Indicative consultation planner

Transcription

Indicative consultation planner
Indicative consultation planner
Activity name
Product name
Status
Next steps
Testing
Common Test Scenarios (including SMKI & Repository
Test Scenarios)
Consultation closed
Consultation
responses
being
analysed and documents updated
Systems Integration Testing (SIT) Approach
Consultation closed
For submission to SEC Panel
Interface Testing Approach
Consultation open
Closes 31 October 2014
SMKI Repository Test (SRT) Approach
For future consultation
Planned w/c 03 November 2014
End-to-end Approach
For future consultation
Planned end November 2014
Device Selection Methodology
Consultation closed
Consultation
responses
being
analysed and documents updated
Enduring Testing Approach
For future consultation
Planned March 2015
SMKI Interface Design Specification
Consultation closed
Submitted to Secretary of State
Consultation open
Closes 14 November 2014
SMKI
Notes
New addition to planner
SMKI Code of Connection
SMKI Repository Interface Design Specification
SMKI Repository Code of Connection
SMKI Registration Policies and Procedures (RAPP)
DCC Public
Page 1 of 4
As at 21.10.2014
Indicative consultation planner
Activity name
Interface
Specifications
Service
Management
DCC Public
Product name
Status
Next steps
SMKI Recovery Procedure
For future consultation
Planned w/c 24 November 2014
SMKI Infrastructure KI Certificate Policy
For future consultation
Planned w/c 15 December 2014
New document emerging from
SEC4
DCC User Gateway Interface Specification (DUGIS)
For future consultation
Planned w/c 20 October 2014
Possible limited delay. Low
risk of material change to DCC
technical documentation –
DUGIDS
Codes of Connection
Consultation open
Closes 04 November 2014
Data Interface Specification - Self Service Interface
For future consultation
Planned w/c 20 October 2014
Registration Data Interface Specification
For future consultation
Planned w/c 20 October 2014
Message Mapping Catalogue
TBC
TBC
Incident Management Policy
For future consultation
reconsultation
Registration Data Incident Management Policy
Error Handling Strategy
Planned w/c 20 October 2014
This date is a reconsultation
plus
a
consultation
on
Business
Continuity
and
Disaster
Recovery
and
Problem Management
For future reconsultation
Planned w/c 20 October 2014
This date is a reconsultation
For future reconsultation
Planned w/c 20 October 2014
This date is a reconsultation
Page 2 of 4
/
Notes
As at 21.10.2014
Indicative consultation planner
Activity name
Product name
Status
Next steps
Comms Hubs
Comms Hub Support Materials – Installation
For future consultation
Planned w/c 15 December 2014
Comms Hub Support Materials – Handover
For future consultation
Planned w/c 15 December 2014
Comms Hub Support Materials – Maintenance
For future consultation
Planned w/c15 December 2014
Fault Diagnosis
For future consultation
Planned w/c 15 December 2014
Non-gateway
Non-gateway Interface Specification
For future consultation
Planned w/c 05 January 2015
Other
Threshold Anomaly Detection Arrangements
For future consultation
Planned w/c 05 January 2015
Development Plan
Consultation closed
Final document published
Business Handover Plan
Consultation closed
Submitted to Ofgem
Published on SharePoint only
Statement of Service Exemptions
Consultation closed
Concluded
DECC consultation
Procurement Strategy
Consultation closed
Concluded
Parsing and Correlation Services
Consultation closed
Final document published
DCC KI Certificate Policy
For future consultation
Planned w/c 15 December 2014
DCC-KI
Notes
New documents
from SEC4
DCC KI Interface Specification
DCC Public
For future consultation
Page 3 of 4
Planned w/c 15 December 2014
As at 21.10.2014
emerging
Indicative consultation planner
Activity name





Product name
Status
Next steps
DCC KI CoCo
For future consultation
Planned w/c 15 December 2014
DCC KI RAPP
For future consultation
Planned w/15 December 2014
DCC KI Certification Practice Statement
For future consultation
Planned w/c 15 December 2014
Notes
These timelines are indicative only and are subject to change
Some of the dates are different to those contained in the Licence or SEC as they are subject to replanning
This planner covers documents out for consultation only, rather than documents published for information only
All documents are published on our website www.smartdcc.co.uk (unless otherwise stated)
Stakeholders can receive email notification of consultation releases by emailing contact@smartdcc.co.uk
DCC Public
Page 4 of 4
As at 21.10.2014