Understanding the Convey Process
Transcription
Understanding the Convey Process
P&P GENERAL SESSION Quality Expectations State of the Network On-Time Performance and Quality Results 2013-2014 State of the Network On-Time Performance Results 2013-2014 Average Days to Complete Initial and Convey Orders 5.00 4.00 3.00 2.00 1.00 State of the Network Quality Results 2014 Number of NPL's SQA Score 600 3.60 500 3.55 400 3.55 477 3.50 424 374 300 377 372 3.49 3.45 200 3.40 100 3.35 3.51 3.50 March April 3.40 0 JANUARY FEBRUARY MARCH APRIL May 3.30 January February May State of the Network Quality Results 2014 Number of Reconveys 350 300 302 250 242 200 181 150 132 100 88 50 0 January February March April May Understanding the Convey Process Understanding the Convey Process Vendor reports post sale conditions Safeguard reviews and reports ICC if all conditions met Client conveys to HUD FSM Inspection HUD accepts property Understanding the Convey Process Post-Conveyance Inspections • An inspection to determine if the property meets the HUD Compliance Standard. • Performed by Field Service Managers (FSMs), independent contractors retained by HUD. • Typically completed 24-72 hours after property is conveyed to HUD. Understanding the Convey Process Post-Conveyance Inspections • FSMs complete detailed inspection report and submit to HUD • HUD evaluates in detail this inspection report Understanding the Convey Process HUD Inspection Report (HIPR) Understanding the Convey Process Other Errors Identified During a HUD Inspection • Non-Performance Letter (NPL) – Issued when insufficient or improper property preservation work is found at the property – No monetary loss or response required, but clients still care Understanding the Convey Process Other Errors Identified During a HUD Inspection • Demand Letter – Issued when HUD is seeking reimbursement of funds for the following reasons o Insufficient supporting documentation for work completed o Mortgagee neglect typically < $2,500 to repair Understanding the Convey Process Other Errors Identified During a HUD Inspection • Preliminary Notice of Intent to Reconvey (PNOIR) – FSM may recommend based on HPIR – HUD will also review loan history to make the decision Understanding the Convey Process Reconvey Notice Reviews • Safeguard’s independent Quality Assurance group reviews for potential: – – – – FSM errors Client errors Safeguard errors Vendor errors Understanding the Convey Process Reconvey Notice Reviews • Safeguard will appeal if FSM or client errors are identified Understanding the Convey Process Common Errors Causing Reconveys • Roof tarps – Temporary measures and roof is expected to be repaired prior to conveyance • Active roof leaks • Water intrusion (non-roof related) • Mold not remediated and/or source not fully addressed Understanding the Convey Process Common Errors Causing Reconveys • Structural damage – Includes settling if not reported at initial secure • Unfinished renovations Understanding the Convey Process Cost of Reconveys Average cost of a reconvey is $30,000 • Holding costs – This is the cost associated with the amount of time the property is in the banks inventory to the time it is reconveyed back to HUD • Repair costs – Safeguard may be responsible for some or all of the costs to repair to the property Understanding the Convey Process Cost of Reconveys • Maintenance costs – If Safeguard is responsible, the client cannot be charged for any routine maintenance work (inspections, grass cuts, winterizations). If you are responsible for a reconvey, you can receive chargebacks for any or all of the above. Understanding the Convey Process How to Prevent a Reconvey • Report all new and worsening conditions and damages – Complete a Property Condition Report on initial secures at conveys at minimum. Best practice is to complete on all P&P orders where you are entering the property. – A condition is worsening if it is not the exact same scope as reported in the Restated Bids section of Vendor Web. – Provide new bid if worsening. Understanding the Convey Process How to Prevent a Reconvey • Report all new and worsening conditions and damages (cont’d) – Include missing items and “mortgagor neglect” – Identify the source – Know the “BIG 6” Understanding the Convey Process How to Prevent a Reconvey • Understand the HUD allowable amounts – Ensures only necessary bids submitted and work completed timely • Ensure necessary photos are present on each and every order – Photo documentation is only means of ensuring the property is ICC • Follow work order instructions Understanding the Convey Process Reconvey Example – Water & Roof Damage • • • Initial secure completed on 8/23/12 No roof damage reported on initial secure, no photos to support interior of property was in convey condition Water, fire and other damages not reported on subsequent inspection updates • • Reconvey initiated by FHA 5/14/13 due to roof and water damage Due to inadequate photos, Safeguard unable to determine if water damage was present prior to conveyance Cost to Vendor > $30,000 Understanding the Convey Process Reconvey Example – Water & Roof Damage • • On 9/20/13 contractor replaced sump pump and provided photos of a barn with the roof intact No photos of the barn were submitted on the UTIL or GCL orders • • On 10/17/13 photos support roof collapsing but vendor reported no new damage Property reconveyed due to dilapidated barn Cost to Vendor > $30,000 Understanding the Convey Process Reconvey Example – Water & Roof Damage • • • • Initial secure completed on 10/9/13 No roof damage reported on initial secure Mold and water damage reported, but no bids to address One photo of attic provided • • Reconvey initiated by FHA 12/19/13 due to active roof leak, water and mold damage Due to inadequate photos, Safeguard unable to determine if roof leak, water and mold damage was present prior to conveyance Cost to Vendor > $30,000 Developing an Eye for Quality Property Damage Assessment Identify, Address, Report, Bid • Identification of damages and the source of damage is essential to protecting a property • Addressing damages utilizing allowables while on site helps prevent further damage from occurring Property Damage Assessment Identify, Address, Report, Bid • Reporting in detail the conditions that exist at the property gives our clients a full picture of the condition of their property • Bids provided with supporting details such as why the repair is necessary, dimensions, materials, and resources needed to complete Property Damage Assessment Identify • • • • Property Condition Report Crew Training & Incentives Review Missed Opportunities with Crews and Office Implement a Check Out Process Using Photo Direct Property Damage Assessment Results of Poor Identification • • • Vendor provides photos of basement walls cracking but reports as mortgagor neglect True source of damage not identified and no bids to repair provided HUD inspector identifies as structural damage, reconvey in process Property Damage Assessment Address • Train crews on proper use of allowables • Photo documentation must support actions taken and amount of allowable used • Ensure the source of the damage is being addressed not just the symptoms • Properly stock trucks with materials and equipment necessary to address while on site • When to call Safeguard? Property Damage Assessment Address Damages – Missed Opportunities • • • Proper use of allowables ensures that the critical issues at a property are addressed while on-site Field crews and office staff should be trained to identify all conditions at a property where an allowable can be used Misuse or not using allowables reduces your profitability and places responsibility of unaddressed issues on your company Property Damage Assessment Report • Utilize the Property Condition Report • Provide all supporting details – Source/cause, dimensions, scope of damage, implications if not addressed • Report worsening conditions every visit to the property • The office staff must act as the final quality control before submitting the order • When in doubt, report! Property Damage Assessment Reporting Errors Property Damage Assessment Reporting Errors • • • Vendor submitted this photo and reported seepage not causing further damage on initial secure Subsequent vendor reports inoperable sump pump Initial secure vendor assessed chargeback for water damage repairs and new sump pump Property Damage Assessment • Details to include: – – – – – – Bid Full description of bid to include source of damage if applicable Dimensions Materials Resources (people, rental equip., licensed sub, etc.) Why is the bid needed What are the implications if not approved • Use a cost estimator to determine fair and consistent pricing • Ensure there are no allowables that could be used to complete work • Bid to repair the source and the symptoms Property Damage Assessment Good Bid Detail Property Damage Assessment Poor Bid Detail