East Africa Metals is a Vancouver-based mineral exploration
Transcription
East Africa Metals is a Vancouver-based mineral exploration
East Africa Metals is a Vancouver-based mineral exploration company focused on advanced exploration in Africa. East Africa Metals has a strong balance sheet with approximately $16.6 million* cash on hand and no debt. The Company’s shares trade on the TSX Venture Exchange under the symbol EAM. *as of Mar 31/2014 HARVEST AND ADYABO PROJECTS - ETHIOPIA The Harvest and Adyabo VMS projects are located in the Tigray region of northern Ethiopia, 600 kilometres north of the capital city of Addis Ababa. The projects are located in the highly prospective Asmara mineral belt in the southern part of the Arabian Nubian Shield (ANS). A number of significant VMS mineralized systems have recently been discovered along strike and northwest of the projects in the same geological terrain, including Bisha, Debarwa, and Emba Derho. Orogenic gold deposits are also typical of the ANS, including the giant 13 million ounce Sukari deposit in Egypt and the recent discovery of more than one million ounces at Koka-Zara in central Eritrea. With the metallogenic endowment of the ANS, EAM’s Harvest and Adyabo projects constitute a highly prospective land package for the discovery of both VMS and gold deposits. Very little historical exploration has been documented in the Harvest area and the ground has not been subject to recent modern exploration techniques. Much like the last decade for the Eritrean regions to the north where significant discoveries have been made, this region hosts significant discovery potential. EAM’s land package in Ethiopia covers approximately 428 sq km. Included is the 70% owned, 116 sq km Harvest project, host to the Terakimti VMS deposit. The company has an option to earn 80% interest in the 312 sq km Adyabo project immediately west of Harvest. Adyabo hosts the highly prospective 8km long Mato Bula trend, highlighted by high sulphidation gold rich VMS - submarine porphyry-related high grade Au-Cu+/-Zn intercepts in recent drilling at both Mato Bula and Da Tambuk. Exploration to date at the Harvest and Adyabo projects indicates potential for the discovery of large, near surface gold and polymetallic VMS deposits. A total of 132 holes totalling 25,887 metres have been completed on the Terakimti, Adi Angoda, Mayshehagne, Nefasit, Mato Bula, Da Tambuk, Adi Gozomo, and VTEM09 prospects. With the establishment of mineralized VMS systems to depth at Terakimti and Mayshehagne, and high grade gold intercepts from recent drilling at Mato Bula and Da Tambuk, additional drilling is proposed to further define known resources, and explore lateral and depth extension to these deposits and prospects. Additionally, new targets continue to be developed using conventional exploration techniques and modern technologies. ETHIOPIA The Federal Democratic of Ethiopia is located in northeast Africa, in the region termed the Horn of Africa. The country is landlocked and is topographically comprised predominantely of high plateau. The population is diverse in terms of languages spoken and religious following, with a Christian majority coexisting with a one-third Muslim population. New mining regulations were issued in 1993 with the purpose of promoting the exploration and development of Ethiopia’s natural resources. Ethiopia is viewed as a country with underdeveloped hydrocarbon and mineral wealth, and opportunity for future economic development is envisaged as a possible significant driver for the country. TANZANIA Tanzania ranks as one of the best overall risk profiles in Africa. With favourable government policies, stable democratic government, and strong economic growth, Tanzania is one of the fastest-emerging gold producers in the world. In 1997, the development of Tanzania’s Mineral Policy marked a clear shift toward private sector development and market–oriented economic management. Prior to 1994, there was no mechanized mining in the country. Tanzania is now Africa’s third-largest gold producer. TERAKIMTI MINERAL RESOURCE ESTIMATE* Mineralization Class Indicated Inferred Ore Type Oxide Sulphide Sub-Total Indicated Oxide Sulphide Underground Primary Sub-Total Inferred Contained Metals NSR Cut -Off ($/ t) Tonnes ('000s) 290 1,841 25.9 23.9 Cu % Au g/t Ag g/t Zn % 0.06 2.20 2.55 1.06 10.5 17.5 0.02 1.65 Cu ('000 lb) 89,477 Au ('000 oz) 24 63 Ag ('000 oz) 98 1,033 Zn ('000 lb) 66,871 89,477 86 1,130 66,871 2,131 25.9 23.9 398 2,583 0.13 1.09 4.77 0.96 7.2 20.6 0.07 1.42 62,187 61 80 92 1,712 77,101 63.9 939 0.69 0.84 15.2 2.92 14,198 25 459 60,358 76,385 166 2,264 137,459 3,920 Highlights: • Mineral Resource has potential to continue at depth. • Near surface oxide gold mineralization shows potential for heap leach amenability. • Supergene and primary mineralization produce copper concentrates (25% copper grade) through conventional floatation processes, with further optimization possible. Attractive zinc concentrates are also produced on selected mineralization. HANDENI PROJECT - TANZANIA East Africa Metals’ Magambazi project is located in the emerging Handeni gold district of eastern Tanzania, where the company has established a large land position covering a 15-km trend. The Handeni region was not thought to be prospective for gold until recent academic research and discoveries by local artisanal miners suggested it may represent the extension of the most prospective segment of the Lake Victoria Goldfields. East Africa Metals Share Structure (October 9, 2014) 101,699,661 Issued and Outstanding Issuable upon exercise of ORG Options Options Warrants Fully diluted 144,100 8,017,500 31,203,167 141,064,428 Board of Directors DR. JINGBIN WANG (2) Chairman ANDREW LEE SMITH (3) ANTONY HARWOOD (1)(2)(3) EAM’s Handeni project comprises two contiguous land holdings covering 47.45 square kilometres, located 173 kilometres northwest of Dar es Salaam and 35 kilometres southwest of the town of Handeni. A mining licence has been acquired over the Magambazi deposit, and a second licence is pending for the surrounding area. In 2009, the discovery hole at Magambazi (hole 001) intersected 59 metres grading 4.28 grams per tonne gold. EAM has drilled more than 110,000 metres in approximately 400 holes over a strike length now defined along nearly one kilometre. GE (ANNA) MAO(1)(3) (1) Audit Committee (2) Compensation Committee (3) Corporate Governance and Nominating Committee Management and Key Advisors MAGAMBAZI MINERAL RESOURCE ESTIMATE** Initial Magambazi Mineral Resource Estimate Summary (Based on a 0.5 g/t Au Cut Off Grade) Estimated Quantities Category DAVID PARSONS(1)(2) Tonnes (000s) Average grade (grams/tonne gold) Contained gold (ounces) Indicated 15,186 1.48 721,300 Inferred 6,683 1.36 292,400 ANDREW LEE SMITH President and CEO NICK WATTERS Business Development JEFF HEIDEMA Vice President Exploration DENIS DILLIP President Canaco Tanzania PETER GRANATA Chief Financial Officer LINGLING YANG Corporate Communications DR. DAVID GROVES Project Development IAIN GROVES Senior Consulting Geologist * Terakimti Mineral Resource Estimate released January 27, 2014. 43-101 report available at www.eastafricametals.com or at www.sedar.com, under the name Tigray Resources Inc., dated March 2014. ** Magambazi Mineral Resource Estimate released May 15, 2012. 43-101 report available at www.eastafricametals.com or at www.sedar.com, under the name Orca Gold Inc., dated June 2012. SHERRY SIU Corporate Secretary Cautionary Statement Regarding Forward-Looking Information This news release contains “forward-looking information” within the meaning of applicable Canadian securities legislation. Generally, forward-looking information can be identified by the use of forward-looking terminology such as “anticipate”, “believe”, “plan”, “expect”, “intend”, “estimate”, “forecast”, “project”, “budget”, “schedule”, “may”, “will”, “could”, “might”, “should” or variations of such words or similar words or expressions. Forward-looking information is based on reasonable assumptions that have been made by the Company as at the date of such information and is subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of the Company to be materially different from those expressed or implied by such forward-looking information, including but not limited to: risks associated with mineral exploration and development; metal and mineral prices; availability of capital; accuracy of the Company’s projections and estimates, including the initial mineral resource for the Harvest Project; interest and exchange rates; competition; stock price fluctuations; availability of drilling equipment and access; actual results of current exploration activities; government regulation; political or economic developments; environmental risks; insurance risks; capital expenditures; operating or technical difficulties in connection with development activities; personnel relations; the speculative nature of strategic metal exploration and development including the risks of diminishing quantities of grades of reserves; contests over title to properties; and changes in project parameters as plans continue to be refined, as well as those risk factors set out in the Company’s listing application dated August 18, 2011. Forward-looking statements are based on assumptions management believes to be reasonable, including but not limited to the price of gold, silver, copper and zinc; the demand for gold, silver, copper and zinc; the ability to carry on exploration and development activities; the timely receipt of any required approvals; the ability to obtain qualified personnel, equipment and services in a timely and cost-efficient manner; the ability to operate in a safe, efficient and effective manner; and the regulatory framework regarding environmental matters, and such other assumptions and factors as set out herein. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. Accordingly, readers should not place undue reliance on forward-looking information. The Company does not undertake to update any forward-looking information that is included herein, except in accordance with applicable securities laws. Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this fact sheet. Suite #3114 ,Four Bentall Centre 1055 Dunsmuir St. P.O. Box 49081 Vancouver, BC Canada V7X 1G4 tel: 604 488 0822 fax: 604 899 1240 email: investors@eastafricametals.com web: www.eastafricametals.com Corporate Office TSX-V: EAM
Similar documents
OFFICIAL, PUBLIC AND PERMANENT RETIREMENT FROM ACTIVE EXPLORATION AND SCIENTIFIC RESEARCH AND DEVELOPMENT By Professor (Grandmaster) Adefioye Sunday Adewumi
I Professor (Grandmaster) Adefioye Sunday Adewumi hereby officially and publicly announce my permanent retirement from active global exploration and scientific research and development in this letter addressed to the United Nations Organization (UNO), Geneva, Switzerland; United Nations Security Council, Vienna, Austria; The International Court of Justice, The Hagues, Netherlands; and for the attention of the British Library of Congress.
More information