Capital Improvement Projects in Progress Precinct 2
Transcription
Capital Improvement Projects in Progress Precinct 2
PUBLIC WORKS DEPARTMENT Project: CW Traffic Signals Project Precinct: 1 & 2 Location / Limits: Next intersections: - Alamo Ranch Parkway at Alamo Parkway Pct 1. - Alamo Ranch Parkway at Lone Star Parkway Pct 1. - Alamo Ranch Parkway at Westwood Loop Pct1. - Shaenfield Rd at Wildhorse Parkway Pct 2. Scope: Project involve the study, design and construction of traffic signals at four intersections . Status: Preliminary Design Additional Information: Consultant: Klotz Associates Bid Opening: TBD Contractor: TBD Construction Start Date: TBD Construction Cost : $ 1,250,000 Construction End Date: TBD Joint Bid: N/A May 11, 2015 PUBLIC WORKS DEPARTMENT Project: FM 471 (Culebra Rd) Precinct: 1 & 2 Location / Limits: From FM 1560 to Old FM 471. Scope: The construction will complete the capacity gap that currently exists on FM 471 from FM 1560 to Old FM 471. The proposed improvements will widen Culebra Road from its existing two-lane configuration to a four-lane divided roadway with anticipated bicycle and pedestrian amenities. Status: Final Design, Utility Relocation /Adjustments. Additional Information: Consultants: CP&Y Advertise Date: 2 Q 2015 Contractor: TBD Construction Start Date: 3 Q 2015 Construction Cost: $ 14,719,463 Construction End Date: 1 Q 2017 Joint Bid: SAWS, CPS Gas. Pass Thru Project (TX DOT) May 11, 2015 PUBLIC WORKS DEPARTMENT Project: Galm Road Phase II Precinct: 2 Location / Limits: Silver Bells St to Government Canyon State Natural Area. Scope: Reconstruct Galm Road from Silver Bells to Government Canyon State Natural Area and alleviate flooding at a low water crossing. The drainage work includes a new bridge and earthen channel along the Culebra creek and improving and widening roadway section and roundabout intersection at “Government Canyon State Natural Area” entrance. Status: Construction. (81 %) Additional Information: Consultants: HNTB Bid Opening: Dec. 13, 2013 Contractor: Capital Excavation Construction Start: 1 Q 2013 Construction Cost: $ 6,663,529 Construction End Date: 2 Q 2015 Joint Bid: SAWS, CPS With Flood Control Component May 11, 2015 PUBLIC WORKS DEPARTMENT Project: Galm Road Phase III Precinct: 2 Location / Limits: From FM 471 to Government Canyon State Park. Scope: Galm Rd is currently a 2 lane Roadway and will be reconstructed to include 4-12’ travel lanes, turn lanes, curb and gutter, drainage improvements 6’ sidewalk 5’ bike lanes. Status: Negotiations Additional Information: Consultants: HNTB Bid Opening: TBD Contractor: TBD Construction Start: TBD Construction Cost: $ 7,500,000 Construction End Date: TBD Joint Bid: N/A MPO Project May 11, 2015 PUBLIC WORKS DEPARTMENT Project: Steubing Rd Precinct: 2 Location / Limits: FM 1560 to Shaenfield Rd. Scope: Proposed roadway reconstruction with concrete pavement. Status: Negotiations. Additional Information: Consultant: Gonzalez de la Garza & Assoc. Advertise Date: TBD Contractor: TBD Construction Start Date: TBD Construction Cost: $ 2,500,000 Construction End Date: TBD Joint Bid: TBD May 11, 2015 PUBLIC WORKS DEPARTMENT Project: Shaenfield Place Subdivision Precinct: 2 Location / Limits: Various streets within Shaenfield Place Subdivision. Scope: The scope of this project is to provide mill/overlay and reconstruction of multiple streets within Shaenfield Subdivision. Status: Negotiatios Additional Information: Consultant: Gonzalez – De la Garza Advertise Date: TBD Contractor: TBD Construction Start Date: TBD Construction Cost: $ 3,000,000 Estim. Construction End Date: TBD. Joint Bid: TBD May 11, 2015