Bever Team planlegging og rapportering
Transcription
Bever Team planlegging og rapportering
Bever Team – Office support Efficient drill and blast management Planning and reporting software to support drilling jumbo’s Bever Team Software for Planning and Reporting • Planning and reporting in office • Surveyor and drilling engineer software tools • Data transfer to and from jumbo • Project Data Base (Microsoft Access) Bever Team modules REPORTS PROJECT DATABASE MS ACCESS TUNNLINE tunnel axis design TUNNCONT tunnel contour design BEVER TEAM project management TUNNPLAN drill plan design SIMULATOR office jumbo simulation DATA TO/FROM JUMBO TUNNPROD drill round report TUNNPROF contour and overbreak report Use of MWD (injection drilling) Parameters to be recorded using Bever logging system • Position on collaring point, and direction and drilling depth • penetration rate • rotation pressure (torque) • feed pressure • percussion pressure • water flushing flow and water pressure MWD is used under injection screen drilling. Drill plan – injection drilling INJECTION DRILLING -LOG Drill log – injection drilling EXAMPLE FROM LOG ON INJECTION DRILLING penetration rate percussion pressure feed pressure water pressure rotation pressure waterflow MWD Baneheia B1000 Peg 3540-3560 (Bever Team Prints) Drilling rate round drilling Drilling data injection Drilling rate Rotation torque Linear cut – injection drilling – see hole distribution also in curves Injection drilling – drilling penetration rate – 3D view DRILL LOG – STATISTICS FOR A PERIODE OF TIME OR TUNNEL LENGTH DRILL LOG – STATISTICS FOR A PERIODE OF TIME OR TUNNEL LENGTH GEOLOGY MAPPING (OSLO) Rock strength Rockma Analysis limeston-blue slate-green diabase-yellow Rock strength Operatörsprogram inne i borrhytten, ROCKMA/BEVER grundläggande Hårdhet Syenitporfyr Diabasgång Kalkformation Skifferserier Lerbergart Syenitporfyr Diabasgång Kalkformation Skifferserier Lerbergart Vatten Sprickighet T-Baneringen Tak H-vägg T-Baneringen Diabas Kalkformationer Skifferserier Lera V-vägg Tak H-vägg DIGITAL KARTERING !! LUNNER - tunneln 20 juni 2002 sektion öst 3400 - 3360 LUNNER - tunneln sektion öst 3400 - 3360 V-vägg Tak H-vägg Sula 20 juni 2002 LUNNER - tunneln 20 juni 2002 sektion öst 3400 - 3360