(MPM)™ to Improve Endura Performance
Transcription
(MPM)™ to Improve Endura Performance
Educational Series: Improving Endura PVD Maintenance Performance With MPM™ FOA July 2015 Fab Overview ■ ■ ■ ■ ■ ■ Location: EU Cleanroom size: 50K Sq.Ft. / 5000m2 Wafer size: 200mm Volume: 4200 wspm Number of Tools: 265 Technology node: 0.18um capable, 0.35um volume production ■ Automation: 90% recipe select / download Goals & Objectives ■ For top 3 toolsets ì Improve Availability to >90%. ì Decrease CV of AV to <10% for all chambers/mainframes ì Top priority AMAT Endura PVD toolset – 6 Tools ■ Opportunities in Availability by: ì Challenging unscheduled downtime. ì Reducing variation in scheduled downtime. MPM™ Scorecard ■ Performed multi site high level review ■ Major functions and practices benchmarked ì People ì Systems ì Performance ■ Identify and prioritize initial processes to focus on ■ Busy improving them Data Integrity ■ ■ ■ ■ Data integrity / quality issues hindered analysis. All information in free text form. Incorrect logging of Scheduled/Unscheduled work. Initial improvement through application of SEMI E10 & E58 states. ■ Fault Codes were introduced enabling categorization. ■ Training carried out to support. Equipment Uptime and Variability of Uptime Availability - Coefficient of Variation by Toolset M-Ratio – Scheduled vs Unscheduled Downtime 54% M-‐Ra<o Endura & CL200 MF's and Chambers Ini<al Assessment 6 5 Number of Tools 5 4 3 3 2 1 1 1 0 0 0.5 1 1.5 2 3 4 5 6 7 8 9 10 M-‐Ra<o ■ PVD System CL200 is Golden tool. ■ >50% of chambers are below 1:1. ■ High Unscheduled downtime leads to high variability. MPM™ KPI Setup ■ KPI’s are required to establish a baseline & track performance. ■ The following KPI’s were installed. ì Output. ì Availability. ì CV of AV. ì Scheduled & Unscheduled downtime. ì M-Ratio. ì Fails within 48 Hours. ì Green-Green time for scheduled work. ì First Time Qual. ì Response Time. Examples of MPM™ KPIs CV of AV M Ratio Fail within 48 Hours MPM ™ KPI Reporting Automation ■ Data automatically extracted from database, summary table generated, analysis carried out and charts produced. MPM™ Endura Tiger Team ■ Tiger teams were formed in each of the areas of focus. ì These were cross functional teams including: ● Equipment Engineering. ● Process Engineering. ● Operations. ● Industrial Engineering. As Required ■ The task of the Tiger Team is to Review the data, identify opportunities, prioritise, create action plans and execute. ■ Initial focus was on reduction of Unscheduled Downtime. Unscheduled D/T Pareto ■ Pareto Analysis indicated that for the Endura toolset the main contributors were Handling/Breakage & Pressure related issues. (480 & 330 Hours resp) M-Ratio: Scheduled / Unscheduled Downtime ■ Handling faults - source of the issues was defective chucks in the Endura SIP chambers. Chuck types replaced. ■ Handling/Breakage failures have reduced to a total of 3.4 hrs/quarter vs. 240 ■ Chamber pressure related failure reduced to 1 hr/quarter vs. 168 hrs/quarter M-Ratio Increased ■ Focussed on unscheduled downtime taking action to: ì Determine the root cause and eliminate ì Updating PM content to mitigate this fail mode. ■ As a result the Endura M-Ratio has Increased significantly over the last 6 Months. MTTR/MTBF Variability ■ Data Analysis highlighted significant variation in the duration of scheduled tasks ■ Delivered improvement in 2 phases: ì Phase 1: Reduce the variation in completion of the scheduled work. ì Phase 2: Reduce the mean time to to complete the scheduled work. ■ RCA carried out to identify phase 1 improvement opportunities. MTTR/MTBF Variability ■ As a result variance and average duration for scheduled tasks are reducing, Specs Updated. Green to Green Time for Scheduled Work CL200 Chamber 1 Kit Chamber 2 Kit Chamber 3 Kit Chamber 3 Kit & Target Chamber 4 Kit Chamber 4 Kit & Target Chamber 5 Kit Chamber 5 Kit & Target Chamber 6 Kit Chamber 6 Kit & Target Long Term Mean WK18 WK19 WK20 WK21 WK22 WK23 WK24 WK25 WK26 7:30:00 4:50:00 5:47:00 4:14:00 3:45:00 4:20:00 8:30:00 7:09:00 4:50:00 4:59:00 3:55:00 5:40 3:54:00 12:30:00 28:30:00 15:30:00 10:55:00 8:43:00 3:06:00 7:39:00 9:55:00 12:54:00 11:30:00 12:08:00 18:00:00 11:30:00 14:00:00 14:25:00 14:00:00 26:00:00 4:55:00 19:30:00 17:55:00 WK27 4:48:00 5:48:00 6:05:00 Green to Green Time for Scheduled Work ENDURA Long Term Mean WK18 WK19 WK20 WK21 WK22 WK23 WK24 WK25 WK26 WK27 Chamber 1 Kit Chamber 1 Kit & Target Chamber 2 Kit Chamber 2 Kit & Target Chamber 3 Kit Chamber 3 Kit & Target Chamber 4 Kit Chamber 4 Kit & Target Chamber C Kit Chamber D Kit 15:00:00 21:00:00 28:30:00 27:00:00 39:00:00 27:30:00 22:00:00 14:00:00 18:00:00 17:05:00 17:55 32:00:00 18:30:00 16:00:00 22:54:00 22:12:00 23:48:00 4:48:00 WK28 WK29 Results To Date - PVD The results of the joint MPM™ Tiger Team work: Increasing the PVD perfromance enabled a significant reduction in a BEOL WIP bubble -> higher TPT, faster CT Low CV => uniform output, higher predictability, lower maintenance costs Fab Wide On track to deliver a quarterly Gross Margin growth of $25M