civicon - Transcentury
Transcription
civicon - Transcentury
INVESTING IN AFRICA civicon Company Profile Executive Summary Civicon Limited was founded in 1975 and is the leeading engineering contractor in Eastern Africa The company provides EPC and turnkey approachh to Engineering, Construction and Logistics in Africa Keyy operating p g divisions include: − Mechanical Engineering, Civil Engineeringg, Logistics, Cranage & Erection Customers include: − − − − − − Downstream Oil & Gas- Tank farms, refinerries, fuel depots and pipelines & piping Upstream Oil & Gas- Exploration and produ uction services Power generation generation- HFO, geothermal and methane gas extraction plants Power transmission- Sub stations and transmission lines Roads & bridges- Construction, rehabilitatio on and repair services Industryd Steell ffabricated b d works k and d out off gauge g h l haulage Uniqueness of Civicon: − Equipmentq p Large g asset base boastingg well equipped eq pp machinery, y, over 350 p pieces of heavy y equipment − People- Dynamic management, engineers annd technicians with in-depth capabilities and extensive experience i across Africa, Af i over 30 engineers i a d 2,000 and 2 000 staff t ff − Daring and meets the challenge- Works in challenging countries with limited infrastructure − Workshop capacity- Operates 5 fully equippped workshops across Eastern Africa 1 Geographical Presence Selected projects in various countries. Tunisia Morocco Algeria Libya Egypt Mauritania Mali Northern Sudan Niger Senegal Northern Sudan Eritrea Chad Djibouti Gambia Guinea Bissau CIVIL ENGINEERING South Sudan: Road construction, maintenance of 113 kilometers Yei Juba road Burkina Guinea Somalia Nigeria Sierra Leone Ethiopia Ivory Coast Central African Republic Liberia Southern Sudan Cameroon Benin Ghana Equatorial Guinea Togo Democratic Republic of Congo Gabon g da Ugand K Kenya Rwanda Congo Burundi MECHANICAL ENGINEERING Kenya: Construction off 48MW Geothermal plant in Naivasha Tanzzania Mozambique Angola g wi Malaw Zambia Zimbabwe Namibia Botswana LOGISTICS Uganda: Transport of brewery vessels Madagascar Swaziland CIVIL ENGINEERING Congo: Mi i services Mining i for f a 5.6 million ounce mine Lesotho South Africa Establishe ed Offices CRANAGE & ERECTION Rwanda Construction of a 25MW HFO plant l in i Kigali Ki li Areas of Operations O 2 Operating Divisions Civicon Mechanical Engineering Business Focus: Civil Engineering Logistics Cranage & Erection Pipelines & piping Roads & bridges Heavy loads Steel erection Marine vessels Piling Specialised cargo Cranage Geothermal steam-fields Well pads Off road haulage Heavy lift Tankage Plant hire Temporary camps/offices Mining services Camp construction Pre-fabricated sales Selected Projects: Contract to construct 113,000 cbm AGO storage & loading facility, facility Kenya Water treatment plant, South Sudan Design, Design fabrication and building 5,000MT barge, Rwanda 115 kilometre road, Soouth Sudan Bridge works and plan nt hire, DR Congo Bridge abutments for 7 bridges South Sudan bridges, Transport of 20m long, 5.85m diameter, 5.89m high b brewery vessels, l Kenya K Transport of bulk jet A1 petroleum, Northern 100MW HFO plant , Kenya 120MW HFO power station Kipevu III stationIII, Kenya 12.8MW Geothermal power station, Ethiopia Uganda Transport of oil rigs, Yemen 3 Mechanical Engineering VTTI, KENYA (in construction) Operations: Full EPC on complex steel structures CASE STUDY #1: VTTI EPC contract to construct a 113,000 cubic Past experience: − − − − − − − International sized tank farms Petroleum pipelines Refinery upgrade and maintenance Piping connection for power plants St l erection Steel ti Welding works Rehabilitation and expansion of water treatment plants Specialisations: In house Quality Assurance Quality Control Section undertaking non Destructive Tests meters AGO storage and loading facility. This includes: − Piling and civil works − Building 10 tanks up to 14,200 square meters − 8 truck loading gantries and all requisite piping − Fire fighting tank and foam system − Office and control room − Instrumentation and commissioning CASE STUDY #2: TANESCO, TANZANIA Tageta 100 MW Diesel Power Station where urgency and time constraint were a priority. Civicon averaged over 250 pipe joints per day installingg all p pipe p work for the: − − − − generator house fuel treatment plant offloadingg area tank farm 207 people on site working 7-day work weeks 4 Case Study: VTTI, Kenya EXTENSIVE WORK AT HEIGHT 5 B BORED PILING FOR TANK FOUNDATIONS 5 Civil Engineering Operations: Engineered concrete and civil works provider in the most demanding geographies Past P experience: i − Road repairs, maintenance and − − − − − construction Mi i services Mining i Piling Engineered concrete Construction of bridges Construction of barges CASE STUDY #1: UNOPS, UNOPS SOUTH SUDAN Rehabilitation of Faraksika-Marridi-Ibba and Yambio-Dabio Road South Sudan funded by USAID and World Bank − 80 kilometer road rehabilitation of existing − − − − road Design and build a further 80 kilometers First pre-designed murram road in South Sudan Built to the Standard Technical Specification f Highway for Hi h work k 2006 USA Similar built constraints to other UNOPS roads CASE STUDY #2: WFP, SOUTH SUDAN Build a road to open up a new corridor to access South Sudan’s capital Juba from Northern Uganda with the aim of providing local farmers and traders a route to gget their produce to Juba − Bush clearing, top soil stripping sub base one, two & GWC, embankments, installation of new culverts, all concrete works for abutments & piers for Kaya river crossing 6 Case Study: UNOPS, South Sudan 1. BEFORE CONSTRUCTION 2. BUSH CLEARING 4. ROAD LAYERING 3. PROCESSING FOR LAYERING 5. ROAD STRUCTURES 6. COMPLETED ROAD 7 Logistics Operations: Full service provider for heavy, heavy oversized and specialised loads Past experience: − − − − − − Jet A1 Petroleum Food stuffs Industrial equipment ie. Distillers B Brew vessels l Relocation of factory plants Oil rigs CASE STUDY #1: KENYA BREWERIES BREWERIES, KENYA Complete turnkey job involving transporting four brew vessels from Mombasa to Ruraka − Vessel measurements: 20m long, 5.85m diameter, 5.89m high − Single largest load trucked in Nairobi − Vessels lifted from Civicon low loaders and rotated to vertical position using 22m high gantry on rails − Low L loaders l d and d gantries t i built b ilt iin h house iin Mombasa workshop CASE STUDY #2: NORWEGIAN PEOPLES AID, SOUTH SUDAN Commissioned to transport food aid from Lokichioggio into South Sudan. Losses of up to 20% were expected before introduction of Civicon’s off road trucks − Losses immediately reduced below 1% − Destinations regarded impossible received regular food supplies 8 Cranage and Erection Operations: Comprehensive service provider of lifting solutions with a fleet of cranes ranging from 14 tonnes to 260 tonnes Past P experiences: i − Steel erection − Tank and piping installation − Fabrication, F b i ti engineering i i and d heavy h transportation − Factory installations and removal HIGHLIGHTS Preferred contractor for the annual shutdown of Kenya Petroleum Refineries Limited Successfully accomplished the repair of the flare tip using 70 ton P&H crane crane. Including supply of all cranes for the project Rough terrain cranage capacity proven at Lake Langano Geothermal L G th l station t ti iin Ethi Ethiopia i using i 18 ton Grove RT 58D Rough Terrain Crane to accomplish equipment and piping installation 9 Resources Worksshops 5 fully equippped workshops across the East African regiion People Standards Over 30 engineers In house Quality Assurance and Quality Control Over 2,000 staff Equipment Over 350 pieces of well maintained heavy equipment 10 References African Barrik Gold Chevron Dalbit Government of Southern Sudan Kenya Breweries Kenya Petroleum Refineries Lutheran World Federation Department for World W Service M Moto G ld Mi Gold Mines Norwegian Peoples Aid Ormat Shell Tristar Twangiza Mining UNOPS Wartsila WFP 11 Contact Us CIVICON KENYA PLOT 2077, KIBARANI MAKUPA CAUSEWAY MOMBASA, KENYA P.O BOX 99491-80107 TEL: +254 202037830/1/2/3/4 E il iinfo@civiconkenya.com Email: f @ i i k CIVICON UGANDA www.civicongroup.com PLOT 53-67 MULWANA ROAD, BUGOLOBI KAMPALA, UGANDA TEL: +256 31 2260074 Email: info@civiconkenya.com 12