etc. 1D.1 1/2" thick plastering in 1:4 cement / sand mortar for the internal wall finished smooth. Sqrs 51.20 1D.2 5/8" thick plastering in 1:4 cement / sand mortar for the external wall finished smooth. Sqrs 29.90 1D.3 1/2" thick rendering in 1:2 cement / sand mortar & with 1/8" thick red cement screed finished smooth. Sqrs 33.30 1D.4 1/2" thick plastering in 1:2 cement / sand mortar to columns & beams. Sqrs 1.00 Sqrs 15.40 Plinth plaster of 1/2" thick in 1:3 cement / sand mortar 1D.5 finished smooth with red cement floating to drainage, pavement & plinth. 1D- Plastering Work 5/38 Transition Recovery Programme Sri Lanka Title of the Project Project No. Site Location District Item 1E Bill of Quantity ReConstruction of Rice Mill at Oddankulam NLDP/ 83642/MUL/1 Oddankulam, Panankamam Mullaitivu Description Unit Qty Rate Amount Roof work & Iron Mongery ROOFING:Supply and fix zinc aluminium colour bond roofing complete with installations as per drg. detail / Engineers instruction. TRIMDEK-HI-TEN ZINCALUM roofing sheet 4.4kg/m2, with thickness of 0.42 mm in base metal and total thickness 0.47 mm with coating from BHP steel lanka or equivalent. Roofing sheets laid with minimum 18" end laps on steel 'C' purlins 1E.1 with 3mm thick heat insulation foil & 3"x3" Galvanized net in between and fixed using No:14-10x75 mm hexagonal head type 17 self drilling screws with seal or bonded washers to required size all as per detail drawing. (C-purlins will be paid separately) Sqrs. 49.30 End truss - 2/ 2" x 2" x 1/4" of 19'-2" length including 2 Nrs 1E.2 12 mm dia 9" long tor steel welded to end truss with 2 coats of anticorrosive paint fixed to the 1:2:4(3/4") concreting L.ft 230.00 Supplying and fixing 40 x 40 x 1.2 mm thick Steel box sectional-purlin not exceeding 4'-0" centers and joints should 1E.3 be neatly welded, purlins welded into 50mm wide 40x40x4mm angle iron cleat . All cleats should be welded on the trusses. L.ft 304.00 Supplying and fixing 100 x 50 x2 mm thick Steel Lipped Channel C-purlin not exceeding 4'-0" centers and joints should be bolted with 2 Nrs. 1/2" dia bolts & nuts, purlins 1E.4 welded into 100mm wide 65x65x6mm angle iron cleat and provide 12mm dia steel tie rods wherever needed. All cleats should be welded on the trusses. L.ft 1536.00 Fabricate 30'-0" span steel web truss with 2/2"x2" x1/4" frame work and 5/8" dia torsteel internal members and 2 1E.5 coats of anticorossive paint and fix in position etc also apply prime coat and two coats of anticorrosive paint to the steel as per drg. /Engineers instruction. Nr. 8.00 Fabricate 11'-9" span steel web truss with 11/4" dia GI pipe frame work and 5/8" dia torsteel internal members and 2 1E.6 coats of anticorossive paint and fix in position etc also apply prime coat and two coats of anticorrosive paint to the steel as per drg. /Engineers instruction. Nr. 4.00 6/38 Transition Recovery Programme Sri Lanka Title of the Project Project No. Site Location District Item Bill of Quantity ReConstruction of Rice Mill at Oddankulam NLDP/ 83642/MUL/1 Oddankulam, Panankamam Mullaitivu Description Unit Qty Providing steel doors consisting of 3/4" x 1/4" flat iron 3/4"x 1/4" C- channel horizontal member, 11/4"x 11/4" x 1/4" angle iron at bottom, both edges and top each 2 Nos welded together in order to run the wheel and racer, 3/4"x 3/4" box 1E.7 iron 1/2" x 1/2" box iron 3mm thick M.S. plates, closed with 18 gauge spacial plate, with necessary items, lock set arrangement and necessary racer and wheel etc 2" x 1/4" revert should used) all complete to working order. ( Including applying 2 coats of anticorrosive paint) ft2 80.00 Providing steel framed grill consisting of 11/4"x 11/4" x 1/4" angle iron at bottom, both vertical edges, mid and top each welded together in order to fixed the 6mm thick M.S. steel 1E.8 rod at the interval of 2" tranverse direction to make the grill net all complete to working order. ( Including applying 2 coats of anticorrosive paint) Fixing & welding charges included. ft2 432.00 9" wide 0.47mm thick Zinc aluminium coated steel plate 1E.9 barge board fixed complete with necessary brass screws with the needed accessories. L.ft 102.00 6.5" x 5.5" Square type Grade-B 0.47mm thick Zincalum 1E.10 coated steel plate eaves gutter fixed with the support of steel brackets at 18" centres & needed accessories. L.ft 268.00 Supply and fix 4"x4" box 0.47mm thick Zinc aluminium coated steel plate down pipe along with the wall and clipped 1E.11 / fastened not exceeding 3'-0" interval with steel bracket to the Engineers approval. L.ft 264.00 Supply & fix Industrial Roller Shutter which are made up of interlocking slats in standard 76 x 1.2mm thick Hot dip 1E.12 galvanised epoxy powder coated steel slats.(according to SABS 1461 specification) Sq.ft 252.00 Rate Amount 1E- Roof Work & Iron Mongery 7/38 Transition Recovery Programme Sri Lanka Bill of Quantity Title of the Project Project No. Site Location District Item 1G ReConstruction of Rice Mill at Oddankulam NLDP/ 83642/MUL/1 Oddankulam, Panankamam Mullaitivu Description Unit Qty Rate Amount DOORS & WINDOWS Door, window and fanlight frames and sashes Special Class timber, Jak, Mahogany, Teak or approved equivalent. All exposed faces of timber are to be wrot. The sizes given below are nominal without allowance for planning except where described as finished sizes. Rates for doors, windows and fanlights unless otherwise specified shall include for heavy quality brass furniture with oxidized finish of approved manufacture. Supplying & fixing window with 33/4"x23/4" frame and mullious, compresing two nos of 11/8" to 11/4" thick sashes 1G.1 obscure glass in special upper class-1 timber or equivalent fixed complete with brass furnitures. Type-W1 Rate included for fixing 5/8" dia. M.S rode horizontally at 4" Crs .as security bars with applying of two coads of anticorosive paint. Nrs Supply & fix 3'-3"x6'-9" Panelled door door with 4"x3" frame and 11/8"thick sash in teak timber or approved equivalent, 1G.2 Nrs including all best quality stainless steel lock set, with knob, hinges, bolts etc. and apply one coat of primer two coats of enamal paint as directed by the Engineer. 4.00 3.00 1G- Doors & Windows 1H Painting Work Rates shall include for all preparation of surfaces, cleaning down, smoothing etc protection of floors cleaning furniture and doors/ windows upon completion. Note: Paint: C.I.C. paint or equvalent approved by Engineer. 1H.1 Prepare surface and apply one coat alkali resistant primer and two coats of emulsion paint of approved quality & colour to internal face of the wall Prepare surface and apply one coat primer and two coats of 1H.2 weather shield emulsion paint of approved quality & colour to the external face of the wall Prepare and apply one coat wood primer and two coats of 1H.3 enamel paint approved colour to exposed faces of Doors, Windows & Security bars 1H- Painting Sqrs 51.20 Sqrs 29.90 Sqrs 2.01 8/38 Transition Recovery Programme Sri Lanka Title of the Project Project No. Site Location District Item Bill of Quantity ReConstruction of Rice Mill at Oddankulam NLDP/ 83642/MUL/1 Oddankulam, Panankamam Mullaitivu Description Unit Qty Rate Amount 2 Construction of Cleaning Room 2A Earth Work Rates shall include for (a) Levelling bottom of trenches and keeping sidesplumb (b) Back filling with selected excavated materials and consolidating (c) Planking and struting if required (d) Disposal of surplus earth and keeping all excavations free from water Manual Excavation over site to reduce level in any material (except rock requiring blasting ) including depositing and levelling as directed distance exceeding 30'-0" but not 2A.1 exceeding 1/4 mile. Cube Anti - termite treatment in Biflex or equivalent to area 1.00 Sqrs m beyond the outer line of building, before and after earth filling to approved specialist contractor's specification and 2A.2 technical literature. (Rate shall include for 5 years warranty). Wall foundation not exceeding 5'-0" deep in any soil except 2A.3 rock requiring blasting, part return filled and rammed and cart away surplus away from site Cube Column foundation not exceeding 5'-0" deep in any soil 2A.4 except rock requiring blasting, part return filled and rammed and cart away surplus away from site Cube Supplying, filling, spreading, watering & 2A.5 required compaction of Gravel under the floor. Cube 2A- Earth work 8.00 20.00 5.00 2.68 10.00 9/38 Transition Recovery Programme Sri Lanka Title of the Project Project No. Site Location District Item Bill of Quantity ReConstruction of Rice Mill at Oddankulam NLDP/ 83642/MUL/1 Oddankulam, Panankamam Mullaitivu Description Unit Qty Rate Amount Concrete work The rates shall include for plant for mixing, handling, hoisting, depositing, compacting etc curing and making good after removing form work etc. 3" thick 1:3:6(1") mix concrete for foundation & column pad. 2B.1 Rate includes for mixing, placing, vibrating and curing of concrete Cube 0.90 2B 2B.2 3" thick 1:21/2:5(1") concrete for floor. Rate includes for mixing, placing, vibrating and curing of concrete 1:2:4(3/4"), Concreting for footing and Column. Rate includes 2B.3 for mixing, placing, vibrating and curing of concrete Tor steel reinforcement to columns, footings & plinth beams bent to shape laid in position and tied with G.I wire as directed. 10mm & 12mm dia Tor steel for reinforcement as 2B.4 per drg. Detail. Mild steel reinforcement for columns and plinth beam- @ 6" 2B.5 C/C & links for plinth beam @6" C/C. Form work Sawn timber/ Plywood formwork. includes making, assembling, dismandling and repairing for re-use -2 2B.6 uses of mould for casting Cube 1.80 Cube 1.90 Kg 642.34 Kg 69.34 Sqrs 6.20 6"x 9" Plinthbeam in 1:2:4(3/4") concrete mix and reinforced with 4 Nr. Y10 dia bar & R6 stirrups @6" c/c including reinforcenet, bent to shape laid in position and tied with G.I wire and Form work by using Sawn timber/ Plywood form for casting of beams. Rate includes making, assembling, dismandling and repairing for re-use -3 uses of mould and 2B.7 curing etc. as per details. L.ft 100.00 6"x 6" Lintol/tie beam in 1:2:4(3/4") concrete mix and reinforced with 4Nr. Y10 dia bar & R6 stirrups @8" c/c including Form work by using Sawn timber/ Plywood form for casting of columns, footings & plinth beams. Rate includes making, assembling, dismandling and repairing for re-use -3 2B.8 uses of mould and curing etc. as per details. L.ft 10.00 10/38 Transition Recovery Programme Sri Lanka Bill of Quantity Title of the Project Project No. Site Location District Item ReConstruction of Rice Mill at Oddankulam NLDP/ 83642/MUL/1 Oddankulam, Panankamam Mullaitivu Description Unit 9"x 9" RCC beam in 1:2:4(3/4") concrete mix and reinforced with 4 Nr. Y12 dia bar & R6 stirrups @6" c/c including reinforcenet, bent to shape laid in position and tied with G.I wire and Form work by using Sawn timber/ Plywood form for casting of beams. Rate includes making, assembling, dismandling and repairing for re-use -3 uses of mould and 2B.9 curing etc. as per details. L.ft 15"x 9" RCC beam in 1:2:4(3/4") concrete mix and reinforced with 4 Nr. Y16 dia bar & R6 stirrups @5" c/c including reinforcenet, bent to shape laid in position and tied with G.I wire and Form work by using Sawn timber/ Plywood form for casting of beams. Rate includes making, assembling, dismandling and repairing for re-use -3 uses of mould and 2B.10 curing etc. as per details. L.ft 3" thick 1:3:6(1") mass concrete for constructing pavement & drainage including needed Form work by using Sawn timber/ Plywood form for casting . Rate includes making, assembling, dismandling and repairing for re-use -3 uses of mould and 2B.11 curing etc. as per details.. cu Qty Rate Amount 80.00 20.00 1.30 2B- Concrete Work 11/38 Transition Recovery Programme Sri Lanka Title of the Project Project No. Site Location District Item 2C Bill of Quantity ReConstruction of Rice Mill at Oddankulam NLDP/ 83642/MUL/1 Oddankulam, Panankamam Mullaitivu Description Unit Qty Rate Amount Masonrywork Rates shall include for all rough and fair cutting, plumbing, angles, forming related reveals, rough arches, raking out joints for pointing plastering etc, cutting and trimming forming or cutting chases, making good and sundry items of a like nature. 6"-9" Rubble work 1:5 ct. mix for foundation 2C.1 Cube 4.80 6" thick Block work in 1:5 ct sand mix by using sandcrete blocks casted with 1:7 cement sand mix including required curing (on the request of Engineer Compressive strength reports to be produced by contractor)rate shall include for 2C.2 provision or casting of blocks Sqrs 4.00 2C- Masonry Work Plastering Work 2D Rates shall include for all temporary rules, screeds, grounds etc. for raking out joints of new brick work or hacking new concrete for key internal and coved angles, joints between different surfaces and between arises and all making good around pipes, electrical fittings, sanitary fittings etc. 1/2" thick plastering in 1:4 cement / sand mortar 2D.1 for the internal wall finished smooth. Sqrs 4.13 5/8" thick plastering in 1:4 cement / sand mortar 2D.2 for the external wall finished smooth. Sqrs 5/8" thick plastering in 1:4 cement / sand mortar 2D.3 for the external column & beam finished smooth. Sqrs 1/2" thick rendering in 1:2 cement / sand mortar & with 1/8" 2D.4 thick red cement screed finished smooth to floor. Sqrs Plinth plaster of 1/2" thick in 1:3 cement / sand mortar 2D.5 finished smooth with red cement floating. Sqrs 2D- Plastering Work 4.13 8.12 12.94 1.10 12/38 Transition Recovery Programme Sri Lanka Title of the Project Project No. Site Location District Item 2E 2E.1 Bill of Quantity ReConstruction of Rice Mill at Oddankulam NLDP/ 83642/MUL/1 Oddankulam, Panankamam Mullaitivu Description Unit Qty Rate Amount Roof work & Iron Mongery ROOFING:Supply and fix zinc aluminium colour bond roofing complete with installations as per drg. detail / Engineers instruction. TRIMDEK-HI-TEN ZINCALUM roofing sheet 4.4kg/m2, with thickness of 0.42 mm in base metal and total thickness 0.47 mm with coating from BHP steel lanka or equivalent. Roofing sheets laid with minimum 18" end laps on steel 'C' purlins with 3mm thick heat insulation foil & 3"x3" Galvanized net in between and fixed using No:14-10x75 mm hexagonal head type 17 self drilling screws with seal or bonded washers to required size all as per detail drawing. (C-purlins will be paid separately) Sqrs. Furnish and install Ridge/Hip capping using standard ridge 2E.2 cap (Zn-Al, G550, AZ150, 0.47mm thick, colour type) complete as per drawings 11.40 L.ft 37.00 2E.3 Supplying and fixing 100 x 50 x2.3 mm thick Steel Lipped Channel C-purlin in Galvanized Iron not exceeding 4'-0" centers and joints should be bolted with 2 Nrs. 1/2" dia bolts & nuts, purlins welded into 100mm wide 65x65x6mm angle iron cleat and provide 12mm dia steel tie rods wherever needed. All cleats should be welded on the trusses. L.ft 2E.4 Fabricate 20'-0" span steel web truss with 2/2"x2" x1/4" frame work and 5/8" dia torsteel internal members and 2 coats of anticorossive paint and fix in position etc also apply prime coat and two coats of anticorrosive paint to the steel as per drg. /Engineers instruction. Nr. 4.00 2E.5 Fabricate 13'-0" span steel lean roof truss with 11/4" dia GI pipe frame work and 5/8" dia torsteel internal members and 2 coats of anticorossive paint and fix in position etc also apply prime coat and two coats of anticorrosive paint to the steel as per drg. /Engineers instruction. Nr. 2.00 360.00 13/38 Transition Recovery Programme Sri Lanka Title of the Project Project No. Site Location District Item 2E.6 2E.7 2E.8 Bill of Quantity ReConstruction of Rice Mill at Oddankulam NLDP/ 83642/MUL/1 Oddankulam, Panankamam Mullaitivu Description Unit Supplying and fixing 40 x 40 x 1.2 mm thick Steel box sectional-purlin not exceeding 4'-0" centers and joints should be neatly welded, purlins welded into 50mm wide 40x40x4mm angle iron cleat . All cleats should be welded on the trusses. L.ft 64.00 Providing 1 Nos of 4'-0"x 8-0" size steel door consisting of 3/4" x 1/4" flat iron 1"x1 "x 1/4" C- channel horizontal member, 11/4"x 11/4" x 1/4" angle iron at both edges, bottom and top each 2 Nos welded together in order to run the wheel and racer, 3/4"x 3/4" box iron 1/2" x 1/2" box iron 3mm thick M.S. plates, closed with 18 gauge spacial plate, with necessary items, lock set arrangement and necessary racer and wheel etc 2" x 1/4" revert should used) all complete to working order. ( Including applying 2 coats of anticorrosive paint) ft2 32.00 9" wide 0.47mm thick Zinc aluminium coated steel plate barge board fixed complete with necessary brass screws with the needed accessories. 78.00 L.ft 6.5" x 5.5" Square type Grade-B 0.47mm thick Zincalum coated steel plate eaves gutter fixed with the support of steel brackets at 18" centres & needed accessories. L.ft Supply and fix 4"x4" box 0.47mm thick Zinc aluminium coated steel plate down pipe along with the wall and clipped 2E.10 / fastened not exceeding 3'-0" interval with steel bracket to the Engineers approval. L.ft Furnish and fixing of coloured Zn/Al flashing, 0.47 mm thick L.ft 2E.11 ,500 mm wide. 2E- Roof Work & Iron Mongery Qty Rate Amount 2E.9 76.00 98.00 16.00 14/38 Transition Recovery Programme Sri Lanka Title of the Project Project No. Site Location District Item 2F 2F.1 2F.2 Bill of Quantity ReConstruction of Rice Mill at Oddankulam NLDP/ 83642/MUL/1 Oddankulam, Panankamam Mullaitivu Description Unit Qty Rate Amount Painting Work Rates shall include for all preparation of surfaces, cleaning down, smoothing etc protection of floors cleaning furniture and doors/ windows upon completion. Note: Paint: C.I.C. paint or equvalent approved by Engineer. Prepare surface and apply one coat primer and two coats of emulsion paint of approved quality & colour to internal face of the wall Sqrs Prepare surface and apply one coat primer and two coats of weather shield emulsion paint of approved quality & colour to the external face of the wall & columns & beams 2F- Painting Work Sqrs 4.13 12.25 15/38 Transition Recovery Programme Sri Lanka Title of the Project Project No. Site Location District Item Bill of Quantity ReConstruction of Rice Mill at Oddankulam NLDP/ 83642/MUL/1 Oddankulam, Panankamam Mullaitivu Description Unit Qty 3A-Earth Work Rates shall include for (a) Levelling bottom of trenches and keeping sides plumb (b) Back filling with selected excavated materials and consolidating (c) Planking and struting if required (d) Disposal of surplus earth and keeping all excavations free from water Manual Excavation over site to reduce level in any material (except rock requiring blasting ) including depositing and levelling as directed distance exceeding 30'-0" but not 3A.1 exceeding 1/4 mile. Cube 19.00 Demolition of unnecessary structural elements(concrete qty0.1cu, Block work-1.0 Sqr,weaker Rendering-40 sqrs) and remove the debris from the site dispose as directed by the 3A.2 Engineer Cube 31.00 Rate Amount 3. Reconstruction of Store 3A Wall foundation not exceeding 5'-0" deep in any soil except rock requiring blasting, part return filled and rammed and 3A.3 cart away surplus away from site as directed by the Engineer. Cube Column foundation not exceeding 5'-0" deep in any soil except rock requiring blasting, part return filled and rammed and cart away surplus away from site as directed by the 3A. 4 Engineer. Cube Supplying, filling, spreading, watering & required compaction of Gravel under the floor.Quantified to 3A.5 compacted volume. Cube 3A- Earth work 4.00 1.00 4.00 16/38 Transition Recovery Programme Sri Lanka Title of the Project Project No. Site Location District Item Bill of Quantity ReConstruction of Rice Mill at Oddankulam NLDP/ 83642/MUL/1 Oddankulam, Panankamam Mullaitivu Description Unit Qty Rate Amount 3B Concrete work The rates shall include for plant for mixing, handling, hoisting, depositing, compacting etc curing and making good after removing form work etc. 3" thick 1:3:6(1") mix concrete for foundation & column pad. Rate includes for mixing, placing, vibrating and curing of 3B.1 concrete Cube 0.10 3" thick 1:21/2:5(1") concrete for floor. Rate includes for 3B.2 mixing, placing, vibrating and curing of concrete Cube 0.80 1:2:4(3/4"), Concreting for footing, Column & plinth beam. Rate includes for mixing, placing, vibrating and curing of 3B.3 concrete Cube 1.10 Tor steel reinforcement to columns, footings & plinth beams bend to shape laid in position and tied with G.I wire as directed. 10mm & 12mm dia Tor steel for reinforcement & 3B.4 6mm mild steel for stirrups as per drg. detail. Kg 3B.5 3B.6 3B.7 3B.8 Mild steel reinforcement for columns and plinth beam- @ 6" C/C & links for plinth beam @6" C/C. Form work by using Sawn timber/ Plywood form for casting of columns, footings & plinth beams. includes making, assembling, dismandling and repairing for re-use -3 uses of mould 6"x 6" Lintol/tie beam in 1:2:4(3/4") concrete mix and reinforced with 4Nr. Y10 dia bar & R6 stirrups @8" c/c including reinforcenet, bent to shape laid in position and tied with G.I wire and Form work by using Sawn timber/ Plywood form for casting of beams. Rate includes making, assembling, dismandling and repairing for re-use -3 uses of mould and curing etc. as per details. 6"x 4" Roof band beam in 1:2:4(3/4") concrete mix and reinforced with 2 Nr. Y10 dia bar & R6 stirrups @8" c/c including reinforcenet, bent to shape laid in position and tied with G.I wire and Form work by using Sawn timber/ Plywood form for casting of beams. Rate includes making, assembling, dismandling and repairing for re-use -3 uses of mould and curing etc. as per details. Kg Sqrs 439.00 67.00 5.20 L.ft 270.00 L.ft 278.00 17/38 Transition Recovery Programme Sri Lanka Bill of Quantity Title of the Project Project No. Site Location District Item ReConstruction of Rice Mill at Oddankulam NLDP/ 83642/MUL/1 Oddankulam, Panankamam Mullaitivu Description Unit Qty 12"x 9" RCC beam in 1:2:4(3/4") concrete mix and reinforced with 4 Nr. Y12 dia bar & R6 stirrups @8" c/c including reinforcenet, bent to shape laid in position and tied with G.I wire and Form work by using Sawn timber/ Plywood form for casting of beams. Rate includes making, assembling, dismandling and repairing for re-use -3 uses of mould and 3B.9 curing etc. as per details. L.ft 3" thick 1:2:4(3/4") mass concrete for casting of Rat-trap with drainage iincluding reinforcenet, bent to shape laid in position and tied with G.I wire and Form work by using Sawn timber/ Plywood form for casting of beams. Rate includes making, assembling, dismandling and repairing for re-use -3 3B.10 uses of mould and curing etc. as per details. Cube 30.00 Rate Amount 2.50 3B- Concrete Work 3C 3C-Masonrywork Rates shall include for all rough and fair cutting, plumbing, angles, forming related reveals, rough arches, raking out joints for pointing plastering etc, cutting and trimming forming or cutting chases, making good and sundry items of a like nature. 6"-9" Rubble work by using 1:5 ct. mix for foundation as per 3C.1 detail drawing. Cube 2.50 3/4" thick DPC work 1:2 ct sand mix & applying 2 coats of hot 3C.2 tar mixed up with sieved river sand Sqrs 0.70 6" thick Block work in 1:5 ct sand mix by using sandcrete blocks casted with 1:7 cement sand mix including required curing (on the request of Engineer Compressive strength reports to be produced by contractor) rate shall include for 3C.3 provision or casting of blocks 3C-Masonary Work Sqrs 19.00 18/38 Transition Recovery Programme Sri Lanka Title of the Project Project No. Site Location District Item 3D Bill of Quantity ReConstruction of Rice Mill at Oddankulam NLDP/ 83642/MUL/1 Oddankulam, Panankamam Mullaitivu Description Unit Qty Rate Amount 3D-Plastering Work Rates shall include for all temporary rules, screeds, grounds etc. for raking out joints of new brick work or hacking new concrete for key internal and coved angles, joints between different surfaces and between arises and all making good around pipes, electrical fittings, sanitary fittings etc. 1/2" thick plastering in 1:4 cement / sand mortar 3D.1 for the internal wall finished smooth. 5/8" thick plastering in 1:4 cement / sand mortar 3D.2 for the external wall finished smooth. 1/2" thick floor rendering in 1:2 cement / sand mortar & with 3D.3 1/8" thick red cement screed finished smooth. 1/2" thick plastering in 1:2 cement / sand mortar to columns 3D.4 & beams. Plaster of 1/2" thick in 1:3 cement / sand mortar finished smooth with red cement floating to drainage, pavement & 3D.5 plinthwall. 3D- Plastering Work Sqrs 19.95 Sqrs 20.00 Sqrs 40.51 Sqrs 1.80 Sqrs 6.90 19/38 Transition Recovery Programme Sri Lanka Title of the Project Project No. Site Location District Item 3E Bill of Quantity ReConstruction of Rice Mill at Oddankulam NLDP/ 83642/MUL/1 Oddankulam, Panankamam Mullaitivu Description Unit Qty Rate Amount 3E-Roof work & Iron Mongery ROOFING:Supply and fix zinc aluminium colour bond roofing complete with installations as per drg. detail / Engineers instruction. 3E.1 TRIMDEK-HI-TEN ZINCALUM roofing sheet 4.4kg/m2, with thickness of 0.42 mm in base metal and total thickness 0.47 mm with coating from BHP steel lanka or equivalent. Roofing sheets laid with minimum 18" end laps on steel 'C' purlins with 3mm thick heat insulation foil & 3"x3" Galvanized net in between and fixed using No:14-10x75 mm hexagonal head type 17 self drilling screws with seal or bonded washers to required size all as per detail drawing. (C-purlins will be paid separately) Sqrs. 49.90 3E.2 End truss - 2/ 21/2" x 21/2" x 1/4" of 21'-10.5" length including 2 Nrs 12 mm dia 9" long tor steel welded to end truss with 2 coats of anticorrosive paint fixed to the 1:2:4(3/4") concreting L.ft 88.00 3E.3 Supplying and fixing 100 x 50 x2 mm thick Steel Lipped Channel C-purlin not exceeding 4'-0" centres and joints should be bolted with 2 Nrs. 1/2" dia bolts & nuts, purlins welded into 100mm wide 65x65x6mm angle iron cleat and provide 12mm dia steel tie rods wherever needed. All cleats should be welded on the trusses. L.ft 1712.00 3E.4 Fabricate 38'-4" span steel web truss with 2/21/2"x21/2" x1/4" frame work and 5/8" dia torsteel internal members and 2 coats of anticorossive paint and fix in position etc also apply prime coat and two coats of anticorrosive paint to the steel as per drg. /Engineers instruction. Nr. 9.00 3E.5 Fabricate 8'-0" span steel web truss with 11/4" dia GI pipe frame work and 5/8" dia torsteel internal members and 2 coats of anticorossive paint and fix in position etc also apply prime coat and two coats of anticorrosive paint to the steel as per drg. /Engineers instruction. 4.00 Nr. 20/38 Transition Recovery Programme Sri Lanka Title of the Project Project No. Site Location District Item Bill of Quantity ReConstruction of Rice Mill at Oddankulam NLDP/ 83642/MUL/1 Oddankulam, Panankamam Mullaitivu Description Unit Supply & fix Industrial Roller Shutter which are made up of interlocking slats in standard 76 x 1.2mm thick Hot dip galvanised epoxy powder coated steel slats.(according to 3E.6 SABS 1461 specification) Sq.ft Supply & fix Industrial Roller Shutter which are made up of interlocking slats in standard 76 x 1.2mm thick Hot dip galvanised epoxy powder coated steel slats.(according to 3E.7 SABS 1461 specification) ft2 9" wide 0.47mm thick Zinc aluminium coated steel plate barge board fixed complete with necessary brass screws 3E.8 with the needed accessories. L.ft 6.5" x 5.5" Square type Grade-B 0.47mm thick Zincalum coated steel plate eaves gutter fixed with the support of steel 3E.9 brackets at 18" centres & needed accessories. L.ft Supply and fix 4"x4" box 0.47mm thick Zinc aluminium coated steel plate down pipe along with the wall and clipped / fastened not exceeding 3'-0" interval with steel bracket to 3E.10 the Engineers approval. L.ft 3E- Roof Work & Iron Mongery Qty Rate Amount 360.00 32.00 88.00 252.00 220.00 21/38 Transition Recovery Programme Sri Lanka Title of the Project Project No. Site Location District Item 3F 3F.1 3G Bill of Quantity ReConstruction of Rice Mill at Oddankulam NLDP/ 83642/MUL/1 Oddankulam, Panankamam Mullaitivu Description Unit 3F-RCC Precast Fanlights Supplying & fixing RCC Precast Fanlight in 4'-0"x 1'-6" size with 3"x3" external frame & intermediate strut fixed by inclined 4"x1" thick RCC concrete slices. Exposed surfaces should be in smooth finish. Quality standards should be approved by the Engineer. Nrs 3F-RCC Precast Fanlights Qty Rate Amount 45.00 3G-Painting Work Rates shall include for all preparation of surfaces, cleaning down, smoothing etc protection of floors cleaning furniture and doors/ windows upon completion. Note: Paint: C.I.C. paint or equvalent approved by Engineer. Prepare surface and apply one coat primer and two coats of emulsion paint of approved quality & colour to internal face 3G.1 of the wall Sqrs Prepare surface and apply one coat primer and two coats of weather shield emulsion paint of approved quality & colour 3G.2 to the external face of the wall Sqrs Prepare and apply one coat wood primer and two coats of 3G.3 enamel paint approved colour to exposed faces of Fanlights 3G- Painting Sqrs 19.95 20.00 1.26 22/38 Transition Recovery Programme Sri Lanka Title of the Project Project No. Site Location District Item Bill of Quantity ReConstruction of Rice Mill at Oddankulam NLDP/ 83642/MUL/1 Oddankulam, Panankamam Mullaitivu Description Unit Qty Rate Amount 4.Construction of Boiler Room 4A 4A-Earth Work Rates shall include for (a) Levelling bottom of trenches and keeping sidesplumb (b) Back filling with selected excavated materials and consolidating (c) Planking and struting if required (d) Disposal of surplus earth and keeping all excavations free from water Manual Excavation over site to reduce level in any material (except rock requiring blasting ) including depositing and levelling as directed distance exceeding 30'-0" but not 4A.1 exceeding 1/4 mile. Cube 11.00 Wall foundation not exceeding 5'-0" deep in any soil except rock requiring blasting, part return filled and rammed and 4A.2 cart away surplus away from site as directed by the Engineer. Cube 3.00 Column foundation not exceeding 5'-0" deep in any soil except rock requiring blasting, part return filled and rammed and cart away surplus away from site as directed by the 4A. 3 Engineer. Cube 2.00 Supplying, filling, spreading, watering & required compaction of Gravel under the floor. Quantified to 4A.4 compacted volume. Cube 10.00 Anti - termite treatment of approved type to the construction area as directed by the Engineer. To be sqrs 12.00 performed by a specialized Contractor as per the Drawings and Specifications and a Ten (10) years warrantee should be 4A.5 submitted. 4A- Earth work 4B 4B-Concrete work The rates shall include for plant for mixing, handling, hoisting, depositing, compacting etc curing and making good after removing form work etc. 3" thick 1:3:6(1") mix concrete for foundation & column pad. Rate includes for mixing, placing, vibrating and curing of 4B.1 concrete Cube 0.70 3" thick 1:21/2:5(1") concrete for floor, pavement & Drainage. Rate includes for mixing, placing, vibrating and 4B.2 curing of concrete Cube 1.80 1:2:4(3/4"), Concreting for footing and Column. Rate includes 4B.3 for mixing, placing, vibrating and curing of concrete Cube 1.40 23/38 Transition Recovery Programme Sri Lanka Title of the Project Project No. Site Location District Item Bill of Quantity ReConstruction of Rice Mill at Oddankulam NLDP/ 83642/MUL/1 Oddankulam, Panankamam Mullaitivu Description Unit Tor steel reinforcement to columns & footings bent to shape laid in position and tied with G.I wire as directed. 10mm, 16mm dia Tor steel for reinforcement & 6mm mild steel for 4B.4 stirrups as per drg. Detail. Kg Mild steel reinforcement for columns and plinth beam- @ 6" C/C & links for plinth beam @6" C/C. Kg Form work Sawn timber/ Plywood formwork. includes making, assembling, dismandling and repairing for re-use -3 4B.5 uses of mould for columns shaft erection work Sqrs 9"x 6" RCC Plinth beam in 1:2:4(3/4") concrete mix and reinforced with 4 Nr. Y10 dia bar & R6 stirrups @6" c/c including reinforcenet, bent to shape laid in position and tied with G.I wire and Form work by using Sawn timber/ Plywood form for casting of beams. Rate includes making, assembling, dismandling and repairing for re-use -3 uses of mould and 4B.6 curing etc. as per details. L.ft 9"x 6" Lintol/tie beam in 1:2:4(3/4") concrete mix and reinforced with 4Nr. Y10 dia bar & R6 stirrups @8" c/c including reinforcenet, bent to shape laid in position and tied with G.I wire and Form work by using Sawn timber/ Plywood form for casting of beams. Rate includes making, assembling, dismandling and repairing for re-use -3 uses of mould and 4B.7 curing etc. as per details. L.ft 9"x 9" RCC beam in 1:2:4(3/4") concrete mix and reinforced with 4 Nr. Y12 dia bar & R6 stirrups @6" c/c including reinforcenet, bent to shape laid in position and tied with G.I wire and Form work by using Sawn timber/ Plywood form for casting of beams. Rate includes making, assembling, dismandling and repairing for re-use -3 uses of mould and 4B.8 curing etc. as per details. L.ft 4" thick 1:2:4(3/4") RCC concrete for casting of ash trap roof slab, reinforced with Y10 @ 8" c/c b/w, including reinforcenet, bent to shape laid in position and tied with G.I wire and Form work by using Sawn timber/ Plywood form for casting of beams. Rate includes making, assembling, dismandling and repairing for re-use -3 uses of mould and 4B.9 curing etc. as per details. Sq.ft 4B- Concrete work Qty Rate Amount 571.00 67.00 5.70 45.00 10.00 105.00 180.00 24/38 Transition Recovery Programme Sri Lanka Title of the Project Project No. Site Location District Item Bill of Quantity ReConstruction of Rice Mill at Oddankulam NLDP/ 83642/MUL/1 Oddankulam, Panankamam Mullaitivu Description Unit Qty Rate Amount 4C 4C-Masonrywork Rates shall include for all rough and fair cutting, plumbing, angles, forming related reveals, rough arches, raking out joints for pointing plastering etc, cutting and trimming forming or cutting chases, making good and sundry items of a like nature. 6"-9" Rubble work by using 1:5 ct. mix for foundation as per 4C.1 detail drawing. Cube 2.90 9" thick Block work in 1:5 ct sand mix by using sandcrete blocks casted with 1:7 cement sand mix including required curing (on the request of Engineer Compressive strength reports to be produced by contractor) rate shall include for 4C.2 provision or casting of blocks Sqrs 7.00 4" thick Block work in 1:5 ct sand mix by using sandcrete blocks casted with 1:7 cement sand mix including required curing (on the request of Engineer Compressive strength reports to be produced by contractor) rate shall include for 4C.3 provision or casting of blocks Sqrs 1.68 4C- masonry work 4D 4D-Plastering Work Rates shall include for all temporary rules, screeds, grounds etc. for raking out joints of new brick work or hacking new concrete for key internal and coved angles, joints between different surfaces and between arises and all making good around pipes, electrical fittings, sanitary fittings etc. 1/2" thick plastering in 1:4 cement / sand mortar 4D.1 for the internal wall finished smooth. Sqrs 5/8" thick plastering in 1:4 cement / sand mortar 4D.2 for the external wall finished smooth. Sqrs 1/2" thick floor rendering in 1:2 cement / sand mortar & with 4D.3 1/8" thick red cement screed finished smooth. Sqrs 1/2" thick plastering in 1:2 cement / sand mortar to soffit, 4D.4 columns & beam. Plinth plaster of 1/2" thick in 1:3 cement / sand mortar 4D.5 finished smooth with red cement floating. 4D- Plastering work 2.51 2.50 5.88 Sqrs 7.70 Sqrs 1.10 25/38 Transition Recovery Programme Sri Lanka Title of the Project Project No. Site Location District Item 4E 4E.1 4E.2 4E.3 4E.4 Bill of Quantity ReConstruction of Rice Mill at Oddankulam NLDP/ 83642/MUL/1 Oddankulam, Panankamam Mullaitivu Description Unit Qty Rate Amount 4E-Roof work & Iron Mongery ROOFING:Supply and fix zinc aluminium colour bond roofing complete with installations as per drg. detail / Engineers instruction. TRIMDEK-HI-TEN ZINCALUM roofing sheet 4.4kg/m2, with thickness of 0.42 mm in base metal and total thickness 0.47 mm with coating from BHP steel lanka or equivalent. Roofing sheets laid with minimum 18" end laps on steel 'C' purlins and fixed using No:14-10x75 mm hexagonal head type 17 self drilling screws with seal or bonded washers to required size all as per detail drawing. (C-purlins will be paid separately) Sqrs. Fabricate 15'-0" span steel truss with 2/2" x2" x1/4" frame work and 2"x2"x1/4" internal members and 2 coats of anticorossive paint and fix in position etc also apply prime coat and two coats of anticorrosive paint to the steel as per drg. /Engineers instruction. Nr. End truss - 2" x 2" x 1/4" of 11'-6" length including 2 Nrs 12 mm dia 9" long tor steel welded to end truss with 2 coats of anticorrosive paint fixed to the 1:2:4(3/4") concreting Supplying and fixing 100 x 50 x2 mm thick Steel Lipped Channel C-purlin not exceeding 4'-0" centers and joints should be bolted with 2 Nrs. 1/2" dia bolts & nuts, purlins welded into 100mm wide 65x65x6mm angle iron cleat and provide 12mm dia steel tie rods wherever needed. All cleats should be welded on the trusses. 6.00 2.00 L.ft 23.00 L.ft 208.00 26/38 Transition Recovery Programme Sri Lanka Title of the Project Project No. Site Location District Item 4E.5 4E.6 4E.7 4E.8 4F 4F.1 4F.2 Bill of Quantity ReConstruction of Rice Mill at Oddankulam NLDP/ 83642/MUL/1 Oddankulam, Panankamam Mullaitivu Description Unit Qty Rate Amount Providing steel doors consisting of 3/4" x 1/4" flat iron 3/4"x 1/4" C- channel horizontal member, 11/4"x 11/4" x 1/4" angle iron at bottom, both edges and top each 2 Nos welded together in order to run the wheel and racer, 3/4"x 3/4" box iron 1/2" x 1/2" box iron 3mm thick M.S. plates, closed with 18 gauge spacial plate, with necessary items, lock set arrangement and necessary racer and wheel etc 2" x 1/4" revert should used) all complete to working order. ( Including applying 2 coats of anticorrosive paint) sq.ft 32.00 9" wide 0.47mm thick Zinc aluminium coated steel plate barge board fixed complete with necessary brass screws with the needed accessories. L.ft 46.00 6.5" x 5.5" Square type Grade-B 0.47mm thick Zincalum coated steel plate eaves gutter fixed with the support of steel brackets at 18" centres & needed accessories. L.ft 52.00 Supply and fix 4"x4" box 0.47mm thick Zinc aluminium coated steel plate down pipe along with the wall and clipped / fastened not exceeding 3'-0" interval with steel bracket to the Engineers approval. L.ft 82.68 4E- Roof work and Iron Mongery 4F-Painting Work Rates shall include for all preparation of surfaces, cleaning down, smoothing etc protection of floors cleaning furniture and doors/ windows upon completion. Note: Paint: C.I.C. paint or equvalent approved by Engineer. Prepare surface and apply one coat Alkali resistant primer and two coats of emulsion paint of approved quality & colour to internal face of the wall Sqrs Prepare surface and apply one coat Alkali resistant primer and two coats of weather shield emulsion paint of approved quality & colour to the external face of the wall Sqrs 4F- Painting work 2.51 10.20 27/38 Transition Recovery Programme Sri Lanka Title of the Project Project No. Site Location District Item Bill of Quantity ReConstruction of Rice Mill at Oddankulam NLDP/ 83642/MUL/1 Oddankulam, Panankamam Mullaitivu Description Unit Qty Rate Amount 5.Construction of Latrine, Septic Tank & Soakage Pit 5A 5A-Earth Work Rates shall include for (a) Levelling bottom of trenches and keeping sidesplumb (b) Back filling with selected excavated materials and consolidating (c) Planking and struting if required (d) Disposal of surplus earth and keeping all excavations free from water Manual Excavation over site to reduce level in any material (except rock requiring blasting ) including depositing and levelling as directed distance exceeding 30'-0" but not 5A.1 exceeding 1/4 mile. Cube Excavation for Wall foundation not exceeding 5'-0" deep in any soil except rock requiring blasting, part return filled and rammed and cart away surplus away from site as directed by 5A.2 the Engineer. Cube Excavation for septic tank & soakage pit in any soil except rock requiring blasting, part return filled and rammed and 5A.3 cart away surplus away from site as directed by the Engineer. Cube Supplying, filling, spreading, watering & required compaction 5A.4 of Gravel under the floor. Cube 5A- Earthwork 2.50 0.44 6.35 0.24 28/38 Transition Recovery Programme Sri Lanka Title of the Project Project No. Site Location District Item 5B Bill of Quantity ReConstruction of Rice Mill at Oddankulam NLDP/ 83642/MUL/1 Oddankulam, Panankamam Mullaitivu Description Unit 5B.4 5B.5 5B.6 5B.7 Rate Amount 5B-Concrete work The rates shall include for plant for mixing, handling, hoisting, depositing, compacting etc curing and making good after removing form work etc. 3" thick 1:3:6(1") mix concrete for foundation. Rate includes 5B.1 for mixing, placing, vibrating and curing of concrete Cube 3" thick 1:21/2:5(1") concrete for floor. Rate includes for 5B.2 mixing, placing, vibrating and curing of concrete Cube 5B.3 Qty 1:2:4(3/4"), Concreting for base, cover slab & roof slab. Rate includes for mixing, placing, vibrating and curing of concrete Tor steel reinforcement to latrine roof slab, pit cover slabs bend to shape laid in position and tied with G.I wire as directed. 10mm Tor steel at 6" c/c bothways as per drawing detail. Form work Sawn timber/ Plywood formwork. includes making, assembling, dismandling and repairing for re-use -2 uses of mould for casting 6"x 9" Ringbeam in 1:2:4(3/4") concrete mix and reinforced with 4 Nr. Y10 dia bar & R6 stirrups @6" c/c including reinforcenet, bent to shape laid in position and tied with G.I wire and Form work by using Sawn timber/ Plywood form for casting of beams. Rate includes making, assembling, dismandling and repairing for re-use -3 uses of mould and curing etc. as per details. 9"x 9" RCC beam in 1:2:4(3/4") concrete mix and reinforced with 4 Nr. Y12 dia bar & R6 stirrups @6" c/c including reinforcenet, bent to shape laid in position and tied with G.I wire and Form work by using Sawn timber/ Plywood form for casting of beams. Rate includes making, assembling, dismandling and repairing for re-use -3 uses of mould and curing etc. as per details. 5B- Concrete work Cube Kg 0.10 0.10 0.60 134.00 Sqrs 1.50 L.ft 59.34 L.ft 59.34 29/38 Transition Recovery Programme Sri Lanka Title of the Project Project No. Site Location District Item 5C Bill of Quantity ReConstruction of Rice Mill at Oddankulam NLDP/ 83642/MUL/1 Oddankulam, Panankamam Mullaitivu Description Unit 6" thick Block work in 1:5 ct sand mix by using sandcrete blocks casted with 1:7 cement sand mix including required curing (on the request of Engineer Compressive strength reports to be produced by contractor) rate shall include for 5C.4 provision or casting of blocks 5C- Masonry Work 5D.1 5D.2 5D.3 5D.4 5D.5 Rate Amount 5C-Masonrywork Rates shall include for all rough and fair cutting, plumbing, angles, forming related reveals, rough arches, raking out joints for pointing plastering etc, cutting and trimming forming or cutting chases, making good and sundry items of a like nature. 5C.1 6"-9" Rubble work 1:5 ct. mix for foundation Cube 3/4" thick DPC work 1:2 ct sand mix & applying 2 coats of hot 5C.2 tar mixed up with sieved river sand Sqrs 4" thick Block work in 1:5 ct sand mix by using sandcrete blocks casted with 1:7 cement sand mix including required curing (on the request of Engineer Compressive strength reports to be produced by contractor) rate shall include for 5C.3 provision or casting of blocks Sqrs 5D Qty Sqrs 0.60 0.21 2.00 3.25 5D-Plastering Work Rates shall include for all temporary rules, screeds, grounds etc. for raking out joints of new brick work or hacking new concrete for key internal and coved angles, joints between different surfaces and between arises and all making good around pipes, electrical fittings, sanitary fittings etc. 1/2" thick plastering in 1:4 cement / sand mortar for the internal wall finished smooth. Sqrs 1.97 5/8" thick plastering in 1:4 cement / sand mortar for the external wall finished smooth. Sqrs 1.32 1/2" thick plastering in 1:4 cement / sand mortar for the soffit finished smooth. Sqrs 0.52 1/2" thick rendering in 1:2 cement / sand mortar & with 1/8" thick red cement screed finished smooth to floor. Sqrs 0.73 Plinth plaster of 1/2" thick in 1:3 cement / sand mortar finished smooth with red cement floating. Sqrs 2.10 5D- Plastering work 30/38 Transition Recovery Programme Sri Lanka Title of the Project Project No. Site Location District Item Bill of Quantity ReConstruction of Rice Mill at Oddankulam NLDP/ 83642/MUL/1 Oddankulam, Panankamam Mullaitivu Description Unit Qty Rate Amount 5E Iron work 5E.1 Providing 2 Nos of 2'-6"x 6-0" size doors made by using 11/4" dia heavy duty GI pipe as outer frame & intermediate line, welded with 1" wide 1/4'' thick flat iron internal panel border to fix the Zincalum 0.42mm thick powder coated steel sheet with the needed accessories Sq.ft 30.00 5E- Iron work 5F-Painting Work Rates shall include for all preparation of surfaces, cleaning down, smoothing etc protection of floors cleaning furniture and doors/ windows upon completion. Note: Paint: C.I.C. paint or equvalent approved by Engineer. 5F 5F.1 5F.2 Prepare surface and apply one coat primer and two coats of emulsion paint of approved quality & colour to internal face of the wall Sqrs Prepare surface and apply one coat primer and two coats of weather shield emulsion paint of approved quality & colour to the external face of the wall & columns & beams 5F- Painting work Sqrs 1.97 1.84 31/38 Transition Recovery Programme Sri Lanka Title of the Project Project No. Site Location District Item 5H Bill of Quantity ReConstruction of Rice Mill at Oddankulam NLDP/ 83642/MUL/1 Oddankulam, Panankamam Mullaitivu Description Unit Qty Rate Amount Plumbing work Rate shall include for: (a) Screws, nails pipe, locks, shaddles, brackets, sockets, connections short lengths, backnuts, nipples and chasings etc. and making good in all trades. (b) All laps straight cutting and waste. Unless otherwise stated rates for the following items shall be for PVC piping for water service waste etc. which shall comply with the latest S.L.S 147 or BSS 3505. Any special water supply and drainage fittings such as bends, tees reducers etc. unless otherwise specified seperately in the Bill of Quantities shall be deemed to be have been included in the relevant items and such items should accordingly be rated to include for such specials etc. any extra work involved and satisfactory completion of such items. 5H.1 Supply & fix 4"dia PVC T-Joint fot Septic tank & soakage pit Nrs 3.00 Eastern closet white commet set as per Model 1001 as detailed in the Sri Lanka Ceramic Corporation leaflet or equivalent with 'S' or 'P' trap complete with foot rest in cement concrete 1:2:4(20mm) & cement rendered all 5H.2 complete to working order. Nrs 1.00 Eastern closet white (squatting pan) as per Model 1001 as detailed in the Sri Lanka Ceramic Corporation leaflet or equivalent with 'S' or 'P' trap complete with foot rest in cement concrete 1:2:4(20mm) & cement rendered all 5H.3 complete to working order. Nrs 1.00 100mm dia P.V.C. pipe 400 type from lavatories extended upto 500mm beyond the outer walls &connect to the soakage pit invert depth not exceeding 600mm below ground level at including excavation, re-filling cement concreteoutlet bedding subsequently completely encasing with cement 5H.4 concrete after the inspection of pipes(400 type). L.ft 5H- plumbing work 18.00 32/38 Transition Recovery Programme Sri Lanka Title of the Project Project No. Site Location District Item Bill of Quantity ReConstruction of Rice Mill at Oddankulam NLDP/ 83642/MUL/1 Oddankulam, Panankamam Mullaitivu Description Unit Qty Rate Amount 6.Repairing of Drying bed, Construction of Motor room, Transformer Room, repairing of well, repairing of soaking tank, construction of soaked water filtering system, fixing steel overhead tank stand, fencing, Construction of Hume pipe Cart crossing 6A Earth work & site clearing Manual Excavation over site to reduce level in any material (except rock requiring blasting ) including depositing and levelling as directed distance exceeding 30'-0" but not 6A.1 exceeding 1/4 mile. Cube Chip off the damaged & weaker plaster & renders from the existing drying bed, existing soaking tank & existing well & remove the waste & debrises from the site(Total qty will be 6A.2 45sqrs) as directed by the Engineer m.days wall & pit foundation for motor room & transformer room not exceeding 5'-0" deep in any soil except rock requiring blasting, part return filled and rammed and cart away surplus 6A.3 away from site Cube Supplying, filling, spreading, watering & required compaction of Gravel under the floor & well apron 6A.4 bed. Cube 6A- Earthwork & site clearing 4.00 4.00 1.76 1.00 33/38 Transition Recovery Programme Sri Lanka Title of the Project Project No. Site Location District Item Bill of Quantity ReConstruction of Rice Mill at Oddankulam NLDP/ 83642/MUL/1 Oddankulam, Panankamam Mullaitivu Description Unit Concrete Work 3" thick 1:3:6(1") mix concrete for foundation & column pad. Rate includes for mixing, placing, vibrating and curing of 6B.1 concrete Cube 3" thick 1:21/2:5(1") concrete for floor. Rate includes for 6B.2 mixing, placing, vibrating and curing of concrete Cube Qty Rate Amount 6B 1:2:4(3/4"), Concreting for footing and Column. Rate includes 6B.3 for mixing, placing, vibrating and curing of concrete Tor steel reinforcement to columns & footings bent to shape laid in position and tied with G.I wire as directed. 10mm, 12mm Tor steel for reinforcement & 6mm mild steel for 6B.4 stirrups as per drg. Detail. Mild steel reinforcement for columns and plinth beam- @ 6" C/C & links for plinth beam @6" C/C. Form work Sawn timber/ Plywood formwork. includes making, assembling, dismandling and repairing for re-use -2 6B.5 uses of mould for casting Cube Kg 0.40 2.20 0.30 87.89 Kg 15.00 Sqrs 1.10 4" thick slab in 1:2:4(3/4") concrete mix and reinforced with Y10 dia bar @8" c/c including reinforcenet, bent to shape laid in position and tied with G.I wire and Form work by using Sawn timber/ Plywood form for casting of beams. Rate includes making, assembling, dismandling and repairing for re6B.6 use -3 uses of mould and curing etc. as per details Sq.ft 6"x 6" Lintol/tie beam in 1:2:4(3/4") concrete mix and reinforced with 4Nr. Y10 dia bar & R6 stirrups @8" c/c including reinforcenet, bent to shape laid in position and tied with G.I wire and Form work by using Sawn timber/ Plywood form for casting of beams. Rate includes making, assembling, dismandling and repairing for re-use -3 uses of mould and 6B.7 curing etc. as per details L.ft 9"x 9" RCC beam in 1:2:4(3/4") concrete mix and reinforced with 4 Nr. Y12 dia bar & R6 stirrups @6" c/cincluding reinforcenet, bent to shape laid in position and tied with G.I wire and Form work by using Sawn timber/ Plywood form for casting of beams. Rate includes making, assembling, dismandling and repairing for re-use -3 uses of mould and 6B.8 curing etc. as per details L.ft 6B- Concrete work 107.50 10.00 32.00 34/38 Transition Recovery Programme Sri Lanka Title of the Project Project No. Site Location District Item 6C ReConstruction of Rice Mill at Oddankulam NLDP/ 83642/MUL/1 Oddankulam, Panankamam Mullaitivu Description Unit Qty Rate Amount Masonry work Rates shall include for all rough and fair cutting, plumbing, angles, forming related reveals, rough arches, raking out joints for pointing plastering etc, cutting and trimming forming or cutting chases, making good and sundry items of a like nature. 6C.1 6"-9" Rubble work 1:5 ct. mix for foundation 6" thick Block work in 1:5 ct sand mix by using sandcrete blocks casted with 1:7 cement sand mix including required curing (on the request of Engineer Compressive strength reports to be produced by contractor) rate shall include for 6C.2 provison or casting of blocks 6C- Masonry work 6D Bill of Quantity Cube 1.20 Sqrs 3.00 Plastering & Rendering work Rates shall include for all temporary rules, screeds, grounds etc. for raking out joints of new brick work or hacking new concrete for key internal and coved angles, joints between different surfaces and between arises and all making good around pipes, electrical fittings, sanitary fittings etc. 1/2" thick plastering in 1:4 cement / sand mortar 6D.1 for the internal wall finished smooth. Sqrs 5/8" thick plastering in 1:4 cement / sand mortar 6D.2 for the external wall finished smooth. Sqrs 5/8" thick plastering in 1:4 cement / sand mortar 6D.3 for the external column & beam finished smooth. Sqrs 1/2" thick rendering in 1:2 cement / sand mortar & with 1/8" thick grey cement screed finished smooth to floor. 6D.4 Sqrs Plinth plaster of 1/2" thick in 1:3 cement / sand mortar 6D.5 finished smooth with grey cement floating. Sqrs 6D- Plaster & render work 3.00 3.00 0.88 48.97 2.40 35/38 Transition Recovery Programme Sri Lanka Title of the Project Project No. Site Location District Item 6E 6E.1 6E.2 Bill of Quantity ReConstruction of Rice Mill at Oddankulam NLDP/ 83642/MUL/1 Oddankulam, Panankamam Mullaitivu Description Unit Qty Rate Amount Iron Work Providing 2 Nos of 2'-6"x 6-0" size doors made by using 11/4" dia heavy duty GI pipe as outer frame & intermediate line, welded with 1" wide 1/4'' thick flat iron internal panel border to fix the Zincalum 0.42mm thick powder coated steel sheet with the needed accessories Sq.ft Providing Steel stand made by using 2"dia heavy duty GI pipe for vertical legs(4Nrs), Horizontal ring tie at 3 places( bottom, intermediate, Top), bracing by using 1" dia heavy duty GI pipe with the needed foundation fitting arrangements as per detail drawing. It should be carry 1000 litre PVC water tank and minimum height-12'-0" from ground. Nrs 6E- Iron work 30.00 1.00 Provisional sum 65,000.00 36/38 Transition Recovery Programme Sri Lanka Title of the Project Project No. Site Location District Item 6F Bill of Quantity ReConstruction of Rice Mill at Oddankulam NLDP/ 83642/MUL/1 Oddankulam, Panankamam Mullaitivu Description Unit Qty Rate Amount Plumbing Work Rate shall include for: (a) Screws, nails pipe, locks, shaddles, brackets, sockets, connections short lengths, backnuts, nipples and chasings etc. and making good in all trades. (b) All laps straight cutting and waste. Unless otherwise stated rates for the following items shall be for PVC piping for water service waste etc. which shall comply with the latest S.L.S 147 or BSS 3505. Any special water supply and drainage fittings such as bends, tees reducers etc. unless otherwise specified seperately in the Bill of Quantities shall be deemed to be have been included in the relevant items and such items should accordingly be rated to include for such specials etc. any extra work involved and satisfactory completion of such items. WATER PIPES (upvc Type 1000 to SLS 147;1983) 1/2" dia as connection to sanitory fittings laid under floor or 6F.1 buried inside wall as directed 3/4" dia. As distribution pipe laid under floor or buried inside 6F.2 wall with necessary specials. 11/2" dia as delivery pipe (600 type) from main supply fixed to wall with M.S hooks or buried inside the wall as directed and commissioning the entire system to the approval of the 6F.3 Engineer. 2" dia as suction pipe (600 type) from main supply fixed to wall with M.S hooks or buried inside the wall as directed and commissioning the entire system to the approval of the 6F.4 Engineer. Supply & install a PVC water tank of 1000 litres and fix a water pump of 1.5 H.P.complete with float switch etc.and the necessary connections as per detail drg./ Engineers 6F.5 instruction. 6F- Plumbing work 6G 6F-Painting work Prepare surface and apply one coat primer and two coats of emulsion paint of approved quality & colour to internal face 6G.1 of the wall Prepare surface and apply one coat primer and two coats of weather shield emulsion paint of approved quality & colour 6G.2 to the external face of the wall & columns & beams 6G-Painting work ft 100.00 ft 200.00 ft 300.00 ft 30.00 Nr. 1.00 Sqrs 3.00 Sqrs 3.88 37/38 Transition Recovery Programme Sri Lanka Title of the Project Project No. Site Location District Item Bill of Quantity ReConstruction of Rice Mill at Oddankulam NLDP/ 83642/MUL/1 Oddankulam, Panankamam Mullaitivu Description Unit 6J External Works 6J.1 Fence, Barbed wire, 6 strands, 12 1/2" B.W.G with 4 points at 3" centers and R.C.C posts 1:2:4 (3/4")mix. Concrete with 4 Nos 1/4" rods with 1/4" stirrups at 8" C/C ,Post to be fixed at 8'-0" C/C including excavation,cement concrete foundation 1:3:6 (1") metal to corner post and struts, straining bolts, all as per detail drawing. struts to be R/F with 4 Nos 3/8" rods & corner post with 4 Nos 1/2" rods. Fence posts, struts and corner post 6'-6" high squre section 4" to 6" fixed complete as directed. L.ft 6J.2 6J.3 6J.4 6J.5 6J.6 6J.7 Gate Double hung with iron grill 1/2"x 1/4" as ornermental design and covered with amona sheet fixed to oter frame with 1 1/2" dia. G.I pipe and 2 Nos of intermediate bearers and fixed the wall with suitable M.S bar hunger to be burried into the wall and concreted as directed including heavy duty pivot hinges and necessary locking arrangement with 2" padlock. Rate to include for two coats of anticrrosive with two coats of enamel paint to approval. R.C.C.footings F1 2'-6"x2'-6"x0'-9" in 1:2:4 (3/4") Mix Reinforce ment with 5 Nos. 10mm Tor steel both ways and 12mm Tor steel column bars and stirrups with 6mm mild steel at 6" C/C. Rate including excavation. Column 9"x9" in R.C.C 1:2:4 (3/4) mix Reinforcements with 4 Nos 12mm Tor steel and 6mm mild steel stirrups at 6" C/C including starter bars from base up top. Plastering 3/4" minimum thickness in 1:3 cement & sand to columns finish smooth. Qty 84.00 Nrs 2.00 Sqrs Construction of 6'-0'x4'-0"x5'-0" size soaked water treatment filtering tank by using 6" thick block work, 4" dia PVC (600 type) connection pipe from soaking tank to treatment filter100'-0" length, supplying of filter materials(4"-6" rubbles, 1" metal, 3/4' metal, River sand Total qty-2 cube) Item Construction of 2'-0" dia 24'-0" long RCC Hume pipe Culvert at Entrance Gate as per the detail Drawing. Item 6J- External work Amount 1050.00 Sq.ft ft Rate 18.00 0.42 allow allow Provisional Sum Provisional Sum 60,000.00 130,000.00 38/38 ~ ANNEX- 1.5.2 II I 9J II II t,r._; I I t3\' g@ \.' [I r-1 (J;) 1YPE 1. ~ (,__7) (9) DRYlNGYARD b DRYING YARD 2 STEAMER 3 SOAKING TANK. .. PRE CLBANJNG SBCOON AND Dum:' ROOM 5 BOILER ROOM AND ASH TRAP 6 (i~; DESCRIPTION MACHINE ROOM with BlaD room, Bulk room, labour l'll8t room, tea room & offiDe mom 7 PADDY STORE I MOTOR ROOM 9 WELL LJ (s)n() ~ni'IE ~W«DUJJ'ir Name ofPI'oject Northern Livelihood Development Project (NLDP) DoDOZ" Client Implemented by Nameofla.b Project 6: No: Rccooatruc:tion of Rke Mill and other relative Btructures at Qrldan...•lam in Manthi Eut DS Divlaion NLDP I 8364-2 MUL I 0110112013 Norway MPCS Panakamam Pattu Drawtng T:I.Oe : Site1ayout Transition Recovery Programme UNDP II mm ' mm Sri Lanka Dn.WII. by: Cla.edr:ed hy: .l.pp!'Oftd. by: Dnwbl.gNo: I•ne NLDP/83642/MUL/1 Field Aaaistant Field. Bnginee:r SPB D- 02 LOT-1 B.evislcm No: Sc:Ue 1/20 Sheet st. .u Date 2012-11-07 ANNEX- 1.5.37 ___J L__ OJ - ALL DJMENSIONS ARE IN MII.LIMI:lERS 02 - C EMDI'l' CONCRETE: HEAD WALLS n!ANSJ'IIDN 1\ND EErrliNG SHALLIIE l ol:G(«lmm) 03 - RE!NrQRCED C ONCRETE: SHALL BE 1:2:' (20mm) Q( - ~~=~R:o~~~~ M - RE!NrQRCEMEN"' SHALLIIE • HIGH YIELO STRESS IIM:S OF C HAitAC!!lUSTIG S'l'RE:NC'l'HOF ~2SN/mm 0 * MILD Sn:EL FORS'111tRlJPS 0$ - aA1I. NO'!'ATION - S1ANDARD NO'!'ATION IS USI:D ["-'20 Y 10 ~~ ___j_J~ ___j HICH _ YIDD BAR ~ 83 - 150 T I I 1------f!' SFAC INC mm) 116RMAR!( DtAMETEit (mm) Pump Room 4'-6" X 3'-6" ~ I I I GlI ~~ ~ . ::J·~ I -- 1'-0" 1 I 50 PL1lN FRONT ELEVATION 2'-6" / 4'-6" / 0'-4" 12Y10 @ 6" c/c / / J / 0'-9'> 1 I 50 0'-4" SECTION X-X i WN~N&] i ""' ~ ~ y \o @) ColoTboml~d Zinc AlunTinum ""'" 1'-3" -- 1'-9" 0 Detail of Foundation ;::..-. lf'G.It'!i Detail of Door ""' 1 I 40 Name of Project Northern Livelihood D evelopment Project (N L DP) NameofSub Project & No: R econstruction of Rice MiU and other rdative structures at Oddankulam in Manthi East D S Division NLD P I 83642 MU L I 01/0 1/2013 Drawing Title : Construction of Motor room by: Checked by: Detail ofRIF slab 1 I 40 Donor Client Implemented by Norway MPCS Panakamam Pattu Transition Recovery Programme UNDP I Approved by: I Drawing No : Issue NLDP/83642/MUL/ I Field Engineer I SPE 1 I 40 D- 37 LOT-I Revision No: I Scale Sheet size A4 Date 2012- 11 - 07 ANNEX - 1.8.38 Color bonded Zinc Aluminum Corrugated Roofing Sheet ( tk. 0.47mm) 1~" x l~"Box Anger bolt iron 0%" Torbar 6mmtk. Bearing Plate 3Mz" Zi. Box type gutter Detail of We Ttrusa I Name ofl'nject Northern Livelihood Development Project (NLDP) Name of lab Project 6: No: Rccooatruc:tion of Rke Mill and other relative Btructures at Qrldan...•lam in Manthi Eut DS Divlaion NLDP I 8364-2 MUL I 0110112013 Drawtng T:I.Oe : 1 .,....... Norway Client anakamam ttu 1 Construction of Mill unit Detail of main TI'WJIJ ... l§:::J I DoDOZ" ..,1--..·1-""' Field.Bnainee:rl SPB I NLDP/8364ZIMULII D- 36 I Implemented by Transition Re Pr~ UNDP 11-""·1·I I LOT-1 I 1/ 28 I 1-I .u I I- I 2012 - ll - 07 ..,......... / / -- -- ANNEX • 1.6.34 .......... .......... I / '~ Detail of mala Tlnul• ·I I \ I I \ \ ~ I \ I \ I '\. ' / ......... .............. -- -- / _,.,... / Name ofPI'oject Northern Livelihood Development Project (NLDP) Nameofla.b Project 6: No: Rccooatruc:tion of Rke Mill and other relative Btructures at Qrldan...•lam in Manthi Eut DS Divlaion NLDP I 8364-2 MUL I 0110112013 Drawtng T:I.Oe : Construction of Mill unit Detail of main TI'WJIJ wn.waby: Cla.edr:ed hy: \ I .l.pp!'Oftd. by: I Dnwbl.g No : I•ne NLDP/8364ZIMUL/1 Field Bnginee:r I SPB D- 34 DoDOZ" Client Norway MPCS Transition Panakamam Pattu Recovery Programme UNDP B.e9islcmNo: I Sc:Ue 1/28 LOT-1 Sheet st. .u Implemented by Date 2012-11-07 ANNEX- 1.8.33 ~~ ( tk.Jl47mm------.)------" -- -- / ............ <36kr bonded Zinc ............ ......___ '\ / Al~ ---- -Detatl of mala Tb'an- B 1/40 _.,... Detail of mala. Ttnul•- G 1/40 I \ " -- -- _..,.. ......... / / Detail of main Ttrass -I I Name ofl'nject Northern Livelihood Development Project (NLDP) Name of lab Project 6: No: Rccooatruc:tion of Rke Mill and other relative Btructures at Qrldan...•lam in Manthi Eut DS Divlaion NLDP I 8364-2 MUL I 0110112013 Drawtng T:I.Oe : 1 .,....... l§:::J I DoDOZ" Norway Client anakamam ttu 1 Construction of Mill unit ..,1--..·1-""' NLDP/8364ZIMUL!l Field.Bnainee:rl SPB I I Implemented by Transition Re Pr~ UNDP Detail of main TI'WJIJ ... 1/40 D- 33 11-""·1·I I LOT-1 I 1/ 28 I 1-I .u I I- I 2012 - ll - 07 ANNEX- 1.8.32 --~ Detail of:maiD tnaaa I Name ofl'nject Northern Livelihood Development Project (NLDP) Name of lab Project 6: No: Rccooatruc:tion of Rke Mill and other relative Btructures at Qrldan...•lam in Manthi Eut DS Divlaion NLDP I 8364-2 MUL I 0110112013 Drawtng T:I.Oe : 1 Norway Client anakamam ttu 1 Construction of Mill unit Detail of main TI'WJIJ .., l§:::J I DoDOZ" .,......,..,1.._.......,1-""' Field.Bnainee:rl SPB I NLDP1836421MUL11 D- 32 I Implemented by Transition Re Pr~ UNDP ~- I 1-""·1•I LOT-1 I 1/ 28 I 1-I .u I I- I 2012 - ll - 07 ANNEX - 1.5.24 ~.1/' 1 90'-0" r 10'-4" 111Q' !O'Q' !O'Q' IO'Q' lO'Q' 10'-0" IO'Q' 1 1 -- I I ----r ~I ~ -- @ -- @ ®- ;l Husk: room Bran room Labour room with Tea room Office 24'-6":.N' 14~:18'-6" IU':.I'-6" ~ - l~'-8"l -- l~'-8"l - l:W'-9"l - 1:te'-'" I : .L] @J Pre cleaning section Machlne room 19'-"'x25'-6" W-6"x25'~' H-- ~~ ~I -- -- -- -- -- I+t'-'" I -- -- -- Il ~ -- I+1'-"' I I I I I I I ~-- -- -- @ -- ~ -- ~[lj\[M Name ofPI'oject Northern Livelihood Development Project (NLDP) Nameofla.b Project 6: No: Rccooatruc:tion of Rke Mill and other relative Btructures at Qrldankt•lam in Manthi Eut DS Divlaion NLDP I 8364-2 MUL I 0110112013 Drawtng T:I.Oe : wn.waby: Cla.edr:ed hy: ~ - • I- ® -- ~- - DoDOZ' Client Implemented by Norway MPCS Transition Recovery Programme Panakamam Pattu UNDP Conatruction of Machinerary room with Pre cleaning unit I .l.pp!'Oftd. by: I Dnwbl.g No : Field Bnginee:r I SPB NLDP/8364ZIMUL/l D- 24 I•ne LOT-1 f_Q__~ ®__ B.e9islcmNo: I Sc:Ue 1/125 Sheet st. .u Date 2012-11-07 "'~ I '""' 1---~"" r-~1 ~ I ..... I ... I @- - ~ ~ Husk room -- ~ ~ 1 4'.fi"~ll'.6" - - ~ - ~ LI'J ~ Labour room with Tea room ~ 19'·6" ~ 11'.6" t-~ -71 ~ ~ r- Machine room ~ ~ ~ ~ I I ~ ~ b] ~~ ~~!"" @ Pre cleaning section ~ .;16 I ~.·.';:;'..( L~::;;:r· ~IElGu~(O)If!l _@ _ ~ _ &__ I {9 _ ft ANNEX - 1.5.36 -~ _ @_ @_ ® LI'J -- ,_r-<J; ':?II-':* II '. ,.; ,:-f? ~ d:: d:: a § [Fl~~lf!l IF!Rl(O)If!lu ~ ~ IOliE IE~IEW~u~(Q)if!J Name of Project Northern Livelihood! D evelopment Project (N L DP) NameofSub Project & No: Reconstruction of Rice MiU and oth er rdative structures at Oddankulam in Manthi East DS Division NLDP I 83642 MUL I 01/01/2013 Drawing Title : Construction of Mill unit by: Checked by: Client Implemented by Norway MPCS Panakamam Pattu Transition Recovery Programme UNDP I Approved by: I Drawing No : Issue NLDP/83642/MUL/ I Field Engineer I SPE Donor D -36 LOT-1 Revision No: I Scale 1/250 Sheet size A4 Date 2012- 11 - 07 ANNEX- 1.6.29 I ~ I ~ ~ I I - I @ ® (i) ® ® ® I I I I I I I I I ® ® 0 ® I I I I I I I I I I m --- L - - -iTf 4 --- ~ 11 9 I I ®> I ' I I I -=!f:t- ~ ~ I I - I - I 1 _ L - - - _L- 1 ~~ ~~ I <D @- --:----:--- r-;~8 ©- - !lO'Q - ®- I - j 8 - ; -I - -@ 8 _ L - - - _ L - - - _ L - - - _l_-- 1 1 1 1 1 1 I I I I I I I I I I I I I I I I I I I I I I I I { P - -© 9 jrl I I I ' @)- -we:_i_€0 1 s--: -$--: -$--: -$--: -$--: -$--: -:~- ~ 9 &-F!£=- 3-B-- 3- ~e - -=tf ·~~-$ -~-fG - ~ fS: - Si-F --~ f E- ~ - --® I ® I ® I ® I I I ® @ I ® 0 I I ® ® I ® lPll!J:IlM IFW!llil g Name ofPI'oject Northern Livelihood Development Project (NLDP) DoDOZ" Client Implemented by Nameofla.b Project 6: No: Rccooatruc:tion of Rke Mill and other relative Btructures at Qrldan...•lam in Manthi Eut DS Divlaion NLDP I 8364-2 MUL I 0110112013 Norway MPCS Drawtng T:I.Oe : Construction of Mill unit Detail of Foundation layout Transition Recovery Programme UNDP wn.waby: Cla.edr:ed hy: I .l.pp!'Oftd. by: I Dnwbl.g No : Field Bnginee:r I SPB NLDP/83642/MUL/1 D- 29 I•ne LOT-1 Panakamam Pattu B.e9islcm No: I Sc:Ue 1/125 Sheet st. .u Date 2012-11-07 ANNEX - 1.5.30 .with 6"Tk. Wall Detail of Drainage S: 1/20 ~t Ck ~ .... ~Yl r = '? ,k 0'-6" (; 0'-6" ., 1 ~ M, ~ ., > Detail of liDtoI Detail of Beam (DO&:Dl) 5' = s: <'.' ~ 1/20 ~~ r ., 0'-6" (.; Detail of Roof band s: .! I'4Y12 16 (; 0'-9" 1'-6" 2'-0" min width 2'-0" min width ., ' Detail of Beam s: S: 1/28 S: 1/25 l/20 Northern Livelihood Development Project (NLDP) NameofSuh Pzoject &: No: Reconstruction of Rice Mill and other relative structures at Oddankulam in Manthi East DS Division NLDP I 83642 MUL I 01/01/2013 Dmwing Title : Construction of Mill unit Detail ofFoundation layout I .l.pp.ro'ftd by: I D.rawiDg No : IField Assistant I Field Engineer I SPE Detail of Foundation (FD-B) Detail of Foundation (FD-.A) «Pte el•mt•a amlt) 1/20 Checked by: I 1'-6" Name ofPzoject IDrawnby: J?~YJ " r :; s~ J?£YJ S:l/20 ~[ 1: NLDP/83642/MUL/ 1 D- 30 DoDOI' Client Implemented hy Norway MPCS Transition Recovery Progranune Panakarnam Pattu UNDP ~-~~~ ~ ~~ ~ !IUJ ilD Sri Lanka Issue LOT-1 Revision No: I Scale Sheet size .1.4 Date 2012 -II- 07 ANNEX- 1.5.31 6mmMSb11r L p ~ L J i~ l r ~ 3'-9' Detail ofFaa light (8mm. MS aet) I; 1/ZO l s Detail of911 X 9" RIF Cola.ma Cl,Fl) I: I /ID Name ofPI'oject Northern Livelihood Development Project (NLDP) DoDOZ" Client Implemented by Nameofla.b Project 6: No: Rccooatruc:tion of Rke Mill and other relative Btructures at Qrldan...•lam in Manthi Eut DS Divlaion NLDP I 8364-2 MUL I 0110112013 Norway MPCS Drawtng T:I.Oe : Construction of Mill unit Detail of Column Transition Recovery Programme UNDP WU.Wilby: Cla.edr:ed hy: I .l.pp!'Oftd. by: I Dnwbl.g No : Field Bnginee:r I SPB NLDP/83642/MUL/l D- 31 I•ne LOT-1 B.e9islcmNo: I Sc:Ue Panakamam Pattu Sh.eetsbe .u Date 2012-11-07 ANNEX - 1.5.28 90'-0" ~I ~ ~ ®- --¥::*4 Hl='l ----HH +¥+ Hl-1 i"+'l HH ~ - Mt-1 -@ ~ ©- _l_ I - ,- -- I I I ....~I -~ - - - - - - 1I ®- - ~ ®- - I• + +• ! ---+ .-! ~ • ! -. F- + +. ;: -----F*:! !--. ~ +-- •-+ 4=-----.J I G) rPL~~ Nam.e ofPI'oject Northern Livelihood Development Project (NLDP) Nam.eofSuh Pl'oject lie No: Reconstruction of Rice Mill and other relative structures at Oddankulam in Manthi East DS Division NLDP I 83642 MUL I 01/01/2013 Drawing Title : IDrawnby: Checked by: Donor Client Implemented hy Norway MPCS Transition Panakamam Pattu Recovery Construction of Mill unit Detail of column layout UNDP I .Approved by: I DrawiDg No : Issue NLDP/83642/MUL/ 1 IField Assistant I Field Engineer I SPE Programme D- 28 LOT-1 Revision No: I Scale 1/150 Sheet size .1.4 Date 2012. 11-07 ANNEX - 1.8.21 --..... ~ ___ .... - _L F ~ - D / E Detail of· D • 1:1/SO - CobcbomdociZilla~Raof!q- (lk.D.47..... ) " --- / Detail of· F • Detail of· E • 1: 1/ID l:l/80 Name ofPI'oject Northern Livelihood Development Project (NLDP) DoDOZ" Client Nameofla.b Project 6: No: Rccooatruc:tion of Rke Mill and other relative Btructures at Qrldan...•lam in Manthi Eut DS Divlaion NLDP I 8364-2 MUL I 0110112013 Norway MPCS Transition Panakamam Pattu Drawtng T:I.Oe : Construction of Cleaming Room Detail of Truss Recovery Programme UNDP wn.waby: Cla.edr:ed hy: I .l.pp!'Oftd. by: I Dnwbl.g No : Field Bnginee:r I SPB NLDP/83642/MUL/1 D- 21 I•ne LOT-1 B.e9islcmNo: I Sc:Ue 1/125 Sheet st. .u Implemented by Date 2012-11-07 ANNEX- 1.8.22 Color bonded Zinc Aluminum Corrugated Roofing Sheet ( tk. 0.47mm) Anger bolt 12'-9" 1~" x 1~" Box / ..~ 01~" Hea .-.- iron 0%" Tor bar 6mmtk. Bearing Plate " tk. Valance board 6m.m tk. Base Plate 0 16 mm, 300 mm :o1t Detall of- Web tzuu I Name ofl'nject Northern Livelihood Development Project (NLDP) Name of lab Project 6: No: Rccooatruc:tion of Rke Mill and other relative Btructures at Qrldan...•lam in Manthi Eut DS Divlaion NLDP I 8364-2 MUL I 0110112013 Drawtng T:I.Oe : 1 Norway Client anakamam ttu 1 Construction of Cleaning Room unit Detail of Tl'WII .., l§:::J I DoDOZ" .,......,..,1.._.......,1-""' Field.Bnainee:rl SPB NLDPJaae4ziMULil 1 D- 22 I Implemented by Transition Re Pr~ UNDP ~- I ~-,..·I•1 LOT-1 11125 I 1-1.u I I- 1 2012 _ n _., ANNEX - 1.5.18 Color bonded ZiDi; A.lumDwm Corruglltl!d. Roofing Sbeat (lk..0.47~ 9"x~ ~ Yl2 RfF ~ I' M 6"x6"Limol 1:2:4<*") Cone. -~ :: -· N ~ 00 ~ ~ ' soil compactor to achieve 95% proctor compac1ion density 3'-3'' 10'-0" $[E(C1fHOJ~ WW c Nam.e ofPI'oject Northern Livelihood Development Project (NLDP) Nam.eofSuh Pl'oject lie No: Reconstruction of Rice Mill and other relative structures at Oddankulam in Manthi East DS Division NLDP I 83642 MUL I 01/01/2013 Drawing Title : IDrawnby: Checked by: 3'-3" Donor Client Implemented hy Norway MPCS Transition Panakamam Pattu Recovery UNDP Construction of Clearning Room unit I .Approved by: I DrawiDg No : IField Assistant I Field Engineer I SPE NLDP/83642/MUL/ 1 D- 18 Programme Issue LOT-1 Revision No: I Scale 1/75 Sheet size .1.4 Date 2012. 11-07 30'-0" I 10'-0' I lO'.q' 10'-0'' ...... __ _ ·-·100-- Dl·.vlo-MBmMILLIIII'Da Ill- CEIII!IIIr COIICllllln! !IliAD1MWI!lllllmSB 1 . -- . --:;l ~ ANNEX -1.5.16 .Am)JISJDDra_,.,D L:.l:l ~ 03-~-=:~"::C. IM-IIIEIIIIIIIc::a't'EI~:auuca:wan •--ua::watiK&ILa •=::'::'.::'-OF~ •IIIYI S!'Bm.FDKIIJIIIBIIII, •--IIOr.IOIOII-IIriiiiWIIIIIIIOI>mOIIaliMI I I .. 1' 10-U-llllf :"'mu,.u :::::J I Cleaning section mAIIIIIEIIIIND) ~ I I ~= ........ 29-e X 19'-6" ;--~· ----- -- -- -- • I=t'-6" I ~ 13 ( LJL_ ~ l- L! - Dust room I I I I ~- -- __ =-_j Type 9'-e l [ 11-e L_ I I 3'.q' I I±0'-9" I ]), Size 4'-0" ][ 8'-0" Deleriptioa N01 Roller shullm Door ( Clo~ Type) 01 14 ~-- IP~IM 10'-0' ~ Name ofPI'oject Northern Livelihood Development Project (NLDP) DoDOZ" Client Implemented by Nameofla.b Rccooatruc:tion of Rke Mill and other relative Btructures at Qrldan...•lam in Manthi Eut DS Divlaion NLDP I 8364-2 MUL I 0110112013 Norway MPCS Transition Recovery Programme UNDP Project 6: No: Drawtng T:I.Oe : ion.WII. by: Cla.edr:ed hy: Pattu Construction of Cleaning Room unit I .l.pp!'Oftd by: I Dnwbl.g No : I•ne NLDP/83642/MUL/l !Field Aaaistant Panakamam I Field Bnginee:rI SPB D- 16 LOT-1 B.e9islcmNo: I Sc:Ue 1/100 Sheet st. .u Date 2012-11-07 ANNEX- 1.6.19 n..vul~s" 1: 2 :4 (3/411) Mass ~k.~:: 1-+- ~00~ 1. / ~ - •• Hrm '. · ~ - I r- - r- .a ~ 0 2 •L YlO 4·YlO v 0'-6" 71/ 1/ 0'-6" 1/ r 7 SOIL COMPACTOR TO ACHIEVE 95% PROCTOR COMPACTION DENSITY • ~ LAVE~ ad--.~ r ~ ~ GAUGE POLYTHENE _.. ,1 · ·• · · S: 1/10 (6"-9.. mm) ' r??' .. RANDOM RUBBLE MASONRY IN 1:5 CEMENT SAND MORTOR S: l/10 3 11 THK 1:3:6 (1 ..). SCREED CONCRETE 0'-61t SCR Gravel/Hard earth Filling SECTION 4-4 0'-3., 1:2!:5 (1") cone. S: 1./25 R06@8" SECTION 3-3 S: 1/25 I[ r , 11 r 3'-0" I, I, 7 14Y10 1/ 0'-6" 1/ 7 Detail of Drainage S: 1/20 S: 1/10 Nam.e ofPI'oject Northern Livelihood Development Project (NLDP) Nam.eofSuh Pl'oject lie No: Reconstruction of Rice Mill and other relative structures at Oddankulam in Manthi East DS Division NLDP I 83642 MUL I 01/01/2013 Drawing Title : IDrawnby: Checked by: Donor Client Implemented hy Norway MPCS Transition Panakamam Pattu Recovery Construction of Clearning Room Details of foundation , Lintol , Roof band , Beam & Drainage I Approved by: I DrawiDg No : Issue NLDP/83642/MUL/ 1 IField Assistant I Field Engineer I SPE D- 19 LOT-1 Programme UNDP Revision No: I Scale 1/125 Sheet size .1.4 Date 2012- 11-07 ANNEX - 1.5.23 01 - ALLDIMENSIONSAREINMILLIME'I'RES 02 - CEMENT CONCRETE HEAD WALU3 TRANSITION ANDBEDDINGSHAILBE 1:3:6 (40rnm). 03 - REINFORCED C ONCRETE SHALL BE 1:2:4 (30mm) OF C HARACTERISTIC STRENGTH feu = 20 N/ mm z. 04 - MINIMUM COVER FOR REINFORCEMENT * Slab & RCC bands 25mm *Pad , colwnn, beam 40nun 05 - REINFORC EMENT SHALL BE * HIGH YIELD STRESS BARS OF CHARACTERisrJC ,~I q 0 STRENGTH OF 428 N/:mm~ • Mn..D STEEL FOR STDUtUPS 06 - BAR NOTATION - STANDARD NOTATION IS USED NUMllER I I ___j_j~ 20 y 10 -~- HIGH - YIElD BAR ___j TL___ TOP SPAC rnG (rrun) DIAMETER (mm) BAR MARK Cleaning section 29'-6" X 19'-6" -- -- -- Type Do q ~ I I I 13 L ~ I ~ -- -- Dust room I I I I I±0'-9" I ~ I @ ~ I-9'~6 11 X 9'~6'' -- >--------. I 3'-0" 01 :~~ "' ~~~ ' " "'"m) '9 "'' "' ----~ I :; I Nos Roller shutter Door ( Closed Type ) [F[pd(QJ ~[j' ::il I _j Description 4'-0" X 8'-0" I ll I±t'-6" I I Size 0 ~ 10'-0" ~I 0 ( ;::; 3'-0" e;, Oo [pl[LfA\~ . V> -' ----= 4"tl:.oonc · /'fJ III~~,)C~ ~= w ~ ~- · ~ .·--'"'=~--~ Y~Tls:rr "":£' ,,_,-~ ~ , j _j ~ H•d 10'-0" ~[E~[j'~ (QJ~ WJ Q Name of Project Northern L ivelihood Devdo]pment Project (NLDP) Name of Sub Project & No: Reconstruction of Rice Mm and other relative structures at Oddankulam in Manthi E ast DS D ivision NLDP I 8364-2 MUL I 01/01/2013 Drawing Title : Construction of Clearning Room unit 3'-3" ~ ~ [Dl[EIE [L IEWJ!A\11 ~ (QJ ~ WJ Donor Client Implemented by Norway MPCS Panakamam Pattu Transition Recovery Programme UNDP Sri Lanka Drawn by: Checked by: I Approved by: I Drawing No : Issue NLDP/83642/MUL/ 1 Field Assistant I Field Engineer I SPE D -23 LOT-1 Revision No: I Scale 1 I 150 Sheet size A4 Date 2012- 11- 07 ANNEX - 1.5.20 01 -ALL DIMEI!IBIOMI ABE IN MlllaiE'l'.ltf. OZ- CEMENT CONCRm'B BBAD WALIB TRANB1'.110N .AND BEDDING SHALl. BE ll3:8 (401nm). IJI3 -IIEINI'OltCED w.HCJIEt:E SHALL BB 1:3:4 f8llmml OF CHARACrl!lll!mCSDIEN<ml •r:r 20 Nlmm ~ 1M- MINIMIJM COVER PORRmiFORCEMEMI' *Sial) 61lCC btuld8 Zllmllll * Plld, colliiNI, beam COinm. 08 -IIEINI'ORCEME!ft' SHALL Ill! * HIOH YJELD lmDIB -.OF CHAliAC'l'Eitll IITRBNG'JH OF 411 Nlmm *MILD lr1'2!Ll'OJllmDUPS 08 -IIDlfOTATION- 8I:ANDJiltD NOTATION IS USED liO T 10 - liS - 180 T :="mm... DIAME.'lER (mm) I I I I .,_.;: liD MAn Y10@6"a/o ______ L llcne4 ca..:. ; 1:3:6(1") ~~ l , ~ '-----!l, , , Detail of 9" x 9" RIF Detail of 6" x 6" RIF Coi'UIUl Column S: l/40 S: l/40 Nam.e ofPI'oject Northern Livelihood Development Project (NLDP) Nam.eofSuh Pl'oject lie No: Reconstruction of Rice Mill and other relative structures at Oddankulam in Manthi East DS Division NLDP I 83642 MUL I 01/01/2013 Drawing Title : IDrawnby: Checked by: Donor Client Implemented hy Norway MPCS Transition Panakamam Pattu Recovery Construction of Clearning Room unit Details of 9" x 9" Column & 6" x 6" Colunm I .Approved by: I DrawiDg No : IField Assistant I Field Engineer I SPE NLDP/83642/MUL/ 1 D- 20 Programme UNDP Issue LOT-1 Revision No: I Scale 1/125 Sheet size .1.4 Date 2012. 11-07 ANNEX - 1.5.15 ----- -------------------...!;> 2/2~LS 2/2~LS l l ts·~· Donor Name ofPI'Oject Northern Livelihood Development Project (NLDP) Namearsu PI'OJect & Na: Reconmuction of Rice Mill and other re1ative structure~ at Oddankulam in Manthi East DS Diviaion NLDP I 83642 MUL I 01 Drawiag 'l'itle : Construction of Boiler and Ash Trap Nonva.y Client Implemented by MPCS Panakamam Pattu Transition Recovery Progzamme UNDP Detail ofTruess by: CWby: Jl.ppnved by: .Aaaisttud I Field E:naineer I SPE Dra.wblg No : NLDP/83842/MUL/1 D-16 I Iuae I Re91aioa No: Seale I I Kot :Ia Rale Slleet•IH I .lA Date I 2012 • 11 • 07 ANNEX- 1.5.13 0I ~ ~ N OoI f... - b - f""l I ~ I ~ 3'11<. cone. , BR 1 15'-0" Name of Project Northern Livelihood Development Project (NLDP) NameofSub Project &: No: Reconstruction of Rice Mill and other relative structures at Oddankulam in Manthi East DS Division NLDP I 83642 MUL I 01 Drawing Title : Construction of Boiler and Ash Trap Drawn by: Checked by: I .Approved by: I Drawillg No : Issue NLDP/83642/MUL/ 1 Field Assistant I Field Engineer I SPE D- 13 Donor Client Implemented hy Norway MPCS Panakam.am Pattu Transition Revision No: I Scale 1/75 Sheet size Recovery Programme UNDP Date 2012- 11-07 QJ-AU.~Aa-~ • ....,.....,.,...,....,... _ ANNEX 1 5 14 -CZIIIEII'I'cxmcaiiiHIIID1I'AWIII~ D-~a.::IIBIIIIB.I.Y!IBl*l~ - 01-~:am~.._· •c.~~~aacc-.. .... . • • •JIIIIII,at....,la.4c... ·-iliWR&tJWI~- ==.:=aCI'~ •IIUJI!m.PDalniiUII •·l&l.mr&naf·IIUIIDIIIID~·II:Bm ~mm-~rrP--;;o= mum~~~~ :::::J ..... 6mm. Stirrups @6" c/c ~ • -1'01' • -IICJI'I'OIII ·lctiiD llltD 111!11. -I'OIUIIDL .... _..,,.... R Y P.Al)-f'UU.I..u'~ P.l -PDIIOIIID ro _, - 0'-6" ~Mard~ Filling 0'-3" ~ ;..., 0'-3" / a.. _, / 0'-9" :A:A / / 0'-3~ ; / 1:2!:5 (1 ")cone. :A>I N ~ .creed Cone. :3:6 I Detail of Foundation [ BR 2 ] 2'-0" min width I 3'-0" I, ~ r ; I, Detail of Drainage 1/30 1/30 Detail of Foundation [ BR I ] r ~ o'-9" ~ r 3,-0" 1 1/20 R06@6" ~ '\- - ~ • -- ~ - ; ! - ; ~[ J~ rE5tL ~ ~I ~ 5> / " 0'-9~ j ~ ..... " I Detail of Beam (a-a) 1/20 n~. !±l ~ 1/20 Detail of slah R06@5" .Jt<r-9" Jt I / " 0'-9" I (, 3'-0" 1/20 Detail of 9" x 9" Column [ BR 3 1 Name of Project Northern Livelihood Development Project (NLDP) NameofSub Project &: No: Reconstruction of Rice Mill and other relative structures at Oddankulam in Manthi East DS Division NLDP I 83642 MUL I 01 Drawing Title : Construction of Boiler and Ash Trap Detail of Beam (b-b) 1/30 Donor Client Implemented hy Norway MPCS Panakam.am Pattu Transition Recovery Programme UNDP Details of Foundation & Lintel D:rawnby: Checked by: I .Approved by: I Drawillg No : Issue NLDP/83642/MUL/ 1 Field Assistant I Field Engineer I SPE D- 14 Revision No: I Scale Sheet size .A4 Date 2012- 11-07 ANNEX- 1.5.6 LIJ'I...,... :t lUJ---1m~ .... •••... :. •I I I II COLUMNR/F •.,•.. ,. ;.·.:··· "' ".. •: l.·.··. lOmm FLEXIBLE Fn.LBR. 1: 2 :4 (314") Mesa ConCI8te WITH RB@B"crs. ,k f1.(," ,., r---~:......~:b.:o-oiJ.=.::-~ 1: 2 :4 (314") Mesa CoAaMte, WITH R6@ 8" crsJ ,. 1000 SOIL COMPACTOR TO ACHIEVE 95% PROCTOR COMPACTION DENSITY Detail of Lintol (6"-9"mm) RANDOM RUBBLE MASONRY IN 1:5 CEMENT SAND MORTOR S: 1/20 GL ~I ~ ·~ 1-r+r'""m-"r--'.... b 1000 GAUGE POLYTHENE LAYER OL \ GAUGEPOLYTHBNELAYER~rtt SOIL COMPACTOR TO Aaiii!VB _ PROCTOR OOMPACTIONDENSITY _j T~ ~.~L.s~:~J TL a "" .. , _J~iTIO·rlji - ~~ 111111-WIDIIU ____j "' mP PM!!SJ~ -ea-~ MaiUIIII: 3"THK. SCREED CONCRETE ~t ~ 81 ftl ~; &~ r FD-B m ., > 3' • SECTION 1 -1 Welddi.ng arrangement for Ex. c:oi11111D D~ofFoundation ~ S: 1/25 L _ ;L_3'.f" ~ ~I Detail of Lintol I 1 ..1. , II Y1D@B"B2 4Y16 S: 1/20 I- YlO , ~~[ I" ~II ~I ,q 14Y1o ~ "" "" ., 0'-6" 1.; r b ' 1:1/20 ~ I tYlO@ 9" llU SCALE 1•:r.o• rle Ex. Rail curder I L ......_ 4Y16 S: 1/20 S: 1/40 L 0'-8" :rL0'-4"L 0'-9" r:r LL :r 0'-2" Detail m of Bat tab 6: Drainage s: 1/20 Nam.e ofPI'oject Northern Livelihood Development Project (NLDP) Nam.eofSuh Pl'oject lie No: Reconstruction of Rice Mill and other relative structures at Oddankulam in Manthi East DS Division NLDP I 83642 MUL I 01/01/2013 Drawing Title : \ COLUMN Ex. 8"x8" colwnn I r Detail of Beam Ex. Rail curder with welding Yl6 Donor Client Implemented hy Norway MPCS Transition Panakamam Pattu Recovery Detail og Foundation , Colwnn , Lintol , Beam , Roof band & Rat tab with drainage for Store Programme UNDP mm Sri Lanka IDrawnby: Checked by: I Approved by: I DrawiDg No : Issue NLDP/83642/MUL/ 1 IField Assistant I Field Engineer I SPE D- 06 LOT-1 Revision No: I Scale Sheet size .1.4 Date 2012. 11-07 ~ I' ANNEX 2.5.39 ~ 1" Cil Pi r LADER, lhzaLESASHDOOR 6•-t"Xl'-6") Gl PIPE (111) RAILIN~ I r1 1 I ANGLE IRON (z''X2''xr.") BRADNO r1 I I I "\ 'I~ ANGLE IRON (2 1/z"X2 1/2"X6mm) ~· .. ~·~ / r~ I' I I I • S1U1. BAR Willi 'I I PADLOCK I ,,CL CL "' FRONT ELEVATION .-~~~ ) "l~"ILA.I""'"r.' r., 3• THICK 1:2'4(3/4"). SlAB WITM1GMM <l't-- ...... ~· ··( II Kll lbt II t ,~ ,. ~ t:~H~J ~ " T . flfj 111. .. . l'r:iil---:~~~: SECTIONC-C ~ '-8' .__ .. TOR STUI.IIAR@ a• C/C llOT1I WAY :-'\ \[~ :: .. mJ\£· ,.;., ~ .. l~:r·~ lfVl I PLAN FRONT ELEVATION L......L...+----+-' END ELEVATION t PLAN STEEL WATER TOWER & PUMP HOUSE PROJECT NAME SUB PROJECT NAME DRAWING TITLE DRAWN BY I CHECKED BY FIELD ASSISTANT NORTHERN LIVELIHOOD DEVELOPMENT PROJECT (NLDP) Reconatructiml of Rice Mill and other reladve atrw:turee at OddankuJam in Manthi Bast DS Diviaion NIDP I 83642 MUL I 01/0112013 DONOR GOVERNMENT OF NORWAY CLIENT MPCS KODIKAMAM UNDP STEEL WATER STAND & MOTOR ROOM APPROVED BYI DRAWING NO I ISSUE I REVISION NO SCALE SHEET SIZE I DATE A4 I 16/01/2013 T I SPE • PMU IMPLEMENTED BY Transition Recovery Programme SPE- PMU INU)P!836fZMULIGIIOII»l3-A39I CWC I Sri Lanka ANNEX- 1.6.38 ,_______1:3:6 Ct Com:t. Hard earth/ Gravel Filling . .. .. ·. • .. .. ,~ I • • . . . . .... Tk. 1 :3:6 Ct Conct. RIR mascmary SECTION AT COllAR SECI'IONIFRONT ELEVATION JOINT ON X-X I. I 900", :1 X X f- f- X X ,-• 'U.MI -• ~----------------------------------~73·~----------~------------------------~ PLAN VIEW Recorumuction of Rice Mill and other relative 11trw:tora at OddanJrularn in Manthi East DS Division lfame of Sall Project 6: No: NLDP I 836+2 MUL I 01101/2013 Drawing Title : Dn.WD:by: Nonva.y Clulck•d :by: MPCS Panakarnam. Pattu Construction of Hume pipe Culvert I .l.ppzoved :by: I Dzawbag Ko : I81R18 Rn1a1oD. No: I Sc:a1e lb.eet•lze NLDP/83642/MUL/1 Piald .Aaai8tant I Field E:nginaarl SPE D-38 LOT-1 A4 'l'raDsition Recove!Y Programme UNDP Dlde 2012-11-07 ANNEX- 1.5.4 llllllllllllllllllll1111111111 11illll_lllll lllllllllllllll llllllllll lll lll llllllllllll lll11111111111111. llll - I - - - - [:J [:J [:J [:J [:J [:J [:J [:J [:J ·L:J ~ [§] I I § § I § I I § I § § I I § I § I .. I lflm@lr!Jlr ~~~w~m@lr!J Type ~ ~ Size Description Nos Do 15'-0" X 10'-0" Roller shutter Door ( Closed Type) 02 n, 9'-0" X 10'-0" 01 D2 4'-0" X 9'-0" Roller shutter Door ( Closed Type ) Double Steel Door F, 4'-Q" X 3'-0" ) Fan light (with lovers) 01 ....._44 ' $~[0) ~ ~~~W~lf~(Q)lr!J Name of Project Northern Livelihood! D evelopment Project (N L DP) NameofSub Project & No: Reconstruction of Rice MiU and other rdative structures at Oddankulam in Manthi East DS Division NLDP I 83642 MUL I 01/01/2013 Drawing Title : Construction of Stroe Room by: Checked by: Client Implemented by Norway MPCS Panakamam Pattu Transition Recovery Programme UNDP I Approved by: I Drawing No : Issue NLDP/83642/MUL/ I Field Engineer I SPE Donor D- 04 LOT-1 Revision No: I Scale 1/20 Sheet size A4 Date 2012- 11 - 07 01 -ALL DIIIEI!ISIOMS.AltS li!I'MILLlMElWES oa- CBMEN'.I' COlfC1tEl'.E HEAD WArM T.ltANIIrl10K ANNEX - 1.5.27 .A1QD BI!DDING llHAL'L BE 1:3:8 (40mzn). 03 -RBINPOIICBD CONCRin'B SBAU. BB 1:1:t (liOmm) OF CHAKAC'.l'BIIS'nC ll'l'lltENCJIH fa,= 20 Nhla J, 04- MINJMUll( COVER FOR REINFORCEMEN'.l' • Slllh a.liiCC bud~! a8mm • Pad, co1umJI, beam 40mm 08 -lU!INPOIICl!MEN'l' SHAD. BB • mGHYIEID 1mU!B8 BAliS OP CHAliAC'l'Eilll lmD!NGTII OF 061flmm 1 • MILD SJEBL FOR SJDUruPS 08- Mil NOTATI<»f- &'l'JUmARD lfO'I'A'ltON 18 liBBD ~bcmdcocl2.in4l Ahlmimml:Ri.olpo .80 T 10-83-lBOT :="mw... DliiMBl1!1l (IIDD) II I II ......a:: BAll NAB -~ N ~ Q $~(C1f~(O)~ ~ c ~ Name ofPI'oject Northern Livelihood Development Project (NLDP) Nam.eofSuh Pl'oject lie No: Reconstruction of Rice Mill and other relative structures at Oddankulam in Manthi East DS Division NLDP I 83642 MUL I 01/01/2013 Drawing Title : IDrawnby: Checked by: Donor Client Implemented hy Norway MPCS Transition Panakamam Pattu Recovery UNDP Construction of Mill unit I .Approved by: I DrawiDg No : IField Assistant I Field Engineer I SPE NLDP/83642/MUL/ 1 D- 27 Programme Issue LOT-1 Revision No: I Scale 1/75 Sheet size .1.4 Date 2012. 11-07 ANNEX-1.5.11 t ' ' 1 1 0'-9" p 13'-3" 8'-0" I I I I I I I I I - I I I I I I I I I I I - ' 0'-IB'-0" 1 1 I I I I I I I I I ' l 0'-9" 1 1 I I 1_1 I I I I I I I I I I :-.:::ldJ·rr=.:: 1-1 I I • Name ofPI'oject Northern Livelihood Development Project (NLDP) I Nameofla.b Project 6: No: Rccooatruc:tion of Rke Mill and other relative Btructures at Qrldan...•lam in Manthi Eut DS Divlaion NLDP I 83642 MUL I 0110112013 I Norway Drawtng T:I.Oe : by: I Cla.edr:ed hy: I DoDOZ" I Client IMroS Panakamam Pattu I Construction of Septic tank and soakage pit l.l.pp!'Oftd. by: I Dnwbl.g No : NLDP/83642/MUL/l Field Bnainee:r I SPB I D- 11 I I•n.e I B.evislcm No: I I LOT-1 Sc:Ue 11/20 Sheet st. I.U I Implemented by Transition Recovery Programme UNDP Date I 2012 - ll - 07 ;.~ Detail of Grab bar arrangement (6"-9" mm) -r~~~~~DOM RUBBLE MASONRY IN 1: CEMENT SAND MORTOR ~ 4'-6" mim 1 1'-Q" ¥ J'-6" '= ., ~ DETAILS OF UNDATIO SCAL~ Grab Bar Grab Bar ./ ! 3'-0" 1 ~I' I 1 , ( 1 ," ) f\l .J \. ~ __/ ANNEX-1.5.10 I \ ~ f;. :... ~ ~ ~ " Side Wall Back Wall Name ofPI'oject Northern Livelihood Development Project (NLDP) Name of Suh Pl'oject a: No: Reconstruction of Rice Mill and other relative structures at Oddankulam in Manthi East DS Division NLDP I 83642 MUL I 01/01/2013 D:rawiDg Title : Construction of Toilet Dono!' Client ImplemeDted by Norway :MPCS Transition Panakamam Pattu Recovery Progranune UNDP mm mm Sri Lanka Checked by: I Approved :by: I Drawing No : IDrawnhy: lf'ield Assistant I Field Engineer I SPE NLDP/83642/MUL/1 D- 10 Issue LOT-1 Revision No: I Scale 1/20 Sbeetslze .1.4 Date 2012-11-07 I ~< ll &-":'· ... ri'.!l" f ...s 1 I -- 5'-4" f'-9f 1'-()"w 1 '·>·' ·2 (! t.%f·"·ll". j-••·a~·!J:;<f~$1i? l .. .. j¢ t·hs :•:J.•·:r;A !t#t·~·'*·'· ~'''··~· &· ~1:: _ I ~1 5> Col' ~ I -GL IFIRi!lll~'ii' le!L~~'ii'~WlOO r 4'-4" "'/ GL' . ~ 3'-4" ~ ;.' -I 11'1. 0 TOILET I S'-0" X 4'-(J" 4'-0" X 3'-0" -....... _ .., / 1 2'-0" i-1 $1elC'ii'~(OJ~ y -y 01· AU. DINIIIIaiiOMIIIIJIB IN'MIWNEmiEB C8 • CDIBN'l'COftCIIIml HEADWAWI '1'IWIIIr11Qif i I i AND IIBDDING IIIWI.BB l:adl (4Gmnl). 011 • RIIINFOilCEIJ WHCIBfE IIIWI.BB l:IIK OIDnuftl OF CIIAJIAcmmmc 811tmCIHt.,r aoirlmm ~ 1M -lmiiMIIM COVBB I'OIIliDNl'OIICBMBift "111m .IICC budl 38mm • P8d, colllnul, beal401nm 08 • RIIINI'OilCENIDIIIIIIU.BB " HIGH '!IBID lr11IDIIIW!II QF CIIIIIIAC1'BRII 8 II'IRIING'1H OF 4211 Nltma "llllm IIIEIILI'Oillft'IIIRDPII 08 • BAJlftOL\'ltOlf -IIIAIIIDAIID..orA'ltClKIBUBm ~ I ~ ~ ;;., JY.m Dl ~ONRY fi'-O"xl'-6" [O:ZNOS) Sq.aia&Jllll-IAIIt- IMORTOR ='DBIDBAJl Dlllliiii'IEil (mD\} u II I 80 y 10·88-11101 Raofllab 3"1k. YlO CIC@ 9" bcdl ~ Dt I J S'-0" "' I I .!__,/" 9'-9"/ ,s, a:: ,--- ~ ---- $ --l I! ; -~~ ~ ~( 9 "· ~ = : 1 fr'- fANNEx - 1.5.9 5 4 ._ .. I I SPACWG;: BAll MAIII: u ..R.l& )<..} I:r 0'·3" Detail of Door DI'UOO Name ofPl'oject Northern Livelihood Development Project (NLDP) Nam.eofSuh Pl'oject & No: Reconstruction of Rice Mill and other relative structures at Oddankulam in Manthi East DS Division NLDP I 83642 MUL I 01/01/2013 D:rawing Title : IDrawnby: IField Assistant Checked by: DODOI' Norway Client Implemented hy MPCS Transition Panakamam Pattu Recovery UNDP Construction of Toilet I .Approved by: I DrawiDg No : Field Engineer I SPE NLDP/83642/MUL/ 1 D- 09 Programme Issue LOT-1 Revision No: I Scale 1/50 Sheet size .1.4 Date 2012. 11-07 ANNEX- 1.5.7 DetaD of Web tnss 21'~\~' 3' ~ -----r 3'-\ • . \l• ,• l - ~ -----r -------- - - - - 3'-t¥ l• - - - - - 3'-t¥ 3'-\'l - / '\ - - - - - - 3'-t¥ ----- • l 'I 'I '\ ----....... Plates "" ~nun~~~::~~_1::::::::~~t:J;~~~~~~~~ Bearlcg Plate 6mm~ Gusset A /--...... B c 1/40 ""' / Detail of· C- r _.>t~.........r-' 3·-t¥'_:::::1 1/50 ~...--::::r-=-~~=~c -- --....... I ~·-1~· ---1 /' t-,."".r -\ ~ - l"llo:r.imll 0*"Torbar 1/50 Detail of· B • "' ...___ -- I /' 16mm'Tct ------siiiOI Detail of Site web tnss Detail of- A. • 1/40 1/50 Nam.e ofPI'oject Northern Livelihood Development Project (NLDP) Nam.eofSuh Pl'oject lie No: Reconstruction of Rice Mill and other relative structures at Oddankulam in Manthi East DS Division NLDP I 83642 MUL I 01/01/2013 Drawing Title : IDrawnby: Checked by: Donor Client Implemented hy Norway MPCS Transition Panakamam Pattu Recovery UNDP Detail of Web Truss and other arrangement for Store I Approved by: I DrawiDg No : IField Assistant I Field Engineer I SPE NLDP/83642/MUL/ 1 D- 07 Issue LOT-1 Programme Revision No: I Scale Sheet size .1.4 Date 2012. 11-07 ANNEX- 1.5.5 _... .. ~ =-=( :;::::. -~ 3 q !':! ~ 5' r-- --- ...... _) I ....._ I 'I -......, ...... I _ ··~ ..... ...... ~ -......, I \ / _\ / \_ -..... l ~r~ I. I_ / .,_._ / J§ - ~ H~ 3'-0" / \_ § - ..... ~ 2: _\ I tfiBL~ ~ / \_ ? ~ ~ lS'-0" I. I_ c ) ......... -- ~ ) 5' 12'-3" i!r a-, r-- .~ ~J 1-+.!::£. """' 10'-4" ~ '9 I_ """"7'1 ~±H 3'~" l 37'-7" $~lC:'il'~@IM I .. I Name ofPI'oject Northern Livelihood Development Project (NLDP) DoDOZ" Client Implemented by Nameofla.b Project 6: No: Rccooatruc:tion of Rke Mill and other relative Btructures at Qrldan...rlam in Manthi Eut DS Divlaion NLDP I 8364-2 MUL I 0110112013 Norway MPCS Transition Recovery Programme UNDP Drawtng T:I.Oe : wn.waby: Cla.edr:ed hy: Panakamam Pattu Construction of Stroe Room I .l.pp!'Oftd. by: I Dnwbl.g No : I•n.e NLDP/83642/MUL/l Field Bnginee:r I SPB D- 06 LOT-1 B.e9islcmNo: I Sc:Ue 1/7& Sheet st. .u Date 2012-11-07 ,...... 1 """' I -- ® ,..... ,....,. I I -- -- ® I -- @) ® B=D\] B ,...... 101'-0" """' 1 """' I -- -- ® ® '"'" I -- @) ® r- ANNEX-1.8.3 ,...... l 1 -- -- ® 8 I ® u I ® ® ~,-- I "r- I ~ :(k.r-~4J! ~ ~® __ -- -- -- - I - [!~ 100'·6" X 37'-1" -- -- -- ~ _...II -- @D I I ~ J. STORE I ~ _;-- ® Ul) ~i I I I - ~r-" '-- I® I C .... ®_ ® _ !3 ®__ I ® .. !3 I -- ® -- I I ® !3 I -- I ® !3 __® .. ®I ® 1- . o = -- ~ [?~~ • ~ I _®_ =--_j -~ Name ofPI'oject Northern Livelihood Development Project (NLDP) DoDOZ" Client Implemented by Nameofla.b Project 6: No: Rccooatruc:tion of Rke Mill and other relative Btructures at Qrldan...•lam in Manthi Eut DS Divlaion NLDP I 8364-2 MUL I 0110112013 Norway MPCS Drawtng T:I.Oe : Construction of Store Room Transition Recovery Programme UNDP Panakamam Pattu II mm ' mm Sri Lanka Dn.WII. by: Cla.edr:ed hy: .l.pp!'Oftd. by: Dnwbl.gNo: I•ne NLDP/83642/MUL/l Field Aaaistant Field. Bnginee:r SPB D- 03 LOT-1 B.evislcm No: Sc:Ue 1/20 Sheet st. .u Date 2012-11-07 . ® ® ·~ @ ® ·~·~ I /~ . ® ~· . ® ~· . r.~ ® @ ® ANNEX- 1.5.8 ·~·. ® ·~. ® ® ~:-- ~ ··~·"il STORE [f ~ BTl ® 0 @iu, !_ ~ ® • I ,~ I = ~~ ~ ~ ~L~'I7ffiln(()]l!l Type ( ~® • ® ,ll ·= . _ ® = • = · . ® __® = • = · . ® ® = • ® . = · . ,_.. ®__ ® = - n, Size lt5'·f" , .....~ J Des~riprion N" I R<>lk:r .r...m l)oof( CI~od 'IY!>< I R<>llct :obulla = ~ • llol!l>I<S~~>elf>o<:o' ® F, 1 4'-1" 1J'_." J I Fan li~ht (w•~, Jovers) ~ IPU\1!1 '~ ~ )I -· ~' __:_ aJ '""'i=: ~~~~~i!llr Northern Livelihood! D evelopment Project (N LDP) NameofSub Project & No: Reconstruction of Rice MiU and oth er rdative structures at Oddankulam in Manthi East DS Division NLDP I 83642 MUL I 01/01/20 13 Drawing Title : Construction of Store Room Checked by: ij;S:: lt<: ~I )li Donor Client Implemented by Norway MPCS Panakamam Pattu Transition Recovery Programme UNDP I Approved by: I Drawing No : Issue NLDP/83642/MUL/ I Field Engineer I SPE I $\~l:lfl (()] li[ ~ 0 ~ Name of Project by: I D -08 LOT-1 Revision No: I Scale 1/250 Sheet size A4 Date 2012- 11 - 07