Regional Operational Programme of the Opolskie Voivodeship for
Transcription
Regional Operational Programme of the Opolskie Voivodeship for
EXECUTIVE BOARD OF THE OPOLSKIE VOIVODESHIP Regional Operational Programme of the Opolskie Voivodeship for 2007-2013 National Strategic Reference Framework 2007-2013 Draft document approved of under Resolution of the Executive Board of the Opolskie Voivodeship No. 57/2006 of 20 December, 2006 and subsequent amendments version recommended by the Government on 20 February, 2007 Opole, February, 2007 draft of ROP OV 2007-2013 Map No. 1 Opolskie Voivodeship 3 draft of ROP OV 2007-2013 Opolskie Voivodeship in comparison to Poland and the European Union in 2005 Item 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Description 2 Area (thousand km ) Population (thousand people) Population (%), age: − pre-working − working − retired Population density per 1 km2 of area (person) Infant mortality (per 1000 live births) Birth rate per 1000 of population Net migration per 1000 people Average lifespan of persons at the age of 0 (years) − men − women Working people per sectors (%) − agriculture, hunting, forestry, fishing − industry and civil engineering − services Total employment rate (%)a Labour force activity rate (%)a Rate of registered unemployment total (%) Education (%)c: − high − medium − low Number of students per 10 thousand of people (person) Expenditure on research and development in relation to GDP (%)b Wired telephone subscribers per 100 people (subscriber) Households with personal computer with access to the Internet (%) Municipal waste per 1 person (kg) − collected − stored Tourist collective accommodation establishments total (establishments) per 100 km² Traffic fatalities per 100 thousand of population GDP per capita (UE-25 (in SSN) = 100 %) Percentage in gross value added (w %)b − agriculture, hunting, forestry, fishing − industry and civil engineering − services Opolskie Voivodeship 9.4 1,047.4 Poland EU-25 312.7 38,157.1 3,972,9 461,478.7 19.6 64.7 15.7 111 4.9 -0.9 -3.0 20.6 64.0 15.4 122 6.4 -0.1 -0.3 16.4 b 67.1 b 16.5 b 118 b 4.5 0.8 3.6 71.9 79.5 70.8 79.4 75.8 81.9 17.2 30.0 52.8 44.7 53.8 18.7 17.1 27.9 55.0 45.2 54.9 17.6 4.9 27.4 67.7 63.8 69.7 b 8.8 10.0 74.1 15.9 355 12.3 70.7 17.0 512 20.6 48.7 30.7 371 b 0.13 0.43 1.95 b 26.6 30.8 81b 19.3 22.5 48.0 243 227 245 226 526 227 1.3 2.2 10.02 b 14 37.3 14 47.0 11 b 100 5.8 37.1 57.0 5.0 30.2 64.8 1.9 26.2 71.9 a ) as per BAEL (Badania Aktywności Ekonomicznej Ludności – Population Economic Activity Poll) ) Data for 2004 c ) Data for 2002. The classification of education into low, medium and high arises from the ISCED (International Standard Classification of Education). The division includes people between the ages of 25 and 64 and specifies the education levels which is classified according to the educational system in a particular EU country Source: − Eurostat, − Rocznik Statystyczny Województwa Opolskiego 2006 (Statistical Yearbook of the Opolskie Voivodeship 2006), Statistical Office, Opole 2006, − Rocznik Statystyczny Województw 2006 (Statistical Yearbook of Voivodeships 2006), Central Statistical Office, Warszawa 2006. b 4 draft of ROP OV 2007-2013 Table of contents 1. Introduction 7 Profile of the Opolskie Voivodeship 10 1.1. Diagnosis of the current situation of the Opolskie Voivodeship 10 1.2 Analysis and evaluation of state aid and foreign assistance between 1999-2006 45 1.2.1 State aid and earmarked funds 45 1.2.2 Foreign assistance – pre-accession funds 47 1.2.3 Foreign assistance – structural funds 53 1.2.4 Rural Development Programme (RDP) 57 1.2.5 Summary 58 1.3 2. 62 Strategy for implementing the Regional Operational Programme of the Opolskie 67 Voivodeship for 2007-2013 2.1 Opolskie Voivodeship Development Strategy 68 2.2 3. SWOT Analysis Regional Operational Programme of the Opolskie Voivodeship for 2007-2013 69 2.2.1 General objective and specific objectives of ROP OV 2007-2013 69 2.2.2 Justification for selecting objectives and priority axes of ROP OV 2007-2007 72 2.2.3 Consistency between the objectives of ROP OV 2007-2013 with the 75 European Union policy and programming documents at the national and regional levels 2.2.4 Implementation of the renewed Lisbon Strategy within ROP OV 2007-2013 78 2.2.5 Indicators for ROP OV 2007-2013 79 2.2.6 Principles to fulfil the objectives of ROP OV 2007-2013 85 Priority axes of the Regional Operational Programme of the Opolskie Voivodeship for 87 2007-2013 3.1 Priority axis 1 – Strengthening the Region’s Attractiveness 88 3.2 Priority axis 2 – Information Society 93 3.3 Priority axis 3 – Transport 97 3.4 Priority axis 4 – Environmental Protection 101 3.5 Priority axis 5 – Social Infrastructure and higher education 106 3.6 Priority axis 6 – Redevelopment of Municipal and Degraded Areas 112 3.7 Priority axis 7 – Technical Assistance 116 3.8 4. Information about complementarity and co-ordination with activities financed from 119 EAFRD and EFF Financial Plan 120 5. System for implementing ROP OV 2007-2013 – implementing provisions 127 5.1 Competency of institutions involved in management of ROP OV 2007-2013 127 5.1.1 Co-ordination 127 5.1.2 Management of ROP OV 2007-2013 127 5 draft of ROP OV 2007-2013 5.2 5.3 6. Monitoring 131 5.2.1 Regional Monitoring Committee for ROP OV 2007-2013 131 5.2.2 Annual and final reports on ROP OV 2007-2013 132 5.2.3 Evaluation 134 5.2.4 Control system 135 Exchange of electronic data to meet payment, requirements monitoring and evaluation 135 5.4 Financial flows 135 5.5 Information and publicity system 136 Ex-ante evaluation of the Programme with the assessment of the expected 138 macroeconomic effect 6.1 Results of ex-ante evaluation of draft ROP OV 2007-2013 138 6.2 7. Assessment of expected macroeconomic effects of the implementation of ROP OV 142 2007-2013 Assessment of the impact of ROP OV 2007-2013 on the environment 148 7.1 Legal basis 148 7.2 Preparer of the Forecast about impact of ROP OV 2007-2013 on the environment 148 7.3 Forecast about impact of ROP OV 2007-2013 on the environment 148 7.4 8. Social consultations on the Forecast about impact of ROP OV 2007-2013 on the environment 7.5 Information about the use of stipulations contained in the Forecast about impact of ROP OV 2007-2013 on the environment, comments passed in the course of consultations and the opinions of the Governor of the Opolskie Voivodeship and of the Voivodeship Sanitary Inspector Information about social consultations held on ROP OV 2007-2013 8.1 Legal basis for consultations 8.2 Objective, organisation and course of social consultations 8.3 Comments passed in the course of social consultations – 3rd stage 8.4 Conclusions 160 160 160 163 165 Glossary List of abbreviations List of tables List of drawings 166 177 179 181 157 157 Appendix No. 1 Information about major projects 183 Appendix No. 2 Context indicators for ROP OV 2007-2013 184 6 draft of ROP OV 2007-2013 Introduction ”The action taken by the Community under Article 158 of the Treaty shall be designed to strengthen the economic and social cohesion of the enlarged European Union in order to promote the harmonious, balanced and sustainable development of the Community. This action shall be taken with the aid of the Funds, the European Investment Bank (EIB) and other existing financial instruments. It shall be aimed at reducing the economic, social and territorial disparities which have arisen particularly in countries and regions whose development is lagging behind and in connection with economic and social restructuring and the ageing of the population. The action taken under the Funds shall incorporate, at national and regional level, the Community's priorities in favour of sustainable development by strengthening growth, competitiveness, employment and social inclusion and by protecting and improving the quality of the environment.”1 The reform of the cohesion policy to be followed between 2007-2013 applies mainly to concentration of actions based on three new objectives, i.e.: 1. Convergence objective, to support growth and job creation in the poorest regions – this objective covers all the voivodeships in Poland. 2. Regional competitiveness and employment objective, to support structural changes in regions which do not satisfy eligibility criteria of the objective 1 and changes in the labour market. 3. European territorial co-operation objective, to support territorial competitiveness and promote harmonious and sustained development of the Community territory at three levels: cross-border, transnational and interregional. New solutions in the years 2007-2013 apply also to correlating the cohesion policy with the EU strategic priorities formulated in the Lisbon Strategy such as competitive economy based on knowledge and sustained development. Hence in the current financial framework, funds within the cohesion policy constitute approximately one third of the budget of the European Union, and at the same time they are a basic instrument for accomplishing objectives of the aforementioned Strategy. In the light of the period of 2004-2006, new provisions apply mainly to streamlining of the process through limiting it to two stages, introducing mono-funding of operational programmes2 and providing for greater decentralisation and regionalisation of funds through the use of simpler, more efficient systems of implementation and management. A new legal framework for 2007-2013 reflects more strategic approach to the programming process. Once the Community Strategic Guidelines were adopted, programming has concentrated more on the EU priorities. Limiting of the process only to two stages means that a member state (Poland) prepares the National Strategic Reference Framework (1st stage), and then draws up national and regional operational programmes (2nd stage). The national strategic reference framework is a new instrument in the programming system for 2007-2013 which defines, among other things, a strategy for preparing operational programmes cofinanced from the European Regional Development Fund (ERDF), the European Social Fund (ESF) and the Cohesion Fund. Operational programmes are to be documents more strategic in nature, i.e. the emphasis on the description of strategies and priorities has been increased. A new approach to more strategic and simpler programming at the same time resulted in the 1 Council Regulation (EC) No. 1083/2006 of 11 July, 2006 laying down general provisions on the European Regional Development Fund, the European Social Fund and the Cohesion Fund and repealing Regulation (EC) No. 1260/1999 (Official Journal 210 of 31.7.2006, p. 25), chapter II, art. 1 2 Council Regulation (EC) No. 1083/2006 (Official Journal 210 of 31.7.2006, p. 25), art. 34 7 draft of ROP OV 2007-2013 resignation from preparing the Community Support Framework and Programme Complements as the situation was in the period of 2004-2006. The idea of complete decentralisation of programming regional development for 20072013 was confirmed when voivodeship local governments were given competencies for preparing and implementing regional operational programmes to be supported from the ERDF according to the principle of mono-funding. Thus Executive Boards of Voivodeships, for the first time, are to serve as Managing Authorities for the programmes. The Regional Operational Programme of the Opolskie Voivodeship for 2007-2013 (ROP OV 2007-2013) should be regarded as one of the instruments for implementing the Opolskie Voivodeship Development Strategy which means that it is to contribute to the achievement of objectives set in it through undertaking actions identified as the most significant in the years 2007-2013 from the point of view of the region’s development and which at the same time are eligible for co-financing from the ERDF3. The eligible area, the system for implementing ROP OV 2007-2013 and the manner of preparing the Programme comply with legal regulations applicable at the national and the Community levels, applicable programming documents as well as basic rules regarding multiannual programming, additionality, partnership, co-financing and evaluation whose details are given in subsequent chapters of the document. The following basic legal acts formed a basis for the preparation of ROP OV 20072013: − Act on rules of how to operate development policy of 6 December, 20064, − Council Regulation (EC) No. 1083/2006 of 11 July, 2006 laying down general provisions on the European Regional Development Fund, the European Social Fund and the Cohesion Fund and repealing Regulation (EC) No. 1260/1999, − Regulation (EC) No. 1080/2006 of the European Parliament and of the Council of 5 July, 2006 on the European Regional Development Fund and repealing Regulation (EC) No. 1783/1999. The general objective of ROP OV 2007-2013 is to enhance competitiveness and ensure social, economic and spatial cohesion in order to increase attractiveness of the Opolskie Voivodeship as a place for investing, working and living. To achieve the general objective seven strategic objectives have been established which will be pursued through seven corresponding priority axes of ROP OV 2007-2013. In accordance with the rules concerning programming, objectives defined in ROP OV 2007-2013 are consistent with the objectives indicated in the aforesaid Opolskie Voivodeship Development Strategy, but also with the development directions set at the national level in the National Strategic Reference Framework 2007-2013 in support of growth and jobs (NSRF 2007-2013)5 and at the Community level in the Cohesion Policy in support of growth and jobs: Community Strategic Guidelines 2007-20136 and guidelines of the renewed Lisbon Strategy. At the same time ROP OV 2007-2013 is complementary to the national operational 3 Regulation (EC) No. 1080/2006 of the European Parliament and of the Council of 5 July, 2006 on the European Regional Development Fund and repealing Regulation (EC) No. 1783/1999 (Official Journal 210 of 31.7.2006, p. 1) 4 Journal of Laws No. 227, item 1658 5 Document approved of by the Government on 29.11.2006 6 Document approved of by the EU Council on 6.10.2006 (Official Journal 291 of 21.10.2006) 8 draft of ROP OV 2007-2013 programmes for 2007-2013 implemented within the NSRF 2007-2013 and other initiatives and programmes to be implemented in the current financial framework. The authors of ROP OV 2007-2013 made every effort to prepare the Programme in a clear and comprehensible manner. The information contained in it constitutes an orderly and logical structure, and applies to the following components: − diagnosis of the social and economic situation of the Opolskie Voivodeship in comparison to other regions of Poland and the European Union along with the analysis of strengths and weaknesses of the region, − development strategy of the region specifying the objective of strategic actions undertaken within the Programme along with the justification for selecting priority axes, − information about priority axes taking into account objectives and fields of intervention, − financial plan divided into years and priority axes indicating sources of financing, − system of implementation (i.e. implementing provisions), specifying tasks of authorities and describing procedures relating to, among other things, management of ROP OV 2007-2013, monitoring and evaluation, audit and control, publicity and information as well as financial flows, − ex-ante evaluation of ROP OV 2007-2013 and assessment of the expected macroeconomic effect, − forecast about impact of ROP OV 2007-2013 on the environment. Moreover, ROP OV 2007-2013 is accompanied by the information concerning major projects as provided for in art. 37, par. 1, letter h of the Council Regulation (EC) No. 1083/2006 (Appendix No. 1) and a list of context indicators for the Programme (Appendix No. 2). All the elements of ROP OV 2007-2013 were prepared according to the rules established for this type of programming documents. Works on ROP OV 2007-2013 began in 2005 when, under resolution of the Executive Board of the Opolskie Voivodeship, a Programme Board and a Task Force for preparing the Regional Operational Programme of the Opolskie Voivodeship for 2007-2013 were appointed. Taking into account the partnership principle, representatives of different environments such as scientific, social, economic and other, were involved in the works of the aforementioned groups. As a consequence the Programme Board determining major directions of works on the Programme was also made up of, apart from members of the Executive Board of the Opolskie Voivodeship and representatives of departments of the Marshal Office of the Opolskie Voivodeship, experts from the outside of the Office who deal with regional development in practice and theory. Within the Task Force, 9 Subgroups were selected to consider basic thematic areas significant to the development of the Voivodeship which became a basis for specifying areas of priority axes of ROP OV 2007-2013. Members of the Sub-groups were appointed from among representatives of all the most important environments associated with creating and operating the regional policy, including socio-economic partners. ROP OV 2007-2013, taking into account results of works of the aforesaid groups, was drawn up at the Department for Co-ordination of Operational Programmes at the Marshal Office of the Opolskie Voivodeship and according to the common practice it was subject to large-scale social and economic consultations held at particular stages of preparing ROP OV 2007-2013. 9 draft of ROP OV 2007-2013 CHAPTER 1 PROFILE OF THE OPOLSKIE VOIVODESHIP 1.1. Diagnosis of the current situation of the Opolskie Voivodeship Methodological comments A diagnosis of the social and economic situation is one of the basic stages in a process of strategic planning. The document identifies the most important internal and external conditions of the Opolskie Voivodeship. It originates from the Opolskie Voivodeship Development Strategy adopted for the years 2000-2015 and the diagnosis itself is a basis for preparing a SWOT analysis. Overwhelming majority of the diagnosis is based on the data from 2004 and 2005. To provide for greater transparency and comparability of the data, they were, if possible, presented in a greater time span, i.e. in the years 1995-2005. A basic source of information was data from the Central Statistical Office in Warsaw and the Statistical Office in Opole as well as information from the EUROSTAT databases for the data on the European Union which were extended by other available publications and our own calculations. In addition, the document contains data from the Investor Assistance Centre in Opole, the Club of Naturalists from Świebodzin, the Opole Inspector of Monuments and the National Heritage Board of Poland in Warsaw. The diagnosis includes eighteen thematic areas, i.e. general information about the Voivodeship, demographic situation, living conditions, population income and safety, labour market, economic growth and investment attractiveness, industry, civil engineering and services, development of rural areas, economic entities, including SME sector, business support organisations, R&D and innovative activities, transport infrastructure, municipal infrastructure and power industry, environmental protection, education and human resources, building of information society, health care, culture and heritage, tourism and sport. Areas for diagnosis were selected on the basis, among other things, of Priorities defined in Regulation (EC) No. 1080/20067. The areas presented in the diagnosis allow for creating a real picture of the Opolskie Voivodeship with particular attention to the most important aspects of its development. General information about the Voivodeship The Opolskie Voivodeship is situated in the south-western part of the country. It neighbours on the following voivodeships: śląskie, łódzkie, wielkopolskie and dolnośląskie. In the south it borders on Czech Republic. The region belongs to a group of small European regions and covers the area of 9,412 km2 (3% of Poland’s area) with the population of approximately 1,050 thousand people. Population density in the Opolskie Voivodeship, although lower than the national average (122 people per km2), is close to the EU average (UE25 = 117.5) and amounts to 112 people per km 2. As regards administrative division the Opolskie Voivodeship is divided into 12 poviats (poviat – second level of local government administration in Poland), including 1 grodzki poviat which is Opole (grodzki poviat – township) and 71 gminas (gmina – first level of local 7 Regulation (EC) No. 1080/2006 (Official Journal 210 of 31.7.2006, p. 1). 10 draft of ROP OV 2007-2013 government administration in Poland), including 3 municipal gminas, 32 municipal and rural ones and 36 rural. All the gminas in the Opolskie Voivodeship have valid studies of land development conditions and directions. However, only 28.3% of the area of the Opolskie Voivodeship are covered with valid land development plans8. Coverage by land development plans is highly diversified – from gminas which do not have such plans at all to gminas which have 100% of the area covered by plans. The evenly developed settlement system of the region consists of 35 towns and 1025 solectwos (solectwo – lowest unit of local administration, usually comprising a single village), including 1191 rural settlement units. The biggest towns are as follows: Opole (population of 128.9 thousand), Kędzierzyn-Koźle (66.1 thousand), Nysa (47.8 thousand) and Brzeg (38.6 thousand). The Opolskie Voivodeship’s functional and spatial structure is based on three zones: central – the Opole agglomeration which covers Opole together with the Opolski and Krapkowicki Poviats, eastern made up of the Kluczborski, Oleski, Strzelecki and Kędzierzyńsko-Kozielski Poviats as well as the western zone with the Namysłowski, Brzeski, Nyski, Prudnicki and Głubczycki Poviats. The Opole agglomeration which serves metropolitan functions includes the following towns: Opole, Krapkowice, Gogolin, Prószków, Ozimek, Niemodlin and Zdzieszowice as well as highly urbanised rural gminas in the Opolski and Krapkowicki Poviats (it total 335 thousand people). A significant limitation to development is the fact that the Opole agglomeration qualities are used only to a small extent, in particular taking into consideration that in the region there is no metropolis. Rural settlement is dense in nature. Typical for rural areas in the region are large villages of the highest in Poland urbanisation rate which are often local development centres. Population of a rural settlement is on average 418 people (in Poland 277 people). The society in the settlements is self-organised and local environments, including national minorities, very active. The Opolskie Voivodeship is a frontier and culturally diverse region on the former Polish, German and Czech borderland. The regional community displays a strong sense of regional identity, has a wealth of experience arising from cultural distinction and openness to the world. In the Opolskie Voivodeship there are 71% of the total number of people in Poland who declare German nationality and 14% declaring to be Silesians. The problem is limited knowledge of the region and its heritage as well as insufficient coverage of multicultural aspects by educational and cultural institutions. After 1989 the third sector of the public life, which is the major element of civil society, began to develop rapidly. Until 1999 only 160 organisations operated, in 1998 about 1,200. The greatest number of non-government organisations were established in 2004, at the moment it is estimated that in the Opolskie Voivodeship there are about 2,700 nongovernmental organisations. Most of them operate in education, sport, tourism, health, rehabilitation, welfare, environmental protection, culture, social and economic development. The region is open to cross-border co-operation within Euroregions “Pradziad” and “Silesia” as well as to contacts with foreign economic partners (among others, with the German land Rheinland-Pfalz, French Burgundy, Czech Středočeský kraj, Hungarian Komitat Fejér, Ukrainian Ivano-Frankivski Region, Austrian Steiermark). Local self-governments in the Opolskie Voivodeship co-operate with partners all over Europe. Local environments, 8 On the basis of data from the Department of Land Development Planning of the Marshal’s Office of the Opolskie Voivodeship as at the end of 2005. 11 draft of ROP OV 2007-2013 including national minorities, are highly active. Self-governments co-operate with each other and, among other things, establishing associations of gminas. However, co-operation between voivodeships is poor as well as the level of integration between environments and subregional co-operation, including partnerships. Demographic situation The comparison of the last two general censuses in respect of the demographic potential shows that the population of the Opolskie Voivodeship in 2002 considerably decreased by 15.7 thousand people in comparison with 1988. Since 2002 the population has been declining systematically (in 2002-2005 further decrease by 13.6 thousand people). The low and declining demographic potential of the region is recognised as the most important barrier of development. The situation arises from high migration which results in permanent stay abroad and negative population growth rate (Tab. No. 1.1). Tab. No. 1.1. Changes in population and population growth rate and migration balance per 1000 people in the Opolskie Voivodeship in 1995-2005. Year Population (31.12) (thousand) Population growth rate 1995 1996 1997 1998 1093.2 1092.5 1091.9 1999 2000 2001 2002 2003 2004 2005 1089.6 1088.3 1084.7 1080.5 1061.0 1055.7 1051.5 1047.4 1.1 0.9 0.7 0.7 0.2 -0.0 -0.2 -0.8 -1.2 -0.9 -0.9 -2.8 -2.2 -2.0 -1.9 -2.0 -3.4 -3.5 -4.3 -4.0 -3.2 -3.0 (‰) Net permanent migration (‰) Source: Rocznik demograficzny, Central Statistical Office, Warszawa 2003, Rocznik statystyczny województw, Central Statistical Office, Warszawa 2003, Mały rocznik statystyczny Polski, Warszawa 2005, Biuletyn Statystyczny Województwa Opolskiego, Opole 2006. (-19) (-68) (-126) (1) (-109) (-136) (28) (-92) (-120) Przyrost naturalny w osobach np. - 136 osób w powiecie nyskim Saldo migracji w osobach (-154) In 2005 the population growth rate in the Opolskie Voivodeship was -0.9 per mill and, similarly as in Poland, was negative. Only in three poviats in the region the population growth rate was positive and amounted to: in the Brzeg Poviat (0.3 per mill), in the Krapkowice Poviat (0.6 per mill), in the Namysłów Poviat (0.3 per mill). The highest negative population growth rate was in the Prudnik Poviat with -2.4 per mill and the Głubczyce Poviat with -2.3 per mill (Fig. 1.1). (-78) > (-130) (-130) - (-260) (-261) - (-390) < (-390) 12 draft of ROP OV 2007-2013 The Opolskie Voivodeship is characterised by the high negative migration balance, mainly abroad, resulting from migratory traditions of the region and existing relations between the society of the region and the destination country, as well Fig. 1.1. Net permanent migration and as the possibility of obtaining legal job abroad9. A positive aspect of population growth rate in the Opolskie labour migration is adopting European models of working, import of Voivodeship in poviats in 2004. new technologies, modern organisation of work as well as of capital Source: Biuletyn Statystyczny brought into the region. Leaving Poland in search for work, apart from Województwa. positive aspects, is also perceived as a threat to the labour market due to draining skilled staff as well as to family life where parent’s longterm stay abroad results in irregularities in family functioning, weakened family ties and greater number of single-parent families. Moreover, depopulation of villages and decrease in births. In addition, disproportions in socioeconomic development as well as in living conditions of people become greater.10. The negative internal and foreign migration balance resulting in permanent stay per 1000 people in 2004 amounted to -3.2 per mill with the national average amounting to -0.2 per mill, which ranks the region first in Poland. In the Opolskie Voivodeship in all the poviats there is negative migration balance. In 2003 in 25 countries of the European Union average migration balance per 1000 of population was 4.6 per mill. The lowest was in Latvia (-1.8), Lithuania (-0.4) and in Poland (-0.4). Positive balance, above 10 per mill, was in: Spain (17.6), Cyprus (17.2) and Italy (10.4). Demographic forecasts for the next 30 years anticipate that the negative population growth rate will maintain in the Opolskie Voivodeship. In case of external migrations from the Opolskie Voivodeship, it will be the second region after the Śląskie Voivodeship where the emigration will be the highest. In 2030 population of the Opolskie Voivodeship will be 866.5 thousand, and 50.2% of it will live in rural areas. Population of the voivodeship will be lower by 194.5 thousand people in comparison with 2002 (Tab. nr 1.2). Tab. No. 1.2. Forecast of the principal demographic quantities in the Opolskie Voivodeship in 20022030. -0.8 Internal migration balance (‰) -0.7 External migration balance (‰) -3.9 9.3 -1.3 -0.3 -4.2 1,045.3 7.6 9.5 -1.9 -0.1 -5.0 1,013.5 2015 7.8 10.0 -2.2 0.0 -4.5 980.1 2020 7.1 10.4 -3.3 0.3 -4.1 945.5 2025 5.9 10.4 -4.5 0.4 -3.8 907.9 Year Birth rate (thousand) Death rate (thousand) Population growth rate (‰) 2002 8.5 9.3 2005 8.0 2010 2030 5.0 10.7 -5.8 0.6 -3.5 Source: Demographic forecast for 2003-2030, Central Statistical Office, Warszawa 2004, p. 104 Population (thousand) 1,061.0 866.5 9 This possibility relates to a part of the region’s population that has German citizenship and EU passports enabling them to obtain legal job, on the basis of: K. Heffner, R. Rauziński, Region migracyjny (wybrane aspekty demograficzne, społeczne i gospodarcze na przykładzie Śląska Opolskiego), Opole 2003, p. 17-34. 10 R. Radziński, Diagnoza sytuacji demograficznej, zatrudnienia, rynku pracy i bezrobocia na Śląsku Opolskim [w:] D. Berlińska (red.): Województwo opolskie 1999. Wstępna diagnoza wybranych dziedzin, Opole 1999. 13 draft of ROP OV 2007-2013 In the Opolskie Voivodeship 496.2 thousand people live in villages. In 2010-2030 the number of people living in towns and villages will be decreasing (Tab. No. 1.3). Tab. No. 1.3. Population and forecast of population in the Opolskie Voivodeship in towns and rural areas in 2010-2030 (in thousand). Description 2005 2010 2015 2020 2025 2030 1047.4 1013.5 980.1 945.5 907.9 866.5 population in towns 551.2 528.3 507.2 483.9 458.9 431.8 population in villages 496.2 485.2 473.0 461.6 449.0 434.7 Total population, including: Source: Opolszczyzna w liczbach 2006, Statistical Office in Opole, Opole 2006. The urbanisation rate in the Opolskie Voivodeship is 52.6% in comparison to the average in Poland of 61.4%. It is forecasted that this rate in 2030 will be lower and will amount to 49.8%. Living conditions, population income and safety According to census data, there were 369.8 thousand households in the Opolskie Voivodeship in 2002. They comprised 2.8% of total households in Poland. According to the demographic forecast, the number of households in 2015 will increase to 397.8 thousand, but will decline later to reach 373.8 thousand in 2030. The anticipated decrease of the number of households in the Opolskie Voivodeship will mainly concern towns. The Opolskie Voivodeship is characterised by higher income of the population than the national average, but the level of average salaries and pensions is lower11. The average monthly gross salary amounted to PLN 2,068.3 (total in Poland – PLN 2,273.4) in the Opolskie Voivodeship in 2004 which ranked the Opolskie Voivodeship the 8th in Poland. Pensions from the extra-agricultural social security system in 2004 reached PLN 1,069.33 (5th place among voivodeships, average in Poland: PLN 1,140.94), whereas pensions of individual farmers amounted to PLN 788.3 (5th place among voivodeships, average in Poland: PLN 747.2). As regards the average income at disposal of 1 person in a household (assigned for expenses, and consumer goods and services, and increase in savings), the Opolskie Voivodeship is ranked 6th in Poland. The income amounts to ca. PLN 744.6 and is higher than the average income in Poland by ca. PLN 10. Moreover, the average monthly expenses are also higher, amounting to PLN 727.5 in the Opolskie Voivodeship, with the national average amounting to PLN 694.7. The difference between the income and expenses in the region, and the average income and expenses in Poland results from the fact that resources originating from work abroad are most probably spent in the Opolskie Voivodeship.12 11 Data do not take into account salaries of people migrating abroad (ca. PLN 2.3 billion annually) that significantly impact the prosperity and consumption level in this part of regional society in the Opolskie Voivodeship. 12 It is estimated that, after taking these into account, average income would increase evenly by ca. 35%. See R. Jończy, Migracje zarobkowe ludności autochtonicznej z województwa opolskiego. Studium ekonomicznych determinant i konsekwencji, Opole University, Opole 2003, p. 188-189. 14 draft of ROP OV 2007-2013 Poverty and social exclusion are problems faced by many families despite better economic level and living conditions. Welfare in the Opolskie Voivodeship is currently aimed at a numerous (142 thousand people) and diverse group of people that need aid. However, the Opolskie Voivodeship is one of the regions in Poland where a relatively low ratio of people is covered by welfare service. In 2004, 526 people per 10 thousand people in the voivodeship used the benefits, whereas the national average amounted to 631 people. The voivodeship records insufficient number of welfare establishments, in particular in rural areas. Moreover, many establishments do not comply with applicable standards and legal regulations. Numerous tasks to aid families facing problems and people endangered by poverty and social exclusion are performed by non-governmental organisations and voluntary services. However, the problem is a low number of such organisations and people involved. Permanently or temporarily inhabited housing stock in the Opolskie Voivodeship reached 333.3 thousand in 2004, which comprised 2.6% of the housing stock in Poland. The number of inhabited flats per 1000 people in 2004 amounted to 317 and it was less than the national average (332 flats). However, in respect of the average usable flat area per person, the Opolskie Voivodeship is characterised by the highest ratio in Poland: 24 m2, which provides the high quality of life of its inhabitants together with other indicators. Taking into consideration a number of new flats commissioned for use in relation to the population, the Opolskie Voivodeship is the last in Poland (2.6 compared to 4.3 flats in Poland in 2003). The results both for the voivodeship and the whole country are bad in comparison with the European Union where these figures range somewhere between 5-10. Since 1998 a number of new flats commissioned for use has increased every year. In 2004 in the Opolskie Voivodeship 1,232 new flats were commissioned for use and it was more than in 2000 by 12%. In Poland the increase was much higher and amounted to 23.2 %. A serious threat to the existing housing stock is their dramatic decapitalisation. The problem is mainly faced by towns and villages with post-state-owned farms and post-militaryowned areas, with the challenge of “refurbishment gap”. In the voivodeship there is a large number of abandoned properties with unsettled ownership, many empty, uninhabited flats and buildings as well as lots of devastated outbuildings. Historic town centres require revitalisation. According to the Land Development Plan of the Opolskie Voivodeship13 in 30 towns historic urban designs survived, including 23 of them listed in the monument register of the Opolskie Voivodeship, i.e. Baborów, Biała, Brzeg, Byczyna, Głogówek, Głubczyce, Głuchołazy, Gorzów Śląski, Grodków, KędzierzynKoźle, Kluczbork, Krapkowice, Leśnica, Lewin Brzeski, Namysłów, Niemodlin, Nysa, Opole, Otmuchów, Paczków, Prudnik, Strzelce Opolskie and Ujazd. Also panel block housing estates, post-industrial and post-military areas as well as degraded districts and working-class housing estates require revitalisation. Living conditions of inhabitants are also significantly affected by safety and operation of public order institutions. The highest number of crimes is noted in towns with large population. Number of crimes in the Opolskie Voivodeship, which comprised 2.6% of total crimes recorded in Poland in 2004 (37.3 thousand), has a declining trend (Fig. 1.2), whereas the crime detection rate increases (Fig. 1.3). The statistical analyses and public opinion polls show that the Opolskie Voivodeship is one of the safest regions in Poland. In spite of improvement in public safety, this field – due to frontier location of the region and dynamics 13 Land Development Plan of the Opolskie Voivodeship approved of with the resolution of the Sejmik of the Opolskie Voivodeship No. XLIX/357/2002 of 24 September, 2002 on approving the Land Development Plan of the Opolskie Voivodeship (Dz. Urz. Woj. Opolskiego No. 112, item 1448). 15 draft of ROP OV 2007-2013 of social phenomena and in consequence dynamics of crime – requires continuous monitoring. Moreover, the attention should be turned to threats from the use of alcohol and drugs by young people. The poll conducted in the Opolskie Voivodeship in 2005 shows that 61.2% of teenagers at the age of 17/18 got drunk and 28.2% of young people at this age used marijuana or hashish14 in 2004. 39 083 45000 40000 37 256 30 549 35000 30000 37 989 34 397 25 778 60 27 472 64,4 70 25000 50 20000 40 55,2 54,4 69,1 67,7 69,4 59,2 1998 1999 2000 2001 2002 2003 2004 15000 1998 1999 2000 2001 2002 2003 2004 Fig. 1.2. Total number of crimes in the Opolskie Voivodeship in 1998 - 2004 Fig. 1.3. Crime detection rate in the Opolskie Voivodeship in 1998 – 2004. Source: Roczniki Statystyczne Województw 19992005, Central Statistical Office. Source: Roczniki Statystyczne Województw 1999-2005, Central Statistical Office. Labour market In 2004, the national economy of the Opolskie Voivodeship employed 290.8 thousand people (2.3% working population in Poland). Average employment in the enterprise sector, amounting to 93.0 thousand people in 2005, is characterised by a growing trend (Tab. No. 1.4). Tab. No. 1.4. Changes of average monthly employment in the sector of enterprises in 2000-2004 in the Opolskie Voivodeship. Description 2000 2001 2002 2003 2004 2005 Average employment in the sector 113.9 107.2 98.5 94.2 91.5 93.0 of enterprises (in thousand) Dynamics (preceding period =100) 94.2 94.1 91.8 95.7 97.1 10 (%) Source: Biuletyn statystyczny Województwa Opolskiego from December 2000, 2001, 2002, 2003, 2004 and from September 2005, Komunikat o sytuacji społeczno-gospodarczej, December 2004 The employment level, expressed in the so-called employment index, is relatively low in comparison with the national average. According to 2004 BAEL15 data, a value of the index in the Opolskie Voivodeship was 43% with the national average amounting to 44.3%. In towns of the Opolskie Voivodeship the index amounted to 44.2%, while in villages 41.3%. In 2004 in the Opolskie Voivodeship the activity rate was 52.3%, while in towns – 54.1% and 14 J. Sierosławski, P. Jabłoński, UŜywanie alkoholu i narkotyków przez młodzieŜ szkolną. Raport z badań ankietowych zrealizowanych w województwie opolskim w 2005 r. Europejski Program Badań Ankietowych w Szkołach ESPAD, Institute of Psychiatry and Neurology, Warsaw 2005, p.16, 24. 15 Population Economic Activity Poll. 16 draft of ROP OV 2007-2013 in villages – 50.0%. The rate is lower than the national average which amounts to 54.9%. It is anticipated that the activity rate will fall by 0.8% in the region in the years 2004-2008. As regards dynamics the Opolskie Voivodeship takes the 15th place in Poland16. Employment structure in the Opolskie Voivodeship as compared with the national structure and the EU structure is unfavourable as it is characterised by high percentage of employment in agriculture and low percentage in services (Fig. 1.4). Many sectors also record insufficient number of well-qualified personnel, in particular experts. There is also a low employment rate in relation to the working population. 80 69,7 70 60 the Opolskie Voivodeship 50 Poland 40 EU 52,6 30,1 30 20 10 17,4 28,3 54,3 25,2 17,4 5,1 0 agriculture, hunting, forestry, fishery and fishing industry and construction services Fig. 1.4. Employees divided into sectors in the Opolskie Voivodeship and in Poland as compared with the European Union in 2003 (in %) Source: Produkt Krajowy Brutto. Rachunki Regionalne 2003, Central Statistical Office 2005, Rocznik Statystyczny Rzeczypospolitej Polskiej 2004, Central Statistical Office 2005. The number of registered unemployed people in the Opolskie Voivodeship at the end of December 2005 amounted to 69.4 thousand people and was characterised by a declining trend, although unemployment, particularly in small towns, in the areas of post-state-owned farms and dominated by small agricultural farms, is recognised as a vital development problem (Tab. No. 1.5). At the end of 2005 at the labour offices in the Opolskie Voivodeship there were 31.6 thousand inhabitants of villages registered which constituted 45.5% of all the unemployed. On average their percentage was 42.6% in Poland. Tab. No. 1.5. Number of registered unemployed people in the Opolskie Voivodeship and unemployment rate in 1999-2005 in Poland and in the Opolskie Voivodeship (at the end of December). Description 1999 2000 2001 2002 2003 2004 2005 Number of unemployed people in the Opolskie Voivodeship 59.5 69.3 78.6 83.4 81.6 74.6 69.4 (thousand) Unemployment rate in the 13.2 15.3 18.2 19.3 21.4 19.9 18.6 Opolskie Voivodeship (%) Unemployment rate in Poland 13.1 15.0 17.5 18.0 19.6 19.0 17.6 (%) Source: Biuletyn statystyczny województwa opolskiego, December 1999, 2000, 2001, 2002, 2003, 2004, Komunikat o sytuacji społeczno-gospodarczej, December 2004. 16 Source: Polska: regionalne prognozy ekonomiczne 2005-2008. Analiza porównawcza polskich województw, PMR Publications, Kraków 2005, p. 60. 17 draft of ROP OV 2007-2013 warmińskomazurskie pomorskie zachodniopomorskie The unemployment rate in the Opolskie Voivodeship at the end of December 2005 amounted to 18.6% (in Poland: 17.6%), which ranks the region 8th among other voivodeships (Fig. 1.5). The unemployment rate is spatially diverse in the region. At the end of December 2005 it ranged between 9.0% in Opole and 29.9% in the Nysa Poviat (Fig. 1.6). podlaskie kujawsko -pomorskie mazowieckie wielkopolskie lubuskie łódzkie lubelskie dolnośląskie świętokrzyskie opolskie śląskie podkarpackie małopolskie od 13,8% do 17,3% od 17,4% do 20,9% od 21,0% do 24,5% od 24,6% do 27,5% Polska = 17,6% woj. opolskie = 18,6% Fig. 1.5. Unemployment rate in Poland according to voivodeships (at the end of December 2005). Source: Biuletyn Statystyczny Województwa Opolskiego, 4th quarter 2005. On average the unemployment rate in the EU ranges between 8-9% and is different in particular states, the lowest: the Netherlands – 4.0%, Ireland – 4.2%, Denmark – 4.3%; the highest: Poland 18.6%, Slovakia – 15.7%, Greece – 9.6%, France – 9.1%. It is forecast that in the Opolskie Voivodeship at the end of 2008 the unemployment rate will be lower than at the moment and will amount to 14.3% which will make the region rank 7th in Poland17. od 9,0% do 14,2% od 14,3% do 19,5% od 19,6% do 24,8% od 24,9% do 29,9% Fig. 1.6. Unemployment rate in the Opolskie Voivodeship according to poviats (at the end of December 2005). Source: Biuletyn Statystyczny Województwa Opolskiego, 4th quarter 2005. Economic growth and investment attractiveness Gross domestic product in the Opolskie Voivodeship in 2003 was PLN 18.2 billion which constituted 2.2% of the state GDP. GDP per capita amounting to PLN 17,173 in 2003 ensured the 11th position of the Opolskie Voivodeship in the domestic ranking (Fig. 1.7). Lower GDP per capita was in voivodeships in the eastern part of Poland (i.e. warmińskomazurskie, podlaskie, lubelskie, podkarpackie and świętokrzyskie). The region is challenged by a lower rate of economic growth as compared with other regions in Poland. A GDP value in 1995–2003 increased almost 2.5 times in Poland (an increase by 148%), whereas in the Opolskie Voivodeship only by 99%. GDP per capita in the region decreases as compared to the national average (Fig. 1.8). 17 Source: Polska: regionalne prognozy…, p. 67 18 draft of ROP OV 2007-2013 20,0 17,4 17,8 17,1 18,2 98,7 15,5 14,8 16,0 12,0 93,5 100 91,6 88,3 13,0 83,7 84,4 81,2 81,9 80,4 1999 rok 2000 rok 2001 rok 2002 rok 2003 rok 80 10,9 9,1 60 8,0 40 4,0 20 0 0,0 1995 rok 1996 rok 1997 rok 1998 rok 1999 rok 2000 rok 2001 rok 2002 rok 2003 rok 1995 rok 1996 rok 1997 rok 1998 rok Fig. 1.7. Change in Gross Domestic Product in the Opolskie Voivodeship in 1995-2003 (in billion PLN). Fig. 1.8. GDP per capita in the Opolskie Voivodeship compared to the national average in 1995-2003 (%) (Poland=100). Source: Produkt Krajowy Brutto. Rachunki Regionalne 1999-2003, Central Statistical Office 2001-2005. Source: Produkt Krajowy Brutto. Rachunki Regionalne 1999-2003, Central Statistical Office 2001-2005. It is forecast that in the coming years GDP will continue to grow, and the GDP increase in 2005-2008 (average annual changes) will be one of the highest in Poland and will amount to 5% in this period. Forecasts predict that in 2008 the region’s share in Poland’s GDP will be at the same level as at the moment and will amount to 2.2%. According to forecasts GDP per capita in the Opolskie Voivodeship will also increase and finally it will reach 81.1% of the national average in 200818. In comparison with other European regions, the share of the Opolskie Voivodeship as regards GDP per capita is also unfavourable because in comparison with the average of the European Union (25 states) it amounts to 37.4%, with average for Poland reaching 45.6%. The Opolskie Voivodeship is in a group of 10 regions of the EU with the lowest GDP per capita (Tab. No. 1.6). As regards this indicator the Opolskie Voivodeship was 6th among the 10 poorest regions in the European Union. Tab. No. 1.6. GDP per capita in EU 25 in 2003. Regions with the highest GDP per capita Regions with the lowest GDP per capita EU(25) EU(25) Item Region Item Region =100% =100% 1 Inner London (UK) 278 1 Lubelskie (PL) 33 2 Bruxelles-Capitale (BE) 238 2 Podkarpackie (PL) 33 3 Luxembourg 234 3 Podlaskie (PL) 36 4 Hamburg (DE) 184 4 Świętkorzyskie (PL) 37 5 Île de France (FR) 173 5 Warmińsko-Mazurskie (PL) 37 6 171 6 Opolskie (PL) 37 165 7 Észak Magyaroszág (HU) 38 8 Wien (AT) Berkshire, Buckinghamshire & Oxfordshire (UK) Provincia Autonoma Bolzano (IT) 160 8 Východné Slovensko (SK) 39 9 Oberbayern (DE) 158 9 Eszag-Alföld (HU) 39 158 10 Dél-Alföld (HU) 40 7 10 Stockholm (SE) Source: Eurostat data. 18 Source: Polska: regionalne prognozy ekonomiczne …, p. 18, 20, 24. 19 draft of ROP OV 2007-2013 Surveys on diversity of investment attractiveness of Poland have placed the Opolskie Voivodeship in the group of regions characterised by average (mediocre) attractiveness (in the so-called III class of investment attractiveness, Fig. 1.9)19. At the same time, it is visible that there is a lack of significant investments in the region.. Both a number of locations of direct foreign investments and the amount of foreign capital per 10 thousand of people make the Opolskie Voivodeship rank respectively as 6th and 7th in Poland. In the Opolskie Voivodeship there are 60 plants owned by foreign investors who in whole Poland invested at least 1 million USD20. This figure constitutes 2% of total locations of this type in Poland. Growth dynamics of companies with foreign capital based in the Opolskie Voivodeship has shown increasing tendency. An important element in the region development is appropriately prepared land for investment. First of all the land has to have technical infrastructure as well as communications with the A4 motorway. The offer of areas for investment is spatially diversified in the Voivodeship (Fig. 1.10). Although the Opolskie region is conveniently located on the border of national and European communication routes, the problem lies in strong competition of the neighbouring voivodeships. There are few offers to attract investors from outside the region as the land is not sufficiently prepared for investment21. Fig. 1.9. Synthetic assessment of investment attractiveness of voivodeships. Source: As in note 14 Industry, civil engineering and services Industry, characterised by the developed sectoral structure, plays a considerable role in the economy of the region. Diversity of industrial structure is recognised as beneficial in the development of the voivodeship. Among the strengths of the region there are plants from the food industry and the cement and lime sector as well as modern and developed furniture and woodworking industries based on long tradition. For the development of the region the potential of such sectors as food, power, construction materials, chemical, engineering, electrical engineering and metalworking are of significance. namysłowski kluczborski oleski brz eski Brze ski Opolski opolski Opole Opole strzelecki Nyski nyski Krkrapkowicki apkowick i prudnicki Prudnicki kędzierzyńsko - kozielski Głubczycki Ogółem – liczba wszystkich tere nów in westycyjn ych Gotowe – tereny o uregulowanym statusie prawnym, d obrym uzb rojeniu technicznym Industrial plants show considerable potential głubczycki Fig. 1.10. Areas for investment in poviats of the Opolskie Voivodeship (at the end of 2005). Source: On the basis of data from the Investor Assistance Centre in Opole. 19 K.Gawlikowska – Hueckel, Konkurencyjność i atrakcyjność województwa opolskiego w świetle integracji z Unią Europejską, [w:] K. Heffner (red.) Uwarunkowania rozwoju regionalnego województwa opolskiego ze szczególnym uwzględnieniem migracji zagranicznych. Red. K. Heffner, Marshal Office of the Opolskie Voivodeship, Opole University of Technology, Faculty of Management and Production Engineering, Opole 2002, p. 77. 20 Kapitał zagraniczny w województwie opolskim, Marshal Office of the Opolskie Voivodeship, Department of Regional Development, Section for Polls and Strategic Analyses, Opole 2005 21 Source: W. Skowroński, T. Skowroński, Analiza sektorowa budownictwa i diagnoza sytuacji ze szczególnym uwzględnieniem sytuacji w województwie opolskim, Study ordered by the Ministry of Economy and Labour in Warsaw, Opole 2005, p. 91, reproduced material 20 draft of ROP OV 2007-2013 proven, among other things, by a number and quality of fixed assets. A gross value of fixed assets in economic entities above 49 employees per capita in the Opolskie Voivodeship is 47.1 thousand PLN, while the national average is 45.8 thousand PLN. This indicator places the region 2nd in Poland. The value of industry production sold per capita in 2004 placed the voivodeship 6th in Poland (17.2 thousand PLN with the national average amounting to 17.8 thousand PLN). After periods of intensive increases in industry production sold, the dynamics of this value has shown considerable fluctuations in recent years. Year 2005 did not change these trends. The industry production sold was approximately 16 billion PLN, which means that it fell by 2.2% in comparison with the preceding year. There is a large development potential of the civil engineering sector in the Opolskie Voivodeship, in combination with the building materials industry based on natural resources22. However, despite the large potential, this sector faces serious difficulties, similarly to civil engineering in the whole country. A value of civil engineering and erection production per capita in 2004 was lower than the national average (PLN 1,100 and PLN 1,904) and, in this respect, the voivodeship was ranked 15th in Poland. In 2005 civil engineering production sold amounted to 1,211.4 billion PLN, in comparison with the corresponding period of the preceding year a 1.2% increase was recorded. It is predicted that in coming years a value of civil engineering and erection production will rise due to, among other things, opening of the EU markets. The forecast for 2005-2008 predicts an increase by 7.6% in the production sold in the region23. The significance of services in the economy of the Opolskie Voivodeship is gradually increasing; however, the region considerably differs from the national average in respect of the development level of the sector. The region comes almost as the last in Poland in respect of percentage of services in developing the regional gross value added (GVA), which demonstrates an insufficiently developed and weak service sector (Fig. 1.11). Rolnictwo, łowiectwo i leśnictwo; rybactwo 80 75,5 72,7 70,6 70,3 Przemysł i budownictwo 70,1 66,1 70 Uslugi 67,2 65,4 62,5 59,0 60 50 37,9 40 30 23,5 24,7 22,3 27,1 28,8 30,2 29,7 31,1 32,7 20 10 0,9 2,6 7,1 2,6 1,1 3,7 3,5 3,1 4,7 3,1 opolskie Polska Czechy Finlandia Węgry Niemcy Włochy Grecja Francja W. Brytania 0 Fig. 1.11. Structure of GVA creation in the EU states and in the Opolskie Voivodeship (in %). Source: Data from the Central Statistical Office. There are 209 documented mineral raw material deposits in the Opolskie Voivodeship. These include mainly carbonate raw materials, natural aggregates, sand and ceramic clay; the most important are carbonate deposits used in cement and lime industry, natural aggregates, sand and ceramic clays used in construction; documented raw material resources provide for functioning of mining industry for ca. 50 years of marl and lime for lime industry and ca. 240 years of natural aggregates. 23 Source: Dodatek do raportu – Polska: regionalne prognozy ekonomiczne 2005-2008. Analiza porównawcza polskich województw, PMR Publications, Kraków 2005 22 21 draft of ROP OV 2007-2013 The service sector provides employment for 52.5% of people working in the region, including 32.4% in market services and 20.1% in non-market services. On average, 54.4 % of people are employed in the service sector in Poland and, in this respect, the region comes 9th in Poland. As regards productivity, services in the Opolskie Voivodeship comprise the most efficient sector of economy, which is demonstrated by the highest GVA as per one working person. This value amounted to PLN 69.3 thousand in 2003. For comparison, GVA as per one working person in the industry amounted to PLN 58.0 thousand, in construction PLN 49.9 thousand and in agriculture PLN 12.5 thousand. Economic entities from the service sector24 comprise 86.8 % of all entities registered in the Opolskie Voivodeship. At the end of 2004, there were about 77 thousand of such entities. Rural development Rural areas constitute ca. 92% of the area of the voivodeship. Rural population stands at almost half a million people, i.e. ca. 47% of all the inhabitants of the region25. As compared with other regions, villages in the Opolskie Voivodeship are characterised by spatial order, aesthetics and beauty of rural landscape as well as a relatively high standard of public space, individual housing and farmyards. As one of few in Poland, the Opole region develops its image by exhibiting villages, e.g. by the 1997 Programme “Rural Restoration.” The rural restoration programme of the Opolskie Voivodeship is the largest and the long-lasting regional project of local society mobilisation in Poland. Moreover, it is the first one that implemented the methodology of establishing the development strategy at the level of solectwo. The number of solectwos that applied to the programme in 2004 increased to 348. In spite of that, the voivodeship records unwillingness to form associations and poor organisation of agricultural producers and agricultural organisations. Villages in the Opolskie Voivodeship are also famous for their excellent tangible assets. Percentage of flats in villages furnished with a water supply system, central heating and bathrooms considerably exceeds the average national values. On the other hand, the situation as regards these facilities in villages is worse than in towns of the region (Tab. No. 1.7). Tab. No. 1.7. Flats with particular facilities in the Opolskie Voivodeship in towns and rural areas in 2004 (w %). Description Towns Rural areas Water supply system 99.2 95.6 Toilet Bathroom 95.1 83.4 93.1 86.0 Gas from network 77.3 2.5 Central heating 83.3 72.4 Source: Rocznik Statystyczny Województwa Opolskiego 2006 (Statistical Yearbook of the Opolskie Voivodeship 2006), Statistical Office in Opole, Opole 2005. 24 Including civil engineering In Poland analogous proportions are as follows: 90% of area and 38% of population in Poland, on the basis of: M. Smoleński, ZróŜnicowanie przestrzeni przyrodniczej polskiej wsi, A. Stasiak, R. Horodelski (red.), Przestrzenne aspekty rozwoju wsi polskiej z uwzględnieniem obszarów depresji społeczno-gospodarczej, Warszawa 2005, p. 37 25 22 draft of ROP OV 2007-2013 However, the problem is poor infrastructure of the sewage system in villages of the Opolskie Voivodeship. In 2004, there were 789.5 km of the sewage system and 5,118.6 km of the water supply system. The indicator of water supply and sewage system density in rural areas continues to rise (Tab. No. 1.8). Tab. No. 1.8. Indicator of water supply and sewage system density in rural areas in the Opolskie Voivodeship in 1999-2004. Description 1999 2000 2001 2002 2003 2004 Indicator of water supply system density in rural areas 55.4 56.5 56.9 58.0 58.5 59.2 (length of water supply system in km per 100 km2) Indicator of sewage system density in rural areas (length of 3.0 3.8 5.2 6.2 7.6 9.1 sewage system in km per 100 km2) Source: Rocznik Statystyczny Województw 2000 (Statistical Yearbook of Voivodeships 2000), Central Statistical Office, Warszawa 2000, Rocznik Statystyczny Województw 2001 (Statistical Yearbook of Voivodeships 2001), Central Statistical Office, Warszawa 2001, Rocznik Statystyczny Województw 2002 (Statistical Yearbook of Voivodeships 2002), Central Statistical Office, Warszawa 2002, Rocznik Statystyczny Województw 2003 (Statistical Yearbook of Voivodeships 2003), Central Statistical Office, Warszawa 2003, Rocznik Statystyczny Województw 2004 (Statistical Yearbook of Voivodeships 2004), Central Statistical Office, Warszawa 2004, Rocznik Statystyczny Województw 2005 (Statistical Yearbook of Voivodeships 2005), Central Statistical Office, Warszawa 2005. There are approximately 26 thousand economic entities registered in rural areas (almost 1/3 of all the entities registered in the voivodeship). These include mainly small and medium-sized enterprises; only 3.8% of entities are related to agriculture. The major development barriers include poorly developed services, craftsmanship and manufacturing in areas with dominating agricultural functions, barely used and undeveloped tourist potential of rural areas as well as a lack of well-furnished recreational areas within the vicinity of towns. In 2004 in rural areas there were 102 healthcare centres and 96 medical practices. The Health Strategy for the Opolskie Voivodeship for 2006-2013 shows that weaknesses of the voivodeship include: limited access to specialist outpatients’ clinics in rural areas and a shortage of specialists outside towns in the region. Moreover, a pre-hospital death rate in acute brain and cardiovascular events is high. Medical infrastructure should be described as poorly developed. Specialist outpatients’ clinics are insufficiently equipped with diagnostic devices, access to outpatients’ services is inequal and computerisation assessed as insufficient.26 The Opolskie Voivodeship has a dense network of educational units in rural areas. In the school year 2004/2005 in the countryside there were: 299 primary schools where 30,617 pupils attended and 63 junior secondary schools with 12,050 pupils. Moreover, there were 2 vocational schools where 222 pupils attended. At the same time 5 secondary schools provided 438 pupils with education. However, some schools need renovation, extension and modernisation. Results of final tests and exams show that pupils receiving education in rural areas gain worse marks than children at their age from municipal areas27. Therefore the efforts 26 Strategia Ochrony Zdrowia dla Województwa Opolskiego na lata 2006-2013 (Health Strategy for the Opolskie Voivodeship for 2006-2013), Sejmik of the Opolskie Voivodeship , Opole 2005, p. 48, 50, 61. 27 Sprawdzian w szóstej klasie szkoły podstawowej w województwie dolnośląskim i opolskim w 2005 roku (Test in the sixth form at primary school in Dolnośląskie and Opolskie Voivodeship in 2005), Report, Wrocław 2005, p. 13. 23 draft of ROP OV 2007-2013 should be intensified to improve the quality of education at all types of schools in rural areas. The analysis of possibilities of running physical education classes indicates that sports and recreational facilities should be improved, including construction of gyms28. Favourable natural conditions of the Opolskie Voivodeship allow for intensive agricultural production29. Agricultural functions are of particular significance to the southern, western and northern parts of the region30. The Opolskie Voivodeship records high percentage of modern agricultural farms with large development potential. The average area of an individual farm exceeding 1 ha of agricultural arable land was 10.1 ha in mid 2004 (8th in Poland). However, small family farms of up to 5 ha in area dominate in the region. In June 2004 there were more than 36 thousand individual farms exceeding 1 ha of arable land. The southern and central part of the region faces periodical water shortages and deficits in periods of the highest demand (e.g. plant vegetation) as well as periods of water surplus (early spring and summer), which result in rivers in spate and floods. One of the problems is poor condition of soil-improving equipment and primary watercourses as well as a shortage of available resources of surface water. 46.1% of arable land (ca. 250 thousand ha) in the Opolskie Voivodeship are improved; however, these include old infrastructure (approximately 30% of the equipment depreciated). There are 8 small storage reservoirs in the voivodeship (total 5.5 million m3 and 232.3 ha of area), which are very unevenly arranged and their impact is insignificant. Economic entities including small and medium-sized enterprises The number of economic entities registered in the Opolskie Voivodeship at the end of 2005 was approximately 91 thousand and it increased by 2.5% in comparison with the corresponding period of the preceding year. Despite the systematic increase of the number of entities, their growth rate has been declining year by year. Enterprise ratios have been lower than the national average for many years. In 2005 the Opolskie Voivodeship came 11th in Poland with the value of 85.5 when the national average amounted to 94.8 (Fig. 1.12). 28 Strategia Rozwoju Edukacji w Województwie Opolskim na lata 2003-2006 (Strategy for Education Development in the Opolskie Voivodeship for 2003-2006), Opole 2002, p. 14. 29 Land is low-lying, flat, slightly rolling, the region is one of the warmest in Poland. A vegetation period begins early, most often at the end of March and lasts 200÷225 days. Annual rainfall ranges between 600÷800 mm, with 160÷180 days with rainfall on average. Soil with grade of 1.06 for arable land and of 1.05 for grassland rates among good ones. 30 Source: Raport o stanie zagospodarowania przestrzennego województwa opolskiego. Synteza. Zarząd Województwa Opolskiego, Opole 2006. 24 draft of ROP OV 2007-2013 100 90 80 70 73,5 78,6 66,6 82,4 90,7 86,1 75,8 80,1 93,8 82,8 93,7 84,1 94,8 85,5 2004 2005 70,9 59,5 60 50 40 30 20 10 0 1998 1999 2000 2001 2002 województwo opolskie 2003 Polska Fig. 1.12 Number of economic entities per 1,000 people in the Opolskie Voivodeship and in Poland in 1998-2004. Source: Own calculations on the basis of data from the Central Statistical Office. The greatest number of entities operate in the service sector – 76.3%, in industry and civil engineering – 19.9%. The sector of small and medium-sized enterprises comprises 99.9% of all the entities, including the highest percentage of micro-enterprises. In 1995-2005, the number of the smallest entities (employing up to 9 people) increased by 46.8 thousand, i.e. by 117.9%. The number of entities employing from 10 to 49 people increased by 1133 (i.e. by 50.7 %) and the number of medium entities (50-249 employees) increased by 75 (i.e. by 11.9%). In the aforementioned period, the number of large entities (employing 250 people and more) fell by 58 entities (by 37.6%). A decrease in the number of large enterprises results, among other things, from advancement of restructuring and privatisation processes. (Tab. No. 1.9). Tab. No. 1.9. Economic entities in the Opolskie Voivodeship as per the number of employees in 1995 and 2005. Number of employees Year Total Up to 9 10-49 50-249 250 and more 1995 42,679 39,661 2,235 632 151 2005 90,597 86,429 3,368 707 93 Source: Data of the Statistical Office in Opole. Business support organisations Business support organisations assist development of small and medium-sized enterprises, e.g. helping establishing economic relationships, providing consulting and financial services, etc. The number of these units in the market has grown significantly. In 1995-2003, the number of business support organisations increased in the Opolskie Voivodeship by 154.6 %, i.e. by over 8 thousand and, at the end of 2003, over 13.7 thousand business support organisations were registered in the region, which is shown in Tab. No. 1.10. Tab. No. 1.10. Number of economic entities according to the division included in business support sector in 1995-2003. 25 draft of ROP OV 2007-2013 Year Total Financial brokerage Including banks IT Other services related to running economic activity Commercial organisations 1995 5,398 634 51 307 4,362 95 1996 7,553 876 49 376 6,200 101 1997 8,416 1,321 52 436 6,549 110 1998 9,449 1,767 51 518 7,051 113 1999 10,673 2,351 43 611 7,595 116 2000 11,733 2,858 36 672 8,080 123 2001 12,788 3,223 39 781 8,659 125 2002 13295 3416 53 847 8901 131 2003 13742 3536 63 900 9165 141 Source: Data of the Statistical Office in Opole. According to data from the Regional Research Centre in Warsaw, the Opolskie Voivodeship has the highest percentage of business support organisations in Poland is comparison to all the registered economic entities. In 2001 this indicator in the Opolskie Voivodeship was 21.4%, while the national average 17.3%31. However, in the region there are no specialist institutions, i.e. scientific and technological parks. The problem of the region is the institutional, organisational and financial weakness of business support organisations and their low competitiveness in comparison with other entities of this type in Poland. The role of business support organisations in the Opolskie Voivodeship should increase year by year. R&D and innovative activities Innovative activities being the determinant of competitiveness are decisive for economic growth. Research and development activities are directly related to innovativeness. The value of expenditure on innovative activities in industrial enterprises in the Opolskie Voivodeship amounted to PLN 396.9 million in 2004, which is 2.6% of total expenditure in Poland. In comparison with the preceding year, the value of expenditure on innovative activities dropped by almost PLN 10 million, i.e. 2.4%. However, as per capita, it was lower than the national average (PLN 377.5 in comparison with PLN 405.8 per inhabitant in 2004). Although the expenditure per capita was so small the voivodeship ranked 5th among voivodeships. Stronger competition in the market and technological progress make it necessary to implement innovations and new technologies. Percentage of industrial plants which in 19982000 implemented technical innovations was in the Opolskie Voivodeship 22.3% and it was one of the highest in Poland (3rd place). Considering innovative activities in respect of companies size it should be highlighted that medium-sized and large companies are definitely more innovative as 38.1% of them implemented technical innovations in 1998-2000, while among small companies employing from 10 to 49 people only 12.1% implemented innovations in 1998-2000. The innovativeness rate for medium-sized and large companies was the highest in Poland, while as regards the analogous rate for small firms the voivodeship 31 W. SuraŜska, Potencjał rozwojowy województwa opolskiego (analiza metodą “benchmarking”), [w:] K. Heffner (red.) Uwarunkowania rozwoju regionalnego województwa opolskiego ze szczególnym uwzględnieniem migracji zagranicznych. Red. K. Heffner, Marshall Oddice of the Opolskie Voivodeship, Opole University of Technology, Faculty of Management and Production Engineering, Opole 2002, p. 56. 26 draft of ROP OV 2007-2013 was 8th. The data of the Polish Agency for Enterprise Development show that in the Opolskie Voivodeship there were 50 companies which in 1991-2001 launched new and modernised products, i.e. 3.7% of all the enterprises in Poland which launched such products. In this group there were 15 firms which launched new products on a market scale (3.8% of all the firms in Poland). The sales of new and modernised products amounted to 317.8 million PLN, while percentage of such products in total production sold was 11.7% and placed the voivodeship 7th in Poland. In 2002 the number of enterprises which launched new and modernised products in the Opolskie Voivodeship increased up to 66, and 2/3 of them were medium-sized firms employing from 50 to 249 people. The Opolskie Voivodeship is characterised by a low potential of the sector of high technologies. In 2000 in the register of economic entities (REGON) there were 79 of entities from the sector of high technologies registered, which constituted 1.2% of all such entities in Poland. In 2000 in the Opolskie Voivodeship there were 12 entities from the sector of high technologies per 1000 of production companies, while the national average was 17 entities which placed the region 12th among voivodeship32. The research and development sector includes scientific establishments of PAN (the Polish Academy of Sciences), research and development units, science support units (science libraries, archives, science associations), universities that conduct R&D activities and development units that conduct research and development work apart from other operations. In 2004, there were only 14 units of this kind in the Opolskie Voivodeship, which comprised approximately 1.4% of establishments of this kind in Poland. In 2004 the number of units classified in the R&D sector increased by one in comparison with 2003. This sector faces problems due to low competitiveness of the regional scientific and research portfolio as well as no co-operation between these units and economic entities. Only 21% of firms undertake co-operation with the R&D institutions – thus it is the field “underdeveloped” by the Opole enterprises. The most common forms of co-operation between these units are trainings, consultations and advisory.33 Employment in research and development units in 2004 amounted to 1,545 people and shows a decreasing trend, yet the number of people employed increased in comparison with 2003 (Tab. nr 1.11). In the Opolskie region there are only 1.5 person employed in the R&D sector per 1,000 inhabitants people, while in the European Union (EU15) it is approximately 6 (e.g. in Finland 13 people). Tab. No. 1.11. Number of people employed in R&D in the Opolskie Voivodeship in 1995-2004. Years 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 1,545 Number of people 1,353 1,790 1,870 1,794 1,817 1,694 1,650 1,553 1,538 Source: Nauka i technika w 2000 roku, Central Statistical Office, Warszawa 2002, p. 91, Nauka i technika w 2001 roku, Central Statistical Office, Warszawa 2003, p. 85., Nauka i technika w 2002 roku, Central Statistical Office, Warszawa 2003, Rocznik Statystyczny Województwa Opolskiego (Statistical Yearbook of the Opolskie Voivodeship), Statistical Office in Opole, Opole 2005. The weakness of the R&D sector in the Opolskie Voivodeship is additionally aggravated by very low expenditure that amounted to PLN 29.4 million in 2004 (0.6% of 32 On the basis of: Profil społeczny i gospodarczy województwa opolskiego, J. Szomburg (kier.), Instytut Badań nad Gospodarką Rynkową, Gdańsk 2002. 33 On the basis of:: Stan innowacyjności przedsiębiorstw Opolszczyzny, wyniki badań monitoringowych cz. I, Opole University of Technology, Academic Business Incubator, Opole 2006 27 draft of ROP OV 2007-2013 outlay in Poland). The organisational and financial support system is insufficient which does not motivate companies and scientists to creative and innovative activities. In the Opolskie Voivodeship only PLN 2.1 million of expenditure on R&D was allocated to one research and development unit, whereas the national average reached almost PLN 5 million. The ratio of the expenditure on research and development to the gross domestic product in 2003 amounted to 0.16% in the Opolskie Voivodeship and was three times lower than the national average. Therefore, the region ranks 15th among other voivodeships.. (Fig. 1.13). 1,40 1,19 1,05 0,86 0,48 0,56 0,43 0,41 0,40 0,36 0,33 0,35 0,25 0,23 0,20 0,18 0,17 0,16 Opolskie 0,54 Zachodniopomorskie 0,70 0,06 Polska Świętokrzyskie Lubuskie Podlaskie Warmińskomazurskie Kujawsko-pomorskie Śląskie Podkarpackie Dolnośląskie Lubelskie Pomorskie Wielkopolskie Łódzkie Małopolskie Mazowieckie 0,00 Fig. 1.13. Ratio of expenditure on research and development (R&D) to gross domestic product as per voivodeships in 2003 (in %). Source: Own calculations on the basis of data from the Central Statistical Office. On average in the European Union the expenditure in 2003 was 1.95%, the greatest was in Finland 3.51%, Denmark 2.6%, Germany 2.5%. Moreover, expenditure on research and development in the Opolskie Voivodeship is very low. In 2004 the amount per capita was PLN 28 with the national average amounting to PLN 135, which made the region 14th among Polish regions. Low expenditure on research and development is a considerable barrier for the region development. Transport infrastructure The A4 Zgorzelec–Korczowa motorway runs across the voivodeship; it is a part of the Third Pan-European Transport Corridor which significantly favours development. The motorway section running across the Opolskie Voivodeship is 88.1 km long, with 6 communication junctions (Fig. 1.14). The motorway ensures efficient transport, and areas in immediate vicinity of it are very attractive for potential investors. However, the problem is poor communications of the A4 motorway with the areas for investment. There are 5 generally accessible border checkpoints (including one full freight), 11 checkpoints of low cross-border traffic and 1 tourist checkpoint through which the Czech Republic can be reached. There is also one railway checkpoint. 28 draft of ROP OV 2007-2013 Fig. 1.14. Transport system in the Opolskie Voivodeship. Source: Department for Spatial Planning of the Marshall Office of the Opolskie Voivodeship. In 2004 in the Opolskie Voivodeship there were 8,516 kilometres of public hardsurface roads, including 969 km of voivodeship roads, 3,771 km of poviat roads and 2,975 km of gmina roads. The indicator of public roads density in the Opolskie Voivodeship in 2004 was 90.48 km/100km2 with the average in Poland amounting to 80.7 km/100km2 (Tab. No. 1.12). Tab. No. 1.12. Public hard-surface roads per 100 km2 and percentage of roads with improved surface in total length of roads in the Opolskie Voivodeship in 1999-2005. Description 1999 2000 2001 2002 2003 2004 2005 Public hard-surface roads per 89.1 89.9 90.9 87.7 90.4 90.5 88.9 100 km2 Percentage of roads with improved surface in total length 87.6 87.9 87.6 87.6 88.1 88.2 88.7 of roads (in %) Source: Rocznik Statystyczny Województw 2000 (Statistical Yearbook of Voivodeships 2000), Central Statistical Office, Warszawa 2000, Rocznik Statystyczny Województw 2001 (Statistical Yearbook of Voivodeships 2001), Central Statistical Office, Warszawa 2001, Rocznik Statystyczny Województw 2002 (Statistical Yearbook of Voivodeships 2002), Central Statistical Office, Warszawa 2002, Rocznik Statystyczny Województw 2003 (Statistical Yearbook of Voivodeships 2003), Central Statistical Office, Warszawa 2003, Rocznik Statystyczny Województw 2004 (Statistical Yearbook of Voivodeships 2004), Central Statistical Office, Warszawa 2004, Opolszczyzna w liczbach, Statistical Office in Opole, Opole 2006. 29 draft of ROP OV 2007-2013 In respect of road traffic safety, the situation in the Opolskie Voivodeship is similar to the average situation in Poland; however, the latter considerably differs from the situation in the “old” EU Member States. There were 1,191 traffic accidents, with 150 fatalities and 1,536 injured in the Opolskie Voivodeship in 2004 (Fig. 1.15). The reasons include, among others, a substandard condition of roads that require modernisation. A considerable development restriction is also the insufficient number of town and village transit ring roads. Number of accidents 1700 1601 1600 1500 193 250 1632 167 1400 149 163 141 Number of fatalities 150 150 1440 1367 1300 200 1348 100 50 1200 1191 1100 0 1999 rok 2000 rok 2001 rok 2002 rok 2003 rok 2004 rok liczba wypadków liczba ofiar śmiertelnych Fig. 1.15. Number of accidents and fatalities in the Opolskie Voivodeship in 1999 - 2004. Source: Data of the Central Statistical Office. Four towns in the region, i.e. Opole, Kędzierzyn-Koźle, Nysa and Brzeg have public transport with 826 bus routes and 195 buses. The analysis carried out by the Chamber of Urban Transport in Warsaw shows that the demand for bus transport has stabilised in towns and conurbations in Poland. In 2004 31 million people used the public transport in the Opolskie Voivodeship, in 2003 also 31 million people and in 2002 - 32 million.34 One of disadvantageous phenomena is a gradual decrease in the number of new buses in public transport. The aforesaid analysis indicates that the average age of town buses used in Poland becomes greater. Approximately 50% constitute ten-year-old and older buses, and just more than 8 % are buses less than three years old which meet the highest ecological and technical standards. A similar situation is in the Opolskie Voivodeship, e.g. in Opole there are 100 buses and the average age is 12.5 years. They offer a low standard of travelling, bad working conditions for drivers, they do not fulfil ecological requirements, and their frequent breakdowns make maintenance costs considerably higher. The Opolskie Voivodeship has a well developed railway system, which, however, requires modernisation. The total length of standard-gauge railway lines used is 839 km. As regards passenger railway transport, a number of connections increases in the Opolskie Voivodeship as opposed to nation-wide trends where many of the links are suspended. In 2005 a number of connections increased as compared with 2004 by 200 thousand train kilometres. In 2004-2005 three modern rail buses were purchased to enable operation of the lines Kluczbork–Opole and Kędzierzyn-Koźle–Nysa–Kamieniec Ząbkowicki 34 Rocznik Statystyczny Województw 2003 (Statistical Yearbook of Voivodeships 2003), Central Statistical Office, Warszawa 2003, Rocznik Statystyczny Województw 2004 (Statistical Yearbook of Voivodeships 2004), Central Statistical Office, Warszawa 2004, Rocznik Statystyczny Województw 2005 (Statistical Yearbook of Voivodeships 2005), Central Statistical Office, Warszawa 2005. 30 draft of ROP OV 2007-2013 closed in 2000. This investment is the first phase in modernisation of depreciated railway stock. Other routes to be reopened soon. There is a large potential of river transport in the voivodeship, in particular related to a water route on the Odra River and its basin. The total length of water routes is 131.2 km. They are equipped with the barrage system with small and large locks. Unfortunately, the quality of hydrotechnical infrastructure does not allow for getting the III navigability class on the Odra River and the Gliwicki Canal. The main ports are located in Opole and Kędzierzyn-Koźle; however, they are highly depreciated. There is no regional passenger airport in the Opolskie Voivodeship and the closest airports in neighbouring regions are located ca. 100 km away. In the voivodeship there are two local airports: in Kamień Śląski and Polska Nowa Wieś, but the latter has a grass runway intended mainly for the Flying Club purposes. The airport in Kamień Śląski is an only airport in the Opolskie Voivodeship with a hard-surface runway more than 2,000 m long, which within a short time may start to operate domestic and international flights. Potential directions for development of the airport in Kamień Śląski: operation of international flights (low fare airlines), operation of regular connections with Germany, - charter flights, - Cargo, - General Aviation: - Certified Flying Training Centre, - authorised maintenance service of aircrafts, - rallies of aircrafts from whole Europe. The Preliminary Feasibility Study for “Opole” Airport in Kamień Śląski35 shows that the passenger airport will bring numerous economic and social benefits for the development of the region. The most significant economic functions include: more jobs for directly and indirectly employed (through so called multiplier effects), a factor affecting the selection of location for domestic and foreign investments, integration of the region with central and highly developed areas in Poland and the European Union. Among social functions of air transport the most important is greater mobility of the society. Public services infrastructure and power industry The length of the water supply system in the Opolskie Voivodeship in 2004 was 6,497.6 km. The density ratio of the system in the Opolskie Voivodeship as compared with the whole country in 2004 was 69 km/100km2, with the national average amounting to 76.5 km, which ranked the voivodeship 8th among 16 voivodeships. In 2004 the water supply system was used by 986.7 people which constitute 93.8 % of total population of the voivodeship using the water supply system. In 1998–2003 in the Opolskie Voivodeship 806 km of the sewage system was commissioned, but the range of the system is still insufficient. The length of the system in the Opolskie Voivodeship in 2004 amounted to 1,797.5 km and served only to 52.1% of the population. The sewage system is available mainly in towns, and a significant development barrier is a predominance of areas which lack collective sewage systems. The density ratio of the system in the Opolskie Voivodeship in 2004 was 19.1 km/100 km2 with the national average amounting to 23.6 km per 100 km2, which ranked the voivodeship 10th among other voivodeships. Increased availability of technical utilities is an essential prerequisite for improving the quality of life. Construction, modernisation and repairs of water supply and sewage 35 The Preliminary Feasibility Study for “Opole” Airport in Kamień Śląski was prepared by Crowley Infrastructure Development Group from Warsaw. The aim of the Study was to assess preliminarily chances of completing the investment. 31 draft of ROP OV 2007-2013 systems should noticeably improve living conditions of people living in the Opolskie Voivodeship. The gas network in the Opolskie Voivodeship is poorly developed and requires investments. At the end of December 2004 its length reached 1,976.6 km. The system was used by 41.4% of the population. Majority of the gas system, ca. 61.2% of its total length, is located in towns of the Opolskie Voivodeship where 76.5% of consumers uses it. The length of the system in rural areas is 767 km; however, gas is used only by 12 thousand (2.4%) people in villages. The average length of the gas system per 100 km2 was over two times lower than the national average36 in the Opolskie Voivodeship in 2004 and amounted to 12.6 km (13th in Poland; Fig. 1.16). 200 Długość sieci wodociągowej na 100 km kw. 180 160 Długośc sieci kanalizacyjnej na 100 km kw. 140 Długość sieci gazowej na 100 km kw. 120 100 80 60 40 POLSKA zachodniopomorskie lubuskie podlaskie warmińskomazurskie małopolskie świętokrzyskie pomorskie podkarpackie opolskie śląskie mazowieckie lubelskie dolnośląskie łódzkie wielkopolskie 0 kujawsko-pomorskie 20 Fig. 1.16. Density of water supply and sewage systems and gas network in voivodeships in 2004. Source: Own calculations on the basis of: Rocznik Statystyczny Województw 2005 (Statistical Yearbook of Voivodeships 2005), Central Statistical Office 2005. The major power supplier in the Opolskie Voivodeship is BOT Power Plant Opole. This is a system power plant with total installed capacity 1,492 MW and attainable capacity of 1,506 MW, fired by hard coal. In addition, in the region there are power plant “Blachownia” in Kędzierzyn–Koźle (158 MW), heat and power generating plants, industrial power plants of local significance (from 4.5 MW to 40 MW) and hydroelectric power plants (from 0.022 MW to 4.8 MW. The basic thermal energy sources for people in towns are heat-generating systems. Moreover, there are still boiler houses (mainly coal-fired) that serve consumers in particular gminas. The power potential of renewable energy sources includes almost 40 boiler houses, using biofuels of total installed capacity 26.2 MW (0.56% of total heat demand in the voivodeship) and 22 hydroelectric power plants of total capacity 18.82 MW (2.5% of total electric energy demand in the Opolskie Voivodeship). Despite considerable resources, renewable energy sources satisfy only a small part of the power demand. Power production from renewable sources in 2002 reached ca. 58.6 MWh. The percentage of renewable sources of energy in the global fuel and energy balance is approximately 18%. Total supplies of renewable energy in Poland in 2002 constituted 5.2% of total supplies of primary energy (while in EU15 5.9%). A basic source of renewable energy in Poland, also in the Opolskie Voivodeship, is biomass. The Opolskie Voivodeship in comparison with Poland has an enormous potential of biomass, the greatest potential of straw and dynamic development of crops based on energy plants. The major consumer of biomass 36 In 2004 in Poland there were 32.6 km of gas network per 100 km2. 32 draft of ROP OV 2007-2013 in the Opolskie Voivodeship is BOT Power Plant Opole. At the moment it burns approx. 75 thousand Mg of biomass, the target is 250 Mg, and therefore it will be necessary to increase its supply. Taking into account sustainable development and limited availability of natural resources, efforts should be made to increase the percentage of energy from renewable sources in the overall structure of energy produced. Environmental protection In 2004 expenditure on investments in environmental protection per capita in the Opolskie Voivodeship was PLN 184 (2nd in Poland). It was above the national average (PLN 140; Fig. 1.17). 200 189 184 180 177 176 167 166 153 160 138 140 133 140 129 114 120 106 96 100 88 87 72 80 POLSKA podlaskie lubuskie lubelskie warmińskomazurskie mazowieckie świętokrzyskie wielkopolskie kujawsko-pomorskie podkarpackie łódzkie zachodniopomorskie małopolskie pomorskie dolnośląskie opolskie śląskie 60 Fig. 1.17. Investment outlay on environmental protection per capita in voivodeships in 2004 (in PLN). Source: Own calculations on the basis of: Rocznik Statystyczny Województw 2005 (Statistical Yearbook of Voivodeships 2005), Central Statistical Office 2005. The quantity of disposed industrial and municipal waste that required treatment in 2004 amounted to 85 hm3, including 96.8% were treated. Approximately 55.1% of total population of the region was served by treatment plants (the national average ratio was 59%), which ranked the region 11th among other voivodeships. All the poviats in the Opolskie Voivodeship have their municipal treatment plants of total flow capacity 219 dam3/d. In total there are 64 municipal treatment plants used in the voivodeship, including 45 biological ones, 18 with increased biogenic removal and 1 mechanical plant. The problem is an insufficient sewage system in the outskirts of towns and in rural areas. Apart from municipal treatment plants, there are 47 industrial treatment plants with flow capacity 726.1 dam3/d, including 21 mechanical ones, 3 chemical plants, 18 biological and 5 with increased biogenic removal. Emission of dust pollution to the atmosphere from plants that are particularly troublesome in the Opolskie Voivodeship decreases every year, which results mainly from 33 draft of ROP OV 2007-2013 reduction of high emission. The problem is still posed by the so called low pollution emission. In 1998 industrial plants emitted 12.4 thousand tonnes of dust pollution and in 2004 8 thousand tonnes (64.5%) less – i.e. 4.4 thousand tonnes. In 1998–2004 the quantity of gas pollution (without carbon dioxide) also decreased – by 3.0 thousand tonnes (i.e. by 5.4%). In 2004 the emission reached 52.7 thousand tonnes. In 2004 in the Opolskie Voivodeship 1,816.6 thousand tonnes of industrial waste was generated, including ca. 87.5% was subject to recycling and 8.7% was neutralised and stored. As regards industrial waste produced the Opolskie Voivodeship is 11th in Poland. Also 270.6 thousand tonnes of municipal waste were produced which calculated per capita places the voivodeship 8th in Poland with 257 kg of waste per person. In Poland the rate is 256 kg. At the end of 2004, there were 45 active waste dumps in the voivodeship whose total area was 259.4 ha and 2 waste dumps with concluded utilisation of total area 5.5. In addition, 17 waste dumps have degassing systems. In the voivodeship there is no common and fully operating system for utilising municipal waste. Moreover, there is no dangerous waste dump. The Opolskie Voivodeship is abundant in underground water and poor in surface water. However, pollution of surface water remains and the quality of underground water deteriorates. Surface water that complies with the requirements of the purity grade I comprises 3%; water of grade II comprises 34.4%; and water of grade III comprises 31.3%. Water polluted above standards constitutes 31.3 % of all waters. A serious threat for the voivodeship is a lack of efficient flood control system and possible losses in case of flood. The existing flood control system is insufficient, with levees, storage reservoirs, small retention reservoirs and river polders requiring most immediate extension and modernisation. Lasy Barucickie In order to improve the flood control system an investment related to the flood control reservoir “Racibórz” of key importance for the Opolskie Voivodeship is in progress. In addition, it is necessary to implement the “Programme for the Odra River 2006” in the Odra basin which is scheduled for 2006-2016. Grądy Odrzańskie Opolska Dolina Odry (Łęg Stobrawski) Jezioro Turawskie Kamień Śląski Jezioro Otmuchowskie Forty Nyskie Góra Świętej Anny Jezioro Nyskie Ostoja Sławniowicko-Burgrabicka Opolska Dolina Odry (Łęg Zdzieszowicki) Góry Opawskie (cz. pn.) The Opolskie Voivodeship is rich in Góry Opawskie (cz. pd.) unique natural resources, in particular: − the Chełm massif which is a Obszary Specjalnej Ochrony Ptaków concentration of stenothermic and Specjalne Obszary Ochrony Siedlisk calciphil plants unique in Poland; Druk prosty - nazwy obszarów wyznaczonych / zgłoszonych Komisji Europejskiej; − the Opawskie Mountains (including Kursywa - nazwy obszarów wymagających wyznaczenia / zgłoszenia their south-east fragment near Fig. 1.18. Target Natura 2000 network in the Opolskie Voivodeship Opawica and Pielgrzymowo) which is Source: Shadow List a “natural bridge” between the Carpathian and Sudeten Mountains; − the Odra valley with fragments of river valley nature best preserved in the voivodship (Grądy Odrzańskie); − unique localities of bats in the Nyskie Forts and Sławniowicko-Burgabickie quarries. The Opolskie Voivodeship carries out activities called Natura 2000 related to protection of natural ecosystems, habitats and communities in the areas of natural sanctuaries. 34 draft of ROP OV 2007-2013 In the Opolskie region the first in Poland regional concept of Natura 2000 network was developed; moreover, the Opolskie Voivodeship as the only one has so called “Red Book37 of Plants in the Opolskie Voivodeship” (in Polish: “Czerwona księga roślin województwa opolskiego”) – a study devoted to endangered plant species. The regional concept of the Programme “Natural Sanctuaries Natura 2000” in the Opolskie Voivodeship suggests establishing of 6 global sanctuaries and within them 15 partial sanctuaries of total area of approx. 144.7 thousand ha (ca. 15.4 % of the region area). At the end of 2005, there is one bird sanctuary approved – Grądy Odrzańskie (11.65 thousand ha). Fig. 1.18 presents target Natura 2000 network in the Opolskie Voivodeship. Moreover, in the Opolskie Voivodeship the Programme “Reintroduction of Spermophilus citellus” (species of gopher) is in progress38. It is an only colony of these animals in Poland. The aim of the Programme is to reconstruct the self-reproducing population of this species of gopher which in Poland became totally extinct at the turn of the seventies and eighties of the 20th century. Education and human resources The Opolskie Voivodeship is characterised by a dense school system adequate to social needs. Nursery education in the Opolskie Voivodeship is characterised by a large number of small units, densely distributed around the voivodeship, although some rural areas lack such units. In 2004 in the voivodeship there were 481 nursery schools (kindergartens and nursery units at primary schools), including 321 in rural areas. Data illustrating the quantity potential of education according to the number of people and available units are shown in Tab. No. 1.13. Tab. No. 1.13. Number of schools according to the education level and the number of pupils in the schools year 2004/2005. Number of schools Number of pupils/students Education for children and youth Primary Junior secondary (in Polish: gimnazjum) Post-primary, including: - vocational - general senior secondary - vocational senior secondary Post-gimnazjum, including: - vocational - general senior secondary - senior secondary with defined specialisation - technical senior secondary - art senior secondary Post-secondary 427 160 68,819 43,746 2 95 27 4,535 49 59 51 53 5 7,723 16, 839 7,681 9,308 575 93 6,474 37 K Spałek, A. Nowak, Czerwona księga roślin województwa opolskiego. Rośliny naczyniowe, wymarłe, zagroŜone i rzadkie [Red Book of Plants in the Opolskie Voivodeship]. Opolskie Towarzystwo Przyjaciół Nauki. Opole 2003. 38 Reintroduction of Spermophilus citellus in the Opole Region is carried out within the programme "Gopher", under supervision of the Polskie Towarzystwo Ochrony Przyrody "Salamandra" in co-operation with the Poznań ZOO and Opole "BIOS" Association. It is funded, among others, by Eko Fundusz and the Voivodeship Fund for Environmental Protection and Water Management in Opole. 35 draft of ROP OV 2007-2013 Number of schools Higher Junior secondary (in Polish: gimnazjum) Post-primary Post-gimnazjum Education for children and youth 6 Education for adults 8 66 71 Number of pupils/students 37,946 834 5,244 3,213 Source: Statistical Yearbook of the Opolskie Voivodeship, Statistical Office, Opole 2005. Development of higher education is a significant advantage of the region. Higher education in the Opolskie Voivodeship is based mainly on the science and academic centre in Opole. There are two active universities in the capital of the voivodeship: the Opole University and the Opole University of Technology; and two schools of higher education: the Academy of Management and Administration and the State Medical Vocational College. Moreover, there are two vocational colleges in the voivodeship: the State School of Higher Vocational Education in Nysa and the private Academy of Humanities and Economics in Brzeg. In addition, in many towns of the region branches of schools of higher education from all over the country are opened. Almost 38 thousand students attend the aforementioned university schools and colleges. These units employ in total 1,518 academic teachers. The largest educational establishment is the Opole University with over 15 thousand students (47% of all students in the voivodeship). The Opole University of Technology is attended by over 11 thousand students (34% of total number of students), whereas the private Academy of Management and Administration in Opole – over 4 thousand students (ca. 11%). The State School of Higher Vocational Education in Nysa has over 4.9 thousand students, the private Academy of Humanities and Economics in Brzeg – over 430 students, and the State Medical Vocational College in Opole – over 580 students. Continuing education of adults in the Opolskie Voivodeship is organised within school and extra-school systems. In the school year 2005/2006 schools for adults provided 8.9 thousand people in total with education. Post-secondary schools were attended by total of 7.2 thousand people, including 715 people at the Teacher Training College of Foreign Languages in Opole. Continued education also takes place at all universities and colleges as a part of extramural and evening studies. A very important role in the educational process of providing the society with knowledge and vocational skills adequate to the growing labour market demand is played, among others, by centres for continued education and practical training as well as for inservice and vocational training. These establishments often have no modern infrastructure and teaching aids, including those enabling participants to use the latest technology applied in economy. Currently, such establishments operate in Opole, Kędzierzyn-Koźle, Nysa, Grodków, Głubczyce and Kluczbork. Most of them require, however, improved infrastructure and modern equipment. Despite the increasing educational ambitions of inhabitants of the voivodeship, the region is generally characterised by a low ratio of people with university education. According to 2002 census data it reaches 8.3%, with the national average amounting to 10.2%. Even taking into account the significant increase in this value since 1988 amounting to 5%, it is still the lowest among other voivodeships (Fig. 1.19). The increased interest in university studies in the Opolskie Voivodeship brought about over twofold increase of students (from 13.7 thousand in 1996 to 38 thousand in 2005). The number of university graduates increased almost five times (7.6 thousand people in comparison with 1.7 thousand five years ago). Owing to continuing population decline and 36 draft of ROP OV 2007-2013 intensified emigration of population as well as taking into account demographic forecasts until 2030 it is anticipated that the number of students and pupils will drop in the immediate future. The level of education differentiates urban and rural population. The ratio of people with university education in towns of the Opolskie Voivodeship is three times higher than in villages of the Opolskie Voivodeship (12% in towns and 4% in villages); the ratio of people with secondary education is also higher (36% in towns and 20.6% in villages). Although in comparison with the European Union the ratio of people with university education is not good, it is important that in the Opolskie Voivodeship the ratio of people with secondary education is higher than the average in Poland and the EU, while the ratio of poorly educated people – lower (Fig. 1.20)39. w ojew ództw o opolskie 11,7 Polska UE–25 12,5 20,6 wysokie 69,3 68,3 średnie 46,7 19,0 19,1 niskie 32,6 0 Fig. 1.19. Percentage of people with university education in Poland in 2002. 20 40 60 80 Fig. 1.20. Education level of population in 2002 (in %). Source: Data of the National Census 2002. Source: As in note 34. Building of the information society Information and communication technologies have become a new factor of competitiveness in the regions. Telephone and IT infrastructure in the Opolskie Voivodeship is poorly developed. It is demonstrated in the number of standard telephone connections: 26 per 100 inhabitants, while the average in Poland is 35. In 2004 in the Opolskie Voivodeship the number of subscribers amounted to 269 thousand people and increased as compared with 1999 by 7.4% (Fig. 1.21). Almost 65% of all the subscribers to standard connections were town inhabitants, while village inhabitants 35.5% 60 65 55 45 37 36 35 33 33 32 32 32 35 31 30 m az U ow ie ck ie po dl za do ask ch l i od noś e lą ni s op om kie or sk po i m e or sk ie lu bu sk ie ś w l ą ar sk m ie iń łó sk d ku om zkie ja az w sk ur osk po ie m or sk m ie ał op ol w sk ie lko ie po ls ki e lu be ls ki e św opo ls ię ki to e kr zy po sk dk i ar e pa ck PO ie LS K A E 35 29 28 27 26 The diagram prepared on the basis of: A New Partnership for cohesion, convergence, competitiveness, 24 23 cooperation. Third 25 report on economic and social cohesion. European Commission. Luxembourg 2004, p. 189, 201. The classification of education into low, medium and high arises from the ISCED (International Standard Classification 15 of Education). The division covers people between the ages of 25 to 64 and specifies the education level classified depending on the educational system in a particular EU state. 39 37 draft of ROP OV 2007-2013 Fig. 1.21. Number of telephone lines per 100 people in the Opolskie Voivodeship in 2002 in comparison with the national average, other voivodeships and the EU. Source: Own study on the basis of the Rocznik Statystyczny Województw 2003 (Statistical Yearbook of Voivodeships 2003), Central Statistical Office 2003 and data of the Central Statistical Office. A poorly developed telephone network results in e.g. restrictions in the access to the Internet (most users connect with the global network via modems). Data of the largest telephone network operator in the Opolskie Voivodeship show that a number of people using the Internet in 2005 was 34 thousand and increased in comparison with 2004 by 19%. The Internet users constitute about 13% of all the people who have telephone connections supplied by this operator. The Opolskie Voivodeship is poorly covered by a network of fibre-optic cables which ensures high bandwidth of data transmission. Moreover, there are serious limitations in a broadband access to the Web, in many areas it is technically difficult and very expensive. The accessibility of IT services is even worse due to the cost of services which is one of the highest in the European Union. In 2004 in the Opolskie Voivodeship 31.6% of all the households were equipped with personal computers, including 13.1% with an access to the Internet. On average 32.9% of households in Poland have computers, including 16.9% with an access to the Internet. Percentage of households with computers, including those with an access to the Internet, significantly differs from the relevant indicators noted in the EU states. For comparison, in 2003 personal computers were owned by 142 people per 1,000 people which is considerably different from the EU average (Fig. 1.22). 640 621 594 577 560 485 480 467 400 310 320 134 110 108 Węgry 142 160 Litwa 240 82 EU-25 (2002) Grecja Portugalia Polska Holandia Niemcy Dania Luksemburg (2002) Szwecja 80 Fig. 1.22. Number of personal computers in use per 1000 of population in the EU selected states in 2003. Source: Own study on the basis of Mały rocznik statystyczny Polski 2006, Central Statistical Office 2006. 38 draft of ROP OV 2007-2013 Public health care The health insurance in the National Health Fund covers approximately 953 thousand people40 in the Opolskie Voivodeship. There are many indications that in following years the demand for health care services will increase, e.g. due to the increasing life expectancy. Life expectancy in the Opolskie Voivodeship is 71.9 years for men and 79.7 for women; in both cases the ratios are above the national average. The percentage of people at pre-working age in the total number of inhabitants in 2004 reached 20.3% and shows a declining trend, but the population at retirement age (15.6%) constantly grows. A mortality rate in the Opolskie Voivodeship is lower than the national average (in 2004 it was 8.7 per 1,000 inhabitants which placed the voivodeship 12th). The major causes of incidence and mortality in the region include cardiovascular illnesses and cancers. Taking into account infant mortality regarded as the synthetic measure of the civilisation level, the Opolskie Voivodeship has the best results in Poland. In 2004 in the Opolskie Voivodeship the infant mortality rate per 1000 live births was 4.3, average in Poland 6.8. Decreasing tendencies for infant mortality have been observed for several years. A value of the indicator in the Opolskie Voivodeship is the same as the average in the “old” states of the European Union. The level of public healthcare of the population in the Opolskie Voivodeship is unsatisfactory, in terms of medical personnel and the infrastructure. All the ratios related to standards in this respect are below the national average. There are 237 people per 1 bed in general hospitals in the voivodeship, with the national average amounting to 208 people, ranking the region 15th as compared with other voivodeships. In 2004 on average there were 17 doctors per 10 thousand of population which made the region the last but one among voivodeships. The average in Poland is higher and amounts to more than 20 doctors (in 2002 23.1). In the EU countries this indicator differed in particular states. In 2002, per 10 thousand of population there were 15.6 in the UK, 24.8 in Portugal and 26.0 in Sweden. In 2004 in the Opolskie Voivodeship on average there were about 39 nurses per 10 thousand of population which placed the region the last but one among voivodeships. On average this indicator in Poland was 48.7, while in the EU countries: 31.4 in Portugal; 33 in Ireland; 42 in Spain and 55 in the Netherlands. On average in 25 states of the European Union there are 639.1 hospital beds per 100 thousand people. In comparison with this value, the Opolskie Voivodeship with the result 445.4 is at a similar level to the one noted in Italy, Denmark and the Netherlands (Fig. 1.23). 1200 1100 1000 900 800 709,9 639,1611,3 700 600 445,4 500 400 300 40 opolskie Polska Hiszpania Portugalia Dania Wielka Brytania Cypr Włochy Holandia Słowenia Estonia EU (15 countries) EU (25 countries) Luxemburg Malta Belgia Finlandia Latwia Słowacja Francja Austria Niemcy Litwa Irlandia Czechy 200 In January 2006 39 draft of ROP OV 2007-2013 Fig. 1.23. Number of beds per 100 thousand of people in the EU states and in the Opolskie Voivodeship in 2002. Source: Eurostat data. In the Opolskie Voivodeship there are 27 general hospitals, including 7 private, with 4,308 beds. Moreover, 5 psychiatric care units, including 3 psychiatric hospitals, 1 alcoholic detox centre and 1 rehabilitation centre for addicts. The ratio in general hospitals is 41 beds per 10 thousand people (15th in Poland). The national average is 48 beds per 10 thousand inhabitants. There are 17 care and treatment centres operating in the Opolskie Voivodeship, with 722 places, and 2 hospices with 33 places. There are no nursing and care units. The outpatient health care in 2004 was provided by 326 health care centres, including 73 public and 253 non-public, and 274 individual and group medical and dental practices. 102 health care centres from among 326 were in rural areas. First aid is provided on the basis of the Opolskie Centre for Medical Emergency Services and 24 medical rescue teams. The medical emergency service has 9 resuscitation teams and 12 casualty teams. There are no emergency air teams on duty. The medical emergency service in the Opolskie Voivodeship is one of the best organised services in Poland; however, it requires integrated and permanent modernisation. There are two operating emergency information centres in the region. In 2004 in the Opolskie Voivodeship there were 255 pharmacies, with 54 of them and 21 dispensaries in the countryside. A number of people per 1 pharmacy regularly decreases and in 2004 it amounted to 4,124 people in the voivodeship. In rural areas the indicator was worse and amounted to 9,213 people per 1 pharmacy. Financial problems faced by public health care, apart from debts of health care centres, result also in infrastructure depreciation, restricted access to medical technologies and low salaries for medical personnel. Equal access to professional public health services is of particular significance, especially that there are differences in this respect in individual parts of the region. It is also important to promote health among inhabitants of the region. Culture and cultural heritage The cultural variety of the region results, among other things, from multiculturalism due to historical circumstances. Under the influence of many cultures, a specific regional tradition and culture have developed which distinguishes the Opolskie Voivodeship in Poland. It is visible mainly in the folklore, customs and language specific to the region. Cultural heritage of the region is rich and artistic achievements numerous. The most significant cultural institutions are situated in the capital of the voivodeship with 2 theatres and a concert hall housing in total 1,727 seats. The ratio of audience in theatres and music centres was 167 per 1,000 people in 2004, with the national average of 244. Cultural institutions in the Opolskie Voivodeship have highly depcapitalised material assets and equipment. Such a situation is in particular true in rural areas and small towns. There are 14 cinemas in the voivodeship housing 5 thousand seats. There were 49 viewers per 1 screening in the Opolskie Voivodeship in 2004, i.e. above the national average (37 viewers per 1 screening) (Fig. 1.24). 40 draft of ROP OV 2007-2013 liczba widzów i słuchaczy w teatrach i instytucjach muzycznych na 1000 ludności 870 121 347 244 183 POLSKA 370 lubuskie 400 lubelskie 102 244 warmińskomazurskie 485 462 268 podlaskie 204 podkarpackie 181 742 665 635 540167 500 291 229 197 315 świętokrzyskie 890 opolskie małopolskie pomorskie mazowieckie 0 255 224 269 938 kujawsko-pomorskie 410 500 949 łódzkie 1000 śląskie 1058 dolnośląskie 1387 wielkopolskie 1500 liczba widzów w kinach na 1000 ludności zachodniopomorskie 2000 1623 Fig. 1.24. Ratio of audience in cinemas, theatres and music centres per 1,000 of population in voivodeships in 2004. Source: Own calculations on the basis of data from the Central Statistical Office. In the region there are only 13 of 668 museums in Poland (the lowest number among all the voivodeships). In 2004, they organised 119 exhibitions visited by 200.8 thousand people, a half of them comprised organised groups of school students. The ratio of visitors in museums per 1,000 of population in 2004 was 191.1 which was almost two times lower than the national average (458.6 visitors per 1,000 of population). The Opolskie Voivodeship has quite low ratios of participation in culture by inhabitants. The audience in cinemas, theatres and music centres per 1,000 people is smaller than the national average. In 2005 every second inhabitant of the region went to the cinema only once and almost every fifth attended a theatrical or musical performance (Tab. No. 1.14). Tab. No. 1.14. Audience in cinemas per 1,000 of population and audience in theatres and music centres per 1,000 of people in the Opolskie Voivodeship in 1999-2005. Description Audience in cinemas per 1,000 of population Audience in theatres and music centres per 1,000 of population 1999 2000 2001 2002 2003 2004 2005 473 276 359 316 375 540 430 198 193 205 190 192 167 190 Source: Rocznik Statystyczny Województw 2000 (Statistical Yearbook of Voivodeships 2000), Central Statistical Office, Warszawa 2000, Rocznik Statystyczny Województw 2001 (Statistical Yearbook of Voivodeships 2001), Central Statistical Office, Warszawa 2001, Rocznik Statystyczny Województw 2002 (Statistical Yearbook of Voivodeships 2002), Central Statistical Office, Warszawa 2002, Rocznik Statystyczny Województw 2003 (Statistical Yearbook of Voivodeships 2003), Central Statistical Office, Warszawa 2003, Rocznik Statystyczny Województw 2004 (Statistical Yearbook of Voivodeships 2004), Central Statistical Office, Warszawa 2004, Rocznik Statystyczny Województw 2005 (Statistical Yearbook of Voivodeships 2005), Central Statistical Office, Warszawa 2005, Opolszczyzna w liczbach, Statistical Office in Opole, Opole 2006. The important sites/buildings of cultural heritage include historically developed urban complexes and elements of architecture. In the voivodeship there are more than 5.5 thousand archaeological sites. In addition, unique in Europe a documentation site of inanimate nature “Trias” in Krasiejów. Here, the most significant discovery in the history of Polish palaeontology was made, i.e. the oldest dinosaur in the world, from 230 million years ago, called the Silesian Saurian from Opole – Silesaurus Opolensis was discovered. 41 draft of ROP OV 2007-2013 The region is one of the most abounding in monuments and historic buildings, unfortunately, many of them are in a bad technical state which reduces their attractiveness and restricts accessibility (Tab. No. 1.15). Tab. No. 1.15. Number of monuments in the Opolskie Voivodeship (at the end of 2005). Percentage of buildings and sites from the Opolskie Voivodeship listed in the national register 5% Type of monument Buildings and sites listed in the voivodeship monument record* Buildings and sites listed in the monument register Immovable monuments 30,000 3,038 Movable monuments 13,000 6,676 4% Archaeological sites Total 10,000 53,000 1,128 10,842 15% 4% * Data about buildings /sites listed in the voivodeship monument record are estimated values. Source: Data of the Opole Inspector of Monuments and the National Heritage Board of Poland in Warsaw. A flagship of cultural life and an “identification mark” of the Opolskie Voivodeship is the Festival of Polish Song which since 1963 has taken place in the Millennium Amphitheatre in Opole every year. Due to the above, Opole is called a capital city of Polish song. The amphitheatre with accompanying facilities is deeply decapitalised – it is not up to today’s standards and needs major renovation. Tourism and sport The Opolskie Voivodeship has attractive and diverse local natural and cultural resources, favourable to developing the economic activity in tourism, recreation and sightseeing. Diversified conditions for the development of tourism are related to values of the natural environment, a variety of landscape forms, a broad range of possible forms of recreation as well as a large number of historical sites. The most favourite places for spending leisure time by the water are Turawskie Lakes and reservoirs situated in the south-western part of the region – Nyskie Lake and Otmuchowskie Lake. Tourist attractions include urban complexes of Medieval towns (Nysa, Otmuchów, Paczków), sacred buildings, monuments of material culture (e.g. castles in Moszna, Kamień Śląski, Głogówek, Rogów Opolski), open-air ethnographic museum Opole-Bierkowice, museums and art galleries. Moreover, the Opawskie Mountains and the Chełmski Massif with the St. Anna Mount, a place of worship and pilgrimages. Landscape Park “St. Anna Mount” has been selected by UNESCO for the World Heritage List. A high quality of landscape and cultural resources of Opole villages (many villages traditional in nature) are also worth mentioning. The majority of buildings and sites interesting for tourists are underinvested. A tourist attraction hardly used in the Opolskie Voivodeship is the Odra River. 42 draft of ROP OV 2007-2013 The chances for development of tourism are seen in creating an attractive and competitive tourist product as well as in sentimental tourism. The infrastructure related to tourism does not allow for exploiting the regional potential to a full extent, which is a considerable barrier to development. In 2004 tourists were offered 33 hotels, motels and pensions, and 94 other group lodging facilities in the Opolskie Voivodeship. In 1998-2004, 28 lodging facilities stopped to operate, which is mainly accountable to lower demand from tourists and a shortage of funds for refurbishment. The network of lodging facilities is very poor. In 2004 in the Opolskie Voivodeship there was 1.3 lodging facility per 100 km2, the average in Poland 2.2, while in the states of the European Union it was on average 10.2. The highest value was in Malt, Italy and the UK, the lowest – in Finland, Latvia and Sweden. (Fig. 1.25). 70 63,1 60 50 38,0 36,8 40 30 24,6 21,7 17,0 16,4 15,5 20 12,6 11,6 10,2 9,7 10 7,0 6,5 5,4 4,2 3,6 3,2 2,5 2,4 1,4 0,9 0,8 0,5 0,4 2,2 1,3 opolskie Polska Finlandia Łotwa Litwa Szwecja Estonia Portugalia Dania Węgry Słowenia Słowacja Francja Hioszpania Grecja Czechy UE - 25 Belgia Irlandia Niemcy Cypr Holandia Luxembourg Austria Wileka Brytania Włochy Malta 0 Fig. 1.25. Number of tourist group lodging facilities per 100 km2 in the EU states and the Opolskie Voivodeship in 2004. Source: Eurostat data. Travel agencies operating in the Opolskie Voivodeship – whose number has greatly increased in recent years – offer mainly transport services. There are few tourist information offices and the newly founded offices at travelling agencies and hotels have insufficient information. In the Opolskie Voivodeship sports and recreational facilities are quite evenly spread over its whole area. However, there are few multi-purpose sports halls with seats for spectators, indoor pools, ice rinks and tennis courts. 1.2 Analysis and evaluation of state aid and foreign assistance in 19992006 A significant element of support for activities of local governments and of other entities aimed at economic, social and cultural development of the voivodeship as well as improving the quality of life of its inhabitants, is the use of state aid, European funding and earmarked funds. Its beneficiary is, directly or indirectly, every person living in the region. 43 draft of ROP OV 2007-2013 Funding programmes presented below do not constitute a complete list of programmes from which beneficiaries in the Opolskie Voivodeship benefited. Only the largest programmes whose effects are of greatest importance to the region development in 1999-2006 are presented. 1.2.1 State aid and earmarked funds Within the framework of the state aid for the Opolskie Voivodeship in 1999-2006 a number of investments were completed. They have contributed, among other things, to strengthening attractiveness of the regional economy, made it more competitive, to a greater extent based on knowledge and entrepreneurship. Contract for the Opolskie Voivodeship In the Opolskie Voivodeship the Contract has been executed in three “editions”: − Contract for the Opolskie Voivodeship 2001-2003; − Contract for the Opolskie Voivodeship 2004; − Contract for the Opolskie Voivodeship 2005-2006. In all the “editions” of the Contract in total 273 projects were accepted and cofunding amounted to PLN 87.4 million. Within the Contract for the Opolskie Voivodeship for the years 2001-2003 the funds were allocated mainly to tasks in technical and social infrastructure, to investments and investment purchases by local government units. The effects of the investment included, among other things: extension of the radiotherapy unit at the Voivodeship Oncology Centre, replacement of fittings in cultural institutions (approx. 36 thousand running metres), construction of approx. 8 km of the sanitary sewage system and 40 km of the water supply system as well as construction of 6 km of roads. Within the Contract for the Opolskie Voivodeship for 2004 funding was provided to road infrastructure, modernisation of cultural buildings of regional importance (e.g. the first stage of thermal modernisation of the Concert Hall and the Jan Kochanowski Theatre in Opole). Tasks aimed at preserving unique objects of cultural heritage in the region (museums, including regional ones, sacred buildings) as well as tasks in health service (38 pieces of equipment for treatment and rehabilitation) were also accomplished. Within the Contract for the Opolskie Voivodeship for the years 2005-2006 the majority of funds have been allocated to upgrading teaching facilities in educational institutions, modernising the health care system and investments into strengthening local and regional attractiveness. Experience gained from implementing the Contract for the Opolskie Voivodeship shows that there is a considerable investment potential among would-be beneficiaries, mainly among units of local self-government, but recently to a greater extent also among other institutions. Regional Fund for Environmental Protection and Water Management 44 draft of ROP OV 2007-2013 Within the Regional Fund for Environmental Protection and Water Management in 1999-200541 the funds in the amount of PLN 395.7 million were granted for 908 projects in: air protection, water protection, water management and ground surface protection, related to erection, repairs and modernisation of plants and equipment to improve the environment (boiler houses, treatment plants, sewage system, waste dumps, etc.). The effects of projects, among other things, are as follows: construction/modernisation of 26 sewage treatment plants, reduction in pollution emitted to the air, construction or extension of waste dumps of area 22.73 ha and capacity 1,974.420 m3, reconstruction of watercourses and flood walls along 155,170 m. “100 million” Programme – Development and improvement of technical infrastructure in rural areas “100 million (…)” Programme was implemented in 1999-2000. Within the programme 32 tasks in construction and modernisation of the road system as well as sewage and water supply systems in gminas of the Opolskie Voivodeship were co-financed in the amount of PLN 5.1 million. The programme covered 30 gminas in the voivodeship, Poviat Starosty (poviat starosty – poviat’s administrative authorities) from Opole and Związek Gmin AQUA Silesia (AQUA Silesia Association of Gminas). As a result of these tasks more than 4.4 km of roads were modernised, almost 33 km of the sewage system and 38 km of the water supply system constructed. In addition 1,120 house drains and more than 500 service lines were made. Fund for Development of Physical Culture – Programme for Development of Sports Facilities Finances from the Fund are allocated to tasks included in voivodeship programmes for development of sports facilities covering several years, approved of by voivodeship sejmiks, as well as to tasks listed in the programme of investments of particular importance for sport, prepared by the Polish Confederation of Sport. The Fund may co-finance, among other things, construction, extension, reconstruction, modernisation and renovation of facilities and provision of equipment for sports purposes. In 1999-2006 in the Opolskie Voivodeship within the “Programme for Development of Sports Facilities in the Opolskie Voivodeship”, 94 tasks were accomplished for the total amount of PLN 70.9 million. The funds were allocated to construction or modernisation of gyms, sports halls, pitches and swimming pools. Projects co-financed from the Fund include mainly the Entertainment and Sports Arena in Kędzierzyn-Koźle which meets requirements set by the Federation of European Volleyball and the Federation of International Volleyball as well as the in-door swimming pool in Dobrodzień whose area is 468 m2. This instrument proved to be extremely important for improving sports facilities in the Opolskie Voivodeship, especially at the lowest level. Regional Agricultural Land Protection Fund 41 The Marshal Office of the Opolskie Voivodeship has data for 2005. 45 draft of ROP OV 2007-2013 The Regional Agricultural Land Protection Fund is a non-budgetary earmarked fund whose resources, in a form of grants, are allocated by the Voivodeship Self-government for protection, reclamation and improvement in the quality of agricultural land, i.e. among other things for: − prevention of soil erosion on farming land; − construction and modernisation of access roads to agricultural land; − preparing documentation on farm land protection; − purchase of computer hardware and software necessary for keeping records of agricultural land protection as well as for opening and updating surveys of land records. Within the Regional Agricultural Land Protection Fund in 2000-2006 in total 203 projects were approved for the amount of PLN 34,5 million. Such a great number of projects are of high importance, in particular for eliminating intraregional differences in the development, noticeable especially in rural areas. In 2006 by the end of June, 47 projects were implemented of total value PLN 10.5 mln, including PLN 8.5 mln for construction of 50.7 km of access roads to agricultural land in 33 gminas. In the Branice Gmina a small storage reservoir of the area of 86 ha is under construction, and 10 starostys were provided with funds for purchasing computer hardware and software necessary for keeping records of agricultural land protection as well as for opening and updating surveys of land records. 1.2.2. Foreign assistance – pre-accession funds Highly developed countries in order to support transformation processes in political systems and economy launched financial aid programmes for the states applying for membership in the European Union whose aim was to assist the countries lagging behind in social and economic development. The basic objective of pre-accession funds was to prepare to the EU membership, to get to know mechanisms and instruments in the European regional policy as well as how to use the Community financial assistance after the accession to the EU. The Opolskie Voivodeship is using or used the following pre-accession programmes: − PHARE SEC – Social and Economic Cohesion; − PHARE CBC – Cross-Border Co-operation; − ISPA (from 1 May, 2004 – Cohesion Fund); − SAPARD. PHARE Social and Economic Cohesion (Phare SEC) 46 draft of ROP OV 2007-2013 Phare Social and Economic Cohesion (Phare SEC) is aimed at reducing lagging and disparities in development between regions through promoting economic activity, solving social problems related to the labour market, restructuring and development of infrastructure. Phare SEC consists of three major parts (components): − Assistance for infrastructure development (INFRA); − Assistance for small and medium-sized enterprises (SMEs); − Assistance for human resources development (HRD). The Opolskie Voivodeship participated in the Phare SEC at a regional level already in 2001 when it used two components of financial assistance, i.e. SMEs and HRD. In 2002 the voivodeship used all the components of Phare SEC. PHARE SEC 2001 Within the framework of Phare SEC 2001 the Opolskie Voivodeship implemented the projects in: − Assistance for the development of Small and Medium-Sized Enterprises (SMEs); − Human Resources Development (HRD). Total value of the projects was PLN 54.3 mln42 and co-financing from Phare - PLN 12.9 mln. - Assistance for the development of Small and Medium-Sized Enterprises (SMEs) Within the framework of the SMEs component of Phare SEC 2001, the Association “Business Promotion” in Opole, Regional Financing Institution, carried out the project “Development of small and medium-sized enterprises in the Opolskie Voivodeship” of total value of PLN 48.7 million. 156 contracts were signed, in overwhelming majority (119) from the Investment Grant Scheme for the amount of co-funding of PLN 8.7 mln. - Human Resources Development (HRD) Within the framework of the HRD component of Phare SEC 2001 the project “Employment promotion and human resources development” was implemented. The project beneficiary was the Voivodeship Labour Office in Opole. The total value of the project amounted to PLN 5.6 million, including the aid from Phare – PLN 4.2 million. The project was carried out in all the poviats in the Opolskie Voivodeship from October 2003 to January 2005. The direct objective of the project was to solve problems in the regional labour market. Within the framework of the programme approximately 400 trainings were organised, including courses and workshops. More than 2,000 people participated in them, including 318 people who took a job, 20 people who received support and 12 who signed agreements for opening their own economic activity. PHARE SEC 2002 42 For Phare SEC, Phare CBC and ISPA/Cohesion Fund the Exchange rate applied was 1 EUR = 4 PLN. 47 draft of ROP OV 2007-2013 Within the framework of Phare SEC 2002 the Opolskie Voivodeship implemented the projects in: − − − Infrastructure development (INFRA); Assistance for small and medium-sized enterprises (SMEs); Human Resources Development (HRD). The total value of the projects was PLN 72.7 million, including aid from Phare - PLN 47.6 million. − Infrastructure development (INFRA) Within the framework of the INFRA component of Phare SEC 2002 in the Opolskie Voivodeship 4 infrastructure projects were implemented. The total value of the projects was PLN 51.7 million and co-financing from Phare – PLN 36,8 million: − “Development of investments in Głogówek” – carried out by the Głogówek Gmina. The project value is PLN 13.5 million and co-financing from Phare – PLN 8.7 million EUR. The aim of the project was to construct a sewage system in the Town of Głogówek, Mochów and DzierŜysławice as well as to drain sewage to the municipal sewage treatment plant. The investment was commissioned in September 2005. − “Economic development of Kolonowskie” - carried out by the Kolonowskie Gmina. The project value was PLN 14.8 million and co-financing from Phare – PLN 11.1 million. The Project included, among other things: construction of the gmina sewage treatment plant “Staniszcze” with the necessary infrastructure (road, water supply system, transformer station, telephone), construction of the sanitary collector from “Staniszcze” sewage plant to the zone of industry and service development in Kolonowskie with the distribution network and terminals. The investment was commissioned in September 2005. − “Development of tourism in the Opolskie Voivodeship” – carried out by the Popielów Gmina. The project value was PLN 12.3 million and co-financing from Phare – PLN 8.7 million. The project resulted in construction of the sanitary sewage system in the Popielów Gmina and environmental protection of the Stobrawski Park Krajobrazowy. The investment was commissioned in September 2005. − “Development of tourism and the SME sector in Ozimek” – carried out by the Ozimek Gmina. The project value was PLN 11.1 million and co-financing from Phare – PLN 8.3 million. The aim of the project was regulation of the water supply and sewage management in the Ozimek Gmina through extension and modernisation of the sewage treatment plant in Antoniów, construction of the sewage system and purchase of vehicles for multifunctional cleaning of the sewage system. The investment was commissioned in October 2005. − Assistance for small and medium-sized enterprises (SMEs) Within the framework of the SME component of Phare SEC 2002 the project “Entrepreneurship in Poland: Regional Programme for Support of SMEs” has been implemented, co-ordinated by the Association “Business Promotion” in Opole, Regional Financing Institution (SPP RIF) and Opolski Regionalny Fundusz Poręczeń Kredytowych Sp. z.o.o. (ORFPK). The total value of the project was PLN 13.2 million. Within the project 124 contracts were concluded for which co-financing amounted to PLN 4.9 million. 48 draft of ROP OV 2007-2013 − Human Resources Development (HRD) Within the framework of the HRD component of Phare SEC 2002 the Voivodeship Labour Office carried out the project “Opole Programme for Staff Training”. The total value of the project was PLN 7.8 million and co-financing from Phare - PLN 5.9 million. Within the programme more than 150 trainings were organised with approximately 2,300 participants from which 282 people took a job. More than 50 new economic entities were established. PHARE SEC 2003 In 2003 works on how to use funds from Phare SEC 2003 began. The total value of the projects is PLN 13.3 million, including the aid from Phare – PLN 8.6 million. In the last edition of Phare SEC the following projects will be funded: - Infrastructure development (INFRA) Within the framework of the INFRA component of Phare SEC 2003 the project “Development of industry in Bierawa” has been carried out whose the beneficiary is the Bierawa Gmina. The total value of the project is PLN 12.4 million and co-financing from Phare – PLN 8.0 million. The aim of the project is to make it possible for entities in Bierawa to drain sewage. The project will allow for making 45 connections to existing economic entities situated in the gmina and in its vicinity, i.e.: Zakłady Azotowe, Blachownia, Rafamet, other chemical plants, and maintaining about 300 workplaces. In addition, the following facilities will be constructed: a petrol station, a car wash, a car showroom, a hotel and a car park as well as workshops creating approximately 100 new jobs. - Assistance for small and medium-sized enterprises (SMEs) Within the framework of the SME component the project: “Regional Programme for Support of MSEs” has been implemented, co-ordinated by Opolski Fundusz Poręczeń Kredytowych Sp. z.o.o. (ORFPK). The total value of the project is PLN 0.9 million and cofinancing from Phare – PLN 0.6 million. By July 2006, 7 credit guarantees were granted. In retrospect and as regards effects produced the aforementioned 3 editions of Phare SEC can be assessed very positively. The effect of infrastructure projects will be creation of approx. 650 new jobs and maintaining more than 1,100 of them in already operating plants in the areas covered by investments. The projects from the component of human resources, according to the data made available by beneficiaries so far, allowed for training and improving vocational qualifications of over 4,400 people (mainly persons permanently unemployed but working ones as well), among whom a large group found permanent employment which is the direct effect of the projects implemented. As a result of the component intended for the SME sector about 250 economic entities received the assistance which significantly enhanced their competitiveness in the local and regional markets as well as allowed for creating new jobs. The projects aimed at capitalisation of the Regionalny Fundusz Poręczeń Kredytowych (Regional Fund of Credit Guarantees) will allow for creating or maintaining approx. 200 workplaces. Large funds involved, for the first time to such a great extent, for the direct aid to the SME sector most important for the development of economy allowed for 49 draft of ROP OV 2007-2013 improving competitiveness of these enterprises and eliminating some unfavourable aspects of competition in the Single European Market. PHARE CBC – Cross-Border Co-operation Programme In the Opolskie Voivodeship the Cross-Border Programme covers two zones of poviats: those situated along the Czech border, i.e. nyski, prudnicki, głubczycki poviats and brzeski, opolski, krapkowicki, kędzierzyńsko-kozielski poviats and the Town of Opole with the poviat rights. Within the framework of Phare CBC in the Opolskie Voivodeship funds have been allocated to two projects related to the development of road infrastructure and to one project connected with the environmental protection whose total value was PLN 40.5 million, including the aid from Phare CBC - PLN 26.5 million: Phare CBC 2000 - Co-financing for the project “Construction of the ring road for the town of Prudnik on the national road No. 408 Kłodzko-Gliwice” submitted by the General Directorate for National Roads and Motorways – Branch in Opole. The total value of the project was PLN 9.7 million, including co-financing from Phare CBC – PLN 8.0 million. As a result of the project the ring road with the status of national road cat. G was constructed, the length of bypass 3.2 km. The investment was commissioned in September 2003. Phare CBC 2002 - Co-financing for the project “Extension of the bypass in Lubrza on the national road No. 40” submitted by the General Directorate for National Roads and Motorways – Branch in Opole. The total value of the Project was PLN 17.4 million, including cofinancing from Phare CBC – PLN 9.7 million. The length of the ring road constructed is 3.4 km. As a result of the project an access to the full freight border crossing PrudnikBartulovice has been facilitated. The investment was commissioned in July 2005. Phare CBC 2003 - In the Opole region the project “Forming a basis for the system of biodiversity and development of Dolina Złotego Potoku” submitted by the Prudnik Gmina. The total value of the project is PLN 13.4 million, including co-financing from Phare CBC – PLN 8.8 million. The aim of the project was to improve surface water of Dolina Złotego Potoku through reduction of sewage discharged directly into the cross-border river Złoty Potok, thanks to extension of infrastructure for sewage disposal in municipal and rural areas to the municipal sewage treatment plant in Prudnik. The tasks already accomplished (Phare CBC 2000, 2002) have improved first of all a transport system in borderland creating conditions for economic growth in these areas. Moreover, an indirect effect of the aforementioned projects is creation of approx. 70 jobs in workshops located in zones affected by them. 50 draft of ROP OV 2007-2013 ISPA/Cohesion Fund Instrument for Structural Policies for Pre-Accession (ISPA) is a programme created in order to assist ten candidate countries of Central and Eastern Europe in protection of the natural environment and transport in 2000–2006. A basic aim of the ISPA is to support candidate countries in social and economic cohesion through co-funding large investment projects in the environment and transport sectors. On the day Poland joined the European Union the ISPA ceased to operate and was replaced by the Cohesion Fund. Within the ISPA/Cohesion Fund in the Opolskie Voivodeship three large investment projects are in progress. They are related to protection of the natural environment and in total they amount to PLN 607.1 million, including aid from the ISPA/Cohesion Fund – PLN 405.5 million: ISPA 2000 - “Sewage treatment in Brzeg” submitted by the Brzeg Gmina. The total value of the project is PLN 115.5 million, including co-financing from the programme – PLN 68.6 million. The aim of the project is to protect drinking water for the towns of Brzeg, Wrocław and Oława, by providing villages with sewage systems in Brzeg, Oława, Olszanka, Lubsza, Skarbimierz and Lewin Brzeski gminas. The project affects directly more than 120 thousand inhabitants of the Opolskie and Dolnośląskie Voivodeships. ISPA 2001 - “Improvement of water quality in Opole” submitted by the Office of the Town of Opole. The major objective of the project is to protect resources of the underground water reservoir GZWP 333 Opole – Zawadzkie which is situated in the Opolskie and Śląskie Voivodeships. The total value of the project is PLN 249.2 million, including cofinancing from the programme – PLN 162.1 million. Seven gminas participate in the project: Chrząstowice, Dąbrowa, Komprachcice, Łubniany, Opole, Prószków and Tarnów Opolski, but the beneficiary is the Opole gmina. ISPA 2003 - The approval was granted to the application “Water supply and sewage treatment in Kędzierzyn-Koźle” submitted by Kędzierzyn-Koźle Gmina. The project will provide a comprehensive solution to current problems in the systems of water supply and sewage treatment. The total value of the project is PLN 167.4 million, including co-financing from the programme – PLN 113.2 million. The material effect of the project will be the construction of 96 km of sanitary sewage system, 76 km of rain water drainage system and 17.5 km of water supply system. In December 2005 the approval was given to the project „Sanitary Sewage Disposal from the Town of Nysa and villages in the Nysa Gmina” submitted by the Nysa Gmina. The project aims at construction of sewage systems in 22 solectwos and 4 districts of the town. In total 171 km of the sanitary sewage system and 38 intermediate pumping stations will be constructed. The total value of the project is PLN 75.0 million and co-financing from the cohesion fund amounts to PLN 61.6 million. Owing to the complexity and procedural problems the implementation of the aforesaid projects is behind the schedule. However, at the present stage it is possible to anticipate their effects (not only material ones). The most significant effect will be considerable relief to the natural environment as the projects are carried out in the biggest population centres in the Opole region (Opole and Kędzierzyn-Koźle are two largest towns in the region). Protection of 51 draft of ROP OV 2007-2013 the underground water reservoir GZWP 333 which covers a significant part of the Opole region is of vital importance to further development of the region since it constitutes the major source of drinking water, while protection of waters of the second largest river in Poland – the Odra River, will improve not only ecological safety but also tourist attractiveness of the region. SAPARD SAPARD Operational Programme has been prepared at the Ministry of Agriculture and Rural Development for the benefit of development of agriculture and of rural areas. SAPARD was launched at the beginning of July 2002 and the deadline for contracting was September 2004. The programme covered the following measures: − Measure 1. Improvement in processing and marketing of agricultural and fish products; − Measure 2. Investments in farms; − Measure 3. Development and improvement of rural areas infrastructure; − Measure 4. Diversification of economic activity in rural areas. Within the framework of SAPARD 430 contracts have been signed for which total value of co-financing was PLN 67.9 million. As a result of the programme village inhabitants were activated and encouraged to improve, in spite of current problems, technical resources of their farms what has become a safeguard of competitiveness in the Single European Market. In addition, these measures allowed for encouraging and supporting people who want to stay in the countryside, however, they want to work out of agriculture. Poland has the highest percentage of people employed in agriculture in the whole European Union. Only if this situation changes, thanks to the funds allocated to business diversification, the structure of employment will be updated. Tasks in the field of basic infrastructure in rural areas were effectively performed. As a result of the programme over 42 km of roads were modernised, over 154 km of the sanitary sewage system and 112 km of water supply system constructed. The programme covered about 6,500 households and enterprises. The experiences gained from SAPARD are now reflected in active participation of rural inhabitants in tasks co-financed from the Sectoral Operational Programme “Restructuring and Modernisation of the Food Sector and Rural Development for 20042006”. 1.2.3 Foreign assistance – structural funds Since 1 May, 2004 Poland has become a beneficiary of structural funds. The aid from structural funds in 2004-2006 can be obtained within the framework of six Operational Programmes and the Community Initiatives: EQUAL or INTERREG. The objective of structural funds is to support restructuring and modernisation of the EU countries economy. This is the way to increase the Community economic and social cohesion. The funds are directed to the economic sectors and regions which without financial assistance are not 52 draft of ROP OV 2007-2013 capable of achieving the average economic level in the EU. The structural policy and funds are to help governments and regional authorities of less developed regions in solving their most important economic problems. Integrated Regional Operational Programme 2004-2006 The Integrated Regional Operational Programme (IROP) aims at creating conditions for increased competitiveness of regions and at preventing marginalisation of some areas in a manner supporting economic development of Poland, its economic, social and territorial cohesion as well as integration with the European Union. The IROP sets out the objectives, directions and amounts of funds earmarked for pursuing the state regional policy to be used in 2004-2006, with the participation of two structural funds: the European Regional Development Fund and the European Social Fund. Almost 40% of finance from the Structural Funds earmarked for Poland for the period of 2004-2006 are allocated to the implementation of IROP. Funds allocated to the Opolskie Voivodeship within the IROP 2004-2006 amount to more than EUR 76.7 million which is 2.78% from all the funds available for the entire state. On average, it is EUR 73 per 1 head in the region. By the end of June 2006, within the IROP 2004-2006, in the Opolskie Voivodeship 998 applications for co-financing from the EU funding were filed and 297 have already been approved for implementation (some IROP measures are still under evaluation) with cofinancing in the amount PLN 307.0 million. By the end of June 2006 260 contracts were signed for co-financing in the amount of PLN 250.4 million. In terms of sums, the largest amounts of funds within the framework of the IROP in the Opolskie Voivodeship have been allocated to projects in road infrastructure. This sum constitutes approximately 31% of the total sum of co-financing for which the projects have been approved. Significant amounts have also been allocated to human resources development, among other things, to trainings and scholarships for pupils and students from the Opolskie Voivodeship. It will be possible to assess all the effects of IROP 2004-2006 when it is completed in 2008 and evaluated by the Managing Authority. However, taking into account the fact that substantial majority of funds has already been contracted, it is possible to state that, apart from the effect which is involvement of potential beneficiaries in a process of obtaining external funding (good augury for the future programming period), the programme has brought about positive economic and social effects. Sectoral Operational Programmes (SOP) In 2004-2006 six operational programmes have been implemented: − Sectoral Operational Programme “Increase in Competitiveness of Enterprises” (SOP ICE); − Sectoral Operational Programme “Human Resources Development” (SOP HRD); 53 draft of ROP OV 2007-2013 − Sectoral Operational Programme “Transport” (SOP T); − Sectoral Operational Programme “Restructuring and Modernisation of the Food Sector and Rural Development” (SOP RURAL); − Sectoral Operational Programme “Fisheries and Fish Processing”(SOP FISH); − Operational Programme “Technical Assistance” (OP TA). The last programme mentioned above, i.e. OP TA is intended only for the Managing Authority and the Paying Authority as the units co-ordinating tasks carried out by other units involved in implementing structural funds. By the end of June 2006 within the framework of the Sectoral Operational Programmes 1,541 projects were approved for implementation and total co-financing for them amounted to PLN 330.3 million (Tab. No. 1.16). Tab. No. 1.16. Projects from the Opolskie Voivodeship approved for implementation within particular Sectoral Operational Programmes. [in mln PLN] Sectoral Operational Programme Number of projects granted SOP “Increase in Competitiveness of Enterprises”* 158 75.6 SOP “Human Resources Development” 70 50.0 SOP “Transport” 1 43.6 1,308 159.3 SOP “Restructuring and Modernisation of the Food Sector and Rural Development” SOP “Fisheries and Fish Processing” Total 4 1,541 Co-financing 1.8 330.3 *co-financing amount: ERDF + state budget Source: Own study. The table above shows that the involvement of entities from the Opole region in accomplishing structural objectives in so many fields is really deep. It is possible to state that in particular activity of enterprises and rural inhabitants is intense which directly translates into improved competitiveness of companies from the Opole region as well as into mobilisation of farmers and diversifying their activities. Such a situation arises probably from the use of pre-accession programmes mentioned above which strengthened the conviction carried by many people and institutions that the accomplishment of the structural policy objectives brings about unquestionable positive effects at every level of social activities. At the same time it should be mentioned that the Opole region is one of the leaders in Poland as regards fulfilling tasks from so called “Village Renovation” programme. These activities require establishing of so called Local Action Groups involved in affairs of inhabitants of a particular village and related to development. 54 draft of ROP OV 2007-2013 Community initiatives Beneficiaries from the Opolskie Voivodeship have taken advantage of the following Community Initiatives which are an important element of the development policy coordinated by the European Commission: INTERREG IIIA Czech Republic - Poland Community Initiative Interreg IIIA Czech Republic-Poland supports mainly measures taken to improve conditions and standard of living on the borderline through joint undertakings performed by communities and institutions from Poland and Czech Republic. Within the framework of the Interreg IIIA Czech Republic-Poland initiative, by the end of June 2006 in total 96 projects for co-funding of PLN 19,8 million were accepted, including 63 projects within 2.2 measure – Support for local initiatives, Micro-Projects, which is implemented by Euroregions: − Small Projects Fund in the Euroregion “Pradziad” – 54 projects were approved for implementation for the amount of co-financing from the ERDF of PLN 2.1 million; − Micro-Projects Fund in the Euroregion “Silesia” – 9 projects were approved for implementation for the amount of co-financing from the ERDF of PLN 193.3 thousand. Preliminary ex-ante evaluation of the programme implementation so far is positive. First, an important element is co-operation necessary for implementing projects within the Initiative. Opportunities offered by the programme allowed for or even encouraged close cooperation between the Czech and Polish partners. It is a very significant element with a view to using the funds from the Territorial Co-operation Programme for 2007-2013 which will require implementing of joint Polish-Czech projects. Apart from infrastructural projects aimed at joint objectives of co-operation related to road traffic safety as well as access to tourist and cultural attractions, a number of projects non-investment in nature are implemented which promote co-operation between local institutions and communities, e.g. co-operation between universities, co-operation whose aim is to promote tourist attractions on both sides of the border, joint cultural and economic events. At the moment, due to the fact that in the majority of infrastructural projects their material implementation has just begun, it is not possible to estimate material effects of the tasks. INTERREG III C Community Initiative Interreg III C aids interregional co-operation with the European Union regions in exchanging of experiences, supporting and popularisation of the best practices. One of the projects carried out in the Opolskie Voivodeship is “PRAXIS. Making Rural Entrepreneurship work” where the Opolskie Voivodeship Self-Government is a partner. The aim of the project is to enhance a restructuring process of farms in the European regions with support for the development of new forms of economic activity in rural areas. PRAXIS enables partners to find “the best practice” thanks to the exchange of experiences of 55 draft of ROP OV 2007-2013 establishing effective partnerships whose objective is to promote and aid rural entrepreneurship. A leading partner in the project is the Essex County Council from the UK. There are 15 partners from different European regions taking part in the project. The project value is PLN 6.8 million, including PLN 379.2 thousand allocated to the Opolskie Voivodeship. EQUAL The EQUAL initiative aims at supporting measures to create more jobs and to ensure unrestricted access to them. As a result of the assessment of projects within EQUAL 2 projects were approved for implementation in the Opolskie Voivodeship of total value of PLN 5.0 million: - Project called ”Opolski e-rzemieślnik” (”Opole e-craftsman”) for the amount of cofinancing of PLN 4.7 million carried out by the Opole Centre for Local Democracy, designed to adapt firms and employees to economic changes and the use of IT technologies. - Project “Partnership for professionalisation of the 3rd sector”, whose value of cofinancing is PLN 303.4 thousand, implemented in the Opolskie Voivodeship jointly by the Opole Centre for Local Democracy and Namysłowskie Stowarzyszenie Inicjatyw Gospodarczych (Association of Economic Initiatives in Namysłów), and aimed at nongovernmental organisations operating in the Opolskie and Śląskie Voivodeships. The aim of the project is, among other things, to develop a model of joint activities of organisations, to prepare to promotion and implementation of initiatives based on cooperation between organisations and partners from two other sectors of economy, undertaken at the local level. Taking into consideration negative phenomena in the labour market, the initiatives designed to support job creation, in particular intended for direct participants of economic changes, affect highly positively the regional labour market. The fact that the project has covered a large group of people (over 100) from the whole voivodeship as well as implementation of innovative solutions (in ICT) indicate that actions undertaken are consistent and comprehensive, and at the same time they follow the regional development policy. 1.2.4 Rural Development Programme - (RDP) The Rural Development Programme (RDP) was financed from the loan from the World Bank, on the basis of loan agreement between the Republic of Poland and the International Bank for Reconstruction and Development concluded in 2000. The RDP included three components: − COMPONENT A - Micro-credits (establishing micro-enterprises); − COMPONENT B – Mobilisation of human resources; − Subcomponent B1 – Labour force retraining; Subcomponent B2 - Education; COMPONENT C – Rural infrastructure. 56 draft of ROP OV 2007-2013 The Opolskie Voivodeship received funds for Component C and Subcomponent B2. The major aims of the programme include raising the employment outside agriculture in rural areas and as a consequence limiting the number of unemployed people. The Rural Development Programme was implemented in 2000-2005, 110 projects were completed for the total amount of co-financing of PLN 16 million, including PLN 5.5 million from the RDP. RDP COMPONENT C – Rural infrastructure Funding was allocated to 15 projects related to road infrastructure (modernisation and construction of gmina and poviat roads, bridges, streets, bicycle paths) as well as to sewage and water supply infrastructure of total value of PLN 8.2 million, including PLN 2.5 million from the RDP. Tasks from the RDP COMPONENT C were completed in 2004. The programme resulted in the construction of 21.8 km of the sewage system, 5.1 km of the water supply system and 5.3 km of roads and two bridges. RDP SUBCOMPONENT B 2 - Education Funds allocated to the Opolskie Voivodeship within the framework of this subcomponent were used, among other things, to refurbishment of village schools, in particular preschool facilities for six-year-old children, including purchasing the equipment for them, as well as to consolidation of school networks (redecoration and equipping of common rooms, etc). In addition the training programme “Building institutional potential of local and regional administration” designed for self-government workers was carried out. By the end of March 2005 when implementation of the subcomponent B2 finished, gminas had accomplished 143 tasks connected with 95 schools in rural areas whose total value was PLN 7.8 million, including more than PLN 3.0 million of co-financing. The programme resulted in renovation of 76 schools, refurbishment of 16 common rooms, supply of equipment to 27 preschool units for six-year-old children as well as provision of furniture, equipment and teaching aids to 24 common rooms. RDP covered also areas which needed the aid most, i.e. rural areas where, although the situation had been improving, significant intraregional differences existed. 1.2.5. Summary The chapter describes particular programmes and the descriptions are accompanied by brief assessment of their effects. Due to the fact that a number of projects within the framework of structural and even pre-accession funds are still in progress (subsequent editions of Phare SEC, PHARE CBC, ISPA), it is not possible to finally sum up their effects. Although at present stage no detailed data about material effects and direct results of the projects already completed or the projects still in progress are available, it is possible to try to summarise in general a process of obtaining external funding (in particular EU structural funds) by entities from the Opolskie Voivodeship. However, the effects produced as a result of 4,000 tasks aimed at the aid for SMEs, human resources and infrastructure at the regional and local levels clearly indicate that the funds allocated to the development of the region can be evaluated positively not only as regards the full use of them, although it is an important but secondary issue. 57 draft of ROP OV 2007-2013 The most significant effects of the measures taken include the observable influence on a better quality of life of inhabitants and first of all direct and indirect support for business activity run in the region. It can be said that an aspect of economic growth was emphasised in most programmes and social measures (aimed at e.g. health care or cultural and educational activities) were designed to improve standard of living and growth of the region’s population necessary for greater mobilisation of the inhabitants in the labour market. Investment processes were efficiently completed by activities aimed at development of human resources (among other things, mobilisation programmes for the unemployed and people at risk of unemployment), building enterprising attitudes (funds to encourage starting business) or finally direct support for enterprises which, as a result, will become competitive and open to market changes. Total co-funding for the Opolskie Voivodeship within programmes implemented in 1999-2006 was PLN 1,830.2 million, which means the assistance in the amount of PLN 1,747 per 1 inhabitant of the region. Tab. No. 1.17. Summary of programmes implemented in 1999-2006. [in mln PLN] NUMBER OF PROJECTS STATE AID AND EARMARKED FUNDS PROGRAMME Contract for the Opolskie Voivodeship 2001-2003, 2004, 2005-2006 Regional Fund for Environmental Protection and Water Management 1999-2005 Fund for Development of Physical Culture – Programme for Development of Sports facilities 1999-2006 100 million Programme – Development and improvement of technical infrastructure in rural areas 1999-2000 Regional Agricultural Land Protection Fund 2000-2006 TOTAL STATE AID AND APPROPRIATED FUNDS CO-FINANCING 273 87.4 908 395.7 94 70.9 32 5.1 203 1510 34.5 593.6 PRE-ACCESSION FUNDS PHARE 2000-2003 ISPA 2000-2005/ Cohesion Fund SAPARD 2002-2004 TOTAL PRE-ACCESSION FUNDS 13 4 430 447 95.6 405.5 67.9 569.0 297 1,541 307.0 330.3 98 24.8 1,936 662.1 STRUCTURAL FUNDS Integrated Regional Operational Programme 2004-2006 Sectoral Operational Programmes 2004-2006 Community Initiatives 2004-2006: Interreg III A Czech Republic-Poland, Equal TOTAL STRUCTURAL FUNDS OTHER Rural Development Programme 2000-2005 TOTAL 110 4,003 5.5 1830.2 on 30 June, 2006.(data about the Regional Fund for Environmental Protection and Water Management cover 1999-2005) 58 draft of ROP OV 2007-2013 Source: Own study. The aid from national and foreign programmes43 related, among other things, to the following fields: − roads, − water, sewage system, waste, − human resources, − health, welfare, − education, − culture, tourism, sport, − entrepreneurship, innovations, − information society. 43 Breakdown covers the following programmes: ISPA/ Cohesion Fund 2000-2005, PHARE 2000-2003, Fund for Development of Physical Culture – Programme for Development of Sports Facilities 1999-2006, 100 million Programme 1999-2004, Regional Agricultural Land Protection Fund 2000-2006, Rural Development Programme 2000-2005, Contract for the Opolskie Voivodeship 2001-2003, 2004, 2005-2006, IROP 2004-2006, Sectoral Operational Programme Increase in Competitiveness of Enterprises 2004-2006, Sectoral Operational Programme Human Resources Development 2004-2006, SOP T 2004-2006. 59 draft of ROP OV 2007-2013 Ryc. 1. 27. Kwota dofinansowania projektów wdraŜnych w latach 1999-2006 w podziale na obszary. Ryc. 1.26. Ilość projektów wdraŜanych w latach 1999-2006 w podziale na obszary. 38 130,4 237 131,0 11,5 209,8 96 253 60,6 139 37,0 76,4 524,2 74 208 210 DROGI WODA, KANALIZACJA, ODPADY ZASOBY LUDZKIE ZDROWIE, POMOC SPOŁECZNA EDUKACJA KULTURA, TURYSTYKA, SPORT PRZEDSIĘBIORCZOŚĆ, INNOWACJE SPOŁECZEŃSTWO INFORMACYJNE ∑= 1,255 projects Source: Own study. DROGI WODA, KANALIZACJA, ODPADY ZASOBY LUDZKIE ZDROWIE, POMOC SPOŁECZNA EDUKACJA KULTURA, TURYSTYKA, SPORT PRZEDSIĘBIORCZOŚĆ, INNOWACJE SPOŁECZEŃSTWO INFORMACYJNE ∑= PLN 1 180,7 mln Source: Own study. As regards the number of projects granted, the greatest number was approved in: entrepreneurship, innovations, roads and education. As regards the sums concerned, the greatest sums were allocated to: water, sewage systems, waste and roads. The breakdown above shows that there are considerable and difficult to fully satisfy needs in technical infrastructure, in particular in sewage disposal and treatment, waste management, construction of roads. Hence, it is necessary to further co-finance these fields. As regards the number of projects implemented, it is noticeable that the funds required are the ones directly related to the development of entrepreneurship which have the greatest effect on the enhancement of competitiveness of the Opole region economy. Taking into consideration the scale and range of tasks (in particular investment ones) performed within the framework of programmes available so far, it is possible to state that external funds constitute and will constitute a powerful and indispensable – having in mind the scale of socio-economic problems – stimulus to the social and economic growth of the Opole region. The interest of the entities from the region was generally greater than the funds available which is evident from the data about the number and value of projects submitted within by and large all the programmes. The experience of implementing structural funds for 2000-2006 will allow for establishing efficient – and what is the most important, friendly for beneficiaries and staff of these institutions – standards, rules and procedures applicable in the next programming period, i.e. 2007-2013. Moreover, it should be highlighted that large projects have had a significant impact and a role of co-operation between different entities in implementation of projects has been increasing. A fine example of such co-operation in the phase of preparing and completing an investment is a regional project in the field of information society (e-Office for the Opole region inhabitant) which is carried out within the framework of the IROP on the basis of the 60 draft of ROP OV 2007-2013 partnership between over 50 self-governments from the Opolskie Voivodeship. Other examples of such co-operation are projects in environmental protection carried out by special associations of self-governmental units (in particular within ISPA). Experiences so far show that such projects of at least supralocal importance or integrating many entities should become a major objective of the European Regional Fund intervention within the ROP OV 20072013. Such trends are noticeable first of all in the measures related to transport, environmental protection, culture or information society. It is also worth mentioning that beneficiaries from the Opole region are genuinely interested in obtaining funds for the development of entrepreneurship and the R&D sector, both at the national and regional levels. It seems that a more and more innovative approach to running business activity should be particularly supported as such entities will determine potential and market competitiveness of our economy. The priority axes indicated in ROP OV 2007-2013 to a significant extent directly or indirectly aid the development of enterprise attitudes, in particular with investment subsidies for enterprises, business support organisations and assistance for research and development. Large amounts of money should be allocated to development of the information society as disproportions within the EU in this respect may lead to further marginalisation of „new” member states. Other fields which should receive special attention in 2007-2013 include the development of transport and the improvement of the natural environment as these elements determine a level of the region’s attractiveness, in particular as a place for investing and working. Moreover, on the basis of present experiences it is noticeable that consistent activities aimed at reviatlisation of degraded areas need support. In the next programming period the assistance should be given to these elements of regional infrastructure of health care and culture which will directly affect a quality of life of the inhabitants and the possibility of using well-developed and modern education. 1.3 SWOT analysis The SWOT analysis, in a condensed and clear manner, presents results of the diagnosis of the socio-economic situation as well as of the analysis and evaluation of the use of the state aid and foreign assistance in 1999-2006. It constitutes a specific summary of information and conclusions contained in the chapters above, indicating the most significant problems and trump cards of the region. This is a breakdown of strengths and weaknesses which determine development potential of the region as well as opportunities and threats to further development of the Opolskie Voivodeship. The SWOT analysis was prepared with the use of the expert method and based on the similar document drawn up for the purposes of the Opolskie Voivodeship Development Strategy updated in 2005. In the course of works it was completed with current information and results of the survey of the region’s experiences in using available aid programmes. The strategic balance of the region is based on assumptions arising from a critical evaluation of the initial situation of the region, on the other hand it is a starting point for specifying a mission, a vision and objectives of the region’s development. The classification of factors in four problem groups has allowed for identifying key issues which determine the strategy and directions of the Opole region development in the future. The problem groups in the strategic balance include: 61 draft of ROP OV 2007-2013 I. Conditions of macroeconomic situation and innovativeness, II. Human resources and social issues, III. Infrastructure, spatial and environmental aspects, IV. Development of rural areas, agriculture. The factors have been selected so as to outline the situation of the region to a largest extent as well as to indicate problems and areas which may be supported by the Programme and to ensure that subsidiary and complementarity principles are applied in particular objectives and areas. The analysis, however, is more comprehensive and includes also the issues which will not be directly addressed by the Programme, but it was necessary to indicate them in order to form a complete picture of the region and the background to the body of the programme. Strengths and weaknesses as well as opportunities and threats were identified first of all on the basis of the analysis of phenomena in time (phenomena taking place now, predicted in future and references to phenomena which may occur) as well as in external and internal aspects (conditions dependent on the region and those arising from general economic phenomena). Strengths and weaknesses refer to the internal and current situation of the region. Opportunities and threats cover internal and external conditions in which the voivodeship operates and relate to future phenomena. Development factors in each problem group have been hierarchised so as to make it clear and easy to understand which issues are of key importance to the implementation of the Opolskie Voivodeship Development Strategy and which directions for development are the most significant. I. Conditions of macroeconomic situation and innovativeness: 62 draft of ROP OV 2007-2013 STRENGTHS 1. 2. diversified structure of industry; highly competitive plants from food industry and cement and lime sector; modern and developed furniture and woodworking industries based on long tradition; high innovativeness of medium-sized and large enterprises; Poland’s highest provision of technical equipment in the workplace (gross value of fixed assets per capita); high level of disposable income and consumption per person in comparison to the national average; advanced restructuring processes of large enterprises; increased interest in the use of assistance funds, including structural funds. 3. 4. 5. 6. 7. 8. WEAKNESSES 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. OPPORTUNITIES 1. 2. 3. 4. 5. 6. 7. 8. transfers of: income, knowledge and technologies from the job-related migration; increase in significance of the SME sector; development of information society; increase in the importance of tourism; potential of food, construction materials, chemicals, power, metal products, engineering and electrical engineering sectors; potential development of the Opole conurbation; increasing competitiveness of the Polish economy; re-emigration. relatively low pace of economic growth in comparison with Poland; very low level of expenditure on research and development (R&D); low potential of the high-tech sector; underdeveloped business support organisations to aid economic growth; shortage of significant investments; low level of entrepreneurship; underdeveloped sector of services; the lowest in Poland employment level in relation to a group of active people; high unemployment rate; insufficiently developed metropolitan functions of the Opole conurbation; developmental disproportions between particular parts of the region; low competitiveness of the scientific and research offer, low integration and shortage of forms of co-operation (partnerships) at the subregional level; funds used to a small extent by economic entities. THREATS 1. competitive position of the neighbouring voivodeships in attracting investments; 2. little interest in the region among external investors; 3. underinvested R&D; 4. steady trend for declining employment in R&D; 5. continuous high unemployment level. II. Human resources and social issues: 63 draft of ROP OV 2007-2013 STRENGTHS 1. 2. 3. 4. 5. 6. 7. 8. strong sense of regional identity and traditions of frugality; developing higher education; people’s territorial mobility; multiculturalism and diversity of experience; high level of activity of local cultural environments; well-developed international co-operation of self-governments; high level of public safety; experience, skills and qualifications gained in foreign labour markets. WEAKNESSES 1. 2. 3. 4. 5. 6. 7. 8. 9. continuous considerable exodus of population to other countries; shortage of staff and specialists significant for development of the region in sectors; no attractive and competitive tourist products; the lowest in Poland scholarisation rate; disproportions in living conditions in the population; unsatisfactory level of social infrastructure; insufficient infrastructure for the development of continuous learning; bad state of monuments and limited access to them; negative effect of labour migration on family ties and local communities. OPPORTUNITIES 1. 2. 3. 4. 5. growing educational aspirations of the voivodeship’s inhabitants; development and increase in significance of educational, health, cultural, sports and recreational services; improving quality of life of population; development of civil society; co-operation and contacts with other countries and the possibility of using European experiences. THREATS 1. 2. 3. 4. 5. further intensification of job-related migration and its transformation into permanent migration; exodus of highly qualified staff from the region; continuing low level of education among inhabitants; decreasing population of the region; intensification of the phenomenon of social exclusion. III. Infrastructure, spatial and environmental aspects: STRENGTHS 1. 2. 3. 4. 5. 6. location in the Third Pan-European Corridor and conditions for establishing logistic centres; dense network of road and railway connections; inanimate nature site “Trias” in Krasiejów, unique on a European scale; rich mineral deposits, underground waters; settlement system evenly developed in the region; network of educational establishments adequate to the needs. WEAKNESSES 1. 2. 3. 4. 5. 6. insufficient transport system between developmental areas and the A4 motorway; insufficient number of ring-roads around towns and villages on transit roads; no regional airport; poorly developed telecommunications and IT infrastructure which limits the access to broadband Internet; insufficient infrastructure for tourist purposes; low level of utilisation of renewable 64 draft of ROP OV 2007-2013 energy sources; continuous pollution of surface waters and deteriorating quality of underground waters; 8. insufficient flood protection; 9. lack of common and fully operating system for utilising municipal waste; 10. bothersome low emission; 11. degraded areas which need major revitalisation activities. 7. OPPORTUNITIES 1. 2. 3. 4. THREATS utilisation of the potential of the A-4 1. motorway infrastructure; opening a regional civil airport; 2. complete implementation of the “Programme for Odra 2006” and utilisation 3. of developmental potential of the Odra River basin; border with Czech Republic. 4. 5. location of investments and place of residence outside the Opole region; inadequate preparation of land for investment purposes; delays in completion of investments important for the regional development whose significance is supraregional (e.g. construction of the water reservoir “Racibórz”); further decapitalisation of transport infrastructure; growing decapitalisation of flats, in particular in degraded areas. IV. Development of rural areas: STRENGTHS 1. 2. 3. 4. 5. 6. high percentage of modern farms with a big production potential; high standard of public space and housing resources; large resources of biomass; high degree of social self-organisation at the local level, numerous leaders and the operation of the programme, groups and associations devoted to rural renovation; experience arising from performing tasks in so called “Village Renovation”; biodiversity as well as attractive and locally diversified natural, cultural and landscape resources, favourable to business development of tourism, recreation and sightseeing. OPPORTUNITIES WEAKNESSES 1. 2. 3. 4. 5. poorly developed services, crafts and production in areas of predominantly agricultural significance; no land development plans in the majority of rural gminas; insufficient access to recreational, leisure and cultural infrastructure; unevenly distributed technical infrastructure; numerous abandoned houses/farms with unspecified ownership status as well as numerous uninhabited homes and devastated outbuildings. THREATS 65 draft of ROP OV 2007-2013 1. 2. 3. 4. 5. increased attractiveness of rural areas for 1. living, spending leisure time and recreation; use of biomass as a potential source of 2. renewable energy; increased demand for agricultural and food 3. products in neighbouring regions; increased demand for regional products, craft and food produced using environment-friendly methods; popularisation of the LEADER approach as well as rural renovation programmes and an increase in the extent to which those activities are financed with structural funds. high competitive position of the neighbouring voivodeships in agricultural and food processing; poor progress in development of agricultural and food processing; spatial disproportions in development of entrepreneurship. 66 draft of ROP OV 2007-2013 CHAPTER 2 STRATEGY FOR IMPLEMENTING OPERATIONAL PROGRAMME OF VOIVODESHIP FOR 2007-2013 THE THE REGIONAL OPOLSKIE The chapter presents justification for priority axes selected for implementation within the framework of the IROP OV RPO WO 2007-2013 and their relations to regional, national and Community strategic documents indicating directions of policies and activities in 2007201344. The fulfilment of the objectives of the EU cohesion policy at the Community, national and regional levels is co-ordinated with regard for the principle which requires making decisions on the basis on strategic documents prepared at these three levels (Fig. 2.1). At the Community level general guidelines for implementing the EU cohesion policy in 2007-2013 set out in the Cohesion Policy in support of Growth and Jobs - Community Strategic Guidelines 2007-201345. The Community guidelines at the national level are laid down in the National Strategic Reference Framework 2007-2013 (NSRF 2007-2013) which as a strategic document gives guidelines for the national development strategy and provides a framework for developing national and regional operational programmes. Operational programmes prepared on the basis of the NSRF 2007-2013 indicate priority areas to be supported in 2007-2013 which will allow for accomplishing the objectives set out in strategic documents applicable to this programming period. At the regional level the operational programme developed also has to be consistent with the development policy directions given in the basic document for planning development of the voivodeship which is the regional development strategy. To rationalise the management of cohesion policy, interventions within structural funds aim at taking measures with the use of only single fund allocated to a particular programme. Hence, the ROP OV for 2007-2013 as regards European funding will be cofunded only from the European Regional Development Fund46. 44 Council Regulation (EC) No. 1083/2006 (Official Journal 210 of 31.7.2006, p. 25), art. 37 and Regulation (EC) No. 1080/2006 (Official Journal 210 of 31.7.2006, p.1) , art. 12 45 Official Journal 291 of 21.10.2006 46 Council Regulation (EC) No. 1083/2006 (Official Journal 210 of 31.7.2006, p. 25) 67 draft of ROP OV 2007-2013 Fig. 2.1 Relations between documents at the EU, national and regional levels CSG NSRF ROP OV OVDS REGION POLAND UE CSG: NSRF: ROP OV: OVDS: Community Strategic Guidelines 2007-2013 National Strategic Reference Framework 2007-2013 Regional Operational Programme of the Opolskie Voivodeship for 2007-2013 Opolskie Voivodeship Development Strategy Source: Own study. 2.1 Opolskie Voivodeship Development Strategy The Opolskie Voivodeship Development Strategy adopted with the resolution of the Sejmik of the Opolskie Voivodeship (Sejmik - voivodeship assembly) No. XXXIX/350/2005 of 11 October, 2005 is a response of the Voivodeship Self-Government to a changing social and economic situation in Poland and conditions for development of the Opolskie Voivodeship. It is a basis for implementing the regional policy in the Opolskie Voivodeship until 2020 and top priorities include enhancing competitiveness of the voivodeship and making a level of the social and economic growth equal throughout the region. The diagnosis and strategic balance of the Opolskie Voivodeship provided a basis for specifying a vision, a mission of the region development and for setting strategic objectives and priorities: VISION OF THE OPOLSKIE VOIVODESHIP: A multicultural region, open to the world, friendly to its residents, with a competitive economy, participating in international co-operation and having a well-educated and active population. MISSION OF THE OPOLSKIE VOIVODESHIP: To take and support measures which will ensure dynamic and sustainable development, competitiveness, socio-economic and territorial cohesion of the region, while preserving the identity, specific nature of the cultural heritage and natural assets of Opole Silesia. 68 draft of ROP OV 2007-2013 STRATEGIC OBJECTIVES of the “Opolskie Voivodeship Development Strategy”: I. Innovative region with a well-educated and active population II. Providing favourable living conditions in the region III. Extension and modernisation of the regional infrastructure IV. Economic stimulation of the region in accordance with the principle of sustainable development V. Development of metropolitan functions of the Opole conurbation VI. Multi-purpose, diversified rural areas attractive for investing and living VII. Development of multicultural identity and international and national regional cooperation PRIORITIES of the “Opolskie Voivodeship Development Strategy”: I. To enhance competitiveness of the Opole Voivodeship II. To make a level of the social and economic development equal throughout the region 2.2 Regional Operational Programme of the Opolskie Voivodeship for 2007-2013 The ROP OV for 2007-2013 specifies directions for development along with a consistent breakdown of priorities to be accomplished with the use of the ERDF. As one of the tools for implementing the Opolskie Voivodeship Development Strategy it includes objectives set in the Strategy which on the basis of the diagnosis and the analysis of the socioeconomic situation in the voivodeship were found to be the most important for achieving in 2007-2013 and which may be supported from the funds in the fields defined in the Council Regulation (EC) No. 1083/2006 and the Regulation (EC) of the European Parliament and of the Council No. 1080/2006. 2.2.1 General objective and specific objectives of ROP OV 2007-2013 Within the Convergence objective the European Regional Development Fund concentrates its aid on the support for sustainable, integrated economic growth and employment at the regional and local levels through mobilisation and strengthening of endogenic capabilities within the framework of operational programmes whose aim is to modernise and diversify economic structures as well as to create and protect permanent workplaces.47 Having in mind the ERDF objective above as well as socio-economic conditions of the Opolskie Voivodeship, including results of the SWOT analysis, the following general objective of ROP OV 2007-2013 was formulated: GENERAL OBJECTIVE OF ROP OV 2007-2013: 47 Regulation (EC) No. 1080/2006 (Official Journal 210 of 31.7.2006, p.1), art. 4 69 draft of ROP OV 2007-2013 To enhance competitiveness and ensure social, economic and spatial cohesion to strengthen attractiveness of the Opolskie Voivodeship as a place for investing, working and living. In order to attain the general objective 7 strategic objectives were defined which are to stimulate the economic potential, improve attractiveness and competitiveness of the Opolskie Voivodeship as well as to raise employment: STRATEGIC OBJECTIVES OF ROP OV 2007-2013 C1. Strengthening the region’s economy through development of entrepreneurship, R&D sector as well as tourist and recreational infrastructure to the benefit of socio-economic growth. C2. Creating technical conditions for common use of ICTs and their popularisation to build the information society in the Opolskie Voivodeship. C3. Enhancement of prospects for development of the region and mobility of its population through development of transport infrastructure. C4. Improvement of the natural environment and environmental protection as well as ensuring safe flood prevention. C5. Strengthening the role of education, increasing significance of culture to enhance attractiveness of the region and raising a level of health safety to ensure efficiency of the regional human resources. C6. Preventing social, economic and spatial marginalisation of selected degraded areas and intended for revitalisation. C7. Ensuring effective and efficient systems of management, implementation, monitoring, evaluation and control of ROP OV RPO WO 2007-2013 and full absorption of structural funds allocated in 2007-2013. System measures aimed at achieving the objectives of ROP OV 2007-2013 are specified in 7 corresponding priority axes of the Programme (Fig. 2.2). The accomplishment of the objectives set in ROP OV 2007-2013 is to affect the development of the entire Opolskie Voivodeship, hence no areas in the region, including rural ones, will be discriminated. At the same time the scope of support for these areas will be consistent with the scope of ERDF intervention as well as actions taken for rural areas will be complementary to undertakings within other initiatives and operational programmes for 20072013. 70 draft of ROP OV 2007-2013 Fig. 2.2 Consistency between strategic objectives and priority axes of ROP OV 20072013. GENERAL OBJECTIVE To enhance competitiveness and ensure social, economic and spatial cohesion to strengthen attractiveness of the Opolskie Voivodeship as a place for investing, working and living. C1. Strengthening the region’s economy through development of entrepreneurship, R&D sector as well as tourist and recreational infrastructure to the benefit of socio-economic growth PRIORITY AXIS 1 Strengthening economic attractiveness of the region C2. Creating technical conditions for common use of ICTs and their popularisation to build the information society in the Opolskie Voivodeship PRIORITY AXIS 2 Information society C3. Enhancement of prospects for development of the region and mobility of its population through development of transport infrastructure PRIORITY AXIS 3 Transport C4. Improvement of the natural environment and environmental protection as well as ensuring safe flood prevention PRIORITY AXIS 4 Environmental protection C5. Strengthening the role of education, increasing significance of culture to enhance attractiveness of the region and raising a level of health safety to ensure efficiency of the regional human resources PRIORITY AXIS 5 Social infrastructure and higher education C6. Preventing social, economic and spatial marginalisation of selected degraded areas and intended for revitalisation PRIORITY AXIS 6 Mobilisation of municipal and degraded areas C7. Ensuring effective and efficient systems of management, implementation, monitoring, evaluation and control of ROP OV 2007-2013 and full absorption of structural funds allocated in 20072013 PRIORITY AXIS 7 Technical assistance Source: Own study. 71 draft of ROP OV 2007-2013 2.2.2 Justification for selecting objectives and priority axes of ROP OV 2007-2013 Identification of strengths and weaknesses as well as of opportunities and threats for development of the Opolskie Voivodeship specified in the region’s strategic balance was a major factor determining objectives and priority axes of ROP OV 2007-2013. The Opolskie Voivodeship is diverse as regards a number of physical and geographical as well as social and economic features. It has numerous assets which offer good development prospects. A favourable geographical location (neighbourhood with Czech Republic, proximity of such centres as Prague, Berlin), a medium-sized municipal conurbation, a convenient transport system (A4 motorway – which is a part of the PanEuropean transport corridor from France to Ukraine), functional diversity of the region, potential for development of the Odra basin or developing higher education are only some of significant factors which have to be utilised in the process of enhancing competitiveness of the region and increasing the pace of economic growth. At the moment a serious difficulty in reducing unemployment and stimulating economic growth in the Opolskie Voivodeship is insufficient support for human resources development and economic potential of the region. The Opolskie Voivodeship is the smallest region in Poland in terms of area and one of the smallest in terms of human potential. In comparison with Poland it stands out with a high, negative migration balance, in most cases due to job-related migration, mainly to Germany, and a negative birth rate which, according to demographic forecasts for the nearest 30 years, will maintain. Small and decreasing demographic potential of the Opolskie Voivodeship is a significant barrier to its development. In addition, the Opolskie Voivodeship as a region from so called socio-cultural borderline, is the area with considerable population diversity. Multicultural aspects and diversified human resources become of particular importance in the situation of stimulating economic relations with the European Community. Characteristic for the region deep relations of native inhabitants with German people contribute mainly to maintaining family ties and contacts, to developing institutional and partner co-operation between gminas, poviats and the voivodeship. Positive aspects of labour migration include adopting European models and better organisation of work, import of new technologies. However, continuing well established strong migration trends, including job-related migration, pose a threat to the regional labour market due to drainage of qualified staff, depopulation of villages and gminas as well as irregularities in family functioning, weaker family ties which result in a greater number of single-parent families and a smaller number of births. An adverse effect of migration leads also to greater disproportions in socio-economic development and, in broad sense, in living conditions of people of different origins. The differences which appear in spatial, social and economic systems are a serious barrier to development of the Opolskie Voivodeship. Taking into account the aforementioned regional conditions, the general objective of ROP OV 2007-2013 is to enhance competitiveness and ensure social, economic and spatial cohesion to strengthen the attractiveness of the Opolskie Voivodeship as a place for investing, working and living. The Opolskie Voivodeship is characterised by relatively slow economic growth and a small number of significant investments which could be a driving force for economic growth, therefore it is necessary to strengthen the region’s economy through development of entrepreneurship, R&D sector as well as tourist and recreational infrastructure. At the moment weak business support organisations as well as a small number of active and powerful institutions to support economic growth, in particular those operating on the basis of 72 draft of ROP OV 2007-2013 innovative solutions, constitute a barrier to development of entrepreneurship. Low dynamics of economic growth in the Opolskie Voivodeship arises from the underdeveloped, weak service sector, in particular tourism, commerce and modern production which create a high added value. As a result in the Opolskie Voivodeship there is a shortage of significant investments. A problem in the Opolskie Voivodeship is also development of innovative economy. Among conditions of macroeconomic situation and innovativeness the most significant weaknesses of the Opolskie Voivodeship there are: very low expenditure on research and development, weak centres of innovation, insufficiently utilised tourist potential of the region. The unsatisfactory situation of the Opolskie Voivodeship in the aforesaid fields will be eliminated through Priority Axis 1 Strengthening economic attractiveness of the region which entirely follows guidelines of the renewed Lisbon Strategy. A weakness of the Opolskie Voivodeship is insufficient use of ICTs, including poor telecommunications and IT infrastructure which restricts access to modern information and communications technologies. In the face of challenges posed by the renewed Lisbon Strategy and taking into account the EU strategy for sustainable development adopted at the Göteborg summit by the European Council, a priority for the Opolskie Voivodeship and an opportunity for its development is to create technical conditions for common use of ICTs and their popularisation to build the information society in the region. Due to the fact that investments in ICTs constitute one of the most important factors of growth and productivity as well as a fundamental element of increasing competitiveness and development of the region, common use of ICTs will be promoted and at the same time the support will be provided to measures aimed at ensuring and increasing availability of these technologies. Actions taken in this field are to contribute to eliminating social differences, narrowing a digital gap and supporting territorial and social cohesion. Development of the information society through development of e-services information modules to enhance competitiveness of the voivodeship and establishing proper infrastructural facilities for ICTs will take place within Priority Axis 2 Information Society. The SWOT analysis shows that it is also necessary to make technical infrastructure more dynamic and to take advantage of a convenient location of the region and its demographic and social potential to a greater extent. A good competitive position of the neighbouring voivodeships as regards attractiveness combined with an unsatisfactory interest in the Opolskie Voivodeship by external investors sets up a serious barrier to development of the region. Such a situation arises, among other things, from a low quality of transport infrastructure in the Opolskie Voivodeship where, in spite of a high level of industrialisation, a well-developed transport network, civilisation gaps are not narrowed to a satisfactory extent and economic weaknesses are not eliminated. Hence, a special attention will be paid to improving accessibility of the areas important to development of the Opolskie Voivodeship (mainly areas for investments, municipal centres) to the A-4 motorway. For these reasons a strategic objective for the Opolskie Voivodeship is to enhance prospects for development of the region and mobility of its population through development of transport infrastructure. This objective will be fulfilled through implementing Priority Axis 3 Transport. The activities carried out within this Priority Axe will be aimed at increasing transport accessibility of the region, improving safety of road users and extending the system of public transport. Improvement of the natural environment and environmental protection as well as ensuring safe flood prevention are to contribute to enhancement of the Opolskie Voivodeship competitiveness and synergy between environmental protection and economic growth in the region. Modern, up to European standards technical infrastructure is one of vital elements of the region’s competitiveness which determines further possibilities of its 73 draft of ROP OV 2007-2013 socio-economic growth. The utilities available translate directly also into a standard of living as well as a value of regional economy and investment potential of the Opolskie Voivodeship. The tasks to be funded within Priority Axis 4 Environmental protection will be aimed at improving the environment quality through modernisation of water and sewage management, improving waste management. Air protection will cover actions designed to reduce emission of gases and dust to the air and air monitoring. In addition, following the Community policy directions for 2007-2013, the tasks performed within axis 4 are to increase the use of renewable energy sources as well as stimulate actions aimed at preserving biological diversity and unique in Poland natural and landscape assets of the Opolskie Voivodeship. Due to the fact that in the Opolskie Voivodeship there is a real risk of flood, the funds will be also allocated to development of flood prevention infrastructure, in particular in the Odra River basin. Unsatisfactory quality of infrastructure has an adverse effect on creating favourable conditions for living in the Opolskie Voivodeship as a place friendly to its inhabitants. Moreover, it does not satisfy basic requirements of the Opolskie Voivodeship population related to work, health services and educational needs. It is important that living conditions in the Opolskie Voivodeship, in particular related to educational and cultural needs, encourage also external investors to locate their businesses in the region. Thus within Priority Axis 5 Social infrastructure and higher education the aim will be to increase attractiveness of the region for living and development of inhabitants through strengthening the role of education, increasing significance of culture and raising a level of health safety. Problematic areas are a sign of disproportions in development, therefore it is necessary to identify and limit them to pursue the regional policy. In the Opolskie Voivodeship to prevent social, economic and spatial marginalisation of selected degraded areas and intended for revitalisation, the measures will be aimed at ensuring sustainable development and intraregional cohesion as well as improving the quality of life of the inhabitants, restoring spatial order and economic revival as well as re-establishing social ties. Areas of intervention within this objective are defined in Priority Axis 6 Mobilisation of municipal and degraded areas. Interrelated actions taken in indicated problematic areas aimed at developing of infrastructural facilities together with actions aimed at socio-economic revival will result in elimination of negative phenomena in the economic, technical and social spheres which lead to intraregional disproportions and do not contribute to sustainable development of the whole region. Revitalisation of municipal areas supported within ROP OV 2007-2013 will be carried out in three dimensions, related to each other: social, economic and spatial, and shall arise from Local Revitalisation Programmes prepared by relevant units of local government. In other degraded areas measures to be taken will be aimed at their development, stimulating economic growth, enhancing investment attractiveness and improving conditions for raising employment. The role of the projects carried out within these undertakings will be to implement processes to make degraded areas able to function efficiently again, by changing the structure of the areas and giving them new functions, and first of all mobilisation of the space by introducing a positive value of the quality change. To ensure effective and efficient management, implementation, monitoring, evaluation, control and promotion of ROP OV 2007-2013, separate support for entities involved in these processes is required which will be provided within Priority 7 Technical Assistance. Having in mind effective implementation of ROP OV 2007-2013, measures to be taken will ensure the increase and stability of employment as well as raising the quality of human resources involved in implementation of the Programme. The measures will be carried out at the staff, organisational and technical levels. The efficient process of management and control of ROP OV 2007-2013 will also cover publicity and promotional actions related to the 74 draft of ROP OV 2007-2013 Programme, including improvement in the flow of information about aid from the Community in 2007-2013. 2.2.3 Consistency of the objectives of ROP OV 2007-2013 with the European Union policy and programme documents at the national and regional levels In response to the globalisation process and challenges posed by the renewed Lisbon Strategy, Poland must have a modern development policy which will allow for narrowing the gap in development separating it from richer states of the European Union. National Development Strategy 2007-2015 (NDS 2007-2015)48 is a basic strategic document specifying objectives and priorities for socio-economic development of Poland as well as conditions to ensure this development. The Strategy sets objectives and identifies areas found the most important for accomplishing these objectives, in which actions of the state will concentrate. At the same time it takes into consideration the most significant tendencies in development of the global economy and objectives defined in the Lisbon Strategy by the European Union. NDS 2007-2015 gives priority to measures to be taken by the government in 2007-2015 in order to implement the vision of Poland. Taking into account the nature of NDS 2007-2015 and the fact that it combines Rother documents prepared for Poland, the analysis of objectives of ROP OV 2007-2013 below was made in relation to the following documents: National Reform Programme for 2005-2008 to implement Lisbon Strategy49, NSRF 2007-2013 and the Opolskie Voivodeship Development Strategy. Moreover, the analysis was given to consistency between the objectives of ROP OV 2007-2013 and the Community Strategic Guidelines. The analysis shows that the objectives of ROP OV 2007-2013 are consistent with the objectives and directions set in superior, strategic documents at the national and Community levels for programming period 2007-2013. Correlations between the objectives of ROP OV 2007-2013 and objectives and directions for development set in the aforementioned documents are presented in Tab. No. 2.1. Due to the nature and the importance of the analysis of consistency between the objectives of ROP OV 2007-2013 and guidelines of the National Reform Programme in the context of attaining the objectives of the Lisbon Strategy, the issue is a separate problem and was presented in chapter 2.2.4 48 49 Document approved by the government on 29.11.2006 Document approved by the government on 27.12.2005 75 draft of ROP OV 2007-2013 Tab. No. 2.1. Consistency between the objectives of ROP OV 2007-2013 with documents at the national and regional levels ROP OV 2007-2013 OPOLSKIE VOIVODESHIP DEVELOPMENT STRATEGY - specific objectives - - strategic objectives - I. Innovative region with well-educated and active population II. Providing favourable living conditions in the region III. Extension and modernisation of the region’s infrastructure IV. Economic stimulation of the region in accordance with the principle of sustainable development I. Innovative region with well-educated and C2 Creating technical conditions for common use active population of ITCs and promoting information society VI. Multifunctional, diverse and attractive for investing and living rural areas C1. Strengthening the region’s economy through development of entrepreneurship, R&D sector as well as tourist and recreational infrastructure for the benefit of socio-economic growth C3. Enhancement of prospects for development of the region and mobility of its population through development of transport infrastructure. C4. Improvement of the natural environment and environmetal protection as well as ensuring safe flood prevention NATIONAL STRATEGIC REFERENCE FRAMEWORK 2007-2013 COMMUNITY STRATEGIC GUIDELINES – horizontal objectives 4. Increasing competitiveness and 1.2 Improving knowledge and innovation innovativeness of enterprises, in for growth particular from the manufacturing sector of high added value and the service sector 4. Increasing competitiveness and innovativeness of enterprises, in particular from the manufacturing sector of high added value and the service sector 6. Making opportunities for development equal and supporting structural changes in rural areas III. Extension and modernisation of the 3. Building and modernisation of region’s infrastructure technical and social infrastructure of IV. Economic stimulation of the region in basic importance for the increase in accordance with the principle of sustainable competitiveness of Poland and its regions development V. Development of metropolitan functions of the Opole conurbation VI. Multifunctional, diverse and attractive for investing and living rural areas II Providing favourable living conditions in 3. Building and modernisation of the region technical and social infrastructure of III. Extension and modernisation of the basic importance for the increase in region’s infrastructure competitiveness of Poland and its regions IV. Economic stimulation of the region in 6. Making opportunities for development 1.2 Improving knowledge and innovation for growth 1.1. Making Europe and its regions more attractive places to invest and work 1.1. Making Europe and its regions more attractive places to invest and work draft of ROP OV 2007-2013 ROP OV 2007-2013 OPOLSKIE VOIVODESHIP DEVELOPMENT STRATEGY - specific objectives - - strategic objectives - C5. Strengthening the role of education, increasing significance of culture to enhance attractiveness and increasing the level of health safety to ensure efficiency of regional human resources C6. Preventing social, economic and spatial marginalisation of selected degraded areas and intended for revitalisation C7. Ensuring effective and efficient systems of management, implementation, monitoring, evaluation and control of ROP OV 2007-2013 as well as full absorption of allocated structural funds in 2007-2013 Source: Own study accordance with the principle of sustainable development VI. Multifunctional, diverse and attractive for investing and living rural areas I. Innovative region with well-educated and active population II. Providing favourable living conditions in the region V. Development of metropolitan functions of the Opole conurbation VI. Multifunctional, diverse and attractive for investing and living rural areas VII. Development of multicultural identity as well as international and national interregional co-operation II. Providing favourable living conditions in the region III. Extension and modernisation of the region’s infrastructure IV. Economic stimulation of the region in accordance with the principle of sustainable development VI. Multifunctional, diverse and attractive for investing and living rural areas I. Innovative region with well-educated and active population NATIONAL STRATEGIC REFERENCE FRAMEWORK 2007-2013 COMMUNITY STRATEGIC GUIDELINES – horizontal objectives equal and supporting structural changes in rural areas 2. Improving human resources and 1.3 More and better jobs increasing social cohesion 3. Building and modernisation of technical and social infrastructure of basic importance for the increase in competitiveness of Poland and its regions 6. Making opportunities for development equal and supporting structural changes in rural areas 2. Improving human resources and 1.3 More and better jobs increasing social cohesion 5. Increasing competitiveness of Polish 2.1 Contribution of cities to growth and regions and preventing their social, jobs economic and spatial marginalisation 6. Making opportunities for development equal and supporting structural changes in rural areas 1. Improving the quality of operating 1.3.4 Administrative capacity public institutions and extending mechanisms of partnership 77 draft of ROP OV 2007-2013 2.2.4 Implementation of the renewed Lisbon Strategy within ROP OV 2007-2013 The Cohesion Policy in 2007-2013 should contribute to economic growth, increased competitiveness and employment including the Community priorities concerning durable growth, determined in the meeting of the European Council in Göteborg in 2001 and in the renewed Lisbon Strategy. In the less developed regions, among which there is the Opolskie Voivodeship, a challenge which is to fulfil these objectives is much more serious than in other areas. In this context, activities aimed, among other things, at establishing and development of innovative enterprises, enhancing economic competitiveness of the region and making it more dynamic or forming a basis for building the information society become of particular importance for creating the development policy of the Opolskie Voivodeship for 2007-2013. As it is necessary to co-ordinate the objectives of the cohesion policy with the priorities of the Lisbon Strategy so called earmarking of funds was introduced according to which a part of funds from the cohesion policy (for ROP OV 2007-2013 from the ERDF) is dedicated to the measures50 fulfilling the objectives of the Strategy. Taking into account the conditions above and the fact that the National Reform Programme for 2005-2008 to implement the Lisbon Strategy51 is a strategic document which at the national level is an instrument for attaining the objectives of the Lisbon Strategy and following the Integrated Guidelines for Growth and Jobs for 2005-200852, an analysis of consistency between the priority axes defined in ROP OV 2007-2013 and measures (priorities) specified in this direction document was conducted (Tab. No. 2.2). Tab. No. 2.2. Analysis of priority axes of ROP OV 2007-2013 in comparison with the National Reform Programme for 2005-2008 to implement the Lisbon Strategy. ROP OV 2007-2013 - priority axes Priority Axis 1 Enhancing economic attractiveness of the region Priority Axis 2 Information society Priority Axis 3 Transport Priority Axis 4 Environmental protection National Reform Programme for 2005-2008 to implement the Lisbon Strategy - priorities Priority 2 Development of entrepreneurship Priority 3 Strengthening innovativeness of enterprises Priority 3 Strengthening innovativeness of enterprises Priority 4 Development and modernisation of infrastructure as well as ensuring conditions for competitiveness in network sectors Priority 4 Development and modernisation of infrastructure as well as ensuring conditions for competitiveness in network sectors Source: Own study. 2.2.5 Indicators for ROP OV 2007-2013 50 The scope of these measures is presented in annex No. 4 to the Regulation (EC) No. 1083/2006. The analysis of the amount of financial assistance within ROP OV 2007-2013 is defined in detail in Chapter 4 ROP OV 20072013. 51 Document approved by the government on 27 December, 2005 52 Official Journal 205 of 6.8.2005 78 draft of ROP OV 2007-2013 Indicators were prepared on the basis of the guidelines from the European Commission and the Co-ordination Authority of Operational Programmes at the Ministry for Regional Development as well as the Task Force for Indicators at the MRD. Indicators for ROP OV 2007-2013 were identified at three levels: − indicators for the general objective (programme), − indicators for the strategic objectives, − context indicators. The aim of the programme indicators, specified at the level of the Programme general objective (Tab. No. 2.3), is to express - by means of countable values - the degree to which the Programme as a whole has been implemented. Target values of programme indicators have been assessed following the HERMIN model and on the basis of the methodology of the European Commission.53 For ROP OV 2007-2013 at the next level there are indicators for Priority Axes. They are given in Chapter 3, in relevant Subchapters. The indicators have been taken from the compulsory list of the European Commission, mentioned in the methodological note for indicators and evaluation54. The set has been completed with result indicators required by the Co-ordinating Authority of Operational Programmes (MRD) and, according to the Managing Authority, necessary for the complete, quantitative presentation of accomplishment of strategic objectives of the Programme and its priority axes. Context indicators are data and information coming from the system of official statistics, obtained mainly on the basis of resources of the Central Statistical Office. The aim of this set of indicators is a multi-faceted presentation of the background of the socioeconomic situation in the region where the programme is to be implemented. For this group of indicators a baseline year is 2005, and if impossible, the most recent data. In several cases data from 2006 were given. For context indicators target values are not assessed since it is impossible to generate the impact of the programme on these indicators. A list of context indicators is Annex No. 2 to ROP OV 2007-2013. Tab. No. 2.3 Indicators for general objective of ROP OV 2007-2013. Item Name of indicator 1. GDP per capita 2. Unemployment rate 3. Production in sector of processing industry Unit Value in Value in Frequency of baseline year target year measurement PLN 20,785* 41,581.2 year % 16.0** 14.2 year mln PLN 5,236.0* 12,592.0 year Source of data baseline value acc. to Central Statistical Office target value acc. to Hermin model baseline value acc. to Central Statistical Office target value acc. to Hermin model baseline value acc. to Central 53 Relates to the indicator of the number jobs created as a result of the programme. It will be assessed on the basis of methodology Guidelines on Measuring Structural Fund Employment Effects and Study on Measuring Employment Effects 54 Version from 01.08.2006. 79 draft of ROP OV 2007-2013 Item Name of indicator Unit Value in Value in Frequency of baseline year target year measurement Source of data Statistical Office target value acc. to Hermin model baseline value acc. to Central Statistical Office target value acc. to Hermin model baseline and target values acc. to Hermin model 4. Production in service sector mln PLN 9,968.0* 17,932.1 year 5. Consumption of households mln PLN 13,774.1*** 29,645.3 year 6. Investments in fixed assets mln PLN 3,019.0**** 7,855.9 year baseline and target values acc. to Hermin model items 0***** To be monitored**** year Central Statistical Office/ Data IZ**** 7. Number of new jobs created (indicator required by the EC) including: − men − women * ** *** **** ***** for 2004 November 2006 for 2002 for 2003 The indicator will be assessed on the basis of the methodology of the Guidelines on Measuring Structural Fund Employment Effects and Study on Measuring Employment Effects Source: Own study. 80 draft of ROP OV 2007-2013 2.2.6 Principles for fulfilling the objectives of ROP OV 2007-2013 To accomplish the objectives laid down in ROP OV 2007–2013, the operational programme will be implemented on the basis of the adopted system of the Community and national legal regulations, including principles of assistance defined in chapter IV of the Council Regulation (EC) No. 55, i.e.: complementarity – EU funds shall ensure assistance which complements national actions, including actions at the regional and local levels, integrating into them the priorities of the Community. cohesion – measures co-financed by the ERDF within the framework of ROP OV 2007-2013 shall be consistent with the policies, priorities indicated by the Community and complementary to other financial instruments of the Community. earmarking of funds – the assistance co-financed by the ERDF within the framework of ROP OV 2007-2013 shall target the EU priorities of promoting competitiveness and creating jobs, including meeting the objectives set out in the Guidelines for Growth and Jobs – integrated guidelines for 2005-2008. co-ordination – respect for responsibilities of the Commission and of the member state related to co-ordination of the assistance from the funds, the EAFRD, the EFF and the interventions of the EIB and of other existing financial instruments. compliance – operations financed within the framework of ROP OV 2007-2013 shall comply with the provisions of the Treaty and of acts adopted under it. programming – objectives of the structural funds shall be pursued in the framework of a multiannual programming system organised in several stages comprising the identification of priorities, the financing and a system of management and control. partnership – preparation, implementation, monitoring and evaluation of ROP OV 2007– 2013 shall comply with a principle of partner co-operation with appropriate bodies of government administration and local, municipal and other public authorities as well as economic, social partners, entities representing the civil society, partners dealing with problems of the natural environment, non-governmental organisations and entities responsible for promoting equality between men and women. The partnership shall be based on the respect for institutional, legal and financial powers of the institutions concerned. At the stage of preparation of ROP OV 2007-2013 the principle was applied through appointing task forces for preparation of the Programme, made up of, among others, representatives of environments indicated directly in the Regulation (EC) No. 1083/2006 and discussed in “Introduction” to ROP OV 2007-2013. The application of the principle as regards consultations about subsequent versions of the document and taking into account comments from theses processes is presented in chapters No. 7 and 8 of the Programme. subsidiarity (at a relevant territorial level) – to ensure optimum efficiency of the EU cohesion policy, the aim shall be to decentralise and deconcentrate performance of tasks related to programming and management of the ERDF at a regional level. According to this principle, particular levels of authorities in the fields which fall outside their exclusive competence shall take actions only if the objectives of a particular measure are not to be achieved to a sufficient extent by the authorities of lower levels. proportionality – financial and administrative resources employed by the European Commission and Poland for implementing structural funds in relation to: the choice of 55 Official Journal 210 of 31.7.2006 81 draft of ROP OV 2007-2013 indicators, the evaluation, the general principles of management and control systems, shall be proportional to the total amount of expenditure allocated to the operational programme. shared management – the EU budget allocated to the funds shall be implemented within framework of shared management between the member state and the Commission. additionality – contributions from the structural funds shall not replace public or equivalent expenditure by a member state. According to this principle, own funds for particular tasks related to the regional development shall be supported, to a reasonable extent, by the funds from the state budget, from the EU structural funds and other financial instruments available throughout the programming period 2007 – 2013. equality between men and women and non-discrimination – within the framework of ROP OV 2007-2013 is shall be ensured that the principle of preventing any discrimination based on sex, race or ethnic origin, religion or belief, disability, age or sexual orientation during the various stages of implementation of the programme is observed, in particular as regards accessibility to funds allocated within its framework. sustainable development – objectives of the funds shall be pursued in the framework of sustainable development and the Community promotion of the goal of protecting and improving the environment. In addition, the implementation of ROP OV 2007-2013 will integrate the following principles: concentration – according to this principle, funds allocated to a limited number of objectives to be achieved in certain areas shall be concentrated. The support areas shall be those of basic importance for the EU socio-economic cohesion, i.e. which guarantee considerable economic growth and rise in employment. evaluation – shall be used in order to improve the quality, efficiency and cohesion of interventions of the structural funds and to improve the implementation of ROP OV 20072013. civil society – implementation of ROP OV 2007-2013 shall support creating space for civil activity, where it is possible for institutions, organisations, social groups and units with a feel of interrelation to operate and which willingly co-operate with each other to serve joint interests, improve a quality of life in the region and for the benefit of the society as a whole. 82 draft of ROP OV 2007-2013 CHAPTER 3 PRIORITY AXES OF THE REGIONAL OPERATIONAL PROGRAMME OF THE OPOLSKIE VOIVODESHIP FOR 2007-2013 In order to attain the objectives of ROP OV 2007-2013 7 priority axes were chosen to be co-financed from the European Regional Development Fund (Tab. No. 3.1). A description of priority axes of ROP OV 2007-2013 includes56: − formulated objectives; − justification of the priority axes chosen; − major groups of beneficiaries; − information about the use of flexibility instrument (cross-financing). Tab. No. 3.1. List of priority axes of ROP OV 2007-2013. PRIORITY AXIS NO. NAME OF THE PRIORITY AXIS Priority axis 1 Strengthening economic attractiveness of the region Priority axis 2 Information society Priority axis 3 Transport Priority axis 4 Environmental protection Priority axis 5 Social infrastructure and higher education Priority axis 6 Mobilisation of municipal and degraded areas Priority axis 7 Technical assistance Source: Own study. 56 Council Regulation (EC) No. 1083/2006, art. 37, (Official Journal 210 of 31.7.2006, p. 25). 83 draft of ROP OV 2007-2013 3.1 PRIORITY AXIS 1 STRENGTHENING ECONOMIC ATTRACTIVENESS OF THE REGION Within Priority axis 1 Strengthening economic attractiveness of the region undertakings to be implemented will be in compliance with Regulation (EC) No. 1080/2006 of the European Parliament and the of the Council on the European Regional Development Fund and repealing Regulation (EC) No. 1783/1999, pursuant to art. 4 items 1, 3 and 6 concerning: − research and technological development, innovation and entrepreneurship; − local initiatives on development and support for structures providing local services in creating jobs; − tourism. CATEGORIES OF INTERVENTION57: 02 - B+TD infrastructure (including equipment, instruments and fast IT networks connecting research centres) and specialist centres of technological competencies 05 - Services in advanced support for enterprises and groups of enterprises 07 - Investments in enterprises directly connected with research and innovations (innovative technologies, establishing enterprises by universities, existing R+TD centres and enterprises, etc.) 08 - Other investments in enterprises 09 - Other actions aimed at stimulating research, innovation and entrepreneurship at SMEs 24 - Bicycle paths 57 - Other assistance to strengthen tourist services 3.1.1 Objectives of the priority axis − To create conditions for initiating and development of entrepreneurship in the region, development of innovation and the knowledge-based economy; − To develop the regional R&D sector for growth of entrepreneurship; − To increase the importance of tourism, recreation and sport as factors affecting socioeconomic growth of the region, in particular the labour market. 57 Commission Regulation (EC) No. 1828/2006 of 8 December, 2006 setting out rules for the implementation of Council Regulation (EC) No. 1083/2006 laying down general provisions on the European Regional Development Fund , the European Social Fund and the Cohesion Fund and of Regulation (EC) No. 1080/2006 of the European Parliament and of the Council on the European Regional Development Fund (Official Journal 371 of 27.12.2006, p. 1). 84 draft of ROP OV 2007-2013 3.1.2 Justification of the priority axis chosen The economic competitiveness and attractiveness of the Opolskie Voivodeship will be increased within the framework of Axis 1 with the measures, among other things, for strengthening enterprises, in particular micro-, small and medium-sized enterprises (MSMEs), development of innovative potential of enterprises, support for the R&D sector and institutions operating to the benefit of entrepreneurship as well as increasing the infrastructure standard and the quality of services offered in regional tourism. A weighty responsibility for creating regional economic potential falls, in accordance with the current tendencies, on MSMEs whose development at the moment is regarded as a basic factor in the economic growth. It is necessary to guarantee favourable conditions for the development of these firms. As a result of Axis 1 it is expected that the regional economy will become more competitive, mainly owing to strengthening its innovativeness, thanks to, among other things, concentration of investments in innovative undertakings which provide the greatest opportunity for creating an added value. To achieve the objectives in Axis 1 different instruments will be applied which contribute to strengthening the role of enterprises in a process of building the knowledgebased economy through an increase in the production and service competitiveness, including technologies and organisation. The support for knowledge and innovation within Axis 1 is in compliance with the measures of the Community Lisbon Programme, in this document regarded as “a driving force for durable growth”58. Among the weaknesses of the Opolskie Voivodeship there is a business support sector which is underdeveloped, with few strong centres to support the economic growth which are unevenly spread over poviats in the region. Thus it is necessary to develop the policy of stronger support for enterprising attitudes. The measures taken to create conditions favourable to the development of entrepreneurship will be aimed at supporting investment processes directly related to intensification of operations carried out by business support organisations to the benefit of initiating and supporting entrepreneurship. Within the framework of Axis 1 the focus of attention will be on supporting investments of regional institutions and structures which assist initiating business activity and help enterprises further operate in the market, i.e. mainly: business incubators, industrial, technological, research and technological parks, clusters, centres for transfer of technologies and management of innovations, logistic centres and commodity exchanges. They gather considerable potential of knowledge and experience, and should be a partner for public authorities in establishing a coherent and efficient economic policy and competitive enterprises. The assistance will not cover entities which provide only consultancy and information services to enterprises. An important element which often creates a barrier to development of enterprises is limited access to external sources of funds. Many companies, due to small capital resources or problems with liquidity, do not meet criteria for obtaining bank credits. The existing Private Equity and Venture Capital funds are reluctant to invest in undertakings at an early stage of company operation. Thus, to solve this problem, it is necessary to develop loan and credit guarantee funds, micro-loan funds and other public financial institutions as well as to channel capital into them. 58 “Common Actions for Growth and Jobs: the Community Lisbon Programme”. Communication from the Commission to the Council and the European Parliament {SEC(2005)981}, Brussels, on 20.07.2005. 85 draft of ROP OV 2007-2013 The R&D sector in the Opole region besets with a number of problems. The expenditure on the operation and infrastructure of the R&D sector is insufficient and as a consequence the offer for enterprises is not competitive. Therefore there is a need for undertakings aimed at strengthening the R&D sector which operates to the benefit of innovative economy as well as at initiating and developing co-operation between the R&D and economic entities which would allow for transferring technologies to companies. To succeed, it is necessary to strengthen significantly the potential of scientific units59 and other entities running R&D activities, including the ones in enterprises and other institutions supporting development of innovation at a regional level, with - among other things purchases of machinery, equipment and intangible assets. A necessary condition for these units to gain assistance will be to prove that they carry out research for development of enterprises. In the Opole region the sector of high technologies has small potential. There are numerous reasons why enterprises absorb innovations and results of researches only to a small extent, among other things, it is poor institutional back-up. Therefore, to increase competitiveness, it is so important to streamline the access to innovations and to support implementation of research results in enterprises. Already existing centres which assist enterprises in solving problems with modernisation should be supported. If the region’s economy is based on any and all available innovative solutions, it will guarantee that its growth will gather pace. The use of innovations and transfer of new technologies, in particular by clusters/networks of such institutions as: enterprises, universities and R&D units60, provide an opportunity for narrowing a gap in development between our region’s economy and the economy of other EU regions61. Underfunding, out-of-date machinery, difficulties and too high risk involved in a rapid and capital-intensive investment process in the development of companies are serious drawbacks in the regional economy. In particular it is true for investments in modern technologies which allow for a fast progress in the economic development. The analyses of enterprises from the Opolskie Voivodeship show that implementation and application of modern technologies and innovations in these enterprises leave much to be desired. The amounts spent on innovations in industrial enterprises in the region are smaller than the average in Poland. Thus, building economic potential of the Opolskie Voivodeship will require heavy expenditure in new and already existing firms on investments related to implementation of innovative solutions (e.g. purchases of patents, licences, know-how, machinery, equipment), including environmental and eco-innovative undertakings to make it possible to implement projects in compliance with the system objectives of the II Polish Ecological Policy. Support for investments leading to an increase in innovativeness of enterprises in the Opolskie Voivodeship, which mean substantial changes in products, production processes or organisational and technical changes, should contribute to improving competitiveness of enterprises in the region. A priority will be given to undertakings arising from the Regional Innovation Strategy of the Opolskie Voivodeship62 and directly connected with sectors of economy which will be found, as a result of research and analyses associated 59 As provided for by the Act of 8.10.2004 on rules for financing science (Journal of Laws No. 238 of 2004, item 2390) 60 As above 61 This direction of assistance is compliance with the objectives of the Seventh Framework Programme of the European Union. 62 “Regional Innovation Strategy of the Opolskie Voivodeship for 2004-2013”, adopted with Resolution No. XXII/196/2004 of the Sejmik of the Opolskie Voivodeship of 29 June, 2004 on adopting the Regional Innovation Strategy of the Opolskie Voivodeship for 2004-2013. 86 draft of ROP OV 2007-2013 with the “Regional Foresight”, as the most innovative and vital for further economic growth of the Opolskie Voivodeship. Among weaknesses of the Opole region there is also relatively low economic growth, disproportions in development between different areas of region, an underdeveloped service sector, high unemployment (registered and hidden), in particular in some towns and in the areas where state-owned farms used to be. The enterprises with insufficient staff, capital and technologies are not competitive in the Single European Market (SEM). Therefore it is necessary to create conditions for growth, stimulation and improving competitiveness of enterprises, in particular micro-enterprises which due to their potential may play a major role in the socio-economic development of the region and elimination of the effects of structural transformations. The major barrier to development of micro-enterprises is the lack of own funds for investments. Activities within Axis 1 will be related, among other things, to support for investments with subsidies for micro-enterprises from the Opolskie Voivodeship allocated to construction, renovation, extension or reconstruction of micro-enterprises, investments related to fundamental changes in production or to purchases of equipment necessary for running a business. A considerable competitive advantage of the Opolskie Voivodeship is the fact that it has conditions for development of such fields as tourist, recreational and sports service since the region is attractive and diversified as regards natural, landscape and cultural assets as well as it has various cultural and tourist sites63. The present state of infrastructure related to tourism, recreation and sport, however, does not allow to fully utilise these assets and can be described as insufficient and unsatisfactory. Similarly, the quality of tourist facilities is poor, in particular accommodation and catering ones. Measures taken to construct new tourist, recreational and sports facilities of regional importance, to stop progressing degradation and deterioration of the existing facilities and to fully utilise them for tourist, hotel, catering, recreational and sports purposes, will contribute to an increase in economic activity in the region and its attractiveness for tourists, investors and inhabitants. They are to strengthen the role of tourism, recreation and sport as factors which positively affect socioeconomic development of the voivodeship, including first of all creation of new, better jobs. Investment tasks accomplished within the framework of Axis 1 are to contribute also to making access to regional attractions as well as tourist, recreational and sports facilities easier. Barriers which at the moment make it impossible for disabled people to use these assets will be removed. The standard of infrastructure facilities will be also increased in the institutions which deal with development of sport in order to ensure the greatest efficiency of their activities. The infrastructure developed should be made available to inhabitants to the greatest possible extent. Fitness and physical condition of the Opolskie Voivodeship population are getting worse and worse due to, among other things, inaccessibility of or difficult access to sports infrastructure at an appropriate level. Updated sports facilities in the region will allow for increasing physical activity of different groups of the society. In addition, it is expected that young people will take an active part in development of sport as well as training conditions for selected competitors representing the voivodeship in Poland and abroad. Investment tasks performed within Axis 1 are also to contribute to facilitating access to regional sports facilities. The support in tourism, recreation and sport will be directed both to enterprises and public entities. 63 „Projekt Strategii ZrównowaŜonego Rozwoju Turystyki w Województwie Opolskim na lata 2007-2013”, Opole, 2005, www.orot.pl. 87 draft of ROP OV 2007-2013 To utilise tourist assets of the voivodeship to the full, the region requires greater promotion to inform about opportunities and forms of recreation, thus establishment of regional tourist information centres will be supported. The tasks carried out within Axis 1 will be related to promotion and publicity, to the benefit of socio-economic growth of the region based on the existing tourist potential. 3.1.3 Assistance within Priority Axis 1 Strengthening economic attractiveness of the region will be provided mainly to the following groups of beneficiaries: 1. Entrepreneurs; 2. Business support institutions; 3. Units of local self-government, their unions and associations; 4. Incorporated organisational units (legal persons); 5. PGL Lasy Państwowe (Polish Forest Management Company) and its organisational units; 6. Social and economic partners; 7. Non-governmental organisations; 8. Churches and denominations as well as legal persons of churches and denominations; 9. Universities; 10. Research/scientific units; 11. Incorporated units from the sector of public finance (legal persons) not mentioned above. 3.1.4 Flexibility instrument (cross-financing) To ensure efficient accomplishment of the objectives from Priority axis 1 Strengthening economic attractiveness of the region a part of measures eligible for assistance from the European Social Fund (pursuant to art. 34 of Council Regulation (EC) No. 1083/2006 of 11 July, 2006) will be implemented within the framework of Axis 1. It will be possible to allocate maximum 10% of funds at the level of Axis 1 to expenditure eligible under the ESF, necessary for completing investment projects and directly associated with them. 88 draft of ROP OV 2007-2013 3.1.5 Target indicators for Priority axis 1 Tab. No. 3.2 Target indicators for Priority axis 1 of ROP OV 2007-2013 Unit Value in baseline year Value in target year Frequency of measuring item 0 24 year item 0 4 year item 0 1,650 year item 0 20 year item 0 1,700 year item 0 155 year item 0 44 year item 0 1,650 year item 0 155 year 1.10. Additional investments – created as a result of assistance EUR 0 EUR 99 mln year Number of enterprises supported in a general number of enterprises: including: Micro: up to 9 employees, 1.11. Small: 10–49 employees, Medium-sized: 50–249 employees, Large: from 250 employees, item 0 item 0 Indicator No. Name Priority axis 1: Strengthening economic attractiveness of the region 1.1. Number of R+D projects Number of projects in co-operation between production and research 1.2. institutions Number of projects related to direct investment assistance for 1.3. enterprises Products 1.4. Number of projects for direct assistance to enterprises 1.5. Number of projects promoting business, entrepreneurship and new technologies 1.6. Number of projects in tourism, recreation and sport Number of jobs created in R+D – only research jobs (best 5 years from the start of the project) Number of jobs created (gross, full-time employment) in enterprises 1.8. - including SMEs 1.7. Results 1.9. Number of jobs created in tourism Potential number of people using tourist, recreational and sports 1.12. facilities supported as a result of the programme 1,300 304 40 6 year 100,000 year Source: Own study 89 draft of ROP OV 2007-2013 3.2 PRIORITY AXIS 2 INFORMATION SOCIETY Within Priority axis 2 Information society undertakings to be implemented will be in compliance with Regulation (EC) No. 1080/2006 of the European Parliament and the of the Council on the European Regional Development Fund and repealing Regulation (EC) No. 1783/1999, pursuant to art. 4, item 2, concerning information society. CATEGORIES OF INTERVENTION64: 10 - Telecommunications infrastructure (including broadband networks) 11 - Information and communications technologies (access, security, interoperability, preventing threats, research, innovations, digital content, etc.) 13 - Services and applications for citizens (e-health, administration, e-learning, e-integration, etc.) e- 14 - Services and applications for SMEs (e-commerce, education and training, creating chains, etc.) 3.2.1 Objectives of the priority axis − To create technical conditions for common use of ICTs; − To promote the information society through developing information modules, including e-services, in order to increase competitiveness of the region. 3.2.2 Justification of the priority axis chosen Within the framework of Priority Axis 2 Information society the actions to be taken will contribute to the development of the information society infrastructure, popularisation and increasing of competencies in the use of information and communication technologies, including development of public services in this field, mainly for inhabitants of our region. The enormous importance of the dynamic development of the information society for economic growth of the whole European Community has been reflected in the guidelines of the renewed Lisbon Strategy and the Community Strategic Guidelines. Information and communication technologies are factors strongly stimulating growth and jobs what make services, skills and infrastructure connected with the development of these technologies a very important element in the modern economy and society. At the same time easy access to services making use of the latest technologies has become a significant element determining economic competitiveness and attractiveness of all the regions in the European Union. Hence, the support for development of the fully integrated information society based on modern information and communication technologies seems to be an opportunity for development of 64 Official Journal 371 of 27.12.2006, p. 1 90 draft of ROP OV 2007-2013 the Opolskie Voivodeship, and this issue is a crucial element in the strategic planning of the Opolskie Voivodeship development. Serious barriers to the development of the digital economy and the common use of ICTs in the region are, among other things, the underdeveloped telephone system which limits access to the Internet (the majority of users connect with the Internet via modems), a low indicator concerning a number of personal computers in households, including those connected to the Internet. In addition, the accessibility of telephone and information services is worsened by a high cost of these services which is the highest in the European Union. Such a situation has a negative effect on the development of ICTs in the Opolskie Voivodeship.65. At the same time the quality and the level of public services offered66 to a significant extent hinder the development of the information society at the level set in the European Union standards and are not favourable to integration and improvement in the quality of life of the region’s population. Free access to and use of knowledge are basic criteria allowing for democratic development of the society based on knowledge, applying necessary technological innovations. Having in mind the above, it is necessary to make positive and substantial changes in the field of the use of information and communication technologies in the Opolskie Voivodeship, including actions to eliminate a phenomenon of digital exclusion. Thus, the aim is to increase the use of ICTs in the region which will allow for efficient production, diffusion and sharing of knowledge affecting at the same time an increase in development of innovations and in consequence an increase in productivity rate. The actions in the field of ICTs to be taken in the voivodeship are to stimulate changes in models of management and affect additional investments in the quality of human resources. In order to ensure an integrated and sustainable impact on the development of ICTs in the region as well as to adjust undertakings planned within Priority axis 2 to processes of development of the information society in Poland and the Community, when selecting measures the objectives set in strategic documents were taken into account. The documents were, among other things: Cohesion Policy for Growth and Jobs: the Community Strategic Guidelines, Development strategy for IT introduction in Poland to 2013 and perspective forecast for transformation of the information society to 202067. The identification of needs of the Opolskie Voivodeship as regards building of the information society integrates also the existing initiatives of the European Union, in particular the initiative “i2010: European Information Society for Growth and Jobs”68. Within the framework of Priority 2 Information society projects to be implemented will contribute to the development of the information society, including the development of resources, services and applications, the improvement in the accessibility of the Internet services. It will be important for the implementation of the Axis to co-finance investments in ICTs in order to achieve so called network effects as well as to promote investments in this field in sectors which do not use ICTs at all or use them only to a limited extent. To produce a significant effect, measures undertaken for the state-of-the-art information technologies should be integrated and the standard of infrastructure enabling the access to IT and telecommunications systems raised. At the same time the knowledge of the ICTs use should be broadened. Due to the fact that the information society means also, apart from the technical infrastructure already existing or under construction, the possibilities and skills of using ICTs in everyday life, adjustment measures corresponding to global tendencies for the 65 acc. to “Report on land development of the Opolskie Voivodeship - synthesis”, June 2006 “Level of Information Technologies introduced in Polish offices. General report on quantative research for the Ministry of Internal Affairs and Administration, 2 edition”, November 2005 67 Version from 24 June, 2005 68 COM(2005)229 66 91 draft of ROP OV 2007-2013 development of on-line services platforms will be taken as well. Popularisation of the development and the standard of ICT services is to contribute to establishing a competitive, efficient electronic economy and at the same time to stimulate an economic sphere of the voivodeship leading to growth and creation of new and better jobs in the Opolskie Voivodeship. Investments in the ICT infrastructure carried out within the framework of the Axis are to take into account a rapid technological growth as well as follow a principle of technical neutrality and unlimited access. The development of the telecommunications and IT infrastructure is an extremely significant element which will determine competitiveness of the Opolskie Voivodeship and affect its modern image. Tendencies in social and economic processes indicate that the condition for the economic development is unrestricted access to information. Basic pillars of building and development of the information society in the Opolskie Voivodeship will be IT networks and telecommunications systems. The use of the ICT tools in all the areas of life is possible only if it is technically possible to have a telecommunications and IT connection between a sender and a receiver. Within the framework of Axis 2 the tasks performed will be aimed at constructing new and modernising already existing local and wide area networks or other adequate tools, including wireless connections. Projects related to building technical bases for the systems using the ICTs in a broad sense, including the systems for secure collection, storage and processing of data, will to be local or regional in nature. The projects exceeding the area of the Opolskie Voivodeship will not be eligible for assistance. The tasks co-financed within the framework of Axis 2 related to increasing access to thematic information and databases are to provide conditions for entrepreneurship development in the region as well as be conducive to integration and the improvement in the quality of life of the Opolskie Voivodeship population. To use infrastructure resources to a maximum, the Internet portals based on e-services should be developed and at the same time the existing systems of databases standardised and updated. Development of new forms of services using modern information technologies should be an interesting alternative to other, often more expensive, models of service provision. In addition, the measures designed to provide the population and economic entities of the Opolskie Voivodeship with better access to the Internet will be undertaken, with a particular attention to continuous improvement and update of services rendered in this field. Improvement of qualifications necessary in the knowledge-based economy, IT education along with easy access to the ICT tools, development of on-line services platforms, available to every person, will be a measure for development of the region regarded as a modern one. Such actions are to make information and communication technologies become a source of new opportunities for the socio-economic growth of the Opolskie Voivodeship and a factor increasing its competitiveness, thanks to the common use of ICTs by economic entities. 3.2.3 Assistance within Priority Axis 2 Information society will be provided mainly to the following groups of beneficiaries: 1. Units of local self-government, their unions and associations; 2. Incorporated organisational units (legal persons); 3. Universities; 4. Government administration; 5. Health centres operating in the public health service; 6. Incorporated units from the sector of public finance (legal persons) not mentioned above; 92 draft of ROP OV 2007-2013 7. Churches and denominations as well as legal persons of churches and denominations; 8. Non-governmental organisations; 9. Entrepreneurs69. 3.2.4 Flexibility instrument (cross-financing) To ensure efficient accomplishment of the objectives from Priority axis 2 Information society a part of measures eligible for assistance from the European Social Fund (pursuant to art. 34 of Council Regulation (EC) No. 1083/2006 of 11 July, 2006) will be implemented within Axis 2. It will be possible to allocate maximum 10% of funds at the level of Axis 2 to expenditure eligible under the ESF, necessary for completing investment projects and directly associated with them. 3.2.5 Target indicators for Priority axis 2 Tab. No. 3.3 Target indicators for Priority axis 2 of ROP OV 2007-2013 Indicator Unit No. Name Value in baseline year Value in target year Frequency of measuring Results Products Priority axis 2 Information society Potential number of public services provided on-line as a result of 2.1 the projects implemented item 0 10 year 2.2 Number of projects in information society item 0 385000 year item 0 Target value will be assessed* year 2.3 * Number of people who gained access to broadband Internet as a result of the programme Target value will be assessed during the implementation of the programme when evaluating it Source: Own study 69 Entities (including commercial law companies), providing public services, where a major shareholder is the Opolskie Voivodeship, a poviat, a gmina, a town, an association of gminas, the State Treasury or entities selected according to the regulations of the Public Procurement Law performing tasks on the basis a separate, valid agreement concluded with a unit of local self-government (also in a form of public and private partnerships) 93 draft of ROP OV 2007-2013 3.3. PRIORITY AXIS 3 TRANSPORT Within Priority axis 3 Transport undertakings to be implemented will be in compliance with Regulation (EC) No. 1080/2006 of the European Parliament and the of the Council on the European Regional Development Fund and repealing Regulation (EC) No. 1783/1999, pursuant to art. 4, item 8, concerning transport investments. CATEGORIES OF INTERVENTION70: 18 - Railway rolling stock 23 - Regional/local roads 25 - Urban transport 29 - Airports 3.3.1 Objectives of the priority axis − To improve accessibility of areas and sites of key importance to economic growth of the voivodeship, of national and international transport systems and to improve safety of road users; − To increase mobility of the region’s inhabitants through extending the public transport system. 3.3.2 Justification of the priority axis chosen The measures taken within the framework of Axis 3 Transport will be aimed at satisfying the most important needs related to transport infrastructure, in particular at improving accessibility of areas and sites of key significance to economic growth of the voivodeship as well as improving mobility of the region’s inhabitants. According to the Community Strategic Guidelines71 and as experiences of the region so far show, efficient and safe transport infrastructure is a necessary condition for achieving economic growth, mainly due to ensuring efficient and quick transfer of people and goods. Dynamically developing transport may have a negative effect on the natural environment and human health. Therefore it is very important to make efforts to combine economic objectives with environmental ones following so called principle of sustainable development. This aspect was emphasised both in the Community Strategic Guidelines72 and 70 Official Journal 371 of 27.12.2006, p. 1 Official Journal 291 of 21.10.2006 72 As above 71 94 draft of ROP OV 2007-2013 in national documents such as: Polish Transport Policy for 2006-202573, Transport Development Strategy for 2007-201374. The Opolskie Voivodeship is among the regions with a relatively well planned system of national and voivodeship roads. An undeniable trump card of the voivodeship is a location of the region in the 3rd Pan-European transport corridor which includes the A4 motorway. Such a location constitutes a strength of the voivodeship as, among other things, it creates conditions for establishing logistic centres and economic zones which in future may attract significant investments. The A4 motorway potential opens up an opportunity for the development of the Opolskie Voivodeship. Moreover, it is necessary to exploit the potential arising from the location on the border. Weaknesses of the region include an insufficient number of roads between areas intended for development with the A4 motorway as well as an insufficient number of ring roads around towns and villages on transit roads. A problem of the region is also relatively poor safety on the roads in the voivodeship. Due to the above, within the framework of Axis 3 measures to be supported will be aimed at developing the road infrastructure of regional and local importance, where a priority will be given to the tasks to contribute to improving an access to the A4 motorway junctions and roads leading to it, to border crossings, investment sites and municipal centres taking into account safety issues. The tasks will be associated, among other things, with construction, reconstruction and repairs of roads, construction of ring roads, flyovers, bridges together with generally available accompanying infrastructure, e.g. lighting system, car parks, bicycle paths. It is important to standardise cross sections of roads, to adapt surfaces to loads of at least 115 kN/axle. Within the road infrastructure of regional importance the aid will be provided to tasks aimed at developing voivodeship roads in order to improve accessibility of investment sites, border crossings as well as of sites and road routes of key importance to economic growth, including airports and A4 motorway. As road traffic safety in the voivodeship is not sufficient, the support will be given to investments designed to protect transport routes against threats and effects of catastrophes, through providing institutions operating in these fields with transport means and equipment used for road rescue. A significant limitation for growth is poorly developed road infrastructure of local importance. Such a situation together with limited funds of local self-governments has a negative effect on competitiveness of the region for potential investors. As a consequence, within Axis 3 the aid will be provided to investments whose aim will be to extend and modernise a network of poviat and gmina roads of economic importance. In addition, the assistance will be given to undertakings to ensure accessibility of investment sites, among other things, aimed at providing utilities for these sites making them ready for economic investments, connecting these sites with national and regional roads, with sites of great importance to economic growth, with municipal centres. Within the framework of Axis 3 the assistance will be given to undertakings aimed at developing of public transport as regards: urban transport, railway transport and airport infrastructure. Today, mobility is one of the basic needs of the society, therefore an element of measures within public transport is to ensure appropriate mobility of population, i.e. a possibility of free movement to different places where human needs are satisfied. It is 73 74 National Transport Policy for 2006-2025, Ministry of Infrastructure, Warsaw 2005 Transport Development Strategy for 2007-2013, Ministry of Transport, Warsaw 2006 [draft]. 95 draft of ROP OV 2007-2013 important to ensure a proper quality of transport, in particular taking into account environmentally friendly solutions offering comfort of travelling. Within urban transport the tasks to receive support will be aimed at creating an attractive offer of public transport as regards motor transport. In the Opolskie Voivodeship a problem lies in decapitalised city buses which do not offer a proper quality of travelling and have a negative effect on the environment. Therefore old buses have to be replaced by new ones up to the highest technical and ecological standards. Moreover, it is necessary to ensure proper infrastructure to serve passengers by construction, among other things, of integrated changing hubs between different means of transport, of car parks “Park and Go”. The investments will contribute to the switch to more environment-friendly means of transport, so called “ecologically clean vehicles” and to establishing an integrated transport system. Through the area of the Opolskie Voivodeship one of the most important, main and first class railway lines in Poland runs. A trump card of the region is a well developed railway network. A number of passenger lines in the Opolskie Voivodeship has increased in contrast with tendencies in Poland. Within railway transport the goal to pursue will be to increase attractiveness and competitiveness of the use of regional railway transport. Therefore, the main element of measures taken within Axis 3 will be the purchase of rolling stock, of so called railbuses for purposes of regional railway passenger transport only by public units in order to improve the environment, increase comfort and safety of travelling, reduce costs of operation and shorten travelling time. One of the factors determining competitiveness of economy is access to air transport. At the moment the demand for these services is rising sharply, in particular at regional airports. As it is forecast that the demand for air transport services will further grow, it will become necessary to extend a network of regional airports, especially based on the existing airport infrastructure, including post-military, sports and service airports75. In national programmes76 it is also indicated that the demand for air transport services has been increasing and it is necessary to use the existing airport infrastructure to build regional ports. In the Opolskie Voivodeship there is no regional airport what was mentioned in the SWOT analysis as a weakness of the region, however, there are sites which have airport infrastructure to be a basis for development of this type of transport. The main emphasis within the framework of Axis 3 will be put on opening an airport falling into category of regional airport, e.g. on the basis of the existing post-military airport in Kamień Śląski, to serve passenger and freight flights. Taking into consideration the existing tendencies, failure to open an airport will result in future in marginalisation of the Opole region in comparison to other voivodeships, in particular neighbouring ones. he airport in the region will be a significant social and economic asset which will open the region to foreign partners and allow the society greater mobility thanks to a modern means of transport. 3.3.3 Assistance within Priority Axis 3 Transport will be provided mainly to the following groups of beneficiaries: 1. Units of local self-government, their unions and associations; 2. Incorporated organisational units (legal persons); 3. Government administration; 75 On the basis of: Air Transport (Export Evaluation), Dr Hab. E. Marciszewska, Dr D. Kaliński, Warsaw School of Economics, Warsaw 2004 76 Programme for Development of Network of Airports and of Ground Air Equipment, Ministry of Transport, Warsaw 2006 [draft]. 96 draft of ROP OV 2007-2013 4. Entrepreneurs; 5. Non-government organisations. 3.3.4 Flexibility instrument (cross-financing) Within the framework of Priority axis 3 Transport the principle of cross-financing shall not apply. 3.3.5 Target indicators for Priority axis 3 Tab. No. 3.4 Target indicators for Priority axis 3 of ROP OV 2007-2013 Indicator Unit No. Name Value in baseline year Value in target year Frequency of measuring Results Products Priority axis 3 Transport * 3.1. Number of projects in transport item 0 46 year 3.2. Number of projects in public transport item 0 6 year 3.3. Number of kilometres of new roads item 0 18 year 3.4. Number of kilometres of reconstructed roads km 0 109 year 3.5. Time saving on new and modernised roads in passenger and freight PLN/ transport EUR 0 Target value will be assessed* year 3.6. Potential number of people using public transport as a result of the item projects 0 3.5 mln year 0 8250 year 3.7. Increase in number of people using municipal transport item Target value will be assessed later, on a basis of methodology of the Institute of Roads and Bridges in Warsaw Source: Own study 97 draft of ROP OV 2007-2013 3.4 PRIORITY AXIS 4 ENVIRONMENTAL PROTECTION Within Priority axis 4 Environmental protection undertakings to be implemented will be in compliance with Regulation (EC) No. 1080/2006 of the European Parliament and the of the Council on the European Regional Development Fund and repealing Regulation (EC) No. 1783/1999, pursuant to art. 4, items 4, 5 and 9 concerning: − the environment; − preventing hazards; − investments in energy. CATEGORIES OF INTERVENTION77: 39 - Renewable energy: wind 40 - Renewable energy: solar 41 - Renewable energy: biomass 42 - Renewable energy: hydroelecrical, geothermal and other 44 - Management of municipal and industrial waste 46 - Sewage treatment 47 - Air quality 48 - Integrated pollution prevention and control 51 - Promotion of biodiversity and nature protection (including NATURA 2000) Preventing hazards (including preparation and 53 - implementation of plans and instruments for preventing and managing natural and technological hazards) 3.4.1 Objectives of the priority axis − To improve a quality of the natural environment through modernisation of water and sewage management and reducing flood hazard; − To increase the amount of waste sorted out and recycled; − To improve the air quality and to increase consumption of renewable energy; − To maintain biological diversity as well as natural and landscape assets of the Opole region. 77 Official Journal 371 of 27.12.2006, p. 1 98 draft of ROP OV 2007-2013 3.4.2 Justification of the priority axis chosen Recently in Poland and in the Opole region a positive tendency in the environment improvement can be observed. It is a result of gradual introduction of, among other things, more environment-friendly technologies. Still, however, there is no proper environmental protection infrastructure which makes it impossible to ensure the appropriate quality of life to the population in the region. It also has an adverse effect on economic growth which takes into account respect for environmental resources and assets. The extension and development of the environmental protection infrastructure are not only to raise living standards, build an integrated monitoring system for the environment and limit the consequences of extraordinary hazards, but also to maintain and protect areas with interesting natural and landscape assets. Within Axis 4 Environmental protection projects to be carried out will contribute to improving a quality of the natural environment through development of infrastructure: municipal as regards water, sewage and waste management, flood protection, air protection, renewable energy sources. Moreover, the measures to be taken will be aimed at maintaining biological diversity, natural and landscape assets in the Opole region as well as those related to monitoring of the environment. Axis 4 will allow for strengthening synergy between environmental protection and economic growth which was highlighted in the Community Strategic Guidelines78 as an important element affecting the improvement in conditions favourable to the region development. Attractiveness of the region is to a significant extent determined by access to basic utilities and public services. Implementation of rational solutions in utilities and public services is an essential element of the contemporary policy on environmental protection. The Opolskie Voivodeship is beset with two serious problems, i.e. considerable pollution of waters and insufficient sewage systems in the region, in particular in rural areas. Due to the above, within water and sewage management the main emphasis will be placed on projects related to construction, extension and modernisation of sewage treatment plants as well as construction and extension of sewage systems, connected to sewage treatment plants, absolutely in towns, but also in rural areas. Projects related to a water supply system will be carried out only if they are an element of a sewage treatment project. In order to extend systems of water quality control and of underground waters protection against pollution, the assistance will be given to undertakings aimed at extending a monitoring system by purchasing devices and necessary equipment. Within water and sewage management the aid will be provided only to individual projects in conurbation areas from 2 to 15 thousand PE79 included in the National Programme for Municipal Sewage Treatment80, at the same time fulfilling the obligations arising from the Framework Water Directive 2000/60/WE81. Among weaknesses of the region there is the lack of common and fully operating system of waste utilisation, including, among other things, recycling, composting, recovering biogas from landfills. Therefore it is necessary to introduce significant changes to waste 78 Official Journal 291 of 21.10.2006 PE = population equivalent 80 National Programme for Municipal Sewage Treatment. The Programme was prepared in order to fulfill obligations of the Polish Government as regards providing conurbations with mass sewage systems and municipal sewage plants adopted in the Treaty of Accession between Poland and the European Union. 81 Directive of 23 October, 200? laying framework for the Community action in water policy (Official Journal 327 of 22 December, 2000). 79 99 draft of ROP OV 2007-2013 management in order to improve systems of sorting out, organisation of waste collection and recycling. Used up, illegal landfill sites should be liquidated or reclaimed, waste should be sorted out, selected and recycled as well residue from municipal sewage treatment plants neutralised and recovered. It is also necessary to take measures aimed at selecting and utilising hazardous waste. As in the Opolskie Voivodeship there is no landfill site for products containing asbestos, such a site should be constructed or already existing sites extended by sections for products containing asbestos. Within Axis 4 no new landfill sites are to be constructed, except landfill sites for products containing asbestos, while the emphasis will be laid on waste recycling. Projects eligible for assistance are only those in compliance with the current Plan of Waste Management for the Opolskie Management. Owing to the location of the Opolskie Voivodeship in the Odra River basin, flood prevention and protection against its effects is a significant problem for the region development. Although a number of investments have been already completed, still a weakness of the region is the lack of efficient flood protection as well as a risk of losses in case of flood. For flood protection of Opole, Nysa, Kędzierzyn-Koźle, Brzeg, Krapkowice and Lewin Brzeski as well as other areas situated in the Odra River basin and for reducing to minimum losses caused by floods, of fundamental importance will be investments related to flood protection structures. The aim should be to increase water retention plus comprehensive modernisation and extension of the system of polders, dry reservoirs, levees and other water devices as well as streamlining and improving the existing monitoring system of flood risks. These measures should create conditions for maintaining and gradual development of river sailing as well as for using energy potential of waters for renewable energy production. Comprehensive flood control should include also measures aimed at maintaining and reconstructing ecosystems of rivers and their valleys as well as maintaining in good technical and ecological state running waters and water equipment significant for agriculture. Tasks carried out within the Axis should constitute complement or continuance of the “Programme for the Odra River 200682” implemented in the Opolskie Voivodeship. To systematically improve the air cleanliness in the Opolskie Voivodeship, actions have to be intensified. In particular the area of the whole Opolskie Voivodeship should be covered with the programme for eliminating low emissions. Within the Axis measures aimed at air protection will be supported. Funds will be granted, among other things, to projects related to replacement of heat sources, construction and modernisation of heating networks in public facilities, leading to reduction in emissions of gases and dusts to the atmosphere. In addition, measures related to air monitoring of regional importance will be co-financed. A weakness of the region is low utilisation of renewable energy sources. Therefore, the aim is to use renewable energy sources (RES) to a greater extent. Axis 4 will include measures taken in order to construct devices and plants for generation, storage, transfer and production of renewable energy, among others: solar, wind, biomass, hydroelectrical, geothermal. In accordance with the Community Strategic Guidelines83 a top priority is to reduce dependence on traditional energy which is possible by the greater efficiency of energy and renewable energy consumption. The energy from renewable sources is to have a significant share in the energy balance of the Opolskie Voivodeship. 82 Government multiannual programme covering modernisation of the Odra Water System (Journal of Laws 2001, No. 98, item 1067 as amended) 83 Official Journal 291 of 21.10.2006 100 draft of ROP OV 2007-2013 The Opolskie Voivodeship is among more valuable regions in Poland as regards biodiversity, landscape and natural assets. It is very important to take actions which will safeguard the most unique natural resources of the voivodeship in an appropriate manner. The projects implemented within Axis 4 will be aimed at preserving natural habitats (ecosystems), making ecological corridors more passable and maintaining diversity of species. Actions designed to protect and recover natural and landscape biodiversity, to maintain and restore habitats, including water and mud as well as forest ones, to ensure functionality of ecological corridors as well to reintroduce species and ex situ protection. These measures are necessary for implementation of the common European ecological system Natura 2000 and for protection of the voivodeship biodiversity. 3.4.3 Assistance within Priority Axis 4 Environmental protection will be provided mainly to the following groups of beneficiaries: 1. Units of local self-government, their unions and associations; 2. Incorporated organisational units (legal persons); 3. Non-government organisations; 4. Churches and denominations as well as legal persons of churches and denominations; 5. Government administration; 6. Water companies; 7. PGL Lasy Państwowe (Polish Forest Management Company) and its organisational units; 8. National and landscape parks; 9. Entrepreneurs84; 10. Incorporated units from the sector of public finance (legal persons) not mentioned above. 3.4.4 Flexibility instrument (cross-financing) To ensure efficient accomplishment of the objectives from Priority axis 4 Environmental protection a part of measures eligible for assistance from the European Social Fund (pursuant to art. 34 of Council Regulation (EC) No. 1083/2006 of 11 July, 2006) will be implemented within Axis 4. It will be possible to allocate maximum 10% of funds at the level of Axis 4 to expenditure eligible under the ESF, necessary for completing investment projects and directly associated with them. 84 Entities (including commercial law companies), providing public services, where a major shareholder is the Opolskie Voivodeship, a poviat, a gmina, a town, an association of gminas, the State Treasury or entities selected according to the regulations of the Public Procurement Law performing tasks on the basis a separate, valid agreement concluded with a unit of local self-government (also in a form of public and private partnerships) 101 draft of ROP OV 2007-2013 3.4.5 Target indicators for Priority axis 4 Tab. No. 3.5 Target indicators for Priority axis 4 of ROP OV 2007-2013 Unit Value in baseline year Value in target year Frequency of measuring 4.1. Number of projects in environmental protection item 0 76 year 4.2. Number of projects in water and sewage management item 0 50 year 4.3. Number of projects in waste management item 0 3 year 4.4. Number of projects aimed at improving air quality item 0 5 year 4.5. Number of projects in renewable energy item 0 10 year 4.6. Number of projects in preventing threats related to floods item 0 8 year item 0 4,800 year ha 0 4 ha year item 0 item/ km2 0 item 0 2000 year kW 0 4,250kW year ha 0 200 ha year Indicator No. Name Products Priority axis 4 Environmental protection 4.7. Number of people connected to a sewage system as a result of the projects 4.8. Reclaimed/restored area 4.9. Number of people covered by selective waste collection as a result of the projects 4.10. Number of people protected against flood Number of people connected to a system supplied by renewable energy as a result of the projects 4.12. Potential generated installed power of renewable energy Results 4.11. * 4.13. Areas covered by biodiversity protection as a result of the projects Target value will be assessed* Target value will be assessed* Target value will be assessed during the implementation of the programme when evaluating it Source: Own study 102 year year draft of ROP OV 2007-2013 3.5 PRIORITY AXIS 5 SOCIAL INFRASTRUCTURE AND HIGHER EDUCATION Within Priority axis 5 Social insfrastructure and higher education undertakings to be implemented will be in compliance with Regulation (EC) No. 1080/2006 of the European Parliament and the of the Council on the European Regional Development Fund and repealing Regulation (EC) No. 1783/1999, pursuant to art. 4, items 7, 10 and 11, concerning: − investments in education; − investments in health care infrastructure and social infrastructure; − investments in culture. CATEGORIES OF INTERVENTION85: 56 - Protection and valorisation of natural heritage 58 - Protection and preservation of cultural heritage 59 - Development of cultural infrastructure 75 - Infrastructure of education system 76 - Infrastructure of health service 3.5.1 Objectives of the priority axis − To increase competitiveness of human resources in the labour market by improving the standard and conditions of education in the region; − To strengthen and improve health safety of the region’s inhabitants, in particular of people active in the labour market; − To protect sites of cultural and natural heritage of regional importance; − To rise in importance the role of culture as a factor affecting an attractive image of the region. 3.5.2 Justification of the priority axis chosen Within the framework of Axis 5 Social infrastructure and higher education the measures implemented will be for the development of educational and medical facilities of the Opolskie Voivodeship, for raising the infrastructure standard in culture of supralocal and regional importance and for protection of cultural heritage. One of the conditions to build and develop a modern, competitive economy on a European scale is to raise the quality of human resources which means a rise in the level of education of the region’s inhabitants. Among the strengths of the Opolskie Voivodeship there are increasing educational aspirations of the voivodeship population and rapidly developing 85 Official Journal 371 of 27.12.2006, p. 1 103 draft of ROP OV 2007-2013 higher education. Still, however, the Opolskie Voivodeship has the smallest in Poland number of people with higher education in total population and a serious shortage of qualified staff and specialists which put up a major barrier to locating new investments in the Opolskie Voivodeship. One of the weaknesses of the voivodeship is continuous and high migration of people abroad, including well-qualified staff from the region. In order to ensure development of human resources in the voivodeship, in particular to increase a number of people with higher education, it is necessary to create appropriate conditions for gaining knowledge by wide social groups in the region and establishing co-ordinated infrastructure of educational facilities, including universities and colleges. It is necessary to provide access to a modern educational system using mainly ICT solutions and tools86. A proper standard of the infrastructure is a significant factor which affects the quality of education and access to knowledge. A changing labour market and technological progress force the society to become well-prepared in the process of education and continuously adjust their qualifications to employers’ expectations. To make the society prepared to requirements of the modern labour market it is necessary to adjust education to the needs of the labour market, to continuously broaden knowledge, improve and acquire new professional skills on a regular basis. The opportunities for development of the region lie in preparing modern educational infrastructure for continuous education and practical training which will affect the whole region. To adjust the infrastructure to the development of establishments for continuous education (CKU) and practical training (CKP) which operate in the Opolskie Voivodeship is of key importance in processes of competitiveness of the regional economy. The measures taken in this field within Axis 5 will be aimed, among other things, at reconstructing, renovating and equipping infrastructure facilities, taking into account a demographic and economic situation in a particular area. The actions within Axis 5 are also necessary to fully achieve the objectives included in the Operational Programme Human Resources. A survey of regional infrastructure in the field of higher, post-secondary and secondary education as well as educational centres for equal educational opportunities (CKU /CKP) shows that that it is necessary to improve the educational facilities and their equipment. At universities and colleges in the Opole region it is necessary mainly to extend research and lecturing facilities. A particular attention should be paid to the development of lecturing facilities for the purposes of science which will contribute to growth of the regional modern economy, in particular in the fields indicated in the research within “Regional Foresight”. Axis 5 excludes investments in research and development infrastructure at universities for the development of entrepreneurship which may be co-financed from funds within Axis 1 Strengthening economic attractiveness of the region of ROP OV 2007-2013. Preparations to mobility in the European labour market require intensive teaching of foreign languages and thus it is so important to provide appropriate training facilities where foreign languages will be taught, including preparations to bilingual education of pupils; especially that year by year there are more and more persons interested in learning foreign languages at such centres. To increase investment attractiveness of the region it is also anticipated within the framework of Axis 5 to implement projects to provide appropriate educational facilities for people migrating due to investments located in the Opolskie Voivodeship. 86 Initiative ” i2010: European Information Society for Growth and Jobs”, COM(2005)229 104 draft of ROP OV 2007-2013 An important element in strategic measures of the Opolskie Voivodeship, complement to the aforesaid directions for development, is to improve a quality of educational infrastructure at the local level. The region has a system of educational units which suits the needs at the primary and junior secondary levels, but the quality of educational infrastructure is poor and ICT tools used to a small extent, in particular in rural areas. Hence, tasks to be completed within Axis 5 will be aimed at lifting barriers in access to education by children, including those from rural and marginalised areas, i.e. in a particularly difficult situation in this respect. Within the framework of Axis 5 the projects will be aimed at raising the infrastructure standard of educational units at the primary and junior secondary levels to make them suit contemporary requirements and new teaching methods, mainly with purchases of investment equipment for teaching purposes, including ICT tools. The quality of health care provided to the population of the Opolskie Voivodeship, both in terms of medical staff and medical infrastructure, is not satisfactory. The indicators concerning medical staff and the use of medical infrastructure by patients are below the national average which means that there are significant difficulties in access to public health centres, modern medical equipment health services. Conditions and the pace of professional life cause greater health hazards and as a consequence the demand for medical services becomes higher. Due to the dynamics of demographic and social changes, significant elements in the society development will be measures, in their broad sense, taken in the field of health care through development of health institutions, in particular for people active in the labour market. The lifestyle, modern-age diseases and hazards result in a larger number of disabled people. In the Opole region a number of the disabled has been increasing and therefore there is a need for the increased accessibility to medical services and rehabilitation by these patients, in particular in order to enable them to return to activity in the labour market. Due to a considerable budgetary deficit in Poland, also in the Opole region a problem determining the quality of health care is decapitalisation of the infrastructure and restricted access to expensive and state-of-the-art medical technologies87. Investments in this field will support restructuring of the existing hospital facilities (stationary health care), mainly changes in their profile and rationalisation of management. These projects are to contribute to raising efficiency of hospital wards, adjustment of a profile and specialist hospital facilities to the needs in the region, optimisation of a network of primary health care hospitals through allocation of beds, further development of long-term care institutions according to the local community requirements and extension of out-patient (daily) hospital facilities. A priority will be given to projects to improve infrastructure of health centres where modern-age diseases are treated, especially those related to early detection, an increase in accessibility to, efficiency and quality of diagnostics and therapy in oncology and haematology as well as treatment of brain vascular incidents, and those contributing to improving health of women of child-bearing age and of neonates and infants. An important element of strategic measures of the Opolskie Voivodeship is also to improve a quality of and accessibility of health care infrastructure at the local level (outpatient health care). 87 “Health Care Strategy of the Opolskie Voivodeship for 2006-2013”, adopted by Resolution No. XLIV/418/2006 of the Sejmik of the Opolskie Voivodeship on 31 January, 2006 on adopting the Health Care Strategy of the Opolskie Voivodeship for 2006-2013. 105 draft of ROP OV 2007-2013 The accessibility of health services is limited at the moment, in particular in rural areas, mainly due to unsatisfactory technical infrastructure of local primary health care centres and a shortage of medical equipment at a proper level. To eliminate negative effects of this situation the measures taken will be aimed at improving the quality of primary health care to guarantee effective contacts with patients. Medical infrastructure will be modernised both in terms of facilities and equipment. These measures will be supported through optimisation of medical facilities of out-patient health care, mainly organising diagnostic and therapeutic support for a system of primary health care units. Within the framework of Axis 5 the aid will be provided to projects related to health care only within a public health insurance system. The measures taken within Axis 5 must not lead to extending the sector of health services by new medical units. The assistance within the framework of Axis 5 excludes health units eligible for assistance under Operational Programme Infrastructure and Environment, i.e. those established by the minister or the central body of government administration, a public medical university running teaching and research activities in medical sciences. The support for culture results from the recognised role of culture as a factor creating social attitudes, moral, ethic and aesthetic standards. The support for culture should be regarded as support for socio-economic development of the region and tourism, raising attractiveness of the region and an element to increase competitiveness based on the regional potential, in particular resources of cultural and natural heritage. Axis 5 will be implemented by development of infrastructure of cultural institutions, preparing a varied regional offer of cultural attractions, protection of monuments and cultural heritage (sites/buildings listed in the register of monuments) and natural heritage which will bring about an increase in attractiveness of the region as a place to work, live and spend a leisure time. The Opolskie Voivodeship has rich culture arising mainly from historically determined merged Polish, Czech and German cultures. The region, however, has lower than the average indicators in Poland for a number of spectators, listeners, readers in cultural institutions. To increase them it is necessary to provide easier access to culture through, among other things, extension of infrastructure, at the moment unevenly spread over the region – located mainly in Opole which is the region’s centre. The assistance for projects in culture will contribute to economic growth of the region as a result of, among other things, creating new jobs, and it will be focused on material investments in public infrastructure of culture contributing to preparation of a high quality cultural offer and to raising active participation of the society in culture. The projects are to affect modernisation of cultural facilities improving their equipment such as exhibition, storage, technical and multimedia equipment as well as systems raising safety of the facilities. The increased cultural potential will have an impact on promotion of Opole where the majority of regional cultural institutions are situated, but also on promotion of the whole region. National and international cultural undertakings will be carried out with the use of the infrastructure already existing and the infrastructure to be built. Modernisation of cultural facilities will provide conditions for creating top quality works and artistic demonstrations. As a result, the interest in participation in different events will increase and social integration of the regional population from municipal and rural areas will be strengthened. The aid will be provided to projects aimed at making culture available to the whole society removing architectural barriers in cultural institutions and system solutions for disabled people. 106 draft of ROP OV 2007-2013 Any measures in culture will focus on the most important projects of at least supralocal importance. The Axis excludes projects which may receive aid within Operational Programme Infrastructure and Environment. Moreover, it excludes the investments which will be supported within Rural Development Programme 2007-2013. The Opolskie Voivodeship is among the richest regions in historical sites/buildings in Poland, however, the weakness is their bad condition and limited accessibility. Among important sites of cultural heritage there are, among other things, historically developed urban areas and items of architecture. Owing to deterioration of monuments, measures will be undertaken to stop degradation and destruction of buildings listed in the register of monuments as well as to utilise them to a maximum extent for cultural purposes. In addition, the assistance will be rendered to projects aimed at preservation of museum pieces, archive records, antique books, book collections and other moveable monuments. In the Opolskie Voivodeship there are over 5.5 thousand archaeological sites. A trump card of the region is a unique on a European scale documentary site of inanimate nature “Trias” in Krasiejów where remains of the oldest dinosaur were found. However, sites of natural heritage are insufficiently developed and hardly available to visitors. 3.5.3 Assistance within Priority Axis 5 Social infrastructure and higher education will be provided mainly to the following groups of beneficiaries: 1. Units of local self-government, their unions and associations; 2. Incorporated organisational units (legal persons); 3. Universities; 4. Legal and natural persons who are bodies managing schools and establishments; 5. Health units operating in the public health care system; 6. Non-government organisations; 7. Churches and denominations as well as legal persons of churches and denominations; 8. Cultural institutions; 9. Incorporated units from the sector of public finance (legal persons) not mentioned above. 3.5.4 Flexibility instrument (cross-financing) To ensure efficient accomplishment of the objectives from Priority axis 5 Social infrastructure and higher education a part of measures eligible for assistance from the European Social Fund (pursuant to art. 34 of Council Regulation (EC) No. 1083/2006 of 11 July, 2006) will be implemented within Axis 5. It will be possible to allocate maximum 10% of funds at the level of Axis 5 to expenditure eligible under the ESF, necessary for completing investment projects and directly associated with them. 107 draft of ROP OV 2007-2013 3.5.5 Target indicators for Priority axis 5 Tab. No. 3.6 Target indicators for Priority axis 5 of ROP OV 2007-2013 Unit Value in baseline year Value in target year Frequency of measuring 5.1. Number of projects in education item 0 11 year 5.2. Number of projects in health care 5.3. Number of projects in cultural and natural heritage item item 0 0 14 10 year year 5.4. Number of students using the effects of the projects item 0 2,900 year 5.5. Number of pupils and other people using the effects of the projects item 0 6,750 year year Indicator No. Name Results Products Priority axis 5 Social infrastructure and higher education * 5.6. Potential number of specialist medical examinations conducted with the use of equipment purchased/modernised as a result of the projects item 0 Target value will be assessed* 5.7. Potential number of patients using the infrastructure and equipment as a result of the projects item 0 2,500 year 5.8. Number of spectators, listeners, visitors and people using cultural facilities item 0 95,000 year Target value will be assessed during the implementation of the programme when evaluating it Source: Own study 108 draft of ROP OV 2007-2013 3.6 PRIORITY AXIS 6 MOBILISATION OF MUNICIPAL AND DEGRADED AREAS Within Priority axis 6 Mobilisation of municipal and degraded areas undertakings to be implemented will be in compliance with Regulation (EC) No. 1080/2006 of the European Parliament and the of the Council on the European Regional Development Fund and repealing Regulation (EC) No. 1783/1999, pursuant to art. 7 and 8 concerning urban areas and those experiencing or threatened by physical deterioration and social exclusion. CATEGORIES OF INTERVENTION88: 50 - Revitalisation of industrial areas and reclaiming of contaminated land 61 - Integrated projects for reviatlisation of urban and rural areas 78 - Housing infrastructure 3.6.1 Objectives of the priority axis − To give new social and economic functions to municipal and degraded areas and reviving them to increase their territorial and economic attractiveness as well as to create conditions for employment rise in these areas. 3.6.2 Justification of the priority axis chosen One of the features distinguishing the cohesion policy is its capability to adapt to special needs and a unique nature of particular geographical challenges and opportunities. Hence, it is of profound importance to prevent unequal regional development which reduces potential for economic growth. To limit heavy concentration of economic, territorial and social problems in urban areas and threatened with degradation is a priority task for the Opolskie Voivodeship in 2007-2013. Diversity of the Opolskie Voivodeship as regards a number of physical and geographical as well as social and economic features highlights the fact that problem areas exist. Negative phenomena from economic, technical and social spheres in these areas result in intraregional disproportions at the voivodeship level. These phenomena set up a barrier to the development of the problem areas themselves, mainly owing to unsatisfactory infrastructure and unfavourable processes affecting them. Weaknesses of the Opolskie Voivodeship identified in the strategic balance of the region include areas requiring comprehensive reviatlisation actions and intensifying social exclusion. Characteristic for these areas – high unemployment rate, low level of economic activity, more and more often 88 Official Journal 371 of 27.12.2006, p. 1 109 draft of ROP OV 2007-2013 occurring pathological phenomena in comparison with other regions, are the reasons why even basic social needs in these areas are not sufficiently satisfied. Social inequality is more and more noticeable in the region – areas of poverty, pathology and threat of crime near areas inhabited by rich people with stable social status. A situation of the voivodeship as regards housing resources is also bad in comparison with other regions in Poland. Negative phenomena in this respect are connected both with the age structure of flats and their statistic shortage. Low dynamics of development of the housing industry is particularly alarming as regards a relation between a number of new flats commissioned and a number of marriages made as in comparison with Poland it is one of the worst.89 The implementation of Axis 6 will include undertakings in indicated areas, combined measures for the development of infrastructure with measures for socio-economic revival. As a consequence, the tasks within the Axis will be aimed at stimulating economic growth, promoting entrepreneurship, development of local employment as well as increasing the quality of services provided to the population. The measures taken within the Axis will contribute, apart from economic aspects, to re-establishing of social ties in problem areas and restoration of spatial order. Due to the fact that economic problems, neglected, degraded spatial structures and social exclusion are of considerable importance to the urbanised areas of the Opolskie Voivodeship – the aim of the measures within the Axis will be revitalisation of urban areas. The assistance for these areas is to contribute to the development of towns as the fields for economic growth and of neighbouring areas to affect sustainable development of the whole Opolskie Voivodeship. It is to result in socio-economic cohesion in urban areas, increasing their attractiveness, support of growth and new, better jobs. Reviatlisation of these areas should introduce solutions in spatial, social and economic dimensions. The effect, on the one hand, should be strengthening or restoration of central functions of urban areas, integrating local communities, but also, among other things, establishing permanent functional relations between urbanised and rural areas. Measures taken within Axis 6 in municipal areas will relate, among other things, to rehabilitation of public space, including separation of industrial functions from housing and recreational ones, to shaping space and building development in a manner facilitating inhabitants mutual communication and co-operation. Moreover, actions taken within the framework of the Axis will also relate to creating safe spaces and at the same time tasks aimed at improving safety of inhabitants from areas subject to reviatlisation as the areas particularly threatened with pathologies. The assistance will be given mainly to old town centres, buildings/sites of cultural heritage and necessary measures in infrastructure, including municipal and power industry infrastructure only in revitalised areas. Some measures in urban areas will be associated with direct investments in the housing construction90. Investments in the housing construction will be directed mainly to housing co-operatives and local self-governments, and they will be related to multi-family buildings and buildings owned by public authorities, intended for dwelling purposes for people with low income from revitalised areas. Measures in this field will not apply to facilities used for purposes of public administration (except external elements of buildings listed in the register of monuments). Within the framework of measures related to revitalisation, projects to be implemented will cover the areas specified in the Local Revitalisation Programmes prepared by relevant self-government units, which apply to at least planning period 2007-2013 89 acc. to “Report on land development of the Opolskie Voivodeship-synthesis”, June 2006 Regulation (EC) No. 1080/2006 of 5 July, 2006 (Official Journal 210 of 31.7.2006, p. 1), art. 7 and Commission Regulation (EC) No. 1828/2006 of 8 December, 2006 (Official Journal 371 of 27.12.2006, p. 1), art. 47 90 110 draft of ROP OV 2007-2013 (projects included in the specified field of revitalisation as per criteria). It is of key importance to reliably identify and analyse areas intended for revitalisation as projects implemented within Local Revitalisation Programmes will not be eligible for assistance under other Priority Axes of ROP OV 2007-2013. Moreover, the areas will be indicated and necessary revitalisation actions planned by units of local self-government in co-operation with other entities based on guidelines laid down on the basis of valid legal solutions by the Managing Institution. As regards revitalisation of urban areas the Managing Institution may also, during the implementation of ROP OV 2007-2013, take a decision about using an additional financial instrument in a form of the Community Initiative JESSICA under terms defined by the Community guidelines. As a part of removing development barriers and negative processes taking place in problem areas, measures to be taken within the framework of Axis 6 will be aimed at development of other degraded areas, located in municipal areas not covered by the Local Revitalisation Programmes referred to above and in areas outside administration borders of towns. Measures to be supported in these areas will be aimed at stimulating economic growth, increasing investment attractiveness and improving conditions for creating jobs in these areas. A role of projects within these undertakings will be implementation of processes which are to restore these areas to efficient functioning through a change in structure of these areas and allocating new functions to them, and first of all mobilisation of these areas through a positive value of a quality change. The support will be provided to undertakings generating the added value for the economy and resulting in an improvement in the quality of life of inhabitants. Revitalisation measures will be taken in three interrelated areas: spatial, social and economic A priority will be given to measures for preparing the sites for new economic investments (including all utilities), demolishing old facilities and preparing existing facilities to support business activity. Investments in infrastructure of facilities with economic, educational, tourist, cultural or social functions should directly translate into an increase of the economy efficiency, i.e. contribute to the development of entrepreneurship, an increase of investment attractiveness of the sites as well as establishing and developing business incubators, technological parks. A condition for fulfilling tasks in areas previously used by army and police is a change in functions of these areas. Undertaking to be carried out will provide inhabitants from degraded areas with access to basic supplies and services. Changes in functions and the structure of degraded areas are to contribute to a general improvement in land development and at the same time directly aid socio-economic growth. 3.6.3 Assistance within Priority Axis 6 Mobilisation of municipal and degraded areas will be provided mainly to the following groups of beneficiaries: 1. Units of local self-government, their unions and associations; 2. Incorporated organisational units (legal persons); 3. Universities; 4. Incorporated units from the sector of public finance (legal persons) not mentioned above; 5. Non-government organisations; 6. Churches and denominations as well as legal persons of churches and denominations; 7. Housing co-operatives and communities; 111 draft of ROP OV 2007-2013 8. Enterprises.91 3.6.4 Flexibility instrument (cross-financing) To ensure efficient accomplishment of the objectives from Priority axis 6 Mobilisation of municipal and degraded areas a part of measures eligible for assistance from the European Social Fund (pursuant to art. 34 of Council Regulation (EC) No. 1083/2006 of 11 July, 2006) will be implemented within Axis 6. It will be possible to allocate maximum 10% of funds at the level of Axis 6 to expenditure eligible under the ESF, necessary for completing investment projects and directly associated with them. 3.6.5 Target indicators for Priority axis 6 Tab. No. 3.7 Target indicators for Priority axis 6 of ROP OV 2007-201 Unit Value in baseline year Value in target year Frequency of measuring 6.1.Number of projects aimed at reviatlisation of areas item 0 13 year 6.2.Number of projects aimed at improving attractiveness of towns item 0 50 year ha 0 25 year Indicator No. Name Products Priority axis 6 Mobilisation of municipal and degraded areas Areas subject to revitalisation including: 6.3. - municipal - degraded Results 6.4. * Number of enterprises operating in the degraded areas, supported as a item result of the projects 6.5.Number o people covered by assistance in areas subject to revitalisation item 0 0 Target value will be assessed* Target value will be assessed* Target value will be assessed during the implementation of the programme when evaluating it Source: Own study 91 Entities (including commercial law companies), providing public services, where a major shareholder is the Opolskie Voivodeship, a poviat, a gmina, a town, an association of gminas, the State Treasury or entities selected according to the regulations of the Public Procurement Law performing tasks on the basis a separate, valid agreement concluded with a unit of local self-government (also in a form of public and private partnerships). 112 year year draft of ROP OV 2007-2013 3.7 PRIORITY AXIS 7 TECHNICAL ASSISTANCE Within Priority axis 7 Technical assistance ROP OV 2007-2013 undertakings to be implemented will be in compliance with Regulation (EC) No. 1083/2006 layig down general provisions on the European Regional Development Fund, the European Social Fund and the Cohesion Fund and repealing Regulation (EC) No. 1260/1999, pursuant to art. 46 concerning technical assistance. CATEGORIES OF INTERVENTION92: Preparation, implementation, monitoring and control Evaluation, research/expert opinions, information 86 and communication 85 - 3.7.1 Objective of the priority axis − To ensure the effective and efficient implementation of the Regional Operational Programme of the Opolskie Voivodeship for 2007-2013 as well as full absorption of structural funds available within it. 3.7.2 Justification of the priority axis chosen The projects implemented within Priority axis 7 of ROP OV 2007-2013 will be aimed at assisting the Managing Authority and other institutions involved in the implementation of ROP OV 2007-2013. The amount of structural funds allocated in ROP OV 2007-2013 to undertakings of priority importance for the region is several times greater than the funds allocated for 20042006 within, among other things, the Integrated Regional Operational Programme. To use these funds efficiently it will be necessary to provide an effective system to implement them which requires considerable financial expenditure. The experiences from years 2004-2006 have confirmed that undertakings carried out within Axis 7 Technical Assistance are extremely important for the efficient use of structural funds. The analysis of the situation of units which have participated in the implementation process of operational programmes in the programming period 2004-2006 shows that it was necessary to support employment of adequately qualified staff, staff trainings, providing institutions with the required equipment (especially computers), organising and servicing meetings of the Monitoring Committee as well as to support promotional and publicity actions. Without financial aid a number of tasks would have been impossible to accomplish. 92 Official Journal 371 of 27.12.2006, p. 1. 113 draft of ROP OV 2007-2013 A new, full, seven-year programming period of structural funds poses a considerable challenge for every region. The challenge is related not only to appropriate preparations, implementation and settlement of the projects by beneficiaries, but also to management of own operational programme by the self-government of every voivodeship. Therefore the aim is to best prepare the Managing Authority and other institutions involved in the implementation of ROP OV 2007-2013, as regards technical, staff and organizational aspects. Technical assistance for ROP OV 2007-2013 will be given to strengthening the institutions involved in management, implementation, monitoring, control, evaluation and assessment of the progress of ROP OV 2007-2013 as well as to promotion and publicity about the aid available within its framework. The assistance will be aimed at providing and equipping office facilities as well as adapting the whole system, particular institutions and single workstations to the needs related to efficient and effective implementation of the programme. It will be necessary to train staff responsible for accomplishment of tasks at particular stages in the management of ROP OV 2007-2013. The stress will be on providing properly educated and prepared personnel. Therefore new employees will be engaged, the staff already working on structural funds further trained and expert support ensured. The funds will be allocated to trainings of employees, their specialist studies, conferences, seminars, traineeships (also abroad) and other forms of in-service training. It will be also necessary to have organisational assistance related to serving functions as the Managing Authority and other institutions taking part in the management of the Programme. It will be important to support a process of collecting, assessing and selecting projects, monitoring their implementation and monitoring the whole Programme, verification of payments and financial audits as well as archiving documents. The assistance will be also provided to serve committees and other auxiliary bodies, also as regards training and preparation of their members to perform functions. A separate task will be to ensure the efficient IT system for implementation of ROP OV 2007-2013. Also all and any information and promotional measures are necessary as they will popularise knowledge of the programme, raise the society awareness of access and use of structural funds. Moreover, training and consultancy measures for potential beneficiaries are required. The actions to be taken will include publication of materials, preparation of services and publicity programmes, specialist analyses, evaluations and expert opinions. The support for information and promotional measures is necessary because their efficiency will affect the number and quality of submitted projects and in consequence the efficient use of funds within ROP OV 2007-2013. In the context of measures above it is also significant to ensure a smooth transfer from the programming period 2004-2006 to the next structural funds programming period – i.e. 2007-2013, as well as proper preparation to the next programming period – after 2013. 3.7.3 Assistance within Priority Axis 7 Technical assistance will be provided to the following beneficiary: 1. Managing Authority for ROP OV 2007-2013 and other institutions participating in the management of the Programme. 3.7.4 Flexibility instrument (cross-financing) 114 draft of ROP OV 2007-2013 Within the framework of Priority axis 7 Technical assistance the principle of crossfinancing shall not apply. 3.7.5 Target indicators for Priority axis 7 Tab. No. 3.8 Target indicators for Priority axis 7 of ROP OV 2007-2013 Unit Value in baseline year Value in target year Frequency of measuring Indicator No. Name Results Products Priority axis 7 Technical assistance * 7.1. Number of projects aimed at supporting a process of the programme implementation item 0 21 year 7.2. Number of workstations serving the programme, co-financed from the TA item 0 Target value will be assessed* year 7.3. Number of workers who participated in at least one form of professional training in relation to a total number of workers serving the programme % 0 100 year 7.4. Number of beneficiaries participating in different types of trainings, conferences and information meetings about the programme item 0 Target value will be assessed* year 7.5. Potential number of recipients of information contained in information materials and on websites item 0 Target value will be assessed* year Target value will be assessed during the implementation of the programme when evaluating it Source: Own study 115 draft of ROP OV 2007-2013 3.8 Information about complementarity and co-ordination with financial measures from the EAFRD and the EFF ROP OV 2007-2013 is complementary to the Rural Development Programme for 2007-2013 [RDP 2007-2013], financed from the European Agricultural Fund for Rural Development [EAFRD] and to the Operational Programme Sustainable Development of the Fisheries Sector and Coastal Fishing Areas 2007-2013, financed from the European Fisheries Fund [EFF], in a manner to prevent overlapping of operations financed under both programmes, within areas relating to Priority axes of ROP OV 2007-2013 below. Tab. No. 3.9. Complementarity and co-ordination of ROP OV 2007-2013 with RDP 20072013 and with OP Sustainable development of the fisheries sector and coastal fishing areas 2007-2013. ROP OV 2007-2013 Rural Development Programme for 2007-2013 Axis 3 Quality of life in rural areas and diversification of rural economy in the following fields: - establishing and development of microenterprises; - tourist, recreational and sports infrastructure. Axis 3 Quality of life in rural areas and Axis 4 Environmental diversification of rural economy protection in the following fields: - water and sewage management; - waste management; - renewable energy. Axis 3 Quality of life in rural areas and Axis 5 Social infrastructure diversification of rural economy and higher education in the following fields: - preservation of cultural heritage; - cultural infrastructure. Axis 3 Quality of life in rural areas and Axis 6 diversification of rural economy in the following fields: Mobilisation of - preservation of cultural heritage; municipal and - cultural infrastructure; degraded areas - tourist, recreational and sports infrastructure. Source: Own study Axis 1 Strengthening economic attractiveness of the region Operational Programme Sustainable development of the fisheries sektor and coastal fishing areas 2007-2013 Priority 2 Aquaculture, inland fishery, fish processing and market in the following fields: - fish farming and breeding (aquaculture); - tourist, recreational and sports infrastructure. Priority 2 Aquaculture, inland fishery, fish processing and market in the following fields: - protection and improvement of the environment and natural resources. - - 116 draft of ROP OV 2007-2013 CHAPTER 4 FINANCIAL PLAN For purposes of the implementation of ROP OV 2007-2013, the region will be allocated under the European Regional Development Fund EUR 427,144,813. The amount of structural funds appropriated to the Opolskie Voivodeship arises from the algorithm 80/10/10 defined in the National Strategic Reference Framework 2007-2013 for Growth and Jobs, National Cohesion Strategy which, taking into account current statistical data, is a resultant of the following criteria: − population in particular voivodeships; − gross domestic product [GDP] per capita; − unemployment rate. Distribution of the allocated funds available within ROP OV 2007-2013 between particular priority axes arises from a number of factors, i.e.: − needs of the region – identified at the stage of the diagnosis of the situation in the Opolskie Voivodeship; − the effect of particular axes on the accomplishment of the general objective of ROP OV 2007-2013, in particular on economic growth of the region; − a scope of interventions of particular axes; − limitations arising from the Community Regulations on implementation of structural funds in 2007-2013; − a demarcation line between regional operational programmes and operational programmes national in nature; − results of socio-economic consultations held according to the partnership principle; − obligations of Poland concerning implementation of guidelines of the renewed Lisbon Strategy. Taking into account the aforementioned factors the funds have been distributed within the Programme, what is shown in the tables from 4.1 to 4.6 below. A full absorption of the funds for ROP OV 2007-2013 depends on a number of factors. One of them is to ensure the appropriate own contribution. Pursuant to art. 53 of Council Regulation (EC) No. 1083/2006, the contribution of funds at the level of operational programmes within the Convergence objectives is maximum 85 %. As experiences from the period between 2000-2006 show, the major beneficiary of funds from the European Union is a local self-government. The use of the funds for ROP OV 2007-2013 to a full extent will depend mainly on ensuring appropriate co-financing from the units of local self-government. A forecast value of the investment potential index in the Opolskie Voivodeship, i.e. a relation between necessary co-financing for projects aided from the EU funds to the total amount of funds for development available to units of local self-government intending to use 117 draft of ROP OV 2007-2013 the EU funds, is lower than the national average93. This shows that a risk of problems with finding appropriate funds for co-financing of projects aided from the EU funds is relatively low. The experiences from 2000-2006 and the analysis of financial potential of units of local self-government provide a basis for a thesis that all the funds within the Programme will be used. Tab. No. 4.1 Distribution of the funds for ROP OV 2007-2013 and implementation of the Lisbon Strategy with division into particular priority axes of the Programme. [EUR] No. Priority axes of ROP OV 2007-2013 % of funds ROP OV 2007-2013 Amount % of implementation of Lisbon Strategy Amount Strengthening economic Axis 1 attractiveness of the region 37 % 158,043,581 89 % 140,785,222 Axis 2 Information society 5% 21,357,241 100 % 21,357,241 Axis 3 Transport 26 % 111,057,652 7% 7,496,392 10 % 42,714,481 13 % 5,552,882 10 % 42,714,481 0% 0 9% 38,443,033 0% 0 3% 12,814,344 0% 0 100 % 427,144,813 41 % Environmental protection Social infrastructure and Axis 5 higher education Mobilisation of Axis 6 municipal and degraded areas Axis 4 Axis 7 Technical assistance Total 175,191,737 Source: Own study. The Managing Authority may, during the implementation of the Programme, decide about excluding some funds from the funds allocated to Axes 3 and 4, to finance so called integrated projects combining two support areas indicated in ROP OV 2007-2013, i.e. road infrastructure from Axis 3 and water and sewage infrastructure from Axis 4 in order to provide all the utilities on sites for economic investments. Tab. No. 4.2. Distribution of total funds for ROP OV 2007-2013 divided into particular years (borrowings). [EUR] Years ERDF contribution 2007 59,880,067 2008 61,282,272 93 M. Mackiewicz, E. Malinowska-Misiąg, W. Misiąg, M. Tomalak “Ramy finansowe strategii rozwoju województw na lata 2007-2013”, Instytut Badań nad Gospodarką Rynkową, Warsaw 2006 118 draft of ROP OV 2007-2013 Years ERDF contribution 2009 62,675,245 2010 61,857,628 2011 60,702,554 2012 59,584,324 2013 61,162,723 2007-2013 427,144,813 Source: Own study, in compliance with NSRF 2007-2013. National public contribution Total 1 2 3=1+2 4=1/3 Private contribution Community contribution For information purposes EIB loans Priority axes ROP OV 2007-2013 ERDF contribution index Tab. No. 4.3. Distribution of funds with division into priority axes and sources of financing. [EUR] 5 6 AXIS I 158,043,581 27,890,044 185,933,625 85 % 0 165,131,928 AXIS II 21,357,241 3,768,925 25,126,166 85 % 0 17,085,793 AXIS III 111,057,652 19,598,409 130,656,061 85 % 0 8,819,284 AXIS IV 42,714,481 7,537,849 50,252,330 85 % 0 6,834,317 AXIS V 42,714,481 7,537,849 50,252,330 85 % 0 8,542,896 AXIS VI 38,443,033 6,784,065 45,227,098 85 % 0 28,945,343 AXIS VII 12,814,344 2,261,355 15,075,699 85 % 0 0 2007-2013 427,144,813 75,378,496 502,523,309 85% 0 235,359,561 Source: Own study 119 draft of ROP OV 2007-2013 Tab. No. 4.4 Indicative distribution, according to categories of the programmed use of the ERDF contribution in ROP OV 2007-2013 – priority issues. [EUR] Priority issues Name of code Code 02 Amount Research and technological development, innovations and entrepreneurship R+TD infrastructure (including equipment, instruments and fast IT networks connecting research centres) and specialist centres of technological competencies 9,798,702 05 Services in advanced support for enterprises and groups of enterprises 07 Investments in enterprises directly related to research and innovations (innovative technologies, establishing enterprises by universities, existing R+TD centres and enterprises, etc.) 39,194,808 08 Other investments in enterprises 60,740,099 09 Other actions aimed at entrepreneurship at SMEs stimulating research, innovations 7,111,961 and Total 23,939,652 140,785,222 Information society 10 11 13 14 Telecommunications infrastructure (including broadband networks) Information and communication technologies (access, security, interoperability, preventing threats, research, innovations, digital contents, etc.) Services and applications for citizens (e-health, e-administration, elearning, e-integration, etc.) Services and applications for SMEs (e-commerce, education and training, establishing chains, etc.) Total 10,251,476 2,562,869 4,271,448 4,271,448 21,357,241 Transport 18 Railway rolling stock 7,496,391 23 Regional/local roads 94,399,004 24 Bicycle paths 25 Municipal transport 1,665,865 29 Airports 7,496,392 862,918 Total 111,920,570 Energy 39 Renewable energy: wind 1,281,434 40 Renewable energy: solar 1,281,434 41 Renewable energy: biomass 1,281,434 120 draft of ROP OV 2007-2013 [EUR] Priority issues Name of code Code 42 Renewable energy: hydroelectrical, geothermal and other Total Amount 1,708,580 5,552,882 Environmental protection and preventing threats 44 Management of municipal and industrial waste 3,075,443 46 Waste treatment 47 Air quality 2,135,724 48 Integrated system of pollution prevention and control 1,059,319 50 Revitalisation of municipal areas and reclaiming contaminated land 51 Promoting biodiversity and natural protection (including NATURA 2000) 2,135,724 53 Preventing threats (including preparation and implementation of plans and instruments for preventing and managing natural and technological threats) 11,532,910 17,222,479 Total 15,377,213 52,538,812 Tourism 56 Protection and valorisation of natural heritage 1,281,434 57 Other support for strengthening tourist services 16,395,441 Total 17,676,875 Culture 58 Protection and preservation of cultural heritage 5,766,455 59 Development of cultural infrastructure 5,766,455 Total 11,532,910 Revitalisation of municipal and rural areas 61 Integrated projects for revitalisation of municipal and rural areas Total 18,452,656 18,452,656 Investments in social infrastructure 75 Infrastructure of educational system 17,085,793 76 Infrastructure of health service 12,814,344 78 Housing infrastructure Total 4,613,164 34,513,301 121 draft of ROP OV 2007-2013 [EUR] Priority issues Name of code Code Amount Technical assistance 85 Preparation, implementation, monitoring and control 5,766,455 86 Evaluation, research/expert opinions, information and communication 7,047,889 Total 12,814,344 TOTAL 427,144,813 Source: Own study, in compliance with annex No. II to Commission Regulation (EC) No. 1828/2006 of 8 December, 2006 setting out rules for the implementation of Council Regulation (EC) No. 1083/2006 and Regulation (EC) No. 1080/2006 of the European Parliament and of the Council. Tab. No. 4.5. Indicative distribution, according to categories of the programmed use of the ERDF contribution in ROP OV 2007-2013 – forms of financing. [EUR] Form of financing Code Name of code Amount 01 Non-returnable aid 427,144,813 02 Aid (loan, interest-rate subsidy, guarantees) 0 03 Venture capital (purchase of shares, venture capital funds) 0 04 Other forms of financing 0 Total 427,144,813 Source: as above Tab. No. 4.6. Indicative distribution, according to categories of the programmed use of the ERDF contribution in ROP OV 2007-2013 - areas. [EUR] Area Code Name of code Amount 01 Municipal area 196,472,091 02 Mountain area 0 03 Isles 0 04 Areas with low or very low population density 0 05 Rural areas (except mountain areas, isles, areas with low or very low population density) 06 Former external borders of the EU (after 30.04.2004) 217,858,378 0 122 draft of ROP OV 2007-2013 07 Peripherial region 0 08 Areas of transborder co-operation 0 09 Areas of transnational co-operation 0 10 Areas of interregional co-operation 0 00 N/A Total 12,814,344 427,144,813 Source: as above. 123 draft of ROP OV 2007-2013 CHAPTER 5 SYSTEM FOR IMPLEMENTING ROP OV 2007-2013 – IMPLEMENTING REGULATIONS 5.1. Competence of institutions involved in the management of ROP OV 2007-2013 5.1.1. Co-ordination 5.1.1.1. Co-ordination at the level of NSRF – Minister competent for regional development The Minister competent for regional development supervises correct operation of the NSRF implementation system and is responsible for evaluations at the level of the NSRF, including horizontal, supplementary and ad hoc examinations arising from monitoring of the NSRF implementation. 5.1.1.2. Co-ordination of 16 Regional Operational Programmes – Co-ordinating Authority for Regional Operational Programmes A function of the Co-ordinating Authority for 16 Regional Operational Programmes will be performed by the Minister for regional development, served by the Department for Co-ordination of Regional Programmes within the Ministry for Regional Development. The Co-ordinating Authority for 16 ROPs is responsible in particular for: − verifying a ROP for its compliance with the National Strategic Reference Framework (NSRF); − negotiating a ROP with the European Commission in co-operation with the Managing Authorities of a ROP; − ensuring consistency of guidelines applied; − monitoring effects of implementing ROPs in regions (comparative analyses). Mutual relations as well as detailed responsibilities and distribution of tasks between the Co-ordinating Authority for ROPs and the Managing Authority of ROP OV 2007-2013, i.e. the Executive Board of the Opolskie Voivodeship, will be specified upon agreement between these authorities. 5.1.2. Management of ROP OV 2007-2013 5.1.2.1. Managing Authority of ROP OV 2007-2013 A function of the Managing Authority of ROP OV 2007-2013 is performed by the Executive Board of the Opolskie Voivodeship. 124 draft of ROP OV 2007-2013 The Managing Authority, pursuant to art. 60 of Council Regulation No. 1083/2006, is responsible for the management of ROP OV 2007-2013 and its implementation following a principle of due management of finance, in particular for: − ensuring that operation for funding are selected in conformity with criteria applicable to ROP OV 2007-2013 as well as that they meet relevant Community and national principles throughout the whole implementation period; − verifying that co-financed goods and services have been provided as well as that expenditure on operations declared by beneficiaries have been actually incurred and that they are in conformity with the Community and national principles; − ensuring a computerised system for registering and storing accounting records for every operation within ROP OV 2007-2013 as well as ensuring that data about performance, necessary for purposes of financial management, monitoring, verification, audits and evaluation are collected; − ensuring that beneficiaries and other entities participating in operations have a separate accounting system or a relevant accounting code for all transactions related to a particular operation without prejudice to the national accounting rules; − ensuring that the evaluation of ROP OV 2007-2013, referred to in art. 48 par. 3 of Council Regulation No. 1083/2006, is in conformity with art. 47 of the aforesaid Regulation; − establishing procedures for ensuring that any documents related to expenditure and audits, necessary for a proper audit trail, are stored pursuant to the regulations of art. 90 of Council Regulation No. 1083/2006; − ensuring that the Certifying Body receives all the necessary information about procedures and verifications carried out in relation to expenditure, for certification purposes; − managing works of the Regional Monitoring Committee of ROP OV 2007-2013 and providing it with documentation required for monitoring a quality of implementation of ROP OV 2007-2013 in the light of its specific objectives; − preparing and submitting annual and final reports on the implementation of ROP OV 2007-2013 to the Commission, after they are approved by the Regional Monitoring Committee; − ensuring compliance with requirements concerning information and publicity defined in art. 69 of Council Regulation No. 1083/2006; − providing the Commission with information to enable it to evaluate major projects. 5.1.2.2. Intermediate bodies The Managing Authority of ROP OV 2007-2013 may commission other entities with some of its tasks, managing or operational in nature, on the basis of a separate contract or agreement. Delegating tasks, however, the Managing Authority of ROP OV 2007-2013 is still fully responsible for the entire implementation of the Programme. 125 draft of ROP OV 2007-2013 5.1.2.3. Certifying Authority The Minister for regional development, as the one responsible for establishing a certification system in conformity with the regulations of the Community and the Polish laws as well as for ensuring that it operates properly, in consultation with the minister competent for public finance will specify general rules and procedures for certification to be a basis for all the certifying authorities to act. A function of the institution responsible for certification of expenditure incurred within 16 ROPs is performed by the Department of the Certifying Authority, established within a structure of the Ministry for Regional Development. The Certifying Authority of ROP OV 2007-2013 is responsible in particular for: − drawing up and submitting the Commission with certified statements of expenditure and applications for payment; − certifying that a statement of expenditure is accurate, arises from reliable accounting systems and is based on verifiable supporting documentation, − certifying that declared expenditure is in compliance with the relevant Community and national principles as well as that it has been incurred in respect of operations selected for funding according to criteria applicable to the programme and meets the Community and national principles; − ensuring, for certification purposes, that it received from the Managing Authority proper information concerning procedures and verifications carried out in relation to expenditure included in statements of expenditure; − taking into account, for certification purposes, results of all audits carried out by the Audit Authority or under its responsibility; − maintaining accounting records in an electronic form related to expenditure declared to the Commission; − keeping an account of amounts recoverable and of amounts withdrawn after cancellation of all or a part of financial contribution for an operation. The amounts recovered are returned to the general budget of the European Union before closure of the operational programme by deducting them from the next statement of expenditure; − if applicable – verifying and approving manuals of regional intermediate certifying authorities. The Certifying Authority for 16 ROPs delegates a part of functions related to certification, on the basis of an agreement concluded, to voivodeship offices. 5.1.2.4. Audit Authority For ROP OV 2007-2013 a function of the Audit Authority is performed by the Chief Tax Inspector. The tasks carried out through a selected organisational unit at the Ministry of Finance, i.e. the Department for Certifying and Declaring Funds from the European Union, and tax inspection offices. The Audit Authority is responsible for ensuring that audits of the management and control systems for the operational programme as well as examinations of projects conducted 126 draft of ROP OV 2007-2013 on the basis of a relevant sample are carried out according to internationally recognised audit standards. The Audit Authority fulfils tasks set in art. 62 and art. 71 par. 2 of Council Regulation No. 1083/2006. The tasks include first of all: − ensuring that audits are conducted in order to verify if the management and control systems for the operational programme function efficiently; − ensuring audits of operations on the basis of relevant samples in order to verify declared expenditure; − presenting the Commission, within nine months after approval of the operational programme, an audit strategy to be employed by entities carrying out audits, a methodology to be followed, a method of selecting data samples for audit purposes and an indicative schedule of audits in order to ensure that major entities will be audited and audits will be evenly spread over the whole programming period; − providing the Commission with an annual report on audits with results of audits from the previous 12 months, ended on 30 June of a particular year, according to the audit strategy for the operational programme as well as informing of any gaps found in the management and control systems for the Programme. The first report to be submitted by 31 December, 2008 covers the period from 1 January, 2007 to 30 June, 2008. Information concerning audits after 1 July, 2015 will be attached to the final report on audits to be a complement of the winding-up declaration; − giving opinions, on the basis of controls and audits carried out under its responsibility, if the management and control systems are efficient so as to provide a rational guarantee that declarations of expenditure submitted to the Commission are correct and at the same time a rational guarantee that transactions which are a basis for it are in compliance with the law and correct; − submitting, if applicable, pursuant to art. 88 of Council Regulation No. 1083/2006, a declaration of partial winding-up with the assessment of compliance with the law and correctness of relevant expenditure. − submitting the Commission, by 31 March, 2017 at the latest, a winding-up declaration, including the assessment of legitimacy of the payment application for the final balance as well as of compliance with the law and of correctness of transactions which are a basis for expenditure covered by the final declaration of expenditure with the accompanying final report on audits. The Audit Authority prepares reports on audits conducted together with any possible recommendations. It is the Executive Board of the Opolskie Voivodeship, i.e. the Managing Authority of ROP OV 2007-2013, to be responsible for implementation of recommendations within dates set by the Audit Authority. 5.1.2.5. Institution competent for receiving payments from the European Commission Funds from the European Commission as payments on account, interim payments and payments of final balance for ROP OV 2007-2013 will be transferred to selected bank accounts administered by a minister competent for public finance. 5.1.2.6. Institution or institutions responsible for making payments to beneficiaries 127 draft of ROP OV 2007-2013 Payments to beneficiaries will be made by the Managing Authority of ROP OV 20072013 in a form of reimbursements of expenditure incurred or payments on account. A basis for a transfer of funds will be an agreement between the Managing Authority of ROP OV 2007-2013 and a beneficiary as well as a correctly prepared and accepted payment application. 5.2 Monitoring The aim of monitoring the operational programme is to ensure a proper quality of implementation of ROP OV 2007-2013. It is carried out by the Managing Authority and the Regional Monitoring Committee of ROP OV 2007-2013. In addition, monitoring of the effects of ROP OV 2007-2013 is carried out by the Co-ordinating Authority of ROP OV 2007-2013. To properly and efficiently monitor the implementation of the Programme context indicators, programme indicators and indicators for strategic objectives have been developed (a system of indicators is described in chapter 2.2.5). The Managing Authority, mainly by means of indicators to be prepared for monitoring particular operations and on the basis of statistical data, will prepare indicators showing the extent to which the objectives of the programme have been accomplished. This will allow for a systematic analysis of the progress in the achievement of the objectives of ROP OV 2007-2013 and taking necessary measures by the Managing Authority in order to ensure attaining the objectives set. Results of current monitoring will be used also in the reporting process and evaluation of ROP OV 2007-2013, and in particular in the annual analysis of the Programme, referred to in art. 68 of Council Regulation No. 1083/2006. Another important element to be subject of current monitoring by the Managing Authority is financial implementation of the Programme dependent on the progress of projects in particular priority axes of the Programme. The aim of current monitoring is to ensure compliance between expenditure incurred and an estimated financial plan. 5.2.1 Regional Monitoring Committee ROP OV 2007-2013 The Regional Monitoring Committee of ROP OV 2007-2013 is set up within three months from the date of the notification to Poland of the decision approving ROP OV 20072013 by the European Commission. The Regional Monitoring Committee in the Opolskie Voivodeship will be chaired by representatives, among others, of: the Managing Authority, Intermediate Bodies (if appointed at all), a minister competent for regional development as a co-ordinator of regional operational programmes, local self-governments, social and economic partners. When determining the composition of the Regional Monitoring Committee a partnership principle will be applied. The Regional Monitoring Committee satisfies itself as to the effectiveness and quality of the implementation of ROP OV 2007-2013 in accordance with the following provisions94: − analyses and approves criteria for selecting projects within ROP OV 2007-2013 within six months of the approval of the operational programme and approves any revision of these criteria in accordance with programming needs; 94 Council Regulation No. 1083/2006, art. 65. 128 draft of ROP OV 2007-2013 − periodically reviews the progress made towards achieving the specific targets of ROP OV 2007-2013 on the basis of documents submitted by the Managing Authority; − analyses results of the implementation, in particular the achievement of the targets set for each priority axis and results of appraisals (evaluations) related to monitoring of the Programme, in particular if monitoring shows significant deviations from the originally set targets or if an application for revising the Programme is filed; − analyses and approves annual and final reports on the implementation on ROP OV 20072013, referred to in art. 67 of Council Regulation No. 1083/2006; − is informed of the annual control report or of the part of the report referring to ROP OV 2007-2013 and of any relevant comments the European Commission may make after analysing the report or its part referring to ROP OV 2007-2013; − may propose to the Managing Authority any revision or examination of ROP OV 20072013, likely to make possible the attainment of the funds’ objectives, referred to in art. 3 of Council Regulation No. 1083/2006 or to improve management of the Programme, including financial management; − analyses and approves any proposal to amend the content of the Commission decision on the contribution from the funds. Monitoring is carried out pursuant to art. 66 of Council Regulation (EC) No. 1083/2006 by reference to the financial indicators and indicators related to products and results95 specified in ROP OV 2007-2013, quantifying objectives of particular priority axes. If possible, relevant statistical data are broken down by sex and the size of projects carried out by the beneficiaries. Data for monitoring purposes will be exchanged with the European Commission electronically. 5.2.2 Annual and final reports on the implementation of ROP OV 2007-2013 The first annual report on the implementation of ROP OV 2007-2013 has to be submitted to the European Commission by the Managing Authority in 2008. Subsequent annual reports will be sent by 30 June each year. The final report on the implementation of ROP OV 2007-2013 will be submitted to the European Commission by 31 March, 2017. The reports before submitting them to the European Commission will be approved by the Regional Monitoring Committee of ROP OV 2007-2013. Reports will include the following information in order to obtain a clear view of the implementation of ROP OV 2007-2013: − the progress in implementing ROP OV 2007-2013 and its priority axes in relation to their specific, verifiable objectives, if possible, with quantification and indicators of product and result at the level of the priority axis; − information about financial implementation of ROP OV 2007-2013, with details for each axis: − the expenditure paid out by beneficiaries, included in applications for payment sent to the Managing Authority and the relevant public contribution; 95 Council Regulation No. 1083/2006, art. 37 par. 1 letter c 129 draft of ROP OV 2007-2013 − the total payments received from the Commission and quantification of the financial indicators; − the expenditure paid out by the body responsible for making payments to beneficiaries; − for information purposes – the indicative breakdown of allocation of funds by categories of intervention, in accordance with the implementing rules adopted by the European Commission; − the steps taken by the Managing Authority or the Regional Monitoring Committee in order to ensure the quality and effectiveness of the implementation, in particular: − measures within arrangements; monitoring and evaluation, including data collecting − a summary of any significant problems encountered in implementing ROP OV 2007-2013 and any measures taken to solve them; − the use made of technical assistance; − the measures taken to provide information about ROP OV 2007-2013 and its publicity; − information about significant problems associated with observing the Community law encountered in implementing ROP OV 2007-2013 and remedial measures taken; − if appropriate, the progress and financing of major projects; − the use of made of assistance released following cancellation, referred to in art. 98 par. 2 of Council Regulation (EC) No. 1083/2006, to the Managing Authority during the period of implementation of ROP OV 2007-2013; − information about cases where substantial modification have been detected on the basis of art. 57 of Council Regulation (EC) No. 1083/2006. Every year, after submitting the annual report on the implementation, the Commission and the Managing Authority analyse the progress made in the implementation of ROP OV 2007-2013, the most important results achieved over the previous year, the financial implementation and other factors in respect of their implementation. The analysis may be given to any aspects of operation of the management and control systems listed in the last annual control report, referred to in art. 62 par. 1 letter d) item i). 5.2.3 Evaluation The aim of the evaluation is to improve the quality, effectiveness and cohesion of the funds assistance as well as the strategy and implementation of ROP OV 2007-2013 in relation to specific structural problems at the national and regional levels, and at the same time taking into account the objective of durable growth and the relevant Community laws concerning the impact on the environment and the strategic assessment of the impact on the environment. The evaluation is carried out before (ex-ante evaluation), during (on-going evaluation) and after the programming period (ex-post evaluation). Pursuant to art. 47 of Council Regulation (EC) No. 1083/2006, ROP OV 2007-2013 will be subject to the evaluation made, depending on current arrangements and in accordance with the proportionality principle, by the Commission or by the Member State. 130 draft of ROP OV 2007-2013 To support the evaluation process, particularly by analysing monitoring data collected on a regular basis, the evaluating unit will be set up in the structures of the Managing Authority. It is possible to identify, among other things, the following tasks of the Managing Authority and/or of the Member State to ensure a proper evaluation process of ROP OV 2007-2013: − ensuring funds, within technical assistance, for evaluation as well as gaining and collecting necessary data from the monitoring system, − ex-ante evaluation – before the implementation of the programme96, − co-operation with the European Commission in ex-post evaluation (evaluation at the end of the Programme), − submitting results of the evaluation to the Regional Monitoring Committee and the European Commission, − ensuring the evaluation related to monitoring of implementing the programme during the programming period, in particular if monitoring revealed significant deviations from the originally set targets or if an application for revising the programme is filed, referred to in art. 33 of Council Regulation (EC) No. 1083/2006, − making results of evaluations, carried out in accordance with the principles of partnership and of access to information, public. The evaluations are carried out by experts or entities, internal or external, functionally independent of the Certifying Authority and the Audit Authority. 5.2.4. Control system A basic control function of the Managing Authority arising directly from Council Regulation (EC) No. 1083/2006 is to verify expenditure on goods and services co-financed within projects, if they have been delivered, if the expenditure has been actually incurred and if it is in accordance with the Community and national rules. In the Polish system, due to a large number of institutions taking part in implementation of programmes, verification of expenditure is usually delegated to the lower levels of management. In such a situation the Managing Authority sets up rules for carrying out control and division of obligations in the system. If the Managing Authority delegates some of its functions defined in art. 60 of Council Regulation (EC) No. 1083/2006 to other bodies (Intermediate Bodies), including also tasks related to verification of expenditure, then it is obligated to carry out system control to ensure that all the functions specified in art. 60 of the aforesaid Regulation are performed appropriately. A system control is carried out directly by the Managing Authority. 96 Ex-ante evaluation of ROP OV 2007-2013 has been carried out by consultancy firm WYG International Sp. z o.o. on order of the Ministry for Regional Development. The results of the ex-ante evaluation are discussed in chapter 6 ROP OV 2007-2013. 131 draft of ROP OV 2007-2013 5.3. Exchange of electronic data to meet requirements concerning payments, monitoring and evaluation The minister competent for regional development is responsible for the secure system for electronic exchange of information with the European Commission and granting accreditation access to the system to the institutions involved in implementation of operational programmes. The minister competent for regional development supervises the computer system and sets standards for collecting data by all the participants in the implementation of the NSRF. The minister competent for public finance is responsible for building and development of the computer system on the basis of standards for collecting data set by the minister competent for regional development. The Managing Authority of ROP OV 2007-2013, in co-operation with the coordinator of the NSRF, is responsible for entering data to the computer system and introduction of the local system. 5.4 Financial flows Funds transferred by the European Commission as pre-financing, interim payments and the final balance will be debited to a selected bank account kept in EUR by the Minister of Finance with the National Bank of Poland. The funds on the account, after conversion into PLN, will be sent to the central account of the budget of the state and will constitute its income. Next the funds from the budget of the state will be transferred to ROP OV 2007-2013. In compliance with the applicable legal regulations the minister competent for regional development will conclude with the Executive Board of the Voivodeship an agreement called “voivodeship contract” on co-financing the Programme with the funds from the budget of the state or from the foreign sources, in scope and under terms and conditions specified by the government (art. 20 par. 5 of the act of 6 December, 2006 on rules for the development policy). On the basis of the “voivodeship contract” the Managing Authority will receive funds from the budget of the state in a form of development subsidy for expenditure to finance the implementation of ROP OV 2007-2013, within annual limits set in the budgetary statute. The limits will be set in agreement with the Minister for Regional Development in the course of works on the budgetary statute on the basis of the table of payments of ROP OV 2007-2013 and multiannual limits of commitments so as to ensure efficient and punctual implementation of the programme. The subsidy will constitute income of the voivodeship self-government. The subsidy may be transferred in a form of pre-financing or reimbursement of expenditure incurred on the implementation of ROP OV 2007-2013, on the basis of the agreed schedule prepared by the Managing Authority. A basis for transferring the first development subsidy for ROP OV 2007-2013 is a decision of the European Commission about the approval of the programme. Subsequent subsidies will be transferred according to arrangements made in this respect. Payments to beneficiaries will be made by the Managing Authority in a form of reimbursement of expenditure paid out or of pre-financing. A basis for transferring the funds 132 draft of ROP OV 2007-2013 will be the agreement between the Managing Authority and a beneficiary as well as a correctly prepared and approved application for payment. If the Managing Authority appoints/indicates an external institution (e.g. the Intermediate Body) to perform selected tasks related to the implementation of the Programme, the funds to beneficiaries will be transferred through this body. In this case a basis for transferring funds will be an agreement between the indicated institution and a beneficiary. The external institution will receive funds from the Managing Authority on the basis of the demand reported once a month or once a quarter based on the projects implemented by beneficiaries. Funds will be transferred into accounts indicated by beneficiaries, mainly in a form of reimbursements. In certain cases, if justified by a significant interest of a category of beneficiaries or a unique nature of projects (measures), the funds can be transferred in a form of pre-financing. For own projects of the Managing Authority funds will be granted on the basis of a decision of the Managing Authority. On the basis of a summary of applications for payment from beneficiaries, the Managing Authority provides the Certifying Authority with collective applications for payment. The Certifying Authority, after positive verification of the application, sends it to the European Commission in order to have the paid out expenditure reimbursed. 5.5 System of information and publicity Information and publicity actions taken within ROP OV 2007-2013 will be regarded as an element of management of the Programme and integrate major provisions of art. 69 of Council Regulation (EC) No. 1083/2006 and chapter 2, par. 1 of Commission Regulation (EC) No. 1828/2006. Moreover, to ensure effective publicity and information actions at the level of operational programmes implemented within NSRF 2007-2013, relevant guidelines of the Co-ordinating Authority for 16 Regional Operational Programmes will be also taken into consideration. Publicity and information actions will be carried out on the basis of the communication plan drawn up by the Managing Authority of ROP OV 2007-2013, specifying their scope and the strategy in the Opolskie Voivodeship. The aim of the actions taken will be to focus them on the added value of the Community assistance, e.g. by establishing and popularising efficient and durable information flows concerning ROP OV 2007-2013 together with indicating the financial contribution under the ERDF. The Managing Authority of ROP OV 2007-2013 will provide all the parties concerned, i.e. potential beneficiaries of the Programme, institutions involved in the implementation of ROP OV 2007-2013 and the community of the Opolskie Voivodeship, with access to clearly formulated and detailed information regarding rules for receiving assistance from the cohesion policy funds, i.e., among other things: − eligibility conditions for receiving co-financing within ROP OV 2007-2013, − procedures for considering applications for co-financing and duration of particular procedures, − criteria for selecting operations for funding. 133 draft of ROP OV 2007-2013 In addition, information and publicity actions will be carried out to popularise the knowledge of effects of the use made of the Community funds and emphasising the role of the Community. To ensure the effective information and publicity process for ROP OV 2007-2013 system actions will be carried out, the Managing Authority will undertake co-operation with national and local authorities, social and economic partners, non-government organisations. The scope of information and publicity actions will include, among other things, information campaigns, publishing and distribution of publications, consultancy. The Managing Authority of ROP OV 2007-2013 will ensure monitoring and evaluation of information and publicity actions taken. Information about measures in this respect will be supplied to the Regional Monitoring Committee and included in annual and final reports of the implementation of ROP OV 2007-2013, referred to in art. 67 of Regulation (EC) No. 1080/2006. 134 draft of ROP OV 2007-2013 CHAPTER 6 EX-ANTE EVALUATION OF THE PROGRAMME WITH THE ASSESSMENT OF THE EXPECTED MACROECONOMIC EFFECT. 6.1. Results of ex-ante evaluation of draft ROP OV 2007-2013 6.1.1 Justification and manner how ex-ante evaluation was conducted The requirement to prepare the ex-ante evaluation for the draft Regional Operational Programme of the Opolskie Voivodeship for 2007 – 2013 within the “Convergence” Objective is imposed on the Executive Board of the Opolskie Voivodeship by art. 48 par. 2 of Council Regulation No. 1083/2006. The report on the ex-ante evaluation was made within expert opinion “Estimated evaluation of drafts of 16 Regional Operational Programmes and Operational Programme Development of Eastern Poland for 2007-2013” prepared by WYG International Sp. z o.o. on order of the Ministry for Regional Development. The evaluation of ROP OV 2007-2013 contains all the standard elements provided for the evaluation of regional operational programmes of particular voivodeships, taking into account the unique nature of the region examined. The report is in conformity with the methodology of the ex-ante evaluation of operational programmes for 2007-2013, set by the European Commission in October 2005. The scope of the evaluation of ROP OV 2007-2013 included: − verification of the socio-economic analysis and of its quality in the light of identified needs of the region’s development, − evaluation of the economic justification and the internal consistency of the projection part of ROP OV 2007-2013, − evaluation of the external consistency of ROP OV 2007-2013 with the Community, national and regional policies, − evaluation of the expected result and effect, − evaluation of the proposed system for implementing the operational programme. The assumptions of ROP OV 2007-2013, including particularly a diagnosis, objectives, priority axes and measures were evaluated in the light of such strategic documents as: Community Strategic Guidelines (CSG), Lisbon Strategy, National Development Strategy (NDS), National Strategic Reference Framework (NSRF), Updated National Concept of Land Development, Polish Ecological Policy, Operational Programme Infrastructure and Environment, Opolskie Voivodeship Development Strategy (OVDS). The chapter presents recommendations from the ex-ante evaluation of draft ROP OV 2007-2013 and the manner how they are taken into account in the present version of the document, while the detailed estimated evaluation of ROP OV 2007-2013 is presented on the 135 draft of ROP OV 2007-2013 Marshal Office website97. It is assumed that the results of the evaluation should contribute to the improvement of ROP OV 2007-2013. 6.1.2 Recommendations from evaluation and manner how results of estimated evaluation of draft ROP OV 2007-2013 have been integrated Diagnosis of the operational programme Generally the results of the evaluation showed that a diagnostic part of the Programme serves its function, i.e. justifies a majority of objectives and priority axes. Evaluation experts pointed out to the relation of the diagnostic part of the Programme to the analogous field in the Opolskie Voivodeship Development Strategy. Positive assessment was given to the selection of parameters, the relevance of data and the use of time series as well as to the internal consistency of the diagnosis. In the opinion of the evaluation expert, to improve the quality of the document it was suggested to make slight changes in the arrangement of the subchapters and add a summary of the diagnostic part. According to the evaluation experts, in the diagnosis the most important stimulating and hindering factors for the development of the region so far were presented. The diagnosis was also completed with the criteria for selecting diagnostic areas, although their arrangement was found accurate. The diagnosis was completed with the comments on the method for making it and the forecast diagnosis, where possible, extended in diagnosis areas. Moreover, the ex-ante evaluation drew attention to adding source items, i.e. giving a breakdown of items (bibliography) and presenting more clearly in the introduction the structure of the document what was completed with relevant provisions in the present version of the Programme. SWOT analysis In evaluation expert’s opinion, to improve the quality of the document it was suggested to sum up the whole diagnostic part so as to show all the needs of the voivodeship and their hierarchy, with particular attention to the needs which may be satisfied with the implementation of ROP OV 2007-2013. According to the results of the evaluation, the SWOT analysis covered also subchapter 1.3 (in the present version of the Programme 1.2) about the use of national and foreign funds. For a greater consistency of the SWOT analysis, it was described how strengths and weaknesses of the Opolskie Voivodeship as well as opportunities and threats are indicated and it was presented how to group these elements in other areas than presented in the diagnosis. The opinion of the evaluation experts about hierarchisation of the region’s needs was taken into account and the phenomena described in the SWOT hierarchised so as to clearly 97 A complete version of “Estimated evaluation of ROP OV 2007-2013. Report”, WYG International Sp. z. o.o., Warsaw, November 2006, presented on the Internet website www.rpo.umwo.opole.pl 136 draft of ROP OV 2007-2013 and directly show that the issues are of key importance for the implementation of the Voivodeship Development Strategy and what the most important directions for development are. Projection part of the operational programme The persons evaluating the programme showed that a projection part of ROP OV 2007-2013 deserves a generally positive opinion. It was emphasised that a structure of the projection part is clear and logical. However, as a result of the evaluation the experts pointed to several shortcomings which need to be addressed. Thus, the missing elements of ROP OV 2007-2013 have been completed according to critical comments of the evaluation experts so as to ensure that the document is complete, i.e. baseline and target values of indicators as well as frequency of measurements together with the source of data have been added, it has been given which year is regarded as baseline and which as target one, the use of cross-financing in particular priority axes explained, the allocation of funds from the ERDF into particular categories of intervention presented, corrections in the financial part according to the guidelines from the Ministry for Regional Development made. As regards comments to Chapter 2 devoted to the implementation strategy for ROP OV 2007-2013, the evaluation experts indicated that the objectives had been selected accurately which, in addition, were justified in the description of the objectives and in the priority axes. In reply to the results of the ex-ante evaluation, in chapter 2 it was emphasised that when drawing up the document theoretical bases for the planned intervention were taken into consideration, i.e. it was shown that a planned intervention focused on such fields where it was possible to indicate that a market mechanism failed (e.g. provision of public goods, support for markets where there are external benefits). Moreover, it was stressed that when preparing the document and specifying particular priority axes due care was given to the territorial cohesion of the region. In order to ensure greater consistency between descriptions in the projection part and the SWOT analysis, the quality of justification for the objectives and the priority axes has been improved. Financial part In chapter 4 devoted to the financial part, referring to the opinion of the evaluation experts, the criteria for distribution of funds between particular priority axes and years have been commented as well as the values in tables updated, taking into account the current distribution of funds (according to the draft NSRF approved by the government, version from 29 November, 2006). The estimated evaluation of ROP OV 2007-2013 points to making a reference to a risk related to the possibility of failure to use the funds allocated to ROP OV 2007-2013, which has been dealt with in chapter 4 of the Programme; it is forecast that the analysis of financial potential of the units of local self-government to be the major beneficiary of the Programme provides a basis to assume that all the funds within the Programme will be used. External consistency of the Regional Operational Programme for 2007-2013 137 draft of ROP OV 2007-2013 As the ex-ante evaluation pf ROP OV 2007-2013 shows, the external consistency of the projection part of the Programme is good. It was noticed that the objectives of ROP OV 2007-2013 are consistent with the objectives of superior strategic documents (such as: CSG, NDS, NSRF, VDS). The consistency arises both from common axiological premises at their bases and identical or coincident diagnostic conclusions. The consistency is considerable, in particular as regards the NSRF and the VDS. Comments to the Programme, arising from the fact that the draft version of the document was subject to the ex–ante evaluation, related to: the update of names of particular guidelines (in CSG) and of the objectives of the NSRF, the explanation of divergence between the relations strategic objectives – CSG and priorities - CSG. All the issues have been explained. Assessment of the expected results and effect The ex-ante evaluation of the Programme showed that a list of indicators for ROP OV 2007-1013 required numerous completions and changes. The situation was due to the fact that a process of drawing up the Programme was carried out at the same time as works of the team for indicators at the Ministry for Regional Development. In the present version of the Programme all the comments of the evaluation experts concerning a system of indicators have been taken into account. As a result of the evaluation, indicators for the general objective have been completed with the effect of ROP OV 2007-2013 on the GDP increase, a decrease in employment in the region, calculated on the basis of HERMIN model (“Assessment of the macroeconomic effect of the Regional Operational Programme for 2007-2013 on the economy of the Opolskie Voivodeship using HERMIN model. Report No. 2”). Also the number of specific objectives of ROP OV 2007-2013 has been reduced by one so as to make it the same as the number of priority axes in order to facilitate monitoring of ROP. The evaluation experts pointed to the consistency between the selected proposals for indicators and a list of indicators set by the European Commission as compulsory for operational programmes. In the present version of the Programme all the indicators have been completed with target and baseline values where required, pursuant to the guidelines of the Ministry for regional Development. For monitoring of the Programme a list of context indicators according to the enclosure to the ex-ante evaluation has also been prepared. A list of context indicators is appendix No. 2 to ROP OV 2007-2013. System for implementing the operational programme According to the evaluation experts a description of the system for implementing the Programme is quite general and based mainly on regulations of the European Commission, the NSRF and the guidelines of the MRD available at the moment the analysed version of the Programme was prepared. Due to the above, the evaluation experts indicated that there were missing elements in the description of the management system of ROP OV 2007-2013 and recommended to make it more precise and complete some provisions. 138 draft of ROP OV 2007-2013 In reply to the results of ex-ante evaluation a structure of management has been described so as to show the whole system as functioning efficiently, effectively and transparently. Apart from listing powers of particular institutions, it has been also outlined how they function and co-operate for the effective and efficient implementation of ROP OV 2007-2013. All the descriptions of powers and relations between the institutions have been verified in more details, according the guidelines of the Ministry for Regional Development so as to remove repetitions, contradictions and gaps. All the powers of institutions have been verified with the national and the Community regulations. Also elements of the publicity system have been described – it has been indicated that a communication plan would be prepared to specify a scope and the strategy for implementation of measures related to information and publicity of ROP OV 2007-2013, the system of information exchange with the European Commission has been described as well as procedures to ensure transparency of the payment process presented. As a result of the evaluation of ROP OV 2007-2013, in the chapter of the report devoted to the implementation system it has been stated that in the Opolskie Voivodeship the system variant chosen for implementation is to ensure maximum effectiveness and efficiency. According to the recommendation that when choosing the system variant for implementing ROP in the context of maximum effectiveness and efficiency a principle of concentrating implementation in the managing authority should be applied, in the evaluation of the programme it was emphasised that tasks related to entrepreneurship and innovations should be delegated to another institution. Taking into account the opinions of evaluation experts, ROP OV 2007-2013 contains provisions regarding a partnership rule, not only in the context of preparing the Programme, but also its monitoring. Thus, it has been described how partners of the system will be able to influence the implementation process of the Programme. Summing up, the evaluation examination proved that ROP OV 2007-2013 presented for evaluation (preliminary draft, version No. 3 b) meets the majority of formal and factual requirements, and the missing elements in the document indicated by the evaluation experts have been included in the present version of the draft of ROP OV 2007-2013. 6.2. Assessment of expected macroeconomic effects of the implementation of ROP OV 2007-2013 The analysis of potential effect of investments carried out within the Regional Operational Programme of the Opolskie Voivodeship for 2007-2013 was conducted following HERMIN model98. For that purpose, first the initial simulation was carried out, for which expenditure within ROP OV 2007-2013 were not taken into account and a number of 98 The assessment of forecast effect of investments to be carried out and co-financed from the European funds was conducted using HERMIN model for regional economies by the team of the Regional Development Agency in Wrocław (WARR) under direction of Prof. Janusz Zaleski, in co-operation of John Bradley, PhD – the author of HERMIN model and a long standing scientist of The Economic and Social Research Institute – ESRI in Dublin. HERMIN is a macro-model for analysing the impact of structural funds on the economy. The model is based on conventional Keynes mechanisms, however, it also has important neoclassical features related to the supply component. More information about HERMIN model: www.funduszestrukturalne.gov.pl and www.warr.pl). A complete version of the document “Assessment of macroeconomic effect of the Regional Operational Programme for 2007-2013 on the economy of the Opolskie Voivodeship using HERMIN model. Report No. 2” available on: http://www.umwo.opole.pl 139 draft of ROP OV 2007-2013 assumptions about external and internal conditions affecting the Polish economy were made (so called baseline scenario)99. The next simulation carried out assumed investment expenditure at the level set in ROP OV 2007-2013100, and then its results were compared with the baseline scenario specifying potential macroeconomic effects of the Programme. As a result of the simulation carried out using HERMIN model the indicators describing the effect of the Regional Operational Programme were defined and presented as a change in relation to the baseline forecast made without the effect of ROP OV 2007-2013. The results of the effect of ROP OV 2007-2013 were presented by means of several basic macroeconomic parameters: GDP (expressed in prices from 1995), unemployment rate, a number of the employed as well as resources of physical infrastructure and human resources. The obtained results of the effect of ROP OV2007-2013 on GDP of the Opolskie Voivodeship allow for stating that that ROP OV 2007-2013 probably will increase GDP in relation to the baseline forecast, as the Programme will be gradually implemented. The initial effect of 0.04% above the baseline level in 2007 is vary low which arises from the fact that in the first year only small payments will be made within ROP OV 2007-2013. By 2013 the effect of ROP OV 2007-2013 on GDP will be increasing gradually and in 2013 will reach the highest value. It is assessed that GDP will be higher then in relation to the baseline scenario by 1.73% (Fig. 6.1). In next two years 2014 and 2015 the increase in relation the baseline forecast becomes smaller as in these years all the investment undertakings within ROP OV 2007-2013 will finish (last payments will be made) (Fig. 6.1). Moreover, in 2014 next funds will be activated related to programming period 2014-2020 whose amount we are not able to anticipate now. 99 Main features of the baseline scenario concerning external conditions are as follows: an increase in industrial production in Poland is forecast at the level of approx. 5 % annually, the efficiency of work is still increasing, implying the probability that the employment will increase more slowly than production, and increasing employment and continuous source of workforce result in continuous decrease of unemployment. It is anticipated that an exchange rate will be constant and the inflation a little bit higher than the average in “the old states” of the European Union. 100 The initial features for the model arising from ROP OV 2007-2013 assume, among other things, the allocation for the Opolskie Voivodeship for 2007-2013 in the amount of EUR 427.14 mln. ROP OV 2007-2013 will be implemented for nine years from 1 January, 2007 to 31 December, 2015 (following the “n+3” principle applicable in 2007-2010 and the “n+2” applicable in 2011-2013). According to the methodology of recalculating transfers into economic categories prepared by WARR, for the Opolskie Voivodeship the following distribution has been calculated: basic technical infrastructure (BI) – 51.2%; human resources development (HRD) – 8%; direct assistance for production sector (DAPS) – 40.8%. 140 draft of ROP OV 2007-2013 Fig. 6.1. Effect of ROP OV 2007-2013 on GDP*. 2,0 1,73 1,49 1,6 1,37 1,39 1,13 1,2 0,91 % 0,8 0,44 0,4 0,17 0,04 0,0 2007 2008 2009 2010 2011 2012 2013 2014 2015 * % change in relation to the baseline scenario (without ROP) Source: “Assessment of macroeconomic effect of the Regional Operational Programme for 2007-2013 on the economy of the Opolskie Voivodeship using HERMIN model. Report No. 2”, Marshal Office of the Opolskie Voivodeship, January 2007 Analysing the effect of ROP OV 2007-2013 on the labour market two indicators were chosen: unemployment rate and employment. It is assessed that the largest decrease of the unemployment rate101 will take place in 2013 and will amount to 0.61 percentage point in relation to the level of this indicator assessed if no funds are used (Fig. 6.2). This means that the accumulated effect in a form of the number of the employed will amount in this year to approx. 2.79 thousand people (Fig. 6.3). Fig. 6. 2. Effect of ROP OV 2007-2013 on unemployment rate in percentage points 0,0 -0,1 -0,03 -0,10 pkt proc. -0,2 -0,23 -0,3 -0,26 -0,4 -0,38 -0,44 -0,5 -0,45 -0,51 -0,6 -0,61 -0,7 2007 2008 2009 2010 2011 2012 2013 2014 2015 Source: “Assessment of macroeconomic effect of the Regional Operational Programme for 2007-2013 on the economy of the Opolskie Voivodeship using HERMIN model. Report No. 2”, Marshal Office of the Opolskie Voivodeship, January 2007 101 Change in the unemployment rate is described in percentage points 141 draft of ROP OV 2007-2013 Fig. 6. 3. Effect of ROP OV 2007-2013 on the number of the employed in thousand people 3,0 2,79 2,28 2,5 1,98 2,04 w tys. 2,0 1,72 1,5 1,20 1,03 1,0 0,43 0,5 0,11 0,0 2007 2008 2009 2010 2011 2012 2013 2014 2015 Source: “Assessment of macroeconomic effect of the Regional Operational Programme for 2007-2013 on the economy of the Opolskie Voivodeship using HERMIN model. Report No. 2”, Marshal Office of the Opolskie Voivodeship, January 2007 The research conducted indicates that the effect of the European funds is relatively higher on economic growth than on the labour market: employment rate and unemployment rate. Structural funds have a particularly strong effect first of all on an increase in efficiency of production factors (both due to improving qualifications of workforce and better accessibility of technical infrastructure, including transport infrastructure). The increase in global efficiency of the economy, with the same production level, results in limiting demand for workforce, however, in a longer time improves international competitiveness of the economy, attracts foreign capital, increases production and in consequence positively affects the employment. Tab. No. 6.1. Total effect of ROP OV 2007-2013 on GDP (in %), unemployment rate (in percentage points), number of the employed (in thousand people) and investments in fixed assets (%) in relation to the baseline scenario. Effect of ROP OV 2007-2013 on: Years 2007 2008 2009 2010 2011 2012 2013 2014 2015 GDP (in %) 0.04 0.17 0.44 0.91 1.13 1.37 1.73 1.49 1.39 Unemployment rate (in percentage points) -0.03 -0.10 -0.23 -0.44 -0.45 -0.51 -0.61 -0.38 -0.26 Number of the employed (in thousand people) Investments in fixed assests (%) 0.11 0.43 1.03 1.98 2.04 2.28 2.79 1.72 1.20 0.35 130 3.05 5.70 5.67 6.11 7.14 4.12 2.60 Source: “Assessment of macroeconomic effect of the Regional Operational Programme for 2007-2013 on the economy of the Opolskie Voivodeship using HERMIN model. Report No. 2”, Marshal Office of the Opolskie Voivodeship, January 2007 142 draft of ROP OV 2007-2013 Taking into consideration a potential effect which the implementation of ROP OV 2007-2013 will have on the production volume in particular sectors of economy, it turns out that the greatest effect will be observable in the industrial sector. In 2013-2014, when it is the highest in relation to the baseline scenario, it will amount to 2.37%. In 2013 in the sector of market services it will be 1.73%. In the labour market, a slightly greater effect is on the industrial sector where the employment rate in 2013 may be higher by approx. 1.39 thousand people (in comparison to the baseline scenario). In the sector of market services in 2013 about additional 1.29 thousand people will find jobs. Detailed data concerning the effect of ROP OV 2007-2013 on the level of actual (i.e. expressed in constant prices) production volume and on the situation in the labour market in particular sectors are presented in Tab. No. 6.2. Tab. No. 6.2. Effect of ROP OV 2007-2013 on production volume (expressed as a percentage change in relation to the baseline scenario) and on the situation in the labour market (expressed as a change in relation to the baseline scenario) in particular sectors. Years Production in sector of processing industry (in %) Production in sector of market services (in %) 2007 2008 2009 2010 2011 2012 2013 2014 2015 0.03 0.13 0.39 0.93 1.42 1.84 2.37 2.37 2.35 0.07 0.27 0.65 1.24 1.30 1.44 1.73 1.11 0.80 Employment in sector of processing industry (in thousand people) 0.02 0.09 0.25 0.57 0.82 1.06 1.39 1.35 1.34 Employment in sector of market services (in thousand people) 0.09 0.33 0.75 1.34 1.14 1.13 1.29 0.31 -0.18 Source: “Assessment of macroeconomic effect of the Regional Operational Programme for 2007-2013 on the economy of the Opolskie Voivodeship using HERMIN model. Report No. 2”, Marshal Office of the Opolskie Voivodeship, January 2007 To increase the level of objectivity of the evaluation of the effect of structural funds on the economy of the Opolskie Voivodeship, the assessment of the macroeconomic effect conducted using HERMIN model was compared to the results obtained with the use of the alternative macroeconomic model. For that purpose, MaMoR2 model was used which is so called computational model of general balance102. The comparison of forecasts of effects of the European funds on GDB obtained using the models above are presented in tables below. 102 Report: “Forecast of macroeconomic effect of the Regional Operational Programme of the Opolskie Voivodeship for 2007 – 2013” was prepared by the Institute of Research on Market Economy (IBnGR) on order of the Ministry for Regional Development. The model used allows for examining some aspects of the economy in the regional context, i.e. at the level of voivodeships. The tool used in the model does not assume simply 16 models for economies of particular voivodeships. The regions are fully autonomous as regards creating a product as well as determining volumes of streams and resources such as consumption, investments or capital. At the national level decisions about the structure of some streams are made: purpose of national production and 143 draft of ROP OV 2007-2013 Tab. No. 6.3. Comparison of a change in GDP with the baseline forecast in 2007-2015 obtained using HERMIN model and MaMoR2 model. Years HERMIN model MaMoR2 model 2007 2008 2009 2010 2011 2012 2013 2014 2015 Average growth pace 0.04 0.17 0.44 0.91 1.13 1.37 1.73 1.49 1.39 0.96 -0.01 -0.01 0.10 0.38 0.78 1.17 1.60 1.97 2.11 0.90 Source: “Assessment of macroeconomic effect of the Regional Operational Programme for 2007-2013 on the economy of the Opolskie Voivodeship using HERMIN model. Report No. 2”, Marshal Office of the Opolskie Voivodeship, January 2007; “Forecast of macroeconomic effect of the Regional Operational Programme of the Opolskie Voivodeship for 2007 – 2013”, IBnGR, November 2006 Tab. No. 6.3 presents the results of simulation for GDP growth pace including investment shock which is ROP OV 2007-2013. The GDP average growth pace with the full use of the European funds using HERMIN model is 0.96%, while using MaMoR2 model it is 0.90% annually. The results obtained with the use of different research tools are coincident and within the limits of modelling accuracy errors and suggest a positive effect of ROP OV 2007-2013 on the economy of the Opolskie Voivodeship. consumption goods. (Report: “Forecast of macroeconomic effect of the Regional Operational Programme of the Opolskie Voivodeship for 2007 – 2013”, IBnGR, November 2006). 144 draft of ROP OV 2007-2013 CHAPTER 7 ASSESSMENT OF THE IMPACT OF ROP OV 2007-2013 ON THE ENVIRONMENT 7.1 Legal basis Pursuant to Art. 47 of Council Regulation (EC) No 1083/2006103 and the Act of 27 April 2001 on Environmental Protection Law104, actions were instigated with respect to the Environmental Impact Assessment of ROP OV 2007-2013. 7.2 Preparer of the Assessment of the impact of ROP OV 2007-2013 on the environment Preparation of the Assessment of the impact of ROP OV 2007-2013 on the environment was entrusted with The Institution of Urban Development in Kraków. The preparer was selected after analysis of quotations which had been submitted by external companies, in their functioning independent from the Marshal Office of the Opolskie Voivodeship, with experience in preparing such documents and meeting requirements set out by the Executive Board of the Opolskie Voivodeship. In selection of the preparer the following criteria were considered: − references confirming experience in preparation of such analyses, compliant with the order; − order completion price; − order completion date. 7.3 Assessment of the impact of ROP OV 2007-2013 on the environment The subject of the Assessment of the impact of the environment was the Regional Operational Programme of the Opolskie Voivodeship for 2007-2013 (draft project, version 3b of 14 July 2006). The framework scope and the degree of detail in the Assessment of the impact of ROP OV 2007-2013 on the environment results from regulations of the Act on Environmental Protection Law as well as arrangements made by the Executive Board of the Opolskie Voivodeship with the Governor of the Opolskie Voivodeship (representing the environmental protection body) and the State Voivodeship Sanitary Inspectorate. The key aim of the assessment was to determine possible effects seen in the environment, which may arise following the implementation of the document being assessed. Below a summary of the Assessment of the impact of ROP OV 2007-2013 on the environment is presented. It was prepared by the Institute of Urban Development in Kraków, with the exclusion of the fragment describing the structure of ROP OV 2007-2013105. 103 104 Council Regulation (EC) No 1083/2006 (OJ L 210 of 31.07.2006) Journal of Laws No. 62 of 20 June 2001, it. 627 with subsequent amendments. 145 draft of ROP OV 2007-2013 7.3.1 Scope of the assessment The assessment is composed of eight parts. In the introductory part an outline and structure of the main national plans were described and so were their links with the EU guidelines. Additionally, goals of the EU Structural Funds were discussed, along with documents which confirm validity of the EU strategy of Sustainable Development from Göteborg, including quotations of binding principles of this policy. The initial part also comprises the topic-related account of ROP OV 2007-2013. The starting point for the analysis of the Assessment was the diagnosis of the state of the environment in the Opolskie Voivodeship, the main problems encountered in the environmental protection, as well as a general description of a development scenario, if plans for the years 2007-2013 were not implemented. The fundamental part in chapter 5 of the Assessment starts with the analysis of ROP OV 2007-2013, with reference to six (6) zones making up sustainable development, as well as the assessment to what degree Priorities of the Programme will constitute implementation thereof. Compliance of goals of the Programme was assessed as against the Opolskie Voivodeship Development Strategy and the Community Strategic Guidelines and Council Regulation (EC) No 1080/2006106. Chapter 5.3 is of crucial significance in the assessment, where an overall review was carried out concerning environmental protection goals, contained in the programme documents of the voivodeship, including an analysis of whether relevant assumptions in ROP OV 2007-2013 would enable, with a build-up of projects, to cover them with programme's support, or whether they could be achieved in the region through national operational programmes. In the Assessment of considerable environmental impact, conducted at the lowest level of arrangements in the Programme, i.e. types of future undertakings, an analysis of mutual interactions of the Programme's goals was performed, indicating the need to join projects with overlapping territories, for reaching effects of project synergy; or the necessity of control whether the goals stand in contradiction with one another which may be revealed in completion of projects with overlapping territories carried out in its various goals. An analysis of alternative solutions of the Programme includes an assessment of possibility to achieve the subject-related scope of environmental goals, allowing for insufficient, as for the actual needs, funds allocated for the environmental priority. In the summary main conclusions were gathered from the Assessment, as well as, among others, criteria were suggested which should be taken into consideration in qualifying projects for inclusion in the Programme's financial support. The essential obstacle in preparing the Assessment of the impact on the environment laid in the open character of ROP OV 2007-2013, concentrated on goals and types of actions, but not including any quantitative projection of goals, or information on the scope and preferences of future actions with location and time not being specified. Therefore, the Assessment of possible impact of the Programme provides a rather general view. Moreover, the lack of any up-to-date statistical data, unavailable at the time of preparation of the Assessment, weakened validity of conclusions drawn from the diagnosis of the environmental state. 105 Entire text of the final report „Environmental Impact Assessment of RPO WO 2007-2013” is available at the Internet site of the Marshal Office of the Opolskie Voivodeship: www.rpo.umwo.opole.pl. 106 OJ L 210 of 31.7.2006, page 1. 146 draft of ROP OV 2007-2013 7.3.2 State of the environment in the voivodeship and major problems Environmental issues were ranked high within the structure of ROP OV 2007-2013, recognised as one of seven strategic objectives, such as Improvement of the environment and environmental protection as well as ensuring flood safety. For the needs of the Assessment, the diagnosis of the environmental state was analysed, which had been prepared within ROP OV 2007-2013, as well as in other, problem-related documents. The balance of environmental strengths and weaknesses, carried out by the authors of the Programme, sees as indisputable advantages of the region its abundance of mineral resources and underground waters, as well as the steady tendency to decrease the burden on the environment, noticeable throughout the recent years and resulting from various actions being undertaken. Strengths of the region include also the palaeontological site in Krasiejów, unique on the European scale, which is expected to revive tourism in the area. As against the entire country, the voivodeship is characterised by a good quality of soil, reflected in high productivity of agriculture. In general, technical infrastructure of the environmental protection is better and the level of its financing is high. However, relatively poor natural resources across the voivodeship, and, above all, insufficient promotion of these assets prevent further development of tourism and recreation in the region. Factors recognised as unfavourable in the balance include the following: − insufficient flood protection, − lack of general and fully operational system of municipal waste utilisation, − arduous, low emission of air pollution, − continuing surface water pollution and deteriorating quality of underground waters, − areas suffering from degradation requiring comprehensive revitalising actions. Ecodevelopment indicators deviating from average values for the entire country are, including but not limited to, the following: - low percentage of areas under protection within system Natura 2000, - no usage of production of renewable energy, including hydro-energy, - low share of ecological crops in the entire agricultural area. The most important problems covering the entire region include water management and its infrastructure. The Opolskie Voivodeship has limited resources of good quality surface water, and, additionally, they are unevenly located, which translates into their insufficient availability for the needs of inhabitants and agriculture. A considerable percentage of surface waters is characterised by high pollution, which requires highly effective methods of water treatment to be applied if a need of their usage arises. In order to improve this situation, it would be necessary to intensify protection in river catchments, particularly of the rivers of Nysa Kłodzka, Biała Głuchołaska, Prosna and Widawa. Since underground waters constitute the major source of water for the inhabitants, its protection is of key importance, primarily the protection of quantity and quality of main groundwater reservoirs, in the first place, GZWP No. 333, as well as the development of monitoring system for these waters. 147 draft of ROP OV 2007-2013 Irrespectively of the aforementioned problems, it is necessary to continue rationalisation of usage of water resources towards: − limitation and elimination of usage of underground waters for purposes other than for drinking water supply, as well as for the needs of food and pharmaceutical industries, − introduction of systems of closed water circulation into industry, water-efficient production technologies; reduction of water losses across water mains. As everywhere in Poland, the problem in the region is also untreated sewage discharge and the necessity to reduce the load of contamination in municipal and industrial sewage entered into waters or ground, including substances especially arduous for the water. What results from this is the necessity to sort out sewage management, in the first place on areas strategic from the point of view of the present and long-term water supply, including rural areas and outskirts of towns without any sewage system of towns, through construction of collective sewage systems and sewage treatment plants, in line with the National Programme of Municipal Sewage Treatment. With respect to air protection, a considerable problem will represent technological adjustment of industry and energy producers to tightened emission standards which will be introduced in 2008. A quality of air in housing complex is influenced, in an equal or even higher degree, by low municipal emission, elimination of which is related both to comprehensive revitalising actions of huge areas, and with modernisation of individual traditional sources of heat; construction of highly efficient systems of heat transfer, as well as thermo-modernisation of buildings, substantially reducing usage of energy, including emission of air pollution from the existing sources of heat. Facing not decreasing automotive pressure, without necessary essential exclusion of traffic in the centres of towns, and simultaneous prudent transport policy with respect to construction of roads and development of collective transport, any significant improvement in the air condition over densely built-up areas seems unlikely. The high level of pollution is followed by increasingly extending zones of excessive traffic noise, additionally strengthened by a poor technical condition of roads, and postponed introduction of duties which lie on administrators of these roads with respect to protection from noise. A serious side-effect of mineral resources exploitation is continuous presence of huge areas suffering from degradation and devastation, including central and eastern poviats, country poviat of Opole and selected gminas, including Lewin Brzeski, Otmuchów and Paczków. In the recent years, the pace of reclamation works has been decreasing. Municipal landfill sites being closed down also need reclamation. Although the voivodeship has plans for waste management, due to the lack of funds, any comprehensive system of selective waste collection does not function within the voivodeship. In 2004, a selected part of waste accounted for just 3.7% of the entire mass of municipal waste. The major method of waste management continues to be storage on landfills, the number of which has dropped to 38 in the recent years, according to the plan to close down a number of these facilities. The scope of necessary steps with respect to the protection of areas with valuable natural resources should, in the upcoming years, cover putting into practice the system of areas Natura 2000 and ECONET, along with propositions of ecological organisations submitted in 148 draft of ROP OV 2007-2013 the “shadow list”. The essential problem is the lack of approved plans of protection. Restitution, renaturisation and reclamation actions should be effected on the following areas: V. majority of forest complexes of the Opolskie Voivodeship, characterised by bio-topic irregularity of the tree stand, seen particularly in forest complexes located within the area of Bory Niemodlińskie, Bory Raciborskie, and in the area of the Protected Landscape “Mokre Lewice”; VI. forest complexes located on flood terraces in the Valley of Odra, Nysa Kłodzka, Mała Panew and on polder “Stobrawa Rybna”; VII. forest complexes requiring reconstruction in areas consumed by the huge fire in 1992 within the limits of the Forest Division of Kędzierzyn-Koźle; VIII. areas requiring comprehensive renaturisation within the river valleys of Odra (upper and middle river), Nysa Kłodzka (middle river) and Mała Panew, below the Turawa reservoir; IX. areas of xerothermic devastations of plant community within the borders of the Landscape Park of the St. Anna Mountain. The essential issue is extension of degree of ecological safety of inhabitants, by way of introduction of new legal regulations for management of materials and substances hazardous for health and the environment, resulting from the EU guidelines; elimination of the existing threats caused by accumulation in the environment of particularly hazardous substances, such as asbestos, PTBs, dioxins and furans; as well as improvement in safety of food and water quality. External operating and rescue plans of high-risk plants located across the voivodeship need to be worked out. A programme of control against release of genetically modified organisms and products of genetically modified food into the environment should be implemented. Organisation of transport routes of hazardous substances needs to be comprehensively solved, and this involves construction of parking spaces for vehicles carrying such substances. The Opolskie Voivodeship is among the ones most liable to floods, due to both probability of occurrence of flood situations, and extent of possible floods. Areas exposed to particular risk are located in the valley of Odra, Nysa Kłodzka, Osobłoga, Stobrawa, Mała Panew, Biała Głuchołaska, Opawa, Opawica, Psina, Troja, and Złoty Potok. Simultaneously, the level of flood retention on these rivers is insufficient. There is no comprehensive system of flood control which would allow for preservation of natural resources, particularly river valleys, or a system of monitoring, meteorological shield and flood alert system. The flood threat may be reduced on condition that assumptions of the “Programme for the Odra River 2006”), will be fully implemented. This includes construction of water tanks, modernisation and construction of embankment, construction of polders, redevelopment and clearance of river beds, construction and modernisation of weirs and flood-gates, and improvement in the water retention system according to the “Programme of construction of small-size retention in the Opolskie Voivodeship”. In addition to the aforementioned problems, one should mention also the poor condition of land reclamation facilities and the necessity to restore drainage and irrigation mainly on agricultural areas, as well as the lack of modern infrastructure for activation of waterway on the Odra River. In the judgement of units of local self-government of the Opolskie Voivodeship (based on eight indicators of environmental load and one related to animated nature potential), areas with deteriorated environmental quality include: 149 draft of ROP OV 2007-2013 − the town of Kędzierzyn-Koźle, due to air pollution, pollutant load in effluents, waste contamination; − the town of Opole – as above, and also due to devastation of land surface; − gmina of Zdzieszowice – as above and also due to flood threat; − gmina of Dobrzeń Wielki – as above. This group also includes gminas of Bierawa, Nysa, Strzelce Opolskie and Ozimek which, at the same time, have high natural potential, measured with the size of natural areas under protection and woodiness indicator of the area. 7.3.3 Assessment of goals of sustainable development and environmental protection in ROP OV 2007-2013 as against the Opolskie Voivodeship Development Strategy and national operational programmes. Within the structure of development plans for the country up to 2013, regional operational programmes are documents which implement voivodeship strategies to a degree determined by the internal division of powers among national and regional programmes. Projects with the national and partially regional range may be carried out within the national programmes, the remaining regional and local projects should be included in ROP. For establishment of goals in ROP important factors were the Community Strategic Guidelines, putting great emphasis on the development of economic sphere, which met response in national guidelines determining limits on individual management divisions in regions. It should be pointed out that the regulation on the European Regional Development Fund, from which funds are to be received for the performance of regional programmes in the three main objectives of the community within the framework of sustainable development, assumes that they will be accomplished largely by way of environment-related priorities. With respect to large-scale goals of the Opolskie Voivodeship Development Strategy, ROP OV 2007-2013 concentrates future actions in its major fields. As to spheres of sustainable development, the main strategic objectives of the Programme are oriented towards management of economic resources, which will directly be achieved through one of the axis, and the results of a number of others are to bring positive changes in the development of entrepreneurship, improved competitiveness and a rise in employment. The remaining priorities of the Programme are distributed in the manner which enable each sphere of sustainable development become the subject of axis actions, however they do not all embrace the range covering sustainable development, particularly in the context of the EU objectives (schedule No. 2 of the Assessment). The conducted assessment of the environmental state and the collected materials for diagnosis show that directions of intents making up the environmental priority simultaneously represent environmental protection issues, most important for the Opolskie Voivodeship, which will be subject to intervention of the Programme. Other objectives related to balancing of actions, or environment-related actions falling outside the range of the environmental priority lie in fields related to the following: − development of tourist and recreation infrastructure – meant to raise their standard; − development of culture and preservation of cultural heritage – serving, among others, to preserve regional cultural and natural heritage; 150 draft of ROP OV 2007-2013 − public transport infrastructure – in which, among others, collective transport is to play a significant role; − urban areas – oriented towards the improvement in living conditions of the inhabitants, including improvement in quality of the environment; − post-military, post-police and post-industrial areas – concentrated on new functions of areas subject to revitalisation actions, with concurrent rise of their environmental standards. A review of objectives stipulated in the most important regional operational documents, particularly in the Programme of Environmental Protection in the Opolskie Voivodeship and the Plan for Waste Management in the Opolskie Voivodeship, indicates that draft ROP OV 2007-2013, through adequate regulations of types of tasks, enables accomplishment of majority of objectives specified in these documents in the future. Other environmental tasks, not included in ROP OV 2007-2013 will be carried out mainly in OP Infrastructure and Environment and the Programme for Development of Rural Areas. 7.3.4 Weighting and quantitative estimate of environmental objectives ROP OV 2007-2013 suggests three types of indicators: − indicators related to strategic objectives, − indicators related to products, − indicators related to results. As concurrently national programmes will also be implemented in the region, indicators of ROP OV 2007-2013 will have to be prepared by the implementation team of the Programme with a view to faithfully reflecting progress in implementation of ROP OV 20072013 in relation to the set target indicators of particular objectives, which should be weighted. Draft ROP OV 2007-2013 analysed in the Forecast does not quote any numerical values for objectives to be achieved, but only stipulates the type of indicator to serve as a quantifier together with the baseline value from the last period. The target numerical values are to be supplied at a later time. For the purpose of forecasting, this circumstance precludes answering the key question: in the light of the issues and needs defined in other regional and national documents, how well draft ROP OV 2007-2013 will be pursuing the objectives and what the relations between these objectives will be. Thus, at the present stage of preparation of programmes the issue of efficacy of the Programme is still debatable. Irrespective of the indicators stipulated in the document, in order to determine the impact of all development plans on a larger scale, it will be necessary to make use of numerous so-called 'contextualised' indicators or 'interrelations' obtained from services dealing with statistics at the national and regional levels. In order to define these databases, especially with respect to evaluation of sustainable development, the Programme should adopt first of all the set of 98 indicators used in Eurostat and EEA analyses as well as materials published on the website of the Ministry of the Environment. This type of indicators is completely ignored in the draft of the National Cohesion Strategy, which stipulates the types of indicators for regional programmes. The Forecast contains some indicators of ecological development for Poland and the Opolskie Voivodeship which may be useful in providing the information missing from the Programme. 151 draft of ROP OV 2007-2013 7.3.5 Expected major environmental impact of the objectives, priorities and lines of activity defined in ROP OV 2007-2013 It is expected that achievement of the objectives related to Priority 4 Protection of the natural environment will directly and significantly contribute to reducing the current adverse effects on the environment in respect of: − limiting the amount of pollutants emitted to surface waters and air, and indirectly hazards to soil and underground waters, − increasing the use of environment-friendly energy from renewable resources, including biomass, − coping with waste management on a local scale, − reducing the risk of flood damage, − improving qualitative and quantitative indicators of environmental protection and increasing biological diversity of the region. The range and location of these changes will be regulated by future projects as yet not defined in ROP OV 2007-2013. Apart from the environmental priority, probably a clearly favourable impact on the environment and human health may be an outcome of implementation of projects: − under Priority 3 Transport, e.g. those aiming to increase the role of public transport, which could result in a reduction of environmental hazard in this branch of economy; − under Priority 6 Mobilisation of municipal and degraded areas, focused on regeneration of urban and other areas, which should result in an improvement of environmental standards in these areas. The ultimate extent of positive outcomes generated under the Programme will depend on the projects under priorities implementing non-environmental objectives which intensify or introduce new activities, which involves a certain increase in the amount of pollutants emitted to the environment, changes in the spatial development of the area and the risk of occurrence of emergencies. Judging by the types of activities meeting these priorities, as envisaged in the Programme, it can be inferred that the Programme does not favour activities characterised as particularly hazardous to the environment. Also the scale of these projects will be limited to the local or sub-regional dimension107. An analysis of possible interrelations between particular lines of activity envisaged in the Programme with a view to limiting adverse effects and enhancing the positive outcomes resulting from implementation of future projects has proved that it is necessary: − to join projects from the same area in order to obtain a synergy of favourable environmental impact; − in the case of non-environmental projects (with physical outcomes), to apply the criteria and indicators related to ecological efficacy in the selection process for such projects; 107 Objectives of national and sometimes regional importance will be pursued under national operational programmes. 152 draft of ROP OV 2007-2013 − to carefully analyse projects from the same area implemented under objectives which may be non-cohesive or even divergent (e.g. construction of a road and protection of a rare natural area); − to examine cohesion of projects developed under different programmes also in relation to one objective, e.g. the environmental objective. An analysis of possible projects stemming from detailed regional programmes has made it clear that some objectives contained therein may clash with other programmes and simultaneously with the objectives of the Programme. This is the case with several projects drawn under the small retention programme and the designed Natura 2000 sites. This requires on the part of the selection committees introduction of appropriate procedures precluding and excluding financing of such projects. Types of actions which should be mutually supportive in order to achieve the synergy effect, and these which may clash have been presented on the basis of the matrix for interactions between lines of activity, that is at the most detailed level in the Programme. 7.3.6 Alternative solutions to those contained in ROP OV 2007-2013 with justification of their selection along with a description of the selection methods Taking into account a diagnosis of the state of the natural environment in the voivodeship in draft ROP OV 2007-2013, there are no equivalent options of a different composition of activities under the environmental priority, as the current range corresponds to the major environmental issues in the region. What come to the fore, however, are the financial resources allocated to the implementation of the 'environmental' priority, which are definitely insufficient. On the basis of the amounts of initially allocated funds it becomes evident that such resources cannot guarantee the accomplishment of objectives remaining in the authority of self-governments, for which detailed programmes have been drafted over the recent years, e.g. small retention or construction of sewage systems from wastewater treatment plants. 7.3.7 Solutions aiming at prevention, limitation or environmental sustenance of possible adverse impact on the environment resulting from implementation of ROP OV 20072013 Recommendations for entities implementing the Programme related to possible limitation of the adverse impact on the environment resulting from the implementation of future projects pertain to: − extension of the range of activities stipulated in Priority 1, among others, inclusion of pro-environmental and ecologically innovative projects in order to facilitate implementation of projects in compliance with the overall aims of the II National Ecological Policy and the Programme for Protection of the Environment in the Opolskie Voivodeship, and also in order to facilitate implementation of ecological education projects under the environmental Priority; − introduction of necessary amendments to the programme, among others, by specifying quantitative objectives, including environmental objectives; − at the stage of project selection, introduction of evaluation of ecological projects in order to identify and analyse the possibilities to enhance the ecological outcomes of projects 153 draft of ROP OV 2007-2013 implemented under non-environmental Priorities of the Programme or also joining projects from the same area with a view to achieving these outcomes at a smaller cost; − application of appropriate ecological, legal and social eligibility criteria for projects, taking into account circumstances external to the Programme, e.g. analysis of compatibility with other objectives, irrespective of the requirements stipulated in the administrative procedures for these projects; − maintenance of open procedures of the Programme management at the stage of planning, selection and implementation of projects, with appropriately extended information for potential beneficiaries as to how to best draft projects to meet eligibility criteria. 7.4 Social consultations on the Forecast about impact of ROP OV 2007-2013 on the environment. In accordance with Art. 43 of the Environmental Protection Act,108 the Forecast about the impact of ROP OV 2007-2013 on the environment, together with the Programme in question, was launched for social consultations between 16 August and 10 September, 2006. This was done according to the regulations and methods adopted by the Executive Board of the Opolskie Voivodeship in the previous stages of public consultation (described in Chapter 8 of ROP OV 2007-2013), i.e. among others by offering unlimited access to the documents in question to all persons and groups interested. Information about launching consultation on both documents was published on the website www.rpo.umwo.opole.pl as well as in two regional daily papers - in 'Nowa Trybuna Opolska' and in Opole supplement to 'Gazeta Wyborcza'. The website offered access to the Forecast about the impact on the environment as well as ROP OV 2007-2013 in the evaluated version. During the consultation period comments could be sent to the following e-mail address: konsultacje.rpo@umwo.opole.pl. In order to arouse the interest of ecological circles for both documents, they were invited to a consultation meeting on 31 August 2006, in which the content of both documents and the main conclusions resulting from the Forecast were presented. The invitation to participate in this consultation meeting was printed in the local press. In addition, 31 institutions – representatives of ecological organisations and institutions involved in the issues of environmental protection – were sent personalised invitations to the meeting 7.5 Information about consideration given to suggestions contained in the Forecast about the impact of ROP OV 2007-2013 on the environment, the comments made during the consultation period as well as the recommendation of the Governor of the Opolskie Voivodeship and the State Voivodeship Sanitary Inspector 7.5.1 Suggestions contained in the Forecast about the impact of ROP OV 2007-2013 on the environment The Executive Board of the Opolskie Voivodeship became acquainted with the suggestions contained in the Forecast about the impact of ROP OV 2007-2013 on the The Environmental Protection Act of 27 April 2001, Journal of Laws No. 62 of 20 June 2001, item 627 with subsequent amendments. 154 draft of ROP OV 2007-2013 environment. With reference to the conclusions contained in the Forecast it has been ascertained that: − Priority 1 does not preclude implementation of pro-environmental and ecologically innovative projects; − implementation of ecological educational projects – under Priority 4, apart from the areas of water and sewage management, waste management, protection of air, renewable sources of energy, such initiatives will also be accepted in the area of Protection of biological diversity. Training sessions can be cross-financed, as a main or supplementary action within the investment project; − ROP OV 2007-2013 will be supplied with the target values of the monitoring indicators; − recommendations related to detailed eligibility criteria for projects will be recognised, as long as they stem from the binding law, in additional documents supplementing ROP OV 2007-2013; − openness of Programme management procedures at each stage of its implementation – ROP OV 2007–2013 will be implemented in accordance with the adopted system of legal regulations, both European and national, and also some other principles, including partnership, safeguarding that the preparation, implementation, monitoring and evaluation of ROP OV 2007–2013 will be done on the basis of partnership with appropriate institutions of government administration, self-government and other public authorities, economic and social partners as well as other interested parties. 7.5.2 Comments received during social consultations During the consultation period no comments concerning either of the documents were submitted, with the exception of the consultation meeting on 31 August 2006, during which comments were made with reference to both the Forecast about the impact on the environment and ROP OV 2007-2013. They concerned: − the diagnosis of the current condition of the voivodeship, mainly obsolete statistical data quoted in the diagnosis – in subsequent versions of ROP OV 2007-2013 statistical data were updated where it was possible; − allocation of funds under ROP OV 2007-2013 proportionally, and not fully based on recognition of real needs – allocation of funds to particular Priorities of ROP OV 20072013 is done on the basis of the diagnosis of the condition of the Opolskie Voivodeship, the European Regional Development Fund priority axis as well as the limits set by the Ministry for Regional Development; − no reference in the Forecast about the impact of ROP OV 2007-2013 on the environment to forecasts on environmental impact made in the Opolskie Voivodeship for other documents - the forecasts were analysed next to the key documents (these are listed in Annex 1 to the Forecast), but since they bore no direct relation on the range of stipulations contained in ROP OV 2007-2013 they were not quoted in the forecast; − too superficial treatment in the Forecast of Natura 2000 sites - the forecast identifies the existing and planned areas earmarked for protection of natural habitats as well as wild flora and fauna, including those created upon the initiative of non-government organisations, emphasises the principle of procedural equality in environmental evaluation in relation to both kinds of areas and draws attention to potential conflicts 155 draft of ROP OV 2007-2013 concerning localisation of projects with projects developed under previously adopted detailed programmes, e.g. small retention, requiring on the basis of these procedures, decisions at the level of eligibility and selection criteria for funding future projects under ROP OV 2007-2013; − discrepancies in the diagnosis of ROP OV 2007-2013 and the Forecast about the impact on the environment in the respect of assessment of the resources and the quality of surface waters in the voivodeship – the mistakes in Chapter 1 of ROP OV 2007-2013 have been rectified. 7.5.3 Recommendation of the Governor of the Opolskie Voivodeship (the body responsible for protection of the natural environment) and the State Voivodeship Sanitary Inspector In accordance with Art. 44 of the Environmental Protection Act,109 on 21 August, 2006 the Executive Board of the Opolskie Voivodeship addressed the Governor of the Opolskie Voivodeship (representing the body responsible for protection of the natural environment) and the State Voivodeship Sanitary Inspector with a request to issue their recommendation concerning ROP OV 2007-2013 and the Forecast about its impact on the environment. The recommendation from the State Voivodeship Sanitary Inspector was passed on 11 September, 2006 and did not contain any critical remarks about the Programme. Moreover, it ascertained that the solutions adopted in ROP OV 2007-2013 safeguard compliance with standards for protection of the natural environment as well as hygiene and health. The Governor of the Opolskie Voivodeship issued a favourable opinion for both documents on 16 October, 2006. The Governor of the Opolskie Voivodeship also attached to his recommendation a copy of 'The paper to accompany the forecast about the impact of ROP OV 2007-2013', written in October 2006 by Dr Eng. Adam Rak, on the basis of which the Governor’s positive opinion was issued. 109 Journal of Laws No. 62 of 20 June 2001, item 627 with subsequent amendments. 156 draft of ROP OV 2007-2013 CHAPTER 8 INFORMATION ABOUT SOCIAL CONSULTATIONS HELD ON ROP OV 2007-2013 8.1 Legal basis of consultations The requirement to hold consultations arises from Council Regulation (EC) No. 1083/2006110. Art. 11 of the aforementioned Regulation states that every member state pursuing objectives of the funds by means of the operational programme is obliged to close co-operation (partnership) with the authorities as well as social and economic partners, also at the stage of preparing the programme. To implement this provision the Executive Board of the Opolskie Voivodeship assumed that ROP OV 2007-2013 should be drawn up and then evaluated by as many environments interested in the development of the region as possible. 8.2. Aim, organisation and course of the process of social consultations 8.2.1 Aim and course of consultations The aim of social consultations was to gather opinions on proposals contained in preliminary drafts of ROP OV 2007-2013 and to discuss in a circle of specialists detail, problem themes integrally connected with the Programme. A process of consultations on ROP OV 2007-2013 began in September 2005. It was carried out in four stages: − 1st stage – internal consultations, directed to people involved in creating the document – Heads of Departments and Offices of the Marshal Office of the Opolskie Voivodeship, representatives of subordinate units and co-operating people, held from 12 September, 2005 to 21 October, 2005. Internal suggestions and comments gathered during internal consultations were used in further works and formulating the Preliminary Draft of ROP OV 2007-2013 in the version adopted by the Executive Board of the Opolskie Voivodeship on 15 November, 2005. − 2nd stage – socio-economic consultations, directed to all the people and environments from the Opolskie Voivodeship, were held from 15 November, 2005 to 9 January, 2006. When organising them the principle was to make them as broadly conceived as possible in geographical as well as sectoral and backgrounds terms. In 20 consultation meetings organised in total 328 people participated. The consultation meetings were an opportunity for presenting to a broad circle of people interested the document, its function and role it is to have in the economic and social development of the region in 2007-2013. During consultations 50 entities sent 287 comments. The aim of this stage of consultations was to gather opinions on proposals contained in the Preliminary draft of ROP OV 2007-2013 of 15 November, 2005, and their effect was drawing up ROP OV 2007-2013 (preliminary draft, version No. 2 of 28 February, 2006). The enclosure to this document was the Report on socio-economic consultations held where the second stage of consultations was summed up. − 3rd stage of socio-economic consultations took place from 20 April, 2006. The subject of consultations was ROP OV 2007-2013 (preliminary draft, version No. 3 of 19 April, 2006) which in particular integrated comments of the representatives of the 110 Council Regulation (EC) No. 1083/2006 (Official Journal 210 of 31.7.2006) 157 draft of ROP OV 2007-2013 European Commission, guidelines of the Ministry for Regional Development, the opinion of the Governor of the Opolskie Voivodeship and motions filed at the second stage of consultations. To this stage of consultations 234 people/entities were invited by name. The 3rd stage of consultations was summarized in detail in July 2006 in the Report on social consultations on ROP OV 2007-2013111. − 4th stage of consultations related to a procedure of preparing the Forecast about the impact of ROP OV 2007-2013 on the environment. Pursuant to the Act of 27 April, 2001 Environmental Protection Law112, the Forecast of the impact of ROP OV 20072013 on the environment and the Programme to which it referred were subject to social consultations. They were held from 16 August to 10 September, 2006. They are summed up in Chapter 7 ROP OV 2007-2013. Motions put at every stage of consultations contributed to verification of provisions of the programme and giving it a form which was an attempt to combine provisions to best fulfil the objectives established in the new programming period and expectations of potential beneficiaries. 8.2.2 Notification of consultations An official notification of consultations and an invitation from the Executive Board of the Opolskie Voivodeship to participate in consultations each time were published on the Internet website of the Marshal Office (www.rpo.umwo.opole.pl.) and in two regional daily papers – in “Nowa Trybuna Opolska” and in the Opole supplement to “Gazeta Wyborcza”. In addition, environments interested in the development of the Opolskie Voivodeship were invited by name to participate in consultations. 8.2.3 Participants of consultations The consultations were based on the openness principle to ensure free access documents and data, on the equality, openness and partnership principles which mean that anybody interested was allowed to participate in them (not only institutions). Apart from public invitations to consultations published in the press and on the Internet website, the Executive Board of the Opolskie Voivodeship invited by name, among others: − Parliament members from the Opolskie Voivodeship; − representatives of all the levels of local self-government in the voivodeship; − Marshals of neighbouring voivodeships; − the Governor of the Opolskie Voivodeship and representatives of government administration in the voivodeship; − social and economic organisations operating in the Opolskie Voivodeship; − organisations of entrepreneurs; − organisations dealing with issues of the natural environment; − scientific environments; − other groups of interest. 111 Report on social consultations on ROP OV 2007-2013 is available on the website of the Marshal Office of the Opolskie Voivodeship: www.rpo.umwo.opole.pl. 112 Journal of Laws No. 62 of 20 June, 2001, item 627 with subsequent amendments. 158 draft of ROP OV 2007-2013 8.2.4 Internet website The Internet sub-site of the Marshal Office of the Opolskie Voivodeship about ROP OV 2007-2013 www.rpo.umwo.opole.pl was launched in November 2005. In order to provide all the interested with access to documents directly related to the version of ROP OV 2007-2013 subject to consultations, the sub-site contained also, apart from the version of draft ROP OV 2007-2013 being consulted, updated versions of legal acts (the Community and national ones), strategic documents and drafts of national operational programmes. In addition, it contained information about organisation of meetings, procedures and rules for participating in consultations and a Form for suggesting comments/amendments. For communication purposes a special e-mail address was launched: konsultacje.rpo@umwo.opole.pl. 8.2.5 Consultation meetings – 3rd stage On 21 April, 2006 the conference inaugurating the 3rd stage of social consultations on ROP OV 2007-2013 and consultations on the National Cohesion Strategy113 was held and, among others, the participants were: − Władysław Ortyl, Undersecretary of State at the Ministry for Regional Development and representatives of the Ministry for Regional Development, − Manfred Beschel from the Directorate General for Regional Development and representatives of the European Commission, − Governor of the Opolskie Voivodeship and representatives of the regional state administration, − Parliament members from the Opolskie Voivodeship, representatives of local selfgovernments, of the institutions for regional development, of science, education, culture and health. Within the framework of the 3rd stage of consultations from 20 April to 30 June, 2006 in total 23 meetings, conferences and discussion panels were organised. In comparison to the 2nd stage of socio-economic consultations, they were more specialist and detailed in nature – they related to selected problems, thematic issues or beneficiaries of ROP OV 2007-2013. Consultation meetings were organised at the request of institutions and were concerned with thematic areas suggested by the entity making a request. 4 such meetings were held: − with the Executive Board of the Association of the Opole Silesia Gminas, about financial issues (algorithm of funds allocation under ERDF to regions, allocation for the Opolskie Voivodeship, algorithm of funds allocation for implementation of local projects); − with representatives of the Regional Directorate of the Forest Management Company in Katowice, about a possibility of including among beneficiaries of the priority axes of ROP OV 2007-2013 entities subordinate to the Directorate of the Forest Management Company; − with representatives of health service, about provisions of the Programme concerning health care; 113 Present name is the National Strategic Reference Framework. 159 draft of ROP OV 2007-2013 − with representatives of the Customs Chamber and the Voivodeship Police Headquarters in Opole, about a possibility of co-financing projects of these bodies within ROP OV 20072013. Also 7 conferences and discussion panels were organised which concerned selected, detailed problems of ROP OV 2007-2013. Another form of presenting and consulting ROP OV 2007-2013 it was a series of meetings, organised in co-operation with powiat starosts and the Voivodeship Fund for Environmental Protection and Water Management in Opole, about preparing future beneficiaries to using ROP OV 2007-2013 as well as other sources of support. Between May and July 2006 12 meetings we organised in all the voivodeship poviats, directed to units of local self-government. Their main aim was to prepare future beneficiaries to applying for funds within ROP OV 2007-2013 and to present the Internet database (so called System of Project Record). In consultation meetings information materials were distributed: printed versions of ROP OV 2007-2013 (preliminary draft, version No. 3); National Cohesion Strategy (National Strategic Reference Framework) draft of 14 February, 2006 and Form for suggesting comments/amendments to the Programme. 8.2.6 Form of making comments and motions When organising social consultations it was decided that comments and motions to ROP OV 2007-2013 could be made only on the “Form for suggesting comments/amendments”. The form made it possible to suggest new content of a provision and justify the comment what allowed for reading the intention of the persons making the comment. Suggestions for amendments could be sent traditionally (fax, mail) or electronically at the e-mail address created especially for that purpose: konsultacje.rpo@umwo.opole.pl. 8.2.7 Documentation of a process of social consultations Complete documentation of social consultations, including opinions, comments and stands from consultations, has been collected at the Unit for Programming and Monitoring of the Department for Co-ordination of Operational Programmes of the Marshal Office of the Opolskie Voivodeship. Also here the documentation on consultation meetings, discussion panels and conferences is stored, except poviat meetings organised and documented by the Unit for Preparing Projects at the Department for Co-ordination of Operational Programmes of the Marshal Office of the Opolskie Voivodeship. 8.3. Comments passed during social consultations – 3rd stage At the 3rd stage of consultations on ROP OV 2007-2013 the Department for Coordination of Operational Programmes of the Marshal Office of the Opolskie Voivodeship received in total 266 comments which were different in terms of how detailed they were, from comments general and analytical in nature to proposals for detailed provisions. The comments were made by 50 entities, including 5 institutions from the outside the Opolskie Voivodeship (the Marshal Office of the Dolnośląskie Voivodeship, Ekstraklasa S.A. in Warsaw, Fundacja Wspomagania Wsi [Foundation for Countryside Support] in Warsaw, Club of Naturalists in Świebodzin and the Regional Directorate of the Forest Management Company in Katowice). 160 draft of ROP OV 2007-2013 From among 266 comments in total passed during consultations, subject to consideration by the Executive Board of the Opolskie Voivodeship were 217 comments about the content of ROP OV 2007-2013. Other comments did not refer directly to provisions of ROP OV 2007-2013 – they were related to measures and conditions extreme for the measures. These comments were considered at the stage of works on supplementary documents for the Programme. Some of these comments were not subject to consideration as they referred to the provisions of ROP OV 2007-2013 which were verified during consultations by the Managing Authority in a form of own amendments, e.g. formulating general and specific objectives of the Programme, names of priority axes precisely specifying its content. The consideration was not given to the comments concerning indicators for monitoring the programme and particular axes as a special work force for indicators set up at the Ministry for Regional Development worked on indicators in order to make them uniform for all the operational programmes for 2007-2013 and establish a central database. As regards thematic content the comments made related mainly to: − a description and a subject scope of priority axes to be implemented in 2007-2013, − beneficiaries anticipated within particular priority axes, − proposals for distribution of funds. Tab. No. 8.1. Comments gathered during consultations by thematic areas. Chapters of ROP OV 2007-2013 (preliminary draft, version No. 3) Number of comments Comments to the whole document 15 Diagnosis of the current situation in the Opolskie Voivodeship 12 SWOT analysis 4 Analysis and assessment of the use of state aid and foreign assistance in 1999-2005 4 Strategy for implementing ROP OV 2007-2013 11 Priority axes ROP OV 2007-2013: 151 Financial plan 18 Other elements ROP OV 2007-2013 2 TOTAL 217 Source: Own study. Comments on specific provisions of priority axes of the Programme were aimed at making them more precise, i.e. among other things: − listing specific tasks which may receive financial assistance; − completing a list of beneficiaries for particular priority axes with additional categories; − completing thematic areas and types of projects with additional, not included categories; 161 draft of ROP OV 2007-2013 − indicating directions for regional development of strategic importance. A part of comments related to proposals for distribution of funds, e.g. shifting funds between priority axes, allocating funds intended as programme reserve. All the comments passed during the consultations on ROP OV 2007-2013 were considered by the Executive Board of the Opolskie Voivodeship which on 24 July, 2006 took a decision about the manner how to address the comments sent – taking them into account or not. A collective summary of comments sent as well as individual decisions about each of them are available on website: www.rpo.umwo.opole.pl., as an element of the report on consultations held114. 8.4. Conclusions As a result of the consultations on subsequent versions of drafts, ROP OV 2007-2013 has undergone changes. The comments sent by participants of the consultations were analysed by the Executive Board of the Opolskie Voivodeship and, if justified and possible, in particular taking into consideration provisions of EC regulations and guidelines of the Ministry for Regional Development, integrated in further works on the document. The changes were related to all the chapters of ROP OV 2007-2013 and, among other things, consisted in: − updating a diagnosis of the socio-economic situation in the Opolskie Voivodeship and the assessment of the use of state aid and foreign assistance on the basis of current and available statistical data; − restructuring the SWOT analysis, both as regards factual content (differently laid stresses, new gradation, indicating new strengths and weaknesses of the region) and clearer presentation of elements of the SWOT analysis; − new formulating of the objectives of ROP OV 2007-2013; − restructuring provisions concerning priority axes – taking into account changes related to the thematic scope and potential beneficiaries, types of projects and support areas as well as the allocation of funds to particular axes; − restructuring parts concerning indicators for monitoring the programme and axes; − preparing the comprehensive system of implementation and management of ROP OV 2007-2013. 114 Detailed description of the process of consultations is presented in the Report on social consultations on ROP OV 2007-2013, available on the website of the Marshal Office of the Opolskie Voivodeship: www.rpo.umwo.opole.pl. 162 draft of ROP OV 2007-2013 Glossary TERM EXPLANATION Conurbation Type of settlement system with a group of towns and villages concentrated around one centre with central functions. It is a concentration, set, grouping of (several or more) settlement units, functionally interrelated, located close to each other and displaying a tendency towards further development of closer economic, social and cultural cooperation, leading to integration into a more compact complex. Conurbation all the time transforms, develops and grows (rarely regresses). Autochthonous population Population of Polish origin living in Silesia. Commonly called “Silesians” applied both to indigenous population in the region, to incoming population living there even for several generations and identifying themselves with a new place of residence as well as to German-speaking population connected with Silesia as a place of birth, residence, tradition and at the moment often living in Germany. Beneficiary Pursuant to Council Regulation (EC) 1083/2006 – economic entity, entity or enterprise, public or private, responsible for initiation or initiating and carrying out undertakings. Within aid schemes referred to in art. 87 of the Treaty, beneficiaries can be public or private enterprises which implement individual projects and receive public aid. Biomass It is the third in volume natural energy source in the world. According to the European Union definition, biomass includes any organic substances of plant or animal origin as well as all derivatives obtained as a result of processing substances of plant or animal origin. According to the order of the Minister of Economic Affairs and Labour of 9 December, 2004 biomass is biodegradable solid or liquid substance of plant or animal origin. Biodiversity Diversity of forms of life with their variability at the level of genes, species and ecosystems, on the global scale or closer biogeographical units. According to the definition officially adopted by the Convention on Biological Diversity, species diversity means diversity of all living organisms on the Earth, among others in land, sea and other water ecosystems as well as in ecological complexes whose part these organisms are. It applies to diversity within the species and diversity at the level of ecosystems. Strategic objective Objective set in a wider sectoral, regional or national perspective to which the project is to contribute. It specifies a required vision of reality within time covered by the programme. Cross-financing Principle of flexible, cross financing aimed at making single-fund operational programmes easier to implement through funding measures which fall within the intervention area of another structural fund, in compliance with art. 34 Council Regulation (EC) 1083/2006. This principle applies only to the measures which are both necessary for successful completion of the project and directly connected with the project or a group of projects. The percentage of funds which may be covered by the principle is limited to 10% at the priority axis level of the Programme. Research and development Creative work undertaken in a systematic manner in order to broaden knowledge and use the knowledge for creating new application. (R&D) Today, economic growth depends on scientific and technical progress which determines its directions and pace. The Treaty of Rome of 1957 (art. 130 f) provides for the necessity of strengthening a scientific and technological position of the European Community in the global market. The aims of the Community measures within R&D are to co-ordinate policies of particular member states as well as to call for and implement scientific and research programmes, in particular related to research problems which – due to many disciplines involved, the amount of expenditure, research staff – may be better, more quickly and more efficiently conducted jointly. 163 draft of ROP OV 2007-2013 TERM EXPLANATION The Community R&D policy is also aimed at creating cohesion between measures taken in this area by particular states as well as making the results available to small and medium-sized enterprises. It is to support and in consequence make technological differences between regions smaller and create better conditions for fair competition. The abbreviation for research and development is R&D. The R&D sphere includes scientific, research and development units, units serving science (scientific libraries, archives, scientific associations), universities running R&D operations and development units running R&D operations apart from other operation. Effectiveness (of funds use) Evaluation criterion to compare expenditure on the programme (e.g. financial, administrative, human) with actual effects of the programme at the level of product, result and impact. Ecosystem Ecological unit which includes biocoenosis (all the populations inhabiting a particular area) and biotope (environment of these populations). European Regional Development Fund (ERDF) One of structural funds whose objective is to eliminate disproportions in development of the EU regions. In particular, the fund provides support for investments in production, infrastructure development, local development initiatives as well as small and medium-sized enterprises. European Social Fund (ESF) One of structural funds, the main instrument of the Community social policy. It ensures financial assistance for projects related to professional trainings, changing professional qualifications and creating jobs. European Agricultural One of structural funds whose aim is to promote sustainable development of rural areas in the whole Community in the manner complimentary to market instruments. Fund for Rural Development (EAFRD) European Fisheries Fund (EFF) One of structural funds whose major aims are rational management of living resources of waters and improvement in efficiency of the fisheries sector as well as increasing competitiveness of fisheries and fish processing. Euroregion Clearly specified and sectioned off borderland in two or more states which cooperating with each other through local self-governments solve common problems of inhabitants, break down mutual prejudices. It can be defined as a formal structure of cross-border co-operation between representatives of societies, local and regional authorities, as well as economic and cultural partners. Joint projects are related most often to: transport, trade, ecology or energy consumption. Joint initiatives on regional development and environmental protection facilitates solving problems at a local level. In the European Union euroregions were strongly promoted as pilot solutions, preceding and preparing to integration of member states. Euroregions and their functioning were regulated by the European framework convention on transborder cooperation (of 1980) and the European Charter of Border and Cross-Border Regions (of 1995). The aims of euroregions include first of all economic co-operation, development of transport connections, environmental protection, cultural and educational activities as well as tourism. Euroregional co-operation is the closest and most institutionalised form of cross-border co-operation. e-services Services provided electronically. Pursuant to the act of 18 July, 2002 on provision of electronic services (Journal of Laws No. 144, item 1204 as amended), electronic services are those rendered through sending and receiving data by means of telecommunications and IT systems, at the customer’s individual request, without both parties present at the same time, and the data are transmitted via public networks. Eservices are for example: purchases in Internet shops, opening bank accounts and bank operations, programme downloading, taking part in auctions. Programme evaluation Assessment of the Community structural assistance impact in relation to objectives and analysis of its effect on specific structural problems. 164 draft of ROP OV 2007-2013 TERM EXPLANATION Ex-post evaluation Evaluation made after the programme implementation is completed whose major aim is to specify its long-term effects, including the amount of funds involved, efficiency and effectiveness of the assistance. The major aim of the ex-post evaluation is first of all to provide information about lasting effects brought about by the implementation of a particular programme along with conclusions on structural policy directions. Ex-ante evaluation Evaluation made before the implementation of the programme begins. Its basic aim is to verify long-term effects of support, included in programme documents. The essential aim of the ex-ante evaluation is to improve a quality of programme documents due to participation of an entity independent of the programming institution in a programming process. Ex-ante evaluation is to ensure that funds appropriated for implementing the policy of eliminating differences in development between particular regions in the European Union will be used so as to guarantee the best effects. Regional foresight Analysis of development and tendencies of the region in order to show the desired directions for changes and optimum route for shaping internal factors of regional growth taking into account the effect of external factors, to identify current priorities in research, development, technologies and innovations on the basis of scenarios for the desired development of these fields as well as the economy and society. Results of the Foresight inform policy-makers of new tendencies, help agree upon scenarios of development, allow for making actions of social partners harmonious. Metropolitan functions Functions of cities and urban complexes. Depending on their level of development and specialisation, quality and uniqueness, they are regional, national, continental or even global in nature. They should ensure external expansion of the region where they are located on national and international scale. Metropolitan functions have a value of rare goods and are characterised by a high quality of basic service functions (including also high quality of space). Private Equity and Venture Capital investments Private Equity investments are those where an investor makes his/her equity available to companies not quoted on the stock exchange. This equity enables entrepreneurs to finance their considerable growth. Private Equity means any investments in a nonpublic capital market aimed at earning medium and long-term profits on capital equity growth. One of the PE investments is participation in a PE Fund. PE Funds may invest in different types of enterprises: mature companies, planning to be listed on the stock exchange in future, requiring restructuring or changing owners. In the Western Europe a popular form of PE investments is management buyout. Venture Capital is another type of Private Equity. These are investments made in early stages of enterprise developments aimed at starting up a particular company or at its expansion. Private Equity investments are investments in enterprises in different phases of their development. Every phase is characterised by specific financing possibilities and has specific requirements. Pre-accession funds Funds of non-returnable financial aid granted to candidate countries by the European Union. Their major aim is to prepare these states to membership in the EU and to help in eliminating economic differences. The instruments within these funds include: PHARE, ISPA, SAPARD. Structural funds EU financial resources which allow for assistance in restructuring and modernisation of member states economy with interventions in key sectors and regions (improvement in structure). There are four structural funds: European Regional Development Fund (ERDF), European Social Fund (ESF), European Agricultural Fund for Rural Development (EAFRD) [in 2004-2006 European Agricultural Guidance and Guarantee Fund], European Fisheries Fund [in 2004 -2006 Financial Instrument for Fisheries Guidance]. Knowledge-based economy Economy directly based on production, distribution and use of knowledge and information. The knowledge is regarded as a product and a factor driving economic growth. The most important feature of the knowledge-based economy is the increasing importance in globalisation, IT technologies, and first of all in the development of 165 draft of ROP OV 2007-2013 TERM EXPLANATION science and knowledge as a basis for changes in the economy. ICT Information and Communication Technologies .A branch of knowledge covering information technology (including hardware and software used for creating, transmitting, presenting and securing information), telecommunications, tools and other technologies related to information. It provides a user with tools which help him obtain information, sort it out, analyse, process, manage and transmit to other people. Modern information and communication technologies are first of all IT technologies (telephone and IT) related to storing, processing, transmitting and using resources of information and knowledge. Business incubator Innovation Non-commercial instrument for entrepreneurship development whose aim is to streamline establishment and operation of small and medium-sized enterprises. It is an instrument aiding job creation and development of different types of business activity, leading to establishing a greater number of firms which use high technologies. Idea, conduct or thing which in quality terms is different from those existing so far. Innovations include products and services as well as actions aimed at providing them to customers and convincing them of their usefulness. They offer entrepreneurs and managers favourable opportunities for making significant changes, undertaking a new activity, rendering new services and attracting innovative customers thanks to them. A test for a successful innovation is a success in the market. [T. Szucki “Encyklopedia marketingu”, Warsaw 1998. In a company innovation means most often novelties used in products, technology or management. Actually, innovations in a company are divided into: process, product, organizational, marketing and environmental. Innovativeness Capability of enterprises to create and implement innovations as well as an actual skill of launching new and modernised products, new or changed technological or organisational and technical processes. Business support institutions Units of financial and insurance system, organisations which facilitate establishing of economic contacts and support economic growth. Intermediate body in management Pursuant to Council Regulation (EC) No. 1083/2006, art. 2 – every entity or institution, public or private, for whose operation the managing or certifying authority is responsible, or unit which is delegated with a part of powers by such an authority for beneficiaries implementing operations. Managing Authority Pursuant to Council Regulation (EC) No. 1083/2006, art. 59 - national, regional or local body of public authorities, or public or private entity indicated by a member state to manage an operational programme. Single European Market Specific economic organism and at the same time a set of rules on common economic policy. Its aim is to bring about such structural changes in economy of the member states in order to increase the EU capability to create economic growth and jobs. Cluster Geographical centres of interrelated firms, specialised suppliers, units providing services, plants/workshops operating in related sectors as well as institutions connected with them (e.g. universities, units for standardisation and trade associations) in particular sectors, competing but also co-operating with each other. Clusters, achieving critical mass and remarkable competition successes in certain fields are a conspicuous feature of almost every national, regional, state economy, and even big-city economy, in particular in developed countries. The effect of their operation is strengthening innovative potential of the region, development of co-operation between firms from related sectors of economy (by cooperation with the R&D sector and business support organisations as well as increasing competitiveness of companies in the local, national and international markets). 166 draft of ROP OV 2007-2013 TERM EXPLANATION Competitiveness of the region Set of features which determine attractiveness of the region as a place for investing or living; it is also a manifestation of technological advantage or lower prices of goods and services produced in the region in comparison with other regions. Convergence One of the three strategic objectives of the EU in programming period 2007-2013. The objective is aimed at areas with low socio-economic development whose priority is economic growth and creating jobs. The objective is to be achieved by improving conditions for growth and jobs thanks to increased investments in material and human resources, development of innovativeness and knowledge-based society, abilities to adapt to economic and social changes, protection and improvement of the environment, increasing in efficiency of administration. Voivodeship contract Pursuant to the act of 6 December, 2006 on rules for development policy – an agreement about co-financing a regional operational programme with funds from the state budget of from foreign sources, concluded between a minister competent for regional development and the executive board of the voivodeship under terms and conditions set by the government. Ecological corridor Pursuant to the act of 16 April, 2004 (Journal of Laws of 2004 No. 92, item 880, of 2005 No. 113, item 954, No. 130, item 1087.) on protection of nature, it is the area allowing for migration of plants, animals and fungi. Third Pan-European corridor Pan-European transport corridors were established at conferences on transport organised by the European Parliament and the European Commission in Crete (1994) and Helsinki (1997). Across Poland there are four pan-European corridors running. The Third Pan-European Transport Corridor is a road and railway route which runs at the northern part of Sudeten and Carpathian Mountains, from southern Germany, across southern Poland, western Ukraine, to Kiev at the Dniepr River. In Poland it connects the most important centres in the south: Legnica, Wrocław, Opole, Gliwice, Katowice, Kraków, Rzeszów, Przemyśl. Continuing education Process of continuous improvement of general and professional qualifications which lasts all man’s life. It is regular adaptation to economic, cultural and scientific changes in the contemporary world as education received at school becomes out-of-date with time. It should be continued and rounded out as time goes by. Continuing education is provided by public and non-public units. Eligibility of expenditure Criteria concerning expenditure incurred when the project is carried out, implemented and monitored which have to be satisfied in order to have it partially reimbursed from structural funds or from the Cohesion Fund. LEADER Community initiative for aiding projects related to rural development, in particular local pilot undertakings. The initiative is fully financed by the Guidance Section of the European Agricultural Guidance and Guarantee Fund. LEADER assistance is intended for grass-roots formulation and implementation of the development strategy for a particular area, not for concrete projects whose themes are imposed in advance. Local community has to organise itself in a local action group (LAG) and present a development strategy for its region. Then it receives financial resources (so called global grant) which is at their disposal within the adopted strategy. The programme provides for two schemes of measures and aid: scheme I – promotion, information and training as a preliminary stage to prepare for devising a strategy. It includes expert evaluations, studies, analyses, assistance in establishing a LAG. Scheme II – financing operational costs of a LAG, promotion of the region, including organisation of cultural events, fairs, exhibitions, competitions etc., information, trainings, inter-regional cooperation, consultancy and expert evaluations. The Community Initiative implemented in Poland in 2004-2006. Small and mediumsized enterprises Pursuant to the Act of 2 July, 2004 on free economic activity, a small enterprise is the one which in at least one of two recent financial years: on average employed fewer than 50 people and recorded net turnover in sales of goods, products and services as well as financial operations not exceeding the equivalent in PLN of EUR 10 million , or sums of its assets in the balance sheet prepared at the end of one of these years did (SMEs) 167 draft of ROP OV 2007-2013 TERM EXPLANATION not exceed the equivalent in PLN of EUR 10 million. A medium enterprise is the one which in at least one of two recent financial years: on average employed fewer than 250 people and recorded net turnover in sales of goods, products and services as well as financial operations not exceeding the equivalent in PLN of EUR 50 million, or sums of its assets in the balance sheet prepared at the end of one of these years did not exceed the equivalent in PLN of EUR 43 million. Small and medium-sized enterprises are not the enterprises where another enterprise, the State Treasury or a unit of local self-government hold: 25% and more shares; rights to 25% or more share in profits; 25% or more votes in the meeting of shareholders, general meeting of shareholders or general meeting of co-operative. Migration In general, phenomena related to travelling of population between spatial units - towns, gminas, regions, states. Migration also means movement of people aimed at changing permanently or temporarily a place of stay both within a particular state (internal, domestic migrations) as well as from one state to the other (external migrations – emigration and immigration). Migration also includes phenomena of population transfer and displacement. Micro-enterprise Pursuant to the Act of 2 July, 2004 on free economic activity, a micro-enterprise is the one which in at least one of two recent financial years: on average employed fewer than 10 people and recorded net turnover in sales of goods, products and services as well as financial operations not exceeding the equivalent in PLN of EUR 2 million, or sums of its assets in the balance sheet prepared at the end of one of these years did not exceed the equivalent in PLN of EUR 2 million. A micro-enterprise is not a firm where another enterprise, the State Treasury or a unit of local self-government hold: 25% and more shares; rights to 25% or more share in profits; 25% or more votes in the meeting of shareholders, general meeting of shareholders or general meeting of co-operative. Hermin model Econometric model for assessing the effect of the EU structural funds on the macroeconomic situation in Poland. Monitoring Process of collecting and analysing systematically financial and material information concerning implementation of projects and programmes. National Strategic Framework of Reference / National Cohesion Strategy Strategic document setting priorities and support areas as well as the implementation system for EU funds: European Regional Development Fund (ERDF), European Social Fund (ESF) and Cohesion Fund within the Community budget for the years 2007– 2013. The NSRF was adopted by the government on 29 November, 2006. NATURA 2000 Programme for establishing in the states of the European Union a common system of areas where nature is protected. A basis for the programme is provided by the Birds Directive and the Habitats Directive as well as a number of other regulations and implementing documents. The aim of the programme is to preserve certain types of natural habitats and species regarded as valuable and endangered on European scale and listed in appendices to the Directives. Irregularity Pursuant to Council Regulation (EC) No. 1083/2006, art. 2 – any infringement of a provision of the Community law resulting from an act or omission of an economic entity which has, or would have the effect of prejudicing the general budget of the European Union by charging an unjustified item of expenditure to the general budget. Public site Site owned by an entity from the sector of public finance. Metropolitan area Area of great city and its immediate surroundings functionally related to it, established in the concept of land development for the state. Rural areas Area of the state excluding towns whose population is at least 5 thousand people (i.e. rural gminas as well as municipal and rural gminas, excluding the area of towns whose population is at least 5 thousand people within their administrative borders). 168 draft of ROP OV 2007-2013 TERM EXPLANATION Renewable energy sources Energy sources whose resources renew themselves and for that reason they are practically inexhaustible. Non-renewable sources are first of all fossil resources: hard coal, brown coal, peat, petroleum and natural gas. The most important renewable source is energy of falling water. Other renewable sources – solar energy, wind energy, biomass, geothermal energy and other – are used to a smaller extent. Renewable energy is cheap, user and environment friendly. Renewable sources are available for free (solar, wind, biogas energy) or at a low cost (straw, wood). Programming period Period when programme documents are valid providing a basis for applying for assistance from the European Commission. Priority axis Pursuant to Council Regulation (EC) No. 1083/2006 – one of the priorities of the strategy in an operational programme comprising a group of operations which are related and have specific measurable goals. Industrial park Industrial lands prepared by gmina for companies which want to invest. Location for plants which, due to the end of “incubation” period in a business incubator, have to continue production in some other place. Such lands should be provided with basic utilities and have prepared roads. A particular type of industrial parks are special economic zones in Poland where investors may obtain tax reliefs. Technological park Institution which supports any measures requiring a high level of innovativeness. A customer of the technological park can be anybody, in particular a small and medium entrepreneur, who would like to start a business based on state-of-the-art technologies or to modernise and improve existing production. A technological park helps in: drawing up a project of innovative enterprise, risk assessment, preparation of business plan, projects and applications for grants and funds, in contacting partners to implement innovative enterprises, obtaining land, premises, necessary equipment for the project, applying to financial institutions and local administration, establishing international relations, marketing actions, promotion of products in Poland and abroad. State aid Any assistance granted by a Member State or with the use of state resources in any form which disrupts or may disrupt competition by favouring some enterprises or manufacturing of some goods, it is against the single market to the extent to which it affects trade exchange between Member States. Gross Domestic Product It is a synthetic measure for a socio-economic level of the state. It signifies production in a particular state in a particular period, usually of one year, as a sum of expenditure by households on purchases of consumption goods and services, expenditure of a private sector on purchases of investment goods and services, state expenditure on purchases of goods and services as well as foreign trade balance. Programme for the Odra River 2006 It was approved for implementation with the Sejm act on 6 July, 2001 as a long-term governmental programme (Journal of Laws 2001, No. 1067, item 98), covering a number of economic and investment measures related to modernisation of the Odra River water system, among which the most important is flood prevention in the whole Odra River basin. The programme is carried out by the Council of Ministers through the agency of the Government Proxy for the "Programme for the Odra River 2006" (Journal of Laws of 2002, No. 31, item 278). A consultative and advisory body is a Steering Committee made up, among others, of: Prime Minister’s representative, representatives of competent ministers (for water management, public finances, public administration, rural development, regional development, economic affairs, transport, sea management and environment), European Integration Committee as well as of governers of lubuskie, śląskie, opolskie, dolnośląskie, kujawsko-pomorskie, łódzkie, wielkopolskie, zachodniopomorskie voivodeships, representatives of science and ecological organisations. The programme is scheduled for the years 2002-2016, and its cost will be more than 9 milliard PLN. For comparison – damage due to the flood in July 1997 were assessed at 14-25 milliard PLN. Operational Document submitted by a Member State and approved by the Commission which specifies a development strategy with the use of coherent set of priorities to be 169 draft of ROP OV 2007-2013 TERM EXPLANATION programme achieved be means of the fund or as for the “Convergence” objective of the Cohesion Fund and ERDF. Project of regional importance Project to the greatest extent is to affect economic growth of the region and creating jobs as well as constitute a driving force for the development of the voivodeship. Integrated project Package of individual projects integrating investment tasks in providing complete utilities for a site which at the same time are covered by two support areas indicated in ROP, i.e. road infrastructure from priority axis 3 - Transport and water and sewage infrastructure from priority axis 4 – Environmental protection. Taking intervention measures in the areas with the smallest opportunities for Fight against social exclusion in some areas development and the most difficult socio-economic situation. Entrepreneurship Set of characteristics and behaviours for which typical are a skill of perceiving Leeds and readiness to take a risk. Apart labour, land and capital, it is a production factor. A measure of entrepreneurship is an entrepreneurship indicator, usually show as a number of economic entities per 1,000 people. Recycling Use of waste or used elements (e.g. machinery parts) for making new products, e.g. waste paper to manufacture paper, used car tyres as fuel in cement plants. Regional Innovation Strategy Necessary document which has to be prepared in every region to make it possible for the region to use the EU funds for measures related to innovations and transfer of new technologies. The document is focused on the SMEs sector, universities, scientific and research institutes as well as large companies. Reemigration Come back of emigrants (return migration) to their homeland after permanent stay abroad. Reemigrants are persons who come back to the home country after permanent stay abroad. Reintroduction In biology a term meaning reintroducing into old places of living native species of animals and plants which used to live there but were killed off. In the Opole region a programme for reintroduction of Spermophilus citellus (a species of gopher) is in progress. Register of monuments On the basis of the Act of 15 February, 1962 on protection of cultural goods and museums (Journal of Laws No. 10 of 1962, item. 48) the Voivodeship Inspector of Monuments keeps a register of monuments located in the voivodeship. The monuments listed in the register of monuments are subject to legal protection. Protection of cultural goods consists in protecting them against destroying, damage, devastation, loss or taking abroad, in ensuring conditions for their durability, in preparation of scientific documentation, recording and registration as well as conservation, restoration or reconstruction, based on scientific principles. Immovable, movable cultural goods and collections are listed in the register of monuments on the basis of a decision of, among others, of the voivodeship inspector of monuments, issued automatically or upon application of the owner of the cultural goods, their user or competent body of the poviat or gmina. Restitution Restoration of a species or population threatened with extinction. Revitalisation Includes a process of rehabilitation and redevelopment of polluted areas or areas whose natural conditions have been adversely changed, in order to restore such conditions which will make it possible for these areas to serve functional purposes. General regulation A fundamental legal act of the European Union which regulates the use of structural funds and Cohesion Fund: Council regulation laying down general provisions on the European Regional Development Fund, the European Social Fund and the Cohesion Fund. [Council Regulation (EC) No. 1083/2006 of 11 July, 2006, Official Journal 210 of 31.07.2006] 170 draft of ROP OV 2007-2013 TERM EXPLANATION Regional development All the measures taken by regional and national authorities aimed at increasing economic potential of regions as well as permanent improving of their competitiveness and living standards of their inhabitants which contribute to socio-economic growth of the state. Population equivalent Conventional parameter specifying the size of sewage treatment plants. 1 PE is a biodegradable organic unit expressed in five-day biochemical demand for oxygen (BDO5) in 60 g of oxygen per day (pursuant to art. 43 par. 2 of the act of 18 July, 2001 Water law). High-tech sector High-tech companies use first of all knowledge and human resources. They require intensive innovative activities and considerable outlays on research and development, aiding growth of all the sectors of economy. Strong and rapidly developing high-tech companies are one of the most important factors determining a success of the whole economy. Thanks to high-tech companies the economies receive new solutions. Their experiences are used by a traditional part of the economy. Transeuropean networks Infrastructure network including transport connections (TENT), power lines (TEN-E) and telecommunications system within the EU area. Habitat Place where an organism or population occurs naturally. Information society Establishing a network of information technology which will radically change living and working conditions in Europe. Joint efforts to create the European information society is a task of top priority for the European Union. In 1994 so called Bangemann’s report highlighted the importance of electronics, IT sector and telecommunications for economic future of the EU. Since 1996 a few thematic projects have been initiated to popularise modern technologies in different environments in the member states. Target groups for projects are enterprises, in particular small and medium-sized, public administration and educational sector. During the summit of the European Union in Helsinki in 1999 a declaration was made to jointly perform tasks recognised as of key importance for building the information society: introduction of digital technology into everyday life, creating opportunities for making use of digital information, social support for these processes and strengthening the European unity. New technologies constitute enormous potential of new services. Often it is enough to use a computer and connect it to a telephone network. Lisbon Strategy Socio-economic programme of the European Union whose aim is to build in Europe by 2010 the most competitive and dynamic economy in the world, knowledge-based, capable of long-term development, creating more, better jobs and characterised by greater social cohesion. The Strategy was adopted in March 2000 during the summit of the European Union in Lisbon, completed during the summit in Goeteborg in 2001. National Development Strategy A basic strategic document specifying objectives and priorities of the development policy for the nearest years and conditions to ensure his development. The National Development Strategy is a superior, multiannual, strategic document for the socioeconomic growth of the state which is a reference for other government strategies and programmes as well as those prepared by units of local self-government. The National Development Strategy is not a document required by the European Commission. However, for information purposes, it will be submitted to the Commission. On 29 November, 2006 the government adopted the National Development Strategy for 2007-2015. Community Strategic Guidelines Community document setting general priorities of the cohesion policy which provides a framework for programming development for 2007-2013. The idea of the document is to give general guidelines for the cohesion policy in programming period 2007-2013 to be taken into account in development plans prepared in particular member states of the EU. The Community Strategic Guidelines were adopted with Council Decision of 6 October, 2006 (2006/702/WE). Form of permanent access to the Internet of high quality, including services added and active equipment administered by an operator, provided with quality warranty; Broadband access to the Internet 171 draft of ROP OV 2007-2013 TERM EXPLANATION common name of transfer technologies (wired, wireless, fibre optic and infra red) which provide a final user with a high capacity access to information (bandwidth several times higher than an access via modem). Development conditionality External and internal conditions and occurrences which may significantly affect economic growth and structural changes in the region. Indicators Measure for objectives to be achieved, resources involved, products and effects obtained as well as other variables (in particular economic, social, related to environmental protection) Storage reservoir Also called artificial, is constructed at water dykes on rivers and intended for taking surplus water (in case of flood, spring melt) and returning it during droughts. Storage reservoirs protect lower situated areas against flood. Water stored in them is often used for power generation purposes (for driving turbines in hydroelectric power stations), irrigation of arable land, water supplies to towns and industrial plants, improvement in conditions of sailing as well as for recreational purposes. Sustainable development Socio-economic development where political, economic and social measures are integrated and at the same time natural balance and basic natural processes are maintained in order to guarantee that basic needs of particular communities or citizens both in contemporary and future generations will be satisfied. 172 draft of ROP OV 2007-2013 List of abbreviations EXPLANATION OF ABBREVIATION ABBREVIATION R&D Research and Development BAEL Population Economic Activity Poll CKP Centre for practical training CKU Centre for continuing education EIB European Investment Bank EIF European Investment Fund EFF European Fishery Fund ERDF European Regional Development Fund EARDF European Agricultural Rural Development Fund ESF European Social Fund EQUAL Initiative on supporting measures aimed at creating a greater number of jobs and ensuring access to them CF Cohesion Fund GUS Central Statistical Office GZWP-333 Underground water reservoir Opole - Zawadzkie ICT Information and Communication Technology – sector of information and telecommunications technologies INTERREG Initiative of inter-regional co-operation between the European Union regions IB Intermediate Body ISPA Instrument for Structural Policies for Pre-Accession IB Implementing Body MA Managing Authority SEM Single European Market SGU Self-government units EC European Commission MC Monitoring Committee NPMWT National Programme for Municipal Waste Treatment LEADER Community initiative on supporting rural development projects MEN Ministry of Education 173 draft of ROP OV 2007-2013 EXPLANATION OF ABBREVIATION ABBREVIATION MRR Ministry for Regional Development SMEs Small and medium-sized enterprises MSMEs Micro, small and medium-sized enterprises NSRF/NCS National Strategic Reference Framework/National Cohesion Strategy RES Renewable energy sources RDP Rural Development Programme PHARE CBC PHARE Cross-Border Co-operation Programme PHARE SEC Socio-economic cohesion OP Operational Programme OP TA Operational Programme Technical Assistance OP I&E Operational Programme Infrastructure and Environment PE Population equivalent ROP OV 2007-2013 Regional Operational Programme of the Opolskie Voivodeship for 20072013 SOP Sectoral Operational Programme SOP RURAL Sectoral Operational Programme “Restructuring and Modernisation of Food Sector and Rural Development” SOP FISH Sectoral Operational Programme “Fisheries and Fish Processing” SOP HRD Sectoral Operational Programme “Human Resources Development” SOP T Sectoral Operational Programme “Transport” SOP IEC Sector Operational Programme “Increase in Enterprises Competitiveness” NDS National Development Strategy OVDS Opolskie Voivodeship Development Strategy SWOT strengths, weaknesses, opportunities, threats – a method for analysing advantages and weaknesses in comparison with opportunities and threats in the area CSG Community Strategic Guidelines TFOGR Regional Agricultural Land Protection Fund EU European Union UMWO Marshal Office of the Opolskie Voivodeship WFOŚiGW Regional Fund for Environmental Protection and Water Management 174 draft of ROP OV 2007-2013 ABBREVIATION EXPLANATION OF ABBREVIATION IROP Integrated Regional Operational Programme 2004-2006 IG Integrated Guidelines on Growth and Jobs 175 draft of ROP OV 2007-2013 List of tables NO. TITLE OF TABLE PAGE 1.1 Changes in population as well as birth rate and migration balance per 1,000 people in the Opolskie Voivodeship in 1995-2005 12 1.2 Forecast of basic demographic values in the Opolskie Voivodeship in 2002-2030 13 1.3 Population and forecast on population in the Opolskie Voivodeship in towns and in rural areas in 2010-2030 (in thousand people) 14 1.4 Changes is average monthly employment in the sector of enterprises in 2000-2005 in the Opolskie Voivodeship. 16 1.5 Number of unemployed registered in the Opolskie Voivodeship and unemployment rate in 1999-2005 in Poland and in the Opolskie Voivodeship (at the end of December 2005) 17 1.6 GDP per capita in the EU 25 in 2003 19 1.7 Flats equipped with systems in the Opolskie Voivodeship in towns and in rural areas in 2004 (w %) 23 1.8 Density of water-supply and sewage systems in rural areas in the Opolskie Voivodeship in 1999-2004 23 1.9 Entities of national economy in the Opolskie Voivodeship by the number of employees 1995 and 2004 25 1.10 Entities of national economy by units belonging to the business support sector in 1995-2003 26 1.11 Number of employed in R&D in the Opolskie Voivodeship in 1995-2004 28 1.12 Public hard-surface roads per 100 km2 and percentage of roads with improved surface in total length of roads in the Opolskie Voivodeship in 1999-2005 29 1.13 Number of schools by the level of education and number of pupils in school year 2004/2005 35 1.14 Audience at cinemas per 1,000 people and audience at theatres and music institutions per 1,000 people in the Opolskie Voivodeship in 1999-2005 42 1.15 Number of monuments in the Opolskie Voivodeship (at the end of 2005) 1.16 Projects from the Opolskie Voivodeship approved for implementation within particular Sectoral Operational Programmes 1.17 Summary of implementation of programmes carried out in 1999-2006 42 55 59 2.1 Consistency of objectives of ROP OV 2007-2013 with documents at the national and regional levels 76 2.2 Analysis of priority axes of ROP OV 2007-2013 in comparison to the National Programme of Reforms for 2005-2008 for the Lisbon Strategy 79 2.3 Indicators for general objective of ROP OV 2007-2013 80 3.1 List of priority axes ROP OV 2007-2013 87 3.2 Target indicators for Priority Axis 1 ROP OV 2007-2013 89 3.3 Target indicators for Priority Axis 2 ROP OV 2007-2013 93 176 draft of ROP OV 2007-2013 3.4 Target indicators for Priority Axis 3 ROP OV 2007-2013 98 3.5 Target indicators for Priority Axis 4 ROP OV 2007-2013 103 3.6 Target indicators for Priority Axis 5 ROP OV 2007-2013 109 3.7 Target indicators for Priority Axis 6 ROP OV 2007-2013 113 3.8 Target indicators for Priority Axis 7 ROP OV 2007-2013 117 3.9 Complementarity and co-ordination of ROP OV 2007-2013 with PDRA 2007-2013 and with OP Sustainable Development of Fisheries and Coastal Fishing Areas 20072013 118 4.1 Distribution of funds for ROP OV 2007-2013 and implementation of the Lisbon Strategy with division into particular priority axes of the Programme 120 4.2 Distribution of total funds for ROP OV 2007-2013 with division into particular years (commitments) 120 4.3 Distribution of funds with division into priority axes and sources of financing 121 4.4 Indicative distribution by categories of the programmed use of the ERDF contribution in ROP OV 2007-2013 – priority issues 122 4.5 Indicative distribution by categories of the programmed use of the ERDF contribution in ROP OV 2007-2013 – form of financing 124 4.6 Indicative distribution by categories of the programmed use of the ERDF contribution in ROP OV 2007-2013 – territory 124 6.1 Total effect of ROP OV on GDP (in %), unemployment rate (in percentage points), number of the employed (in thousand people) and investments in fixed assets (%) in relation to the baseline scenario 144 6.2 Effect of ROP OV 2007-2013 on production volume (expressed as percentage change in relation to the baseline scenario) and situation in the labour market (expressed as change in relation to the baseline scenario) in particular sectors 145 6.3 Change in GDP in comparison to baseline forecast in 2007-2015 obtained using HERMIN model and MaMoR2 model 145 8.1 Comments gathered during consultations by thematic areas 163 177 draft of ROP OV 2007-2013 List of drawings NO. TITLE OF DRAWING PAGE 1.1 Migration balance and birth rate in the Opolskie Voivodeship by poviats in 2004 12 1.2 Total number of crimes in the Opolskie Voivodeship in 1998-2004 16 1.3 Indicator of crime detection in the Opolskie Voivodeship in 1998–2004 16 1.4 Working people by sectors in the Opolskie Voivodeship and Poland in comparison to the European Union in 2003 (in %) 17 1.5 Unemployment rate in Poland by voivodeships (at the end of December 2005) 18 1.6 Unemployment rate in Poland by poviats (at the end of December 2005) 18 1.7 Changes in Gross Domestic Product in the Opolskie Voivodeship in 1995-2003 (in PLN mld) 19 1.8 GDP per capita in the Opolskie Voivodeship in relation to the national average in 19952003 (%) (Poland=100) 19 1.9 Synthetic assessment of investment attractiveness of voivodeships 20 1.10 Investment sites in poviats of the Opolskie Voivodeships (at the end of 2005) 20 1.11 Structure of creating GVA in the state of the European Union and in the Opolskie Voivodeship in 2002 (in %) 22 1.12 Number of economic entities per 1,000 inhabitants in the Opolskie Voivodeship and in Poland in 1998-2004 25 1.13 Relation of outlays on R&D to GDP by voivodeships in 2003 (in %) 28 1.14 Transport system in the Opolskie Voivodeship 29 1.15 Number of accidents and fatalities in the Opolskie Voivodeship in 1999–2004 30 1.16 Density of water-supply, sewage and gas systems by voivodeships in 2004 32 1.17 Investment outlays on environmental protection per one inhabitant by voivodeships in 2004 (in PLN) 33 1.18 Target Natura 2000 network in the Opolskie Voivodeship 34 1.19 Percentage of people with higher education in Poland in 2002 37 1.20 Level of education in 2002 (in %) 37 1.21 Number of telephone lines per 100 inhabitants in the Opolskie Voivodeship in 2002 in comparison to the national average, to other voivodeships and the EU 1.22 Number of computers used per 1,000 people in selected states of the European Union in 2003 38 39 1.23 Number of beds per 100 thousand inhabitants in the states of the European Union and in the Opolskie Voivodeship in 2002 40 1.24 Audience at cinemas, theatres and music institutions per 1,000 people by voivodeships in 2004 41 1.25 Number of tourist facilities of collective accommodation per 100 km2 in the states of the European Union and in the Opolskie Voivodeship in 2004 44 1.26 Number of projects implemented in 1999-2006 with division into areas 60 178 draft of ROP OV 2007-2013 1.27 Amount of co-financing for projects implemented in 1999-2006 with division into areas 60 2.1 Relations between documents at the Community, national and regional levels 68 2.2 Consistency of strategic objectives and priority axes of ROP OV 2007-2013 71 6.1 Effect of ROP OV 2007-2013 on GDP 143 6.2 Effect of ROP OV 2007-2013 on unemployment rate in percentage points 144 6.3 Effect of ROP OV 2007-2013 on number of the employed in thousand people 144 179 draft of ROP OV 2007-2013 Appendix No. 1. Information about major projects Major projects, pursuant to Council Regulation (EC) No. 1083/2006115, are expenditure associated with an operation comprising a number of works, measures or services: − whose aim is to accomplish a non-divided task precise in economic or technical nature, − which has clearly set objectives, − whose total cost does not exceed EUR 25 mln in the natural environment and EUR 50 mln in other fields. Within the framework of the Regional Operational Programme of the Opolskie Voivodeship for 2007-2013 it is not anticipated to finance expenditure associated with implementation of major projects. 115 Council Regulation (EC) No. 1083/2006 (Official Journal 210 of 31.7.2006, p. 25)., art. 39. 180 draft of ROP OV 2007-2013 Appendix No. 2. Context indicators for ROP OV 2007-2013 Item Variable/Indicator Baseline value SOCIETY 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. Employment rate*: − by age groups (up to 25; 25-55, 55-64) [%]**: − up to 24 − 25-54 − 55 and more − by sex [%]**: − men − women Working in total, including **: − previous year=100 [%] − in private sector [%] − in SMEs [%] Long-term unemployed in % total unemployed* − including women [%] Unemployment rate*: − acc. to BAEL [%] − including women [%] − including town [%] − including village [%] − Registered Households equipped with computer with access to the Internet in % total households.** Percentage of schools equipped with computers with access to the Internet by level of education [%]*: - primary and junior secondary [in Polish gimnazjum] schools; - post-primary and post-gimnazjum schools (including postsecondary ones) Education of people at the age of 15 and more****: − secondary (including vocational and post-secondary) [%] − higher [%] − including in villages [%] Rooms rented in tourist facilities of collective accommodation per 1 thousand of inhabitants [items]*: − Including foreign tourists [item] Fatalities in road accidents [items]*: − per 100 thousand of inhabitants; − previous year=100 [%] Migration balance [‰]*: − in towns [‰] − in villages [‰] − abroad [‰] 43.0% 22.7% 70.6% 13.9% 51.3% 35.8% 290,772 99.8% 70.3% 74.9% 65.6% 70.6% 17.0% 20.7% 17.0% 17.0% 18.7% 13.1 75.3% 12.5% 55.8% 8.3% 4.0% 475.0 69.6 147 14.0 98.0% -3.0 ‰ -4.6 ‰ -1.4 ‰ -2.4 ‰ 181 draft of ROP OV 2007-2013 Item Variable/Indicator Baseline value ECONOMY 11. 12. 13. 14. 15. 16. 17. 18. Gross domestic product [PLN mln]**: − per capita [PLN] Increase in GDP (in constant prices) [%]** 21,902 20,785 13.7% Gross added value by sectors of economy [PLN]**: - per 1 working person [PLN] - Agriculture, hunting and forestry, fishery and fishing - Industry - including industrial processing - Building industry - Market services - Non-market services 21,589 84,951 80,264 59,495 79,765 53,677 Structure of working people by sectors of economy [%]**: − voivodeship=100 [%] - Agriculture, hunting and forestry, fishery and fishing - Industry - including industrial processing - Building industry - Market services - Non-market services − previous year=100 [%] - Agriculture, hunting and forestry, fishery and fishing - Industry - including industrial processing - Building industry - Market services - Non-market services Entities of national economy registered in the REGON register per 10 thousand of population [items]*: − including: SMEs [items] Outlays on research and development (current prices) in relation to GDP [PLN]**: − including financed by enterprises [PLN]*** Percentage of enterprises running innovative operations in industry [%]** Production of new and modernised goods in the sold production in industry [%]* 17.3% 24.8% 22.1% 5.4% 32.5% 20.0% 99.6% 99.8% 100.0% 101.7% 99.2% 105.5% 865.0 864.1 0.13% 0.05% 40.8% 9.0% ENVIRONMENT 182 draft of ROP OV 2007-2013 Item 19. 20. 21. 22. Variable/Indicator Total emission of pollution to air*: − dust [thousand tonnes/year]; − previous year = 100 [%] − sulphur dioxide (without CO2) [thousand tonnes/year]; − previous year = 100 [%] − nitrogen oxides [thousand tonnes/year] − previous year = 100 [%] Population using sewage system [thousand] * - in % total population: − including in villages [%] Population using water-supply system [thousand] * - in % total population: - including in villages [%] Population served by sewage treatment plants in % total population, - including in villages [%]** Baseline value 3.8 86.0 12.2 97.6 20.9 98.0 561.4 53.6% 17.3% 981.5 93.7% 89.6% 55.1% 15.3% 25. Treated industrial and municipal waste: − per km2 of area** − in % sewage needing treatment* Percentage of waste recycled in total waste (excluding municipal waste) produced [%] (industrial) * Municipal waste produced per 1 inhabitant [kg] ** 26. Energy from renewable sources, installed power [MW]* 22.84 5.2% 29. Percentage of energy production from renewable sources of energy in total production [%]**** Area with special natural assets legally protected in % total area [%] ** Area of reclaimed and developed post-industrial and other degraded land to total land for reclaiming [%]** 30. CO2 emission [thousand tonnes/year]** 23. 24. 27. 28. * ** *** **** 0.874 m3 96.6% 90.5% 9.3 27.1% 2.1% 13,669.2 Data at the end of 2005; Data at the end of 2004; Data at the end of 2003; Data at the end of 2002; Source: Central Statistical Office (GUS) 183