Stamford Street Quietways Report
Transcription
Stamford Street Quietways Report
Quietways TLRN Consultation Stamford Street/Cornwall Road junction Response to consultation March 2015 Quietways TLRN Consultation Stamford Street/Cornwall Road junction Response to consultation Quietways Q1 | Stamford Street and Cornwall Road TLRN Junction 2 Executive Summary Between 15 December 2014 and 9 February 2015, Transport for London (TfL) consulted on proposals for the junction of Stamford Street and Cornwall Road. We received 64 responses to the consultation, of which 59% supported or partially supported our proposals. However, some expressed concern that the plans don’t go far enough. Having considered the responses, TfL intends to proceed with the scheme as shown in the consultation documentation. The works will commence and are planned to start in late April 2015. We will write to local residents and businesses before work starts to provide an overview of the updated plans and an outline of the construction programme. This document explains the processes, responses and outcomes of this consultation, as well as TfL’s responses to issues commonly raised. Quietways Q1 | Stamford Street and Cornwall Road TLRN Junction 3 Contents Executive Summary .............................................................................................................. 3 1 Background ................................................................................................................ 5 2 Introduction ................................................................................................................ 6 3 The consultation ......................................................................................................... 7 4 Overview of consultation responses ........................................................................... 9 5 Analysis of consultation comments ............................................................................11 6 Conclusion and next steps.........................................................................................17 Appendix A – Response to issues commonly raised ............................................................18 Appendix B – Copy of the consultation letter and map .........................................................19 Appendix C – Leaflet distribution area..................................................................................23 Appendix D – List of 539 stakeholders consulted .................................................................24 Appendix E – Email sent to stakeholders .............................................................................38 Quietways Q1 | Stamford Street and Cornwall Road TLRN Junction 4 1 Background 1.1 About Quietways The Quietways form a key part of the Mayor’s Vision for Cycling; a 10 year plan to deliver cycling improvements across the Capital. By 2022, £913m will be invested in cycling and we envisage over £123m to be allocated to this programme. The Quietways will deliver a pan-London network of high quality, well-signed cycle routes predominately using back streets with little traffic. They are designed to overcome barriers to cycling, targeting less confident cyclists and those who prefer a more relaxed journey. Quietways will complement other cycling initiatives, such as the Central London Cycling Grid and Cycle Superhighways. Transport for London is are working in partnership with the London boroughs and managing authorities to deliver seven Quietways routes by late spring 2016. The seven pilot routes, boroughs and partners, are Q1 Waterloo to Greenwich (LB Lambeth, LB Southwark, LB Lewisham, LB Greenwich) Q2 Bloomsbury to Walthamstow (phase 1 - Bloomsbury to Mare Street) (LB Camden, LB Islington, LB Hackney, LB Waltham Forest, Lea Valley Regional Park) Regents Park to Gladstone Park (Dollis Hill) (City of Westminster, LB Camden, LB Brent) Elephant & Castle to Crystal Palace (LB Lambeth, LB Southwark) Aldgate to Hainault (phase 1 – Mile End to Barkingside) (LB Tower Hamlets, LB Hackney, LB Newham, LB Redbridge, and the London Legacy Development Corporation) Waterloo to Croydon (via Clapham Common) (LB Lambeth, LB Wandsworth, LB Croydon) Clapham Common to Wimbledon (LB Lambeth, LB Wandsworth, LB Merton) Design on the first two pilot routes is well underway. It is expected that they will be delivered by summer 2015. The remaining five routes are expected to be delivered by late spring 2016. 1.2 About this report – Stamford Street to Cornwall Road There are junctions on the Transport for London Road Network (TLRN) along the pilot routes and for these it is the responsibility of TfL to consult on changes at these locations. Modifications at these junctions range from providing Advanced Stop Lines (ASLs) and carriageway markings to more complex reworkings of junction layouts. The Stamford Street and Cornwall Road junction is on the proposed Waterloo to Greenwich Quietway. The London boroughs will consult locally on their respective sections of the route. Quietways Q1 | Stamford Street and Cornwall Road TLRN Junction 5 2 Introduction 2.1 Purpose of the Scheme As part of the Quietways programme, TfL is developing proposals to enhance facilities for cyclists and pedestrians without adversely affecting other road users. During December to early February 2014 we invited the public and key stakeholders to comment on its proposals for the TLRN junction of Stamford Street and Cornwall Road. 2.2 Description of the proposals a) A new Advanced Stop Line (ASL) on the southern arm of Cornwall Road. This would provide a new area in which cyclists can wait at a red traffic signal in front of other traffic, giving them a ‘head start’ when the signals change to green b) ASL space increased to five metres on both Stamford Street arms and the northern arm of Cornwall Road. This would provide more space for cyclists to wait at a red traffic signal ahead of other traffic c) Footway widened on the western side of the northern arm of Cornwall Road, using unused carriageway space by increasing the space for pedestrians around the junction d) Realignment of the eastern kerb line on the northern arm of Cornwall Road to assist cyclists positioning when approaching the junction e) Advisory cycle feeder lanes increased to 1.8 metres wide. This would improve cyclists’ access to the ASLs f) A section of parking bay on the southern arm of Cornwall Road has been moved a short distance. This would remove a possible conflict point between cyclists waiting in the ASL and southbound vehicles 2.3 Location maps For a larger version of this junction plan and in context to the whole route see page 22. Quietways Q1 | Stamford Street and Cornwall Road TLRN Junction 6 3 The consultation The consultation ran from 15 December 2014 to 9 February 2015. It was designed to enable TfL to understand local opinion about the proposed junction changes. The potential outcomes of the consultation are: We decide the consultation raises no issues that should prevent us from proceeding with the scheme as originally planned We modify the scheme in response to issues raised in consultation We abandon the scheme as a result of issues raised in the consultation The objectives of the consultation were: To give stakeholders and the public easily-understandable information about the proposals and allow them to respond To understand the level of support or opposition for the change To understand any issues that might affect the proposal of which we were not previously aware To understand concerns and objections To allow respondents to make suggestions 3.1 Who we consulted The public consultation intended to seek the views of people living close to the junction. We also consulted stakeholders including the affected councils, traffic police, London TravelWatch, Members of Parliament, Assembly Members, London Cycling Campaign and local interest groups. A list of the stakeholders consulted is shown in Appendix D. A summary of the stakeholder groups that responded is in Section 5. Quietways Q1 | Stamford Street and Cornwall Road TLRN Junction 7 3.2 Consultation material, distribution and publicity The consultation material was available at tfl.gov.uk/Stamford-street, via door drop, and email. Materials included an overview letter, along with a detailed drawing of the junction showing the proposals. We invited people to respond via an online survey on the TfL website, by letter, telephone and email to consultations@tfl.gov.uk. We promoted the consultation through multiple channels: Email: We emailed 539 stakeholder groups. A list of these stakeholders is shown in Appendix D of this report and a copy of the email is available in Appendix E. Letter: We distributed a consultation letter and junction plan to 5,870 residents and businesses within a 400 metre radius of the junction. A copy of the letter and location area of the door drop is shown in Appendix B. The consultation asked one question; Do you support the proposed changes to the Quietway TLRN junction at Stamford Street and Cornwall Road? The options to choose to reply from were Yes Partially Not sure No No opinion The results for the above question are on page 9 for the public and page 14 for stakeholders. Quietways Q1 | Stamford Street and Cornwall Road TLRN Junction 8 4 Overview of consultation responses 4.1 Number/Type of responses received The consultation received 64* responses in total; eight emails were received and 56 from online respondents. A breakdown of the number of responses received by respondent type can be seen in Table 1 below. Table 1: Consultation responses by respondent type Stakeholder groups (11) 17% Respondent Number Percent Members of the public 53 82.81% Stakeholder groups 11 Total received 64 17.19% Public (53) 83% 100% Table 2: Response to – Do you support the proposed scheme? PUBLIC ONLY Not Answered (2) 4% Yes (20) 38% No (21) 39% Partially (10) 19% *Please note, the closed question on the overall proposals was not directly answered by 6 respondents. We have therefore coded their responses according to their comments on the overall proposals, and their answers to other questions in the survey. With these 6 manually-coded responses removed, the results break down as: Yes - 40%; Partially - 19%; Yes and partially – 59%; No - 38%, Not answered - 3%. Quietways Q1 | Stamford Street and Cornwall Road TLRN Junction 9 Table 3: Answers received to question – How did you hear about this consultation? PUBLIC AND STAKEHOLDERS RESPONSES COMBINED 20 18 16 14 12 10 8 6 4 2 0 Saw an Read Through Received Other, Not Received advert on about it social an email please Answere a letter the TfL in the media from TfL specify: d from TfL website press Series1 19 15 9 7 7 4 3 Others specified Through Greenwich Cyclists SE1 website (twice) Looking at proposed Quietways routes Visited consultation hub Kennington POB (People On Bikes) Email from another cycling group Quietways Q1 | Stamford Street and Cornwall Road TLRN Junction 10 5 Analysis of consultation comments 5.1 Comments from the Stamford Street/Cornwall Road TLRN junction Of the 64 respondents who replied to the consultation, 54 (84% of the total) provided comments. The issues most commonly raised are outlined below. a) Negative comments about ASLs and feeder lanes: 16 respondents (25%) were concerned about the level of protection ASLs and feeder lanes offered and about motorist compliance. Comments included: i. 8 respondents: ASLs are not enough; they offer little or no protection Cyclist Touring Club (CTC) London: The lead-in lanes to the ASLs are very short; these should be as long as the traffic queue or a reason for their termination. Southwark Living Streets: A semi-segregated lead into the ASL from both the east and west directions should be created. ii. 5 respondents: Feeder lanes require more space, 1.8m length or width isn’t wide enough iii. 4 respondents: Motorist behaviour change required towards ASLs ASLs are not enforceable and are often occupied by motor vehicles, they need to be enforced. Most drivers think they can drive into an ASL whenever there isn’t a cyclist in it b) Concern at perceived lack of ambition: 14 respondents (22%) were concerned that the changes were cosmetic and minor, unambitious, and requested segregation. Comments included: i. ii. 6 respondents: These are unambitious designs and no safer for cyclists 5 respondents: These proposals are cosmetic and minor changes LB Lambeth: Said it is uncertain that the proposals alone will drastically improve the junction for cyclists. iii. 4 respondents: Junction flow concerns and segregation requests Capital Rides: Local cycling instructor said Cornwall Road is not a good cycling environment, and that the plan would not substantially change this. c) Suggestions for junction alterations: 12 respondents (19%) made suggestions for changes or additions to the proposed scheme. Comments included: 5 respondents: To avoid congestion change the parking rules by adding double yellow lines at southern and northern ends of Cornwall Road junction 4 respondents: Close Cornwall Road to motor traffic or make one way 3 respondents: Car parking should be removed 2 respondents: Requested car parking to be added Quietways Q1 | Stamford Street and Cornwall Road TLRN Junction 11 Sustrans: Said they are supportive of the removal of parking, however double red lines (or double yellow lines) should be extended on either side of the road to prevent any parking close to the junction. d) Junction plans offer little or no safety improvements: 11 respondents (17%) were concerned that the junction plans offered little or no safety improvements. Southwark Living Streets: Said that Stamford Street remains an extremely intimidating environment to cycle along. Alliance of British Drivers: Said that they were particularly opposed to the buildout of the kerb on Cornwall Road, claiming that such designs are dangerous as they tend not to be seen by the drivers until too late and obstruct the free flow of traffic. Cyclist Touring Club (CTC) London: Said that the general traffic lane opposite the ASL in Stamford Street should be at least 4 metres wide to avoid cyclists being squeezed. e) Rat-running: 10 respondents (16%) were concerned about motor vehicles ‘ratrunning’ along Cornwall Road. Capital Rides: Said stop traffic rat-running along Belvedere Road/Upper Ground spine through bollard closures that allow pedestrians and cyclists through. f) Cost concerns: 8 respondents (12%) were concerned that the scheme is a waste of money and/or that cyclists should contribute to the cost of the highway. g) General positive comments: 7 respondents (11%) welcomed the junction improvements. Comments included: I regularly cycle from New Cross to central London via Waterloo using these back roads – any improvements would be most welcomed. I welcome the investment to put the safety of cyclists first. Looks like a good step in the right direction. Hope we can have many more of these in the years ahead. Good idea to remove the parking on Cornwall Road, as there is always a jam with cars trying to enter and exit Cornwall Road. Sustrans: Are supportive of widening all existing ASLs and cycle feeder lanes to give cyclists a head start over traffic. London TravelWatch: Said the best road designs are understandable and selfexplaining. This proposal complies with this principle and so is welcomed. John Lewis Partnership: Said we fully support schemes that help make cycling in London safer. Quietways Q1 | Stamford Street and Cornwall Road TLRN Junction 12 Other responses with two comments or less included Propose a 20 mph speed limit Provide clear signage for right of way Add additional cycling parking Suggestion to register cyclists The waiting area should be replaced with a yellow box Suggestion change to add split signalling (pedestrians/cyclists) Cyclists should be policed in the area for breaking the Highway Code, John Lewis Partnership: Request that kerbside loading is accommodated, practically and safely. LB Lambeth: Said that signals at the junction appears to let few vehicles through, leading to a build up of traffic waiting to turn into Stamford Street, competing with vehicles parked in the bays on the south wide of Cornwall Road. Quietways Q1 | Stamford Street and Cornwall Road TLRN Junction 13 5.2 Stakeholder responses There were 11 stakeholder responses, a summary of which follows below. Table 4: Response to – Do you support the proposed scheme? Not Answered (0) 0% No (3) 27% Yes (6) 55% Partially (2) 18% 5.3 Summary of stakeholder responses These are listed in alphabetical order Stakeholder group Alliance of British Drivers Bromley Cyclists (sub group of LCC) Capital Rides (Cycling instructor) Summary of response Particularly opposed to the build-out of the kerb on Cornwall Road. Said such designs are dangerous as they tend not to be seen by drivers until too late and obstruct the free flow of traffic. Argued the adjustments will give few benefits for cyclists and seem to be an exercise in 'being seen to do something' rather than tackling issues elsewhere. As a cycling instructor who teaches adults and pupils in this area the respondent does not consider Cornwall Road, especially north of Stamford Street to be a good cycling environment. And does not believe that the plan substantially changes this. The respondent has provided an image of how the South Bank be made child cycle-friendly while also allowing deliveries of goods and building materials, taxis to drop off theatre-goers, and people with blue badges or an aversion to public transport to drive to the area https://www.google.com/maps/d/u/0/edit?mid=zcydiB FjzdoQ.k36fyzY9-9I8 Quietways Q1 | Stamford Street and Cornwall Road TLRN Junction 14 Catford Police Traffic Garage Cyclist Touring Club (CTC) London No issues with these two junctions. John Lewis Partnership LB Lambeth Said the lead-in lanes to the ASLs are very short; these should be as long as the traffic queue or a reason for their termination. Requested for the general traffic lane opposite the ASL in Stamford Street to be at least 4.0m wide to avoid cyclists being squeezed, and for additional cycle parking to be incorporated. Said it fully supports schemes that help to make cycling in London safer. Requested that care be taken to ensure that kerbside loading is accommodated as practically and as safely as possible, and without compromise to other road users. Said it is difficult to assess the proposals without them being placed in the context of the wider Quietway proposals, but is uncertain that the proposals alone will drastically improve the junction for cyclists. Added that the junction (and Stamford Street as a whole) will only be improved for cyclists and pedestrians if the large volume of heavy vehicles (lorries, coaches and buses) is reduced. Expressed concerns relating to the level of traffic using Cornwall Road between Stamford Street and Belvedere Road and the timing of the traffic lights, which it said appeared to let very few vehicles through at a time. It added that this sometimes leads to a build up of traffic waiting to turn into Stamford Street which competes with other vehicles parked in the bays on the South side of Cornwall Road. London Fire and Emergency Planning Authority London TravelWatch Southwark Living Streets Said that TfL should analyse the responses from this consultation, but then pause the implementation to wait for the wider Quietway plans to be finalised and to ensure that they compliment each other. Said the proposals have very little impact on the London Fire Brigade. However, the respondent welcomes any proposal to improve road safety and during the construction phase and we would like to ensure continued liaison with managers at local fire stations to enable pre planning to minimise any possible disruption to appliances attending incidents. Said the best road designs are understandable and self-explaining. This proposal complies with this principle and so is welcomed. Said the proposals appear adequate in relation to Cornwall Road, but requested further improvements to Stamford St such as a 20mph speed limit and the creation of a semi-segregated lead into the ASL for cyclists from both the east and the west directions. Quietways Q1 | Stamford Street and Cornwall Road TLRN Junction 15 Added that Stamford Street remains an extremely intimidating environment to cycle along. Sustrans Generally supportive of the minor proposals to this junction. Although this is a quiet junction, an ASL would make cyclists feel safer. Supportive of widening all existing ASLs and cycle feeder lanes. This should give cyclists a larger ‘head start’ over traffic which is beneficial for slower cyclists and disability cyclists who can find the slope makes it harder to accelerate. Supportive of the footway widening as this should encourage vehicles to not overtake. This would presumably remove the existing bike marking next to the kerb, which currently misleads cyclists who shouldn’t be positioning themselves so close to the kerb. Supportive of the removal of parking, however the double red lines (or double yellow lines) should be extended on either side of the road to prevent any parking close to the junction. Quietways Q1 | Stamford Street and Cornwall Road TLRN Junction 16 6 Conclusion and next steps Overall, 59% of consultation respondents said they supported or partially supported TfL’s proposals for the Stamford Street and Cornwall Road junction. Having considered the responses, TfL intends to proceed with the scheme as shown in the consultation documentation. The works are planned to start in late April 2015. We will write to local residents and businesses before work starts to provide an overview of the updated plans and an outline of the construction programme. Please see Appendix A for TfL’s Response to issues commonly raised in consultation. Quietways Q1 | Stamford Street and Cornwall Road TLRN Junction 17 Appendix A – Response to issues commonly raised Negative comments about Advanced Stop Lines (ASLs) and feeder lanes The proposals to increase the length of ASLs and width of feeder lanes increase the space available for cyclists. The reduced width ASLs on both Cornwall Road arms of the junction safeguard cyclists from the swept paths of larger vehicles turning in from Stamford Street, which in turn allows the ASLs to be kept as close to the junction as possible. This will slightly reduce the distance into the junction for cyclists. The intrusion of motor vehicles into ASL’s is being addressed by the Met Police through Operation Safeway, where officers are regularly deployed at key junctions across the capital to enforce road safety and give advice to all road users The feeder lanes to the ASLs at 1.8m will be wider than currently exists. Feeder lanes are not proposed on the Cornwall Road arms, as due to the narrow width of the road. Cyclists are encouraged to take a primary riding position by cycling further away from the kerb to mitigate the risk of collision with vehicles, for example, during a left ‘hook’ manoeuvre. The feeder lanes are advisory and segregated or semi-segregated feeder lanes would not be compatible with the London Borough of Lambeth’s proposals for the Quietway along Cornwall Road, which the borough will consult on separately. Concern at perceived lack of ambition; suggestions for junction alterations As outlined above, the scheme has been designed to provide a safer and more comfortable route for cyclists through the junction. TfL consider that the design is a proportionate and cost-effective solution for this particular junction. Requests for changes to parking arrangements and a junction closure on Cornwall Road will be shared with LB Lambeth, which is the Highway Authority for Cornwall Road. Junction plans offer little or no safety The proposals have been designed to provide a safer and more comfortable route for cyclists through the junction. New and larger Advanced Stop Lines and feeder lanes will provide more space for cyclists and make it easier for them to wait ahead of other vehicles at the junction. The revision to the footway kerb alignment in Cornwall Road (north arm) has been designed to ensure a smoother approach for cyclists into the junction. It also moves out the point at which vehicles from the crossover will be emerging onto the carriageway, and creates more pedestrian space. Rat-running Comments relating to Cornwall Road will be shared with the London Borough of Lambeth, which is the Highway Authority for this road. Quietways Q1 | Stamford Street and Cornwall Road TLRN Junction 18 Appendix B – Copy of the consultation letter and map 15 December 2014 Consultation Team Transport for London 11th Floor, Zone G8, Palestra 197 Blackfriars Road London SE1 8NJ consultations@tfl.gov.uk Dear Resident, Have your say – proposed changes to the Stamford Street junction with Cornwall Road As part of the Quietways programme, Transport for London (TfL) is developing proposals to enhance facilities for cyclists and pedestrians without adversely affecting other road users. We would like to know your views on the proposed changes to the junction at Stamford Street and Cornwall Road. The Quietways programme will deliver a pan-London network of high quality, well signed cycle routes predominately using back streets with little traffic. They are designed to overcome barriers to cycling, targeting less confident cyclists and those who prefer a more relaxed journey. Quietways will complement other cycling initiatives, such as the Central London Cycling Grid and Cycle Superhighways. The Stamford Street and Cornwall Road junction is on the proposed Waterloo to Greenwich Quietway. The London boroughs will consult locally on their respective section of the route. We are committed to make it easier and safer to cycle in London, and the proposals for this junction include: 1. A new Advanced Stop Line (ASL) on the southern arm of Cornwall Road. This will provide a new area in which cyclists can wait at a red traffic signal in front of other traffic, giving them a ‘head start’ when the signals change to green 2. ASL space increased to five metres on both Stamford Street arms and the northern arm of Cornwall Road. This will provide more space for cyclists to wait at a red traffic signal ahead of other traffic 3. Footway widened on the western side of the northern arm of Cornwall Road, using unused carriageway space by increasing the space for pedestrians around the junction 4. Realignment of the eastern kerb line on the northern arm of Cornwall Road to assist cyclists positioning when approaching the junction 5. Advisory cycle feeder lanes increased to 1.8 metres wide. This will improve cyclists’ access to the ASLs Quietways Q1 | Stamford Street and Cornwall Road TLRN Junction 19 6. A section of parking bay on the southern arm of Cornwall Road has been moved a short distance. This will remove a possible conflict point between cyclists waiting in the ASL and southbound vehicles The enclosed consultation junction plan shows the current proposals. A detailed design process will follow this consultation, and as a result the works may change. The proposed modified junction reflects the emerging improvements in cycling infrastructure design standards including to: Improve safety for cyclists Increase the number of cyclists and cycle journeys Reduce journey times for cyclists Use some innovative design features recognised as best practice Reduce traffic speeds Improve the environment for local residents and businesses Not to disbenefit other road users How to comment on the proposals Website For further information or to let us know your views please visit our website tfl.gov.uk/stamford-street Email Send to consultations@tfl.gov.uk When responding by email please add ‘Quietways – Stamford Street’ in the subject line. Letter You can also contact TfL’s Consultation Team by writing to us FREEPOST TFL CONSULTATIONS, Quietways TLRN Junctions (Stamford Street), 11G8, Palestra, 197 Blackfriars Road, London SE1 8NJ. Telephone You can call customer enquiries on 0343 222 1234 (service and network charges may apply) and quote ‘Quietways – Stamford Street’. The consultation closes on Monday 9 February 2015. To learn more about Quietways please visit tfl.gov.uk/cycle-quietways The measures that we propose are subject to change as a result of this consultation. It is anticipated that construction of these enhancements will begin in early 2015 with completion by spring 2015. Yours faithfully Julie Vindis Consultation Team Quietways Q1 | Stamford Street and Cornwall Road TLRN Junction 20 Transport for London Surface Transport Communications Quietways Q1 | Stamford Street and Cornwall Road TLRN Junction 21 Junction location maps Quietways Q1 | Stamford Street and Cornwall Road TLRN Junction 22 Appendix C – Leaflet distribution area Quietways Q1 | Stamford Street and Cornwall Road TLRN Junction 23 Appendix D – List of 539 stakeholders consulted Organisation 20's Plenty For Us 3663 First for Foodservice A.S. Watson Abellio West London Ltd t/a Abellio Surrey, Action Disability Kensington & Chelsea Action for Blind People Action on Hearing Loss (formerly RNID) Addison Lee AECOM Age Concern London Age UK London Alive in Space Landscape and Urban Design Studio All Hallows by the Tower church All Party Cycling Group All Party Parliamentary Cycling Group Arriva London North Ltd, Asian Peoples Disabilities Alliance Association of Bikeability Schemes Association of British Drivers Association of Car Fleet Operators Association of Guide Dogs for the Blind Association of Town Centre Management Association of British Drivers Automobile Association Barking & Dagenham Safer Transport Team Barking and Dagenham Barnet Safer Transport Team Bayliss Executive Travel Bayswater BID Bayswater Residents Association BBC Belgravia Residents Association Best Bike Training/ Cycletastic Better Bankside Bexley Accessible Transport Scheme, Bexley Council Bexleyheath BID Bidvest Logistics Quietways Q1 | Stamford Street and Cornwall Road TLRN Junction 24 Big Bus Company Ltd Bikeworks BikeXcite Blue Triangle Buses Ltd, Borough Cycling Officers Group (BCOG) Breakspears Road Project Brent Safer Transport Team Brentwood Community Transport Brewery Logistics Group British Cycling British Dyslexia Association British Land British Medical Association British Motorcycle Federation British Retail Association British School of Cycling Bromley Safer Transport Team Brookline BT Bucks Cycle Training Buzzlines Cabinet Office Camden Council Camden mobility forum Camden Safer Transport Team Camden Town Unlimited Campaign for Better Transport Canal River Trust Canary Wharf Management Ltd Capital City School Sport Partnership Carlton Motors Ltd Carousel Buses Ltd CBI-London CCG Central London (WESTMINSTER) CCG City and Hackney Centaur Overland Travel Ltd, Central London Cab Trade Section Central London CTC Central London Forward (City of London) Central London Freight Quality Partnership Quietways Q1 | Stamford Street and Cornwall Road TLRN Junction 25 Central London NHS Trust Centre for Accessible Environments Chalkwell Garage & Coach Hire Ltd, Chartered Institute of Logistics and Transport Chauffeur and Executive Association Children's Society Christopher Stephen Hunn t/a Travel with Hunny/TWH, City Bikes (Vauxhall Walk) City Cyclists (LCC) City Hall City Hall Liberal Democrat Office City of London City of London Access Forum City of London Police City of Westminister Colas Volker Highways URS Community Transport Association Computer Cab Confederation of British Industry (CBI) Confederation of Passenger Transport UK Covent Garden Market Authority CPT Cross River Partnership Crown Equerry Croydon Bid Croydon Coaches (UK) Ltd t/a Coaches Excetera, Croydon Mobility Forum Croydon North Croydon Safer Transport Team Crystal Palace Transition Town (Croydon) CT Plus Ltd t/a Hackney Community Transport, CTC ‘Right to Ride’ Network CTC, the National Cycling Charity Cycle Confidence Cycle Experience Cycle Newham Cycle Systems Cycle Training East Cycle Training UK (CTUK) Cycle-wise Thames Valley Quietways Q1 | Stamford Street and Cornwall Road TLRN Junction 26 Cycling Embassy of Great Britain Cycling Instructor Ltd Cycling Tuition Cycling4all Cyclists in the City Department for Transport Design for London DHL UK and Ireland Dial-a-Cab Disability Alliance Disabled Persons Transport Advisory Committee Downing Street E Clarke & Son (Coaches) Ltd, t/a Clarkes of London, E11 BID (Leytonstone) Ealing Broadway BID Ealing Council Ealing Cycling Campaign Ealing Passenger Transport Users' Group Ealing Safer Transport Team East and South East London Thames Gateway Transport Partnership East End Express (X1) East South East London Thames Gateway Transport Partnership EDF Energy Enfield Safer Transport Team English Heritage - London Ensign Bus Company Ltd, Enterprise Mouchel Evolution Cycle Training Express Networks Forum Federation of Small Businesses First Beeline First Beeline Buses Ltd First Group Fitzrovia Neighbourhood Association Fitzrovia Partnership Business Improvement District Freight Transport Association Friends of the Earth Future Inclusion Future Inclusion/IDAG G4S Quietways Q1 | Stamford Street and Cornwall Road TLRN Junction 27 Garratt Business Park (Earlsfield) Gatwick Flyer Ltd, Ghost Bus Tours Ltd GMB Go-Coach Hire Ltd Golden Tours Golden Tours (Transport) Ltd, Greater London Authority Greater London Forum for Older People Green Flag Group Green Line (Arriva) Green Urban Transport Ltd, Greenwich Safer Transport Team Guide Dogs Association Guide Dogs for the Blind - Inner London District team Hackney Safer Transport Team Hainault Business Park Hamilton-Baillie Associates Ltd., Hammersmith & Fulham Action on Disability Hammersmith & Fulham cyclists Hammersmith & Fulham Safer Transport Team Haringey mobility forum Haringey Safer Transport Team Harrow Safer Transport Team Harrowby and District Residents Association Hartnell Taylor Cook Havering Safer Transport Team Health Poverty Action Heart of London Business Alliance Heritage London Hertfordshire County Council Hillingdon Council Hillingdon mobility forum Hillingdon Safer Transport Team Historic Royal Palaces (HM Tower of London) HMRC HMS President.com Honourable Artillery Company, Army Ceremonial requirements Hounslow Safer Transport Team Quietways Q1 | Stamford Street and Cornwall Road TLRN Junction 28 House of Commons Household Cavalry Mounted Regiment HR Richmond Ltd t/a Quality Line, Hyde Park Estate Association Hyde Park Stables Ilford Town BID In & Around Covent Garden In Holborn In Streatham Inclusion London Independent Disability Advisory Group Independent Shoreditch In Midtown Inner and Middle Temple Inner Temple Institution Institute for Sustainability Institute of Advanced Motorists Institution of Civil Engineers Islington mobility forum Islington Safer Transport Team IT Skillfinder J Brierley & E Barvela t/a Snowdrop Coaches James Bikeability John Lewis Partnership Joint Committee on Mobility of Blind and Partially Sighted People (JCMBPS) Joint Mobility Unit K&C mobility forum Keltbray Ltd (construction) Kensington & Chelsea Safer Transport Team Kensington and Chelsea Cyclists Kimpton Industrial Park (Sutton) Kings Ferry Ltd, Kings Troop Kingston First Kingston mobility forum Kingston Safer Transport Team Laing O'Rourke Lambeth BID Lambeth Cyclists Quietways Q1 | Stamford Street and Cornwall Road TLRN Junction 29 Lambeth Safer Transport Team Lancaster London Hotel LCC Enfield Leonard Cheshire Disability LEPT Lewisham Safer Transport Team Liberal Democrats Licenced Private Hire Car Association Licensed Taxi Drivers' Association Line Line Coaches (TGM), Living Streets Action Group Living Streets London Local Government Ombudsman London Ambulance Service London Bike Hub London Borough of Barking and Dagenham London Borough of Barnet London Borough of Bexley London Borough of Brent London Borough of Bromley London Borough of Bromley London Borough of Camden London Borough of Croydon London Borough of Ealing London Borough of Enfield London Borough of Greenwich London Borough of Hackney London Borough of Hammersmith & Fulham London Borough of Haringey London Borough of Harrow London Borough of Havering London Borough of Hillingdon London Borough of Hounslow London Borough of Islington London Borough of Kingston Upon Thames London Borough of Lambeth London Borough of Lambeth London Borough of Lambeth London Borough of Lewisham London Borough of Merton Quietways Q1 | Stamford Street and Cornwall Road TLRN Junction 30 London Borough of Newham London Borough of Redbridge London Borough of Richmond Upon Thames London Borough of Richmond-Upon Thames London Borough of Richmond-Upon -Thames London Borough of Southwark London Borough of Sutton London Borough of Sutton London Borough of Tower Hamlets London Borough of Waltham Forest London Borough of Wandsworth London Borough of Wandsworth London Borough of Wandworth London Cab Drivers Club Ltd London Central Cab Section London Chamber of Commerce and Industry (LCCI) London City Airport London Civic Forum London Climate Change Partnership London Councils London Cycling Campaign London Duck Tours Ltd London European Partnership for Transport (LEPT) London Fire and Emergency Planning Authority London Fire Brigade London First London General London Mencap London Older People's Strategy Group London Private Hire Board London Riverside (Rainham) London Strategic Health Authority London Suburban Taxi Drivers' Coalition London Taxi Drivers' Club London Tourist Coach Operators Association (LTCOA) London Transport Users' Committee London TravelWatch London Underground London United Busways Ltd, London Visual Impairment Forum Quietways Q1 | Stamford Street and Cornwall Road TLRN Junction 31 Lonon borough of lambeth LoTAG LoveWimbledon BID LPHCA LTCOA Marshalls Coaches Marylebone Association Medway Estate Residents' Forum Megabus/Stagecoach Merton Council Merton Metropolitian Police Service Merton Safer Transport Team Met Police Metrobus Ltd Metroline Ltd Metropolitan / City Police Metropolitan Police - Community Police Metropolitan Police Service Metropolitan Police Traffic Management MIND Ministry of Defence Mobile Cycle Training Service Mode Transport Motorcycle Action Group (MAG) Motorcycle Industry Association Mullany's Coaches National Autistic Society National Children's Bureau National Express Ltd National Grid National Motorcycle Council National Trust - London Neighbourcare St John's Wood & Maida Vale New Addington BID New West End Company (NWEC) Newham Safer Transport Team NHS London Northbank BID Northbank Guild Norwood Green Residents' Association Quietways Q1 | Stamford Street and Cornwall Road TLRN Junction 32 Ocean Youth Connexions Olympus Bus & Coach Company t/a Olympian Coaches, On Your Bike Cycle Training One Events Original Tour Orpington 1st Oxford Tube (Stagecoach) Oxford Tube (Thames Transit) Paddington Paddington BID Paddington Residents Active Concern On Transport (PRACT) Parliament Security Parliamentary Advisory Council for Transport Safety (PACTS) Parliamentary Estates Passenger Focus Pedal4Health Permium Tours Phil Jones Associates Philip Kemp cycle training Pimlico FREDA Planning Design Porcellio Ltd t/a Meridian Duck Tours, Port of London Authority PRACT Premium Coaches Ltd, Private Hire Board Purple Parking Ltd, Queen Mary University of London R Hearn t/a Hearn's Coaches, Rabobank RAC Foundation for Motoring RADAR London Access Forum Radio Taxis Rank and Highways Representative for Unite Red Rose Travel Redbridge Cycling Centre Redbridge Safer Transport Team Redwing (Evan Evans) Redwing Coaches (Pullmanor Ltd) Reliance Travel Quietways Q1 | Stamford Street and Cornwall Road TLRN Junction 33 Residents Society of Mayfair and St James's Reynolds Diplomat Coaches Richmond Council Richmond Safer Transport Team Ringway Jacobs RMT London Taxi branch RNIB (Royal National Institute for the Blind) RNID (Royal National Institute for Deaf People) Road Danger Reduction Forum Road Haulage Association Roadpeace Royal Borough of Greenwich Royal Borough of Kensington & Chelsea Royal Borough of Kingston Upon Thames Royal Borough of Richmond upon Thames Royal Greenwich Cycle Training Royal Household Royal Institute of British Architects Royal Institute of Chartered Surveyors Royal London Society for Blind People Royal Mail Royal Parks Royal Town Planning Institute (RTPI) Sainsbury's Supermarkets SCOPE SEBRA Sense Sixty Plus Sloane Robson Investment securities Soho Society Somerset House South Bucks Cycle Training South East Bayswater Residents Association South East London PCT South Herts Plus Cycle Training South London Business Forum South London Partnership Southbank Employers Group Southdown PSV Ltd, Southgate & Finchley Coaches Ltd Quietways Q1 | Stamford Street and Cornwall Road TLRN Junction 34 Southwark Cyclists Southwark Safer Transport Team Space Syntax Spokes Cycling Instruction St Helen's Residents' Association St John's Wood Society STA Bikes Ltd. Steer Davies Gleave Stratford Renaissance Partnership Stroke Association Successful Sutton Sullivan Bus and Coach Ltd Supreme Court Supreme Courts Sustrans Sutton Centre for Voluntary Sector Sutton mobility forum Sutton Safer Transport Team Taxi and Private hire Taxi Rank & Interchange Manager Team London Bridge Technicolour Tyre Company Terravision Transport Ltd / Stansted Transport Ltd, Tesco TfL TfL (Buses) TfL (Cycling related projects) Quietways and Grid TfL (Specific groups) TfL (Specific groups) Anx re CS5 re Ldn T Watch TGM Group Ltd Thames Water Thamesmead Business Services The Company of Watermen and Lightermen The Original London Sightseeing Tour /London Pride Sightseeing Ltd, Thomas's London Day Schools (Transport) Ltd Thorney Island Society Time for Twickenham TNT Tower Hamlets mobility forum Quietways Q1 | Stamford Street and Cornwall Road TLRN Junction 35 Tower Hamlets Safer Transport Team Tower Place West Facilities Manager Tower RNLI Tower Transit Operations Ltd, Trade Team Trailblazers, Muscular Dystrophy UK Transport for All Transport for Greater Manchester Transport Initiatives Tyssen Community School Cycle Training UK Power Networks Unite The Union Unite the Union (taxis) University College London University of Westminster University bus Ltd t/a uno, UPS Urban Movement Vandome Cycles Vauxhall One BID Velo Mondial Victoria BID Vision Impairment Forum Vogt and Maguire shipbroking Ltd Walk England Walk London Waltham Forest Safer Transport Team Wandsworth - London Cycling Campaign Wandsworth Cycling Campaign Wandsworth mobility forum Wandsworth Safer Transport Team Waterloo Quarter Wellington Trust West London Alliance West Twyford Residents' Association Westfield London Westfield Shepherds Bush Westminster Abbey Westminster City Council Westminster City Council Conservation Officer Quietways Q1 | Stamford Street and Cornwall Road TLRN Junction 36 Westminster Cyclists Westminster Safer Transport Team Westminster School Westminster Special Events Westway Development Trust Wheels for Wellbeing Whizz-Kidz Willow Lane Trading Estate (Merton) Wilsons Cycles Wincanton Woodfines www.cyclinginstructor.com Young Lewisham and Greenwich Cyclists Quietways Q1 | Stamford Street and Cornwall Road TLRN Junction 37 Appendix E – Email sent to stakeholders Dear Stakeholder, I am writing to let you know that Transport for London (TfL) has launched three consultations proposing changes to junctions on the Transport for London Road Network (TLRN). These junctions are on the first two pilot routes of the Quietways (tfl.gov.uk/cycle-quietways) and we would like to know what you think about the proposals. The Quietways will deliver a pan-London network of high quality, well signed cycle routes predominately using back streets with little traffic. They are designed to overcome barriers to cycling, targeting less confident cyclists and those who prefer a more relaxed journey. Quietways will complement other cycling initiatives, such as the Central London Cycling Grid and Cycle Superhighways. The three junctions under consultation are: Stamford Street and Cornwall Road – on the Waterloo to Greenwich Quietway Great Dover Street and Globe Street – on the Waterloo to Greenwich Quietway City Road / Colebrooke Row and Goswell Road / Owen Street – on the Bloomsbury to Walthamstow Quietway The proposed modified junctions reflect the emerging improvements in cycling infrastructure design standards including to: Improve safety for cyclists Increase the number of cyclists and cycle journeys Reduce journey times for cyclists Use some innovative design features recognised as best practice Reduce traffic speeds Improve the environment for local residents and businesses Not to disbenefit other road users We are consulting on the introduction of the following measures and safety features, which are similar to those likely to be proposed for further Quietways junctions on the TLRN: Increased pedestrian crossing widths New Advanced Stop Lines (ASL) Increased ASL space at some junctions New Pedestrian Countdown Indicators informing pedestrians how long they have to cross the road. These are being installed as part of TfL’s programme to improve pedestrian convenience The three consultations that have been launched today are the first along the initial two pilot routes. As the next five pilot routes are announced, we will consult on more Quietways junctions on the TLRN. The London boroughs will consult locally on their respective section of the route. How can I find out more? To view our proposals and have your say, please see our consultations website tfl.gov.uk/consultations or use the links below to go directly to the consultation which interests you the most. The consultations close on Monday 9 February 2015. Quietways Q1 | Stamford Street and Cornwall Road TLRN Junction 38 tfl.gov.uk/stamford-street tfl.gov.uk/great-dover-street tfl.gov.uk/city-road We have also announced that Sustrans has been awarded the contract to support the rollout of the Quietways network across London. To learn more about the first seven pilot routes and the contract award please visit tfl.gov.uk/cycle-quietways. The Quietways form a key part of the Mayor’s Vision for Cycling; a 10 year plan to deliver cycling improvements across the Capital. By 2022, £913m will be invested in cycling and we envisage over £123m to be allocated to the Quietways programme. We hope this is useful and look forward to your response to the consultations. We will keep you informed throughout the programme. Yours sincerely, Peter Bradley Head of Consultation Surface Transport Transport for London End of document Quietways Q1 | Stamford Street and Cornwall Road TLRN Junction 39