CONTRACT ALLOCATION NO. : CT 2003/2013/5077 RD

Transcription

CONTRACT ALLOCATION NO. : CT 2003/2013/5077 RD
"Contract Allocation" CALL
CT 2003 / 2013
Rev 1
CONTRACT ALLOCATION NO. : CT 2003/2013/5077
RD File No. :
TM File No. :
Other related files :
RD40/15
CLASSIFICATION OF WORK
ASSIGNMENT:
RWP Ref :
CA Issue Date :
Level 1
CLOSING DATE :
X
RWP1-426/15
Level 2
Level 3
CLOSING TIME :
Level 3
LOCATION FOR SUBMISSION:
1.
2.
Locality and Location of Works :
p/o Strait Street, Valletta (btw South Str and Melita Str)
Entity Requiring work :
X Transport Malta
Other :
3.
Description of works required :
Paving Works and other ancillary infrastructural works.
4.
Delivery Period of Works :
5.
Works Order Ref. :
6.
Start Date :
7.
Total "Contract Allocation" Value : € 56,492.28
8.
Enclosed Documents forming part of this Works Order Contract :
Site Plan:
X
____35_____ calendar days (ref to cl. 1.1.11 as necessary).
_____________ (if applicable).
____/_____/_____
End Date : ____/_____/_____
attached
Construction detail(s):
X
Copy of works' permit and conditions:
X
Programme of works:
X
attached
Traffic management plan:
X
attached
Quality assurance programme:
attached
attached
Comments :
Page 1 of 2
CT 2003 / 2013
"Contract Allocation" CALL
9.
General :
i.
The Contract and the Works emanating from the award of this "Call-Off" shall be regulated by all
the applicable Contract Conditions and Specifications defined under the Framework Agreement
for the construction and maintenance of roads and for trenching and plant laying works for the
extension and renewal of electricity cable, potable water and waste water pipe networks in
different localities in Malta and Gozo on behalf of the Authority for Transport in Malta.
ii.
The appointed contractor shall enter into a Contract of Works in respect of this assignment in
accordance with Appendix I of Volume 1 of the Invitation for participation in the Framework
Agreement.
10.
Product & Performance Guarantee :
€ _________________
To be submitted as per cl. 1.1.14 and Volume 2, Section 4; 10% of this Contract Allocation Value.
Submission within 10 days from Notification of Award.
11.
Declaration :
In response to your invitation to tender for the above contract, I / we, the undersigned, hereby
i.
declare that:
I / We have examined and accept in full the content of this “Contract Allocation" No. […….......]. I
/ We have inspected and familiarised myself / ourselves with the location of the Works and the
corresponding site conditions. I / We hereby accept the provisions of this dossier in their
ii.
entirety, without reservation or restriction;
I / We offer to execute and complete, in accordance with the terms of the "Contract Allocation"
dossier and the conditions and time limits laid down, without reserve and restriction, the
iii.
required works;
The price of my / our tender is to be decided in accordance with the rates tendered in the
attached Schedule of Rates. It is also declared that if no other rates are indicated in this
iv.
Schedule of Rates our tender shall be as per maximum rate.
This tender is for a period of 150 days from the final date of submission of tender.
v.
If my / our tender is accepted, I / we undertake to abide by all applicable contract conditions
and specifications defined under this Framework Agreement that I / we have entered into with
the Authority for Transport in Malta.
Name & Surname : _________________________ authorised to sign obo : __________________
Signiture :
Date :
Stamp of the company :
Page 2 of 2
Rev 1
SITE
S
IR
A
ST
CHIEF OFFICER
PROJECT TITLE :
S.GRIMA
ARCHITECT
A.C.
CHECKED BY
*
VALLETTA
DRAWING TITLE :
TRIQ ID-DEJQA B/W SOUTH TO MELITA
SITE PLAN
DATE :
J.B.
FILE No :
DRAWING No :
RD40/15
February 2015
RD26/15
PROJECT No. :
DRAWN BY
P:\Design\Common Area\Traffic Management\2015\Valletta\2015 Valletta.dwg
SHEET SIZE
M.B.
A4
SCALE :
1 : 2500
REVISION :
A
SHEET No :
2
25
m
25
m
CHIEF OFFICER
PROJECT TITLE :
S.GRIMA
ARCHITECT
A.C.
CHECKED BY
*
VALLETTA
DRAWING TITLE :
TRIQ ID-DEJQA B/W SOUTH TO MELITA
TRAFFIC MANAGEMENT
DATE :
J.B.
FILE No :
DRAWING No :
RD40/15
February 2015
RD26/15/a
PROJECT No. :
SHEET SIZE
DRAWN BY
P:\Design\Common Area\Traffic Management\2015\Valletta\2015 Valletta.dwg
M.B.
A4
SCALE :
1 : 2500
REVISION :
A
SHEET No :
2a
0
1
2
3
4
5
6
7
8
9
10
20
30
N
-1.0
40m
3
1
2
2
Plan indicating Paving as Existing
Scale: 1:200
3
9
15.30
16.30
Existing Street Lighting
LEGEND for Proposed Paving:
Plan indicating Paving as Proposed
9
Old hardstone steps to be lifted, restored and
re-layed on a new bedding,
Scale: 1:200
10
LEGEND for Existing Paving:
1
2
3
4
Deteriorating old hardstone steps showing:
1) settling
2) cracks and missing parts
New hardstone paving as existing
New hardstone paving as existing
5
6
Deteriorating new hardstone paving as existing showing:
1) settling
2) cracking
concencrated in areas marked in red.
40W LED 3025 lumens 3000 K colour temperature
Lava / hardstone paving as proposed
NOTES:
11
Old hardstone steps to be lifted, restored and re-layed on a new bedding.
Concrete sections are to be removed and replaced with recycled hardstone
12
Hardstone paving steps as proposed
1.
2.
3.
All dimensions are in Metres.
Do not scale directly from drawing.
This drawing is covered by copyright and may not
be reproduced without the permission of the
Director General - Projects Design and
Implementation Division.
Extent of deterioration shown on drawing is only
indicative.
4.
Pressed pattern concrete paving
7
Concrete cast in situ
8
Deteriorating old hardstone steps alternating with concrete and
deffun fill showing:
1) settling
2) cracks and missing parts
PROJECT TITLE :
REHABILITATION PROJECTS OFFICE
210, TRIQ IR-REPUBLIKA, VALLETTA
Tel: (+0356) 22921800
TRIQ ID-DEJQA PAVING PROJECT
DRAWING TITLE :
DIRECTOR GENERAL :
R. FARRUGIA
Lava paving as existing
80W 6050 lumens 3000 K colour temperature
CHIEF DRAUGHTSMAN :
DIRECTOR :
CHIEF ARCHITECT :
N. GATT
DRAUGHTSMAN :
M. FSADNI
SURVEYOR :
-
S.S.I.
TRACED BY :
--DATE :
ARCHITECT / ENGINEER :
---
DATE :
DRAWING SCALE :
1:200
DETERIORATION DATA GATHERED BY :
--
---
DATE :
15-14
FILE No :
DRAWN BY :
S.S.I.
001
P:\Design\Common Area\Local councils\VALLETTA\Triq Id-Dejqa\\Triq Id-Dejqa Pavement Drawings.dwg
SHEET SIZE
A3
DRAWING No :
RD 40/15
February 2015
DETERIORATION DATA PLOTTED BY :
SCALE :
1:200
REVISION :
A
RD21/15
SHEET No :
1
PROJECT
Strait Street, Valletta (btw Melita Street str and Melita Street)
LOCALITY
Valletta
Item
1
2
3
Week 1
4
5
6
7
34
35
WSC works
Excavation works
Road formation works
Paving Works
Item
Week 5
29
WSC works
Excavation works
Road formation works
Paving Works
30
31
32
33
8
9
Week 2
10 11 12
13
14
15
16
Week 3
17 18 19
20
21
22
23
Week 4
24 25 26
27
28
EXISTING WALL
GRADIENT 1:40
PROPOSED STAIRS LEVELS
EXISTING HARDSTONE SLABS
SAND-CEMENT BEDDING
AS PER SPECIFICATIONS
150MM THICK CONCRETE
SLAB C25 WITH A252
EXISTING SUB-BASE
MATERIAL
NOTES:
1. ALL DIMENSIONS ARE IN
MILLIMETERS.
Rev : Remarks :
tm
Transport
Malta
Roads & Infrastructure Directorate
-
M:\Common\Daniel Micallef\Road Construction\Residential Roads\Residential Roads.dwg
Issued drawing.
Drawn :
M.Borg
Date :
16-3-15
Title :
Drawing No. :
PAVEMENT CONSTRUCTION
SECTION DETAILS
-
2000
1250
tm
Transport Malta
2000
tm
Transport Malta
1250
APPROVED
PROJECT :
ARCHITECT
DRAWING TITLE :
DESIGN MANAGER
DRAWING No. :
Framework Drawings
FM-20
DRAWN BY
SCALE :
1 : 20
File Path :
M:\Common\Mark Borg\Traffic Management\framework drwgs.dwg
tm
Valletta Paving Roads
TM Works Signs
DATE:
File No. :
02-02-2015
Revision :
*
Transport
Malta
Roads & Infrastructure Directorate
SHEET SIZE :
A4
*
Revision
Alterations
Date
900
900
Warning
600
600
Keep out
Construction Area
Authorized Personnel only
Sign
900
900
600
600
ROAD
CLOSED
tm
Transport
Malta
MUST BE WORN
AT ALL TIMES
Construction Area
Safety Wear
Sign
APPROVED
PROJECT :
Framework Drawings
ARCHITECT
DRAWING TITLE :
Construction Area
Works Signs
DESIGN MANAGER
DRAWING No. :
FM-19
SCALE :
DRAWN BY
p:\design\common area\public transport reform\framework.dwg
File No. :
16-1-2013
Revision :
n.t.s.
File Path :
DATE:
*
Roads & Infrastructure Directorate
SHEET SIZE :
A3
*
Revision
Alterations
Date