Failure reporting form Gas-insulated Switchgear and Circuit Breaker Operating Mechanism Basic information
Transcription
Failure reporting form Gas-insulated Switchgear and Circuit Breaker Operating Mechanism Basic information
Failure reporting form Gas-insulated Switchgear and Circuit Breaker Operating Mechanism Complete reporting form as detailed as possible. Return the document to your service center. Basic information Name of installation: Customer name: Date of incident: Contact person: Country of installation: Telephone (mobile): Equipment type: GIS Other E-mail address: Voltage level [kV]: Component data Component type: ELK EXK ENK Other: Year of manufacture: Voltage [kV]: Total circuit breaker operations [CO]: Phase designation: Spare parts available: ABB bay designation: Customer bay designation: No Yes (attached to report) Operating status Before incident: In service Out of service After incident: In service Out of service Delivery address spare parts Company name: c / o: State: Street: Country: Postcode: Contact person: City: Telephone: Attachments Supply additional documents as attachment to failure reporting form. Pictures Event log Layout scheme (with marked-up failure location) Gas analysis Customer report Other Failure type a) Dielectric failure b) Operating mechanism failure c) Gas leakage d) Software / electronic part Pneumatic system (LTB / AIS only) Other (specify in event description) Rupture disc activated: No Yes Short circuit current [kA]: Gas analysis available: No Yes (attached to report) Event log available: No Yes (attached to report) Visible oil leakage: No Yes Pump start frequency [starts / day]: Switch position: Open Closed Total drive operations since commissioning [CO]: Drive operations since last maintainance [CO]: Total pump starts since commissioning [CO]: Pump starts since last maintenance [CO]: b) Operating mechanism failure Drive type: Serial number: AHMA HMB HMC ? Other: c) Gas leakage Gas compartment designation: Gas pressure [kPa]: Failed component: absolut relative Date measured: d) Software / electronic part failure Failure location: LCC GIS drives Control room Event description Send form to responsible service center: Submit to CH Submit to DE Submit to CN ABB Switzerland Ltd Service High Voltage Products Brown Boveri Strasse 5 8050 Zurich / Switzerland ABB Germany Ltd Service High Voltage Products Kallstadterstrasse 1 68309 Mannheim / Germany 24-hour Call and Support Center Phone:+41 844 845 845 E-mail:gis.troubleshooting@ch.abb.com 24-hour Call and Support Center 24-hour Call and Support Center Phone:+49 180 6222 007 Phone:+86 18150895781 E-mail:power.service-team@de.abb.com E-mail:cn-gis.troubleshooting@abb.com Print ABB China (Xiamen) Ltd Site and After Sales Service 6# Chuangxin 3rd Road 361006 Xiamen / P.R.China © Copyright ABB Switzerland Ltd, 1HC0088874 E01 / AD14 a) Dielectric Failure Short circuit current duration [ms]: