Wolf Ranch Parkway (build) - Transportation Bond Election 2015

Transcription

Wolf Ranch Parkway (build) - Transportation Bond Election 2015
Overall Transportation BC
Plan Project Identifier:
Roadway Project
Location:
Project Description:
Wolf Ranch Pkwy - DB Wood Dr To
Southwest Bypass
Issue Addressed:
Mobility, Bottleneck, Economic Development
New construction of Wolf Ranch Pkwy from DB Wood Dr to Southwest Bypass.
The City of Georgetown has committed to construction of Wolf Ranch Pkwy and Southwest Bypass to complete the
connection from SH 29/DB Wood Rd. to Leander Rd.. Wolf Ranch Pkwy. will provide the connection between SH 29/DB
Wood Rd. and Southwest Bypass.
Proposed Roadway:
Right of Way
Acquisition:
5 Lanes
Yes
Anticipated 2035
36,000 Vehicles
Average Daily Traffic:
Functional
Classification:
Minor Arterial
Anticipated Start Date: 2017
Anticipated End Date: 2020
Legend
W UNIVE
Build
Design
RSITY AV
E
Begin Project
29
V
U
D B RD
OD
WO
Planning
Georgetown
ASS
BYP
EST
THW
SOU
K
End Project
Printing Date: April 06, 2015
Path: G:\0573.009.000\07.00 CADD\GIS\Project Sheets_With_Paragraph.mxd
N
F RA
WOL
CH P
KWY