Legend - Transportation Bond Election 2015
Transcription
Legend - Transportation Bond Election 2015
Overall Transportation AN Plan Project Identifier: Roadway Project Location: Project Description: DB Wood Dr - SH 29 To Oak Ridge Dr Issue Addressed: Mobility, Bottleneck, Economic Development Reconstruction of DB Wood Dr from SH 29 to Oak Ridge Dr. DB Wood Rd. is a north/south minor arterial which provides congestion relief from Williams Dr. for traffic from the western portion of Georgetown to SH 29. This project will widen DB Wood Rd. from a 2-lane to a 4-lane divided facility from SH 29 to Oak Ridge Dr.. Proposed Roadway: Right of Way Acquisition: Widening to 5 Lanes No Anticipated 2035 8,600 Vehicles Average Daily Traffic: Functional Classification: Minor Arterial Anticipated Start Date: 2021 Anticipated End Date: 2024 Begin Project K OA R E RID G D Legend Build Design Planning WOLF RANC H PKWY Y RSIT NIVE WU AVE Printing Date: April 06, 2015 Path: G:\0573.009.000\07.00 CADD\GIS\Project Sheets_With_Paragraph.mxd EST THW SOU PASS BY K D B RD OD WO Georgetown 29 V U End Project