Runway 9R‐27L Comprehensive Maintenance Project

Transcription

Runway 9R‐27L Comprehensive Maintenance Project
Chicago Department of Aviation
Bi d Opportuni ty
Runway 9R‐27L Comprehensive Maintenance Project for O'Hare
International Airport
The City of Chicago Department of Aviation has issued a bid opportunity for the following project:
Runway 9R‐27L Comprehensive Maintenance Project for O'Hare International Airport
Specification Number: 131388
RFQ Number: 98511
Advertisement Date: April 8, 2015
Description: The project is located at O'Hare International Airport
and includes a bituminous milling and overlay of Runway 9R‐27L and adjacent taxiways, removal
of existing taxiway pavement, and removal of existing airfield lighting systems and replacement
with new.
Pre‐Bid Conference Location:
O'Hare International Airport
Aviation Administration Building
10510 W. Zemke Road‐2nd Floor
Conf. Rm. #1
Chicago, IL 60666
Date: April 15, 2015
Time: 10:00 AM C.S.T.
Questions Due: April 16, 2015 at 5:00 PM C.S.T. Bid Opening Date: April 28, 2015 at 11:00 AM C.S.T.
The bid document is available at the Bid and Bond Room,
City Hall, 121 N. LaSalle Street, Room 103, Chicago, IL 60602
To view other bids with the City of Chicago, Department of Procurement Services go to:
http://www.cityofchicago.org/city/en/depts/dps.html
To view other bids with the City of Chicago Department of Aviation go to:
http://flychicago.com/BusinessInformation/DoingBusiness/Default.aspx Forw ard th i s emai l
This email was sent to cdaalerts@cityofchicago.org by cdaalerts@cityofchicago.org | Update Profile/Email Address | Rapid removal with SafeUnsubscribe™ | Privacy Policy.
Chicago Department of Aviation | 10510 West Zemke Rd | Floor 2 | Chicago | IL | 60666