Fall 2009 - Robert W. Carlstrom Co., Inc.
Transcription
Fall 2009 - Robert W. Carlstrom Co., Inc.
RWC Volume 7 Issue 2 1901 Excel Drive Mankato, MN 56001 Fall 2009 Crew Talk quality. local. Current Projects ISJ/Mayo Health System, various small projects, Mankato, MN Andreas Cancer Center 1 Luther Mankato Honda 2 St. Peter Clinic 2 Creation Technologies 3 Rhapsody Music 3 RWC Happenings 3 Blue Earth Nicollet County Humane Society (BENCHS), Mankato, Paulsen Architects Bethany Academic Building, Mankato, Paulsen Architects United Prairie Bank remodel, Mankato, Paulsen Architects Current Projects 4 Kraft Foods, various projects, New Ulm In-Progress Projects 4 Creation Technologies, St. Peter, Paulsen Architects Robert W. Carlstrom Co., Inc. 1901 Excel Drive Mankato, MN 56001 Blue Earth Nicollet County Humane Society Mankato, MN Completion of Andreas Cancer Center... RWC recently completed the construction of the Andreas Cancer Center - Mayo Health System at the Immanuel St. Joseph’s Hospital in Mankato. Construction of the Cancer Center started in May 2008 with the construction of a temporary entry and drop off for the Emergency, Oncology & Same Day Surgery departments as the existing entryway was removed and reconstructed with the new Cancer Center. Once that was complete, ground was broken and new construction started on the Cancer Center in July 2008. The biggest challenge we faced throughout construction was the remodeling portion of the project. Along with the new construction of the Cancer Center, which is 33,150 sf of new building on two levels, we completed 14,400 sf of remodeling on three levels of the existing building with a majority of it taking place on the 1st floor in the Emergency & Radiation Oncology departments. Fifteen different phases of construction remodels in the PACU, Radiation Oncology, Emergency, Same Day Surgery, Medical Records, Switchboard and Registration departments were completed, all while keeping the departments functioning and operating during that time. We also broke our site work into three different phases and turned over two-thirds of the parking lot last fall to alleviate the parking shortage caused by the construction. All the hard work and planning ...continued on Page 3 Check out our new website at: www.rwcarlstrom.com Bethany Honsey Hall Mankato, MN In Progress Phone: 507-625-2872 Fax: 507-388-2513 Email: rwc@rwcarlstrom.com craftsmanship. RWC CREW: Chad Amundson (Construction Manager), Keith Furst (Superintendent), Jim Amundson, Andy Bahr, Tim Clabo, Bernie Davey, Roger Davey, Tim Domeier, Doug Drill, Glenn Eilders, Pete Eustice, Drew Forsyth, Terry Gappa, Dustin Gansen, Jason Gleason, Steve Herz, Jim Jirak, Rick Johnson, Mitch Kalar, Duane Karels, Loren Karels, Cory Kramer, Mark Lemerond, Louie Lemert, Colter Lenz, Kirby Loewen, Arnie Nimps, Paul Nuytten, Brent Otto, Kyle Ramaker, Gary Roemhildt, Keith Rogers, Jake Romsdahl, Don Serr, Mike Sheldon, Ryan Smith, Tom Stadick, Mark Stadler, Bobby Umhoefer, Dale Van Stelten, Nick Vogel, John Weldon, Paul Wels, Jared Wendt, Vic Wendt, Curt Willson Luther Mankato Honda Mankato, MN Project Manager: Dan Gjerde RWC Crew: Jim Jirak (Superintendent), Jim Amundson, Tim Clabo, Bernie Davey, Doug Drill, Duane Karels, Arnie Nimps, Brent Otto, Gary Roemhildt, Mark Stadler, John Weldon, Vic Wendt The remodel at Luther Mankato Honda’s new location on Madison Avenue is now complete. RWC had the challenge of working while the dealership was in operation. All in all, the project went very well and Luther has ended up with a well designed larger facility to be able to service their clients better. Some of the upgrades were: painting of the exterior of the building, new metal roof panels at the mansards, new service write-up offices and retail parts “boutique” room, new and updated bathrooms, showroom remodel, electrical and HVAC upgrades, and overall upgrade of the finishes (walls, floors, casework, etc.) Thanks to Baker Associates (Jon Baker, Stephen Myslajek, Kristy Hausladen), the Luther Automotive Group (Mark Beithon, Linda McGinty, Kathy Dickson and all the great people at LMH), and to our job superintendent Jim Jirak, the RWC crew, and the subcontractors for helping on this successful remodel project! ISJ Andreas Cancer Center…continued from Page 1 produced a beautiful new building which boasts a grand entry with a revolving door, spacious and open new Cancer Center with bountiful natural light and an inspirational connection to the outdoors including a patient-accessible healing garden with stone columns, metal trellis and stone planters. The entryway also creates a direct path into the ER with a terrazzo hallway, architectural glass, wood veneer wall covering and stone details. Having Radiation Oncology and Medical Oncology now located side-by-side and improving the flow and look of the ER, the Mankato area is blessed to have a state-of-the-art facility right here in our community to serve patients. The completion of this project is a tribute to the hard work, thought and planning of many from every side of the table. We want to thank ISJ Hospital Staff including Rick Westmark, Jon Conner, Dan Briggs, Steve Hammes, Greg Wersal, Shawna Merrill, Ismail Ahmed, Tom Allen, Becky Shaw, Kristi Olson and all other ISJ employees who contributed to the project. We would also like to thank Ellerbe Becket, project architect and engineer, including Dave Lyon, Kim Pierson, Jim Lohman and Dean Smith. In closing I would like to thank Chad Amundson, RWC Construction Manager, and Keith Furst, RWC Superintendent and the rest of the RWC crew who participated in the project as well as all the subcontractors and suppliers for all their hard work. Project Manager: Jeremy Hatlevig Creation Technologies, St. Peter, MN In September, RWC broke ground on a new production and office facility for Creation Technologies in St. Peter, MN. The new facility is a 50,000 sf precast building with approximately 12,000 sf of office space and 38,000 sf of production space including a loading dock. The project is scheduled to be completed in the Spring of 2010. St. Peter Clinic - Mayo Health System St. Peter, MN The St. Peter Clinic – Mayo Health System is the newest facility to be built on St. Peter’s hospital campus. Pre-construction planning was essential in completing this project successfully as it was built under unique circumstances. The City of St. Peter was building their Medical Office Building (M.O.B.) on the same site at the same time as RWC was constructing the St. Peter Clinic. The facilities are connected by a shared wall and are located adjacent to the City’s hospital. Both construction projects had to be completed on schedule as the St. Peter Clinic patients need to pass through the M.O.B. to get to the hospital if needed. The St. Peter Clinic is a very valuable asset to the City as it provides the services of Family Medicine, Behavioral Health and Chiropractic Care. Thanks to the designers from Paulsen Architects and Dunham Associates along with Rick Westmark and Randy Sorenson of ISJ, and Ismail Ahmed, Margie Hanson, and the rest of the Clinic staff. A special thanks to Jesse Schott of Paulsen Architects and Arnie Nimps of RWC, the RWC crew and the subs/suppliers for all their hard work on this well-run project. RWC is acting as the Construction Manager for the project and will be self performing the cast in place concrete, steel fabrication & erection and carpentry work for the project. Rhapsody Music, Mankato, MN Recently completed was a minor remodel at the Rhapsody Music Store in Mankato. The RWC crew completed a Practice Room (consisting of metal stud work, ceiling work, flooring) within Rhapsody’s facility due to an increase in the number of music students that they teach. Thanks to Arnie Nimps, Job Superintendent, and his crew for completing this project with minimal disruption to the store’s employees and customers. Project Manager: Danny Umhoefer RWC HAPPENINGS: Thank you to all who made our Mankato Chamber’s Business After Hours a successful event Project Manager: Dan Gjerde RWC Crew: Arnie Nimps (Superintendent), Jim Amundson, Tim Clabo, Bernie Davey, Roger Davey, Tim Domeier, Doug Drill, Pete Eustice, Steve Herz, Mitch Kalar, Paul Nuytten, Kyle Ramaker, Gary Roemhildt, Don Serr, Tom Stadick, Mark Stadler, Bobby Umhoefer, Dale Van Stelten, John Weldon this past June. We had a great time with attendance at more than 200 people! This summer we welcomed Drew Forsyth as an Intern. He is currently attending South Central College in a 2-year Carpentry Program. 40 hours of carpentry work by RWC was donated to raise money for the ISJ Hospice program. Best Wishes to Terry Gappa on his retirement! Terry has been a laborer with RWC for over 23 years. We will miss his easy-going, positive personality and his knowledge and expertise of the construction industry.